Loading...
HomeMy WebLinkAboutPublic Works - 6/20/2018 ARCHIVES RECORDS TRANSMITTAL & Q*91e'vrye"tary of State BOX CONTENT LIST KLM Division of Archives and Records Management Archives ry Received y Date Accession Number Use Only 06/20/2018 PS-20180620-03 Name of Agency Office/Sub-Division Prepared By City of Kent Public Works Michael S.Saunders Records Coordinator Records Coordinator Telephone Number Records Coordinator E-mail Sue Hanson 253-856-5727 SHanson@KentWA.gov Box/ Location 1 Reel# Record Series l File Title Dates DAN Archives Use Only Ell H6 1. ( Design Correspondence: 1992—2004 1 GSSO-11-18 (1 of 8) j General,Internal,King County,Interlocal Equipment,Burlington Northern j Santa Fe Railroad,Union Pacific Railroad,Acquisition Status Report/Right of Way Maps,Metro,Auburn,Auburn Agreement,Auburn-King County Agreement,Property Owners,Publicity,Open House Meeting Ell H6 3. Department of Fisheries,Corps of Engineers,King Co.Surface/Water 1994—2006 - GS50-11-18 (2 of 8) Management,SEPA Checklist,Environmental Impact Statement,King Co. " Right of Way,King Co.Grading Permit Ell G7 4. WA Dept.of Natural Resources,WA State Dept,of Ecology,WA State Dept.of 1995—2000 GS50-11-IA (3 of 8) Social and Health Services,METRO,Shoreline Management Permit,WA State Department of Transportation,Burlington Northern Santa Fe Railroad,Union Pacific Railroad,US Natural Resource Conservation,Environmental Protection Agency,Shoreline Management:C.O.E.Mill Creek SAMP Study,SMAP Permit Auburn,SMA Permit Kent,SMA Permit King County Ell G7 5. Street Design and Layout,Signal Design,Storm Drainage Design&Layout, 1995—2002 1 GS50-11-18 (4 of 8) Sanitary Sewer Design,Water Main Design,Survey Ell G7 k 6. Photographs 1987—2001 G550-11-18 (5 of 8) Ell H7 7. j Specifications,Estimating,Design Approval,Design Reports,108th SE Bridge Fi 1991-1002 i GS50-11-18 j (6 of 8) Design,Pedestrian Bridge Design,Pedestrian Bike Path @ Green River, I Pedestrian Bridge,Hill Climb Grade and Fill Ell H7 8. 1 TAC Review,116th Ave.,Detail Maps,Well Decommission,Well Monitoring 1991 GS50-11-18 (7 Of 8) ( and Mitigation,Wetland Mitigation,Wetland Mitigation Site F,Wetland i Mitigation Site FP,Green River Enhancement,Fish Habitat Enhancement, j Vegetation Landscape Ell H7 I 12, Wetland Mitigation,Value Engineering,Technical Advisory Committee, 1997—2003 GS50-11-18 (8 Of 8) I Preliminary Design,Hydraulic Analysis,Short Plats i Transfer of Custody Agreement—Local Government Records Only (Not Required for State Government and Security Microfilm) The Office of Record,hereby transfers the records listed above to the custody and jurisdiction of the Washington State Archives with the understanding that the records will become and remain the property of the State of Washington and shall be stored,referenced and managed only in accordance with the laws of the State of Washington,the regulations of the State and Local Records Committees,the policies and procedures of the Division of Archives and Records Management,and the instructions of the Stat Ar ivi1� 1 , Signed: J� � Signed: _41J,.1 , iz Official of Office of Record Date Archivis Ibitel