HomeMy WebLinkAboutCity Council Meeting - City Council Workshop - 01/21/2025 (3) Approved
City Council Workshop
• Workshop Regular Meeting
KENT Minutes
WAS M IN G 7 0 N
January 21, 2025
Date: January 21, 2025
Time: 5:15 p.m.
Place: Chambers
I. CALL TO ORDER
Council President Kaur called the meeting to order.
Attendee Name _ Title Status Arrived
Satwinder Kaur Council President Present
Bill Boyce Councilmember Excused
John Boyd Councilmember Present
Brenda Fincher Councilmember Present
Marli Larimer Councilmember Present
Zandria Michaud Councilmember Present
Toni Troutner Councilmember Present
Dana Ralph Mayor Present
II. PRESENTATIONS
1 2024 Transportation Grant Summaries David Paine 45 MIN.
and 2025 Grant Opportunities
Transportation Planner, David Paine provided the Council with an update
on 2024 Transportation Grant Summaries and 2025 Grant Opportunities.
2024 Transportation Grants
Major sources of funding included Legislative appropriation and
competitive grants.
Paine provided a recap of the grant awards from 2024. Grants were
awarded from the Puget Sound Regional Council for the following
projects:
• Meet Me on Meeker - Interurban to 6th Ave S
• Earthworks Park to Downtown Connection
• S 212th Street Preservation
• S 196th Street Preservation
WSDOT awarded a grant for the SR 99/Pacific Highway - Pedestrian
Hybrid Beacon between S 244th and S 246th
The Transportation Improvement Board grants are for the following
projects:
City Council Workshop Workshop Regular January 21, 2025
Meeting Kent, Washington
Minutes
......................................................................................................................................................................................................................................................................................................._...............................................................................................................................................................................................................
• 132nd Ave SE Multi-use path (north of SE 240th)
• 83rd Ave SW Sidewalk
• 132nd Ave SE Sidewalk (north of SE 278t" PI)
Next steps include formally accepting the grants, updating the
Transportation Improvement Plan, and finally implementing the projects.
The 2026 - 2031 Transportation Improvement Program
The Transportation Improvement Program is a 6-year workplan of
projects in development and underway.
Paine walked the Council through the schedule starting in January and
ending with the adoption of the plan in May.
The Performance Measures Dashboard was reviewed. Staff is constantly
looking at how they are doing.
Meeting ended at 5:40 p.m.
Ki, le,y A. Kavu)to-
City Clerk
...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Page 2 of 2
,1.1
Transportation
Grants &
M
2026 - 2031 TIP
�j
4�
7
KENT CITY COUNCIL
WORKSHOP
1 . 21 . 2 S
,,.
Loll
��} 34
r
rw�"• I"s:q e� t 1 c r.
Agenda
I. 2024 TRANSPORTATION GRANTS
Recap and awards
II. 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
Schedule
Performance measures
Potential 2025 grant nominations
2
■ What we did
How we did
• What's next
3
2024 Funding and Grants
��ghington
9 m
4tlfOn lM9,014
PSRC WSDOT TIB
4
2024 Awards Recap
MMoM Interurban to 6th Ave s PSRC
Earthworks Park to Downtown Connection PSRC
S 212th Street Preservation PSRC
» -
�i 1
J ■ S 196th Street Preservation PSRC
IE
132nd Ave SE, Multi-use path (north of 240th) TIB
_ .--- -� i ti r. .
y C._._ 132nd Street (SE 278th to SE 130th) TIB
41
83rd Ave SW TIB
■ SR 99/Pacific Highway - PHB (S 244th/S 246th) WSDOT
5
MEEKER '
RIGHT OF WAY
PSRC
4
L IMee ce tree
— -�--
■ Meet Me on Meeker — Interurban to 6th Ave S
L 1
RIGHT OF W
■ Earthworks Park to Downtown Connection
a
LUSLTS - St - S 212th Street Preservation
Smith St �ESmith I I
' S 196th Street Preservation
777L I
�Me t ��. ■
3toweSt> WTtta t 3 -
A
'�" 6
Pedestrian Hybrid Beacon
•
Walk SB SB SB NB NB NB Walk
HOV LANE LANE LANE LANE Fro
SR 99/Pacific Highway - Pedestrian Hybrid
P Beacon between 244th
, 246th
it
■
■
M1� i4 ' ? � • r4 f„' '�
i
■ �. i , i� fro i� i
■
�17
1' !• � - �� 1. %dry � �Y $1•1�
♦ �S V
FK
IWO
00
SE 2?l PI
n ^' fop
fa Pedestrian Hybrid Beacon
y y y T T T -- •
Side Side Grants totaling
Walk SB SB SB NB NB NB Walk
HOV LANE LANE LANE LANE HOV
NEEKER ■ MMoM Interurban to 6th Ave s PSRC
■ Earthworks Park to Downtown Connection PSRC
■ S 212th Street Preservation PSRC
■ S 196th Street Preservation PSRC
LTs m•, y, �ESmrthSt ■ 132nd Ave SE, Multi-use path (north of 240th) TIB
rr rr Stl�1--_- 5
WG 5t 132nd Street (278th to 130th) TIB
a
■ 83rd Ave SW TIB
■ SR 99/Pacific Highway - PHB (S 244th/S 2461h) WSDOT
9
WHERE DID THESE PROJECTS COME FROM?
4.20
TMvr.ve miry nnd.x,m,tMt pry.aM w.Mrn n M M 9a+d iAra„n rtr.KtMe nrcdv hLvry nm/
Transportation
.N..ngc..vp naafi w annrrv...�..fugn..,�uvriY T+M«�me Gry cuu.Lna Mm puK.�,wlra�
i
Master Plan 2021 TMPGOALS 20 PERFORMANCE MEASUREMENTS TO RANK PROJECT!
h"
Our Story
sa.aamw rer wrtr �1
Goals ® ~��
Programs
Projects + NOW
2025-2030 TIP 2026-2031 TIP
Programs Schedule
Projects Key Metrics
Programs
Projects
Grant Applications
Craft
Apply
10
The
2026 �
• Schedule
■ Key Measures
2031
• 2025 Grants
2026- 2031 TI Update
Review Outreach Adoption
Briefings and project nominations Public involvement and feedback City Council public hearing
40
Draft Revision & Committee
Staff update materials and of the Whole
recommendations Present to committee and revise
12
PERFORMANCE
ii j MEASURES m
c o 0 o O G o 0
I
Performance r(ategory(Title) W What We Tra(k
MeasuresPerceni of Commute trips taken other than by single occupancy vehicle 31% >> 35.3% In 2023AP 0
Dashboard -
• � Mode Share Percent of trips taken via walking 1.4% » 3.1% in 2023` ♦ ��
• Overall, continued Percent of trips taken via transit 3.7% >> 4.0% in 2023
progress toward resilience
Mode Share Percent of workers that work from home 12.9% >> 17.7% in 2023 I _�
Awards
we der of GrantlState Appropriation Met the target of 3 from 2020
C Total Awards Met the target of$4.5 million �/J
Funding �/
STRATEGY
Average Award Amqunt Met the target of$500,000
0*/
Average TIF Collected Annually Did not meet target of$3.2 million
0)(
13
11mI 1111 ! r
\1FA m13
�
1� 14i111�� � �■ ..r-•
0 0
SCAN ME
11 `-111 �r '�i•� 1�1 � - �� � �ir! s �
111 �■ 11,111� Fu r7
I�If z�nf
IF W- 3
MINE
��� • i �' ��gr �, Ir� r.III ��� � ���IC � �'-_*. f 1
A11 �
c
IN
.� r �► III
1 -- • - . . - . . . .- -- . . .: -
w
9011-1
AN
UL
ism
� .. . • ' •.• • � Il �irl��l�ll �I��� � "' r�\� �Ilnull � �r y
III
f
11�► ..rfflfl��r �� .. ��1
1 � �
slot
pm
1.12Mlow
� �� '� lip ■�i - r,�� �� -_��'~ ���..
NIP
UL
111 � � ��■ 11lIII� � �Fu r7 "�
� �� � �� r �► Iff
l•1 � ,�j 'III :.�' - �a G' �
NO
Poll
,
• - • ���z of � R , , ._+,,,��, — �• _
rAA � �=r �1 man • r
LIL
IS
1
ti
}
. f
���;_�►.�'�� � +ram ,�
�• _ _ �I.