Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CAG2024-292 - Change Order - #6 SCI Infrastrcuture - S 218th St-98th Ave S (94th Pl S S 216th St) Stage #1 - 2/13/25
Agreement Routing Form 4^4���{ • For Approvals,Signatures and Records Management liEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. W A S H I N G T O N (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: 2/18/2025 N/A O L. C. Authorized to Sign: Date of Council Approval., C' El Director or Designee ❑Mayor 6/11/2024 a Budget Account Number: Grant? 0 Yes ❑No R90110.64110.120 Budget? El Yes ❑No Type: Federal Vendor Name: Category: SCI Infrastructure Contract Vendor Number: Sub-Category: C 33999 Change Order#6 Project Name: S 218th St- 98th Ave S (94th PI S-S 216th St) Stage #1 E L 402 � Project Details:Add type-1 catch basin to existing storm drain line north of CB27 and plumb into C property owner installed CB at the end of the sidewalk on adjacent short plat. C W Agreement Amount:$14,314.47 Basis for Selection of Contractor: E Bid GO i Start Date: N/A Termination Date: 213 Working Days a Local Business? ❑Yes ❑No* *Ifineets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes El No CAG2024-292 Date Received by City Attorney: Comments: C1 C 3 0 a, Ift a, oc .a p� Date Routed to the Mayor's Office: N1 Date Routed to the City Clerk's Office: 2/18/25 adccW22313_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements K EN T FEB 112025 WASH HOTON CHANGE ORDER NO. 6 By NAME OF CONTRACTOR: SCI Infrastructure LLC. ("Contractor") CONTRACT NAME & PROJECT NUMBER: S 218th St-98th Ave S 94th PI S-S 216th St ORIGINAL CONTRACT DATE: June 11, 2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Add type 1 catch basin to existing storm drain line north of CB27 and plumb into property owner installed CB at the end of the sidewalk on adjacent short plat. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $6,059,881.82 (including applicable alternates and WSST) Net Change by Previous Change Orders $538,739.30 (incl. applicable WSST) Current Contract Amount $6,598,621.12 (incl. Previous Change Orders) Current Change Order $14,314.47 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $6,612,935.59 Original Time for Completion 200 working days (insert date) Revised Time for Completion under 212 working days prior Change Orders (insert date) CHANGE ORDER - 1 OF 3 Days Required (f) under Minor Change 00 working days Orders Days Required (f) for this Change Order 01 working days Revised Time for Completion 213 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: t y q,U1y signed by Chad Bieren By: By. Chad Bieren uele.2025.02.1316:4111-08'00' signature) (signature) Prino me: Print Name: Chad Bieren P.E. Its C-0 N-1R-Az,-r B h,-a Its Public Works Director (title) (title) DATE: DATE: EC KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable If Mayor's signature required) Kent City Clerk, Kent Law Department C[In this field,you may enter the electronic filepalh where the oantrad has been saved] CHANGE ORDER - 3 OF 3 File No. 200.2 �f KENT CHANGE ORDER 1 ORKSHEET NO. 06 ,....o.e. Construction Engineering Division - Public Works Project: S 218th St/ 98th Ave S From 94th PI S to S Project No: 17-3010 Project Engineer: Abdulnaser Almaroof Fed-Aid No: 9917(045) Capital Projects Sean Flint KBA Inc. Contractor: SCI Infrastructure LI..0 Date: 1/15/2025 I. Proposed Change Add type 1 catch basin to existing storm drain line north of CB 27 and plumb into property owner installed CB at end of sidewalk on adjacent short plat. II. Reason and Background for Change Existing 12" concrete storm drain line north of CB 27A was not aligned with CB as indicated on construction drawings, making connection to this structure unfeasible. Contractor was directed to add a type I catch basin intercepting the existing concrete storm drain line and plumb into cored hole on structure CB 27A as well as plumb a storm drain line connecting the added type I catch basin to the type I catch basin at the end of the sidewalk on Parcel 0722059044. III. Method of Payment NEW PAY ITEMS ❑Not applicable livable No' Item Description To otEst. Unit Unit Price Total Estimated Cost of Item IV Add type I CB and connect to CB27A and 1 FA $14,314.47 $ 14,314.47 Property Owner CB $0.00 $ ' $0.00 $ - $0.00 $ - $0.00 $ - New Pay Items Total: $ 14,314.47 DELETE EXISTING PAY ITEMS) per 1-09.5 , Not avolicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item $ - Delete Existing Pay Items Total: $ INCREASE DECREASE TO EXISTING PAY ITEMS , Sch Bid item No. Item Description Qty Unit Unit Price Cost of Item 0 $0.00 $ _ $ - Increase Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $14,314.47 *Total of the Cost of Item Columns Page 1 IV. WORKING DAYS Original Contract:1 200 1 Due This Change Order:I I Previous Total:J 212 Explanation/Justification for Additional Working Days: ;Storm work is critical path. *TOTAL WORKING DAYS: 213 *This Change Order+ Previous Total Capital Projects Manager: �'�' 7'9Z� Date: 2/4/2025 5e Flint (KBq;Inc) Construction Engineering .�� Date: Z Z S Ja Barry Construction Manager: = Date: F Eric Connor Page 2 Per Field Directive 04, add catch basin north of CB27A to intercept existing 12" concrete pipe and plumb into Catch Basin on parcel 0722059044. The following Force Account sheets are paid with this change order: FA 34 12/11/2024, $11,061.90: SCI crew excavated and cut existing 12" concrete drainpipe north of CB27A and installed new type 1 Catch Basin. Price includes materials for this installation. FA 35 12/12/2024, $3,252.57: SCI crew completed installation of added catch basin to CB 27A and plumbed run from previously installed property owner catch basin into new catch basin. Total Cost = $14,314.47 DAILY REPORT OF FORCE ACCOUNT WORKED MA- ..ab CONTRACTOR SCI Infrastructure LLC DATE 12/11/2024 SUBCONTRACTOR PAY EST# 4 Project No.:17-3010 ITEM# 1355 Federal Aid No.:HIPUL-CRRSAA-STBGUL-HLP-9917(045) FA# 34 DESCRIPTION OF WORK Field Directive 4.Added Type 1 CB at approximately 61+61'32'L.CB was PERFORMED:cut and sleeved onto existing concrete stone. Contractor FA# LABOR WORKER'S NAME WORKER'S OCCUPATION REG HRS REG RATE OT HRS OT RATE AMOUNT Dallas McClellan Equipment Operator Grp 2 800 $ 97.95 $ 12760 $783.60 Ryan Clark Equipment Operator Grp 2 400 $ 97.95 $ 12760 $391 80 Lucas Liles Equipment Operator Grp 2 800 $ 97.95 $ 12760 $783 60 Elijah Jackson General Laborer-Appr 60%(Step 1 800 $ 49.62 $ 63.45 $396 96 Shane Elmendorf Pipe Layer/railor 800 $ 8623 $ 115.88 $689 84 Jason Davis Truck Driver-Dump Trk&Trailer 800 $ 91.11 $ 117.30 $728 88 $ - $ $0 00 LABOR SUBTOTAL $3.774 68 29%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAIL $1,09466 Per WSDOT Spec 1-09.6,add an additional 2%for Contractor Sick Leave $75 49 TOTAL LABOR S4,944.a3 EQUIPMENT EQUIPMENT TYPE EQUIPMENT SIZE REG HRS REG RATE STDBY HRS :STDBY RATE AMOUNT 200-157 CAT Excavator 320E 8 $ 130.92 $ 4040 $1,047 36 200-164 Komatsu PC138USLC-11 8 $ 109.95 $ 3668 $879 60 325-115 Misc On•Hlghway Flatbed Truck 4x2 20KGVW DSL 8 $ 41.58 $ 589 $332 64 110-151 CAT Loader Composite 938M 4 $ 70.77 $ 2057 $283 08 300-079 Dump Truck&Pup Composite N/A 8 $ 96.83 $ 1631 $774 64 EQUIPMENT SUBTOTAL $3.317 32 21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $696 64 TOTAL EQUIPMENT $4,013.96 MATERIALS andlor SERVICES. VENDOR&INVOICE# MATERIAL SUBTOTAL TAX AMOUNT Fowler Inv#16868702 type 1 CB and risers $410 54 $41 88 $452 42 Fowler Inv#16828565 12"SDR 35 stone pipe,14'x 3 sticks $684 10 $90 18 $974 28 Fowler 12117t24 11:16 12"sand collar $253.64 $25 87 S279 51 Pacific Construction Supply 137632 Fast Patch $28 95 $2 95 $31.90 $0 00 $0 00 MATERIALS SUBTOTAL INCLUDING TAX $1.738,11 21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $365 00 TOTALMATERIALS $2,103.11 SUBCONTRACTOR 1NVOICED WORK VENDOR&INVOICE# WORK DESCRIPTION AMOUNT $0.00 $0 00 SUBCONTRACTOR INV SUBTOTAL $0 00 Tax on Material(if applicable) $0 00 TOTAL SUBCONTRACTOR INV WORK $0.00 AMOUNT PRIME Subtotal of Labor,Equipment,&Material Work $11,061 90 SUBCONTRACTOR Subtotal of Labor,Equipment,Material,&Subcontractor Invoiced Work $0 00 Markups on work performed by Subcontractor.up to$50,000=1 2%,$50,0004200,000=10%Greater than$200,000=7% 12 Subcontractor Mark-up $0.00 TOTAL COST $11,061.90 E� If checked,this work is in dispute.By signing this farm,parties are agreeing to the time and I effort needed to accomplish the task. Entitlement to be determined at a later date. Owners Representative ConlracTars Representative Form Date 9/2024 DAILY REPORT OF CONTRACTOR'S WORK �� Project: S 218TH ST/98TH AVE S from 94th PL S to S 216TH ST Project No.: 17-3010 Prime Contractor: SCI Infrastructure Date of Work: 12/11/2024 Subcontractor: Fed Aid No: HLP-9917(045) Description of Work Field Directive 4 Added Type 1 CB at approximately 61+61'32' L. CB was cut and sleeved onto &Reference existing concrete storm. Documents(RFI, Field Memo, Bid Item, etc.) RECORDTIME WORKERS AND/OR OCCUPATION OF WORKERS OR HOURS WORKED EQUIPMENT HRS EQUIPMENT NUMBER EQUIPMENT SIZE REG. OT REG. STDBY Dallas McClellan Operator 8 Ryan Clark Operator 4 Lucas Liles Operator 8 Elijah Jackson Apprentice Laborer 8 Shane Elmendorf Laborer/Pipe Layer 8 Jason Davis Teamsters 8 #200-157 320 Excavator 8 #200-164 138 Excavator w/Hoe Pack 8 #325-115 1 Ton Tool Truck 8 #110-151 Cat 930 Loader 4 #300-079 Dump Truck and Trailer 8 MATERIALS/SERVICE QUANTITY/MATERIALS I SERVICE DESCRIPTION Type 1 Catch Basin-1 Installed 12"PVC Storm Pipe-32.5 LF 12"Sand Colllar Comments: Joe Reed Patrick Liles Inspector(printed name) Contractor's Representative(printed name) See attached Pic Inspector Signatu Date Contractor's Representative Signature Date By signing this form, parties are agreeing to the time, materials, and equipment needed to accomplish this task. Entitlement to be determined at a later date. 1 of 1 P-17(Rev.2023 March) Daily cost Record 2821 SOUTH 154th ST • SEArrLE.WA 88188 • (M);242.4633 • FAX(ZX)2Q-lWi 2 32091 project c S -T Job# i L Date A ��� - �'� wasther '[a%A `r•-r'_ Description(must be complete)`II F t►-\ A M wA -T•V,�ti : c 1.3 S ; 31"A2 l e-x ,n r f'+�l•fit DETAIL COST RECORD CODE _ HOURS RATE EXTENSION I, S.T. O.T. I]-T TOTAL --�� b�irr Ica�c: �� �0��.1►5. _ - - sub-Total Labor Taxes&Fringe Benefits — f Travel Tate Labor Markup — Total Labor Costs rA 0 ul _ :41— — -- Sub-Tplal l Equipment M arkup { Total Equipment Costs �- — -- I LU �3i5 z Sub-Total Sales Tax(if applicable) Material Markup Total Malenal Costs ul O Total Other Casts - - - - -- Sub-Total Bond Insurance Taxes— Miscellaneous Costs -- - -- - - Contractors Representative Sdh Tntai - Overhead Subcontractor's Reoreaenlat- - - - - - - - Owner's Represeitlative Sub-Total Sales Tate - - - - - ------ - �---- - No- _5heat of From: Sean Flint To: Barry.Jason;Frame,Corey Cc: Connor.Eric;Cameron Bloomer Subject: Fw:S218th ST DCR 23091 Date: Wednesday,February 5,2025 12:05:49 PM Attachments: imaae001.ona This message originated outside the City of Kent. Use caution when following links or opening attachments as they can be malicious. Please contact IT Security at ISP@IientWA.gov with an questions. Good Morning, Please see SCI's response below to the tax question on FA 34(SCI DCR 32091). 1 will respond to the methodology for the charges on FA 34 in a separate email. Sean Flint 425.365.3469 1 sflintf@kbacm.com KBA, Inc. I Construction Management Professionals Teams That Build Trust From:Jennifer Scoccolo<Jennifer.Scoccolo@scibuilds.com> Sent: Wednesday, February 5, 2025 11:51 AM To:Sean Flint<sflint@kbacm.com> Subject:S218th ST DCR 23091 This DCR was for Schedule IV—so yes,the HD Fowler invoice should have tax on it. jv�/&,/( peloeeola sci infr,iStl-LIC'Ure, LLJ SCIINL*993JA 2821 S 154th Street,SeaTac,WA 98188 206-242-0633,ce11206-423-5673 3633136th PI SE,Ste 100,Bellevue,WA 98006 Page 1 of 1 H■D FOWLER PO Box 160,Bellevue,WA 98009-0160 COMPANY Phone 425-654-8800'Fax 425-641-8885 Pacific Branch 1417 Thomton Ave SW REMIT: PO Box 84368, Seattle,WA 98124 Pacific,WA 98047 Invoice PADS (253)863-8600 Fax(253)863-8681 -Number 16868702 #192970 °= SCI INFRASTRUCTURE LLC Ship to: S 218TH ST198TH AVE S; FROM 94TH PLACE 2821 S 154TH ST KENT WA 980324016 SEATAC WA 98188 Order# Inv Date: Order Writer: 08329740 10/31/24 Michael Owens erms: 10P+30 Due: 12/10/24 PO/JOB: STRUCTURES OB: FACTORY Ship Via: FACTORY TRUCK S 218TH ST Qty Qty Part# Unit Extended Line Shlp'd BO'd UoM Description Price Price 50 3 EA TYPE 1 CONCRETE CATCH BASIN 34"X 30"X 44" 243.50 730.50 51 1 EA 4"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 4" 71.59 71.59 53 1 EA 12"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 105.68 105.68 12" 54 1 EA 24"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 170.45 170.45 24" { 61 2 EA TYPE 1 CONCRETE CATCH BASIN 34"X 30"X 44" 243.50 487.00 METER VAULT 62 1 EA 4"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 4" 71.59 71.59 DOM.WATER SERVICE 63 1 EA 6"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 6" 83.52 83.52 23-038;DOWNSPOUTS 64 1 EA 12"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 105.68 105.68 12" 65 1 EA 24"CATCH BASIN RISER FOR TYPE 1 34"X 30"X 170.45 170.45 24"24-008;STRUCTURES Sub total 1,996.46 Freight Tax STEVE Grand Total 1,996.46 Serving the Pacific Northwest since 1911 www.hrifnwler_mm 3633136th PI SE,Ste 100,Bellevue,WA 98006 Page 1 of 1 H.D. FOWLER PO Box 160,Bellevue,WA 98009-0160 COMPANY Phone 425-654-8800'Fax 425-641-8885 Pacific Branch 1417 Thornton Ave SW REMIT: PO Box 84368, Seattle,WA 98124 Pacific,WA 98047 Invoice }} 2 PADS (253)863-8600 Fax(253)863-8681 Number I #192970 o: SCI INFRASTRUCTURE LLC Ship to: S 218TH ST/98TH AVE S;FROM 94TH PLACE Ic 2821 S 154TH ST KENT WA 98032-4016 SEATAC WA 98188 Order# Inv Date: Order Writer: 08290517 09/19/24 Michael Owens arms: Due: 11/10/24 POMOB: SDR35 PVC PIPE OB: FACTORY Ship Via: FACTORY TRUCK S 218TH ST Qty My Part# Unit Extended Line Shlp'd BO'd UoM Description Price Price 2 1708 FT 12"SDR35 3034 GASKETED PVC SEWER PIPE 14' 21.05 35,953.40 LENGTH -7-: P"4,701 GtT6L-- 3 742 FT 18"PS46 F679 GASKETED PVC SEWER PIPE 14' 37.08 27,513.36 LENGTH 4 1008 FT 8"SDR35 3034 GASKETED PVC SEWER PIPE 14' 9.41 9,485.28 LENGTH 5 910 FT 6"SDR35 3034 GASKETED PVC SEWER PIPE 14' 5.18 4,713.80 LENGTH Sub total 77,665.84 Freight Tax STEVE Grand Total 77,665.84 Serving the Pacific Northwest since 1911 www_hdfnwlAr.r nm 12117124.11:16 AM H.D.Fowler Company Pricing SCI INFRASTRUCTURE LLC H D Fowler Company Summary Info Aging Project Analysis Bide Orders Backorders Reprint Document Pricing I Service List O&M Manuals I Contact James Help Project:S 218TH ST The prices display here are only for reference.ptease contact customer service for final pricing. Enter items for price inquiry and/or order: Seemh by your part#(Must be previously setup) _ Enter your part number: 821Bib Kent l:224.163 Search by.OW part M _ - Enter Ho Fowler Part Numbers Search by Descripgon Patty Found:S Description Select the Part v ---.-- . F "tera description to have Customer Service locate the Item. Enters Dwriplion-- - I Enter Emal address to have Priced Inventory list_sent_to you. En%r EmWi Address O List only Items purchased before. Add to Workpad If Clear Workpad Make Order WorkPad Part Descri llon UaM G61L(tit I Nicol Ext PrICu Dplele MCPVC651PS 1'12'IPS PVC SANDED MANHOLE COUPLING&GASKET FOR JEA ir—Edl—tl 1 253.64 253.04 Delet+ Total 5253.84 https://ww5.hdfowler.00m/pdcing.aspx 1l1 PACIFIC CONSTRUCTION SUPPLY, INC Invoice Po Box 1616 �swNot� +W°A Piet,s DATE INVOICE# Bothell, Wa 98041-1616 cER7171E0 was ��-frn.Nwp.r DSECKF0027281 #W2F0027291 SCS1D:2287 9/26/2024 137632 office 425499-2683 JOB NAME BILL TO JOB# Yard Stock SCI Infrastructure LLC SHIP TO 2821 South 154th Street 2821 S 154th St SEATAC,WA 98188-2034 SeaTac,WA 98188 RESALE# I Exp 12/3ll25,A16942825 Purchaser Trevor Hansen 253-954-6287 P.O.0 Terms Due Date Rep Ship Date Ship Via Sales Order# Pick Ticket# Net 30 10R6/2024 JRH 9/26/2024 jell 28880 DESCRIPTION OTY RATE AMOUNT Fast Patch 55 LB Bag,Ocean,psi(lhr. 1015)...(1 day 1450)...(7 day 4350)...(28 day 5800)(56 168 28.95 4,863.60 bags Plt) Pallet Deposit 3 35.00 105.00T Subtotal $4,968.60 Sales Tax(10.2%) $10.71 Total $4,979.31 THANK YOU FOR YOUR SUPPORTI TAX ZONE Payments/Credits Received $0.00 Now 24 Years in business! *We Accept Visa,Mastercard for Payment on day of purchase SEATAC-1733-efl'04/24 Balance Due $4,979.31 WBE Women's Business Enterprises#W2F0027281 E-mail Admin@PaciffcConstruction5upply.Com Certified King County Small Supplier SCS ID:2287 Certified DBE#D2F0027281 DAILY REPORT OF FORCE ACCOUNT WORKED we A CONTRACTOR SCI Infrastructure LLC DATE 12/12/2024 SUBCONTRACTOR PAY EST# 4 Project No.:17-3010 ITEM# 1355 Federal Aid No.:HIPUL-CRRSAA-STBGUL-HLP-9917(045) DESCRIPTION OF WORK Pipe crew spent time restoring property and backfilling added CB and pipe at FA# 35 C13#27A per Field Directive 4.Old CMP was removed at homeowners PERFORMED: Contractor property and pipe end was sealed. FA# LABOR WORKER'S NAME WORKER'S OCCUPATION REG HRS REG RATE OT HRS OT RATE AMOUNT Dallas McClellan Equipment Operator Grp 2 3.00 $ 97.95 $ 127.60 $293.85 Lucas Liles Equipment Operator Grp 2 3.00 $ 97.95 $ 127.60 $293.85 Elijah Jackson General Laborer-Appr 60%/Step 1 3.00 $ 49.62 $ 63.45 $148.86 Shane Elmendorf Pipe Layer/Tailor 3.00 $ 86.23 $ 115.88 $258.69 Ryan Clark Equipment Operator Grp 2 1.00 $ 97.95 $ 127.60 $97.95 Jason Davis Truck Driver-Dump Trk&Trailer 3.00 $ 91.11 $ 117.30 $273.33 $ $ - $0.00 LABOR SUBTOTAL $1,366.53 29%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $396.29 Per WSDOT Spec 1-09.6,add an additional 2%for Contractor Sick Leave $27.33 TOTAL LABOR $1.790,15 EQUIPMENT EQUIPMENT TYPE EQUIPMENT SIZE REG HRS REG RATE STDBY HRS STDBY RATE AMOUNT .200-164 Komatsu PC138USLC-11 3 $ 109.95 $ 36.68 $329.85 .200-157 CAT Excavator 320E 3 $ 130.92 $ 40.40 $392.76 110-151 CAT Loader Composite 938M 1 $ 70.77 $ 2057. $70.77 325-115 Misc.On-Highway Flatbed Truck 4x2 20KGVW DSL 3 $ 41.58 $ 5.89 $124.74 300-079 Dump Truck&Pup Composite N/A 3 1$ 96.83 $ 16.31 $290 49 EQUIPMENT SUBTOTAL $1,208.61 21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $253 81 TOTAL EQUIPMENTI $1.462,42 MATERIALS andlor SERVICES VENDOR&INVOICE# MATERIAL SUB TOTAL TAX AMOUNT $0 00 $0.00 $0 00 $0.00 $0 00 $0.00 MATERIALS SUBTOTAL INCLUDING TAX $0.00 21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $0 00 TOTAL MATERIALS $0.00 SUBCONTRACTOR INVOICED WORK VENDOR&INVOICE# WORK DESCRIPTION AMOUNT $0.00 $0.00 SUBCONTRACTOR INV SUBTOTAL $0 00 Tax on Material(it applicable) $0.00 TOTAL SUBCONTRACTOR INV WORK 30,00 AMOUNT PRIME Subtotal of Labor,Equipment,&Material Work $3,252.57 SUBCONTRACTOR Subtotal of Labor,Equipment,Material,&Subcontractor Invoiced Work $0 00 Markups on work performed by Subcontractor:up to$50,000=12%,$50,000-$200,000=10%Greater than$200,000=7% 12% Subcontractor Mark-up $0 00 TOTAL COST $3,252.57 If checked,this work is in dispute.By signing this form,parties are agreeing to the time and effort needed to accomplish the task. Entitlement to be determined at a later date. Owner's Representalive Contractors Represenfarlve Form Date 9/2024 DAILY REPORT OF CONTRACTOR'S WORK Project: S 218TH ST/98TH AVE S from 94th PL S to S 216TH ST Project No.: 17-3010 Prime Contractor: SCI Infrastructure Date of Work: 12/12/2024 Subcontractor: Fed Aid No: HLP-9917(045) Description of Work Pipe crew spent time restoring property and backfilling added CB and pipe at C13#27A per Field &Reference Directive 4. Old CMP was removed at homeowners property and pipe end was sealed. Documents(RFI, Field Memo, Bid Item, etc.) RECORDTIME WORKERS AND/OR OCCUPATION OF WORKERS OR HOURS WORKED EQUIPMENT HRS EQUIPMENT NUMBER EQUIPMENT SIZE REG. OT REG. STDBY Dallas McClellan Operator 3 Lucas Liles Operator 3 Elijah Jackson Apprentice Laborer 3 Shane Elmendorf Laborer/Pipe Layer 3 Ryan Clark Operator 1 Jason Davis Teamsters 3 #200-164 320 Excavator 3 #200-157 138 Excavator w/Hoe Pack 3 #110-151 930 Cat Loader 1 #325-115 1 Ton Tool Truck 3 #300-079 Truck and Trailer 3 MATERIALS/SERVICE QUANTITY/MATERIALS/SERVICE DESCRIPTION Comments: Joe Reed Patrick Liles inspector(printed name) Contractors Representative(printed name) 12/16/2024 See Attached Pic. ,Inspector Signatu Date Contractors Representative Signature Date By signing this form, parties are agreeing to the time, materials, and equipment needed to accomplish this task. Entitlement to be determined at a later date. 1 of 1 P-17(Rev.2023 March) Daily Cost Record 1 SOUTH 1 S1th ST SEATTLE.WA 981R (Z)6)ZQ-UU33 FAX CIN)242.OM 32092 Profec! Jab k Date weather Description(must be Complete)- - - - - -- -- -- _ DETAIL COST RECORD CODE HOURS S T o.T. A.T TOTAL RATE E?CfE1V5lQfV LA Sub-Total Labor Texa 8s Fringe Benefits f , f Travel Time Labor Markup - 1 Total Labor Costs � f • 2 -- - - + tu -o Sub-Total - �- tyj Equipment Markup i Total Equipment Costs 7t -- - 2 . Sub•Total- - - - - - -- - - —I Sates Tax Sit applicablay - Matenal Markup Total Matenal Costs j f i LU Total Otter Costs � f Sub-Total _ ` Bond insurance Taxes -- ' _-, Miscellaneous Costs • -� Contractors Representative Sub-Total - �. _ t�rtreatt i - Subr nfraatlor'sRepresentative -- - --- -- - - - - - t 4 Owner's Reprewft ive Sub,-Total �^ Sales Tax 'No. Sheet of TOTAL -- - - - - - - ---- lfl a a rn o n � u N5 m C � Q CL C V � X C W a ., Q , C 0 z m ti a b n 1, N 0•M M W r O A A Q 4 n 0 U 1 W'Q W I�b N O W l0•M r M IN W M m W W O Q W'N W•M n W O r N m 0 0 M n T W O co iW O b 0'Q m'Q M N"i r M0 W b L m (V (9 V W r,W I CO m 0)(O W (i N N C C Q)OO C CO•C'f O (0 M:l 01 lO•(V V(D'IM C (V N M'mm Q a)r rN•N Q•Mn W W 00 W W W W m(O W IAA rN N M M Q'l0 QQ'Q rNM A m� O O O W m m N:O N O S'V to O Mn m O 6 N N m m O 0 0In C4 a W C4 M CO W m r(D N 6N�W m GO lr N i�r nrr W W M rrrm MO mMO W MO IN IN t+Ci W 66M Qg o(A Nt: ai [i 6O di (0 m O Is m W Vri m r M'a M0 q A A W r O ry N A A W W W 0 0 In (D w a n a co MO[+W C) CO MO co cl AAOONb[+ NW 09'M InW W O N(OmM .O W MO 00 W•W W'W a0I� bM C�DO W mmb M OObMNO W L m O m(�i vi M M!i d0 ei a V co O (9[�A(O O v G N!:LV i� r(Li L6 r•W O to)+ O W A m M:7 g N N N M 0)W O O r N r W O O b O 0 O N M A M W W Q W N Q W W N n N N M MhN l`N n M MO 10(o V) N `m M WW W O r rON W n W Of'Q N n NW W O M O W w In n O W M W O W n A b O b 0 N 0-0 0. M W N W O Q MO ll�N 0) n O m co W W'W W n W A Q Q MO W W W co co W W(0 A W 0) W MO W(O A n al n h ir-u)W W A O N W CO W n Q'Q Cl)Cl Cl)N N LL] W b Q Q Q W MO O W M N W W Q M N N O r M D) V7 OQ m m m M r r r•m N O N W W W N lT W W W W m Of N W O W'Q W N W O O Q W r r M N r N m V O 0•O N r L ® MO W M M V O v lO a) to m n n�fV Ci CO (�)O O tl] l�O (i N CIA V. m a¢ W W W co I�N n W r V.W CO W W d) M 0 O) 00 M O O:rl A W W W D1 W 0 C) 0 h h co Mri m a 0 3 N Q O Y 7 Q O m N � � J O Q N O O 000 00 OO OO'O O O O'G OO 000I00 00 OO OO O O'O 00 00 y b MO MO MO MO LL7 MO'W MO'W W iLL7 M)') MO b iW MO MO•MO W MO iW b'W b b N b W W O'O O O�O O C N N NNN NiN NN NN�NM N N NNN (V N V iNN NN N(V IN IN N Q'Q QQ QQ Q a N C N (q M W m O W Ir'M it N W M r W W In N N n in MO Q r 0'n O W N W'M T O)W W W'M r N m Q W a) M n•m C•NN IN W W Q'QNNrQ'rn NW MO Q'O Mn A00 r W W W MD X O O W m W W O) r O N W A r•t` r 0•N N t`A W W W'O O W 01 O W il-W O m M F N b O C O N b b b b b b b N b b LL)'b r A A r I A :�N N.A A 1,1,A A N N N N N N r r r r r r r r r r r r W W m W W W W W W W W W W W'W W W W b b 1Q b N O m C•N n W b b iW b MO b LL7 6 Mn W ib W W W W W W W 00 W m W 00'W W co W W W-to CO aW. O'OEc N NNN N N N N N N N N N N'N N N N N N N N N W O=m C C d M RO O (q'0)Cl) MO MO N A N MO•W O ilh MO W W m b Q W 'Q W W 0) M M l0 M Mn O N A M N m 'O n (O r W•W W M D)A r W W'O co•O O M O W O b b W CO W•M r'O W h W O W W W W O ICIO a Nn M ui N Q In A n W MO A•C m'W co l`.A W M 'V O Oi (.4mMO C Q M V OON M (0 7 'W W M P Q Q Q MO (O N M M M'Q W'l0 MO l0 LLf)l0 M W W M M Q'7 Q In M0 Q In 10 M M QO O p co?� N o v) `m m m a m J m N O 0 0 O in�O O 'W V i0 0 i0'0�O•O i0 ^ ? W U W m m N Z W A W W•W M17 •m cc O W A A'W W•O)W # J N `y y� -m - -- -mm iiOCC •pM O m 0`0 W 0m fO0 OW iO0 O NCIL m O CO (0 ,Y t -Cm CmV mU C '�o ` ic m mm m d > mwUp 0 LL Nm�0Nm 0m�•0 ? N 0mm !w INEo am) LU ` COm > :gy 1OO20�mN 00 ymmm V¢F>¢Sa � 2 L mam m m x H CJ J W ¢ ¢ -to � o ¢ EL LL CO ¢ mFomm H p ¢LJ < ¢ Q MQ'IA T 11 Kent S 218th St-98th Ave S #025-Subm025-Labor and Equipment Rates Submittal item detail #Various-025-0: Subm025-Labor and Equipment Rates A, Status Created on Due date Closed Sep 20, 2024 ID 61 Ball in court Brooklyn Cummings(SCI Infrastructure, LLC) Manager Susan Timm(Akana) Responsible contractor Brooklyn Cummings(SCI Infrastructure, LLC) Watchers Construction Manager Sean Flint Susan Timm General Contractor Spec section Various Various Spec sub section Description Final Response No Exceptions Taken Final Response Attachments SUBM025-LABOR AND EQUIPMENT RATES 202409261141.PDF, Sep 26, 2024, 7:41 PM UTC Final Response Comments Package Created by Susan Timm with Autodesk®Construction Cloud TM on Sep 26,2024 at 12:41 PM PDT Page 1 of 2 , c 7 _ ro , 2 \ kCL % cr ° G / § / w in / � . c / £ . / 2 3 f k / g E g E m o Ln ' / ' / 5 E a ' \ LU / LU / LU q f \ 2 k � c « > g uCL � k tA 2 z � \ � 2 q q q � k k k $ $ $ § 2 \ \ q N co- \ o , , $ CL \ \ j N \ N } 2 2� »k $ , ƒtn { D / J c / 4 \ [ / [ ) Ln } _ $ E a _ _ _ / \ k ^ CA A U. . \ k o c @ ° ' & E ■ J y E 2 § m ƒ E \ } m / u w LA2 v 3I 0 f m I L 41 p U) N J 0) U) V J w < Q < N a O # or" H J C. � o x LU y U U ) m °' m mu Of w u w z Z O c d O U) c o �5 � a O : Mcoo LL J o r c U)Y � -c� Q a Q ( Q Q. ' QU)CO Of � . LL o Z J> cc J J O2? N °� Q Q � m m v > W N [N co O rn a U) a CN o N It 0 W\ VJ Nco w / O N < ++ CD N U) x CO COco cn N Z N o Z `) a LN m � o CLc w a m co d O N r N �p ci o V N 7 U N a N U) m COca m m W N 10 v O O m m co N m N 0 1(7 0 v m m m N 1D m m 47 r m N 07 r u]Il V I- O t0 +n m W m m V' r (p W (O r I�N h N m r r m V m N L m n m m O o In th M O N m y O m r W r•m•O 0 Ol l0 m r N N N M r m O r m m m f0 m m 10 1� r N N M v T 1n v v N )� n O O to m m N O O v v+I] t0 m 0 0 N N m m O O m 1h N m W N m W [� m m N m v O ('] O N m m (�] N .- n r m m M r r r m M a[¢M O m I. N N (`m m n v m m M M N O r m(p v m m (7 O)IM (A I[i 4 OC N Of M O r�m W m m 0 10(O 1r m r 0 N N n n W m m O O m O O m r m a 'O N tq M O m 1n O N n W m M ('] `lf)q1 N v 10 m y m m N N W N v o m m� 1D rNOrr Nm r` v W vv O7� 1n n+na MN r rlvN OI- M O.m� �'m m m O O m r n W r W oil 14 OmON M (nm WQ N W m(r (`NNNN W r.NnN1� mIn W u7N MN Opp m mdr•v r N OO p1 ma�7[n W IN In 1� W m vN r`N m 4 ai m Q>'o �o m(7G m nN(ri iri ui to[� (fib M W c+im O vu'i cY mlti m m 'n aam ml� r�vvu�m W mmm co W r.m(�o In lnm W 1.I, W I-r- Ur o W 0 v N T•dabm vans C^W N MaOa 0P][n opvmu] .-m vo W mm mm m � 7M•NvmNf` v, 4vtc7u7rvo]mp�('7v W al m m V mqq M W N 61 N 1f]Oo N OIN l0 (mO W mmrnn W 00� dOCrnmN�OON W ap CID GO 07 �rnmr<�aMO v N +O O (O (�I uJ m m O r W m m v v M v ID N M O r v m m 1,n W O m +- M le m m O r N N M V m O r 1f) t0 10 lq 1D 1D v m r•O r r N (7 M y (n M c, m r N C Y > r O O r r 0 '- U m N c7 J O N O O 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O b 0 0 0 0 0 lo 0 0 0 0 0 y 11) W W o ta)W mo W W IA t M Iq Iq 1D i!1 ID 10 1D ID 1n m N 47 1D 1n to o! O O O O O O C N N N N N N N (V N N N N N " N N N N cV (V cV N N N N N N N c v v v v v v v N N M m m 0 m r M I ll N m M m W N N fti 117 v r M m O cD N CO M m m m m m M 1D m M r m v N N*, O m 1n v v N N r v"-' t`N W. M m v 0 10 r: m r m W m m O O m m co m m 0 o (O � r r O N N r_r- m m m 0 0 m M O W r m M H N N O O N v vl C q r n w f v n N N N N N N M N C O d. m W OR m m W m W m W W m W W W W O M M M M M N y O m •C N m o o o o In o'1n m m W m m m m m W m m m (D m fU•m(O m m y v v v v 7 a-1 O C ? N N N N N N N'N N N N N N N N N N N N N N N O {F p C M d O 41 O N C C aJ (n l() O M m M 1(1 1D N r N W m l(l In m m 1D 1(] v m V W (n m M M h M 1D O N m N m O ti 1D r lD m m m rl r (D O m O O M M m O 10 1D m m lyrj M c- o_ m r�(O m m W m m O I mMO mmWM N 10 m m m 0 r m m In l() M v v v v 1D N M M - - - In u�In 1n m m M M v v v (O LL7 v 10 1p m(mn V O O D m 0 0 � N O N w m y Q' m O J � y IM N O e o o o 0 o V o 0 0 V N C W 4 W m - (0 m m 1` n m m J 3 �R m c o J N Nlu !] tlf 03 Gl �e c O O O 4 O O O ,C V U V ` d p} m m m m 12 T m m O c . G b N iILL C C C C O N O L N N N m m m > m V qy Q Y y �' g a r ob'OO O O O O O m a m y Q ('S IIL c m m a) m m m w m ¢¢Q j g m g' E C G � (7o w m sa�° L (v� mc`° a � °' � m � � d �l �+ a� � o.a° EEE ¢QQ~ Q N 4 0 IiFt7 dU' �. �.� btu U' u� C�7i7�+D(n4Q¢ai¢ Qoi¢ inH�iFmHH LLi�(=nFo- V M m a Q co N 0 N N M y Y¢] • ¢ r N N try v = L N r Q C EquipmentWatch_ www.equipmentwatch cam All prices shown in US dollars($) Rental Rate Blue Book®,O&O Rates Report(Monthly) September 19,2024 Name:912024 September Fleet Update Adjustments Note:Values not specified at the fleet level will be taken from individual equipment adjustments. Rate Effective Date:- Rate Effective Date:- Region:Washington Organization:Washington DOT Owrtershl p Ad ustrul 100% O raun Ad u$tntemz 100% Rental Rate Blue Book®Rates All prices shown in US dollars($) Equipment Details Rental Rate Blue Book® Adjustments ID Equipment Size Manufacturer Model Year Serial Configuration/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operaling Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Rate Rate Cost 100-055 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 12G Grader $50.68 $48.75 $25,34 $6945 07-01 Washington: $8,940.00 $8,920,00 $99A3 Composite 102 8% 100-07B Cat USD USD USD USD 2024- multiple 100% 100% •USD USD USD 140H Grader $30.73 $4237 $15.36 $53.67 07-01 Washington: $5,71500 $5.40832 $73.10 Composite 102,8% 100-079 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 140G Grader $3853 $48.10 $19,27 $59,38 07-01 Washington: $6,860.00 $6,781.76 $86.63 Composite 102.8% 100-080 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 140H Grader $32.20 $4237 $16.10 $55.14 07-01 Washington: $5.71500 $5,66725 $74-57 Composite 1,02 8% 100-201 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 160M Grader $75.98 $72.47 $37.99 $105.01 07-01 Washington: $13,070.00$13,371.60$148 45 Composite 102 8% 110-146 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 930G Loader $29,20 $29J7 $14.60 $38 35 07-01 Washington: $5,110.00 $5.138 67 $58 37 Composite 1019% 110-147 Cal USD USD USD USD 2024 multiple 100% 100% USD USD USD 930H Loader $33.63 $29.45 $1661 $4178 07-01 Washington: $5,845.00 $5.91863 $6308 Composite 1019% 110-14B Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 936H Loader $36.71 $33 37 $18 35 US 42 07-01 Washington: $6.390.00 $6,460 68 $70 06 Composite 101,9% 110-149 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 950H Loader $3960 $37178 $1980 $5301 07-01 Washington: $6,925,00 $6,969.46 $77-38 Composite 1019% 110-150 USD USD USD USD 2024- multiple 100% 100% USD USD USD Deere 544K $35.71 -$2834 $17.86 $44.45 07-01 Washington: $6,190.00 $6,26532 $64.05 Loader 1019% Composite 110-151 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 938M Loader S4114 $29.63 $20.57 $52.58 07-01 Washington: $7,135.00 $7,241.14 $70.77 Composite + 1019% 110-152 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $40.35 $2638 $20A7 $4899 07-01 Washington: $6.990.00 $7,10128 $6673 Loader 8 101.9% Loader Composite 110-154 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $40.36 $2638 $20.18 $49.00 07-01 Washington: $6,990.00 $7,102 92 $66 74 Loader 10L9% Loader Composite 110-204 USD USD USD USD 2024. multiple 100% 100% USD USD USD Deere 844K- $74.92 $7L31 $37.46 $101.62 07-01 Washington: $12,980 00$13,186 25$146.03 II Loader L 1019% Composite 110-206 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $4767 $34.01 $2394 $60.137 07-01 Washington: $8,41000 $8.42513 $81138 WA380-B IoL9% Loader LN�; Composite 110-207 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $4B.54 $34-01 $24-27 $6154 07-01 Washington: $8,410.00 $8,54390 $8255 WA380-8 101-9% Loader Composite 110-206 USD USD USD USD 2024- multiple 100% 100% USD USD USD Deere 544K $35.71 $2834 $17,86 $44.45 07-01 Washinglon: $6.190.00 $6,285,32 $64.05 Loader 101-9% Composite 110-20B 4-Wd 150- Deere 544K 2016 Horsepower:167-0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Loader Articulated 174 hp Operator $32.39 $26.16 $16.20 $41.13 07-01 Washington: $5,595.00 $5,70L31 $58 55 Wheel Pmtecbon:EROPS, 103-9% Loaders Power Mode:Diesel 120-201 Compact 2501- Caterpillar 289C 2010 Horsepower:82.0, USD USD USD USD 2024- 99.81% 100% 100% USD USD USD Track 2850 Operator $58 44 $37-24 $29 22 $69.54 07-01 Washington: $10,005-00$10,285.71$95.68 Loaders as Pmtecllon:ROPS, 103% Power Mode:Diesel 125-134 Standard 60-74 Deere 450H 2O04 Dozer Type:PAT, USD USD USD USD 2024- 100% 100% 100% USD USD USD Crawler hp Horsepower:70.0, $23.61 $23.72 $11.60 $30,49 07-01 Washington: $4.050,00 $4,155.30 $47.33 Dozers Operator 102.6% Protection:ROPS, Power Mode:Diesel 125-136 Standard 85- Deere 650H LT 2002 Dozer Type:PAT, USD USD USD USD 2024- 99.91% 100% 100% USD USD USD Crawler 104 hp Horsepower:900, $31.28 $2R44 $15.64 $39.23 07-01 Washington: $5,370.00 $5.504 88 $59.72 Dozers Operator 102.6% Protection:ROPS, Power Mode:Diesel All material herein©2003-2024 Randall-Reilly All rights reserved Page 1 of 7 Equipment Details Rental Rate Blue Book@ Adjustments ID Equipment Size Manufacturer Model Year Serial Conligurahon/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Rate Rate Cost 125-142 Cal USD USD USD USD 2024- multiple 100% 100% USD USD USD D9L Dozer $125.84 $139.25 $62.92 $179.31 07-01 Washington: $22,20500$22,147.37$265-09 Composite 102.6% 125-143 USD USD USD USD 2024- multiple 100% 100% USD USD USD Deere 700K $53.44 $41.18 $26.72 $65 69 07-01 Washington: $9,285 00 $9,405.36 $94,62 XLT 102.6% Composite 125-144 Lgp Crawler 190- Deere 850K 2011 Dozer Type:PAT, USD USD USD USD 2024- 9895% 100% 100% USD USD USD Dozers 259 hp LGP Horsepower:205,0, $112.16 $78 B4 $56.08 $136.31 07-01 Washington: $19,350.00$19.740.65$19100 Operator 103.1% Proleclion:ROPS, Power Mode:Diesel 125-145 Lgp Crawler 160- Komatsu D61PXI- 2014 Dozer Type:Crawler, USD USD USD USD 2024- 9991% 100% 100% USD USD USD Dozers 189 hp 23 Horsepower:170,0, $104 85 $75,89 $52.43 $126 86 07-01 Washington: $17,91500$18.454-48$180.74 Operator 103.1% Proteclion:ROPS/FO PS ,Power Mode:Diesel 125-146 Lgp Crawler 130• Komatsu D51PXI- 2020 Dozer Type:Power USD USD USD USD 2024- 99.9% 100% 100% USD USD USD Dozers 159 hp 24 angle till, $68-94 $42.63 $34.47 $80.76 07-01 Washington: $11,780.00$12,132.67$111,57 Horsepower:131..0, 1031% Operator Prolecjion:EROPS Power Mode:Diesel 125-147 Standard 105- Komatsu D39PXI- 2023 Horsepower:105,0 USD USD USD USD 2024- 99.97% 100% 100% USD USD USD Crawler 129 hp 24 $46.97 $32,50 $23.49 $57.26 07-01 Washington: $8,060.00 $8,267.03 $79A7 Dozers 1026% 135-043 Single 18-29 Caterpillar 623E 1993 Horsepower:365,0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine cu yd Operator $161.52 $147.99 $80.76 $202.31 07-01 Washington: $27,815,00$28,426.93$309.41 Elevating Proleclion:ROPS, 102.2% Scrapers Power Mode:Diesel, _ Scraper Capacity:23.0 _ - 135-044 Single 18-29 Caterpillar 623E 1993 Horsepower:365,0, USD USD USD USD 2024- L '100% 100% 100% USD USD USD Engine cu yd Operator $16152 $147,99 $8076 $202.31 07-01 Washington: $27,81500$28.42693$30941 Elevating Protection:ROPS, 102.294;r Scrapers Power Mode:Diesel, Scraper Capacity:23.0 .� 135-048 Single 1B-29 Caterpillar 623E 1993 Horsepower365,0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine cu yd Operator $161.52 $147 89 $80,76 $20231 07-01 Washington: $27,815.00$28,426.93$309 41 Elevating Protectlon:ROPS, 102 2% Scrapers Power Mode:Diesel, Scraper Capacity:23,0 135-049 Single 18-29 Caterpillar 623E 1993 Horsepower:3650, USD USD USD"�USD 2024- 100% 100% 100% USD USD USD Engine cu yd Operator $161.52 $147,89 $80.76 $202.31 07-01 Washington: $27,815.00$28,426 93$309A1 Elevating Proleclion:ROPS, 1022% Scrapers Power Mode:Diesel, " Scraper Capacity23,0 140-087 Single 16 cu Caterpillar 631E 1993 Horsepower:450.0, USD 'USD' USD USD 2024- 100% 100% 100% USD USD USD Engine yd& Operator $267.75 $213.49 $133 87$330,30 07-01 Washington: $46,290.00$47,123,22$48123 Conventional Over Proteclion:ROPS, 1018% Scrapers Power Mode:Diesel, - Scraper Capacity:21.0- 310 140-090 Single 16 cu Caterpillar 631E 1993 Horsepower:450.0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine yd& Operator 1 $267 75 $213.48 $133 87 5330.30 07-01 Washington: $46,290,00$47,123.22$481,23 Conventional Over Proteclion:EROPS, 101.8% Scrapers Power Mode:Di Ail, Scraper Capacity:21.0- 31.0 140-091 Single 18 cu Caterpillar 531E 1g93 Horsepower:450 0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine yd& Operator $267 75 $213.48 $133 B7$33030 07-01 Washington: $46.290.00$47,12322$481.23 Conventional Over Protection:EROPS, 101.9% Scrapers Power Mode:Diesel. Scraper Capacity:21.0- 31"0 140-093 Single 1B cu Caterpillar 631E 1993 Horsepower:450.0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine yd& - Operator $26775 $21348 $133.87$330-30 07-01 Washington: $46,290.00$47.123.22$49123 Conventional Over Protection:EROPS, 101.9% Scrapers Power Mode:Diesel, Scraper Capacity:2L0- 31.0 140-094 Single 18 cu Caterpillar 631E 1993 Horsepower:450.0, USD USD USD USD 2024- 100% 100% 100% USD USD USD Engine yd& Operator $267.75 $213,46 $133 87$330.30 07-01 Washington: S46,29100$47,123,22$481.23 Conventional Over Prolection:EROPS, 101.8% Scrapers Power Mode:Diesel, Scraper Capacity:21.0- 31.0 140-098 WW Ott-Highway 400- Caterpillar 631E 1993 Horsepower:450, USD USD USD USD 2024- 100% 100% 100% USD USD USD Water 499 hp Power Mode:Diesel, $24180 $254,52 $120.90$297.93 07-01 Washington: $42,01000$42.556.13$496 32 Tanker Tank Capacity:196 9 101,3% Trucks 150-109 Articulated 29.5- Deere 370E 701$ Axle Configuration:6 x 2 USD USD USD USD 2024- 98 5% 100% 100% USD USD USD Rear Dumps 34,4 ,Body Capacity:21.3, $236.45 $126,55 $118 23$264,04 07-01 Washington: $40,86000$41,61542$36300 mt Horsepower:422,0, 103 4% Power Mode:Diesel, Rated Payload:30.4819 150-110 Articulated 29 5- Deere 370E 2016 Axle Conliguration:6 x 2 USD USD USD USD 2024- 99.02% 100% 100% USD USD USD Rear Dumps 34"4 ,Body Capacity:21.3, $237.69 $126,55 $118 85$265 2B 07-01 Washington: $40,860.00$41.834.16$364.24 mt Horsepower:422.0, 103.4% Power Mode:Diesel, Rated Payload:30.4919 200-142 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $6865 $32.33 $34.32 $75.41 07-01 Washington: $11,745.00$12.082.33$100.98 PC338USLC- 102 8% 11 Composite 200-144 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $69.20 S41.07 $34.60 $75,59 07-01 Washington: $11,955.00$12,179-21$11027 PC138 102.B% Composite All material herein©2003-2024 Randall-Reilly All rights reserved. Page 2 of 7 Equipment Details Ramat Rae Stua aoblO Adjustments ID Equipment Size Manula[tury Model Year Serial Configuration/Notes Adjusted Hourly Slandby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Rate Rate Cost 200-145 Cal USD USD USD USD 2024- multiple 100% 100% USD USD USD 330 $107.17 $71.53 $53.58 $125.66 07-01 Washington: $18.440.00$18,861.44$178.70 Composite 1028% 200-156 Cal No data available for this model 320E LRR Composite 200-156-1 USD USD USD USD 2024- multiple 100% 100% USD USD USD Ca1320E $7432 $44.75 $37,16 $34 B8 07-01 Washington: $12.740.00$13.080,62$119 07 LRR 102.8% Composite 200-157 Cat No data avadahW for Ihr model 320E LRR Composite 200-157-1 USD USD USD USD 2024- multiple 100% 100% USD USD USD Ca1320E $6081 $5011 $4040 $91.37 07-01 Washington: $13.885.00$14,22107$130.92 LRR 102.6% Composite 200-158 Cat No data available for this model 314 Composite 200-158-1 USD USD USD USD 2024- multiple 100% 100% USD USD USD Cat 314 S68 97 $41.06 $3k,18 $75.23 07-01 Washington: $11,820=$12.138 31$110-05 Composite 102.8% 200-159 No data available for this model Komatsu PC240LC-10 ti Composite 200-159-1 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $76 03 $4610 $31101 $BB 33 07-01 Washington: $13,030.00$13.380 55$122 13 PC240LC-10 102.8% Composite 200-160 Cat No data available for this model 349E L Composite 200-160-1 USD USD USD USD 2024- multiple 100% 100% USD USD USD Cal 349E L $117.55 $83.17 $58.78 $145 63 07-01 Washington: $20,160.00$20.689 38$200 72 Composite 1028% 200-161 USD USD USD USD 2024- multiple 100% 100% USD USD USD Deere 245G $83.59 $40.57 $41.80 $94.64 07-01 Washington: $14,325,00$14.711.99$12416 LC 1028% Composite 200-162 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 336E L $80.02 $55-61 $40.01 $10025 07-01 Washington: $13,695.00$14,083 08$135.63 Composite 1028% 200-164 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $73 36 $36 59 $36 68 $80.12 07-01 Washington: $12.515.00$12,911 31$109 95 PC138USLC- 1028% 11 Composite 200-165 USD USD USD USD 2024- multiple 100% 100% USD USD USD Case $61.89 $33.24 $30.94 $6898 07-01 Washington: $10,540.00$10,892-18$95.13 CX145D SR 102-8% Composite 200-166 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $76.06 $3889 $3803 $87,53 07-01 Washington: $12,980.00$13,38654$114.95 PC21OLCI-11 1028% Composite 200-167 USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu $10896 $55.44 $54.48 $12682 07-01 Washington: $18.605 00$19,177,07$164,40 PC390LCI-11 •�. 102.8% Composite - - 200-16B USD USD USD USD 2024- multiple 100% 100% USD USD USD Hitachi Zaxis .- $e9.05 $50.39 $44.53 $106 36 07-01 Washington: $15,225-00$15.673,15$139.44 345USLC-6 102.9% Composite 200-169 - USD USD USD USD 2024- multiple 100% 100% USD USD USD Komatsu y $73.48 $36 59 $36.74 $80.24 07-01 Washington: $12.515,00$12,93288$110.07 PCI3BUSLC- 102 B% 11 Composite 200-170 USD USD USD USD 2024- multiple 100% 100% USD USD USD Volvo $10959 $7258 $54.79 $130.86 07-01 Washington: $18.960-00$19,287.14$182.17 EC460B LC 1028% Composite 200-171 USD USD USD USD 2024- multiple 100% 100% USD USD USD Case $68.70 $35 32 $34.35 $75.79 07-01 Washington: $11,675.00$12,090,92$104.02 CX145D SR 1028% Composite 202-109 USD USD USD USD 2024- multiple 100% 100% USD USD USD Yanmar $33,12 $22-55 $16 56 $38 47 07-01 Washington: $5,660.00 $5.829 83 $5567 V1O45 101.6% Composite 202-110 USD USD USD USD 2024- multiple 100% 100% USD USD USD Yanmar $34.07 $23.00 $17,04 $3942 07-01 Washington: $5,825.00 $5,996.80 $57.07 V1O55 101.6% Composite 202-111 USD USD USD USD 2024- multiple 100% 100% USD USD USD Yammer $34,07 $23.00 $17X4 $39.42 07-01 Washington: $5,82&00 $5.99680 $57.07 V1O55 101.6% Composite 202-112 USD USD USD USD 2024- multiple 100% 100% USD USD USD Yammer $34.10 $23.00 $17.05 $39,45 07-01 Washington: $5.825-00 $6,000.99 $57,10 V1O55 101.6% Composite 202-113 USD USD USD USD 2024- multiple 100% 100% USD USD USD Kubota $31.92 $22-37 $15.96 $37.47 07-01 Washington: $5.450.00 $5.617.32 $54.29 KX040 10L6% Composite All material herein©2003-2024 Randall-Reilly All rights reserved. Page 3 of 7 Equipment Details Rental Rate Blue BookO Adjustments ID Equipment Size Manufacturer Model Year Serial Conligurauon/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Rate Rate Cost 202-114 Cat USD USD USD USD 2024- multiple 100% 100% USD USD USD 308 $51,44 $27.84 $25.72 $55,96 07-01 Washington: $8,755-00 $9,053.49 $79.28 Composite 102,8% 202-115 USD USD USD USD 2024- multiple 100% 100% USD USD USD Yanmar $34.07 $23.00 $17.04 $39.42 07-01 Washington: $5,825.00 $5.996,80 $57.07 VIO55 101.6% Composite 202-117 Crawler 6,5- Hitachi ZAXIS 2014 Horsepower.54-0, USD USD USD USD 2024- 99.55% 100% 100% USD USD USD Mounted 8.4 m1 75US-3 -Operating Weight 8.0, $33.41 $15.12 $16.70 $37,16 07-01 Washington: $5,74500 $5,879-42 $48 53 Hydraulic Power Mode:Diesel 102 8% Excavators 205-141 Tractor- 13,5- Deere 81086 2004 DlNe:4WD, USD USD USD USD 2024- 9981% 100% l00% USD USD USD Loader- 144 R Horsepower 86 0, $24.76 $28 35 $12.38 537.00 07-01 Washington: $4,260 00 54,358 34 $5111 Backhoes Operator 102,5% Protection:ROPSIFO PS ,Power Mode:Diesel 205-143 Tractor- 135- Deere 310SG 2004 Dri-AWD, USD USD USD USD 2024- 9981% 100% 100% USD USD USD Loader- 14.4 If Horsepower:86-0, $24,76 $2835 $1238 $37.00 07-01 Washington: $4,260-00 $4,35834 $53-11 Backhoes Operator 102,5% Protection:RO PSIFOPS ,Power Mode:Diesel 205-146 Tractor- 13.5- Deere 310SG =X DrNeAWD, USD USD USD USD 2024- 9997% 100% 100% USD USD USD Loader- 144 It Horsepower:86.0, $24-80 $28 35 $12.40 $37.04 07-01 Washington: $4 260 00 $4,365.17 $53.15 Backhoes Operator 102.5% Pro ection:ROPSIFOPS ,Power Mode:Diesel 210-145 Tandem 1-5- Wacker RD27- 2005 Drum Widlh:47.2', USD USD USD USD 2024- 91 81% 100% 100% USD USD USD Vibratory 3.4 tot Neuson 120 Horsepower33.7, $14.39 $10.00 $7,19 $17.29 07-01 Washington: $2,670,00 $2.532.09 $24,39 Compactors Power Mode:Diesel 103-3% 210-147 Single Drum 45- Dynapac CA150D 2006 Drum Type:Smoolh, USD USD USD USD 2024- 9932% 100% 100% USD USD USD Vibratory 7.4 mt Drum Widlh:66-0, $19,48 $23-80 $9.74 $27.09 07-01 Washington: $3.445.00 $3,428-47 543.28 Compactors Horsepower 80.0, 100.2% Power Mode:Diesel 210-148 Single Drum 7.5- Caterpillar CS-563E 2003 Drum Type:Smooth, USD USD USD USD 2024- 9952% 100% 100% USD USD USD Vibratory 11.4 Drum Width B4-0, $29.18 $40 87 $14.59 542-69 0701 Washington: $5.150,00 $5,135-67 $70-05 Compactors ml Horsepower:142.0, 100.2% Power Mode:Diesel 210-149 Single Drum 11,5- Hamm 3412 2006 Drum Type:Smoolh, USD USD USD USD 2024- 97 99% 100% 100% USO USD USD Vibratory 14.4 Drum Width 84.0. $21.65 $30-35 $10-82 $34-39 07-01 Washington: $3,880.00 $3,809 55 $52-00 Compactors mt Horsepower:134.0, 1002% Power Mode:Diesel 210-150 Single Drum 7.5- Caterpillar CS-563E 2005 Drum Type:Smoolh, USD USD USD USD 2024- 9981% 100% 100% USD USD USD Vibratory 11.4 Drum Width 84,0, $29-26 $4087 $1463 $42-77 07-01 Washngton: $5,150.00 $5.150,39 $70.13 Compactors mt Horsepower:142.0, 100.2% Power Made:Diesel 210--151 Tandem 1.5- Hamm HD12VV 2021 Drum Widlh:47,2, USD USD USD USD 2024- 9994% 100% 100% USD USD USD Vibratory 3.4 tot Horsepower:30-0. $15-28 $9 45 $7 64 $17-86 07-01 Washington: $2,605.00 $2,689 38 $24.73 Compactors Power Mode:Diesel 103 3% 210-152 Tandem To 1.4 Miscellaneous TO 1.7 2023 Drum Wldth:WA, USD USD USD USD 2024- 99 97% 100% 100% USD USD USD Vibratory tot MTONS Horsepower180, $695 5483 $3.48 $8.50 07-01 Washington: $1,185-00 $1.223,71 $11-78 Compactors Power Mode:Diesel 103.3% 215-132 Sell 200- Caterpillar 816E 1996 Front Wheel Wid81:63' USD USD USD USD 2024- 100% 100% 100% USD USD USD Propelled 299 hp X 40', $110,26 $105.14 $55.13 $144 44 07-01 Washington: $19.195,00$19,406.14 5215,40 Sanitation Horsepower.2100, 301,1% Compactors Power Mode:Diesel, Rear Wheel Widlh:83'X 40' 300-079 USD USD USD USD 2024- multiple 100% 100% USD USD USD Dump Truck $32.62 $61.21 $1631 $73,59 07-01 Washington: $6,355.00 $5,741.20 $96,83 &Pup 101.8% Composite 300-080 - USD USD USD USD 2024- multiple 100% 100% USD USD USD Dump Truck $32.62 $64.21 $16.31 $73,59 07-01 Washington: $6,355.00 $5,74120 $9683 &Pup 101.8% Composite 300-081 _ _ USD USD USD USD 2024- multiple 100% 100% USD USD USD Dump Truck - $32.62 $6421 $16.31 $73,59 07-01 Washington: $6.355-00 $5,74120 $9683 &Pup 1018% Composite - b .300-062 USD USD USD USD 2024- multiple 100% 100% USD USD USD Dump Truck $3262 $64,21 $1631 $73.59 07-01 Washington: $6,355-00 $5,741.20 $9683 &Pup ' - 1018% Composite 300-082 Solo '' USD USD USD USD 2024- multiple 100% 100% USD USD USD &Till Deck $44.01 $67.65 $22.01 $84,96 07-01 Washington: $8440.00 $7.746,33$111.66 Composite lOLB% Composite 300-201 USD USD USD USD 2024- multiple 100% 100% USD USD USD Dump Truck $35 94 $64 21 $17.92 $76 Bl 07-01 Washington: $6,355.00 $6,306-21 $100.05 &Pup 1018% Composite 305-065 USD USD USD USD 2024- multiple 100% 100% USD USD USD Tractor& $24.13 $4562 $12.06 $5102 07-01 Washington: 54,365.00 $4,246.24 $6995 Side Dump 102.4% Composite 310-045 On-Highway To 199 Miscellaneous BB2 DSL 1993 Horsepower:150.0, USD USD USD USD 2024- 75.19% 100% 100% USD USD USD Water no 4X22500 Power Mode:Diesel, $7.11 $20.65 $3.56 $20.83 07-01 Washington: $1.630.00 $1,251.40 $27,76 Tankers Tank Capaciry:2500,0 1021% 310-046 On-Highway To 199 Miscellaneous BB2 DSL 1995 Horsepower:150.0, USD USD USD USD 2024- 75,19% 100% 100% USD USD USD Water hp 4X22500 Power Mode:Diesel, $7.11 $20.65 $156 $20.83 07-01 Washington: $1.630-00 $1,251.40 $27.76 Tankers Tank Capacity:2500.0 102.1% 310-047 On-Highway To 199 Miscellaneous BB2 DSL 1999 Horsepower:1510, USD USD USD USD 2024- 80.43% 100% 100% USD USD USD Water hp 4X22500 Power Mode:Diesel, $7.61 $20.65 $3.80 $21.33 07-01 Washington: $1,630.00 $1,33851 $28.26 Tankers Tank Capacily:2500.0 102.1% 325-106 On-Highway 19,501 Miscellaneous 4X2 2006 Axle Conliguratior-AX2 USD USD USD USD 2024- 87-77% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower.200.0, $10.34 $2980 $5,17 $3258 07-01 Washington: $2,045.00 $1.819.95 $40-14 Trucks 26.000 DSL Maximum Gross 1014% Ibs Vehicle Weigho20000,0 ,Power Mode:Diesel All material herein 0 2003-2024 Randall-Reilly All rights reserved. Page 4 of 7 Equipment Details Rental Rale Blue Book(g) Adjustments ID Equipment Sze Marwlapwm- Model Year Serial Conliguration/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cos[ Rate Rate Rate Cost 325-109 On-Highway 19,501 Miscellaneous 4X2 2010 Axle ConligurationAX2 USD USD USD USD 2024- 92A% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower 200,0, $10.95 $29 BO $5.47 $33.19 07-01 Washington: $2,045.00 $1.926.39 $40.75 Trucks 26,000 DSL Maximum Gross 101.4% Ibs Vehicle Weight 20000.0 ,Power Mode:Diesel 325-110 On-Highway 19,501 Miscellaneous 4X2 2008 Axle ConligurationAX2 USD USD USD USD 2024- 8887% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower200.0, $10.47 $29.80 $5.24 $32.71 07-01 Washington: $2,045.00 $1,842.82 $4427 Trucks 26,000 DSL Maximum Gross 101.4% Ibs Vehicle Weighl:20000,0 ,Power Mode:Diesel 325-111 On-Highway 19,501 Miscellaneous 4X2 2008 Axle Conligurauon:02 USD USD USD USD 2024- BB 87% 100% 100% USD USD USD Flashed - 20KGVW ,Homepower:200.0, $10.47 $2980 $5.24 $32.71 07-01 Washington: $2.045.00 $1,842,82 $40.27 Trucks 26,000 DSL Maximum Gross 101.4% Ibs Vehicle Weigh[20000.0 ,Power Mode:Diesel 325-112 On-Highway 19.501 Miscellaneous 4X2 2014 Axle ConligurahonAX2 USD USD USD USD 2024- 97.37% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower.200.0, $11,47 $29,80 $5,74 $33.71 07-01 Washington: $2.045.00 $2,019-06 $4127 Trucks 26.000 DSL Maximum Grass 1014% Ibs Vehicle Weight:20000,0 ,Power Mode:Diesel 325--- S On-Highway 19,501 Miscellaneous 4X2 2022 Axle Configuration 4X2 USD USD USD USD 2024- 99.95% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower 200,0, $11,78 $29 BO $5,89 $34,02 07-01 Washington: $2,045.00 $2,072.51 $41.58 Trucks 26,000 DSL Maximum Gross 101.4% Ibs Vehicle Weight:20000,0 ,Power Moc lesel 325-201 On-Highway 19.501 Miscellaneous 4X2 2017 Axle ConligurationAX2 'USD USb USD USD 2024- 99.79% 100% 100% USD USD USD Flatbed - 20KGVW ,Horsepower:200.0, $11.76 $29 80 $5,88 $34.00 07-01 Washington: $2,045.00 $2,069.31 $4156 Trucks 26.000 DSL Maximum Gross 101 4% .. Ibs Vehicle Weighl:20000.0 ,Power Mode:Diesel 325-202 On-Highway 19,501 Miscellaneous 4X2 2017 Axle Conligurat-AX2 USD USD USD USD 2024- 99 79% 100% 100% USD USD USD Flatbed . 20KGVW ,Homepower.200,0, $11,76 $29-80 $5-88 $34.00 07-01 Washington: $2,04500 $2.069.31 54156 Trucks 26.000 DSL Maximum Gross 101.4% Ibs Vehicle Weight 20000.0 ,Power Mode:Diesel 335-104 On-Highway 200- GMCICHEVY 1500 2006 Axle Conliguration:4.0 x USD USD USD USD 2024- 92-42% 100% 100% USD USD USD Light Duty 299 hp 2.0,Cab $3.57 $22.43 $179 $21.81 07-01 Washington: $675.00 $628 84 $26.00 Trucks Type Conventional, 100 8% Horsepower:280-0, Power Mode:Gasoline, Ton Rating:1.0 12.0 335-111 On-Highway 200- GMC\CHEW 1500 2007 Axle Conhguralion:4.0 x USD USD USD USD 2024- 92.84% 100% 100% USD USD USD Light Duty 299 hp 70,Cab $3.59 $2243 $179 $21.83 07-01 Washington: $675.00 $631.66 $2602 Trucks Type:Conventional, 100.8% Harsepower.280.0, Power Mode:Gasoline, - Ton Rating:1.0/2.0 335-128 On-Highway 300 hp Miscellaneous 4X4 3/4 2009 Axle Conliguralion:4X4 USD USD USD USD 2024- 93.12% 100% 100% USD USD USD Light Duty &Over 440 ,Cab Type:Crew, $560 $2450 $260 $24.91 07-01 Washington: $1,050,00 $985,56 $30,10 Trucks CREW Horsepower:440, 100.8% DIESEL Power Mode:Diesel, Ton Rating 3/4 335-131 On-Highway 300 hp Miscellaneous 4X4 3/4 200B Axle Conliguratiori USE, USD USD USD 2024- 92.86% 100% 100% USD USD USD Light Duty &Over 440 ,Cab Type:Crew, $558 $24.50 $2.79 $24.89 07-01 Washington: $1,050.00 $982.88 $30.08 Trucks CREW Horsepower.440, 10a 8% DIESEL Power Mode:Diesel. Ton Raeng.3/4 335-133 On-Highway 200- GMCICHEVY 1500 2005 Axle Configuralion:40 x USD USD USD USD 2024- 90.64% 100% 100% USD USD USD Llghl Duty 299 hp 40.Cab Type:Crew, $4.13 $2276 $2.06 $22.37 07-01 Washington: $795-00 $72639 $2689 Trucks Horsepower.280.0, 100 8% Power Mode:Gasoline, Ton Rating:1.0 12.0 335-139 On-Highway 200- Miscellaneous 4X4 V2 2016 Axle Conliguralion:4X4 USD USD USD USD 2024- 99.28% 100% 100% USD USD USD Light Duty 299 hp 277 ,Cab Type:Crew, $6.06 $16.66 $3.03 $18.22 07-01 Washington: $1,06E00 $1,06582 $22,72 Trucks CREW Horsepower:277, 100.8% DIESEL Power Mode:Diesel, Ton Rating:1/2 335-140 On-Highway 200- Miscellaneous 4X4 V2 2016 Axle ConfigurationAX4 USD USD USD USD 2024- 99.28% 100% 100% USD USD USD Light Duty 299 hp 277 ,Cab Type:Crew, $6.06 $1666 $3.03 $19.22 07-01 Washington: $1,065.00 $1.065.82 $22.72 Trucks CREW Horsepower:277, 100.8% DIESEL Power Mode:Diesel, Ton Rating:112 335-141 On-Highway 200- Miscellaneous 4X4 112 2016 Axle ConliguralionAX4 USD USD USD USD 2024- 99 28% 100% 100% USD USD USD Light Duty 299 hp 277 ,Cab Type:Crew, $6.06 $16.66 $3.03 $18.22 07-01 Washington: $1,065.00 $1.065,82 $22.72 Trucks CREW Horsepower277, 100-8% DIESEL Power Mode:Diesel, Ton Raling:1/2 335-145 On-Highway 200- GMCICHEVY 1500 2015 Axle Conliguralion:4.0 x USD USD USD USD 2024- 98-29% 100% 100% USD USD USD Light Duty 299 hp 20,Cab $3.80 $22.43 $190 $22 04 07-01 Washington: $675 00 $66B 79 $26 23 Trucks Type Conventional, 100.8% Horsepower:280.0, Power Mode:Gasoline, Ton Raling:1.012.0 335-146 On-Highway 200- GMC\CHEW 1500 2016 Axle Configuration d,0 x USD USD USD USD 2024- 99 28% 100% 100% USD USD USD Light Duty 299 hp 4,0,Cab Type:Crew, $4,52 $22.76 $226 $22.76 07-01 Washington: $795-00 $795-61 $27,28 Trucks Horsepower:280-0, 100.8% Power Mode:Gasoline, Ton Rating:1-0/20 335-147 On-Highway 200- GMCICHEVY 1500 2004 Axle Conliguralion:4.0 x USD USD USD USD 2024- 89 83% 100% 100% USD USD USD Light Duty 299 hp 2,0,Cab $3,47 $22.43 $1_74 $21.71 07-01 Washington: $675.00 $611.23 $25.90 Trucks Type Conventional, 10018% Horsepower:280.0, Power Mode:Gasoline. Ton Rating:1.0 12.0 335-148 On-Highway 200- GMC\CHEW 1500 2018 Axle Conligura[ion:4.0 x USD USD USD USD 2024- 99.67% 100% 100% USD USD USD Light Duty 299 hp 2,0,Cab $3,85 $2243 $1,93 $22.09 07-01 Washington: $675-00 $678.16 $26.28 Trucks Type:Conventional 100-8% Horsepower:280.0 Power Mode:Gasoline Ton Raling:1.0/2.0 All material herein©2003-2024 Randall-Reilly All rights reserved. Page 5 of 7 Equipment Details Rental Rate Blue Book® Adjustments ID Equipment Size Manufacturer Model Year Serial Configurabon/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Rate Rate Cost 335-150 On-Highway 200- Miscellaneous 4X4 1/2 2015 Axle ConfiguralionAX4 USD USD USD USD 2024- 98.29% 100% 100% USD USD USD Light Duty 299 hp 277 ,Cab Type:Crew, $6.00 $16.66 $3.00 $18.16 07-01 Washington: $1,065,00 $1,055.20 $22.66 Trucks CREW Horsepower.277, 100,8% DIESEL Power Mode:Diesel, Ton Rabng:112 335-151 On-Highway 200- Miscellaneous 4X4 1/2 2019 Axle ConbgurationAX4 USD USD USD USD 2024- 99.79% 100% 100% USD USD USD Light Duty 299 hp 250 ,Cab Type:Crew, $5.97 $15.31 $2.99 $16,94 07-01 Washington: $1,045.00 $1.051-11 $21L28 Trucks CREW Harsepower:250, 100,8% DIESEL Power Mode:Diesel, Ton Raling:1/2 335-152 On-Highway 200- Miscellaneous 04112 2021 Axle ConfigurationAX4 USD USD USD USD 2024- 99 95% 100% 100% USD USD USD Light Duty 299 hp 277 ,Cab Type:Crew, $6.10 $16 66 $3 05 $18 26 07-01 Washington: $1,065.00 $1,07294 $2276 Trucks CREW Horsepower:277, 1008% DIESEL Power Mode:Diesel, Ton Raling:1/2 335-154 On-Highway 200- Miscellaneous 4X4 1/2 2020 Axle ConliguralionAX4 USD USD USD USD 2024- 99.9% 100% 100% USD USD USD Light Duty 299 hp 277 EXT ,Cab Type:Extended, $5,78 $16.53 $2 89 $17.94 07-01 Washington: $1,010.00 $1.017.05 $22 31 Trucks DIESEL Horsepower.277, 100.8% Power Mode:Diesel, Ton Rating:1/2 335-156 On-Highway 200- GMC\CHEW 1500 2020 Axle Contiguralion:4,0 x USD USD USD USD 2024- 99.9% 100% 100% USD USD USD Light Duty 299 hp 20,Cab $3.86 $22-43 $1,93 $22.10 07-01 Washington: $675-00 $679.71 $26.29 Trucks Type:Convenlional, 100.8% Horsepower:290,0, - Power Mode:Gasoline, Ton Raling:1.0/2.0 335-157, On-Highway 200- GMC\CHEW 1500 2020 Axle Configurabon:4,O x USD USD USD USD 2024- 99.9% 100% 100% USD USD USD Light Duty 299 hp 2.0,Cab $3,86 $22.43 $1.93 $22.10 07-01 Washington: $675 00 $679.71 $26 29 Trucks Type:Conventional, 100.8% Horsepower:280,0, Power Mode:Gasotine, Ton Rating:LO/2.0 335-158 On-Highway 200. Miscellaneous 4X2 1 1/4 2021 Axle ConfigurationAX2 USD USD USD USD 2024- 99.95% 100% 100% USD USD USD Light Duty 299 hp 260 Cab Type:Crew, $352 $20.85 $1.76 $20.46 07-01 Washington: $615.00 $61958 $24.37 Trucks CREW Horsepower:260.0, 100.8% GAS Power Mode:Gasoline, Ton Rating:1 L4 335-159 On-Highway 200- GMC\CHEW 1500 =0 Axle Conliguration:4.0 x USD USD USD USD 2024- 999% 100% 100% USD USD USD Light Duty 299 hp 2,0,Cab $3.66 $2243 $1-93 $22 10 07-01 Washington: S67UO $679.71 $2629 Trucks Type:Conventional 100.8% Horsepower:280.0 Power Mode:Gasoline Ton Raling:1.012.0 335-160 On-Highway 200- GMC\CHEW 1500 40P3 Axle Configuralion:4.0 x USD USD USD USD 2024- 99.95% 100% 100% USD USD USD Light Duty 299 hp 2.0.Cab $3 86 $22.43 $193 $22.10 07-01 Washington: $675 00 $680 03 $26 29 Trucks Type:Convenbonal, 100.8% Horsepower.280 0, Power Mode:Gasoline, Ton Raling:1-0/2-0 335-161 On-Highway 200. GMC\CHEW 1500 9A_a} Axle Configuralion:4.0 x USD USD USD USD 2024- 99.95% 100% 100% USD USD USD Light Duty 299 hp 20,Cab $386 $2243 $L93 $22.10 07-01 Washington: $675.00 $68003 $26.29 Trucks Type:Conventional, 100.8% Horsepower:280 0. Power Mode Gasoline, Ton Rating:1.0/2 0 335-162 On-Highway 200- Miscellaneous 4X4 112 2023 Axle Con6guration:4X4 USD USD USD USD 2024- 99.99% 100% 100% USD USD USD Light Duty 299 hp 277 EXT ,Cab Type:Exlended, $5 78 $16 53 $2 89 $17-94 07-01 Washington: $1,010.00 $1,017A5 $2231 Trucks DIESEL Horsepower:277, 100.8% Power Mode:Diesel, Ton Rating:1/2 335-203 On-Highway 200- Miscellaneous 4X2 1 114 2016 Aide ConfigurationAX2 USD USD USD USD 2024- 9928% 100% 100% USD USD USD Light Duty 299 hp 260 ,Cab Type:Crew, $3.50 $20.85 $1.75 $20.44 07-01 Washington: $615.00 $615.47 $24.35 Trucks CREW Horsepowen260.0, 100-B% GAS Power Mode:Gasolme Ton Rating:l 114 335-207 On-Highway 200- Miscellaneous 4X2 1/2 2016 Axle ConfigurationAX2 USD USD USD USD 2024- 99-28% 100% 100% USD USD USD Light Duty 299 hp 290 ,Cab $3.76 $23.03 $1,89 $22.67 07-01 Washington: $665,00 $665.51 $26 81 Trucks CONV Type:Conventional 100.8% GAS Horsepower:290, Power Mode:Gasoline y_ Ton Rating:112 r 335-212 On-Highway 200• GMC\CHEVY 1500 2017 Axle Conbguration:4.0 x USD USD USD USD 2024- 99.4% 100% 100% USD USD USD Light Duty 299 hpy, 20,Cab $3.94 $22.43 $1.92 $22.08 07-01 Washington: 5675 00 $676 31 $26.27 Trucks - _ Type:Conventional, 100.8% .. Horsepower:280.0, Power Mode:Gasoline, Tan Rating:1.0/20 335-213 On-Highway 200- GMC\CHEW 1500 2017 Axle Configuration:4.0 x USD USD USD USD 2024- 994% 100% 100% USD USD USD Light Duty 299 hp 20,Cab $3.84 $22-43 $1-92 $22.08 07-01 Washington: $67500 $676 31 $26.27 Trucks Type:Conventional, 100.8% Horsepower:260.0, Power Mode:Gasoline, Ton Rating:1.0/20 335-214 On-Highway 200- GMC\CHEVY 1500 2017 Axle Configurabon:4,0 x USD USD USD USD 2024- 99.4% 100% 100% USD USD USD Light Duty 299 hp 20,Cab $3.84 $2243 $1.92 $22.08 07-01 Washington: $675 00 $676 31 $26.27 Trucks Type.Conventional, 100,8% Horsepower:280.0, Power Mode:Gasolme, Ton Raling:LO 12.0 335-215 On-Highway 200- Miscellaneous 4X4 1/2 2018 Axle ConrigurationAX4 USD USD USD USD 2024- 99.67% 100% 100% USD USD USD Light Duty 299 hp 250 ,Cab Type:Crew, $5,97 $1531 $29B $16.94 07-01 Washington: $1,045.00 $1,049.90 $2L28 Trucks CREW Horsepower:250, 300.8% DIESEL Power Mode:Diesel, Ton Rating:112 40 Ton Hydraulic All Miscellaneous 340 Capacity:40.0,Number USD USD USD USD 2024- 99.74% 100% 100% USD USD USD Trailer Removable Of Axles:3,0,Number $12.91 $8.21 $6.46 $12.91 07-01 Washington: $2,245-00 $2.272,86 $21.12 Gooseneck Of Tires:120 101.5% Equipment Trailers All material herein©2003-2024 Randall-Reilly All rights reserved. Page 6 of 7 Equipment Details Rental Rate Blue Book® Adjustments ID Equipment Size Manufacturer Model Year Serial Configuration/Notes Adjusted Hourly Standby Idling Revision Region Age Ownership Operating Unadjusted Adjusted FHWA Type Class Number Hourly Operating Monthly Monthly Hourly Ownership Cost Rate Raze Rate co'l 540031 sell All LayMp1 6HC18HC 2001 Horsepower.37.0, USD USD USD USD 2024- 88.1% 100% 100% USD USD USD Prowted Power Mode:Diesel $40.85 $30.17 $20.43 $45.86 07-01 Washington: $7,855.00 $7.190.26 $71.02 pavement 103 9% dooms 602-861 Portavo BMW Magnum MLT52002008 Number Ol L,91his-n- USD USD USD USD 2024• 90.76* 100% 100% USD use LSD Lam YovetHs ACr poorer Made O'eeel, $3.19 $5.51 $1.60 $6.30 01*1 Washington; $58500 $551.72 $e.70 TOW&He%w 30 105-8% 602-862 Portable BMW Magnum MLT5200 2009 Number 01 L,ghrs s, USD USD USD USD 2024. 1 93.07% 100% 100% USD USD USD Light Towers&Over 111 t--Mode D§xeJ- $3.27 $5.51 $1.64 $6 38 01-01 Washington: $585.00 $575.01 $8:8 Tcwin He,DW!3D 105.89a Cal Telescoping 4.5- Caterpillar THSBOS 2008 Base Capaory1100OA USD USD USD USD 2024- 100% 100% 100% USD USD USD Boom Rough 4.9 ml ,Hcrsepcw ..117.5. $86.65 $5161 $43 32 $96.73 07-01 Washington: $14.565.00$16,249 55$138.26 Terrain Lift Maximum trh 104.7% Trucks Heigmw87t 1). Mazmum Reach.504.0 per Mode.a-esel These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book®Print Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for(mark.scoccolo@scibuilds.com) Q� A L ll i All material herein C 2003-2024 Randall-Reilly All rights reserved. Page 7 of 7 Kent S 218th St-98th Ave S #034.1-Subm034.1-Labor and Equipment Rates for G&G Submittal item detail #Various-034.1 -0: Subm034.1 -Labor and Equipment _ A Rates for G&G Status Created on Ball in court due date Closed Jan 27, 2025 ID 100 Ball in court Brooklyn Cummings(SCI Infrastructure, LLC) Manager Susan Timm (Akana) Responsible contractor Brooklyn Cummings(SCI Infrastructure, LLC) Watchers Construction Manager Sean Flint Susan Timm General Contractor Spec section Various Various Spec sub section Description Labor and Equipment Rates Final Response For Record Only Final Response Attachments SUBM034.1-LABOR AND EQUIPMENT RATES FOR G&G 202501301059.PDF,Jan 30, 2025, 8:32 PM UTC Final Response Comments Package Created by Susan Timm with Autodesk®Construction Cloud^"on Jan 30,2025 at 12:33 PM PST Page 1 of 2 \ 2 M _ _ / k � k LkLn 2 (A / m � g 2 } k / = e o fa = / k / E -0 c) / -0 \4-1 / Ln CD CD / \ ' d -0 d -0 j 2 / L ƒ Ln L$ 2 Lu$ \ E / J � 21 CD M _ . $ o CL k 2 2 � 2 2 2 7 � q q q 2 k k k i ) 7 2 Ln ■ o , \± § / \ \ \ 2 N }k , kcu ) D / y 7 > . / - [ § 00 § 2 § E p ) p k n - E Ln � a & - o c m a g a § dLn u a ■ r n ■ � a 2 ■ � o - J 2 § / 2 c a ƒ 2 k' m R I R S / R 2 R } R j } d �! 0 N U N o 6 N � +' N o 0 w J d Q Z7 J C � Q pq 7 w r ' m Q a M o _ 0 _ V n Q l� J � cu Q U co4.1 LI _ 0 CO)wU w - a ILw _& Z Z o a U) co V N � � o c' O00 LL c m cn rn c Q E Z •c aD a N CO m Z a H Q YOU) 0 0 r LL > Z J J o N N °' a a � 0C w m N 00 O o N aF 06 IL O (n N N w - [G O li U) m cc, M N co x � co _ OD N Z a o CD Z (!) " � a m � o 'Q �� CD O � 00 a w O v U) c _ NL � ) m N O V It 7 cv c6 m N a V) N f/) � J ca J 18044 SE 224TH STREET KENT,WA 98042 425-432-1325 EMAIL:TAMARASLEEMAN.GNGQGMAIL.COM ELECTRICAL CONTRACTOR January 27th, 2025 SCI, INFRASTRUCTURE, LLC. 2821 S 154th Street SeaTac, WA 98188 RE: 17-3010—LID 363: S. 218TH STREET —2025 LABOR RATES (Updated) KING COUNTY LABOR PRICE LIST FOR FORCE ACCOUNT BILLING JOURNEYMAN ELECTRICIAN- TOTAL WAGE BASE WAGE FICA SUTA FUTA L&I STRAIGHTTIME 112.10 101.92 7.80 0.95 .61 .823 TIME&HALF 167.74 152.88 11.70 1.42 .92 .823 DOUBLE TIME 223.37 203.84 15.59 1.90 1.22 .823 GROUND PERSON STRAIGHTTIME 62.68 56.66 4.33 .53 .34 .823 DOUBLE TIME 124.54 113.32 8.67 1.05 .68 .823 G &G, INC.-2024 LABOR RATES 1 18044 SE 224TH STREET KENT,WA 98042 425-432-1325 EMAIL:TAMARASLEEMAN.GNG@GMAIL.COM ELECTRICAL CONTRACTOR _ January 27th, 2025 SCI, INFRASTRUCTURE, LLC. 2821 S 154th Street SeaTac, WA 98188 RE: 17-3010—LID 363: S. 218TH STREET —2024 EQUIPMENT RATES 2025 EQUIPMENT RATES TRUCKS(INCLUDES SMALL TOOLS) 1)2008 GMC 1500 SIERRA PU $37.68 2)2003 FORD F350 DIESEL SERVICE TRUCK $39.30 3)2012 FORD F150 PU $39.36 4)2006 ISUZU FLATBED TRUCK $28.97 5)2014 GMC 1500 SIERRA CREWCAB PU TRUCK $49.16 6)2008 DODGE RAM 4X4 PU $37.45 7)2004 CHEV 1500 SILVERADO PU $37.68 8)2000 FORD F250 3/4 TON PU $38.94 9)2004 FORD F250 3/4 TON PU $37.68 10)2000 GMC C2500 SERVICE TRUCK $36.87 11)2011 CHEVY 3500 4X4 SILVERADO SERVICE TR $40.70 12)2008 FORD F250 PU W/LIFT GATE $39.94 13)2010 FORD F150 PU $39.21 14)2011 DODGE 2500 CREW CAB PU $42.88 15)2011 FORD F-450 DIESEL SERVICE TRUCK $42.88 16)2008 CHEVY 1500 SILVERADO PU $37.68 17)2010 CHEVY 1500 SILVERADO PU $37.68 18)2007 TOYOTA TUNDRA PU $37.68 G &G, INC.-2024 EQUIPMENT RATES 1 2024 EQUIPMENT RATES(CONT...) G&G,INC.-TRUCKS WITH SMALL TOOLS INCLUDED 19)2005 CHEVY SILVERADO 1500 PU $37.68 20)2008 CHEVY 1500 SILVERADO PU $37.68 HEAVY EQUIPMENT 1988 CASE BACKHOE 580K $44.00 2006 JOHN DEERE 31OG 4X4 BACKHOE $46.53 2002 INTL.5 YARD DUMP TRUCK $44.58 1994 FREIGHTLINER DIGGER/DERRICK $43.53 2011 INTL.7500 DIGGER DERRICK $44.31 2006 CHEV C5500 BOOM TRUCK $43.53 2000 FORD F450 BUCKET TRUCK $46.84 2002 INTL.4300 BUCKET TRUCK $64.05 2003 INTL.4300 BUCKET TRUCK $64.05 2005 INTL.4300 BUCKET TRUCK $64.05 1995 INGERSOL RAND 185 COMPRESSOR $15.70 2011 INGERSOL RAND 185 COMPRESSOR-2 $15.70 2007 SULLIVAN D210 QH COMPRESSOR $15.70 2008 DOOSAN 185 COMPRESSOR $15.70 2004 TAKEUCHI TB 145 MINI EXCAVATOR $31.21 2004 KUBOTA KX-41 MINI EXCAVATOR $24.40 2006 HITACHI MINI EXCAVATOR TB 145 $23.47 20??MINI EXCAVATOR GREEN IHI 20JX $24.40 2003 MECO STRAIGHT&CIRCULAR SAWS $10.88 EA. 2015 WOLVERINE CIRCULAR/STRAIGHT SAW $20.00 2017 KUBOTA STRAIGHT SAW $15.00 2001 CRAFCO SS60 P TAR MACHINE W/TRAILER $18.42 G &G, INC.-2024 EQUIPMENT RATES 2 2024 EQUIPMENT RATES(CONT...) HEAVY EQUIPMENT(CONT...) 2011 CRAFCO SS60 P TAR MACHINE W/TRAILER $18.42 2015 CRAFCO SS60 P TAR MACHINE W/TRAILER $18.42 2005 C&B FLATBED TRAILER $3.55 2015 BIG TEX DUMP TRAILER $5.24 2015 XCEL MIRAGE 14'UTILITY TRAILER $5.24 2020 EAGLE EQUIPMENT TRAILER $5.24 1993 CZ BEAVERTAIL EQ TRAILER $5.24 1995 FREIGHTLINER LOOP TRUCK $46.62 2011 FREIGHTLINER LOOP TRUCK $60.00 2005 INTL.4300 LOOP TRUCK $64.05 2009 VACTRON PMD-850 DIESEL 400 VAC/TRAILER $110.0 G &G, INC.-2024 EQUIPMENT RATES 3