HomeMy WebLinkAboutCAG2024-172 - Change Order - #2 Northwest Cascade, Inc. - Reith Road Roundabouts - 2/10/25 Agreement Routing Form
• For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H I N G T O N (Print on pink or cherry colored paper)
Originator: Department:
Stephanie Anderson PW Engineering
Date Sent: Date Required:
> 2/11/2025 N/A
0
L
aAuthorized to Sign: Date of Council Approval:
Q El Director or Designee ❑Mayor 4/2/24
Budget Account Number: Grant? ❑Yes 0 No
R20123.64110.120 Type: N/A
Vendor Name: Category:
Northwest Cascade, Inc. Contract
Vendor Number: Sub-Category:
0 Change Order 2
0
Ira Project Name: Reith Road Roundabouts
IE
L
= Project Details.Grade changes in sidewalk at STA 69+50 on the NW corner of 46th Ave S and Reith Road.Changes were
_ made on revision 3. Payment includes FA Sheet#20-$5551.42,FA Sheet#21 -$2,671.87,and FA Sheet
1W #22-$4,765.59.Revision 3 also includes 75LN FT of additional pedestrian curb to be installed.
C
Go Agreement Amount: $16,144.98 Basis for Selection of Contractor: Bid
Go
bStart Date: 4/10/2024 Termination Date: 157 Working days
Q
Local Business? ❑Yes ❑ No*
*Ifineets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce.
Notice required prior to disclosure? Contract Number:
❑Yes ❑No CAG2024-172
Date Received by City Attorney: Comments:
C1
C
a+
3
3 Ix
a,
•� i
4J
cc ate+
1a
p� Date Routed to the Mayor's Office:
'v1
Date Routed to the City Clerk's Office: 2/1 1/25
Visit Documents.KentWA.gov to obtain copies of all agreements
f
KENT
W H -N O T O N
CHANGE ORDER NO. #2
NAME OF CONTRACTOR: Northwest Cascade ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Reith Road Roundabouts
ORIGINAL CONTRACT DATE: April 10, 2024
This Change Order amends the above-referenced contract; all other provisions. of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Grade changes in sidewalk at STA 69+50 on the NW corner of 46th Ave
S and Reith Road. Changes were made on revision 3. Payment includes
FA Sheet #20 - $5551.42, FA Sheet #21 - $2,671.87, and FA Sheet #22
- $4,765.59. Revision 3 also includes 75LN FT of additional pedestrian
curb to be installed.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $4,283,685.98
(including applicable alternates and
WSST) _
Net Change by Previous Change Orders $29,615.00
(inch applicable WSST)
Current Contract Amount $4,313,300.98
(Incl. Previous Change Orders)
Current Change Order $16,144.98
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $4,329,445.96
CHANGE ORDER - 1 OF 3
Original Time for Completion 150 working days
(insert dare)
Revised Time for Completion under 154 working days
prior Change Orders
(insert date)
Days Required (f) under Minor Change 0 working days
Orders _
Days Required (f) for this Change Order 3 working days
Revised Time for Completion 157 working days —
(insert date) 1
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied,
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
DigiWly signed by Chad Bieren
Chad B i e re n Case.2025.0210
By 816:39-0e•0(y
(signature) (signature)
Print Name: Print Name: Chad Bieren P.E.
Its *ltC fameh T' Its Public Worsts Director
(title) (title)
DATE: ?026 DATE:
EC
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
C[]n this field,you may enter the electronic filepath where the contract has been saved)
CHANGE ORDER - 3 OF 3
File No. 200.2
KENT
CHANGE ORDER WORKSHEET NO. 2
Construction Engineering Division - Public Works
Project: Reith Road Roundabouts Project No: 22-3005
Project Engineer: Thomas Leryer Fed-Aid No: N/A
Capital Projects Josh Harris Contractor: Northwest Cascade
Managgirm
Date: 12/30/2G24
I. Proposed Change
Grade changes at STA 69+50 in sidewalk at the NW corner of 46th Ave S and Reith Road. Changes were made via
Revision 3. Payment includes the following three FA sheets: FA20- $5553.24, FA21- $2660.14 and FA22-$4744.10. Rev
3 also included 75LN FT of additional pedestrian curb to be installed.
II. Reason and Background for Change
During the construction process, Northwest Cascade identified a significant ADA slope issue at STA 69+50. The existing
plans indicated that cross slope of the new sidewalk was to be 30%, which does not meet ADA standards. Recognizing
the importance of accessibility, Northwest Cascade took immediate action to address by regrading the area to meet
ADA standards as best possible with existing constraints.
Key Actions Taken:
- **Initial Assessment**: Upon discovery, Northwest Cascade and Kent Construction evaluated the area for compliance
and spent a day making modifications to significantly improve conditions.
- **Consultation**: Discussions were then held with Thomas Leyrer to determine best final course of action as he
believed more was required.
- **Redesign Decision**: Decision was made to redesign the corner to create a flat landing at the intersection of the
two sidewalk match points requiring further excavation, with regrading and compaction. This change was documented
and directed in Revision 3.
- **Execution**: Northwest Cascade dedicated an additional day and a half of labor and equipment to adjust grades in
accordance with the new Revision 3 parameters.
III. Method of Payment
NEW PAY ITEMS ❑Notapplicable
Sch. Item Description Total Est. Unit Unit Price Total Estimated Cost of
No Qty Item
I Regrading sidewalks and ADA ramps 1 FA $12,957.48 $ 12,957.48
New Pay Items Total: $ 12,957.48
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑✓ Not applicable
Sch Bid Item No. Item Description
No. Qty Unit Unit Price Cost of Item
Page 1
$ _
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEMS) ❑Not applicable
Sch Bid Item No. Item Description Qty Tnit Unit Price Cost of Item
No.
I 1211 Curb-4 Pedestrian Curb , 75 LF 1 $42.50 $ 3,187.50
$
Increase / Decrease to Existing Pay Items Total: $ 3,187.50
*TOTAL ESTIMATED COST OF CHANGE ORDER: $16,144.98
*Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 150 Due This Change Order: 3 Previous Total: 154
Explanation/Justification for Additional Working Days:
Northwest Cascade spent 3 separate days working on fixing this issue.
*TOTAL WORKING DAYS: 157
*This Change Order+ Previous Total
Capital Projects Manager: ! Date: 1 17 Z
jo Harris
Construction Engineering } Date: z
Supervisor:
] an Barry
Construction Manager: Date:
Eric Connor
Page 2
FA Sheet No.: 20
DAILY REPORT OF
FORCE ACCOUNT WORKED ANT
Project Name: Reith Road Roundabouts Project No: 22-3005
Item No.: Date: 10/1/2024
Description of Work: Re qreade sidewalk and ramp at STA 49+65 after plan bust left a 30%cross
slope
Work by Subcontractor?: No
Prime Contractor: Scarsella Bros Sub-Contractor:
LOWR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Dave Honeywell Foreman 8 107.5 2 147.4 $ 1,154.80
Bob Lea operator light 8 97.94 2 133.06 $ 1.049.64
Joe Roeshline Laborer 79.39 1 110.67 $ 110.67
Mike Rose operator heavy 99.64 1 135.621 $ 135.62
Joe Marci Operator Light 2 97.94 2 133.006 $ 46189
$
$
$
$
SUBTOTAL-LABOR: 5 2,912-62
LABOR OVERHEAD&PROFIT @ 31% $ 902,91
LABOR TOTAL 5 3,815.53
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
C890 Chevy C350OHD 10 33.99 $ 339-90
D199 John Deere 644J 4 82.23 $ 328.92
D224 Cat 308 Hoe Pack 10 62.42 $ 624.20
Plate Wacker 10 407 $ 40.70
Jumping Jack 10 434 $ 43.40
Generator 10 0.24 $ 2.40
Laser Level 10 0.36 $ 3.60
Hot Saw 10 0.35 $ 3.50
GPS Base Station 10 3.95 $ 39.50
SUBTOTAL-EQUIPMENT $ 1.426.12
EQUIPMENT OVERHEAD&PROFIT @ 21% 5 299.49
EQUIPMENT TOTAL S 1,725.61
MATE RIALSISERVICESIRENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Small Tools 1 ea $ 10.00 $ 10.00
$
$
SUBTOTAL $ 1000
OVERHEAD&PROFIT @ 21% $ 210
TOTAL $ 12.10
Verification of Hours Worked: TOTAL: $ 5,553.24
12%MARKUP (for prime when
subcontract work) $
contractors Representative Date SHEET TOTAL: $ 5,553.24
Owner's Representative Dale
Pay Estimate Entered:
Date:
By:
ti 60n 6n �
FA
Qo..L7 O Vmt O O O o o a�
p w cc rn
�� s+i rye'? ❑ a o omi
❑ c o.a e: �i vi v oo a O m a as'^ O p ❑ F"
ENw � ��wNs°O•s sn sn r �VM1 uos mU9 NZA
�uN9 um9 jVm1y N6Nq rA son �vai son
�G FM �v v,� o � F
w'0 F N ve`ae' No NF F � m`rn�iMoc°nrnF F Fw}' F FO F
w o M rn O N a ni o Ki O O @@ O O a O O
o � � .o�� m� � o '� F �wvs pi t� smn�FF � oao MFF �' F � F F
2❑ CL y❑ C
ao pC C]
� o�eoN ao
—
� NN � p � o� 0000.Nd �ooa000 rev �a NO �"�'s=i0
3 � y
nr
0
ooNoa — o � p 00000c
a
C
A
a
� OF❑ F F❑ F �'�"� zC7
F �d�24 Ad
mL�F2F
N W
M
G p'
� N
O N ��] w
F F z ex
w F z o 0 e x wC,
a G. a si Q
Z Z Q O C a `� O O w Ll L1 U Z AC7xa�°0 vn Cn a
QN;W, NORTHWEST CASCADE INC.
POST OFFICE BOX 73399,PUYALLUP,WASHINTON 98373/TOLL FREE 800-562-4442
DAILY FORCE ACCOUNT WORK SHEET
PAGE: OF OWNER: P-97JJr WEATHER: C 1, EW#:
JOB NAME&#: f,(7 A6 START TIME: -7 00 *,4 DATE:
OWNERS REP: END TIME: 15:0a ?A 1 0- ,-W
WORK PERFORMED&LOCATION:
9 Reeosq ►qv z ` -2,S? zLo '70.8 +,rlw6 CXOLS-� SL�
o r#s 6Xs 1,V il F t A! S Afb" 8 7-%r Grass s Llc$M
722
9.2's-o T�s� W&Pd sab 4- 6-S A "r JMPd s
+� -r
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG TIME TIME&A HALF DOUBLE TIME
�r fe2efAlwn/ a �-
926 AL o wrt--e z
o w m/w
!F-F ;a�rsT i
e A4
EQUIPMENT
EQUIPMENT NUMBER EQUIPMENT DESCRIPTION HOURS STANDBY
Irvi FIX61 .
MATERIALS OR SERVICES
VENDOR&INVOICE# MATERIAUVENDOR DESCRIPTION
NWC RE RESENTAIIVE: OWNER REPRESENTATIVE: REPRESENTATIVE TITLE:
Project Reith Road Roundabouts Project# 22-3005
Date 10/1/2024 0 Workable Day Of the Week Tuesday
Weather:AM Sunny
Weather: PM Sunny
Contractor Northwest Cascade, Inc. 0 Submit Representative Paddy Worthington
Location and Type of Work
Contractor's Active Men and Equipment
Dave Honeywell
Bob Lea
Joe Roeshline
Mike Rose
Joe Marci
Contractor's Inactive Equipment
C890
D 199
D224
Diary
Contractor spent day Working FA regrading pedesrian access ramp leading to townhomes. Plan grades had sidewalk cross
sloap at 30%. Northwest Construction worked to figure out new slopes for sidewalk and ramp and regraded entire area.
FA Sheet No-: 21
DAILY REPORT OF .40
FORCE ACCOUNT WORKED ` Kill
Project Name: Reith Road Roundabouts Project No: 22-3005
Item No.: Date: 10/10/2024
Description of Work: Finish Re rade of sidewalk and ramp for curb to be installed
Work by Subcontractor?: No
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHTTIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Dave Honeywell iForeman 3 107.5 1474 $ 322.50
Bob Lea ioperator light 3 97.94 133.06 $ 29382
Joe Roeshline iLaborer 3 7939 11067 $ 23817
Mike Rose operator heavy 3 9964 13562 $ 29892
Joe Marci operator light 3 97.94 133.006 $ 29382
$
$
$
SUBTOTAL-LABOR: $ 1,447.23
LABOR OVERHEAD&PROFIT @ 31% $ 448.64
LABOR TOTAL $ 1,895.87
EQUIPMENT r
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs I Standby Rate AMOUNT
C890 Chevy C350OHD 3 33.99 $ 101.97
D199 John Deere 644J 3 8223 $ 246.69
D224 Cat 308 Hoe Pack 3 62.42 $ 187.26
Plate Wacker 3 19.33 $ 57.99
Jumping Jack 31 4.34 $ 13.02
Generator 3 024 $ 0.72
Laser Level 3 0.36 $ 1.08
Hot Saw 3 0.35 $ 1.05
GPS Base Station 3 3.95 $ 11.85
SUBTOTAL-EQUIPMENT $ 621.63
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 130.54
EOUIPMENIT TOTAL $ 752.17
k .MATERIALS/SERVICESIRENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Small Tools 1 ea $ 1000 $ 10.00
$
SUBTOTAL $ 10.00
OVERHEAD&PROFIT @ 21% $ 2.10
TOTAL $ 12.10
Verification of Hours Worked: TOTAL: $ 2.660.14
12%MARKUP (for prime when
subcontract work) $ -
i,Sontractor's Representative Date SHEET TOTAL: $ 2,660.14
,Owner's Representative Dale
Pay Estimate Entered:
Date:
By:
NW NORTHWEST CASCADE INC.
POST OFFICE BOX 73399,PUYALLUP,WASHINTON 98373/TOLL FREE 800-562-4442
DAILY FORCE ACCOUNT WORK SHEET
PAGE: OF_� OWNER: WEATHER: 4 EW#:
JOB NAME&#: &�r A @qAC START TIME: Xuovo DATE:
OWNERS REP: END TIME: D !O'I0-
WORK PERFORMED&LOCATION: , r
P WI S S44lep CS re, '�
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG TIME TIME&A HALF DOUBLE TIME
D& �!
MCC Kosrr mot.
EQUIPMENT
EQUIPMENT NUMBER EQUIPMENT DESCRIPTION HOURS STANDBY
-* 710VL 3
LAF
v►� 3
MATERIALS OR SERVICES
VENDOR&INVOICE# MATERIAL/VENDOR DESCRIPTION
NWC RE E SENTATIVE: OWNER REPRESENTATIVE: REPRESENTATIVE TITLE:
49
..^C/
Project Reith Road Roundabouts Project# 22-3005
Date 10/10/2024 0 Workable Day Of the Week Thursday
Weather:AM Overcast
Weather: PM Overcast
Contractor Northwest Cascade, Inc. 0 Submit Representative Paddy Worthington
Location and Type of Work
Contractor's Active Men and Equipment
Dave Honeywell
Bob Lea
Joe Roeshline
Mike Rose
Joe Marci
Contractor's Inactive Equipment
C890
D199
D224
Diary
Northwest Cascade finished FA work at Sta 69+50 regrading sidewalk and ramp. Crews dug out for new pedestrian curb to be
installed ahead of concrete crew forming for pour. Crews worked from 7AM-10AM on FA
TSI concrete formed up and poured pedestrian curb from STA 30+50 to sta 69+00 and stripped forms to finish exposed curb
N r O O N
O. N1
Wi
01
.-.
rz
OM6N9 bnry9 ON OT M jV3 po O
A � O
0 61)
Vpp V, M OOo69
FOF
b9 V3 VI Vi V3 V! VI
� M
w� nNQ N � � n 0� :JHM O+ o+N
AC � ? �F F TNN ryrn ": FO F WI amn F F F» F F F
o M�j r ^ �O ae�i raM�l e�e iO� O
N M a F<<4444 F �dd� or
us Fa
U 'wO z Q h O rOn O
OM O���YI[RN�1NN � aacan o �:a Mop.,NO' �nin»aN 9--o r, NO
m w u
T OU vOi � vUi
LA
CC
3 N
w
N
O
0
0
N
O
ry •'1 v� of v� Y'! v�Y1 Yy vj Wi 04
Q� N C fV N W vt 00 a0 GR[fl M 06
O
U
F F
u d
e w A
O
V �
r m
Old
7 F; C7 m L7 Z C3, C7 z
� � �Oa Oaavda z
pp � m U� QFcy. F �
Z 3E a w No
Wy
a a a x U U a x '" b O
F U O o. > >h
O 3 o
q O Q w d N rn F
Z Z .a a s O O w h
FA Sheet No.: 22
DAILY REPORT OF
FORCE ACCOUNT WORKED •1EN-r
Project Name: Reith Road Roundabouts Project No: 22-3005
Item No.: Date: 101912024
Description of Work: Re greade sidewalk and ramp at STA 49+65 after REV 3 changed ramp.and
Dross slopes
Work by Subcontractor?: No
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Dave Honeywell Foreman 3 107.5 2.5 147.4 $ 691.00
Bob Lea operator light 3 97.94 2.5 133.06 $ 626.47
Joe Roeshline Laborer 79.39 2.5 110.67 $ 276.68
Mike Rose operator heavy 9964 2.5 135.62 $ 339.05
Joe Marci Operator Light 3 97.94 25. 133.006 $ 626.34
$
$
Is
Is
SUBTOTAL-LABOR: $ 2.559.54
LABOR OVERHEAD&PROFIT @ 31% $ 793.46
LABOR TOTAL 5 3:353.00
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Slandby Rate AMOUNT
C890 Chevy C350OHD 5.5 33.99 $ 186.95
D199 John Deere 644J 5.5 82.23 $ 452.27
D224 Cat 308 Hoe Pack 5.5 62.42 $ 343.31
Plate Wacker 5.5 19.33 $ 106.31
Jumping Jack 5.51 4.34 $ 23.87
Generator 5.5 0.24 $ 1.32
Laser Level 5.5 0.36 $ 1.98
Hot Saw 5.5 0.35 $ 1.93
GPS Base Station 5.5 3.95 $ 21.73
SUBTOTAL-EQUIPMENT $ 1,139.67
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 23933
EQUIPMENT TOTAL $ 1.379.00
MATERiALSISERV IC ESIREN TALS
MATERIALS I SERVICES Quantity Units I Unit Price DOLLAR AMOUNT
Small Tools 1 ea Is 10.00 $ 10.00
$
SUBTOTAL $ 10.00
OVERHEAD&PROFIT @ 21% $ 2.10
TOTAL $ 12.10
Verification of Hours Worked: TOTAL: $ 4,744.10
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 4,744.10
Owner's Representative Date
Pay Estimate Entered:
Date:
By:
rNW, NORTHWEST CASCADE INC.
POST OFFICE BOX 73399,PUYALLUP.WASHINTON 98373/TOLL FREE 800-562d442
DAILY FORCE ACCOUNT WORK SHEET
PAGE: OF OWNER: WEATHER: yA/ EW#:
JOB NAME&#: Rewy START TIME: DATE:
OWNERS REP: V p� END TIME: 6-.-
WORK PERFORMED&LOCATION: re -TA06—
o fCT0
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG TIME TIME&A HALF DOUBLE TIME
} .?-S
a r 3 �-
M 3 .
EQUIPMENT
EQUIPMENT NUMBER EQUIPMENT DESCRIPTION HOURS STANDBY
L
MATERIALS OR SERVICES
VENDOR&INVOICE# MATERIAL/VENDOR DESCRIPTION
NWC PRpENTATIVE: r OWNER REPRESENTATIVE: REPRESENTATIVE TITLE:
Project Reith Road Roundabouts Project# 22-3005
Date 10/9/2024 ❑ Workable Day Of the Week Wednesda
Weather:AM Cloudy
Weather: PM Cloudy
Contractor Northwest Cascade, Inc. Submit Representative Paddy Worthington
Location and Type of Work
Contractor's Active Men and Equipment
Dave Honeywell
Bob Lea
Joe Roeshline
Mike Rose
Joe Marci
Contractor's Inactive Equipment
C890
D199
D224
Diary
Northwest cascade spent the morning grading sidewalk and curb between STA 26+59 and 28+25.
Contractor started working on FA at 1230PM to regrade sidewalk and pedestrian ramp at STA 59+60 with new REV 3 plan.
Crews worked until 6PM regrading\area for sidewalk pour tomorrow.
I
LO LO
N
r i'] .•� C1�� 'r7,
w
) s
N +
� cq cq
N CD
0
� op
V)L 0
M
M
w
� N �
I
v
a0
a
N
' cD cQ Q J .
r N N h7 N
QD w ��' , N
�M � � I
W L
N M
N N ,—
+ +� + M ( �d! N N
CV
�to � I .�
Ln
HF�- H M (D M
in cn in 0 # M V Q
co O
� r I N
4 N N N < \ U
,— ¢ (n.
LO r �`
LO
LO
O r U)
co co N rC lui
J �
! NON .
w` w
� V �I CV �. M � O
w
�� t '
Harris, Josh
From: Harris,Josh
Sent: Thursday, October 17, 2024 1:58 PM
To: Blake Elgas
Cc: Clint Myers; Barry, Jason
Subject: RE: Reith Road Roundabouts - Small Tools
Blake,
Section 9 of the ACG/WSDOT agreement states"the contractor shall promptly supply a list of small tools and equipment
that has been utilized in the work." For force account work that used more than just a hand shovel the city will propose
a $10 flat rate per FA sheet.
For the current PE4 the only FA this would be applicable to would be digging up, cutting,
and capping existing irrigation.
Thanks,
Josh Harris
Josh Harris, capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Phone 253-856-5554 I Cell 253-736-5961
iharris@kentwa.gov
CITY OF KENT,WASHINGTON
KentWA.aov Facebook -_ YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Blake Elgas<BlakeElgas@nwcascade.com>
Sent:Tuesday, October 15, 2024 7:42 AM
To: Harris,Josh<J Harris@ kentwa.gov>
Cc: Clint Myers<ClintMyers@nwcascade.com>
Subject: Reith Road Roundabouts-Small Tools
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISP KentWA.go_v_ with any
questions.
Josh,
NWC believes we should get paid something for the small tools associated with the FA work.We have small tools such
as levels, shovels, grade rods, ETC.. associated with some of the FA work.Additionally,there are a bunch of small tools
that are on the foreman truck that is being used during all the FA work. We've already come down on the foreman truck
package, at a minimum we should be able to charge for the small tools that are on the foreman truck that is being used
during all the FA work. Section 9 of the AGC-WSDOT equipment rental agreement does not state that the tools have to
be actively used to be eligible for the small tools percentage. In the past,we've charged 3%for the small tools but we
are willing to negotiate. Let me know what you think.