Loading...
HomeMy WebLinkAboutCAG2024-172 - Change Order - #3 - Northwest Cascade, Inc. - Reith Road Roundabouts - 2/11/25 Agreement Routing Form • For Approvals,Signatures and Records Management T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KEN W A 5 H I N G T O N (Print on pink or cherry colored paper) Originator: Department: Stephanie Anderson PW Engineering Date Sent: Date Required: > 2/11/2025 N/A CL 0 L a Authorized to Sign: Date of Council Approval: Q 0 Director or Designee ❑Mayor 4/2/24 Budget Account Number: Grant? ❑Yes 0 No R20123.64110.120 Type: N/A Vendor Name: Category: Northwest Cascade, Inc. Contract Vendor Number: Sub-Category: Change Order 3 0 Project Name: Reith Road Roundabouts E L a Project Details:Hazardous tree removal near STA 11+80 on Reith Road. Cost include work C tracked on FA Sheet#19 for atotal cost od $1,660.38 C 41 Agreement Amount: $1,660.38 Basis for Selection of Contractor: Bid 41 LStart Date: 4/10/2024 Termination Date: 157 working days Q Local Business? ❑Yes ❑ No* *if meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: ❑Yes ❑No CAG2024-172 Date Received by City Attorney: Comments: C1 C �.r 3W Iftft 12 1Q 0 ; Date Routed to the Mayor's Office: �t Date Routed to the City Clerk's Office: 2/12/25 Visit Documents.KentWA.gov to obtain copies of all agreements • KENT W A S M I N G T O N CHANGE ORDER NO. #3 NAME OF CONTRACTOR: Northwest Cascade ("Contractor") CONTRACT NAME & PROJECT NUMBER: Reith Road Roundabout ORIGINAL CONTRACT DATE: April 10 2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Hazardous tree removal near STA 11+80 on Reith Road. Cost include work tracked on FA Sheet #19 for atotal cost od $1,660.38 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $4,283,685.98 (including applicable alternates and WSST) Net Change by Previous Change Orders $45,759.98 (incl. applicable WSST) Cnt Contract Amount $4,329,445.96 (incl. Previous Change Orders) Current Change Order $1,660.38 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $4,331,106.34 CHANGE ORDER - 1 OF 3 Original Time for Completion 150 working days (insert date) Revised Time for Completion under { 157 working days prior Change Orders f (insert date) Days Required (f) under Minor Change 0 working days Orders Days Required (f) for this Change Order 0 working days Revised Time for Completion 157 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: ❑igi[ally signed by Chad$ieren By: Chad Bleren pale 2025.02.111357:06-06'00' (signature) (signature) Print Name: Print Name: Chad Bieren P.E. Its . tom fteffwmarr Its Public Works Director (title) (title) DATE: 5 DATE: EC KIP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department L C[In this Field,you may enter the electronic Filepath where the contract has been saved] f CHANGE ORDER - 3 OF 3 File No. 200.2 K NT n.,. CHANGE ORDER WORKSHEET NO. 3 Construction Engineering Division - Public Works Project: Reith Road Roundabouts Project No: 22-3005 Project Engineer: Thomas Leryer Fed-Aid No: N/A Capital Projects Josh Harris Contractor: Northwest Cascade Date: 12/30/2024 I. Proposed Change Hazard tree removal near STA 11+80 on Reith Road. Costs include work tracked on FA sheet #19 for a total cost of $1660.38 II. Reason and Background for Change During the installation process of the storm pipe around catch basin 1376, the contractor encountered extensive tree roots. Upon further inspection, it was determined the tree in question posed a risk due to instability. As a result, immediate action was necessary to ensure safety and project continuity. Key Points; - **Tree Condition**: - Extensive digging revealed significant root interference. - Assessment concluded that the tree was unstable and required removal. - **Action Taken**: - Norwest Cascade was engaged to perform the removal. - The work was conducted on a force account basis, ensuring prompt action. - **Disposal**: - Following removal, the tree was disposed of in accordance with environmental and safety regulations. III. Method of Payment NEW PAY ITEMS ❑✓ Not applicable Schh. I Item Description Total Est. Unit Unit Price Total Est Imeat d Cost of No OtyI Hazard Tree Removal 1 FA $1,660.38 $ 1,660.38 New Pay Items Total: $ 1,660.38 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑� Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ Page 1 L - f Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑� Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ $ - Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $1,660.38 *Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 1SO Due This Change Order: 0 Previous Total: 1S7 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 1S7 *This Change Order+ Previous Total r Capital Projects Manager: Date: �' 1 Josh' arris Construction Engineering Supervisor: Date: a on Barry Construction Manager: _ Date: c Connor f �i Page 2 FA Sheet No.: 19 DAILY REPORT OF FORCE ACCOUNT WORKED KEWT Project Name: Reith Road Roundabouts Project No: 22-3005 Item No.: Date: 10/22/2024 Description of Work: Do to storm installation a tree had all of its major roots ripped out posing a potential falling hazzard.NWC removed the tree on the cit s direction. Work by Subcontractor?: NO Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Mrs Hourly Rate Hrs OT Rate AMOUNT Joe R Operator Heavy 2 99.64 $ 199.28 Mike Rose Laborer 2 79.39 $ 158.78 Joe Marci Operator Light 2 97.94 $ 195.88 Chris S Truck Driver 1 97.94 $ 9794 $ SUBTOTAL-LABOR: $ 651.88 LABOR OVERHEAD&PROFIT @ 31% $ 202.08 LABOR TOTAL $ 853.96 _EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT C707 Kenworth T80013 1 92.41 $ 92.41 D262 John Deere 135G 2 113.32 $ 22664 D199 John Deere 644J 2 82.23 $ 16446 $ SUBTOTAL-EQUIPMENT $ 483.51 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 101.54 EQUIPMENT TOTAL $ 585.05 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Waste Connection INV#422156190H 1 LS $ 18295 $ 18295. $ - SUBTOTAL $ 182.95 OVERHEAD&PROFIT @ 21% $ 38.42 TOTAL $ 221.37 Verification of Hours Worked: TOTAL: $ 1,660.38 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 1,660.38 Owner's Representative Date Pay Estimate Entered: Date: By: CNW, NORTHWEST CASCADE INC. POST OFFICE BOX 73399,PUYALLUP.WASHINTON 98373/TOLL FREE 8OO-5624M2 DAILY FORCE ACCOUNT WORK SHEET PAGE: OF OWNER: 7 WEATHER: �I� EW#: JOB NAME&#: ZTH OAS lam. . ' �� r -�T STARTTIME: DATE: OWNERS REP: END TIME: 3 WORK PERFORMED&LOCATION: aV s� ��G re-Dk'A v- d 1 0 1= E TN Z 20 UT j,,io 0'FF LABOR WORKER'S NAME WORKER'S OCCUPATION REG TIME TIME&A HALF DOUBLE TIME oe T.aCL /ade [ r,�� 2 EQUIPMENT EQUIPMENT NUMBER EQUIPMENT DESCRIPTION HOURS STANDBY Lid 1 M P-FP-U C-e__ 1 (o Z I ,r, Fc A kI R 7'o+Z E MATERIALS OR SERVICES VENDOR&INVOICE# MATERIAL/VENDOR DESCRIPTION i EPRESENTATIVE TITLE: NWC REPRESENTATIVE: OWNER REPRESENTATIVE: R i en o o 0 r � N W R ti A 69 fA fR Z m O 00 O N O 0�0 O b a C O �/1 V1 o W LY1 O N d � 0 0 d 0 ] � p11;C o n a$ � oao 4 orr � ro o�^ oo ao E ❑ N O °� O °� O �n 00 ❑ H C N O �D C OQ O ❑ O 06¢O O�J C l^ O N a 0 0 ❑a O cn �'C'4 �''D va ss sv I wl C14 ss 6H In N [- 10 N ¢ .a`7- N N am O, J a �y7 FW',,ay �o o F F dAAO OM ' vNo Mo10aY OF OF� O FF ' � s h � �� � o 6qF .19 �N O U zF 5 0 rn U FU O y 0 nQ ~ x F e z G NI. N O N a a ❑�'N N N N N N �`7 N O N N M J N W C N y Oj N O a fLCC o. x o cn � a w N N N N N N N o R � 3 0 a E CW7FF WOF F .�-,�.. FOW WOE � WOWO�O x � c4 vFiaCm 0 � ( N p Q U 2 b o o 0 w O\ T Cl - V a H E 3 a 0 PE W N 0 O ❑ CDs M a b " z x o a 44 o o asap (� SzF Vl U ❑ ❑ " C7 O N O W N M1� V> 0!: N N S 7. O C o 0 0 �O O C N 3 �7 ❑ V] C y 0 3 w U ° a o a F� � 3 H q O C 20, n r N Z z a a 0 0 0, U 8 C] a �c7xwa0 v v a Date Account Number REMIT TO: 10/31/2024 219OH-1179 PCRCD,LLCdba LRI-HV Invoice Number INVOICE TOTAL A WASTE CONNECTIONS COMPANY 17925 MERIDIAN ST E 42215B190H $219.18 PUYALLUP,WA 98375 AMOUNT DUE I PAYMENT DUE 253-847-75SS $219.18 Upon Receipt BILL TO: NORTHWEST CASCADE LATE PAYMENT MAY RESULT IN AN INTERRUPTION OF SERVICE. PAST DUE INVOICES MAY BE SUBJECTTO A LATE CHARGE P.O.Box 73399 FOR EACH MONTH OR PARTTHEREOF THAT THE INVOICE IS PUYALLUP,WA 98373 PAST DUE. r)%TE TiCKIFT rRUII K,CD R FERtNCL T ONTYARD DESCRIPTION nOLLARS 10/28/2024 112822 1.00 Payment -451.02 Balance Forward: $0.00 10/25/2024 2845051 4455 1.01 CONST&DEMO-COMM 182-95 10/25/2024 2845298 4455 0.19 CONST&DEMO-COMM 36.23 Total UnitS: 1.20 Invoice ToWt,$279.1$ Total Balanc4lDu,e.$219.18 ACCOUNT AGING 0-30 Days 31-60 Days 61-90 Days Over 90 Days Total $219.18 $0.00 $0.00 $0.00 $219.19 Project Reith Road Roundabouts Project# 22-3005 Date 10/22/2024 ❑ Workable Day Of the Week Tuesday Weather:AM Overcast Weather: PM Overcast Contractor Northwest Cascade, Inc. Submit Representative Paddy Worthington Location and Type of Work Contractor's Active Men and Equipment Joe Mike Joe Chris Contractor's Inactive Equipment C707 D262 D 199 Diary Norwest Cascade crews are working on grading sidewalk, driveway and pedestrian bike ramp between STA 11+00 and 12+00 While prepping sidewalk at STA 11+80 crews noticed more roots needing to be taken out from a large tree.The tree had already had extensive root damage from starm installation. Called Jason Barry for approval to remove tree on FA do to tree now being a fall hazard. Crews worked FA to remove tree from 12PM to 2PM using an excavator to take off branches before falling the entire tree and loading into a dump truck. Harris, Josh From: Harris,Josh Sent: Thursday, October 17, 2024 1:58 PM To: Blake Elgas Cc: Clint Myers; Barry,Jason Subject: RE: Reith Road Roundabouts - Small Tools Blake, Section 9 of the ACG/WSDOT agreement states"the contractor shall promptly supply a list of small tools and equipment that has been utilized in the work." For force account work that used more than just a hand shovel the city will propose a $10 flat rate per FA sheet. For the current PE4 the only FA this would be applicable to would be digging up, cutting, and capping existing irrigation. Thanks, Josh Harris Josh Harris, Capital Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Phone 253-856-5554 1 Cell 253-736-5961 Jharris@kentwa.gov CITY OF KENT,WASHINGTON KentWAmov Facebook Twitter YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAII From: Blake Elgas<BlakeElgas@nwcascade.com> Sent:Tuesday, October 15, 2024 7:42 AM To: Harris,Josh<JHarris@kentwa.gov> Cc: Clint Myers<ClintMyers@nwcascade.com> Subject: Reith Road Roundabouts-Small Tools This message originated outside the City of Kent. Use caution when following links or opening attachments as they can be malicious. Please contact IT Security at ISP(0)KentWA.Clov with any questions. - J Josh, NWC believes we should get paid something for the small tools associated with the FA work. We have small tools such as levels, shovels, grade rods, ETC.. associated with some of the FA work.Additionally,there are a bunch of small tools that are on the foreman truck that is being used during all the FA work.We've already come down on the foreman truck package, at a minimum we should be able to charge for the small tools that are on the foreman truck that is being used during all the FA work. Section 9 of the AGC-WSDOT equipment rental agreement does not state that the tools have to be actively used to be eligible for the small tools percentage. In the past,we've charged 3%for the small tools but we are willing to negotiate. Let me know what you think. i