HomeMy WebLinkAboutCity Council Meeting - City Council Workshop - 01/21/2025 Approved
City Council Workshop
Workshop Regular Meeting
KENT Minutes
January 21, 2025
Date: January 21, 2025
Time: 5:15 p.m.
Place: Chambers
I. CALL TO ORDER
Council President Kaur called the meeting to order.
Attendee Name Title _ Status Arrived
Satwinder Kaur Council President Present
Bill Boyce Councilmember Excused
John Boyd Councilmember Present
Brenda Fincher Councilmember Present
Marli Larimer Councilmember Present
Zandria Michaud Councilmember Present
Toni Troutner Councilmember Present
Dana Ralph Mayor Present
II. PRESENTATIONS
1 2024 Transportation Grant Summaries David Paine 45 MIN.
and 2025 Grant Opportunities
Transportation Planner, David Paine provided the Council with an update
on 2024 Transportation Grant Summaries and 2025 Grant Opportunities.
2024 Transportation Grants
Major sources of funding included Legislative appropriation and
competitive grants.
Paine provided a recap of the grant awards from 2024. Grants were
awarded from the Puget Sound Regional Council for the following
projects:
• Meet Me on Meeker - Interurban to 6th Ave S
• Earthworks Park to Downtown Connection
• S 212th Street Preservation
• S 196th Street Preservation
WSDOT awarded a grant for the SR 99/Pacific Highway - Pedestrian
Hybrid Beacon between S 244th and S 246th
The Transportation Improvement Board grants are for the following
projects:
City Council Workshop Workshop Regular January 21, 2025
Meeting Kent, Washington
Minutes
• 132nd Ave SE Multi-use path (north of SE 240th)
• 83rd Ave SW Sidewalk
• 132nd Ave SE Sidewalk (north of SE 2781h PI)
Next steps include formally accepting the grants, updating the
Transportation Improvement Plan, and finally implementing the projects.
The 2026 - 2031 Transportation Improvement Program
The Transportation Improvement Program is a 6-year workplan of
projects in development and underway.
Paine walked the Council through the schedule starting in January and
ending with the adoption of the plan in May.
The Performance Measures Dashboard was reviewed. Staff is constantly
looking at how they are doing.
Meeting ended at 5:40 p.m.
K tey A. Kot oto-
City Clerk
Page 2 of 2
t-y-r-
�S
Transportation
Grants
2026 - 2031 TIP
` KENT CITY COUNCIL
WORKSHOP
4 Y'
1 . 21 . 25
y
�� i s._ ,..iSar.S:�.s.� iLy•�+�:.F�`+,.��L.w�`'�t�SSra ,-':�.'!..
Agenda
I. 2024 TRANSPORTATION GRANTS
Recap and awards
II. 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
■ Schedule
Performance measures
■ Potential 2025 grant nominations
2
Imm 2024
■ What we did
■ How we did
Grants 13 -
■ What's next
3
- 2024 Funding and Grants
gton
PSRC WSDOT TIB
2024 Awards Recap
m r
E '
_ r
MMoM Interurban to 6th Ave s PSRC
IryryI F1
LL� Earthworks Park to Downtown Connection PSRC
r:i sTFTF
5- �� l S 212th Street Preservation PSRC
5 �
:.o T
a ~
S 196th Street Preservation PSRC
ILI
Lft
m132nd Ave SE, Multi-use path (north of 240th) TIB
132nd Street (SE 278th to SE 130th) TIB
/ u I � 1'X 83rd Ave SW TIB
■ SR 99/Pacific Highway - PHB (S 244t"/S 246t") WSDOT
5
�
MEEKER J
LU RIGHT OF WA
' 3 1
PSRC
1 , Meeker tree
-T Meet Me on Meeker — Interurban to 6th Ave S
■ Earthworks Park to Downtown Connection
a a
11 o ■ S 212th Street Preservation
LTS S'SmithSt [ESinithStI L
I , i�lll �'
.. - .rst yy� ■ S 196th Street Preservation
W Gowe 5t
2
> WTRU'St
a
516
..rti
s
6
Pedestrian Hybrid Beacon
AWL
---------- Tro
f �. WSDOT
Walk SB SB SB NB NB NB Walk
HOV LANE LANE LANE LANE HOV
SR 99/Pacific Highway - Pedestrian Hybrid
JL
I
` �
m...
a..
s$hln9ton s fn
zo r a
q w
O4 Impr°�0
■ 132nd Ave SE Multi -use path (north of SE 240th)
83rd Ave SW Sidewalk
■ 132nd Ave SE Sidewalk (north of SE 278th PI)
TIB
+ n
_i
�d Pedestrian Hybrid Beacon t
0 0 �•
SB SB NB NB SB NB Walk
Walk Grants totaling $8 . 6M +
HOV LANE LANE LANE LANE HOV
MEEKER ■ MMoM Interurban to 6th Ave s PSRC
■ Earthworks Park to Downtown Connection PSRC
S 212th Street Preservation PSRC
■ S 196th Street Preservation PSRC
US IESmthSt ■ 132nd Ave SE, Multi-use path (north of 240th) TIB
St
\ G"e5l - 132nd Street 278th to 130th TIB
t
■ 83rd Ave SW TIB
- _ SR 99/Pacific Highway - PHB (S 244t"/S 246t") WSDOT
b_
•
- --s .•
WHERE DID THESE PROIECTSCOME FROM?
Transportation ��w.`� '. ".rcrMx•.A°.{,'..' ,...
Master Plan 2021 TMPGOAES 20 PERFORMANCE MEASUREMENTS TO RANK PROLE(
Our Story
Goals ~• �•
n
Programs
Projects ~
2025-2030 TIP ' ' 2026-2031 TIP
Programs Schedule
Projects Key Metrics
Programs
Projects
Grant Applications
Craft
Apply
10
The 2026 � • Schedule
■ Key Measures
2031
■ 2025 Grants
z�
2026- 2031 TIP Update
Review Outreach Adoption
Briefings and project nominations Public involvement and feedback City Council public hearing
Draft Revision & Committee
Staff update materials and of the Whole
recommendations Present to committee and revise
12
PERFORMANCE r m
o a o 0
0 o O O err
Performance
T
MeasuresPercent of Commute trips taken other 31% >> 35.3% in 2023
than by single occupancy vehicle ♦ '
Dashboard 0
• • Mode Share Percent of trips taken via walking 1.4% >> 3.1% in 2023`
1
Overall, continued Percent of trips taken via transit 3.7% >> 4.0% in 2023 .
progress toward resilience
Mode Share Percent of workers that work from home 12.9% » 17.7% in 2023
Number of Grant!State Appropriation 0*/
Awards Met the target of 3 from 2020
Total Awards Met the target of$4.5 million 0*/J
Funding �J
Average Award Amount Met the target of$500,000 G
Average TIF Collected Annually
Did not meet target of
$3.2 million 0)(
13
IC ! • - r .r
�.
. .�
SCAN ME
2025 Grants
PSRc
USDOT
��� ' ��: l IIII IIII
r �w� �'C � 11 mr.III ;�� ��� �W�1 �►
"`�� ��� � � _.► �:elU � �� � t► III
, rcc
.J �� �i✓ � ��min in `l _� 1
• - • . •
IN
on
1■■
l•1�11 • �1 1 _ IIII � �, .� _ I%..', G. � -.
_�- �•. :�, IIII � 1 �''`r ' '
.. • LU
- •.• • n� Fill
oil
•
., / �•► , 'IIII � ' � t► II
Safe Streets for All (Citywide) - Implementation Phase
Detail Pending Target Zero Action Plan March 2025
rz
LU
- y
r. .___.�._._._.. SE.192 ST�
i W 96 ST -L. I
ST.-
I_ a
II ST t
5-200-ST"jSP200!§T
•y p Q _N. ��QJ�
5203'ST a S203 ST-
2025 Grants ,r, , r -S 212 ST sE 208 ST
5216 ST- 5 �N
i
i y m
v- Tw
ST:
PSRC a
aq j- 228
r- - T,
USDOT '` Z
P
a N
Safe Streets and Roads For All - ' WJAP.7ES�ST EJAMES.ST'-'S-240 ST- ¢ _SE 240,ST
W-SMITH ST F s:;uT rl ST
.,11(\�FEKER ST e I
SEf2dE ST �
a �5'248 S �T 1
.a I
S 25 9.P- m N SE 256 ST
-._S2fi0:S
l I -
q T� 1
~ N I I a
ssT�. s.r,•2 ii1.
y`y V
SE.277:ST;sE 274.`1'f
/ST a —�
_ w
-- Citywide >
N Zw SE•238-5T \�
LF`
��lim - �■ �_, ylll �T 1 '_ 0 r
1 ' -
A .. !
11 iriit� ��•+i ,i .� � ICI � . �,' ►.��::� t �
•
"11 I 1'■r .�
111E II�'a ;:�`i� i.. , i �• , /� �1-;�: \` ��N
rvi
• 1 Alli�11111 i u -- � � � 1'�- . �:V .RI.
• - • it 11 ` p \ -III�` �'
1 . �• . • r � �',� Ac � 'r' III ��� ���� j�W� A � , E
• � cur � ,:. 1 ;- _ �� .
"',� ��� i 1 �I ... �:nlll ` � � �► III
4i f .f III' ., � . � � _ � •
Vk~4
.
' 7M . •, � ~ t �) •1• � 1. �'� I _
RAW
r .
Jr