Loading...
HomeMy WebLinkAboutCAG2024-570 - Amendment - KPG Psomas Inc. - Trail at Naden Ave - Final Design - 2/5/25 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: a g1n= Agreement Routing Form Dir Asst: 'HTL • For Approvals,Signatures and Records Management Dir/Dep:BL BL KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (optional) W A 5 H I N G T O N Originator: Department: KateLynn Jennings for Bryan Higgins Parks,Recreation&Community Services Date Sent: Date Required: > 2/5/2025 2/19/2025 0 L. Authorized to Sign: Date of Council Approval: QWIDirector or Designee Mayor N/A Budqet Account Number: Grant? Yes W]No P21079 Budget?w]YesEl No Type: N/A Vendor Name: Category: KPG Psomas Inc. Contract Vendor Number: Sub-Category: = 2479959 Amendment P0 Trail at Naden Ave- Final Design -Amendment 1 Project Name: E i = Project Details: Consultant shall provide revised Stormwater Design, plans, details, cost estimate and updated report. Agreement Amount: $24,900 Basis for Selection of Contractor: Other 41 *Memo to Mayor must be attached 11- Start Date: 12/19/2024 Termination Date: 12/31/2025 a Local Business?E]Yes 0No* If meets requirements per KCC3.70.100,pleosecomplete"VendorPurchase-Locol Exceptions"form onCityspace. Business License Verification:Yes Elln-Process ElExempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: [:]YesW]No CAG2024-570 Comments: tm C a+ 3 3 0 a, •> i a3, Date Received by City Attorney: N/A M C_ Date Routed to the Mayor's Office: N/A V1 Date Routed to the City Clerk's Office: aaccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20200218 • KENT W A S H I N G T O N AMENDMENT NO. 1 NAME OF CONSULTANT OR VENDOR: Psomas DBA KPG Psomas Inc. CONTRACT NAME & PROJECT NUMBER: Trail at Naden Ave- Final Design/CAG2024-570 ORIGINAL AGREEMENT DATE: 12/19/2024 This Amendment is made between the City and the above-referenced Consultant or Vendor and amends the original Agreement and all prior Amendments. All other provisions of the original Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force and effect. For valuable consideration and by mutual consent of the parties, Consultant or Vendor's work is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, the Consultant or Vendor shall: As described in the attached exhibit A, incorporated herein, consultant shall provide revised Stormwater Design, plans, details, cost estimate and updated report. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are modified as follows: Original Contract Sum, $135,853 including applicable WSST Net Change by Previous Amendments $0 including applicable WSST Current Contract Amount $135,853 including all previous amendments Current Amendment Sum $24,900 Applicable WSST Tax on this $0 Amendment Revised Contract Sum $160,753 AMENDMENT - 1 OF 2 Original Time for Completion 12/31/2025 (insert date) Revised Time for Completion under N/A prior Amendments (insert date) Add'1 Days Required (f) for this 0 Amendment Revised Time for Completion 12/31/2025 (insert date) The Consultant or Vendor accepts all requirements of this Amendment by signing below, by its signature waives any protest or claim it may have regarding this Amendment, and acknowledges and accepts that this Amendment constitutes full payment and final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Amendment, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and warranty provisions of the original Agreement. All acts consistent with the authority of the Agreement, previous Amendments (if any), and this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this Amendment, which is binding on the parties of this contract. IN WITNESS, the parties below have executed this Amendment, which will become effective on the last date written below. CONSULTANT/VENDOR: CITY OF KENT: Elizabeth Gibson By: EIi7aboth Gibson(FPb 5,2025 11:12 PST) By: le Parascon ola(Feb 5.2025 14:36 PST) Print Name: Elizabeth Gibson Print Name: Julie Parascondola, CPRE Its Vice President, Psornas Inc. Its Parks, Recreation,and Community Svcs Director DATE: 02/05/25 DATE:2-5-2025 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Li� A Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] AMENDMENT - 2 OF 2 City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements Exhibit A—Additional Scope of Work for Stormwater Design Revisions January 21, 2025 Scope Design through 60% for the Naden Interurban Trail have been completed, including plans and engineers cost estimate, and submitted for City Permit review. Through review after permit submittal Puget Sound Energy (PSE) has requested that the storm drainage design be revised to allow for required 50' dia clear access to the transmission pole located at the north end of the project,just south of the Meeker St ROW. Task 1 - Stormwater Design Changes The items have been identified for additional work associated with the storm drainage revisions, to bring the plan set up to 60%as previously submitted. • Resizing and redesigning the conveyance system • Stormwater modeling update and resizing the bioretention facility • Revising the drainage report (graphics and some supporting text) • Revising storm drainage plans, profiles and details • Stormwater phasing and construction sequence (this is based on the understanding that the PSE facility will likely go into construction first) • Revising grading plans • Site Prep and Grading Plans (3 plan sheets) Revise Landscaping plan and schedule • Landscape Plans (2 plan sheets, 1 detail sheets) • Revise quantity takeoffs and estimate (for civil, grading, planting and stormwater) • 60%revised design check print for City Permitting and PSE plan review • 90%revised design submittal (for review by City and PSE • Coordination to incorporate updated stormwater plans into PSE construction set In addition, there will be some associated support and coordination with PSE to provide for phased construction, with the substation going to construction first, before the improvements for the Interurban Trail. o Provide support for coordination with PSE for substation redevelopment, including a combined package for permit submittal. o Additional project management for coordination, meetings, and invoicing. Page 1 1 Supplement for PSE Stormwater Design Changes Psomas City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements ASSUMPTIONS • The scope of this additional work is to be completed by end of April 2024 PROVIDED BY PSOMAS o Revised Stormwater Design, plans, details, cost estimate and updated report o Project management, coordination and meetings Page 12 Supplement for PSE Stormwater Design Changes Psomas 0 CD 0 CD ) { ) k k \\ _; § U \/ LUM CO § k 2 mwV#m E ) § m0 w ®um sso-m ) ® 0 ,n m_s00 ._@sec] adeospue-1 | 00 _#m a r e .PalMaiv ® — O ( ] ® ,1391IL13AV \ , adeospuel,O £ ) 0 & __. u m m� m # CR j ] ._u�k� \ G , 3 ma a ) § ._UIBUBm_s § e 2 22 a I_mBua mUOS ( c-4 k .Jefi_w B.m6 l__w B.mB LL LL 0 §CL ° § / \t ¥ / § § 2 \ 8 \ ® § § | � ] r \) J SL § 0 ) / Q {\ \) z � = - k \\ (\ � qr � ) ) ! )//§ co"6 ■ fff/ « 2o | f \ E0 z ate ! « «* ; � L § f { ; ; � x § # � + )) m Waoa � a3 � ` Signature: 9?—YK�j� Signature: �Yc eb 5,2 5444PSF1 Email: bhiggins@kentwa.gov Email: parkscontracts@kentwa.gov Signature: 8rcariLeve�cl2 eri Signature: Brian Levenhagen(Feb 5,2025 1:0 SPST Chris Brooks(Feb 6,202508:52 PST( Email: bj[evenhagen@kentwa.gov Email: cityclerk@kentwa.gov PPD-KPG Psomas-Interurban Trail At Naden Ave-Final Design-CAG2024-570 AMD1 Final Audit Report 2025-02-06 Created: 2025-02-05 By: KateLynn Jennings(kjennings@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAARTiTUEg41xYEp8XKXzPE1FruD6kCBxRW "PPD-KPG Psomas-Interurban Trail At Naden Ave-Final Design- CAG2024-570 AM D 1 " History Document created by KateLynn Jennings (kjennings@kentwa.gov) 2025-02-05-4:35:55 PM GMT Document emailed to Bryan Higgins (bhiggins@kentwa.gov)for signature 2025-02-05-4:36:55 PM GMT Email viewed by Bryan Higgins (bhiggins@kentwa.gov) 2025-02-05-4:37:26 PM GMT 'a Document e-signed by Bryan Higgins (bhiggins@kentwa.gov) Signature Date:2025-02-05-4:37:43 PM GMT-Time Source:server Document emailed to Kent Parks (parkscontracts@kentwa.gov)for signature 2025-02-05-4:37:45 PM GMT Email viewed by Kent Parks (parkscontracts@kentwa.gov) 2025-02-05-4:44:06 PM GMT �'% Signer Kent Parks (parkscontracts@kentwa.gov) entered name at signing as Phung Huynh 2025-02-05-4:44:55 PM GMT �'% Document e-signed by Phung Huynh (parkscontracts@kentwa.gov) Signature Date:2025-02-05-4:44:57 PM GMT-Time Source:server Document emailed to Brian Levenhagen (bjlevenhagen@kentwa.gov)for signature 2025-02-05-4:45:00 PM GMT Email viewed by Brian Levenhagen (bjlevenhagen@kentwa.gov) 2025-02-05-7:05:07 PM GMT Q Adobe Acrobat Sign Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date:2025-02-05-7:05:42 PM GMT-Time Source:server Document emailed to liz.gibson@psomas.com for signature 2025-02-05-7:05:44 PM GMT Email viewed by liz.gibson@psomas.com 2025-02-05-7:10:07 PM GMT Signer liz.gibson@psomas.com entered name at signing as Elizabeth Gibson 2025-02-05-7:12:54 PM GMT r} Document e-signed by Elizabeth Gibson (liz.gibson@psomas.com) Signature Date:2025-02-05-7:12:56 PM GMT-Time Source:server Document emailed to Julie Parascondola Qparascondola@kentwa.gov)for signature 2025-02-05-7:12:58 PM GMT s Email viewed by Julie Parascondola (jarascondola@kentwa.gov) 2025-02-05-10:35:43 PM GMT z Document e-signed by Julie Parascondola Qparascondola@kentwa.gov) Signature Date:2025-02-05-10:36:15 PM GMT-Time Source:server Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature 2025-02-05-10:36:17 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2025-02-05-10:55:49 PM GMT Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date:2025-02-05-10:56:01 PM GMT-Time Source:server Document emailed to cityclerk@kentwa.gov for signature 2025-02-05-10:56:03 PM GMT s Email viewed by cityclerk@kentwa.gov 2025-02-06-4:52:19 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Chris Brooks 2025-02-06-4:52:44 PM GMT Document e-signed by Chris Brooks (cityclerk@kentwa.gov) Signature Date:2025-02-06-4:52:46 PM GMT-Time Source:server Agreement completed. 2025-02-06-4:52:46 PM GMT Adobe Acrobat Sign