HomeMy WebLinkAbout1066 I RESOLUTION NO. A RESOLUTION of the City Council of the City of Kent, Washington , adopting the Capital Improvement Program: 1986-1990 . WHEREAS, the City has previously adopted functional plans in the areas of transportation, fire, parks and recreation, and City Hall office facilities; and WHEREAS, the implementation of these plans is important to the quality of life in Kent; and WHEREAS, funding for the implementation of the projects contained in those plans is limited; and WHEREAS, it is important to coordinate and prioritize the funding of projects in those plans; and WHEREAS, a comprehensive Capital Improvement Program is the best vehicle for accomplishing such a coordinated planning process; and WHEREAS, the City Staff has developed a draft Capital Improvement Program for the years 1986 through 1990 ; and WHEREAS, a great deal of public input has been sought and obtained through surveys and public meetings regarding priorities and funding sources; and WHEREAS, the final draft of the Capital Improvement Program contains three alternative scenarios, each depicting a different combination of projects and funding sources; NOW THEREFORE THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS: Section 1 . The 1986 - 1990 Capital Improvement Program Scenario 2 of the proposed Funding alternatives attached hereto and incorporated herein by reference is hereby adopted. Section 2 . A final Capital Improvement Program shall be printed in accordance with the adopted Scenario 2 . Section 3 . The City Attorney is directed to prepare an ordinance enacting the real estate excise tax with an effective date of , fi. 1, )-V Section 4 . The City Administrator is directed to incorporate the elements of The Capital Improvement Program into the proposed 1986 Annual Budget. Section 5 . A process shall be developed to address the recommendation that a public safety bond issue should be submitted to the voters sometime during 1986 . Passed at a regular meeting of thie City Council of the City of Kent Washington this day of '� 1985. r Concurred in by the Mayor of the City of Kent, this l� day of , 1985. t ISABEL HOGAN, M YOR ATTEST: �MAE �, C T CLERK APPROVED AS TO FORM: P. STEP N DiJULIO, CITY ATTORNEY I hereby certify that this is a true and correct copy of Resolution No.1 0 6(,-, , passed by the City Council of the City of Kent, Washington, the day of '�'-a-'r . 1985 . CITY OF KENT 1966 - 1990 CAPITAL IMPROVEMENT PROGRAM FUNDING SCENARIOS CITY OF KENT 1986-90 CAPITAL IMPROVEMENT PROGRAM FUNDING SCENARIOS Over a year ago the City of Kent began developing its first Capital Improvement Program (CIP) . The five-year CIP was needed to bring together the City's non-utility long range plans into one comprehensive City-wide plan. This plan would then act as a master plan for the City, identifying which City projects would be funded and what year funding would occur. The need to develop such a plan arose when it became apparent that the City could not afford to simultaneously implement all of its non-utility long range plans. These plans, such as the Transportation Plan, the Fire Master Plan and the Parks and Recreation Plan, were being adopted independent of the needs of other departments and more importantly, regardless of available revenues. Hence, a coordinating plan was needed to balance the needs of the departments and to balance planned expenditures with available revenues. THE CIP PROCESS The process of developing a CIP began when each City department was asked to. complete a standardized capital improvement request form for each non-utility capital project needed through the year 1990. It was important that the projects requested were intergrally related to the City's overall mission and that they were needed to fulfill goals established in departmental long range plans. Once the request forms were completed, they were forwarded to the Finance Department for review and analysis. The Finance Department then prepared the Preliminary Capital 1 Improvement Program. The Preliminary CIP, issued in February of 1985, confirmed the expectation that planned expenditures exceeded projected revenues. In particular, the Preliminary CIP showed the City had over $100 million in identified capital improvement needs. Seventy-six million of that need was identified for funding in the five year period from 1986-90. Netting out dedicated revenue, such as state and federal grants, private donations and LID's, the Preliminary CIP showed that the City needed $38 million to fund its non-utility projects from 1986 to 1990. Traditionally the City sets aside certain revenues for capital improvements. These revenues were projected to total about $16 million over the next five years however $9 million is needed to pay the existing City debt service. Thus,' with $7 million available to fund projects the City has an unfunded deficit of $31 million. Given the tremendous impact that the CIP has on Kent's future and the City's history of involving citizens in local government decisions, an extensive public review process was conducted to solicit input on how to balance the CIP's $31 million deficit. A questionnaire was sent out with the March utility bills informing the citizenry of three neighborhood meetings, one each on the Valley Floor and the East and West Hills. In addition the City Council held two workshop meetings, four City Council committee meetings, and the City staff had several meetings with a special task force of the Kent Chamber of Commerece. Over 600 questionnaires were completed and returned with utility payments. The results of this input have been analyzed and are used as the bases for developing three CIP scenarios. The scenarios were balanced based on the input received from the public, the City Council and the Kent Chamber of Commerece. The only difference between the scenarios is the impact of new taxes. Each scenario 2 1 uses progressively more revenue sources, based on the addition of the least objectionable taxes, with the first being the least expensive and the third the most. All scenarios extensively use the financing option of project deferral. Although each scenario balances revenue and expenditures over a five year period, an annual review process will update revenue estimates and may change project priorities, therefore the 1986 proposal is the most important part of each scenario. The three scenarios and their revenue assumptions are listed below: First Scenario: -Voted G.O. for Public Safety in 1986 (20 yr, 10%) -Councilmanic G.O. for Library and City Hall Office Space in 1988 (20 yr, 10%) Second Scenario: Voted G.O. for Public Safety in 1986 Councilmanic G.O. for Library and City Hall Office Space in 1988 -Real Estate Excise Tax ($300,000 in 1986 growing at a real rate of 5% thereafter) Third Scenario: -Voted G.O. for Public Safety in 1986 -Councilmanic G.O. for Library and City Hall Office Space in 1988 -Real Estate Excise Tax -Add'1 1.5-2% Utility Tax (calculated to be $900,000 in 1986 and to grow at 5% thereafter) -5% Admissions Tax (calculated to be $100,000 a year with no substantial growth) 3 RESULTS OF PUBLIC INPUT Three scenarios were developed based on the results of: the questionnaire mailed to all utility customers, the public comments received on the questionnaire and through public meetings, the Chamber of Commerce review process, and the criteria established by the Council at a special CIP workshop. QUESTIONNAIRE RESULTS The questionnaire results are presented below in order of most supported to least supported. The range was "5" for strongly support and "1" for strongly oppose. The far right coulumn identifies how willing the respondents are to support a tax for the type of project described. % Who Support Ranking Score a tax 1 Emergency equipment for public safety 3.781 69.9% 2 Facilities for automobile and truck traffic 3.653 47.4% 3 Communication and training facilities for public safety 3.593 61.2% 4 Recycling City garbage 3.434 51.8% 5 Greenbelts and open space 3.272 37.1% 6 Drainage facilities 3.256 49.0% 7 Bike routes/pedestrian paths 3.211 44.8% 8 Public safety facilities 3.057 40.8% 4 9 Expanded library facilities 2.889 39.0% 10 Community playfields & cultural facilities 2.880 35.7% 11 Neighborhood and industrial area parks 2.855 33.4% 12 Technological equipment 2.852 31.5% 13 City Hall office space 2.398 23.2% OTHER PUBLIC COMMENTS The following is a summary of questionnaire responses and input obtained from public meetings as well as from the Chamber of Commerce. 1) The public expressed support for public safety projects. 2) Many people feel that the people and businesses moving into Kent should pay for the growth related problems they cause--i.e. traffic problems, parks and recreation needs, etc.. 3) Voted G.O.'s are an acceptable form of taxation. t 4) There is support for a real estate excise tax. 5) Preference should be given to projects which generate revenue. 6) State and federal funding should be used wherever possible. 7) Projects should be those included in approved City plans. 8) City employees should be more productive in providing City services. 5 COUNCIL CRITERIA During a special workshop on the CIP, the City Council came up with the following criteria. 1) Priority to projects with outside funding sources. 2) Increase allocation of existing funding to capital needs. 3) Services not now provided get prioirity over existing services. 4) Preserve future projects thru current acquisition of right-of-way, both for land and buildings. 5) Build into CIP funding funds for unanticipated opportunities. 6) Develop existing property prior to acquiring new property. 7) Before funding a capital project insure availability for operation and maintenance funding. 8) Insure conformance with City plans and vice versa, where possible. 9) Where possible, multi-purpose projects should be supported. 10) A project should have demonstrated public support. OTHER CIP BALANCING CONSIDERATIONS In addition to the public comment and Council criteria there are a number of other factors which impact the CIP. City studies, state regulations and staff input affected the outcome of the three CIP scenarios. These considerations are: 6 1) Fire Department computer generated location package--This package will be used to determine the optimum location for the City's fire stations. Pending the outcome of this study and the on-going negotiations on a lease/purchase agreement for an industrial area Fire Station, the City will have a better grasp of what precisely will be needed. It may turn out that the Fire Headquarters station will lend itself to expansion and remodel instead of replacement and/or that the training facility will be built jointly with the cities of Renton and Tukwila. In any event, it is recommended that new fire stations and equipment be funded from a voted bond issue. It is further recommended that prior to making a decision on what to include in the issue, a citizen committee be formed to help determine what projects will be included and when the issue should be introduced. 2) City Automation Plan--The on-going Automation Plan will determine computer needs on a City-wide basis. All computer related projects are included in the General Government section under the project heading "Computer Systems." Pending the outcome of the Automation Plan, the City will have a better idea of its computer need priorities and how much it will cost to meet those needs. 3) Road District Analysis—The City is examining the possibity of forming a Road District to finance the major road projects. Road Districts are separate taxing entities formed when voters in a proposed district approve its formation by a 60% margin. The District would be administered by the County's Public Works Department which would construct and maintain roads within the District. The establishment of a Road District would greatly expedite the East-West arterial projects. 4) Right-of-Way Acquisiton Fund Analysis--It is proposed that a fund be created to 7 provide a reserve for acquiring right-of-ways before development occurs thereby preserving a future road project. 5) Street Funding--State law mandates that fuel tax revenues be used to fund street and arterial street projects. b) Library Needs Analysis--The Library Board will be working on an analysis of library needs and space requirements. The study should be completed in late 1985. 7) Library District Analysis--The City is looking into the possibility of annexing to the King County's Library District. Annexing to the County Library District would eliminate the City's current involvement in providing library services. This would make available $450,000 a year which is currently being spent by the City for Library operation and maintenance costs. This would allow the City to either lease its half of the library to King County or purchase the County's half to provide for City Hall expansion. 8) Voted G.O. Criteria--Because of the costs and the time involved in a campaign to issue voted general obligation debt, certain criteria should be met before placing a voted G.O. issue on a ballot. These crieria are: a) There should be demonstrated public support for a project, including support in the form of an interested group of citizens that would be willing to raise funds and work on a campaign committee. b) The project should be highly visible providing a clear-cut, broadly 8 distributed public benefit. CONCLUSIONS DRAWN FROM PUBLIC INPUT AND OTHER CONSIDERATIONS Based on the public input results and the other considerations mentioned above the following conclusions were drawn and incorporated into the CIP scenarios: 1) There seems to be a consensus that those who contribute to a problem should help pay to alleviate that problem. Toward this end the City will continue its policy of promoting LID's to provide City improvements to specially benefited developments. All three scenarios use $7.5 million in probable LID money to fund various projects. 2) The City Council and the public has emphasized the importance of utilizing non-City sources of funding. This is yet further evidence that the City should aggresively pursue LID's. In addition it indicates that the City should be thorough and persistent in seeking funding from the State and Federal Governments and private parties. Including LID's, the City staff has identified nearly $29 million of possible outside funding. 3) Public safety is of major concern to the citizens of Kent and projects addressing public safety needs should receive attention. Moreover the Council has stated that preference should be given to projects with demonstrated public support. In all three CIP scenarios, the majority of public safety projects are identified for funding in 1986. 9 4) A voted G.O is the least objectionable taxing option and public safety projects are the most favored. Moreover the questionnaire shows that people are willing to accept higher taxes to pay for public safety projects. Given this information and the criteria, public safety projects are the most likely candidates for a voted G.O. bond issue. In all three scenarios a voted G.O. is used to fund public safety projects in 1986. The voted G.O. issue is currently identified for $11,149,000. However, this amount is subject to revision pending the outcome of the Fire station location analysis, a joint training facility study with Renton and review by a citizens committee. 5) Many people feel that Kent's problems are being caused by people and businesses moving into Kent and that those people and businesses should help pay for the problems they cause. In 1981 the City initiated an environmental excise tax based on square feet of construcction or number of bedrooms per home. The authority for this tax was taken away from the City by the 1982 State Legislature. The Legislature substituted the Real Estate Excise Tax. A Real Estate Excise Tax is the best of existing available sources to tax those people and businesses most responsible for Kent's growth related problems. The tax, at one-quarter of one percent, taxes the transfer of real property between seller/resident and buyer/newcomer. Both King County and most of the cities surrounding Kent already impose this tax. Since a larger dollar volume of the property sales are in the non-residential sector, those firms which develop property in Kent and encourage people and businesses to move to Kent will be contributing to any revenues brought to the City through a Real Estate Excise Tax. A Real Estate Excise Tax is proposed in the Second and Third CIP Scenario. 10 6) Streets and open spaces received high levels of public support. The Council expressed a desire to preserve future projects through land and right-of-way acquisitions. All three CIP scenarios emphasize land acquistion as opposed to development. 7) Street projects were given high priority however the questionnaire revealed there was less support for additional taxes to fund them. Since the State mandates that its fuel tax revenues be used expressly for street and arterial street projects the City was able to fund most of its street projects without using local funding sources. Thus street projects were given high priority but are being funded with existing revenue sources and LID's. 8) The public and City Council favor projects which are identified in adopted City Plans and those projects which are multi-purpose. The New Library and City Hall Office Space are related. The City Hall Master Plan, completed in 1983, projects that additional office space will be needed by 1996. In addition, a preliminary Library needs analysis shows the present Library cannot adequately serve Library patrons and that a bigger library is needed to serve a growing community. Since the architectural design of the Library building prohibits upward expansion and since the City will need additional office space, particularly to house a coordinated permit processing center, the City Hall Master Plan suggests that the Library be relocated to a larger facility thereby allowing City Hall to expand into the vacated Library. A coordinated permit center should greatly enhance City productivity in meeting community development needs. All three CIP scenarios provide for the New Library/City Hall project through a councilmanic 11 general obligation issue in 1988. However, pending the outcome of the Library Needs Analysis and the Library District Analysis this project may be revised or funded from an alternate source such as annexation to the Library District. 9) The City-wide "Computer Systems" project was partially funded to address the public's desire to increase the productivity of their government. "Computer Systems" is a multi-purpose project which affects all City operations from police investigations to gathering and storing demographic information. Currently the City is using antiquated labor intensive methods for performing duties which can be more efficiently performed by computers. Each scenario identifies $125,000 in funding for each of the five years of the program. This amounts to $625,000 for the whole program leaving $1,090,000 to be funded in 1991 or beyond. It is possible that a public safety bond issue could include computer systems. STAFF RECOMMENDATION The staff is recommending the Second Scenario. This scenario best represents the views of the public and the Council and it also addresses staff concerns regarding on going City studies, State regulations and adopted City Plans. Although the Second Scenario is largely balanced by defering projects until a later date, the staff feels that the City can fund Kent's most critically needed and desired capital improvements with the funding levels presented in the Second Scenario. 12 The most prominent features of the Second Scenario are a voted G.O. bond issue for public safety and a Real Estate Excise Tax. Though the amount of the bond issue is currently identified at $11,743,000, it will most likely decrease following completion of the Fire Station Location Package, the Training Facility Study and other input analyzed by the citizens committee. Assuming a $11,743,000 issue at 10% for 20 years, the annual debt service would be $1,379,328 or $.63 per $1,000 of asessed valuation. This would amount to approximately $50 per year on an $80,000 home. A real estate excise tax is a one quarter of one percent tax on the sale of real property. Based on historical trends the City would generate approximately $300,000 annually if this tax were implemented. These in combination with existing sources of capital improvement revenue and debt financing options for councilmanic debt will begin the funding process for Kent's capital needs. 13 CITY OF KENT SUMMARY RECOMMENDED CIP FIRST SCENARIO: -VOTED G.0 FOR PUBLIC SAFETY IN 1986 -COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL OFFICE SPACE IN 1988 TOTAL 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND ------ ---- ---- ---- ---- ---- ------ PROJECTED CIP REVENUE 16,266 2,959 3,130 3,256 3,390 3,531 N/A COMMITTED DEBT SERVICE 8,980 1,727 1,825 1,927 1,806 1,695 N/A PROPOSED DEBT SERVICE 574 287 287 NET AVAILABLE CIP REVENUES 6,712 1,232 1,305 1,329 1,297 1,549 N/A PROPOSED NEW REVENUES VOTED G.O. FOR PUBLIC SAFETY 11,743 11,743 COUNCILMANIC G.O. FOR LIBRARY 2,450 2,450 TOTAL AVAILABLE CIP REVENUE 20,905 12,975 1,305 3,779 1,297 1,549 N/A TOTAL PROJECTS 20,872 12,967 1,292 3,738 1,300 1,575 33,432 BALANCE 33 8 13 41 (3) (26) FIRST SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 PROJECTS 'TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------ ------- ------ ---- ---- ---- ---- ---- ------ PUBLIC SAFETY Police 1. Police Radio* 250 250 250 2. Valley Can Imp. 61 61 61 3. Training Facility* 1,175 1,175 1,175 4. W. H. Sat. Sta.* 170 170 170 A. Police Headquarters 1,700 1,700 1,700 Fire 1. Aid Cars* 146 146 146 2. Suburban Pumpers* 310 310 310 3. E.H. Fire Station* 1,640 1,640 1,640 4. WVH Sta.Trn. Ctr.* 3,215 3,215 3,215 5. W. H. Fire Station* 1,614 1,614 1,614 6. Fire HQ Station* 3,025 3,025 3,025 7. Fire Canmun. Sys.* 558 558 158 400 8. Valley Can Imp. 17 17 17 9. Mobile Comp. Ter.* 40 40 40 TOTAL 13,921 13,921 11,743 78 . 0 0 0 2,100 PUBLIC WORKS 1. Green River Bridge 2,907 2,622 285 285 2. SR 515 8,776 8,451 325 325 3. Ped & Bike Path Imp 1,117 457 660 125 125 125 285 4. Adv Right-of-Way Acq 37 346 (383) 5. S.E.192nd NR toEVH 7,913 3,000 4,913 4,913 6. City Shop Remodel 225 75 150 150 7. 180th and WVH Int. 600 450 150 150 8. 180th and EVH Int. 229 65 164 164 9. 212th & WV Int.Imp 250 250 250 10. EVH 192nd-180th 2,901 1,575 1,326 600 726 11. 76 Ave 212th-222nd 1,257 561 696 25 671 12. 240th & 104th Int. 80 80 80 13. 240th & 116 Int Imp 138 138 138 14. 84th & 167 Int Imp 50 50 50 15. 240th @ 102nd 425 425 16. WVH Imp Meeker-180 3,619 3,619 A. 196/200 EV Hwy N.R. 10,580 2,000 8,580 8,580 B. S.196 & WV Int. Imp 142 142 142 FIRST SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCIL{NANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 PROTECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------- ------- ------ ---- ---- ---- ---- ---- ------ C. K-D M Road & SR 99 116 116 116 D. S 224th and E.V.Int 104 104 104 E. New Arterial-224th 6,942 3,471 3,471 3,471 TOTAL 48,371 26,771 21,600 647 660 713 750 851 17,979 PARKS 1. Riverfront Acq 850 850 350 150 350 2. Van Doren's Dev. 129 129 129 3. Kent Can. Parking 250 250 250 4. Golf Course Dev. 1,000 1,000 389 611 5. Mill Creek Can. Tr 450 450 100 150 200 6. Lake Fenwick Park 300 300 25 275 7. Ball Field Lights 65 65 65 8. East Hill Park 1,050 100 950 400 550 9. S. Scenic Hill Park 50 50 50 10. Riverfront Dike 115 115 37 78 11. Uplands Parking 160 160 60 12. Upper Mill Cr. Park 569 569 569 13. Riverfront Parking 65 65 65 14. Green River Rest. 150 150 150 15. Glenn Nelson Park 500 500 500 16. Commons Playfield 300 300 300 17. Performing Arts Ctr 3,400 3,400 3,400 18. Russell Rd. Park 1,760 1,760 1,760 19. Campus Can. Park 50 50 50 20. S. Willis Park 60 60 60 21. Good News Bay Park 420 420 22. Riverfront Park 1,000 1,000 1,000 23. Orillia Dist. Park 250 125 125 125 24. G. R. Frontage Tr. 100 100 100 A. Sunnycrest Neigh. 260 260 260 B. Clark Lake Can. Park 1,100 150 950 950 C. Mill Creek Woods G. 120 120 120 D. W. Ponds & Wetlands 600 500 100 100 E. Panther Lake Park 85 85 85 F. Sprinigbrook Park 175 75 100 100 G. T-Bridge Green Belt 80 80 80 H. S. Merid. Can.Park 525 200 325 325 I. Interburban N. Park 50 50 50 FIRST SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------- ------- ------ ---- ---- ---- ---- ---- ------ J. Interburban C. Park 50 50 50 K. Interburban O'Brien 50 50 50 TOTAL 16,138 1,570 14,568 452 279 450 425 599 12,263 GENERAL GOVERNMENT 1. Library** 2,150 2,150 150 2,000 2. City Hall Expansion** 450 450 450 3. Telecommun. System 425 425 4. Computer Systems*** Geocoding 300 300 Police Computer 140 140 Fire Computer 150 150 Other 1,125 1,125 1,715 1,715 125 125 125 125 125 1,090 TOTAL 4,740 425 4,315 125 275 2,575 125 125 1,090 GRAND TOTALS 83,170 54,404 1,292 1,300 33,432 28,766 12,967 3,738 1,575 * Included in 1986 Voted G.O. ** Included in 1988 Councilmanic G.O. *** Funding allocation to individual projects based on results of Automation Plan CITY OF KENT SUMMARY RECOMMENDED CIP SECOND SCENARIO: VOTED G.O FOR PUBLIC SAFETY IN 1986 -COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL OFFICE SPACE IN 1988 -REAL ESTATE EXCISE TAX TOTAL 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND ------- ---- ---- ---- ---- ---- ------ PROJECTED CIP REVENUE 16,266 2,959 3,130 3,256 3,390 3,531 N/A COMMITTED DEBT SERVICE 8,980 1,727 1,825 1,927 1,806 1,695 N/A PROPOSED DEBT SERVICE 574 287 287 NET AVAILABLE CIP REVENUES 6,712 1,232 1,305 1,329 1,297 1,549 N/A PROPOSED NEW REVENUES VOTED G.O. FOR PUBLIC SAFETY 11,743 11,743 COUNCILMANIC G.O. FOR LIBRARY 2,450 2,450 REAL ESTATE EXCISE TAX 1,658 300 315 331 347 365 TOTAL AVAILABLE CIP REVENUE 22,562 13;275 1,620 4,109 1,644 1,914 N/A TOTAL PROJECTS 22,511 13,267 1,594 4,074 1,648 1,928 32,268 BALANCE 51 8 26 35 (4) (14) *Assumes implementation in 1986, additional funds would accrue if implemented in 1985. SECOND SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX PROJECTS 'DOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------- ------- ------ ---- ---- ---- ---- ---- ------ PUBLIC SAFETY Police 1. Police Radio* 250 250 250 2. Valley Com Imp. 61 61 61 3. Training Facility* 1,175 1,175 1,175 4. W. H. Sat. Sta.* 170 170 170 A. Police Headquarters 1,700 1,700 1,700 Fire 1. Aid Cars* 146 146 146 2. Suburban Pumpers* 310 310 310 3. E.H. Fire Station* 1,640 1,640 1,640 4. WVH Sta.Trn. Ctr.* 3,215 3,215 3,215 5. W. H. Fire Station* 1,614 1,614 1,614 6. Fire HQ Station* 3,025 3,025 3,025 7. Fire Conmun. Sys.* 558 558 158 400 8. Valley Can Imp. 17 17 17 9. Mobile Comp. Ter.* 40 40 40 TOTAL 13,921 13,921 11,743 78 0 0 0 2,100 PUBLIC WORKS 1. Green River Bridge 2,907 2,622 285 285 2. SR 515 8,776 8,451 325 325 3. Ped & Bike Path Imp 1,117 457 660 125 125 125 285 4. Adv Right-of-Way Acq 187 498 173 (858) 5. S.E.192nd NR toEVH 7,913 3,000 4,913 4,913 6. City Shop Remodel 225 75 150 150 7. 180th and WVH Int. 600 450 150 150 8. 180th and EVH Int. 229 65 164 164 9. 212th & WV Int.Imp 250 250 250 10. EVH 192nd-180th 2,901 1,575 1,326 600 726 11. 76 Ave 212th-222nd 1,257 561 696 198 171 327 12. 240th & 104th Int. 80 80 80 13. 240th & 116 Int Imp 138 138 138 14. 84th & 167 Int Imp 50 50 50 15. 240th @ 102nd 425 425 16. WVH Imp Meeker-180 3,619 3,619 A. 196/200 EV Hwy N.R. 10,580 2,000 8,580 8,580 SECOND SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------ ------- ------ ---- ---- ---- --- ---- ------ B. S.196 & WV Int. Imp 142 142 142 C. K-D M Road & SR 99 116 116 116 D. S 224th and E.V.Int 104 104 104 E. New Arterial-224th 6,942 3,471 3,471 3,471 TOTAL 48,371 26,771 21,600 797 812 886 923 1,022 17,160 PARKS 1. Riverfront Acq 850 850 500 350 2. Van Doren's Dev. 129 129 129 3. Kent Cam. Parking 250 250 250 4. Golf Course Dev. 1,000 1,000 571 429 5. Mill Creek Can. Tr 450 450 50 50 150 200 6. Lake Fenwick Park 300 300 300 7. Ball Field Lights 65 65 65 8. East Hill Park 1,050 100 950 150 600 200 9. S. Scenic Hill Park 50 50 50 10. Riverfront Dike 115 115 37 63 15 11. Uplands Parking 160 160 60 12. Upper Mill Cr. Park 569 569 569 13. Riverfront Parking 65 65 65 14. Green River Rest. 150 150 150 15. Glenn Nelson Park 500 500 500 16. Commons Playfield 300 300 300 17. Performing Arts Ctr 3,400 3,400 3,400 18. Russell Rd. Park 1,760 1,760 1,760 19. Campus Can. Park 50 50 50 20. S. Willis Park 60 60 60 21. Good News Bay Park 420 420 22. Riverfront Park 1,000 1,000 1,000 23. Orillia Dist. Park 250 125 125 125 24. G. R. Frontage Tr. 100 100 100 A. Sunnycrest Neigh. 260 260 260 B. Clark Lake Cam. Park 1,100 150 950 950 C. Mill Creek Woods G. 120 120 120 D. W. Ponds & Wetlands 600 500 100 100 E. Panther Lake Park 85 85 85 F. Sprinigbrook Park 175 75 100 100 G. T-Bridge Green Belt 80 80 80 SECOND SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------- ------- ------ ---- ---- ---- ---- ---- ------ H. S. Merid. Com.Park 525 200 325 325 I. Interburban N. Park 50 50 50 J. Interburban C. Park 50 50 50 K. Interburban O'Brien 50 50 50 TOTAL 16,138 1,570 14,568 602 429 613 600 781 11,443 GENERAL GOVERNMENT 1. Library** 2,150 2,150 150 2,000 2. City Hall Expansion** 450 450 450 3. Telecammun. System 425 425 4. Computer Systems*** Geocoding 300 300 Police Computer 140 140 Fire Computer 150 150 Other 1,125 1,125 1,715 1,715 125 '125 125 125 125 1,090 TOTAL 4,740 425 4,315 125 275 2,575 125 125 1,090 GRAND 'TOTALS 83,170 54,404 1,594 1,648 31,793 28,766 13,267 4,074 1,928 * Included in 1986 Voted G.O. ** Included in 1988 Councilmanic G.O. *** Funding allocation to individual projects based on results of Automation Plan CITY OF KENT SUMMARY RECOMMENDED CIP THIRD SCENARIO: -VOTED G.O FOR PUBLIC SAFETY IN 1986 -COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL OFFICE SPACE IN 1988 -REAL ESTATE EXCISE TAX -ADD'L 1.5-2% UTILITY TAX -5% ADMISSIONS TAX TOTAL 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND ------ ---- ---- ---- ---- ---- ------ PROJECTED CIP REVENUE 16,266 2,959 3,130 3,256 3,390 3,531 N/A COMMITTED DEBT SERVICE 8,980 1,727 1,825 1,927 1,806 1,695 N/A PROPOSED DEBT SERVICE 574 287 287 NET AVAILABLE CIP REVENUES 6,712 1,232 1,305 1,329 1,297 1,549 N/A PROPOSED NEW REVENUES VOTED G.O. FOR PUBLIC SAFETY 11,743 11,743 COUNCILMANIC G.O. FOR: LIBRARY 2,450 2,450 PERFORMING ARTS CENTER 3,400 3,400 REAL ESTATE EXCISE TAX 1,658 300 315 331 347 365 ADD'L 1.5%-2% UTILITY TAX 4,973 900 945 992 1,042 1,094 5% ADMISSIONS TAX 500 100 100 100 100 100 TOTAL AVAILABLE CIP REVENUE 31,435 14,275 2,665 5,202 2,786 6,508 N/A TOTAL PROJECTS 31,404 14,265 2,649 5,194 2,763 6,533 23,000, BALANCE 31 10 16 8 23 (25) *Assumes implementation in 1986, additional funds would accrue if implemented in 1985. THIRD SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX ADD'L 1.5-2% UTILITY TAX 5% ADMISSIONS TAX PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------ ------- ------ ---- ---- ---- ---- ---- ------ PUBLIC SAFETY Police 1. Police Radio* 250 250 250 2. Valley Com Imp. 61 61 61 3. Training Facility* 1,175 1,175 1,175 4. W. H. Sat. Sta.* 170 170 170 A. Police Headquarters 1,700 1,700 1,700 Fire 1. Aid Cars* 146 146 146 2. Suburban Pumpers* 310 310 310 3. E.H. Fire Station* 1,640 1,640 1,640 4. WVH Sta.Trn. Ctr.* 3,215 3,215 3,215 5. W. H. Fire Station* 1,614 1,614 1,614 6. Fire HQ Station* 3,025 3,025 3,025 7. Fire Commun. Sys.* 558 558 158 400 8. Valley Can Imp. 17 17 17 9. Mobile Camp. Ter.* 40 40 40 TOTAL 13,921 131921 11,743 78 0 0 0 2,100 PUBLIC WORKS 1. Green River Bridge 2,907 2,622 285 285 2. SR 515 8,776 8,451 325 325 3. Ped & Bike Path Imp 1,117 457 660 155 125 125 125 130 4. Adv Right-of-Way Acq 0 675 870 331 (1,876) 5. S.E.192nd NR toEVH 7,913 3,000 4,913 4,913 6. City Shop Remodel 225 75 150 150 7. 180th and WVH Int. 600 450 150 150 8. 180th and EVH Int. 229 65 164 164 9. 212th & WV Int.Imp 250 250 250 10. EVH 192nd-180th 2,901 1,575 1,326 600 726 11. 76 Ave 212th-222nd 1,257 561 696 400 296 12. 240th & 104th Int. 80 80 80 13. 240th & 116 Int Imp 138 138 138 14. 84th & 167 Int Imp 50 50 50 15. 240th @ 102nd 425 425 THIRD SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX ADD'L 1.5-2% UTILITY TAX 5% ADMISSIONS TAX PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------ ------- ------ ---- ---- ---- ---- ---- ------ 16. WVH Imp Meeker-180 3,619 3,619 A. 196/200 EV Hwy N.R. 10,580 2,000 8,580 467 763 7,350 B. S.196 & WV Int. Imp 142 142 142 C. K-D M Road & SR 99 116 116 116 D. S 224th and E.V.Int 104 104 104 E. New Arterial-224th 6,942 3,471 3,471 296 3,175 TOTAL 48,371 26,771 21,600 1,285 1,339 1,444 1,488 1,614 14,430 PARKS 1. Riverfront Acq 850 850 500 100 250 2. Van Doren's Dev. 129 129 129 3. Kent Can. Parking 250 250 250 4. Golf Course Dev. 1,000 1,000 200 800 5. Mill Creek Can. Tr 450 450 100 125 225 6. Lake Fenwick Park 300 300 300 7. Ball Field Lights 65 65 65 8. East Hill Park 1,050 100 950 332 278 340 9. S. Scenic Hill Park 50 50 50 10. Riverfront Dike 115 115 115 11. Uplands Parking 160 160 160 12. Upper Mill Cr. Park 569 569 350 219 13. Riverfront Parking 65 65 65 14. Green River Rest. 150 150 150 15. Glenn Nelson Park 500 500 500 16. Commons Playfield 300 300 300 17. Performing Arts Ctr 3,400 3,400 3,400 18. Russell Rd. Park 1,760 1,760 1,760 19. Campus Can. Park 50 50 50 20. S. Willis Park 60 60 60 21. Good News Bay Park 420 420 22. Riverfront Park 1,000 1,000 1,000 23. Orillia Dist. Park 250 125 125 125 24. G. R. Frontage Tr. 100 100 100 A. Sunnycrest Neigh. 260 260 260 B. Clark Lake Can. Park 1,100 150 950 950 C. Mill Creek Woods G. 120 120 120 THIRD SCENARIO VOTED G.O. FOR PUBLIC SAFETY IN 1986 COUNCILMANIC G.O. FOR LIBRARY AND CITY HALL IN 1988 REAL ESTATE EXCISE TAX ADD'L 1.5-2% UTILITY TAX 5% ADMISSIONS TAX PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND ------- ------- ------ ---- ---- ---- ---- ---- ------ D. W. Ponds & Wetlands 600 500 100 100 E. Panther Lake Park 85 85 85 F. Sprinigbrook Park 175 75 100 100 G. T-Bridge Green Belt 80 80 80 H. S. Merid. Com.Park 525 200 325 325 I. Interburban N. Park 50 50 50 J. Interburban C. Park 50 50 50 K. Interburban O'Brien 50 50 50 TOTAL 16,138 1,570 14,568 1,112 957 1,175 1,150 4,794 5,380 GENERAL GOVERNMENT 1. Library** 2,150 2,150 150 2,000 2. City Hall Expansion** 450 450. 450 3. Telecommun. System 425 425 4. Computer Systems*** Geocoding 300 300 Police Computer 140 140 Fire Computer 150 150 Other 1,125 1,125 1,715 1,715 125 125 125 125 125 1,090 TOTAL 4,740 425 4,315 125 275 2,575 125 125 1,090 GRAND TOTALS 83,170 54,404 2,649 2,763 23,000 28,766 14,265 5,194 6,533 * Included 'in 1986 Voted G.O. ** Included in 1988 Councilmanic G.O. *** Funding allocation to individual projects based on results of Automation Plan APPENDIX A CITY OF KENT PROJECTED CIP REVENUES PROJECTED CIP REVENUES TOTAL 1986-90 1986 1987 1988 1989 1990 ------- ---- ---- ---- ---- Sales Tax - Capital Improvement(1) 9,318 1,653 1,752 1,857 1,969 2,087 Fuel Tax - Street(2) 1,690 312 324 337 351 365 Fuel Tax - Arterial Street 1,127 208 216 225 234 243 Federal Marshal Payments(3) 1,235 247 248 247 247 246 Federal Revenue Sharing(4) 100 100 Interest - Capital Improvement(5) 375 75 75 75 75 75 Loan Repayment - Capital Imp. (6) 170 34 34 34 34 34 Contributions - General Fund(7) 1,790 358 358 358 358 358 Contributions - Golf Course(8) 470 94 94 94 94 94 Contributions - Water Fund(9) 141 28 28 28 28 29 1986 Beginning Fund Balances(10) Street Funds 44 44 Capital Improvement Fund (245) (245) Revenue Sharing Fund 51 51 TOTAL PROJECTED CIP REVENUES 16,266 2,959 3,130 3,256 3,390 3,531 (1) Sales Tax will increase at a real rate of 6% per year based on historical growth. (2) Fuel Taxes will increase at a real rate of 4% per year based on historical growth (3) Federal Marshal Payments are exact per contract with the Federal Marshal. (4) Federal Revenue Sharing is assumed to be discontinued by Congress in 1987. It is assumed based on historical usage that the City will use about $100,000 of its Revenue Sharing monies to fund capital improvements in 1986) . (5) Valley Corn will pay the Capital Improvement Fund $34,000 a year to repay a loan m to Valley Com in 1984. (6) Interest on the Capital Improvement Fund is expected to generate $75,000 a year. (7) The General Fund is assumed to continue to contribute about $350,000 a year for G Course and LID debt. (8) The Golf Course will generate $94,000 to help pay its debt service. (9) The Water Fund is contributing $28,000 a year for debt service. (10) The City is going into 1986 with beginning fund balances of $44,000, $(245,000) , $51,000 for the Street Funds, Capital Imporovement Fund and Revenue Sharing Fund, respectively. APPENDIX B COMMITTED COUNCILMANIC DEBT SERVICE TOTAL 1986-90 1986 1987 1988 1989 1990 ------- ---- ---- ---- ---- ---- MATURITY 1966 Street Bonds 1986 26 26 1973 General Purpose Bonds 1990 General Government - 30.5% 186 37 37 37 37 38 Street - 46.6% 287 57 57 57 57 59 Water - 22.9% 141 28 28 28 28 29 Senior Center (Old) 1991 25 5 5 5 5 5 Crow Road/SE 260th LID 300 1997 273 61 58 55 51 48 S 252nd/Kent Kangely LID 301 1997 199 45 42 40 37 35 Smith Street LID 304 1997 156 12 11 114 10 9 1978 General Purpose Bonds 1998 Parks - 26.7% 177 36 36 35 35 35 Street - 73.3% 386 98 95 96 97 Des Moines LID 1987 2 1 1 1981 Golf Course G.O. Bonds 2001 1,189 241 239 237 235 237 1984 General Purpose Bonds 2004 Jail - 25.2% 1,235 247 248 247 247 246 Senior Center - 53.1% 2,606 522 523 521 521 519 Golf Course - 21.7% 1,062 213 213 212 212 212 W. Meeker St LID 297 1997 294 66 62 59 55 52 W. Valley Drainage LID 306 1998 258 70 66 63 59 104th @ 270th Water LID 1997 10 2 2 2 2 2 N. Central Imp LID 318 1998 48 12 12 12 12 CBD Improvement LID 313 1997 132 30 28 26 25 23 Upper Mill Creek Purchase Agr. 1990 195 33 54 54 54 James Street Improvement LID 32 1997 93 25 24 23 21 --- ---- ---- ---- ---- ---- TOTAL COMMITTED DEBT SERVICE 8,980 1,727 11825 1,927 1,806 11695 � Y � � KE/YT, WASH/IYGTOIY aR- �!n'-•`-'fit -� K .r�� `••40•<'":: WA r , 4 i � ems •u _r h � at h V r 40 y� , r • • • • • • 0 • • • • l �l � 1 � 1 1 CITY OF KENT Washington � 1 1986-1990 CAPITAL IMPROVEMENT PROGRAM _ 1 l �J Prepared by: Finance Department Tony McCarthy Finance Director Michael Ledbetter Project Analyst TABLE OF CONTENTS Section/Page INTRODUCTION I-1 ADOPTED CAPITAL IMPROVEMENT PROGRAM (CIP) II-1 CIP PROCESS AND FUNDING SCENARIOS III-1 Results of Public Input III-3 Other CIP Balancing Considerations III-5 Conclusions Drawn from Public Input and Other Considerations III-7 Preliminary CIP - Final CIP Comparison III-9 CIP POLICIES AND PROJECTS General IP Policies IV-1 CIP Financial Policies IV-3 Policies and Projects by Function IV-4 Public Safety IV-I10 Public Works 5 Parks and Recreation IV-1 General Government IV-19 EXISTING EXPENDITURES AND REVENUES Expenditures V-1 Revenues V-2 Expenditures and Revenues V-5 FINANCING OPTIONS AND STRATEGIES Option 1 --Deferring Projects VI-1 VI-2 Options--Analysis of Revenue Base Existing Revenue Base VI-2 VI-3 Expansion of Revenue Base Strategies - Cash Versus Debt Issuance VI-7 Special Assessment and Revenue Bond Financing VI-7 General Obligation Bonds VI-8 Innovative Financing Strategies VI-11 VI-12 Conclusion J . l � J LIST OF TABLES AND APPENDICES TABLES Page 1 CIP Summary II-3 2 Summary List of CIP Projects II-5 3 Summary of Questionnaire Results II-4 4 Summary of Public Comments III-4 5 Summary of Council Criteria III-5 6 Preliminary and Final CIP Comparison III-10 7 Public Safety Projects IV-6- 8 Public Works Projects IV-12 9 Parks and Recreation Projects IV-16 10 General Government Projects IV-20 11 Total Proposed Capital Expenditures V-2 12 Net Projected Available CIP Revenues V-3 13 Summary of Preliminary CIP Expenditures and Revenues V-6 14 1985 City Tax Rate Comparisons VI-4 15 Legal Debt Margin for 1985 VI-10 16 Projected Councilmanic Bonding Capacity VI-11 APPENDICES A CIP Resolution B Projected CIP Revenues C Committed Councilmanic Debt Service D Capital Improvement Program Questionnaire E Chamber Project Criteria F Chamber Funding Criteria G Currently Funded Capital Improvement Projects H Net Capital Expenditures by Function I Net Committed Debt Expenditures by Function J Capital Improvement Fund Policies K Detailed Project Proposal Description Sheets by Function K - 1 Summary of Proposed Expenditures K - 2 Public Safety K - 3 Public Works K - 4 Parks and Recreation K - 5 General Government INTRODUCTION 1 _ J _ 1 'J INTRODUCTION Over a year ago the City of Kent began developing its first Capital Improvement Program (CIP). The five-year CIP was needed to bring together the City's nonutility long-range plans into one comprehensive plan. This plan would then act as a master plan for the City, identifying which capital improvement projects would be funded and what year funding would occur. After many months of hard work, involving initial documentation of capital needs, public hearings, and final prioritization of projects and funding sources, the City has its first comprehensive Capital Improvement Program. The 1986-1990 Capital Improvement Program is a long-range plan containing a list of all the City's planned nonutility capital improvement projects and the recommended financing methods for funding those projects. The program states City policies and goals and presents all available options and strategies for financing capital improvements. Capital improvements, for the purpose of this report, are any nonutility City projects costing more than $25,000 which involves the purchasing, refurbishing or construction of physical assets. This will include such projects as new parks, new fire stations, and extensive street improvements. The need to develop a Capital Improvement Program arose when it became apparent that the City of Kent could not afford to simultaneously implement all of its nonutility long-range plans. These plans, such as the Transportation Plan, the Fire plaster Plan and the Parks and Recreation Plan, were being adopted independent of the needs of other departments and regardless of available revenues. Hence, a coordinating plan was needed to balance the needs of the departments and to balance planned expenditures with available revenues. Another reason for developing a CIP was that Kent was outgrowing its existing public services. Projections for growth in the Kent area indicate even heavier demands will be placed on Kent's streets, parks, and other public facilities. As of April 1 , 1985, Kent's population was 26,979, but by 1990 it is expected to grow to almost 33,000. More importantly, Kent is a net importer of labor with its daytime population expected to grow from 40,000 to 50�000 over the next five years. To meet this expected demand, a long-range Jplan was needed to first prioritize capital improvement needs and then . identify funding Y sources for the Cit 's highest priority projects. The Capital Improvement Program is such a plan. I-1 The 1986-90 Capital Improvement Program is organized into six sections. Section I provides an introduction. Section II presents the adopted Capital Improvement Program scenario Section III describes the CIP process drawing from two main documents: City of Kent 1986-90 Capital Improvement Program Funding Scenarios and the 1986-90 Preliminary Capital Improvement Program. Both documents were completed as part of the CIP process and are now being incorporated into the final CIP. Section IV, CIP Policies and Projects, describes the policies upon which the CIP rests and their relationship to the projects identified. Section V. Existing Expenditures and Revenues, shows the initial CIP expenditure and revenue figures and describes the City's traditional CIP revenue sources. Section VI, Financing Options and Strategies, presents the options and strategies available to the City of Kent for financing its capital improvements. The last three sections of this report are extracted from the last three sections in the Preliminary CIP, and are presented as originally shown in that document. In this way the information on projects and financing options can be traced from their initial unbalanced _ presentation to the adopted funded CIP described in Section II. I-2 � 1 _I ADOPTED CAPITAL IMPROVEMENT PROGRAM I � l � I . I J J J _l J J J J J ADOPTED CAPITAL IMPROVEMENT PROGRAM Following the CIP process described later in Section III, the City Council held a public hearing on the Capital Improvement Program. Following the public hearing the City Council held a special workshop. At that workshop the City Council received final staff input regarding the State's Infrastructure Loan Program and taxing options for the City of Kent. Then at the regular Council meeting of July 15, 1985, the City Council adopted the Second Scenario, amended to implement the real estate excise tax beginning September 1 , 1985, as the City of Kent 1986 - 1990 Capital Improvement Program. The resolution adopting a CIP is found in Appendix A. A CIP summary is provided in Table 1 and a comprehensive list of capital improvement projects included in that summary is found in Table 2 beginning on Page II-5. In summary, the adopted CIP recommends using a voted general obligation bond to fund public safety projects in 1986, a councilmanic general obligation bond to fund a new library and City Nall office expansion in 1988, and institutes a real estate excise tax primarily to fund advanced right-of-way acquisition for streets and acquisition of open spaces for parks. These sources plus $7 million in existing CIP revenues over the five year period will fund a $22.5 million program. Although the adopted CIP was partly balanced by deferring projects until a later date, the City feels it is funding Kent's most critically needed and desired capital improvements. Moreover, the adopted CIP seems best to address the concerns of citizens worried about high taxes, the quality of public services, and the growth related problems caused by the many businesses and people moving into Kent. The CIP summary in Table 1 first lists traditional and initially existing CIP revenues. Explanations of these revenues and the assumptions used to make the projections can be found in Appendix B. New CIP revenues are listed next. The amount of the voted general obligation bond for public safety is currently identified at $11 ,743,000; however, it will likely decrease following completion of several ongoing City studies, i .e. , the Fire Station Location Package and the Training Facility Study. A citizens committee will also be formed to evaluate the results of these studies and to determine precisely what should be included in the voted G.O. bond issue and when that issue should be placed on the ballot. Assuming an $11 ,743,000 issue at ten percent for 20 years, the annual debt service would be $1 ,379,328 II-1 or $.63 per $1 ,000 of assessed valuation. This would amount to approximately $50 per year on an $80,000 home. The Councilmanic general obligation bond identified to fund a new library and City Hall expansion will not affect property taxes; however, it will have an impact on existing City revenues. Assuming a $2,450,000 issue at ten percent for 20 years the City will be _ committed to paying $287,000 in debt service annually for 20 years from its capital improvement revenue. A real estate excise tax is a one quarter of one percent tax on the sale of real property. Based on historical trends the City would generate approximately $300,000 annually. Furthermore, an additional $100,000 should be generated by initiating the tax beginning September 1 , 1985. Committed and planned debt service are listed next and backed out of projected revenues to come up with net available CIP revenues. A detailed list of committed debt can be found in Appendix C. The planned debt service is for the 1988 councilmanic issue for the new library and City Hall expansion. The net available CIP revenues fund $22,511 ,000 in CIP projects over the five year period. Table 2 individually identifies the projects funded. A detailed explanation of the individual projects is found in Appendix K. When revenues are matched with expenditures, the City has a $254,000 surplus. $100,000 of that surplus is accounted for by initiating the Peal Estate Excise Tax four months earlier than anticipated under the Second Scenario. The remaining surplus is provided for contingency needs. The contingency needs will be evaluated with each annual update. Each year the CIP will be updated following an abbreviated version of the same CIP process described in Section III. Since this was the City's first CIP, the process was rather long and involved. In subsequent years the City staff will simply review project costs, need and timing, and update revenue projections. The public will again review a Preliminary CIP and provide input regarding project selection and funding choices. During each CIP update, the City will also review its long-range policies and goals and its legally available financing options. The long-range policies and goals which guided the II-2 TABLE 1 CITY OF KENT 1986-1990 CAPITAL IMPROVEMENT PROGRAM SUMMARY (Amounts in Thousands of 1986 Dollars) TOTAL 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND TRADITIONAL CIP REVENUE Sales Tax - Capital Improvement 9,318 1 ,653 1 ,324 1 ,337 1 ,351 2,365 N/A Fuel Tax - Street 1 ,689 312 324 337 351 365 N/A 243 N/A Fuel Tax - Arterial Street j ,235 24127 8 248 247 247 246 N/A Federal Marshal Payments100 100 Federal Revenue Sharing Interest - Capital Improvement 375 75 75 75 75 75 N/A Loan Repayment - Capital Imp. 170 34 34 34 34 34 N/A Contributions - General Fund 1 ,790 358 358 358 358 358 N/A Contributions _ Golf Course 14� 28 28 28 28 29 N/A Contributions Water Fund 1986 Beginning Fund Balances 44 44 Street Funds Capital Improvement Fund* (245) (245) Revenue Sharing Fund 51 51 TOTAL TRADITIONAL CIP REVENUES 16,265 2,959 3,130 3,255 3,390 3,531 N/A NEW CIP REVENUES Voted G.O. for Public Safety 11 ,743 11 ,743 Councilmanic G.O. for Library 2,450 2,450 Real Estate Excise Tax ** 1 ,758 400 315 331 347 365 TOTAL NEW CIP REVENUES 15,951 12,143 315 2,781 347 365 TOTAL PROJECTED CIP REVENUES 32,216 15,102 3,445 6,036 3,737 3,896 DEBT SERVICE 8,877 1 ,727 1 ,825 1 ,824 1 ,806 1 ,695 N/A Committed 574 287 287 Planned NET AVAILABLE CIP REVENUES 22,765 13,375 1 ,620 4,212 1 ,644 1 ,914 N/A EXPENDITURES (See II-5 for details) 0 p 2,100 Public Safety 11 ,821 11 ,743 78 0 Public Works 4,440 797 812 886 923 1 ,022 17,160 Parks and Recreation 3,025 602 429 613 600 781 11 ,543 I General Government 3,225 125 275 2,575 125 125 1 ,090 TOTAL EXPENDITURES 22,511 13,267 1 ,594 4,074 1 ,648 1 ,928 31 ,893 UNCOMMITTED BALANCE Z54 108 26 138 (4) (14) *Amount is net of $250,000 Capital Improvement Fund Reserve. **Implemented September 1 , 1985 with $100,000 carry-over from 1985, included in 1986 amount. II-3 I � development of the CIP are presented in Section IV. In short, polices which guided initial project selection were those policies embodied in existing City �lans. Public Safety policies deal with providing adequate police and fire facilities and equipment to assure the safety of the people living, working, or visiting Kent. Public Works' policies dealt with providing quality transportation and storm drainage services. Parks and Recreation policies are concerned with preserving and enhancing the quality of life in Kent through parkland and facility development. General Government projects are guided by the City's general policies of promoting economic growth, maintaining the livability of the community, cooperating with other governmental entities, and providing improved public services. As for CIP financial policies to go with the City's program policies, the City will first encourage and seek non-City sources of funding. If these funds are not available, the City will look toward user charges or Local Improvement Districts (LID's). If user charges or LID's are not appropriate, the City may use its own funds or issue debt. These policies will be pursued in this order to insure the City's healthy financial position. The legally available financing options for the City of Kent are presented in Section VI. Aside from deferring projects which is a definite option, the City's available financing options can be grouped into two categories: capital related taxes and contributions from operating type revenues. The capital related taxes are those taxes which the State Legislature has mandated to be used specifically to fund capital improvement projects. These taxes are the Excess Property Tax Levy and the Real Estate Excise Tax. Contributions from operating type revenues are those taxes which are primarily used to cover operating expenses but could have a portion of their revenues allocated to capital projects. These taxes are the Business and Occupation Tax, the Utility Tax, and the Admissions Tax. Once the revenue sources are decided, there are certain strategies involved in deciding to fund with cash or issue debt. When issuing debt, whether it be general obligation bonds or user specific debt such as revenue and special assessment bonds, there are certain statutory debt capacity limits the City cannot exceed. Currently only the councilmanic debt capacity ceiling is of concern. Next year when the CIP is updated the City's councilmanic capacity, as well as all other debt limits and financing options, will be reassessed, updated and then explained to the public. These issues are discussed in more detail in Section VI. II-4 TABLE 2 SUMMARY LIST OF CIP PROJECTS (Amounts in Thousands of 1986 Dollars) PROJECT TOTALS YEAR PROJECT FUNDED Gross Dedi- Net 1991 & Project cated Project Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND PUBLIC SAFETY Police 1 . Police Radio* 250 250 250 61 2. Valley Com Imp. 61 61 3. Training Facility* 1 ,175 1 ,175 1 ,175 4. W. H. Sat. Sta.* 170 170 170 1 ,700 A. Police Headquarters 1 ,700 1 ,700 Fire 1 . Aid Cars* 146 146 146 2. Suburban Pumpers* 310 310 310 3. E.H. Fire Station* 1 ,640 1 ,640 1 ,640 4. WVH Sta.Trn. Ctr.* 3,215 3,215 3,215 5. W. H. Fire Station* 1 ,614 1 ,614 1 ,614 6. Fire HQ Station* 3,025 3,025 3,025 400 7. Fire Commun. Sys.* 558 5188 158 17 8. Valley Com Imp. 17 9. Mobile Comp. Ter.* 40 40 40 TOTAL 13,921 13,921 11 ,743 78 2,100 PUBLIC WORKS 1 . Green River Bridge 2,907 2,622 285 285 2. SR 515 8,776 8,451 325 325 125 125 125 285 3. Ped & Bike Path Imp 1 ,117 457 660 187 498 173 (858) 4. Adv Right-of-Way Acq 4,913 5. S.E.192nd NR to EVH 7,913 3,000 4,913 150 6. City Shop Remodel 225 75 150 50 7. 180th and WVH Int. 600 450 150 164 8. 180th and EVH Int. 229 65 164 164 250 9. 212th & WV Int.Imp 250 250 600 726 10. EVH 192nd-180th 2,901 1 ,575 1 ,326 19$ 171 327 11 . 76 Ave 212th 222nd 1 ,257 561 696 80 12. 240th & 104th Int. 80 80 13. 240th & 116 Int Imp 138 138 138 14. 84th & 167 Int Imp 50 50 50 15. 240th @ 102nd 425 425 16. WVH Imp Meeker-180 3,619 3,619 8,580 A. 196/200 EV Hwy N.R. 10,580 2,000 8,580 142 B. S.196 & WV Int. Imp 142 142 116 C. K-D M Road & SR 99 116 116 + II-5 J TABLE 2 SUMMARY LIST OF CIP PROJECTS PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net (Amounts in Thousands of 1986 Dollars) Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND D. S 224th and E.V. Int 104 104 104 E. New Arterial-224th 6,942 3,471 3,471 3,471 TOTAL 48,371 26,771 21 ,600 797 812 886 923 1 ,022 17,160 PARKS 1 . Riverfront Acq 850 850 500 350 2. Van Doren's Dev. 129 129 129 3. Kent Con. Parking 250 250 250 4. Golf Course Dev. 1 ,000 1 ,000 571 429 5. Mill Creek Can. Tr 450 450 50 50 150 200 6. Lake Fenwick Park 300 300 300 7. Ball Field Lights 65 65 65 8. East Hill Park 1 ,050 100 950 150 600 200 9. S. Scenic Hill Park 50 50 50 10. Riverfront Dike 115 115 37 63 15 11 . Uplands Parking 160 160 60 100 12. Upper Mill Cr. Park 569 569 569 13. Riverfront Parking 65 65 65 14. Green River Rest. 150 150 150 15. Glenn Nelson Park 500 500 500 16. Commons Playfield 300 300 300 17. Performing Arts Ctr 3,400 3,400 3,400 18. Russell Rd. Park 1 ,760 1 ,760 1 ,760 19. Campus Com. Park 50 50 50 20. S. Willis Park 60 60 60 21 . Good News Bay Park 420 420 22. Riverfront Park 1 ,000 1 ,000 1 ,000 23. Orillia Dist. Park 250 125 125 125 24. G. R. Frontage Tr. 100 100 100 A. Sunnycrest Neigh. 260 260 260 B. Clark Lake Com. Park 1 ,100 150 950 950 C. Mill Creek Woods G. 120 120 120 D. W. Ponds & Wetlands 600 500 100 100 E. Panther Lake Park 85 85 85 F. Springbrook Park 175 75 100 100 G. T-Bridge Green Belt 80 80 80 H. S. Merid. Com.Park 525 200 325 325 I. Interburban N. Park 50 50 50 J. Interburban C. Park 50 50 50 K. Interburban O'Brien 50 50 50 TOTAL 16,138 1 ,570 14,568 602 429 613 600 781 11 ,543 II-6 TABLE 2 SUMMARY LIST OF CIP PROJECTS PROJECTS TOTAL YEAR PROJECT FUNDED Gross Dedi- Net (Amounts in Thousands of 1986 Dollars) Project cated Project 1991 & Cost Revenue Cost 1986 1987 1988 1989 1990 BEYOND GENERAL GOVERNMENT 1 . Library** 2,150 2,150 150 2,000 2. City Hall Expansion** 450 450 450 3. Telecommun. System 425 425 4. Computer Systems*** Geocoding 300 300 Police Computer 140 140 Fire Computer 150 150 Other 1 ,125 1 ,125 1 ,715 1 ,715 125 125 125 125 125 1 ,090 TOTAL 4,740 425 4,315 125 275 2,575 125 125 1 ,090 GRAND TOTALS 83,170 54,404 1 ,594 1 ,648 31 ,893 28,766 13,267 4,074 1 ,928 * Included in 1986 Voted G.O. ** Included in 1988 Councilmanic G.O. *** Funding allocation to individual projects based on results of Automation Plan. J J J J II-7 CIP PROCESS AND FUNDING SCENARIOS CIP PROCESS AND FUNDING SCENARIOS The process of developing a CIP began when each City department was asked to complete a standardized capital improvement request form for each nonutility capital project needed through the year 1990. It was important that the projects requested were integrally related to the City's overall mission and that they were needed to fulfill goals established in departmental long range plans. Once the request forms were completed, they were forwarded to the Finance Department for review and analysis. The Finance Department then prepared the Preliminary Capital Improvement Program. The Preliminary CIP, issued in February of 1985, confirmed the expectation that planned expenditures exceeded projected revenues. In particular, the Preliminary CIP showed the City had over $100 million in identified capital improvement needs. Seventy-six million of that need was identified for funding in the five year period from 1986-90. Netting out dedicated revenue, such as state and federal grants, private donations and LID's, the Preliminary CIP showed that the City needed $38 million to fund its nonutility projects from 1986 to 1990. Traditionally the City sets aside certain revenues for capital improvements. These revenues were projected to total about $13 million over the next five years; however, $6 million is needed to pay the existing City debt service. Thus, with $7 million available to fund projects the City had an unfunded deficit of $31 million. Given the tremendous impact that the CIP has on Kent's future and the City's history of involving citizens in local government decisions, an extensive public review process was conducted to solicit input on how to balance the CIP's $31 million deficit. A questionnaire/public hearing notice was sent out with the March 1985 utility bills informing the citizenry of three neighborhood meetings, one each on the Valley Floor and the East and West Hills. In addition the City Council held two workshop meetings, four City Council committee meetings, and the City staff had several meetings with a special task force of the Kent Chamber of Commerce. Over 600 questionnaires were completed and returned with utility payments. The results of the public input process were presented in City of Kent 1986-90 Capital Improvement Program Funding Scenarios. This document showed the tabulated results of the CIP Questionnaire, a summary of oral and written public comments received on the questionnaire and at the CIP public meetings, and the Council 's CIP criteria established i III-1 during a special workshop on the CIP. The Questionnaire results, based on over 600 respondents, showed resounding support for public safety projects and a willingness to accept a tax to help pay for these projects. The people who wrote comments on the _ questionnaire also expressed support for public safety projects as did the people in attendance at the three community meetings held to solicit public input. Another widely held view of the citizens of Kent was that the people and businesses moving into Kent _ should help pay for the growth related problems they cause; e.g. , traffic problems, parks and recreation needs, etc. A full summary of public comments appears on page III-4. Finally, the City Council established their own CIP criteria which is shown on page III-5. The Funding Scenarios document also contained the latest available updates regarding project costs, project timing, and revenue and debt assumptions. The greatest single update was the elimination of all drainage projects from the CIP. On April 1 , 1985 the City Council authorized a drainage utility which established a drainage fee based on square footage of impervious surface. Since the CIP contains only nonutility projects, all drainage projects identified in the Preliminary CIP were removed. Based on public input and other staff considerations, such as City studies, State regulations, and the implementation of the drainage utility, three alternative funding scenarios were developed. The only difference between the scenarios was the impact of new taxes. Each scenario used progressively more revenue sources, based on the addition of the least objectionable taxes, with the First Scenario being the least expensive and the Third the most. All scenarios extensively used the financing option of project deferral . The three scenarios and their revenue assumptions are listed below: First Scenario: -Voted G.0 for Public Safety in 1986 (20 yr, 10%) -Councilmanic G.O. for Library and City Hall Office Space in 1988 (20 yr, 10%) Second Scenario: -Voted G.0 for Public Safety in 1986 III-2 -Councilmanic G.O. for Library and City Hall Office Space in 1988 -Real Estate Excise Tax ($300,000 in 1986 growing at a real rate of 5% thereafter) Third Scenario: -Voted G.O. for Public Safety in 1986 Councilmanic G.O. for Library and City Hall Office Space in 1988 -Real Estate Excise Tax -Additional 1 .5-2% Utility Tax (calculated to be $900,000 in 1986 and to grow at 5% thereafter) -5% Admissions Tax (calculated to be about $100,000 a year with no substantial growth) RESULTS OF PUBLIC INPUT The three scenarios were developed based on the results of the questionnaire mailed to all utility customers; the public comments received on the questionnaire, at the public meetings and from Chamber of Commerce review process; and the criteria established by the City Council at a special CIP workshop. Questionnaire Results The questionnaire mailed with the Parch 1985 utility bills and responded to by 600 citizens is shown in Appendix D. The questionnaire identifies policy statements expanded upon in Section IV. Each policy statement represents a set of CIP projects which implement the stated policy. A summary of the questionnaire results are presented in Table 3 in order of most supported to least supported. The range was 5 for strongly support, 1 for strongly oppose. The far right column identifies how willing the respondents were to support a tax for the type of project described. III-3 Table 3 Summary of Questionnaire Results % Who Support Ranking Score a tax 1 Emergency equipment for public safety 3.781 69.9% 2 Facilities for automobile and truck traffic 3.653 47.4% _ 3 Communication and training facilities for public safety 3.593 61 .2% 4 Recycling City garbage 3.434 51 .8% 5 Greenbelts and open space 3.272 37.1% 6 Drainage facilities 3.256 49.0% 7 Bike routes/pedestrian paths 3.211 44.8% 8 Public safety facilities 3.057 40.8% 9 Expanded library facilities 2.889 39.00/o/ 10 Community playfields & cultural facilities 2.880 35.7% 11 Neighborhood and industrial area parks 2.855 33.4% 12 Technological equipment 2.852 31 .5% 13 City Hall office space 2.398 23.2% Other Public Comments In addition to the numerical responses summarized above, the questionnaire responses contained a number of other comments. The following table is a summary of questionnaire responses and input obtained from public meetings and from the Chamber of Commerce. In addition, the Chamber of Commerce developed a list of project and funding criteria shown in Appendix E and F. Table 4 Summary of Public Comments 1 ) The public expressed support for public safety projects. 2) Many people felt that the people and businesses moving into Kent should pay for the growth related problems they cause; e.g. , traffic problems, parks and recreation needs, etc. 3) Voted G.O. 's are an acceptable form of taxation. 4) There is support for a real estate excise tax. 5) Preference should be given to projects which generate revenue. 6) State and federal funding should be used wherever possible. III-4 7) Projects which support adopted City plans should be favored over those which do not. 8) City employees should be more productive in providing City services. City Council Criteria The City Council during a special workshop on the CIP developed the following criteria which was incorporated into the funding scenarios. Table 5 Summary of Council Criteria 1 ) Priority should be given to projects with outside funding sources. 2) Increase allocation of existing funding to capital needs. 3) Services not currently provided get priority over existing services. 4) Preserve future projects through current acquisition of right-of-way, both for land and buildings. 5) Build into CIP resources funds for unanticipated opportunities. 6) Develop existing property prior to acquiring new property. 7) Before funding a capital project, insure availability for operation and maintenance funding. 8) Insure conformance with City plans and vice versa. 9) Multi-purpose projects should be given priority. 10) A project should have demonstrated public support. OTHER CIP BALANCING CONSIDERATIONS In addition to public comment and Council criteria, there are a number of other considerations which impact the CIP. City studies, state regulations and staff input affected the outcome of the three CIP scenarios. The other considerations are as follows: Fire Department computer generated location package. This package will be used to determine the optimum location for the City's fire stations. Pending the outcome of Jthis study and the ongoing negotiations on a lease/purchase agreement for an industrial area Fire Station, the City will have a better grasp of what precisely will be needed. It J III-5 may turn out that the Fire Headquarters station will lend itself to expansion and remodel instead of replacement and/or that the training facility will be built jointly with the cities of Renton and Tukwila. In any event, it is recommended that new fire stations and equipment be funded from a voted bond issue. It is further recommended that prior to making a decision on what to include in the issue, a citizen committee be formed to help determine what projects will be included and when the issue should be introduced. City Automation Plan. The ongoing Automation Plan will determine computer needs on a City-wide basis. All computer related projects are included in the General Government section under the project heading "Computer Systems. " Pending the outcome of the Automation Plan, the City will have a better idea of its computer need priorities and how much it will cost to meet those needs. Road District Analysis. The City is examining the possibility of forming a Road District to finance the major road projects. Road Districts are separate taxing entities formed when voters in a proposed district approve its formation by a 60 percent margin. The District would be administered by the County's Public Works Department which would construct and maintain roads within the District. The establishment of a Road District would greatly expedite the East-West arterial projects. Right-of-Way Acquisition Fund Analysis. It is proposed that a fund be created to provide a reserve for acquiring right-of-ways before development occurs thereby preserving a future road project. Street Funding. State law mandates that fuel tax revenues be used to fund street and arterial street projects. Library Needs Analysis. The Library Board will be working on an analysis of library needs and space requirements. The study should be completed in late 1985 or early 1986. Library District Analysis. The City is looking into the possibility of annexing to the King County's Library District. Annexing to the County Library District would eliminate the City's current involvement in providing library services. This would make available $450,000 a year which is currently being spent by the City for Library operation and maintenance costs. It would allow the City to either lease its half of the library or purchase King County's half to provide for City Hall expansion. III-6 Voted G.O. Criteria. Because of the costs and the time involved in a campaign to issue voted general obligation debt, certain criteria should be met before placing a voted G.O. issue on a ballot. These criteria are: There should be demonstrated public support for a project, including support in the form of an interested group of citizens that would be willing to raise funds and work on a campaign committee. The project should be highly visible providing a clear-cut, broadly distributed public benefit. CONCLUSIONS DRAWN FROM PUBLIC INPUT AND OTHER CONSIDERATIONS Based on the public input results and the other considerations mentioned above the following conclusions were drawn and incorporated into the CIP scenarios: There seems to be a consensus that those who contribute to a problem should help pay to alleviate that problem. Toward this end the City will continue its policy of promoting LID's to provide City improvements to specially benefited developments. All three scenarios use $7. 5 million in probable LID money to fund various projects. The City Council and the public have emphasized the importance of utilizing non-City sources of funding. This is yet further evidence that the City should aggressively pursue LID's. In addition it indicates that the City should be thorough and persistent in seeking funding from the State and Federal governments and private parties. Including LID's, the City staff has identified nearly $29 million of possible outside funding. Public safety is of major concern to the citizens of Kent and projects addressing public safety needs should receive attention. Moreover, the Council has stated that preference should be given to projects with demonstrated public support. In all three CIP scenarios, the majority of public safety projects are identified for funding in 1986. ' A voted G.O. bond issue is the least objectionable taxing option and public safety projects are the most favored. Moreover, the questionnaire shows that people are willing to accept higher taxes to pay for public safety projects. Given this information, public safety projects are the most likely candidates for a voted G.O. bond issue. In all three scenarios a voted G.O. bond issue is used to fund public safety projects in 1986. The III-7 voted G.O. bond issue is currently identified for $11 ,743,000. However, this amount is subject to revision pending the outcome of the Fire station location analysis, a joint training facility study with Renton, and review by a citizens committee. Many people feel that Kent's problems are being caused by people and businesses moving into Kent and that those people and businesses should help pay for the problems they cause. In 1981 the City initiated an environmental excise tax based on square feet of construction or number of bedrooms per home. The authority for this tax was taken away from the City by the 1982 State Legislature. The Legislature substituted the Real Estate Excise Tax. The Real Estate Excise Tax is the best of existing available sources to tax those people and businesses most responsible for Kent's growth related problems. The tax, at one-quarter of one percent, taxes the transfer of real property between seller/resident and buyer/newcomer. Both King County and most of the cities surrounding Kent already impose this tax. Since a large dollar volume of the property sales are in the nonresidential sector, those firms which develop property in Kent and encourage people and businesses to move to Kent will be contributing to any revenues brought to the City through the Real Estate Excise Tax. The Real Estate Excise Tax is proposed in the Second and Third CIP Scenarios. Streets and open spaces received high levels of public support. The Council expressed a desire to preserve future projects through land and right-of-way acquisitions. All three CIP scenarios emphasize land acquisition. Street projects were given high priority; however, the questionnaire revealed there was less support for additional taxes to fund them. Since the State mandates that its fuel tax revenues be used expressly for street and arterial street projects the City was able to fund most of its street projects without using local funding sources. Thus street projects were given high priority but are being funded with existing revenue sources and LID's. The public and City Council favor projects which are identified in adopted City Plans and those projects which are multi-purpose. The New Library and City Hall Office Space are related. The City Hall Master Plan, completed in 1983, projects that additional office space will be needed by 1986. In addition, a preliminary Library needs analysis shows the present Library cannot adequately serve Library patrons and that a bigger library is needed to serve a growing community. Since the architectural design of the building prohibits III-8 upward expansion, and since the City will need additional office space, particularly to house a coordinated permit processing center, the City Hall Master Plan suggests that the Library be relocated to a larger facility thereby allowing City Hall to expand into the vacated Library. A coordinated permit center should greatly enhance City productivity, meeting community development needs. All three CIP scenarios provide for the New Library/City Hall project through a councilmanic general obligation issue in 1988. However, pending the outcome of the Library Needs Analysis and the Library District Analysis this project may be revised or funded from an alternate source such as annexation to he Library District. The City-wide "Computer Systems" project was partially funded to address the public's desire to increase the productivity of their government. "Computer Systems" is a multi-purpose project which affects all City operations from police investigations to gathering and storing demographic information. Currently the City is using antiquated labor intensive methods for performing duties which can be more efficiently performed by computers. Each scenario identifies $125,000 in funding for each of the five years of the program. This amounts to $625,000 for the whole program leaving $1 ,090,000 to be funded in 1991 or beyond. It is possible that a public safety bond issue could include computer systems. PRELIMINARY CIP - FINAL CIP COMPARISON The Capital Improvement Program is more than just a forecasting tool to keep Kent looking to the future. It is also a record of the past. Developing the City's CIP was a group effort involving the citizens of the community, the City Council and the City staff. Each group provided input throughout the CIP process. As a result, the projects costs and funding dates in the CIP changed periodically to reflect new information. This section makes a statistical comparison of the figures in the Preliminary CIP with those in the final CIP and explains the major differences between the two. The comparison is made in Table 6. When the Preliminary CIP was first issued, it showed the City needed $76,776,000 to fund J its capital improvement needs through 1990. The final CIP shows $51 ,277,000 being funded Jthrough 1990. The difference is the result of various changes which took place during the CIP process. J J III-9 TABLE 6 PRELIMINARY AND FINAL CIP COMPARISON (Amounts in Thousands of 1986 Dollars) PRELIMINARY CIP FINAL CIP 1986-90 TOTALS ADJUSTMENTS 1986-90 TOTALS TRADITIONAL CIP REVENUES Sales Tax - Capital Improvement 8,700 618 9,318 Fuel Tax - Street 1 ,663 26 1 ,689 Fuel Tax - Arterial Street 1 ,106 21 1 ,127 Federal Marshal Payments 1 ,235 1 ,235 Federal Revenue Sharing 500 (400) 100 Interest - Capital Improvement 125 250 375 Loan Repayment - Capital Improvement 205 (35) 170 Contributions - General Fund 1 ,000 790 1 ,790 Contributions - Golf Course 470 470 Contributions - Water Fund 141 141 1986 Beginning Fund Balances Street Funds 44 44 Capital Improvement Fund (245) (245) Revenue Sharing Fund 51 51 TOTAL TRADITIONAL CIP REVENUES 13,299 2,966 16,265 NEW CIP REVENUES Voted G.O. 11 ,743 11 ,743 Councilmanic G.O. 2,450 2,450 Real Estate Excise Tax 1 ,758 1 ,758 TOTAL NEW CIP REVENUES 15,951 15,951 TOTAL PROJECTED CIP REVENUES 13,299 18,917 32,216 DEBT SERVICE Committed 6,480 2,397 8,877 Planned 574 574 NET AVAILABLE REVENUES 6,819 15,285 22,765 EXPENDITURES Public Safety 12,511 (690) 11 ,821 Public Works 48,461 (17,250) 31 ,211 Parks and Recreation 11 ,354 (6,759) 4,595 General Government 4,450 (800) 3,650 TOTAL PROJECTS 76,776 (25,499) 51 ,277 LESS DEDICATED REVENUE (38,714) 9,948 (28,766) NET EXPENDITURES 38,062 (15,551 ) 22,511 FUND BALANCE (Deficit) (31 ,243) 31 ,497 254 III-10 Projected revenue and debt assumptions changed because: 1 ) Projections for sales tax, fuel tax, interest income and General Fund contributions were increased because of higher than expected collections. 2) Federal Revenue Sharing was reduced to reflect the latest available information, that Federal Revenue Sharing will be eliminated after 1986. 3) The loan repayment from Valley Com was reduced to include only principal payments. 4) Debt service contributions from the Federal Marshal , the Water Fund and the Golf Course were included as revenue rather than being netted out of the debt service expenditure amount as done in the Preliminary CIP. 5) Beginning Fund balances for the Street Funds, Capital Improvement Fund, Revenue Sharing Fund were included. The Capital Improvement Fund shows that it needs $245,000 to replenish a $250,000 reserve. 6) A $11 ,743,000 voted G.O. Bond issue for public safety is planned in 1986. 7) A Councilmanic G.O. for a new Library and City Hall expansion are planned in 1988. 8) The real estate excise tax implemented September 1 , 1985 will generate approximately $1 ,758,000. 9) The committed debt service figure changed $6,480,000 to $8,980,000 to reflect total cost as opposed to net debt service. The $6,480,000 was net debt service while $8,980,000 is the gross debt service with the contributions for debt service appearing in the revenue totals. In addition, LID 320 was added as a possible LID to begin in 1987. Projected expenditure assumptions changed because: 1 ) Many CIP projects were deferred until 1991 and beyond. 2) In some cases projects were funded from outside sources, i .e. , State and Federal grants, thereby moving the project from the CIP list to the currently funded Capital Improvement Projects list in Appendix G. 3) Since the CIP contains only nonutility projects, implementing the drainage utility this Spring resulted in the removal of all drainage projects. 4) Several times during the CIP process, the City departments were asked to update cost estimates based on the latest available information. Dedicated revenue assumptions changed because: 1 ) All drainage projects and therefore their dedicated revenue sources were removed from the CIP. III-11 2) Some projects with dedicated revenue were taken off the list of CIP projects and added to the list of currently funded capital improvement projects in Appendix G. Initially, the Preliminary CIP showed a $31 ,243,000 deficit. After adjustments, the program has a $254,000 surplus. III-12 POLICIES AND PROJECTS 1 - I 1 � l J POLICIES AND PROJECTS The projects included in the City' s Capital Improvement Program are a reflection of the City's goals and policies. These goals and policies have been defined in individual City plans such as the Transportation, Parks, and Fire Master Plans, and are now being brought together in the Capital Improvement Program. By bringing together all the City's individual long-range plans, it would be readily seen that the City could not afford to implement these plans simultaneously. Hence, the City needed to prioritize the goals upon which these plans rest. This involves not necessarily picking one goal as more important than another goal but trying to meet all goals in some optimum fashion. Prioritizing City goals was necessary because as the individual plans were developed, the assumption of unlimited resources was made such that each plan identified a possible revenue source for funding its projects irrespective of what other plans might have identified for that same revenue source. As such, the projects cannot be completed as scheduled in the individual plans without some review of the City's overall goals and policies. This section will formalize the City 's long-range capital improvement policies with respect to general policies, financial policies and project policies. The general CIP policies address the City's philosophy regarding economic growth, quality of life decisions, intergovernmental cooperation and automation. The CIP financial policies deal with funding decisions, and the project policies show how the City' s individual capital improvement 1 plans relate to the projects selected to appear in the Preliminary CIP. The project lists J in this section appear exactly as they did in the Preliminary CIP. Leaving the lists the same accomplishes two things. First, it shows when individual City plans indicated a particular need. Second, it allows a detailed comparison to be made between the project lists in the Preliminary CIP and the project lists in the final CIP presented in Section II. GENERAL CIP POLICIES 1 J The general CIP policies are the City's broadest policy statements addressing City goals and philosophy. These policies are: 1 J IV-1 1 ) Probably the most significant theme that permeates all City plans is the expectation that Kent will continue to grow and develop in accordance with its Comprehensive Land Use Plari. As such, the first CIP policy of the City of Kent is that the City recognizes, accepts and encourages the fact that it is a growth oriented community and it pledges itself to cooperate in achieving the community's developmental goals. In accordance with this policy, the City agrees to maintain an adequate level of police, _ fire and emergency services to protect its citizens and their property; and to provide adequate transportation, water, sewer, drainage and sanitary collection systems to assure continued economic health. 2) The City acknowledges that the quality of life in Kent is equally as important as the City's economic health. Thus, the second CIP policy of the City of Kent is that high priority will be given to projects which help to maintain or enhance the aesthetic qualities and livability of Kent. These projects will include park acquisition and development, and projects which support recreational , cultural and educational programs. The City does not want to sacrifice its community identity in the name of economic growth. 3) The third CIP policy which can be attributed to the City as a whole is that the City of Kent is committed to cooperating fully with other governmental agencies during the planning, design, construction and funding of capital improvement projects. Cooperating with Federal , State and County governments as well as neighboring cities can only benefit the City. The City has a long history of intergovernmental cooperation as shown with its consolidated fire services to Fire District 37 and the fact that the four South King County cities plus numerous districts participate in the Valley Communications Center. These are only two of the intergovernmental services currently provided. The City will continue to look to others as a means of improving services while minimizing costs. 4) The fourth CIP policy is that the City of Kent as an entity is interested in using new technologies which increase productivity, result in cost savings, or result in better service being provided to the public. As a progressive growth oriented city, Kent should be dynamic and willing to accept change. IV-2 CIP FINANCIAL POLICIES As an extension of the City's CIP policies, the City has a set of financial policies which promote the objective of continued economic growth and assure a responsible and equitable method of collecting and distributing CIP funds. These policies are as follows: 1 ) Before using City funds to fund a project, the City will encourage and seek non-City sources of funding. Non-City funding sources include Federal and State grants and private donations. Federal and State grants have diminished recently, but the City has been able to acquire numerous donations of land, particularly land that is being donated for open space. 2) If outside funds are not available, projects providing special benefit shall have their costs divided up among those individuals or groups in proportion to the benefit received by that individual or group. To this end, the City uses utility connection charges, Local Improvement Districts (LID' s) and user charges. These funding mechanisms assure the greatest degree of equity because those who benefit from a project and those who pay for a project are most closely matched. 3) Those projects or portions of projects which are of general benefit to the entire community will be funded from accumulated cash or future tax resources. If future tax resources are projected, the City may decide to issue general obligation debt. When issuing debt, as a general policy, voted general obligation bonds will be preferred over nonvoted general obligation bonds. Because of the costs and the time involved in a campaign to issue voted general obligation debt, certain criteria shall be met before placing a voted general obligation issue on a ballot. These criteria are: (a) There should be demonstrated public support for a project, including support in the form of an interested group of citizens that would be willing to raise funds and work on a campaign committee. (b) The project should be a highly visible project which provides a clear-cut, broadly distributed public benefit. J (c) Because of the real possibility of voter rejection, only those projects that the community could do without or could accept a delay without serious consequences to public safety or other vital public services, will be chosen to be placed on a ballot. IV-3 i POLICIES AND PROJECTS BY FUNCTION Within the overall framework of City-wide CIP policies are more specific City policies related to Public Safety, Public Works, Parks and Recreation, and General Government. These policies have a direct bearing on future capital needs in that capital improvement projects will have to be undertaken in order to implement these policies. This section briefly summarizes the City's more specific capital improvement policies related to Public Safety, Public Works, Parks and Recreation, and General Government and shows how these policies are related to the proposed projects in the Preliminary CIP. Although many of the projects in the Preliminary CIP had to be deferred because of insufficient funding, the need for the projects still exist. This section documents the need for CIP projects by relating the policies of the City' s individual capital improvement plans, e.g. , the Fire Master Plan and the Transportation Plan, to the projects requested in the Preliminary CIP. Since these projects are still needed, it is important to show the initial justification for CIP projects and to show when individual CIP plans had indicated a particular need. For instance, if the Transportation Plan indicated that a major resurfacing project would be needed by 1987, but, in the final CIP it was delayed until 1991 and beyond, it is important to know next year when the CIP is being updated that this particular project was initially identified for funding in 1987. The project may still not be funded on time, but the information will be there to show when City planners had identified the need. Another benefit of leaving project titles, project costs and funding dates as they appeared in the Preliminary CIP is to allow a more detailed comparison between the final CIP and the Preliminary CIP than was provided in the previous section. Section III provided a summary comparison of total 1986-1990 figures; however, by comparing the project list in this section with the project list in Table 2 of Section II, it is possible to see which specific projects were deferred, taken off the list or updated. Public Safety The City of Kent is charged with the safety of the people living, working, or visiting Kent and with the security of their property. To meet this responsibility, the City has three important policies which directly impact future capital improvement needs: 1 ) the City of Kent will provide strategically located public safety facilities so that there will be an IV-4 adequate response time to emergency incidents and so that acceptable levels of nonemergency services can be maintained; 2) adequate emergency equipment will be provided to assure a timely and effective emergency response; 3) police officers and firefighters will be given the necessary communication equipment and training to effectively deal with emergency situations. These policies were listed on the questionnaire shown as Appendix D. Based on these policies, Public Safety capital improvement projects are listed on the facing page. A map following Table 7 shows the location of those projects which can be associated with a specific geographic area. 1 ) Provide Strategically Located Public Safety Facilities. To implement this public safety policy, which results in providing adequate emergency response times and acceptable levels of nonemergency services, several facilities will be needed in the near future. These projects are the East Hill Fire Station, West Hill Fire Station, West Valley Highway Fire Station, Fire Headquarters Station, Police Satellite - West Hill , and Police Headquarters Facility. The first three projects involve constructing new fire stations to improve fire and medical emergency responses. The East Hill , West Hill , and West Valley Highway Fire Stations have all been made obsolete by the rapid residential , commercial , and industrial growth that has occurred in the City. These stations cannot adequately serve their expanded service areas because they are no longer centrally located and are often inhibited by traffic congestion. The locations of all three stations would be determined based on a computer model that analyzes the projected number of service calls and distances to compute optimum station location. A new headquarters station for the Fire Department is also needed to improve emergency response times on the Valley Floor and to improve operational efficiencies in Fire i Department services. The present headquarters lacks adequate space for administrative offices, apparatus maintenance, building maintenance, suppression crew activities, and storage of supplies. These overcrowded conditions often result in nonproductive work time. For example, each time equipment comes into the shop area for repair, the whole shop must be rearranged to accommodate the equipment and to provide some room for the mechanic to work. i TABLE 7 PUBLIC SAFETY PROJECTS (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND Police Capital Expenditures by Priority 1 . Police Computer System 140 140 2. Police Radio System 250 150 100 *3. Valley Com Improvements 61 61 4. Police Satellite - West Hilla 170 170 5. Police Training Facilitya 1 ,175 1 ,175 Projects Planned for 1991 and Beyond A. Police Headquarters Facility 1 ,700 Total Police Capital Expenditures 1 ,796 1 ,526 270 1 ,700 Fire Capital Expenditures by Priority 1 . Aid Car Replacement 146 73 73 2. Suburban Pumper Replacement 310 155 155 3. E. H. Fire Station (Benson Hwy) 1 ,640 1 ,640 4. WVH Station & Training CenterD 3,215 3,215 5. West Hill Fire Stationb 1 ,614 1 ,614 6. Fire Headquarters Station 3,025 3,025 7. Fire Computer System 150 150 8. Fire Communication System 558 158 400 *9. Valley Com Improvements 17 17 10. Mobile Computer Terminals 40 40 Total Fire Capital Expenditures 10,715 9,892 195 228 400 Total Public Safety 12,511 11 ,418 465 228 400 1 ,700 *Indicates project has received prior funding a Indicates only Police costs of joint Police/Fire Facility bIndicates only Fire costs of joint Police/Fire Facility IV-6 PUBLIC SAFETY 160cn 166cn S1 'S 200 cn a O. 2osce w I a•t. w v. r z16cn 1 a TNX0 XJ �y O yy� ♦s+• l•: W �. a 7 _E. •: : , „ fr+ 4::........:... `� y i l :•1 1 277 cn J To provide strategically located public safety facilities for nonemergency services, the Preliminary CIP proposed to build a Police Satellite Station adjacent to the proposed West Hill Fire Station. Police offices on the West Hill would provide better nonemergency police services for permit processing and for the reporting of vehicle accidents and other nonemergency incidents. Finally, in the more distant future, a Police headquarters station is proposed to be built on the same site as the new Jail and Aukeen Court. The 1983 City Hall Master Plan recommended that the Police Department be moved out of City Hall in 1995. This would relieve existing overcrowding which hinders effective Police work. In addition, relocating Police Headquarters to the same site as the new Jail and Aukeen Court would better serve the justice service needs of the public and would result in a more efficient Police Department. Relocation would reduce the time and cost associated with transporting personnel and prisoners to and from the new Jail and the existing Police headquarters at City Hall . 2) Provide Adequate Emergency Equipment To implement the second Public Safety policy which assures a timely and effective response of emergency vehicles, two capital projects were proposed in the Preliminary CIP. Aid Car Replacement and Suburban Pumper Replacement involve purchasing two new aid cars and two suburban pumpers. Presently there is only one specialized aid car, but it is well worn and needs replacement. The City needs a reliable aid car and a reliable reserve to assure that emergency medical responses are not delayed or interrupted by equipment failure. To assure that fire suppression responses are not delayed or interrupted by equipment failure, two new suburban pumpers are needed to replace two 1965 models. The 1965 models have exceeded their useful life as front line or reserve pieces of equipment. Moreover, parts for these antiquated engines are very expensive and difficult to obtain. 3) Provide Adequate Communications Equipment and Training Facilities To implement the last Public Safety policy which provides that public safety personnel be adequately trained and have adequate communications equipment, six capital improvement projects were proposed. For professional training the City proposed that it build a joint Police/Fire training facility adjacent to the proposed West Valley Highway Fire Station. IV-8 The Police and Fire Departments have similar training facility requirements and the most cost efficient way for the City to meet its training needs is to combine its Police and Fire training efforts into one facility. The facility would include an indoor physical fitness area, an outdoor physical agility testing area, a fire training tower, a driver's course, and a training classroom area. The City of Renton has similar needs and a common facility shared by Kent and Renton is being evaluated. The equipment needs identified as necessary for making the City's emergency response personnel effective are: Valley Com Improvements, Fire Communication System, Mobile Computer Terminals, Police Radio System, Fire Computer System, and Police Computer System. Valley Communications Center (Valley Com) is a jointly owned dispatch center for all emergency calls in the Valley. The Police and Fire Departments of Kent and several other neighboring cities are currently participating in major improvements at the jointly owned communications center. Facility and equipment upgrade improvements are underway to prepare for future dispatch needs, including 911 and a microwave radio system which improves transmission quality and provides cost savings by eliminating telephone line charges. It is imperative that the City continue to fund its share of the ongoing improvements. Once these Valley Com improvements are completed, the City will need its own improvements in order to communicate with the Center. In particular, the Fire Department will need a new communication system to go along with the microwave communication system at Valley Com. Two other capital improvement projects involve purchasing mobile data terminals (MDT's) for fire command vehicles and a police radio system, which includes MDT's, for twenty police patrol cars. MDT's can give fire command personnel information on the content of a burning building while enroute to a fire, and the status of available equipment during the course of an emergency. For police officers, a new radio system with MDT's will improve investigative practices by coding transmissions and by providing computer access to officers in the field. Coded transmissions make it impossible for crime perpetrators to monitor police communications, and computer access provides officers with direct access to local , state, and national crime files. Moreover, MDT's would reduce the need for future dispatch positions by replacing the labor intensive system with a more productive advanced system. �J IV-9 The last two projects are Police Computer System and Fire Computer System. The first involves purchasing a computer system which includes terminals, printers, and software packages. This system would allow the Police Department to perform many of their own computer functions more efficiently than now performed, and it would provide an additional investigative tool for proactive crime analysis. The Fire computer system would be used for collecting and managing information needed for emergencies, everyday operations, and long term forecasting. This would enhance the efficiency and effectiveness of both the Code Enforcement Division as well as the Suppression and Administration Divisions. Fire Department personnel need to be free of routine time consuming processes, such as inventory control , training and inspection records, and permit processing. In addition, other City departments would benefit from ready access to Fire Department information which in the past was too time consuming to retrieve. Public Works The City of Kent through its Public Works function oversees the planning, design, construction, operation, and maintenance of all public works facilities including transportation, storm drainage, sanitary sewer, water supply systems, garbage collections, and the City motor pool . To accommodate the growth that has occurred in Kent and to prepare for future growth, several long-range Public Works plans have been developed. Water, sewer, transportation, and storm drainage plans have been developed to identify major Public Works projects that will be needed in the years to come. These projects will be needed to meet the service standards established in each respective long-range plan. The City's utility plans are based on relatively straight forward service standards. The Water Plan, in essence, provides a plan to assure the City can continue to provide clean pressurized water to the property line of every business and resident in Kent. Similarly, the Sewer Plan shows what facilities will be needed to provide a safe and sanitary waste disposal system. Finally, the Storm Drainage Plan projects what facilities will be needed to reduce the incidence of flooding on both private and public property in Kent. The Transportation Plan, however, is a little more complex in that it deals with a variety of modes of travel . For automobile and truck traffic the City will support the community's economic growth and developmental goals by providing sufficient facilities for expedient IV-10 and safe travel . These facilities will support the City' s Land Use Plan. For nonvehicular travel , pedestrians and bicycles will be provided separate facilities for travel along arterials, and bicycles will be provided roadway shoulders or sidewalks in the vicinity of elementary and middle schools. The Public Works policies were summarized for inclusion in the questionnaire shown as Appendix D. As stated in the earlier of this report, utility projects are left out of the Capital Improvement Program. However, the Preliminary CIP was issued before the establishment of the drainage utility so drainage projects are included in the table of Public Works projects below. The map following Table 8 identifies project location. 1 ) Provide Facilities for the Adequate and Safe Movement of Truck and Automobile Traffic To support the community's economic growth and developmental goals and in support of the City's Land Use Plan, the City is proposing numerous street projects aimed at improving the flow of automobile and truck traffic. One of these projects is the widening of the Green River bridge on South Central Avenue. The bridge will be widened from two to four lanes. This project also will be financed largely from outside sources. Due to a large Federal grant and County participation, the City will only pay ten percent of the project cost. Another major traffic improvement project involves widening Benson Highway from its existing two lanes to five lanes from 196th to 256th Street. The Benson Highway is the major north-south arterial on the expanding East Hill area of the City, but it only has two lanes. Future traffic demand will require five lanes. Since Benson Highway is a State highway, the State will pay for most of the cost of this project. Since the City has State and Federal commitment on both the Green River Bridge and Benson projects, they have been given top priority for 1986. A third street project will add a two-way left turning lane on North Central Avenue from James to 224th Street. The volume of traffic along North Central is such that left turns to the many businesses along the way are very difficult. This fact is supported by the rising number of rear end collisions involving left turning vehicles. This project will be entirely funded from State money and an LID. J IV-11 TABLE 8 PUBLIC WORKS PROJECTS (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority *1 . Green River Bridge S. Centrala 2,907 2,907 *2. SR 515 - 196th to S.E. 256tha 8,776 2,125 6,651 3. Willis at Central 38 38 4. Upper Mill Creek 510 510 5. Garrison Creek Storage 1 ,350 1 ,350 6. North Central-James 2,304 2,304 *7. Green River Levy Improvement 753 53 250 250 200 8. LID 306 West Valley Drainage 10,367 3,320 7,047 9. S.E. 240th at 102nd 425 425 *10. Pedestrian & Bicycle Path Imp. 1 ,297 255 210 197 455 180 926 11 . S.E. 252nd at SR 99 - Signal 120 120 12. City Shop Rem. & Gravel Strg Bin 225 150 75 *13. Reith Road - S. 256th to 38th 222 222 14. E. Valley Hwy. S. 192nd - 180th 2,901 800 2,101 15. Garrison Creek Erosion Control 880 160 200 400 120 16. 76th Avenue S. 212th to 222nd 1 ,257 350 907 17. W. Valley Blvd. Improvement LID 3,619 3,619 18. S. 180th & W. Valley Highway Int 600 600 19. S. 180th & E. Valley Highway Int 229 229 20. S.E. 192nd New Route tt EV Hwy. 7,913 7,913 21 . S. 212th & W. Valley Highway Int. 250 250 22. S.E. 240th & 104th S.E. Int. 80 80 23. S.E. 240th & 116th Intersection 138 138 24. 84th Ave. S. & SR 167 Int. Imp. 50 50 25. General Drainage Improvements 1 ,250 250 250 250 250 250 Projects Planned for 1991 & Beyond A. 196/200 New Route to EV Hwy. 10,580 B. S. 196 & WV Intersection Imp. 142 C. Kent-Des Moines Road & SR 99 116 D. S 244th and East Valley Int. 104 E. New Arterial Vicinity of 224th 6,942 Total Capital Expenditures 48,461 18,958 18,520 9,340 1 ,213 430 18,810 aProject is committed for 1986 funding. See Detailed Public Works Priority Sheets. *Indicates project has received prior funding. IV-12 PUBLIC WORKS 8 18oth ig 188tb LL 192nd � a L 94 t zoscn M I 1 � 1 - I a cL ,2 16 ., y, I•: 1 W - - _:. : ;: 15 3 c0 cn i-3e ash...::•:•:��'.'::.:::;;" ' .�ii :............ i' z s.n :j•• � N I - v _ _ - F t i i J IV-13 Two more major street projects which deserve mention are the 192nd/196th New Route from SR 515 to East Valley Highway and 196th/200th - East Valley Highway to Orillia. These projects involve constructing two five lane roadways; one from Benson Highway to East Valley Highway and one from East Valley Highway to Orillia. The projects are needed to accommodate the traffic that will be generated from planned land use. The new routes will ease current east-west traffic congestion. 2) Provide Bike Routes and Pedestrian Paths A number of capital improvement projects are being proposed to accommodate those who ride bicycles and walk. These projects are concentrated around school areas where young people have no choice but to walk or ride a bicycle. However, some projects are aimed at providing facilities for recreational bike riding and walking. All the major pedestrian and bike improvement projects have been included under one project heading--Pedestrian and Bike Path Improvements. See Appendix K-3, Public Works, Priority 10. In addition to these, many other street projects include constructing sidewalks and other amenities for pedestrians and bicyclists. All pedestrian and bicycle projects will enhance the safety of the children and adults who use those facilities. Some of these projects are: providing a sidewalk and widening the outside lane on the southeast side of Kent-Kangley from Alvord to 101st Street; providing a sidewalk and widening the outside lane on Benson Highway, 262nd to 264th Street; and providing sidewalks, curbs and drainage on US 99 from SR 516 to South 252nd Street. 3) Provide Adequate Drainage for Storm Runoff To reduce the incidence of flooding in Kent, the City is proposing four major capital improvement projects which will help control flooding and greatly reduce the damage caused by flooding. In addition to these four projects, there are numerous smaller drainage projects which are incorporated into other projects. Two of the major drainage projects identified involve constructing storm water storage facilities on Garrison Creek. The first major proposal is constructing a 100 acre-foot storm water storage facility to ease flow restrictions from 212th to 180th Street. This project would prevent flooding of the industrial area east and west of SR 167. The second Garrison Creek project involves constructing two smaller storm water storage facilities to IV-14 halt the severe erosion presently occurring in the Garrison Creek Canyon. Salmon spawning and rearing grounds are .being destroyed and the sediments being deposited in Garrison Creek are reducing its carrying capacity. A third major drainage project involves raising the height of and extending the Green River levy. The Army Corps of Engineers has also identified this as a needed project. Damage from one flood occurrence along Green River is estimated at $37 million. Finally, the fourth project involves the construction of a 400 acre-foot storage facility and a 12,000 lineal foot drainage canal in the area bounded by the Green River, West Valley Highway, and South 212th Street. The property owners in this area are highly interested in forming an LID to alleviate the flooding problems. However, the City is also expected to receive some benefit from the project. If this project were to be selected for funding, the City and the property owners would pay for the project in proportion to the benefit each respective participant receives. Since the Drainage Utility was established May 1 of this year, all drainage projects were removed from the CIP. Hence, the final CIP project list in Table 2 of Section III does not contain drainage projects. Parks and Recreation The City is also committed to preserving and enhancing the quality of life in Kent through parkland and facility development. The City of Kent is situated in a high growth area and as existing open spaces are consumed by development, provisions will have to be mad e to preserve the natural beauty and livability of Kent. i To determine future capital needs the City Council commissioned the development of a Parks and Recreation Master Plan which identified various parkland and facility development projects aimed at preserving the livability of Kent. This plan identified areas of need in the following categories: 1 ) neighborhood and industrial area park facilities; 2) greenbelts and open space; and 3) community playfields and cultural facilities. These categories are included on the questionnaire shown as Appendix D. The projects identified I are listed on the following table. Their location is identified on the map following Table 9. IV-15 TABLE 9 PARKS A14D RECREATION PROJECTS (Amounts in Thousands of 1986 Dollars) _ Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority 1 . Golf Course Expansion 900 500 400 2. Van Doren' s Landing 129 129 3. Kent Commons Parking 250 250 4. Riverfront Property 350 350 5. Mill Creek Canyon Development 250 100 150 6. Lake Fenwick Park Development 250 100 150 7. Ball Field Lights 65 65 8. East Hill Neighborhood Park 500 300 200 9. S. Scenic Hill Neighborhood Park 50 50 10. Riverfront Dike Blacktop 115 75 40 11 . Uplands Park Parking Lot 30 30 12. Upper Mill Creek Canyon Park 340 290 50 13. Riverfront Parking Lot 65 65 14. Green River Restrooms 150 75 75 15. Garrison Creek Park Improvements 70 70 16. Glenn Nelson Park Expansion 500 500 17. Commons Playfield Expan./Parking 300 300 18. Performing Arts Center 3,400 3,400 19. Russell Road Park Expansion 1 ,760 1 ,760 20. Campus Community Park 50 50 21 . S. Willis Neighborhood Park 60 60 22. Good News Bay Neighborhood Park 420 420 23. Riverfront Park Phase I 1 ,000 500 500 24. Orillia Neighborhood Park 250 250 25. Green River Frontage Trails 100 100 Projects Planned for 1991 and Beyond A. Sunnycrest Neighborhood Park 260 B. Clark Lake Community Park 1 ,000 C. Mill Creek Woods Green Belet 120 D. Westside Ponds and Wetlands 600 E. Panther Lake Neighborhood Park 85 F. Springbrook Neighborhood Park 175 G. T-Bridge Green Belt 80 H. S. Meridian Community Park 525 I. Interurban N. Neighborhood Park 50 J. Interurban C. Neighborhood Park 50 K. Interurban O'Brien Neighborhood 50 Total Capital Expenditures 11 ,354 1 ,649 7,375 1 ,730 600 2,995 IV-16 PARKS AND RECREATION LL lsocn 192nd \ i cn ,„ zoo 0 r 216tn X. '* ix F4• :�� W - F- 4 �,:..^ _... ,,..k},, .. ..:.-^......:. :;•: -:V-'=fir'; ;•1 •i�d Gt:•. G :6 ..LI. 2 E .r. .......... .............................. Y:d etje _'•o ••r 2 Y H (�1 V - - a i i:i:i:':`�'''•' Z' "- F r_ , ?a 1 277cb \ I i IV-17 J 1 ) Provide Neighborhood and Industrial Area Park Facilities The Parks and Recreation plan identified a shortage of neighborhood and industrial area - parks in all three of the City's subareas (East Hill , West Hill, Valley Floor). This deficiency will become more severe as more people move into the park service areas. The plan also indicated Kent residents placed a high degree of importance on neighborhood and - industrial area parks. Hence, based on this needs assessment the City sees a need for thirteen neighborhood and industrial area parks. On the East Hill two neighborhood parks are requested--East Hill Neighborhood Park and South Scenic Hill Neighborhood Park. East Hill Neighborhood Park would likely be located adjacent to Sequoia Junior High and South Scenic Hill Neighborhood Park would be next to Scenic Hill Elementary School . In addition, in the more distant future, the East Hill is projected to need two neighborhood parks in conjunction with Panther Lake Elementary School and Springbrook Elementary School . These two will depend on future City annexation. On the Valley Floor, four industrial area parks and two neighborhood parks are targeted for future funding. The four industrial area parks, Interurban North District Park, Interurban Central District Park, Interurban O'Brien District Park, and Orillia District Park, are located along the Interurban Trail and the Green River. These parks will provide rest stops and picnic areas for the Valley Floor's estimated daytime population of 40,000 people. Two neighborhood parks on the Valley Floor would also be located on the Green River, one in the south of Willis residential area and the other in the Good News Bay area. On the West Hill there are plans to expand and develop Lake Fenwick Park and in the more distant future to establish a park adjacent to Sunnycrest Elementary School . 2) Provide Greenbelts and Open Space The Parks and Recreation Master Plan also revealed very strong support for greenbelts and open space or special feature parks. Greenbelts and special feature parks consists of four major elements: 1 ) the wood slopes of the West Valley Wall ; 2) the Green River and associated wetlands and farms west and south of the river; 3) the wooded slopes of the East Valley Wall and the associated canyons of Mill Creek and Garrison Creek; and 4) Soos Creek and its associated wetlands and steep slopes. IV-18 Most of the greenbelt and special feature parks identified in the Preliminary Capital Improvement Program are located along the Green River Corridor. These include Riverfront Park, Westside Wetlands and Ponds, and Green River frontage and trails. Another important greenbelt project on the East Hill is the Mill Creek Canyon Greenbelt which is a park developed at the base of the canyon. Future improvement is planned for the canyon park. 3) Provide Community Playfields and Cultural Facilities Finally, the Parks and Recreation Plan identified needed community playfields and cultural facilities. Community playfields are large parks designed to provide space for those types of activities that have greater space requirements than can normally be accommodated by neighborhood parks. The community parks identified in the Preliminary CIP are the Campus Community Park, Clark Lake Community Park, and South Meridian Community Park. The only cultural facility included in the Preliminary CIP is the Performing Arts Center. Currently, the City is gearing up to begin construction of a new senior center to be located on Smith Street between Titus and Kennebeck. General Government In line with the City's overall policies of promoting growth, recreation, cooperation, and new technologies, the City's remaining projects include a new library, City Hall expansion, a City-wide telecommunication system, a Geocoding system, and additional computer system _ enhancements. These projec ts were summarized for inclusion on the questionnaire shown as Appendix D. Included under the heading "General Government," these projects are listed in the following table. The new library and City Hall projects are really two phases of the same project. The City Hall Master Plan published in 1983 recognized the need for a new library. The existing l library is one of the busiest libraries in South King County. Architectural and design -J constraints limit expansion of the existing library to meet future library needs. The City Hall Master Plan forecast the need for an additional 15,000 square feet by 1987. Both J library and City office space needs can be met by constructing a new library and remodeling the old library space for office use by the City. J �J J IV-19 The other three projects in the General Government category--City-wide telecommunication system, a geocoding system, and additional computer system enhancements--involve implementing new technologies to make the City government more cost efficient. The proposed City-wide telecommunications system is in direct response to the divestiture of AT&T. Because of the divestiture, the City is now responsible for operating and maintaining its own communication system. The geocoding system is a computer system for - storing and managing land use data, employment statistics, and other demographic information which is collected and used frequently by various City departments. The additional computer system enhancement represents equipment required to provide updated technologies for all departments and to ensure all departments work efficiently together to meet the need of the public. TABLE 10 GENERAL GOVERNMENT PROJECTS (Amounts in Thousands of 1986 Dollars) 1991 & Total 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority 1 . Library 2,150 150 2,000 2. City Hall Expansion 450 150 300 3. Telecommunication System 425 85 85 85 85 85 4. Geocoding System 300 100 200 5. Computer Systems Enhancement 1 ,125 225 225 225 225 225 Total Capital Expenditures 4,450 460 2,560 810 310 310 IV-20 II EXISTING EXPENDITURES AND REVENUES _ I al ' 1 l _1 J J J J J J J EXISTING EXPENDITURES AND REVENUES Based on the projects presented in Section IV, this section summarizes the City's capital expenditures and matches those expenditures with projected CIP revenues. CIP revenues are those revenues that the City has chosen to set aside to be used specifically for funding capital improvements. Again all figures and assumptions used in projecting revenues are as they were in the Preliminary CIP. Both revenue and expenditure figures are in 1986 dollars. Because of the uncertainties involved with projecting inflation, an inflation factor was not added to projected revenues or expenditures. Each year when the CIP is updated, the latest available projections will be included for both revenue and expenditure estimates. Expenditure estimates, for the most part, have not been subjected to extensive design and construction costs studies. This is especially true for projects in the later years of the program. For these projects, the staff has used their expertise and past experience, as well as input from outside experts to come up with cost estimates for CIP projects. EXPENDITURES The City's currently funded capital improvement projects are listed in Appendix G. Appendix G shows the City has almost $24 million in ongoing capital improvement projects. The City's proposed capital expenditures are summarized in Table 11 . This summary is based upon the policies and project requests shown in Section IV. Each expenditure category is broken down into the four subcategories used in Section IV--Public Safety, Public Works, Parks and Recreation, and General Government. The needs of each category are projected through the year 1990. In addition, a separate column, "1991 & Beyond," has been added to j show some, but not all , longer range needs. over the next five ears the City will need almost $77,000,000 (in shows that Y The analysis 1986 dollars) for capital expenditures. Almost thirty-nine million dollars of this need can be met by State and Federal grants, private donations, Local Improvement District contributions, and other nongeneral tax sources of dedicated revenue. Therefore, the City needs approximately $38,000,000 to fund its Capital Improvement Program. J TABLE 11 TOTAL PROPOSED CAPITAL EXPENDITURES (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND CAPITAL EXPENDITURES Public Safety 12,511 11 ,418 465 228 400 1 ,700 Public Works 48,461 18,958 18,520 9,340 1 ,213 430 18,810 Parks and Recreation 11 ,354 1 ,649 7,375 1 ,730 600 2,995 General Government 4,450 460 2,560 810 310 310 Total Capital Expenditures 76,776 32,485 28,920 12,108 2,523 740 23$ 05 Less Dedicated Revenue (38,714) (15,953) (16,884) (4,552) (960) (335) (7,176) CITY FUNDING NEEDED 38,062 16,502 12,036 7,556 1 ,563 405 16,329 The summary data tables in Appendix li provide a different sort on the same expenditure dollars. The data base for this table is the departmental summaries which appear at the beginning of each subsection in Appendix K. These summaries, in turn, are based on the individual project sheets. The highest level of detail is provided by the project sheets in Appendix K. Each of the City's proposed capital improvement projects is described in detail by a project sheet. The project sheets give: the title of a project; some background on the project; the year, the amount, and the purpose for which the funds are needed; operational financing needs; factors supporting the project; and any alternatives to the project that may exist. It is important to keep in mind that the information on the costs of a project are only estimates and that all costs are in 1986 dollars. The majority of the projects, especially those in the latter years, have not been subjected to extensive planning, engineering or design studies. REVENUES Table 12 lists the existing revenue sources which the City has earmarked specifically for capital improvement projects. The total revenues have been netted by committed debt service expenditures to provide net available CIP revenues. To the right of each revenue V-2 source is the accounting fund where the revenues are deposited. Some of these revenues are required by law to be used for specific purposes, while others are used for capital projects as a matter of City policy. The majority of these revenues are deposited in the Capital Improvement Fund which the City established in 1981 . The criteria used in prioritizing the use of the Capital Improvement Fund is displayed in Appendix J. Following Table 12 is an explanation of each revenue source and assumptions used to make projections through 1990. TABLE 12 NET PROJECTED AVAILABLE CIP REVENUES (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND Projected CIP Revenues Sales Tax - Capital Improvement 8,700 1 ,544 1 ,636 1 ,734 1 ,838 1 ,948 N/A Interest - Capital Improvement 125 25 25 25 25 25 N/A Loan Repayment - Capital Improvement 205 41 41 41 41 41 N/A Revenue Sharing - Revenue Sharing 500 100 100 100 100 100 N/A Fuel Tax - Street 1 ,663 308 320 332 345 358 N/A Fuel Tax - Arterial Street 1 ,106 205 213 221 229 238 N/A Contributions - General Fund 1 ,000 200 200 200 200 200 N/A Projected CIP Total Revenue 13,299 2,423 2,535 2,653 2,778 2,910 N/A Committed Debt Service 6,480 1 ,358 1 ,311 1 ,288 1 ,269 1 ,254 N/A Net Projected Available CIP Revenues 6.819 1 ,065 1 .224 1 ,365 1 ,509 1 ,656 __WA Sales Tax Revenue For the last three years, the City of Kent has committed one-quarter of its local sales tax receipts to capital improvement projects. In 1985 this amounted to $1 ,457,000. Based on historical growth, sales tax revenue is projected to increase at a real rate of six percent l per year. J �� V-3 Interest Revenue The Capital Improvement Fund, set up as the depository for one-quarter of the City sales tax revenue, is expected to maintain a fund balance of $250,000. At a ten percent interest rate, $250,000 will earn $25,000 a year. Loan Repayment In 1985, the Capital Improvement Fund loaned Valley Com $222,000 for facility improvements and equipment upgrade. Valley Com will repay the Fund $41 ,000 in annual principal and interest cost for the next ten years. Shared Revenues The City has several revenue sources which are collected by other governmental agencies and then redistributed back to the City. These include the fuel tax revenue received from the State and deposited into two separate funds and Federal Revenue Sharing which is received from the Federal Government and deposited into the Revenue Sharing Fund. Federal Revenue Sharing receipts amount to approximately $520,000 per year and may be used for a multitude of purposes. In 1985, $102,000 of Revenue Sharing was used for capital improvement projects with the balance being used for social services and minor one-time only projects. It is expected that a similar amount of Revenue Sharing Funds will be used in the upcoming years unless the Federal Government eliminates the program as is currently being proposed. The fuel tax revenue, on the other hand, must by law be used for street and arterial street operations or capital projects. It is City policy to use 100 percent of its Street and Arterial Street funds for capital improvement projects including debt service, thereby leaving the General Fund to pay for street maintenance costs. Fuel tax revenue growth is a function of population growth and fuel prices. Based on historical trends, fuel tax revenue will grow an estimated four percent per year. V-4 1 General Fund Contributions The General Fund is the depository for all the City's operating revenues. After operating expenses were paid, the General Fund contributed $211 ,000 for capital project debt service in 1985. It is assumed that the General Fund will continue to contribute a similar amount through 1990. In 1986 dollars, the City has projected that it will have $6,819,000 as net available CIP revenues through the year 1990. This assumes that there will be no major changes in City, State, or Federal laws which may impact capital improvement revenues. EXPENDITURES AND REVENUES When the City's funding needs are matched with its CIP revenues in Table 13, an unfunded balance of over 30 million dollars is revealed. This 31 million dollar need is the focus of Section VI, Financing Options and Strategies. Section VI will explore the options available to the City for financing capital improvement programs. L1 l � I J r J J I V-5 �J TABLE 13 SUMMARY OF PRELIMINARY CIP EXPENDITURES AND REVENUES (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND CAPITAL EXPENDITURES Public Safety 12,511 11 ,418 465 228 400 0 1 ,700 Public Works 48,461 18,958 18,520 9,340 1 ,213 430 10,810 Parks and Recreation 11 ,354 1 ,649 7,375 1 ,730 600 0 2,995 General Government 4,450 460 2,560 810 310 310 0 Total Capital Expenditures 76,776 32,485 28,920 12,108 2,523 740 23,505 Less Dedicated Revenue (38,714) (15,953) (16,884) (4,552) (960) (335) (7,176) City Funding Needed 38,062 16,502 12,036 7,556 1 ,563 405 16,329 PROJECTED CIP REVENUES Sales Tax - Capital Imp. 8,700 1 ,544 1 ,636 1 ,734 1 ,838 1 ,948 N/A Interest - Capital Improvement 125 25 25 25 25 25 N/A Loan Repayment - Capital Imp. 205 41 41 41 41 41 N/A Revenue Sharing - Rev Sharing 500 100 100 100 100 100 N/A Fuel Tax - Street 1 ,663 308 320 332 345 358 N/A Fuel Tax - Arterial Street 1 ,106 205 213 221 229 238 N/A Contributions - General Fund 1 ,000 200 200 200 200 200 N/A Total Projected CIP Revenues 13,299 2,423 2,535 2,653 2,778 2,910 N/A Less Committed Debt Service (6,480) (1 ,358) (1 ,311 ) (1 ,288) (1 ,269) (1 ,254) N/A Net Projected Available CIP Revenues 6,819 1 ,065 1 ,224 1 ,365 1 ,509 1 ,656 N/A UNFUNDED NEED 31 ,243 15,437 10,812 6,191 54 1 251 ) 16,329 V-6 FINANCING OPTIONS AND STRATEGIES � I _ 1 : 1 �l sl _ l J J J J J J FINANCING OPTIONS AND STRATEGIES The options for financing the Capital Improvement Program are directly related to project timing and choices of revenue sources. The first option is of course to defer projects until they can be funded with existing revenue sources. If this is not desired, then revenue source options in the form of grants, user charges, and increased taxes would be investigated. The City will always try to obtain whatever grants might be available. Following that, the City will look to user charges to match project costs with those who benefit. Only then would the City look at an increase in its taxing structure. Whether the deferral or the revenue option is selected the City must decide its strategies based upon planned project implementation. These strategies relate to the alternatives of funding with cash versus the issuance of debt. Debt is chosen if project implementation is needed sooner than cash can be provided, but since it must be paid back there are limitations. The City can use special assessment debt when the benefit is received by specific individuals. It can use revenue bonding debt when the benefit is received by the entire community, but the benefit received must be directly related to units of service or product provided. The third choice is general obligation debt where the individual benefit received is not clearly defined or is determined to be for the good of the community as a whole. This section will review some of the financing options related to deferral or revenue raising and then review the strategies related to using cash versus the issuance of debt. OPTION 1--DEFERRING PROJECTS Before reviewing revenue raising options, it is important to first look at the option of deferring capital projects to a later date. It is evident that some projects will have to be pushed ou t to a later date, but if the Preliminary CIP was balanced only by pushing projects out into the future then the City's Police, Fire, Street, and Park services would have seriously deteriorated. The 77 million dollars in proposed projects in this plan are needed by 1990, yet it would take nearly thirty years to fund these projects if the City were to utilize only its currently identified CIP revenue sources. Moreover, as the City continues to grow, more and more land will be consumed by development, and the City will lose opportunities to provide public facilities such as VI-1 parks, libraries, open spaces, etc. Once a property is developed, it becomes very expensive to acquire for a needed public facility. OPTIONS--ANALYSIS OF REVENUE SOURCES If the community wishes not to defer project implementation then it must raise revenues. The raising of City revenue can be discussed in two areas. The first area describes an analysis of the City's existing revenue base and how that revenue base may be increased based on the community's economic growth. The second area discusses the expansion of the City's revenue base. Part of the analysis compares the City of Kent's tax base with those of neighboring communities to insure that the City of Kent does not lose its tax advantage in attracting economic growth. Existing Revenue Base The City's existing revenue base includes taxes, (42 percent) ; user charges, (39 percent) ; Federal , State, and local shared revenue, (11 percent) ; and miscellaneous, (8 percent). As mentioned earlier the City uses user charges and intergovernmental revenue as its preferred funding option. With respect to user charges, the City establishes those charges in an effort to cover the cost of services rendered to individuals. Where the benefits are provided to a small segment of the City, Local Improvement Districts are established so that the costs associated with those developments are identified and apportioned to individual property owners. Where the benefits are provided to the entire City, charges are developed to cover the cost of operation and maintenance including the recovery of capital expenditure costs. Thus user charges are established to fund the City's water and sewer utilities and is planned for the City's drainage utility. These operations provide specific services, and those services can be measured with an associated cost per unit of service determined and charged to the individuals who receive the service. Where costs and benefits are not directly associated, the City's general tax base provides the primary revenue source for funding governmental services. This tax base is established within the limits prescribed by State law and as such is similar to all communities in the State of Washington. State law gives cities the authority to levy taxes, and in certain cases cities have some leeway within that authority to establish their own rates. VI-2 Except for the first year of new construction, property tax revenue is limited in growth to six percent of the previous year' s levy. Therefore, tremendous expansion in development does not necessarily provide the City with significant additional property tax revenue. Growth in sales tax revenues are more related to growth in the economy. In 1984 the City's sales tax revenues increased 15 percent above the previous year' s actual . This increase is predominantly attributable to growth as the annual inflation factor was only about three percent. This was a very good growth year, but the City's projections for the future are six percent per year above inflation based on a ten-year historical trend in sales tax growth. Continuing years like the one recently completed could provide substantial revenues beyond what is shown in the revenue projections. Utility taxes also grow substantially from year to year based primarily upon growth in utility rates. The tax rate is a flat percentage applied to utility payments. Since most utility rates have been escalating in the neighborhood of 20 percent a year for the last couple years, the utility tax has been a strong source of revenue. The growth in sales and utility tax revenues should provide additional revenue for funding some of the City's capital improvement projects, but most of the revenue will be used to fund expansion of operating programs. Growth not only affects future capital needs, it also affects the ability to continue to provide services to an expanding and demanding populous. Both capital and operating needs must compete for these limited funds. o P P P Expansion of Revenue Base As is evident from Table 14, on the following page, the City has tax rates that are well I within statutory limits and are very favorable when compared to neighboring communities. _) Kent does not currently utilize several taxes that other communities have such as an admissions tax, a real estate excise tax, and a business & occupation tax (B&0 tax). In other areas, Kent tax rates are significantly lower than those of neighboring communities. VI-3 TABLE 14 1985 CITY TAX RATE COMPARISONS PROPERTY TAX REAL POPULA LEVY RATES SALES ADMISSIONS UTILITY ESTATE B & 0 BUSINESS CITY TION GENERAL VOTED TAX TAX TAX EXCISE TAX LICENSE LEGAL LIMITS 3.600 (A) .01 .05 .06 (B) .0025 .002 (C) - ---------------------------------------------------------------------------------------------- Seattle 493,486 2.212 .824 .008 .05 .06-.093 YES .00185- $25+ .00357 Tacoma 159,100 2.846 1 .456 .01 .05 .08 (1 ) NO .001- $5+ .072 (8) .005 .0922 (6) Bellevue 78,620 1 .800 .200 .01 .03 .048 (5) YES .0008 $1 Renton 33,340 2.666 .408 .01 .02 .05 (5) YES - $41-47,594 .05 .03 (9) per empl . Auburn 28,950 2.560 .390 .009 .05 .03 (5) YES - $5 .01 (9) Redmond 27,340 1 .500 .520 .01 .01 .055 (5) YES - $50-800+ Kent 26,250 2.318 .069 .01 - .02 (1 ,2) NO - $50-75 .025 (7) Lynnwood 23,140 2.466 - .01 - - YES - $40+4.50 per empl . Mercer Is. 20,910 2.169 .550 .01 - .064 (7) YES .001 $25 .024 (1 ,3) .07 (8) Kirkland 18,850 1 .677 .542 .009 .05 .05 (10) YES - - .064 (11 ) Puyallup 18,500 2.464 .526 .01 .05 .06 (4,6) 140 - $50-750(12 .072 (8) .08 (1 ,3) Des Moines 13,100 1 .724 .095 .007 .05 None NO - $15-25 Tukwila 4,560 2.472 .167 .008 - None NO - $50 & up (A) To this level within limits of previous year's property tax revenue. All cities at maximum. (B) Cities in excess must come down to six percent by 1987. (C) Cities with high rates had them Grandfathered in by 1982 State Legislature. (1 ) Water Only (4) Garbage Only (7) All Other Utilities (10) All Utilities Residential (2) Sewer/Garbage (5) All Utilities (8) Electric/WNG (11 ) All Utilities Commercial (3) Sewer Only (6) Telephone (9) Cable (12) Based on No. of Employees VI-4 This is noted by the fact that the excess property tax levy for voted bond issues is one of the lowest in the area and the fact that the utility tax is also one of the lowest. From Table 14 it can be seen that the City of Kent has tax advantages over neighboring communities and therefore has some leeway to either increase existing tax rates or to implement new ones. The City's taxing options will be discussed in two areas; those specifically related to capital improvements and those related to operations for which the City Council could mandate that all or a portion of the revenue generated be dedicated to capital improvements. 1 ) Capital Related Taxes The two capital related taxes that are available to the City are the excess property tax levy and the real estate excise tax. These taxes, by law, must be used to fund capital improvement projects. a) Excess Property Tax Levy The City of Kent has an excess property tax levy of 6.9 cents per $1 ,000 of assessed valuation. This is the lowest of all of the neighboring cities shown in Table 14. Therefore, Kent could have a voter approved excess levy without impairing its advantage over other cities. In addition, it should be noted that Kent is a substantially different kind of community than a typical suburban community. This is noted in the fact that only 20 percent of Kent's property valuation is classified as single family residential . This would mean that 80 percent of an excess levy would be paid by the nonresidential community. b) Real Estate Excise Tax The other capital tax available to fund capital projects is the real estate excise tax. In 1982 the State legislature allowed cities to impose a tax of one quarter of one percent on the sale of real property. The tax must be used to fund capital improvements since it was ` initiated as a substitute for the use of development fees that the City of Kent and other cities had previously utilized. It can be noted from Table 14 that eight of the thirteen cities shown have a real estate excise tax including both of our immediate neighbors, the City of Auburn and the City of Renton. In addition, King County imposes the real estate excise tax in the unincoporated area outside Kent. '� VI-5 2) Contributions from Operating Type Revenues In addition to the specifically related capital taxes described above, the City can opt to increase or establish new operational taxes. A specific portion of these operational taxes y can be segregated for capital improvements or monies can be transfered from operating to capital funds based upon the availability of funds determined in conjunction with the balancing of the operating budget. The revenues that fit into this category are the business and occupation (B & 0) tax, the utility tax, and the admissions tax. Each of these taxes affect a different segment of the community. a) Business and Occupation Tax (B & 0 Tax) The B & 0 Tax affects the business community. Generally, a B & 0 Tax is a tax on the gross receipts of businesses. The maximum tax allowed by State law is two-tenths of a cent (.002) , but the most common rate is one-tenth of a cent ( .001 ) . A preliminary estimate shows that with a one-tenth of a cent B & 0 tax rate the City could raise approximately $600,000 per year. Like the Ci ty's sales tax, a B & 0 tax would greatly expand with the growth and activity of the business community. b) Utility Tax A tax that affects the community as a whole is the utility tax. This tax is applied to the cost of electric, gas, telephone, water, sewer, and garbage bills which are received by the entire community. It is both a tax on the business community and a tax on individual residents. As noted in Table 14, Kent has a two percent tax on its own utilities (water, sewer, garbage) and a two and a half percent tax on other utilities (electricity, gas, and telephone). The table shows that Kent's rates are currently one of the lowest in the area. Therefore, depending upon demand for capital improvements, this tax could be raised to provide additional revenue for funding capital improvement projects. c) Admissions Tax A third tax used in nine of thirteen communities in Table 14 is an admissions tax. This tax is a tax on entertainment revenue derived from the sale of tickets, cover charges, and food and beverages where free entertainment is provided. Because the City has very few establishments where an admissions tax would be applicable, this tax was determined to VI-6 provide the City with somewhat less than $100,000 in additional revenue. This tax, unlike the B & 0 tax and utility tax, would be borne strictly by the residential populous. However, because the City attracts to its corporate limits numerous people from outside the City, the admissions tax would be a way to recover something from those people who use City facilities but do not live within the corporate limits. STRATEGIES--CASH VERSUS DEBT ISSUANCE Following a decision on what revenue sources might be applicable, the City has some strategies related to timing. One strategy relates to funding capital projects with cash. This requires accumulating revenue over time and accruing interest income. The other strategy is to pledge specific revenue or the full faith and credit of the City to acquire the funds now. This strategy allows for immediate construction and assures that the people using the improvement over its life would be paying for it either with expanded user charges or increased taxes. Therefore, there are certain advantages to issuing debt. The City can issue two types of debt; one being bonds that are user specific, i.e. special assessment bonds or revenue bonds; the other being general obligation bonds which are voted on by the people and paid for with an excess levy or approved by Council and paid for through the City's general government tax base. Special Assessment and Revenue Bond Financing The user specific debt as mentioned above is related to the issuance of special assessment bonds are financing bonds and revenue bonds. Special assessment g mechanisms that allow for the completion of certain street and utility improvements particularly related to private development. The debt is usually paid back over a ten-year period. Many times the City participates in these projects if it is determined that there is a benefit to the general City or if City property is included within the improvement boundaries. Special assessments have has been used frequently by the City to fund many capital improvement projects in the undeveloped areas of the City. As part of the City's effort to let the development community pay for the projects which benefit them, the City has Jinitiated a policy of local improvement district covenants. These covenants are adopted as conditions of developments so that when enough of the property is going to be developed, J VI-7 the City will be able to put in a full improvement rather than having partial improvements as an individual develops his specific parcel of property. If the capital improvement is for much more than a specific section of the City, the City may have the capability of doing revenue bond financing. This type of financing is designed to establish rates that cover the cost of operation. It requires pledging future revenues generated by these rates to the capital improvement. Under this theory the people in the future who will be paying the higher rates will also be receiving the benefits of the capital improvement. Revenue bonds are currently used in the City's water, sewer and drainage utilities. General Obligation Bonds If the City is unable to establish Local Improvement Districts and revenue bonding is not possible, the City could use its general obligation bonding capacity to finance certain projects assuming the City has a revenue base to fund the debt service. This revenue base can be voted on as an excess levy in conjunction with approving a bond issue for special projects or it can be taken from the existing City revenues within definite limitations. The two types of issues are described below: 1 ) Voted Bond Issues As noted previously, the City has an excess property tax levy rate that is lower than most neighboring communities and therefore has room to initiate new taxes without jeopardizing Kent's favorable tax position. Also as noted, the nonresidential community would be paying 80 percent of this debt. As shown in Table 15, the City has used very little of its bonding capacity for the issuance of voted general obligation debt. The City has approximately $32 million of remaining debt capacity for' voted general purposes and an additional $47 million of capacity for both voted utility purposes and voted open space and park purposes. The use of this voted capacity would mean that citizens of the City had voted to tax themselves. An analysis that was prepared in evaluating the Civic Center proposal showed that for each million dollars of capital improvements financed by voted debt, an average of approximately five cents per thousand dollars of assessed valuation would be annually levied to an individual property owner. VI-8 2) Councilmanic Debt If the voted alternative is not an acceptable method of financing the project, the City may choose to issue nonvoted (councilmanic) debt. This is what happened in 1984 when the City issued councilmanic debt for the completion of the Senior Center, Jail , and for the purchase of Golf Course expansion property. Although the City has a capacity of $14.3 million dollars in councilmanic debt, $11 .7 million is currently outstanding. This leaves only $2.6 million available for capital needs. However, this capacity grows each year with increased assessed valuation and should grow to over $11 million by 1988 (see Table 16) assuming current growth rates and no more councilmanic debt is issued. 1 _ l J J J J J VI-9 TABLE 15 LEGAL DEBT MARGIN FOR 1985 Total Debt Outstanding Remaining Capacity Debt Debt Capacity GENERAL PURPOSES Councilmanic Capacity .75% on assessed value of 1 ,908,294,718 $ 14,312,210 Bonded Debt 11 ,660,000 - Nonbonded Debt 38,448 14,312,210 11 ,698,448 2,613,762 Voted additional capacity 1 .750 of assessed valuation 33,395,157 829,000 32,566,157 Total 47,707,367 12,527,448 35,179,919 UTILITY PURPOSES Voted - 2.5% of assessed valuation 47,707,367 47,707,367 OPEN SPACE AND PARK PURPOSES Voted - 2.5% of assessment valuation 47,707,367 47,707,367 CAPACITY 143,122,101 12,527,448 AMOUNT AVAILABLE IN DEBT SERVICE FUNDS 131 ,990 CAPACITY UTILIZED 12,659,438 LEGAL DEBT MARGIN 8.85% $130,594,653 VI-10 TABLE 16 PROJECTED COUNCILMANIC BONDING CAPACITY @ .75% Existing Amount Available Remaining Assessed Assessed Councilmanic in Debt Councilmanic Valuation Valuation Debt Service Fund Capacity 1986 2,209,805,283 16,573,539 11 ,445,000 132,380 5,260,919 1987 2,558,954,517 19,192,158 11 ,065,000 127,620 8,254,778 1988 2,963,269,330 22,224,519 10,675,000 132,508 11 ,682,027 Innovative Financing Strategies In trying to determine whether there are any innovative financing strategies that might be employed, the City discussed this issue with its financial advisors. As yet, there appear to be no new strategies which benefit the City. In addition, the Federal Government is looking at ways to close current tax loop holes and may prohibit certain so called innovative financing techniques that are currently available, The City of Kent currently is using industrial revenue bond financing to attract development to the area. This should provide a certain amount of economic growth, but as far as issuing its own debt there are limited innovative techniques. Most of these new financing instruments were created to attract a certain type of investor. For instance, zero coupon bonds are designed to attract the attention of individual bond holders who are fastly replacing financial institutions as the predominant municipal bond holding group. The attractiveness of these bonds, which are nothing but traditional bonds less their coupons, is that bond holders who are willing to forego tax free income over the life of their investment will receive a tax exempt capital gain upon maturity. J Similarly, PP coupon stripped on bonds, compound interest bonds, stepped coupon bonds, tender P Joption bonds, and floating rate bonds all have certain features which attract a particular investor group. In general , however, these new innovative methods of financing are only desirable if traditional bonding methods are unavailable. Accordingly, the City of Kent will probably not use these methods unless traditional means are unavailable. .1 VI-11 CONCLUSION The financing options discussed above are the options currently available to the City of Kent. In subsequent years, Federal and State laws, and the City's own actions may change the available options. The Federal Government may eliminate the tax exempt status of municipal bonds. The State Government may authorize a new taxing source or raise debt - capacity limits. Or the City may approach an existing limit by issuing more councilmanic debt. In any event, each year the City's options for financing the Capital Improvement Program will be reviewed, updated and then explained to the public as part of the overall CIP update process. VI-12 APPENDICES i i i i i J J APPENDIX A RESOLUTION NO. A RESOLUTION of the City Council of the City of Kent, Washington, adopting the Capital Improvement Program: 1986-1990. WHEREAS, the City has previously adopted functional plans in the areas of transportation, fire, parks and recreation, and City Hall office facilities ; and WHEREAS, the implementation of these plans is important to the quality of life in Kent; and WHEREAS, funding for the implementation of the projects contained in those plans is limited; and WHEREAS, it is important to coordinate and prioritize the funding of projects in those plans; and WHEREAS, a comprehensive Capital Improvement Program is the best vehicle for accomplishing such a coordinated planning process ; and WHEREAS, the City Staff has developed a draft Capital Improvement Program for the years 1986 through 1990; and WHEREAS, a great deal of public input has been sought and obtained through surveys and public meetings regarding priorities and funding sources; and WHEREAS, the final draft of the Capital Improvement Program contains three alternative scenarios, each depicting a different combination of projects and funding sources; NOW THEREFORE THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS: Section 1 . The 1986 - 1990 Capital Improvement Program Scenario 2 of the and incorporated herein b reference is Funding alternatives attached heretop Y proposed 9 hereby adopted. . i CIP APPENDIX 471F-19F (11/5/85) Section 2. A final Capital Improvement Program shall be printed in accordance with the adopted Scenario 2. Section 3. The City Attorney is directed to prepare an ordinance enacting the real estate excise tax with an effective date of September 1 , 1985. Section 4. The City Administrator is directed to incorporate the elements of The Capital Improvement Program into the proposed 1986 Annual Budget. Section 5. A process shall be developed to address the recommendation that a public safety bond issue should be submitted to the voters sometime during 1986. Passed at a regular meeting of the City Council of the City of Kent Washington this day of 1985. 1985. Concurred in by the Mayor of the City of Kent, this day of , ISABEL HOGAN, MAYOR ATTEST: MAR E JENSEN, CITY CLERK APPROVED AS TO FORM: P. S EPHEN DiJULIO, CITY A ORNEY I hereby certify that this is a true and correct copy of Resolution No. passed by the City Council of the City of Kent, Washington, the day of 1985. (SEAL) MARIE JENSEN, CITY CLERK CIP APPENDIX 471F-19F (11/5/85) APPENDIX B CITY OF KENT PROJECTED CIP REVENUES (Amounts in Thousands of 1986 Dollars) TOTAL 1986-90 1986 1987 1988 1989 1990 Sales Tax - Capital Improvement(1 ) 9,318 1 ,653 1 ,752 1 ,857 1 ,969 2,087 Fuel Tax - Street(2) 1 ,689 312 324 337 351 365 Fuel Tax - Arterial Street 1 ,127 208 216 225 234 243 Federal Marshal Payments(3) 19235 247 248 247 247 246 Federal Revenue Sharing(4) 100 100 Interest - Capital Improvement(5) 375 75 75 75 75 75 Loan Repayment - Capital Imp. (6) 170 34 34 34 34 34 Contributions - General Fund(7) 1 ,790 358 358 358 358 358 Contributions - Golf Course(8) 470 94 94 94 94 94 Contributions - Water Fund(9) 141 28 28 28 28 29 1986 Beginning Fund Balances(10) Street Funds 44 44 Capital Improvement Fund (245) (245) Revenue Sharing Fund 51 51 TOTAL PROJECTED CIP REVENUES 16,265 2,959 3,130 3,255 3,390 3,531 (1 ) Sales Tax will increase at a real rate of 6% per year based on historical growth. (2) Fuel Taxes will increase at a real rate of 4% per year based on historical growth. (3) Federal Marshal Payments are exact per contract with the Federal Marshal . (4) Federal Revenue Sharing is assumed to be discontinued by Congress in 1987(In its most recent form Federal Revenue Sharing will be cut in half beginning in 1986, cutting Kent's share from about $500,000 to $250,000. However, it is assumed that the City will continue to use about $100,000 of its Revenue Sharing monies to fund capital improvements through 1987). (5) Valley Com will pay the Capital Improvement Fund $34,000 a year to repay a loan made to Valley Com in 1984. (6) Interest on the Capital Improvement Fund is expected to generate $75,000 a year. tribute about 350 000 a year for Golf (7) The General Fund is assumed to continue to con $ Y Course and LID debt. (8) The Golf Course will generate $94,000 to help pay its debt service. (9) The Water Fund is contributing $28,000 a year for debt service. (10) The City is going into 1986 with beginning fund balances of $44,000, $(245,000), and $51 ,000 for the Street Funds, Capital Imporovement Fund and Revenue Sharing Fund, respectively. CIP APPENDIX 471F-19F (11/5/85) COMMITTED COUNCILMANIC DEBT SERVICE APPENDIX C TOTAL (Amounts in Thousands of 1986 Dollars) -� 1986-90 1986 1987 1988 1989 1990 MATURITY 1966 Street Bonds 1986 26 26 1973 General Purpose Bonds 1990 General Government - 30.5% 186 37 37 37 37 38 Street - 46.6% 287 57 57 57 57 59 Water - 22.9% 141 28 28 28 28 29 Senior Center (Old) 1991 25 5 5 5 5 5 Crow Road/SE 260th LID 300 1997 273 61 58 55 51 48 S 252nd/Kent Kangely LID 301 1997 199 45 42 40 37 35 Smith Street LID 304 1997 53 12 11 11 10 9 1978 General Purpose Bonds 1998 Parks - 26.7% 177 36 36 35 35 35 Street - 73.3% 386 98 95 96 97 Des Moines LID 1987 2 1 1 _ 1981 Golf Course G.O. Bonds 2001 1 ,189 241 239 237 235 237 1984 General Purpose Bonds 2004 Jail - 25.2% 1 ,235 247 248 247 247 246 Senior Center - 53.1% 2,606 522 523 521 521 519 Golf Course - 21 .7% 1 ,062 213 213 212 212 212 W. Meeker St LID 297 1997 294 66 62 59 55 52 W. Valley Drainage LID 306 1998 258 70 66 63 59 104th @ 270th Water LID 1997 10 2 2 2 2 2 N. Central Imp LID 318 1998 48 12 12 12 12 CBD Improvement LID 313 1997 132 30 28 26 25 23 Upper Mill Creek Purchase Agr. 1900 195 33 54 54 54 James Street Improvement LID 32 1997 93 25 24 23 21 TOTAL COMMITTED DEBT SERVICE 8,877 1 ,727 1 ,825 1 ,824 1 ,806 1 ,695 CIP APPENDIX 471F-19F (11/5/85) APPENDIX D CAPITAL IMPROVEMENT PROGRAM QUESTIONNAIRE I. Please provide your street address for statistical analysis. III. Would you be will- if. Capital Improvement Policy Statements ing to support a local tax to pay for Indicate your support for the policy statements below by the types of pro- circling the appropriate number which most closely repre- jects needed to implement these sents your views. Strongly Strongly policies. Support Oppose 1. Provide bike routes/pedestrian paths. 5 4 3 2 1 Yes No 2. Provide strategically located public safety 5 4 3 2 1 Yes No facilities. 3. Provide greenbelts and open space. 5 4 3 2 1 Yes No 4. Provide expanded library facilities. 5 4 3 2 1 Yes No 5. Provide adequate communication and training 5 4 3 2 1 Yes No facilities for Police and Fire. 6. Provide facilities for the adequate and safe 5 4 3 2 1 Yes No movement of truck and automobile traffic. 7. Provide cost saving technological equipment 5 4 3 2 1 Yes No to improve City services. 8. Provide neighborhood and industrial area 5 4 3 2 1 Yes No park facilities. 9. Provide adequate emergency equipment for 5 4 3 2 1 Yes No public safety. 10.Provide adequate City Hall office space. 5 4 3 2 1 Yes No 11.Provide community playfields and cultural 5 4 3 2 1 Yes No facilities. 12.Provide adequate drainage for storm runoff. 5 4 3 2 1 Yes No 13. Provide facilities for recycling and power 5 4 3 2 1 Yes No generation from City garbage. 14.Other _ — 5 4 3 2 1 Yes No Cut And Return With Utility Payment - ---------------------------------------------------------------------------------------- -° - M n � - _ -n = o v -� 0 Z -v > f— O � oc Cr — ; O CD m F) 0N O o N WM K) 00 Zia o w cy) Coo W N � sv m I � � W � n CNrtO� hn Cn3 23 Z � 0 G `� z O O`G Cn = 6 W Z 1 Z J `G _r,+ C N N B r — CD — DZ Y/ (0 _ � CD -� D o � � �A � m .n 3 970 �� � � m � � m m m � 3 C 0.rn = Z 0 O 0 ' O c -0 � � '—' � cn - O > > O C O z N U - (I Q) Y 0aZ Z cU) E > - 2a- W = O O ' . a ) cz U(c�D � � ' o ) a LU :3 —cU wa a OOEfl0 z X O > M O— > Q O � a)° ic5 icO O _ �cc> > Cz v O a -O U .- J (n C Q, � ocncE = c 'c c� ° � 0 -� � nn > o ac c p � °3 . , C o Lu � ° �� -0a o � � Un ° ov F- , ova c � i w > QoO � > :3COCDE LLJ OQ)� ? >1 `�N (a) N Q W > N ° v � p C>U �m O � F® o � a a (30 E ° � � Q00 O � U Q � = .� . cn > > — O �. — O Q W — "— — gip fn — N O c� ap W c� � � � as S � 00 v Z Z EE 4 Z O S r t I- F- Lo ' ,�� O w Cl) m j o rn1 `4 0 0. z a J w 'p a c w a w FL cn p�c Oc ° W C 0 Q Q > a O � a o) E c Q' oc > � > O (� p> o CI. i � o � o O ' oZ > � ° U CC cn rn Q) O ar 0 a a � o � - C � N C �' o Q- C _o a > ° Q > .L o > m O a) Q > cn > C c� > C CUQ > OY a) O � O - 0 ncMQ) ° o � L) CU � U) > v - aic a c J U uj � � ?Ecu - c - cn _0 � -QL > _ T 0 -0 ' y--, 0 v Q °U W 2 c to J > C Q > cn C O > E � �i� QQC) mQ) � .0co -O .c J -c Ocu > � � v U _Fu rz .E � ° 2: O 0 .0 Co E o � F- aQa c� _> a_C -Q F- o m � :� Q - m V > a > 0 ° c� = fit°- a~ a� U 3: -0 a2 E -°a 2Q c �: .2cn .Q?w APPENDIX E CHAMBER PROJECT CRITERIA 1 . Maintenance and Operation (M & 0) costs - - Should be funded from existing revenues, where possible. - Annual M & 0 should not exceed 30 percent of the original investment. - Any consideration to increase revenue sources for M & 0 should be limited to selected public safety projects. 2. Public Safety - - Fire Department services should be limited to level adopted in the Fire Master Plan. - Projects should result in current or better level of insurance ratings. - Police Services should be maintained at current levels, and future investments should assure protection of the community. 3. Acquisition of Land for Future Projects - - No acquisition outside planned annexation limits should be considered. - No acquisition at prices above appraised or fair market values. - Acquisitions must be consistent with approved City Master Plans. - Where resources are limited, high priority should be given to acquisition of land for future projects. 4. Traffic - - Use adopted transportation plan priorities as baseline for street projects. - Balance cost of added public safety projects versus cost for traffic improvement that might reduce or eliminate such additions. - Give higher priority to projects that would promote use of public transportation. 5. General Considerations - - Provide proper balance of investment in projects between commercial and residential interests over the term of the plan. - Give high priority to projects for which outside funding can be acquired. - Consider combining projects which would result in greater efficiency and/or lower project costs. - Give high priority to projects which, with a reasonable level of investment, can eliminate dysfunctionality or be brought to needed levels of capability. - Look first to cost trades/benefits involved in contracting for certain services from other sources versus investing in own facilities. - Provide higher priority to multi-services/purpose projects. �l �.l CHAMBER. FUNDING CRITERIA APPENDIX F 1 . Evenly spread costs for projects over the five year period. 2. Consider deferral of low priority projects beyond this give year period. 3. Maintain the current prudent balance between cash flow and councilmanic bonding. 4. Maintain the current indebtedness policy regarding the use of capital funds. 5. Do not divert existing capital funding allocations to other purposes. 6. Assure that additional taxing be shared by all segments including nonresidents. 7. Revenue Sources (In order of desirability) : - Voted bonds (increase in property taxes) Acceptable - Councilmanic bonds Acceptable - Real estate excise tax ( .25%) *Undesirable - Utility tax (+1%) *Undesirable - Admissions (5%) very marginal *Undesirable - B & 0 Tax Unacceptable *If required, these undesirable sources should be reserved for 1.1 & 0 or to develop reserves for future projects. APPENDIX G CURRENTLY FUNDED CAPITAL IMPROVEMENT PROJECTS (Amounts in Thousands of Dollars) Total 1985 1984 1983 1982 1981 1980 PUBLIC SAFETY Police Jail Facility 4,391 4,391 *Police Remodel 75 75 *Valley Com Improvements 163 163 Fire Engine/Aid Car 300 300 Fire Facility Improvements 100 100 Breathing System 28 28 *Valley Com Improvements 61 61 *Fire Communication System 23 23 PUBLIC WORKS *Pedestrian & Bicycle Path Imp. 255 255 84th & S. 212th 165 165 *Green River Levy Improvement 47 47 *SR 515 - 196th to S.E. 256th 175 175 Smith Street Channelization 250 250 Hot Plastic Pavement Marking Equip 10 10 Meeker Street Lighting 35 35 Kent-Kangley Improvement 48 48 James Street @ 102nd Overlay 128 128 Green River Management 41 41 West Valley Highway Improvement 131 131 Upper Mill Creek 65 65 West Valley Highway at James 130 130 S. 212th at 42nd Avenue 525 200 300 25 Bicycle/Pedestrian Imp. Sunnycrest 25 25 Willis at Central 37 37 Smith at Central Intersection 430 355 LID 297 - W. Meeker Improvement 2,136 1 ,729 20 306 81 LID 313 - CBD 777 441 336 81 Mill Creek Spillway 55 55 East-West Arterial Study 90 90 I Bicycle Path - Jason to Hazel 135 135 �J Bicycle Path - Titus to Woodland 65 65 S.E. 256th & 116th Intersection 223 183 40 *Reith Road 625 150 475 Central and James St. Intersection 100 100 Mill Creek Culvert 40 40 Meeker Street Storm Drainage 143 143 Smith and Jason St. Improvement 216 216 Topographical Map Instruments 30 30 CIP APPENDIX 471F-19F (11/5/85) Total 1985 1984 1983 1982 1981 1980 PARKS Neely/Lakes Donation 800 800 *Van Doren's Landing 432 222 210 *River Front Property 160 150 *Ball Field Lights 15 15 Kent Memorial Bldg. Renovation 29 9 20 Kent Commons Energy Study 25 25 Senior Citizen Center 4,216 4,216 Mill Creek Canyon Park 508 406 102 Green River Bike Trail 67 67 West Fenwick Community Park 474 474 Glenn Nelson Restrooms 72 12 60 *Golf Course Expansion 1 ,719 1 ,719 Kent Commons Reader Board 35 35 GENERAL GOVERNMENT Computer Equipment Upgrade 170 50 70 50 Telephone Study 60 60 *Library 150 150 Total Capital Expenditures 21 ,195 5,530 13,996 555 727 306 81 Total Debt Expenditures 29508 1 ,716 792 TOTAL EXPENDITURES 23,703 7,246 14,788 555 727 306 81 REVENUES City Funding Fuel Tax - Street 553 297 256 Fuel Tax - Arterial Street 5CO 198 170 25 107 Sales Tax - Capital Improvement 2,574 1 ,457 1 ,117 Interest - Capital Improvement 50 25 25 Loan Repayment-Capital Improvement 526 41 485 Revenue Sharing 1 ,195 452 214 327 33 169 Contributions - General Fund 548 211 287 20 30 Remaining Funds from 1984 864 864 1978 Street Bond Issue 803 143 660 1984 Councilmanic Bond Issue 7,924 7,924 Remaining Funds from 1983 2,143 29143 Dedicated Revenue For Capital Expenditures 6,851 3,228 3,489 40 34 60 For Debt Expenditures 718 473 245 TOTAL REVENUES 23,703 7,246 14,788 555 727 306 81 * Indicates project is only partially funded. CIP APPENDIX 471F-19F (11/5/85) APPE14DIX H NET CAPITAL EXPENDITURES BY FUNCTION (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND CAPITAL EXPENDITURES Public Safety p 0 1 ,700 Police Capital Expenditures 1 ,796 1 ,526 270 0 10,715 9,II92 195 228 0 0 0 Fire Capital Expenditures ,511 ,4 8 465 228 0 00 Public Works Capital Expenditures 48,461 18,958 18,520 9,340 1 ,213 430 18,810 Dedicated Revenue (37$514) (15,768) (16,699) (3,922) (875) 180) (6,259 10,947 3,190 1 ,821 5,418 338 180 12,55 Parks and Recreation 375 1 ,730 600 2,995 Capital Expenditures 11 (775 1 (130 7, (925) Dedicated Revenue (775) (130) ,2-75 ,185) 2,070 10,579 1 ,519 7,27� 1 ,185 600 General Government Capital Expenditures 4,450 460 2,560 810 310 310 Dedicated Revenue (425) (85) (85) (85) (85) (85) 4,025 375 29475 725 225 225 i Total Net Capital Expenditures 38,062 16,502 12,036 7,556 1 .563 405 16,329 i `.J �J :J 1 APPENDIX I NET COMMITTED DEBT EXPENDITURES BY FUNCTION (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND NET COMMITTED DEBT EXPENDITURES Public Safety Councilmanic Debt Expenditures 1 ,235 247 248 247 247 246 Voted Debt Expenditures 215 42 46 44 42 41 Dedicated Revenue for Debt Service (1 ,450) (289) (294) (291 ) (289) (287) Public Works Councilmanic Debt Expenditures 799 181 156 154 153 155 City's Share of LID's 1 ,265 216 285 271 255 238 2,064 397 441 425 408 -93 Parks and Recreation Councilmanic Debt Expenditures 5,061 1 ,018 1 ,017 1 ,010 1 ,008 1 ,008 Dedicated Revenue for Debt Service (830) (94) (184) (184) (184) (184) ,2231 924 833 826 General Government Voted Debt Expenditures 173 86 87 Councilmanic Debt Expenditures 185 37 37 37 37 37 Dedicated Revenue for Debt Service (173) (86) (87) 185 37 37 37 37 37 Total Net Committed Debt Expenditures 6,480 1 358 1 ,311 1 ,288 1 ,269 1 ,254 APPENDIX J CAPITAL IMPROVEMENT FUND POLICIES I. Appropriation and Allocation Criteria 1 . The total amount to be annually allocated to the Capital Improvement Fund shall be Fund shall be equal to one quarter (25%) of the projected annual revenue from the levying of a one percent sales tax. 2. A reserve of at least $250,000 shall be maintained but could be used in unique circumstances to take advantage of unforeseen opportunities. 3. No more than 60 percent of the funds allocated can be pledged either for debt service or into an accumulative reserve fund to finance a specific long-term capital improvement program. No one city department shall receive 100 percent of said 60 percent. 4. Funds shall be allocated among competing needs in a way which recognizes their diversity and relative importance. II. General Project Eligibility Criteria: To be eligible for funding, a project must meet the following standards: 1 . Must be a capital project. 2. Must be a nonutility capital project. 3. Must exceed $100,000 in total cost. 4. Must be compatible with citywide goals. 5. Should emanate from an approved plan which projects needs at least five years into the future. Projects may from time to time arise which are not included in the criteria in Section III to warrant funding. However, such circumstances should be rare and where a need is identified, the appropriate plan should be changed to reflect this inclusion. 6. Capital improvements perceived as having a high probability of success through a voter approved G.O. issue, such as those associated with police or fire, should be required to seek approval prior to being considered for funding. III. Basic Guideline Criteria: The following are factors which are designed to distinguish one project from another. Priority should be given to: 1 . Projects which are partially funded from other grants or L. I.D. ' s. 2. Projects which do not have an alternate source of funding. 3. Projects which are multi -use and meet more than one need. 4. Projects which produce revenue reduce operating expense, or reduce potential P liability. 5. Projects which are required to preserve a future project or opportunity. 6. Projects which replace or maintain an existing capital improvements as opposed to new facilities. J 7. Acquiring land which will be needed for public use in the future. 8. Visible projects which people can relate to and see that a change has been made. J �J J APPENDIX K DETAILED PROJECT PROPOSAL DESCRIPTION SHEETS BY FUNCTION Summary of Proposed Expenditures K-1 Public Safety Proposal - Police K-2,1 - Public Safety Proposal - Fire K-2,2 Public Works Proposal K-3 Parks Proposal K-4 General Government Proposal K-5 APPENDIX K-1 SUMMARY OF PROPOSED EXPENDITURES (Amounts in Thousands of 1986 Dollars) & Total 1991 86-90 1986 1987 1988 1989 1990 BEYOND PUBLIC SAFETY Police Capital Expenditures by Priority 1 . Police Computer System 140 140 2. Police Radio System 250 150 100 3. Valley Com Improvements 61 61 4. Police Satellite West Hill 170 170 5. Police Training Facility 1 ,175 1 ,175 A. Police Headquarters Facility 1 ,700 Total Police Capital Expenditures 1 ,796 1 ,526 270 1 ,700 Fire Capital Expenditures by Priority 1 . Replacement Aid Cars 146 73 73 2. Replacement Suburban Pumper 310 155 155 3. E. H. Fire Station (Benson Hwy) 1 ,640 1 ,640 4. WVH Station & Training Center 3,215 3,215 5. West Hill Fire Station 1 ,614 1 ,614 6. Fire Headquarters Station 3,025 3,025 7. Fire Computer System 150 150 400 8. Fire Communication System 558 158 9. Valley Com Improvements 17 17 10. Mobile Computer Terminals 40 40 Total Fire Capital Expenditures 10,715 9,892 195 228 400 Total Capital Expenditures 12,511 11 ,418 465 228 400 1 ,700 PUBLIC WORKS Capital Expenditures by Priority 1 . Green River Bridge S. Centrala 2,907 2,907 2. SR 515 - 196th to S.E. 256tha 8,776 2,125 6,651 3. Willis at Central 38 38 4. Upper Mill Creek 510 510 5. Garrison Creek Storage 1 ,350 1 ,350 6. North Central -James 2,304 2,304 7. Green River Levy Improvement 753 53 250 250 200 a Project is committed for 1986 funding. See detailed Public Works Priority Sheets. �J �1 (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND 8. LID 306 West Valley Drainage 10,367 3,320 7,047 9. S.E. 240th at 102nd 425 425 10. Pedestrian & Bicycle Path Imp. 1 ,297 255 210 197 455 180 926 11 . S.E. 252nd at SR 99 - Signal 120 120 12. City Shop Rem. & Gravel Strg Bin 225 150 75 - 13. Reith Road - S. 256th to 38th 222 222 14. E. Valley Hwy. S. 192nd - 180th 2,901 800 2,101 15. Garrison Creek Erosion Control 720 160 200 400 120 16. 76th Avenue S. 212th to 222nd 1 ,257 350 907 17. W. Valley Blvd. Improvement LID 3,619 3,619 18. S. 180th & W. Valley Highway Int 600 600 19. S. 180th & E. Valley Highway Int 229 229 20. S.E. 192nd New Route to EV Hwy. 7,913 7,913 21 . S. 212th & W. Valley Highway Int. 250 250 22. S.E. 240th & 104th S.E. Int. 80 80 23. S.E. 240th & 116th Intersection 138 138 24. 84th Ave. S. & SR 167 Int. Imp. 50 50 25. General Drainage Improvements 1 ,250 250 250 250 250 250 A. 196/200 New Route to EV Hwy. 10,580 B. S. 196 & WV Intersection Imp. 142 C. Kent-Des Moines Road & SR 99 116 D. S. 224th and East Valley Int 104 E. New Arterial Vicinity of 224th 6,942 Total Capital Expenditures 48,461 18,428 18,520 9,340 1 ,213 430 18,810 PARKS AND RECREATION Capital Expenditures by Priority 1 . Golf Course Expansion 900 500 400 2. Van Doren's Landing 129 129 3. Kent Commons Parking 250 250 4. Riverfront Property 350 350 5. Mill Creek Canyon Development 250 100 150 6. Lake Fenwick Park Development 250 100 150 7. Ball Field Lights 65 65 8. East Hill Neighborhood Park 500 300 200 9. S. Scenic Hill Neighborhood Park 50 50 10. Riverfront Dike Blacktop 115 75 40 11 . Uplands Park Parking Lot 30 30 12. Upper Mill Creek Canyon Park 340 290 50 13. Riverfront Parking Lot 65 65 14. Green River Restrooms 150 75 75 15. Garrison Creek Park Improvements 70 70 16. Glenn Nelson Park Expansion 500 500 17. Commons Playfield Expan./Parking 300 300 18. Performing Arts Center 3,400 3,400 (Amounts in Thousands of 1986 Dollars) Total 1991 & 86-90 1986 1987 1988 1989 1990 BEYOND 19. Russell Road Park Expansion 1 ,760 1 ,760 20. Campus Community Park 50 50 21 . S. Willis Neighborhood Park 60 60 22. Good News Bay Neighborhood Park 420 420 23. Riverfront Park Phase I 1 ,000 500 500 24. Orillia Neighborhood Park 250 250 25. Green River Frontage Trails 100 100 A. Sunnycrest Neighborhood Park 200 0 1 .B. Clark Lake Community Park ,020 C. Mill Creek Woods Green Belt 60 85 D. Westside Ponds and Wetlands E. Panther Lake Neighborhood Park 85 175 80 F. Springbrook Neighborhood Park G. T-Bridge Green Belt 80 525 50 H. S. Meridian Community Park I. Interurban N. Neighborhood Park 50 50 J. Interurban C. Neighborhood Park K. Interurban O'Brien Neighborhood 5U Total Capital Expenditures 11 ,354 1 ,649 7,375 1 ,730 600 2,995 Capital Expenditures by Priority 1 . Library 2,150 150 2,000 2. City Hall Expansion 450 150 300 3. Telecommunication System 425 85 85 85 85 85 4. Geocoding System 300 100 200 5. Computer System Expenditures 1 ,125 225 225 225 225 225 Total Capital Expenditures 4,450 460 2,560 810 310 310 GRAND TOTALS 76,776 32,485 28,920 12,108 2,523 740 23,505 'J ,J J J J City of Kent Appendix K-2.1 Capital Improvement Program Public Safety Proposal -Police (Amounts in Thousands and in 1985 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority 1 . Police Computer System 140 140 2. Police Radio System 250 150 100 * 3. Valley Com Improvements 61 61 4. Police Satellite West Hill** 170 170 5. Police/Fire Training Fac.** 1 ,175 1 ,175 Projects Planned for 1991 & Beyond A. Police Headquarters Facility 1 ,700 Total Capital Expenditures 1 ,796 1 ,526 270 1 ,700 Debt Expenditures 1984 G.O. - Jail 1 ,235 247 248 247 247 246 Total Expenditures 3,031 1 ,773 518 247 247 246 1 ,700 Dedicated Revenue to for Debt Service Federal Marshal Payments 1 ,235 247 248 247 247 246 Total Dedicated Revenue 1 ,235 247 248 247 247 246 City Funding Needed 1 ,796 1 ,526 270 _ 1 ,700 *Indicates projects has received prior funding. **Includes only Police portion of joint Police/Fire facility. I� City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 1 POLICE PROJECT TITLE: Police Computer System -------------- PROJECT DESCRIPTION ------------------- Purchase computer system including four terminals, three printers, three communication packages--$70,000. Software packages--$65,000. Training for personnel --$5,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 140 140 - Total 140 140 Capital Funds Needed 140 140 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 25 25 25 25 ------- ------- ------- ------- Total 25 25 25 25 BACKGROUND Data processing in the City is undergoing a significant change. In the long-range plan for data processing, a stand alone computer system was recommended for the requirements of the Police Department. The addition of a micro computer system would allow for timely information retrieval for street use, free flow data entry and retrieval , a cost effective management review system, and additional investigative tool designed for proactive crime analysis. FACTORS SUPPORTING PROJECT -------------------------- 1 . The Police Department could do many of their own computer functions more efficiently than going through Information Services. ALTERNATIVES TO PROJECT ----------------------- 1 . Remain with existing City system in spite of recommendation by data processing study. 2. Delay relief until 1990. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 2 POLICE PROJECT TITLE: Police Radio System -------------- PROJECT DESCRIPTION ------------------- Equip police car fleet with Mobile Data Terminals(MDT's) and a reciprocal radio system. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 250 150 100 ------- ------- ------- Total 250 150 100 Less: Dedicated Funding Sources Capital Funds Needed 250 150 100 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 15 15 2C 2C 20 ------- ------- ------- ------- ------- Total 15 15 20 20 20 BACKGROUND Based on the 1984 consultant recommendations from the Kent Police Department Communications Review, the Police Department should purchase a radio system and make the necessary adaptations for communication with Valley Com. The radio system would be designed to meet the needs of the Department through the year 2000. The MDT's would allow better and safer investigative practices, and it would greatly reduce air time thus allowing up to 100 units to operate simultaneously. This type of communication is coded at each end of the transmission thereby precluding monitoring by crime perpetrators. It will allow direct access by patrol officers to our files as well as WASCIC and NCIC. This would eliminate the need to have support personnel manually provide the function. lFACTORS SUPPORTING PROJECT -------------------------- 1 . Recommended by Preliminary communication study. � . 2. Replacement schedule for existing equipment begins in 1986. ALTERNATIVES TO PROJECT 1 ---Purchase-alternative system identified in the communication study. .1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 3 POLICE PROJECT TITLE: Valley Com Improvements -------------- PROJECT DESCRIPTION ------------------- Provide Police Department percentage of costs (22.52%) for necessary update of equipment for the Valley Communications Center. Requirements are as follows: 1 )Microwave System $70,000, PD cost - $15,764; 2) Computer Assisted Dispatching $200,000, PD cost - $45,040. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 61 61 ------- ------- Total 61 61 Capital Funds Needed 61 61 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 9 9 9 9 9 Other Operating Costs 1 1 1 1 1 ------- ------- ------- ------- ------- Total 10 10 10 10 10 BACKGROUND Valley Communications Center is the emergency dispatch center for the entire valley. Due to the growth that has occurred in the valley, emergency calls have been steadily increasing. Facility improvements are long over due. FACTORS SUPPORTING PROJECT -------------------------- 1 . The Microwave System: a) would be paid off in seven and a half years by telephone line charge savings; b) may eliminate long distance citizen calls for police, fire and emergency services if the calling site is outside of Kent; c) offers opportunities for revenue generation from other than Valley Com member entities. ALTERNATIVES TO PROJECT ----------------------- 1 . End our participation with Valley Com and set up our own communication system. City of Kent Final Priority: CAPITAL IPipROVEMENT PROJECTS Department Priority: 4 POLICE PROJECT TITLE: Police Satellite West Hill ------------- PROJECT DESCRIPTION ------------------- Construct a new 1500 square foot police satellite facility for the West Hill adjoining the recommended West Hill Fire Station. Costs listed include, land, building construction, equipment costs, landscaping, and personnel . These are only the Police Department costs of the new facility. Fire Department costs are listed separately. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 198E 1989 1990 BEYOND -----------------------------------------------/ /------- Land 150 150 Bldg. & Bldg. Imp. 20 20 Total - 170 170 Capital Funds Needed 170 170 OPERATIONAL FINANCIAL NEEDS -------------------------- Salaries & Benefits 22 22 22 Other Operating Costs 2 2 2 ------- ------- ------- Total 24 24 24 BACKGROUND With continued growth, the West Hill will need a satellite station to cover the necessary I patrol and other police services for that area. J FACTORS SUPPORTING PROJECT -------------------------- _� 1 . Resource and relief available for assigned officers. 2. The new station will provide police support services (i .e. accident reports, etc. ) to the residents of that area of the City. At this time these services are only available at the City Hall complex. ALTERNATIVES TO PROJECT --------------------- I 1 . Leave Police Department in its existing location and relocate other City departments. �J 2. Postpone construction of West Hill station until 1990. J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 5 POLICE PROJECT TITLE: Joint Police/Fire Training Facility -------------- PROJECT DESCRIPTION ------------------- Construct a 4500 square foot joint Fire/Police training facility on six acres in the Valley area. Costs below reflect only the Police portion of the total costs--50%. The remainder of the costs appear under the Fire Department's number 5 priority project. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 250 250 Bldg. & Bldg. Imp. 750 750 Other Capital Outlay 175 175 - ------- ------- Total 1 ,175 1 ,175 Less: Dedicated Funding Sources Capital Funds Needed 1 ,175 1 ,175 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 11 11 11 11 Other Operating Costs 10 10 10 lO ------ ------- ------- ------- Total 21 21 21 21 BACKGROUND Based on the overall training and physical fitness requirements for Police and Fire Department employment, a joint training facility is needed. This facility could be rented on an annual basis to neighboring cities and the Washington State Criminal Justice Commission. FACTORS SUPPORTING PROJECT -------------------------- 1 . State law requires that officers meet fitness standards. 2. City public safety departments require successful completion of training annually or semiannually. 3. The Fire and Police Department can centralize and coordinate training efforts. 4. Facility would better utilize training resources. ALTERNATIVES TO PROJECT ----------------------- 1. Construct regional facility with outside municipalities. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: A POLICE PROJECT TITLE: Police Department Facility -------------- PROJECT DESCRIPTION ------------------- Construct a new 15,000 square foot police station to be located along South Central Avenue on the same site as the new jail and Aukeen Court. CAPITAL FINANCIAL NEEDS -------------------- (Amounts in Thousands and in 198E Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 1 ,275 Bldg. & Bldg. Imp. 75 Site Improvements 350 Other Capital Outlay ------- Total 1 ,700 Capital Funds Needed --1 ,700 OPERATIONAL FINANCIAL NEEDS --------------------------- salaries & Benefits 18 Other Operating Costs ------- Total 18 BACKGROUND The City and County y are currently in the process of building a new 56-bed jail and Aukeen of the Central near 259th Street. The development Court on property located on South property will occur in two phases. Phase I will include construction of the jail and he court. Phase II will include a new 15,000 square foot City of Kent Police Station. FACTORS SUPPORTING PROJECT --------------------- 1 . The City Hall Master Plan identified the need for additional space the early 1990's. A separate facility was recommended for the Police Department. 2. Dividing the police and jail facilities is less cost effective than having all justice service related functions together on the same property. JALTERNATIVES-TO-PROJECT 1 . Remain permanently at current location and relocate other city departments into new facilities. 2. Build the facility on property adjacent to City Hall . l City of Kent Appendix K-2.2 Capital Improvement Program Public Safety Proposal -Fire (Amounts in Thousands and in 1985 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority 1 . Replacement Aid Cars 146 73 73 2. Replacement Suburban Pumpers 310 155 155 3. E.H. Fire Stat. (Benson Hwy) 1 ,640 1 ,640 4. WVH Stat & Training Center** 3,215 3,215 5. West Hill Fire Station** 1 ,614 1 ,614 6. Fire Headquarters Station 3,025 3,025 7. Fire Computer System 150 150 8. Fire Communication System 558 158 400 * 9. Valley Com Improvements 17 17 10. Mobile Computer Terminals 40 40 Total Capital Expenditures 10,715 9,892 195 228 400 Debt Expenditures 1980 voted G.O. - Fire Appr. 215 42 46 44 42 41 Total Debt Expenditures 215 42 46 44 42 41 Total Expenditures 10,930 9,934 241 272 442 41 Dedicated Revenue for Debt Service 1984 Property Tax Levy 215 42 46 44 42 41 Total Dedicated Revenue 215 42 46 44 42 41 City Funding Needed 10,715 9,892 195 228 400 *Indicates projects has received prior funding. **Includes only Police portion of joint Police/Fire facility. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 1 FIRE PROJECT TITLE: Two Replacement Aid Cars -------------- PROJECT DESCRIPTION ------------------- Purchase two aid cars with equipment $146,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEY014D -----------------------------------------------/ /------- Other Capital Outlay 146 73 73 ------- ------- ------- Total 146 73 73 Capital Funds Needed 146 73 73 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 1 1 1 1 BACKGROUND Presently the City has one aid unit; however, it is old and needs replacement. The only reserve aid car available to the City is the unit owned by King County Fire District No. 37. The City needs its own reserve unit in order to provide service in the event of a breakdown and also to enable the Fire Department to respond to multiple alarms. FACTORS SUPPORTING PROJECT -------------------------- 1 . The existing aid car has been overhauled, but it has a limited useful life as a front line piece of equipment. 2. With the increase in industry and family dwellings in our response area, we are experiencing more aid calls, thus there is a need for a new aid car and a reserve aid car. Aid cars are more efficient in responding to aid calls. ALTERNATIVES TO PROJECT ----------------------- 1 . Buy another used aid car and accept increasing maintenance cost and down time. J 2. Wait and replace front line and reserve front line aid car with all new apparatus at higher costs. J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 2 FIRE PROJECT TITLE: Replacement Suburban Pumpers -------------- PROJECT DESCRIPTION ------------------- _ Purchase two 1 ,500 gpm single stage replacement pumpers for $310,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1986 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 310 155 155 ------- ------- ------- Total 310 155 155 Capital Funds Needed 310 155 155 ------- ------- ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 1 1 1 1 BACKGROUND Pumper apparatus are old and need replacement. If replaced, the resale of these apparatus will generate revenue to the City. Consequently, the delivery time for new apparatus is twelve to eighteen months. FACTORS SUPPORTING PROJECT -------------------------- 1 . The age and design of the apparatus to be replaced makes obtaining parts quite difficult. Some parts are no longer made nor stocked. 2. The amount of use and degree of reliability needed for emergency response dictates that age, type of use, and serviceability play a critical role in the usefulness of the apparatus. 3. Two of the oldest apparatus have been repowered and stretched to their maximum front line serviceability. ALTERNATIVES TO PROJECT ----------------------- 1 . Continue to maintain existing apparatus, but face increasing maintenance cost, the unavailability of parts and higher potential for apparatus failure at an emergency. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: FIRE PROJECT TITLE: East Hill -- Paid/Volunteer Fire Station -------------- PROJECT DESCRIPTION ------------------ - Locate a new three bay fire station on East Hill and equip it with an engine. Two acres of land $108,000. A building of 15,000 square feet. CAPITAL FINANCIAL NEEDS (Amounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90. 1986 1987 1988 1989 1990 BEYOND ----------------------------------------------- / /------- Land 108 108 Bldg. & Bldg. Imp. 1 ,300 1 ,300 Site Improvements 70 70 Other Capital Outlay 162 162 ------- ------- Total 1 ,640 1 ,640 Capital Funds Needed 1 ,640 1 ,640 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 423 423 423 423 Other Operating Costs 23 23 23 23 Total 441 441 441 441 BACKGROUND The building that houses Station 74 is seriously deteriorated, does not adequately serve the Benson corridor and cannot be expanded. The Benson corridor is a high response area with a very poor response time. Therefore, a replacement station should be priority consideration. FACTORS SUPPORTING PROJECT ------------------------ 1 . The projected future growth of commercial establishments and residential units is to the East. Given increased population and traffic, a station centrally located will reduce the response time and provide an adequate level of service. ALTERNATIVES TO PROJECT 1 . Delay building, then at a later date and a much higher cost for building and land, located and build a station on the Benson corridor. 2. Build the station, but place an aid car in place of an engine in the station, thereby reducing personnel cost by $139,334. i 4 . i City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 4 FIRE PROJECT TITLE: W.H. Fire Station and Combined Police/Fire Training Center -------------- PROJECT DESCRIPTION ------------------- New fire station and training facility. Reflects only Fire Department cost. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 640 640 Bldg. & Bldg. Imp. 1 ,900 1 ,900 Site Improvements 600 600 Other Capital Outlay 75 75 Total -3,215 3,215 Less: Dedicated Funding Sources Capital Funds Needed 3,215 3,215 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 22 22 22 22 22 Other Operating Costs 20 20 20 20 20 ------- ------- ------- ------- ------- Total 42 42 42 42 42 BACKGROUND Build a station to replace Station 76 along with a joint Police/Fire Training Center.The Center could serve City training needs such as police and fire training City-wide driver training and general public training in safety and disaster planning. Some revenue may be generated under alternative 1 . Given the potential for cooperative agreements, alternative 1 should be seriously considered. FACTORS SUPPORTING PROJECT -------------------------- 1 . There is a need to build a station to replace Station 76 which is out of space and poorly located. 2. Current training facilities for both departments are very inadequate. ALTERNATIVES TO PROJECT --------------------- 1 . Regional training center for Police and Fire and a regional fire station for the Fire Department. e.g. Kent/Renton/Tukwila. 2. Regional training center for the Fire Department, e.g. Kent/Renton Tukwila. 3. Merge Fire Departments. 1 = 1 _ 1 � l _ 1 J J J .1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 5 FIRE PROJECT TITLE: West Hill Fire Station -------------- PROJECT DESCRIPTION ------------------- Replace a fire station on the West Hill with a three bay station. Two acres of land $254,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 254 254 Bldg. & Bldg. Imp. 1 ,300 1 ,300 Site Improvements 60 60 Total 1 ,614 1 ,614 Capital Funds Needed 1 ,614 1 ,614 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 134 134 134 Other Operating Costs 3 3 3 ------------------------- Total 137 137 137 BACKGROUND The fire station on West Hill is not strategically placed for current and future service and there is insufficient room for expansion. The station is limited as the the apparatus that can be housed. FACTORS SUPPORTING PROJECT -------------------------- 1 . The location of the existing station does not allow for expansion or proper parking. 2. The proposed new developments have an adverse impact on traffic flow on the West Hill . The added multidwellings have increased the need for a more centrally located station to reduce response time. 3. The current workspace is inadequate for apparatus storage. ALTERNATIVES TO PROJECT ----------------------- 1 . Delay building and then at a later date build a new station at a much higher cost. In the mean time, costly remodeling would be required to enable the station to house replacement apparatus. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 6 FIRE PROJECT TITLE: New Headquarters Station -------------- PROJECT DESCRIPTION ------------------- New headquarters station located between the railroad's right of ways. CAPITAL FINANCIAL NEEDS ----------------------- (Anounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 425 425 Bldg. & Bldg. Imp. 2,000 2,000 Site Improvements 600 600 ------- ------- Total 3,025 3,025 Capital Funds Needed 3,025 3,025 OPERATIONAL FINANCIAL NEEDS Salaries & Benefits 537 537 537 Other Operating Costs 15 15 15 ------------------------- Total 552 552 552 BACKGROU14D The Fire Department headquarters is inadequate. The present headquarters lacks adequate space for administration offices, support services (apparatus and Building Maintenance) , suppression crew activities, and storage of supplies. Vertical expansion is impossible. FACTORS SUPPORTING PROJECT -------------------------- 1 . Because of the growth of industry in the north end and the development of new east-west roads, the present location is hampered by traffic. ] 2. The present station is too small to accommodate the administrative staff, apparatus maintenance, building maintenance functions and all suppression forces. The building is incapable of horizontal or vertical expansion. ALTERNATIVES TO PROJECT I -1 . Build alarger station along the Benson corridor to handle more of the administrative J suppression and support services and remodel Station 71 to make more space. 2. Build a separate training facility and add an apparatus maintenance facility that can Joffer maintenance service to other fire departments. �J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 7 FIRE PROJECT TITLE: Fire Computer System -------------- PROJECT DESCRIPTION ------------------- A computer system to handle daily department operations. Computer will be compatible with other city functions. Computer hardware and software $150,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 150 150 ------- ------- Total 150 150 Capital Fund Needed 150 150 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The Department presently has limited access to computer services. The development of a computer system will enhance the department's ability to collect and manage information needed for everyday operations and for long-term forecasting. This includes the Building Department and fire prevention functions. FACTORS SUPPORTING PROJECT -------------------------- 1 . Police and Fire have already established a geocoding system on which we are gathering information. However, the system needs to be expanded to handle additional information and to allow for a rapid exchange and use of information in day-to-day operations as well as on the emergency ground. . 2. There is a need to free management personnel from routine and time consuming processes such as tracking the permit process, addressing, scheduling of personnel , inventory control , training and inspection records, and internal correspondence. ALTERNATIVES TO PROJECT ----------------------- 1 . Establish a regional computer system with neighboring fire department. 2. Establish a police/fire computer system. City of Kent Final Priority: CAPITAL IMPROVED=1ENT PROJECTS Department Priority: 8 FIRE PROJECT TITLE: Fire Communication System -------------- PROJECT DESCRIPTION ------------------- Maintain and enhance the communication capability of the Fire Department for emergency communications and disaster operations. Radios and support $158,000 and microwave $400,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 558 158 400 ------- ------- ------- Total 558 158 400 Capital Funds Needed 558 158 400 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 1 1 1 1 1 ------- ------- ------ ------ ------- Total 1 1 1 1 1 BACKGROUND Improvements are overdue to make the department's communication system adequate to meet future demands and to handle large scale emergencies or disasters. FACTORS SUPPORTING PROJECT -------------------------- 1 . The present radio system has limited frequencies. It is critical that we have the ability for extra frequencies to handle multiemergencies and/or disasters. 2. The need to communicate at the scene of an emergency is critical . We must be able to communicate with all units to ensure their safety. ALTERNATIVES-TO-PROJECT 1 . Continue to install a replacement system, a section at a time, with increasing cost and potential operational deficiencies. J 2. Keep present system and have inefficient dissemination and reception of emergency ground information which could delay effective operations. J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 9 FIRE PROJECT TITLE: Valley Com Improvements -------------- PROJECT DESCRIPTION ------------------- Dispatch computerization needs. Includes initial microwave and updated computer $17,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 17 17 ------- ------- Total 17 17 Less: - Dedicated Funding Sources Capital Funds Needed 17 17 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND Many improvements are overdue to prepare Valley Com for future dispatch emergency requirements, including 911 . FACTORS SUPPORTING PROJECT -------------------------- 1 . Valley Communication is the most cost effective way to provide emergency dispatch and communications. 2. The cost of telephone lines continues to climb. Microwave systems have a pay-back and future savings in the long run. 3. The number of emergency calls in the Valley Communication's service area are increasingly taxing communications. 4. There are no frequencies available to expand. ALTERNATIVES TO PROJECT ----------------------- 1 . Have each jurisdiction operate a separate dispatch service at higher costs to all . City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 10 FIRE PROJECT TITLE: Mobile Data Terminals -------------- PROJECT DESCRIPTION ------------------- Supply five command vehicles with mobile data computer capabilities. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 40 40 Total 40 40 Capital Funds Needed 40 40 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total . � BACKGROUND Mobile CRT's will allow command personnel to accurately and efficiently control incidents. Currently during an emergency, command personnel must rely on memory and/or information which may not be accurate. Often they must call Valley Communications to acquire information on available apparatus. This causes reduced quality of decision making and delayed response of needed apparatus. FACTORS SUPPORTING PROJECT -- ------ ----- ----- - 1 . --Mobile--CRT's--allow-command personnel to rapidly access information on special apparatus available including those apparatus from other jurisdictions. 2. Mobile CRT's will provide command personnel with information about a building's contents, water supply, hazardous materials or operations, entry and exit points of the building, life safety of the building, and so on. ALTERNATIVES TOPROJECT - - 1 . Continue to increase work load on Valley Communications and accept accompanying loss J of quality in decision making and delayed arrival of apparatus. 2. Place terminals in all apparatus. J J City of Kent Appendix K-3 Capital Improvement Program Public Works Proposal (Amounts in Thousands and in 1985 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority * 1 . Green River Bridge S Central 2,907 2,907 * 2. SR 515 - 196th to S.E. 256th 8,776 2,125 6,651 3. Willis at Central 38 38 4. Upper Mill Creek 510 510 5. Garrison Creek Storage 1 ,350 1 ,350 6. North Central - James 2,304 2,304 * 7. Green River Levy Improvement 753 53 250 250 200 8. LID 306 West Valley Drainage 10,367 3,320 7,047 9. S.E. 240th at 102nd 425 425 *10. Ped & Bicycle Path Imp. 1 ,297 255 210 197 455 180 926 11 . S.E. 252nd at SR 99 - Signal 120 120 12. Shop Rem. & Gravel Strg Bins 225 150 75 *13. Reith Road-S. 256th to 38th 222 222 14. E. Valley Hwy. S. 192nd-180th 2,901 800 2,101 15. Garrison Creek Erosion Control 880 160 200 400 120 16. 76th Avenue S. 212th to 222nd 1 ,257 350 907 17. W. Valley Blvd. Imp. LID 3,619 3,619 18. S. 180th & W. Valley Hwy Int. 600 600 19. S. 180th & E. Valley Hwy Int. 229 229 20. SE 192nd New Route to EV Hwy 7,913 7,913 21 . S 212th & W. Valley Hwy Int. 250 250 22. S.E. 240th & 104th S.E. Int. 80 80 23. S.E. 240th & 116th Int. 138 138 24. 84th Ave. & SR 167 Int. Imp. 50 50 25. General Drainage Imp. 1 ,250 250 250 250 250 250 Projects Planned for 1991 & Beyond A. 196/200 EV Hwy. New Route 10,580 B. S. 196 & WV Intersection Imp. 142 C. Kent-Des Moines Road & SR 99 116 D. S. 224th and E. Valley Inter. 104 E. New Arterial-Vicinity 224th 6,942 Total Capital Expenditures 48,461 18,958 18,520 9,340 1 ,213 430 18,810 Debt Expenditures 1 . 1966 Non Voted G.O. 26 26 2. 1973 Non Voted G.O. 288 57 57 59 57 58 3. 1978 Non Voted G.O. 485 98 99 95 96 97 J 4. LID 301 199 45 42 40 37 35 5. LID 300 273 61 58 55 51 48 6. LID 304 53 12 11 11 10 9 7. LID 297 - Future 294 66 62 59 55 52 8. LID 306 - Future 258 70 66 63 59 9. LID 314 10 2 2 2 2 2 10. LID 318 46 12 12 12 10 11 . LID 313 - Future 132 30 28 26 25 23 Total Debt Expenditures 2,064 397 441 425 408 393 Dedicated Revenue for Capital Exp. Grants FAUS - EVH 192nd - 180th (14) 500 500 UAB - N. Central - James (6) 1 ,590 1 $ 90 FED - Green River Bridge (1 ) 2,220 2,220 State-SR 515/196th-256th (2) 8,451 1 ,800 6,651 King County/Renton/Tukwila Green River Bridge (1 ) 327 327 S. 180th-WVH Intersection (18) 450 450 S. 180th-EVH Intersection (19) 65 65 S.E. 192nd - New Route (20) 3,000 3,000 196/200th-New Route EV Hwy (A) 2,000 New Arterial Vicinity 224th(E) 3,471 LID's N. Central - James (6) 605 605 LID 306-W Valley Drainage(8) 7,047 7,047 S.E. 240th & 102nd (9) 300 300 Pedestrian & Bike Path (10) 457 130 22 305 780 EVH/S. 192nd to 180th (14) 1 ,075 1 ,075 76th/S. 216th to 222nd (16) 561 350 211 WV Hwy Improvement (17) 3,619 3,619 Contributions LID 306 West Valley (8) 1 ,200 1 ,200 Drainage Utility 240th & 102nd (9) 125 125 Green River Levy (7) 753 53 250 250 200 Garrison Creek Erosion. (15) 880 160 200 400 120 General Drainage Imp. (25) 1 ,250 250 250 250 250 250 Upper Mill Creek (4) 510 510 Garrison Creek Storage (5) 1 ,350 1 $ 50 LID 306 W Valley Drain. (8) 2,120 2,120 Utility Funds (1 ) (6) 0 2) 259 259 Total Ded. Rev. for Cap. Exp. 37,514 15,768 16,699 3,922 875 250 6,251 Total Dedicated Revenue 37,514 15,768 16,699 3,922 875 250 6,251 City Funded Needed 13,011 3,587 2,262 5,843 746 573 12,559 *Indicates project has received prior funding City of Kenn Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 1 PUBLIC WORKS PROJECT TITLE: Green River Bridge South Central -------------- PROJECT DESCRIPTION ------------------- Widen functionally deficient bridge to four lanes including installing City water thereon to service property south of river. To date, $443,000 has been spent on this project. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 2,907 2,907 Total 2,907 2,907 Less: Dedicated Funding Sources Water Utility 75 75 County 327 327 Federal Grant 2,220 2,220 Capital Funds Needed 285 285 OPERATIONAL FINANCIAL NEEDS None identified ---------------------------- BACKGROUND The Federal Government will pay for 80 percent of this project. The City and the County will share equally the 20 percent match. JFACTORS SUPPORTING PROJECT -------------------------- 1 : The City needs only to pay for 10 percent of the project. J 2. The four lanes on the bridge will allow the four lanes on the rest of the road to be fully utilized. ALTERNATIVES TO PROJECT ----------------------- 1 . Continue to inspect the bridge and request maintenance by the County. I 2. The two lane bridge will be a bottleneck as traffic volumes increase. �J :.J .1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 2 PUBLIC WORKS PROJECT TITLE: SR 515-196th to S.E. 256th - -------------- PROJECT DESCRIPTION ------------------- Widen existing two lane arterial to five lanes. State project. This is an ongoing project. To date, $175,000 has been spent. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 2,125 2,125 Other Capital Outlay 6,651 6,651 ------- ------- ------- Total 8,776 2,125 6,651 Less: Dedicated Funding Sources State Grant 8,451 1 ,800 6,651 Capital Funds Needed 325 325 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The Benson Highway is a major north-south arterial but it only has two lanes. Future traffic demand will require five lanes of capacity. Most of the construction funds will come from the State. FACTORS SUPPORTING PROJECT -------------------------- 1 . Project is needed to serve planned land use. 2. State is funded to construct SR 515 252nd Street, 242nd Street in 1986 and 236th Place - 196th Street in 1987. ALTERNATIVES TO PROJECT ----------------------- 1 . Construct additional new north-south arterial . 2. Do nothing. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 3 PUBLIC WORKS PROJECT TITLE: Willis Street at Central Avenue -------------- PROJECT DESCRIPTION ------------------- Add a turn lane, grading, draining, paving, curb and gutter, sidewalk channelization and signing. The land needed for this project was acquired in 1984. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 38 38 Total 38 38 Capital Funds Needed 38 38 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND SR 516 is now completed. As a result, increased traffic is being funneled into the Willis Street portion of SR 516. Much of this traffic turns on Central on its way to the East Hill . The Kent Transportation Study, developed by Wilsey and Ham, correctly indicated the need for an additional eastbound lane. FACTORS SUPPORTING PROJECT -------------------------- 1 . With this improvement, the traffic level of service will be maintained at "C" even with the additional traffic generated by the new SR 516 extension. ALTERNATIVES TO PROJECT ----------------------- I 1 . Plan for a more direct connection to SR 516/Canyon Drive. This alternative would �J have been feasible eariler, but downtown development has made it impossible. J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 4 PUBLIC WORKS PROJECT TITLE: Upper Mill Creek Detention Basin -------------- PROJECT DESCRIPTION ------------------- Acquire two outstanding parcels plus expand the existing storage capacity from 12 acre-foot to 60 acre foot. The land for this project was already acquired for $65,000. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land Site Improvements 510 510 ------- ------- _ Total 510 510 Less: Dedicated Funding Sources Drainage Utility 510 510 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS --------------------------- BACKGROUND The storm water detention basin was completed in the fall of 1978. However, two outstanding parcels have been in condemnation with easements to be eventually purchased. Funding to purchase these parcels was received in 1984. The Drainage Utility Master Plan identifies this as the least cost alternative to minimizing the flooding along Mill Creek between Smith Street and SR 167. FACTORS SUPPORTING PROJECT -------------------------- 1 . The easements will give the City the necessary rights to use the property in question as a storm water detention facility. The additional storage capacity will reduce down stream flooding thereby reducing City liability associated with flood damage. ALTERNATIVES TO PROJECT ----------------------- Reconstruct the Mill Creek channel from Smith Street to SR 167 (estimated at over $1 ,500,000). City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 5 PUBLIC WORKS PROJECT TITLE: Garrison Creek Storage -------------- PROJECT DESCRIPTION ------------------- Construct 100 acre-feet storm water facility on Garrison Creek west of SR 167. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 530 530 Site Improvements 820 820 Total 1 ,350 1 ,350 Less: Dedicated Funding Sources Drainage Utility 1 ,350 1 ,350 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The City's blaster Drainage Plan reflects significant flow restrictions within the existing Garrison/Springbrook Creek channel from 212th to 180th Street. Such restrictions will result in major flooding of the adjacent industrial developments. FACTORS SUPPORTING PROJECT -------------------------- 1 . Represents the lowest cost method for reducing the flooding in Springbrook Creek. 2. Will result in decreased peak flows downstream. 3. Disruption of Springbrook Creek and effect of fish will be minimized. 4. Locally implementible, not dependent on outside agencies. i ALTERNATIVES TO PROJECT ----------------------- 1 . Reconstruct 5000 linear feet of the Garrison/Springbrook channel estimated at $2,000,000. I r City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 6 PUBLIC WORKS PROJECT TITLE: North Central-James -------------- PROJECT DESCRIPTION ------------------- Add two way left lane, drainage, paving, sidewalks, landscaping. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 506 506 Site Improvements 1 ,798 1 ,798 ------- ------- Total 2,304 2,304 Less: Dedicated Funding Sources UAB 1 ,590 1 ,590 LID 605 605 Water Utility 109 109 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND North Central Avenue from James to 224th serves many businesses which are dependant on convenient vehicle access. The volume of through traffic on Central makes left turns off Central difficult. 'This is reflected in the number of rear-end collisions which involve a left turning vehicle. A two way left turn lane would provide safe storage for left turning vehicles and would increase the capacity for through traffic. The Washington State Department of Transportation has constructed a turn signal on Central from 224th to 228th. FACTORS SUPPORTING PROJECT -------------------------- 1 . UAB has presently approved funding of this project. 2. The City has accepted the grant. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 7 PUBLIC WORKS PROJECT TITLE: Green River Levee Improvements -------------- PROJECT DESCRIPTION ------------------- Raise height of levee along Green River to eliminate over topping during high river flows. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 753 53 250 250 200 ------- ------- ------- ------- ------- Total 753 53 250 250 200 Less: Dedicated Funding Sources Drainage Utility 753 53 250 250 200 Capital Funds Needed 0 0 0 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The Army Corp of Engineers Green River flood study showed a need to improve approximately one mile of existing levee and construct approximately a half mile of new levee. Total estimated damage form one flood occurrence is $377 million. Building elev River flooding would make continued development impractical . FACTORS SUPPORTING PROJECT - 1 . With this improvement, catastrophic damages due to Green River flooding would be eliminated. 2. FEMA's flood plain study would not significantly change upon future updating, thereby enabling development to continue. 3. City's potential liability exposure would be minimized. ALTERNATIVES TO PROJECT ----------------------- J1 . Do nothing and increase the City's insurance coverage. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 8 PUBLIC WORKS PROJECT TITLE: LID 306 West Valley Drainage -------------- PROJECT DESCRIPTION ------------------- Construction of a 400 acre-feet storage facility in vicinity of the City's abandoned sewage lagoon and 12,000 lineal feet of drainage channel . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 10,367 3,320 7,047 ------- ------- ------- Total 10,367 3,320 7,047 Less: Dedicated Funding Sources LID 7,047 7,047 Drainage Utility 2,120 2,120 City Property Land Contribution 1 ,200 1 ,200 Capital Funds Needed 0 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The valley studies identified the improvements necessary to solve the drainage problems of the area bounded by the Green River, West Valley Highway and S. 212th Street. Major property owners are highly interested in forming an LID to implement the improvements. The Drainage Master Plan, however, depicts that a portion of the improvements, namely the 300 acre-feet storage pond, has regional significance. Approximately 50 percent of the storage facility's capacity has regional implications. FACTORS SUPPORTING PROJECT -------------------------- 1 . City presently owns much of the land involved. 2. Affected property owners are very much interested in forming a participatory LID. ALTERNATIVES TO PROJECT ----------------------- 1 . Reconstruct Mill Creek channel from Puget Power right of way and 220th block to 180th Street, approximately $9 - $10 million. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 9 PUBLIC WORKS PROJECT TITLE: S.E. 240th at 102nd S.E. -------------- PROJECT DESCRIPTION ------------------ Add a turn lane, improve 102nd with grading, draining, paving, curb and gutter, sidewalks, signing, possible signalization, potential LID CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 425 425 Total 425 425 Less: Dedicated Funding Sources LID 300 300 Utility Drainage 125 125 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND A property owner requested an LID be formed for the widening of James Street from 100th to 104th and installation of traffic signal at 102nd. Due to lack of support from other property owners, the request was not pursued. In 1981 , a developer attempting to short plat other property in the vicinity, requested an LID. At that time, property valuation _ was insufficient to support the LID. There is a definite need for the improvement to facilitate a smoother movement of traffic through the area. JFACTORS-SUPPORTING-PROJECT 1 . Property owners are interested in the improvement and would possibly be supportive of an LID. 2. Access to adjacent commercial properties could be consolidated at a single point. ALTERNATIVES TO PROJECT J1 . Prohibit area development which would create the need for the project. J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 10 PUBLIC WORKS PROJECT TITLE: Pedestrian and Bicycle Path Improvements -------------- PROJECT DESCRIPTION ------------------- Construction of improved walkways, crossings, and some bicycle paths in various locations identified on the attached sheet. These projects are high priority needs in the City-wide Transportation Plan. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 1 ,297 255 210 197 455 180 926 ------- ------- ------- ------- ------- ------- ------- - Total 1 ,297 255 210 197 455 180 926 Less: Dedicated Funding Sources LID 457 130 22 305 780 Capital Funds Needed 840 125 210 175 150 180 146 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Wilsly & Ham has recommended a series of improvements for pedestrians and bicyclists. Many of the projects are related to student safety. New developments are required to provide the necessary facilities but most established neighborhoods lack such improvements. FACTORS SUPPORTING PROJECT -------------------------- 1 . Increased safety for school , children and other pedestrians and bicyclists. ALTERNATIVES TO PROJECT ----------------------- 1 . Do nothing. As traffic increases, citizen complaints and potential for injury will also increase. Pedestrian Improvements 1 . Canyon Drive (SR 516) : Alvord Street to 101st Street. $730,000 Sidewalk and widened outside lane on Southeast side. 2. 104th Avenue S.E. : 262nd to 264th Street Sidewalk on East 22,000 side six foot paved shoulder on West side. 3. 116th Avenue: S.E. 240th Street to S.E. 234th-six foot paved 25,000 shoulder on West side. 4. Reiten Road/Maple Street/99th Avenue/S.E. 267th Street: 231 ,000 Kensington Avenue to City Limits-sidewalk on Northeast side-five foot paved shoulder on Southeast side. 5. South 212th Street: EVH to Green River sidewalks both sides. 305,000 6. US 99: SR 516 to South 252nd Street sidewalks both sides 780,000 including curb and drainage. 7. SR 181 (Washington Avenue) : Green River to James Street- 130,000 Sidewalks both sides. --------- TOTAL $2,223,000 . 1 _ 1 _ l J J . J J .1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 11 PUBLIC WORKS PROJECT TITLE: S.E. 252nd Street at SR 99-Signal -------------- PROJECT DESCRIPTION ------------------- Span wire signal installation with controller, illumination, detection installation. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 120 120 --- -- Total 120 120 Capital Funds Needed 120 120 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND S.E. 252nd serves a substantial amount of traffic from the residential areas in southwest Kent. The signal is close to being warranted by traffic conditions. It is expected that it will be warranted by 1985. We are conferring with the State in hopes that they will assume responsibility for traffic signals along the entire length of SR 99. FACTORS SUPPORTING PROJECT ------------------------- 1 . Congestion and collisions are accumulating to the point where it would be worthwhile to install a traffic signal .. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 12 PUBLIC WORKS PROJECT TITLE: City Shop Remodel -------------- PROJECT DESCRIPTION ------------------- Expand City equipment storage shed row and construct storage bins. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Bldg. & Bldg. Imp. 225 150 75 Total 225 150 75 Less: Dedicated Funding Sources Utilities 75 75 Capital Funds Needed 150 75 75 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Existing shed rows do not provide enough space to store City equipment. As such, many of the more expensive pieces of equipment stay out in the weather all year round. This is hard on the equipment and leads to early replacement. Also, the City has no storage bins for its sand and rock. These materials are just stacked in piles which results in significant waste to both the material and manpower time associated with loading it on trucks. FACTORS SUPPORTING PROJECT -------------------------- 1 . Utilities would pay half the cost of the shed rows. 2. Extend equipment's useful life. 3. Save material and manpower. J ALTERNATIVES TO PROJECT None identified ----------------------- �J J ..1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 13 PUBLIC WORKS PROJECT TITLE: Reith Road - South to 38th South -------------- PROJECT DESCRIPTION ------------------- Reconstruct curve, add left turn lane, bike path, pedestrian shoulder, grading, draining paving, channelization, lighting, and bikeway. In 1985, $150,000 was spent on this project. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 222 222 Total ----222 ----222 Capital Funds Needed 222 222 OPERATIONAL FINANCIAL NEEDS BACKGROUND Reith Road is designated as a collector arterial and is the main connection from the West Hill area to the Kent Valley. The existing road has an oil mat surface and does not meet modern design standards for a road of such significance. In addition, the new West Hill Park is expected to draw traffic to this area. FACTORS SUPPORTING PROJECT -------------------------- 1 . The existing road is not suited for handling greater amounts of traffic safely. 2. This improvement will safely and effectively serve the transportation needs of the West Hill community for years. The West Hill Park will have safe and convenient access. ALTERNATIVES TO PROJECT ----------------------- 1 . Reconstruct Reith Road as a four-lane arterial connecting the new road North of South 253rd Street and the widened road West of Military Road. City of Kent Final Priority: CAPITAL IMPROVEMENT.PROJECTS Department Priority: 14 PUBLIC WORKS PROJECT TITLE: East Valley Highway: S. 192nd - S. 180th Street PROJECT DESCRIPTION ------------------- Complete five lane section, drainage, paving, sidewalks, curb and gutter, lighting, landscaping, underground utilities, and bridge. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 400 400 Site Improvements 2,501 800 1 ,701 ------- ------- ------- Total 2,901 800 2,101 Less: Dedicated Funding Sources LID 1 ,075 1 ,075 FAUS 500 500 Capital Funds Needed 1 ,326 800 526 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The-East--Highway used to be designated State Route 1679 and is one of the primary north-south arterials in Kent. Most of the route has been widened to four or five lanes from its original two-lane width -- the most recent widening was from S. 212th Street to S. 192nd Street, immediately South of this proposed project. That section was completed in 1980. FACTORS-SUPPORTING-PROJECT 1 . Continued industrial development North of S. 200th Street will increase traffic volumes on the East Valley Highway. 2. The private railroad crossing North of 190th Street is poorly maintained. Constant attention is required to maintain the surface in an acceptable condition. ALTERNATIVES TO PROJECT ----------------------- 1 . Reconstruct the railroad crossing to match the existing roadway, which would remain as is. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 15 PUBLIC WORKS PROJECT TITLE: Garrison Creek Erosion Control -------------- PROJECT DESCRIPTION ------------------- Construction of 24 acre-feet storage facility in vicinity of 98th Ave. South and S.E. 232nd Street and a six acre-feet storage facility in the vicinity of S.E. 220th and 102nd S.E. . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 160 160 Bldg. & Bldg. Imp. 720 200 400 120 ------- ------- ------- ------- ------- Total 880 160 200 400 120 Less: Dedicated Funding Sources Drainage Utility 880 160 200 400 120 Capital Funds Needed _ 0 0 0 0 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Severe erosion is presently occurring in the canyons. As such, salmon spawning and rearing are being disrupted and/or destroyed. Also the sediments being deposited in the valley channels reduces their respective carrying capacity. FACTORS SUPPORTING PROJECT -------------------------- 1 . Peak flows and associated flooding in Springbrook Creek on the valley floor would be reduced. 2. Only limited disruption of the existing channel including fish habitat would occur. ALTERNATIVES TO PROJECT ----------------------- 1 . Do nothing. 2. Reconstruct the canyon channel in an erosion-proof manner. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 16 PUBLIC WORKS PROJECT TITLE: 76th Avenue South 212th to South 222nd -------------- PROJECT DESCRIPTION ------------------- New construction, grading, draining, paving, curb and gutter, sidewalks, street lights, signing, and street trees. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 1 ,257 350 907 ------- ------- ------- Total 1 ,257 350 907 Less: Dedicated Funding Sources LID 561 350 211 Capital Funds Needed 696 0 696 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND 76th Avenue is completed from approximately 222nd Street to 228th Street. This project would complete the street to 212th. Some of the traffic load would be taken off the West Valley Highway. FACTORS SUPPORTING PROJECT -------------------------- 1 . 76th is now a 1/2 mile long dead end street. 2. 76th Avenue is an oil mat street which is in an extremely deteriorated state due to � the heavy truck traffic. 3. As the area develops, routes other than the West and East Valley Highways will be necessary to adequately serve new businesses. ALTERNATIVES TO PROJECT ----------------------- 1 . Structurally rebuild the exiting two lanes at a significant City expense to adequately support the truck loads. 2. Construct parallel route linking 212th to 228th. City of Kent Final Priority: PUBLIC WORKS CAPITAL IMPROVEMENT PROJECTS Department Priority: 17 PROJECT TITLE: West Valley Highway Improvement: Meeker Street - 180th Street - PROJECT DESCRIPTION ------------------- Complete with drainage, curb and gutter, sidewalks, lighting, landscaping, underground utilities, etc. . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 3,500 3,500 Other Capital Outlay 119 119 ------- ------- Total 3,619 3,619 Less: Dedicated Funding Sources LID 3,619 3,619 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND West Valley Highway, designated State Route 181 , is one of the primary north-south arterials in Kent. Most of it is four lane highway with two to four feet wide paved shoulder. At key intersections it's been widened for a left turn pocket. Limited sections of the highway have adequate street lighting, but the bulk of it does not. The drainage system consists of some piped sections, but the majority is an open ditch system. The State plans to resurface the entire route in 1985. FACTORS SUPPORTING PROJECT -------------------------- 1 . Industrial development has extensively occurred along the frontage of the highway. As a consequence, some property owners have expressed an interest in the project. 2. With the State proposing to pay for the resurfacing, the cost to fully upgrade the street would never be cheaper. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 18 PUBLIC WORKS PROJECT TITLE: South 180th and West Valley Highway Intersection .Improvements -------------- PROJECT DESCRIPTION ------------------- Upgrading the intersection to provide two additional turn lanes on the north and south legs and to provide an additional turn lane on the east and west legs. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 600 600 Total 600 600 Less: Dedicated Funding Sources Proposed Renton and Tukwila 450 450 Capital Funds Needed 150 150 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND This is an intersection of two important arterials, so heavy turn movements can be expected. All the turn lanes are needed now. _J FACTORS SUPPORTINGPROJECT - - 1 . Additional traffic-carrying capacity added at low relative cost. ALTERNATIVES TOPROJECT None identified - - J J �1 J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 19 PUBLIC WORKS PROJECT TITLE: South 180th and East Valley Highway Intersection Improvements -------------- PROJECT DESCRIPTION ------------------- Additional turn lanes will be constructed. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 229 229 ---- Total 229 229 Less: Dedicated Funding Sources Renton Participation 65 65 Capital Funds Needed 164 164 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND This is an intersection of two important arterials so heavy turn movements can be expected. All the turn lanes are needed now. FACTORS SUPPORTING PROJECT -------------------------- 1 . Additional traffic-carrying capacity added at low relative cost. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 20 PUBLIC WORKS PROJECT TITLE: S.E. 192nd/196th New Route SR 515 to East Valley Highway -------------- PROJECT DESCRIPTION ------------------- Construction of five lane roadway from SR 515 to East Valley Highway CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 1 ,920 1 ,920 Site Improvements 5,993 5,993 Total 7,913 7,913 Less: Dedicated Funding Sources Proposed King County and Renton Participation 3,000 3,000 Capital Funds Needed 49913 4,913 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Traffic generation from planned land use will exceed the capacity of existing east-west roads. FACTORS SUPPORTING PROJECT -------------------------- 1 . Existing roads cannot be feasibly improved to the extent necessary to serve planned I land use. �J ALTERNATIVES TO PROJECT ----------------------- 1 . Widen 180th & 208th to six lanes and improve intersections accordingly. 2. Do nothing--allow congestion and collisions to increase to unacceptable levels. 3. Change land use to types which generate less traffic. �.1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 21 PUBLIC WORKS PROJECT TITLE: South 212th and West Valley Intersection Improvements -------------- PROJECT DESCRIPTION ------------------- Provide double left turn lanes and right turn lanes on the north and south legs of West Valley Highway. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEY014D -----------------------------------------------/ /------- Site Improvements 250 250 Total 250 250 Capital Funds Needed 250 250 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Backups from the existing left turn lanes regularly measure 1/2 mile. As industrial development continues in the valley, traffic demand will increase. FACTORS SUPPORTING PROJECT -------------------------- 1 . Congestion at existing turn lanes is heavy, particularly during peak hours. 2. The intersection is an important one for continued industrial development. ALTERNATIVES TO PROJECT ----------------------- 1 . Do nothing and accept higher levels of congestion and collisions. This may influence new businesses to locate elsewhere. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 22 PUBLIC WORKS PROJECT TITLE: S.E. 240th and 104th S.E. Intersection Improvements -------------- PROJECT DESCRIPTION ------------------- Construct right turn lanes on the east and west legs of S. E. 240th at 104th S.E. . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 80 80 Total 80 80 Capital Funds Needed 80 80 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND ---------- S.E. 240th is one of the few east-west arterials extending from the East Hill to the Valley. 104th S.E. is a primary north-south arterial on the East Hill . As traffic increases and the Benson Highway is widened in unincorporated King County, there will be more traffic turning onto the Benson Highway. FACTORS SUPPORTING PROJECT -------------------------- 1 . Additional capacity provided at relatively low cost. ALTERNATIVES TO PROJECT None identified ----------------------- J J J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 23 PUBLIC WORKS PROJECT TITLE: S.E. 240th and 116 S.E. Intersection Improvement -------------- PROJECT DESCRIPTION ------------------- Upgrade signalization and construct additional turn lanes at 240th and 116th. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 138 138 ---- ---- Total 138 138 Capital Funds Needed 138 138 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Intersection is signalized now, but there are no turn lanes. As traffic demand increases, left turn storage lanes and exclusive left turn signal phases will be required. FACTORS SUPPORTING PROJECT -------------------------- 1 . Collisions will be reduced. 2. Intersection capacity will be increased. ALTERNATIVES TO PROJECT ----------------------- 1 . Prohibiting left turns will move this problem to another intersection. 2. Doing nothing will increase the collision rate due to the mix of turning traffic and heavy straight-through traffic. In addition, left turns will create a bottleneck. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 24 PUBLIC WORKS PROJECT TITLE: 84th South and SR 167 Intersection Improvement -------------- PROJECT DESCRIPTION ------------------- Construct additional lane on the southbound off ramp. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 50 Total 50 50 Capital Funds Needed 50 50 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND If a 224th connection is built from the Valley to the East Hill , the SR 167/84th Avenue interchange will have to be upgraded. State participation is likely. The future layout will be two left turn lanes plus a right turn lane. FACTORS SUPPORTING PROJECT -------------------------- 1 . Traffic congestion will cause backups onto the freeway. ALTERNATIVES TO PROJECT ----------------------- 1 . Provide more capacity at another interchange. 2. Do nothing and accept the high potential for collision due to stopped cars on the freeway. J J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 25 PUBLIC WORKS PROJECT TITLE: General Storm Drainage Improvements -------------- PROJECT DESCRIPTION ------------------- Construction of drainage facilities to resolve drainage problems in various locations throughout the City. These improvements are identified in the Storm Drainage Master Plan. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 1 ,250 250 250 250 250 250 ------- ------- ------- ------- ------- ------- Total 1 ,250 250 250 250 250 250 Less: Dedicated Funding Sources Drainage Utility 1 ,250 250 250 250 250 250 Capital Funds Needed 0 0 0 0 0 0 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND The Drainage Master Plan identified many localized problems such as flooding of streets and/or private property, erosion at specific outfalls, and totally deteriorated or undersized systems or no system at all . All of these problems should be addressed in the context of the total drainage system. FACTORS SUPPORTING PROJECT -------------------------- 1 . Extend the life of existing road bed and pavements. 2. Allow effective street maintenance to occur. 3. Reduce the potential for personal injury. 4. Reduce the potential for property damage. 5. Improve the environment. 6. The drainage utility is anticipated to be operational in 1985 for which the responsibility for these projects would fall under its jurisdiction. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: A PUBLIC WORKS PROJECT TITLE: S 196/200th-East Valley Highway to Orillia - New Route -------------- PROJECT DESCRIPTION ------------------- Construction of a five lane roadway with bridge over railroad tracks and river. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- 1 ,740 Bldg. & Bldg. Imp. Site Improvements 8,840 Total 10,580 Less: Dedicated Funding Sources County Participation 2,000 Capital Funds Needed 8,580 OPERATIONAL FINANCIAL NEEDS --------------------------- BACKGP.OUND As vacant land develops, traffic generated will exceed the capacity of the existing roads to carry it. This project would provide a high capacity link from East Valley Highway to Orillia Road passing over all the railroads in the area. Another link from East Valley Highway to Benson Highway is required for best efficiency. FACTORS SUPPORTING PROJECT -------------------------- 1 . More east-west street capacity is needed to serve planned land use. 2. This would be the only east-west street in Kent which would not be blocked when trains pass through the area. ALTERNATIVES TO PROJECT ----------------------- 1 . Widen adjacent arterials (S. 180th & S. 212th) to six lanes. I 2. Provide overpasses over the Burlington Northern & Union Pacific tracks on 180th & �-1 212th. 3. Reduce demand by scaling down planned land use. J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: B PUBLIC WORKS PROJECT TITLE: South 196th and West Valley Intersection Improvements -------------- PROJECT DESCRIPTION ------------------- Construction of two additional turn lanes on 196th and upgrade of existing signal . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 142 Total 142 Capital Funds Needed 142 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND This project would beef up the intersection in conjunction with the new east-west arterial project (192nd/196th). FACTORS SUPPORTING PROJECT -------------------------- 1 . Provides extra capacity through the intersection for new east-west route. ALTERNATIVES TO PROJECT ----------------------- 1 . If new arterial is not built, similar improvements would be needed at intersections on existing east-west arterials. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: C PUBLIC WORKS PROJECT TITLE: Kent-Des Moines Road and SR Intersection -------------- PROJECT DESCRIPTION ------------------- Construction of an additional westbound lane on west leg of Kent-Des Moines Road. CAPITAL FINANCIAL NEEDS (Amounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements ----116 Total 116 Capital Funds Needed ----116 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND Additional traffic demand on the SR 99 - SR 516 intersection will require improvements on both the east and west legs of the intersection. The east leg is under the ar tment of Transportation. the State De P jurisdiction of p FACTORS SUPPORTING PROJECT -------------------------- 1 . Increased traffic carrying capacity. ALTERNATIVES TO PROJECT 1 . Build a new east-west route elsewhere. 2. Accept higher levels of congestion and accidents. J J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: D PUBLIC WORKS PROJECT TITLE: SR 224th and East Valley Intersection -------------- PROJECT DESCRIPTION ------------------- Upgrade signalization at intersection. Construct northbound right turn lane, eastbound left turn lane and westbound left and right turn lanes and two through lanes. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land Site Improvements 104 Total 104 Capital Funds Needed 104 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- BACKGROUND This intersection is where the proposed 224th arterial would connect with the East Valley Highway. FACTORS SUPPORTING PROJECT -------------------------- 1 . Developing vacant land on the East Hill will create the need for more capacity. This improvement will provide access to planned land use. ALTERNATIVES TO PROJECT ----------------------- 1 . Not needed if 224th arterial not built, but James and 208th would have to be widened to six lanes along with accompanying intersection improvements. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: E PUBLIC WORKS PROJECT TITLE: Middle Road (New Arterial 224th vicinity) -------------- PROJECT DESCRIPTION ------------------- Construct five lane roadway from SR 515 to East Valley Road with northbound on ramp. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- 2,090 Site Improvements --4,852 Total 6,942 Less: Dedicated Funding Sources County Participation 3,471 Capital Funds Needed --3,471 OPERATIONAL FINANCIAL NEEDS None identified --------------------------- J BACKGROUND Traffic generation from planned land use will exceed the capacity of existing east-west roads. FACTORS SUPPORTING PROJECT .� 1 . Existing roads cannot be feasibly improved to the extent necessary to serve planned land use. ALTERNATIVES-TO-PROJECT 1 . Widen 208th and James (240th) to six lanes and improve intersections accordingly. 2. Do nothing--allow congestion and collisions to increase to unacceptable levels. 3. Change land use to type which generate less traffic. J J J City of Kent Appendix K-4 Capital Improvement Program Parks Proposal (Amounts in Thousands and in 1985 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority * 1 . Golf Course Expansion 900 500 400 * 2. Van Doren's Landing 129 129 3. Kent Commons Parking 250 250 * 4. Riverfront Property 350 350 * 5. Mill Creek Canyon Development 250 100 150 6. Lake Fenwick Park Development 250 100 150 * 7. Ball Field Lights 65 65 8. East Hill Neighborhood Park 500 300 200 9. S. Scenic Hill Neighbor. Park 50 50 10. Riverfront Dike Blacktop 115 75 40 11 . Uplands Park Parking Lot 30 30 12. Upper Mill Creek Canyon Park 340 290 50 13. Riverfront Parking Lot 65 65 14. Green River Restrooms 150 75 75 15. Garrison Creek Park Imp. 70 70 16. Glenn Nelson Park Expansion 500 500 17. Commons Playfield Expan&Park 300 300 18. Performing Arts Center 3,400 3,400 19. Russell Road Park Expansion 1 ,760 1 ,760 20. Campus Community Park 50 50 21 . S Willis Neighborhood Park 60 60 22. Good News Bay Neigh. Park 420 420 23. Riverfront Park Phase I 1 ,000 500 500 24. Orillia District Park 250 250 25. Green River Frontage Trails 100 100 Planned for 1991 & Beyond A. Sunnycrest Neighborhood Park 260 B. Clark Lake Community Park 1 ,000 C. Mill Creek Woods Green Belt 120 D. Westside Ponds and Wetlands 600 E. Panther Lake Neigh. Park 85 F. Springbrook Neighborhood Park 175 G. T-Bridge Green Belt 80 H. S. Meridian Community Park 525 I. Interurban N. Dist. Park 50 J. Interurban C. Dist. Park 50 K. Interurban O'Briend Dist. 50 JTotal Capital Expenditures 11 ,354 1 ,649 7,375 1 ,730 600 2,995 �l Debt Expenditures 1 . 78 G.O. Korry Field 177 36 36 35 35 35 3. Des Moines LID 2 1 1 4. Old Senior Center 25 5 5 5 5 5 5. 1981 Golf Course G.O. 1 ,189 241 239 237 235 237 6. 1984 Golf Course G.O. 1 ,062 213 213 212 212 212 7. 1984 Senior Center G.O. 2,606 522 523 521 521 519 Total Debt Expenditures 5,061 1 ,018 1 ,017 1 ,010 1 ,008 1 ,008 Dedicated Revenue for Debt Service Golf Course Phase I 470 94 94 94 94 94 Golf Course Phase II 360 90 90 90 90 Total Ded. Rev. for Debt Service 830 94 184 184 184 184 Dedicated Revenue for Capital Exp. IAC Grants East Hill (8) 100 100 Orillia (24) 125 125 Clark Community Park (B) 150 South Meridian Community Park 200 Donations Upper Mill Creek (12) 130 130 Good News Bay (22) 420 420 Westside Ponds & Wetlands (D) 500 King County Participation Springbrook Neigh. Park (F) 75 Total Ded. Rev. for Cap. Exp. 775 130 100 545 925 Total Dedicated Revenue 1 ,605 224 284 729 184 184 925 City Funding Needed 14,810 2,443 8,108 2,011 1 ,424 824 2,070 *Indicates project has received prior funding. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 1 PARKS PROJECT TITLE: Golf Course Expansion -------------- PROJECT DESCRIPTION ------------------- Acquire additional land to build an eighteen-hole executive course and expand the athletic field at Russell Road Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 500 500 Site Improvements 400 400 Total 900 500 400 Less: Dedicated Funding Sources Capital Funds Needed 900 500 400 OPERATIONAL FINANCIAL NEEDS --------------------------- Revenue Generated Over Expend. 90 90 90 90 BACKGROUND The-nine-hole, par 3 municipal golf course has proven to be extremely successful . A study has shown that expanding the nine-hole to an eighteen-hole executive course would prove to be equally successful . FACTORS SUPPORTING PROJECT -------------------------- I 1 . Forty-two acres has already been purchased for the project. �J 2. There is no other eighteen-hole public course in the Kent area. 3. The project would generate revenue. .J ALTERNATIVES TO PROJECT None identified ----------------------- J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 2 PARKS PROJECT TITLE: Van Doren's Landing Restroom/Picnic Shelter -------------- PROJECT DESCRIPTION ------------------- Complete the development of Van Doren's Landing Park by adding restrooms and picnic shelter. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 129 129 ------- ------- Total 129 129 Less: Dedicated Funding Sources Capital Funds Needed 129 129 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 3 3 3 3 3 Other Operating Costs 1 1 1 1 1 ------- ------- ------- ------- ------- Total 4 4 4 4 4 BACKGROUND State Park acquired this park property which was turned over to the City of Kent for development and maintenance. The City contributed $29,000 of King County Forward Thrust funds towards the project, and the property owner donated $30,000. A 50% IAC grant was received to provide $222,000 worth of development in 1985. FACTORS SUPPORTING PROJECT -------------------------- 1 . Supported in the Park and Recreation Comprehensive Plan which shows a need for 60 additional acres of riverfront property by 1987. 2. The Parks Department has received a $111 ,000 grant to develop this site. The grant was not adequate to include restroom and covered picnic shelters. ALTERNATIVES TO PROJECT None identified ----------------------- ,1 r City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 3 PARKS PROJECT TITLE: Kent Commons Parking -------------- PROJECT DESCRIPTION ------------------- Acquire land behind Kent Commons for parking. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 250 250 Total 250 250 Capital Funds Needed 250 250 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 1 1 1 1 BACKGROUND The Kent Commons is losing money because it does not have adequate parking to attract the large event. FACTORS SUPPORTING PROJECT -------------------------- 1 . Presently, the facility is losing revenue. 2. An expanded parking lot will serve the public better. ALTERNATIVES TO PROJECT None identified J ----------------------- J J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 4 PARKS PROJECT TITLE: Riverfront Property -------------- PROJECT DESCRIPTION ------------------- Acquire two parcels of property totaling approximately 12-1/2 acres adjacent to the Green River. These two parcels will complete the land acquisition needed to complete Riverfront Park and allow the Golf Course to be expanded to 18 holes. To date, $150,000 has been spent on this project. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 350 350 ------- ------- Total 350 350 Capital Funds Needed 350 350 ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND The City owns Riverfront Park and the golf course expansion property which surrounds these two important parcels of land. Acquisition of these properties would allow for proper development of Riverfront Park and the expansion of the municipal Golf Course to 18 holes. FACTORS SUPPORTING PROJECT -------------------------- 1 . High priority in the Green River Corridor Plan and Comprehensive Park and Recreation Plan. ALTERNATIVES TO PROJECT ----------------------- 1 . Purchase only one of the properties and obtain an easement across the other. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 5 PARKS PROJECT TITLE: Mill Creek Canyon Development -------------- PROJECT DESCRIPTION ------------------- Extend the maintenance/pedestrian trail from the Mill Creek Earthworks/amphitheater to Crow Road. Develop parking and a picnic area at the Crow Road access point. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- 0 0 Site Improvements 250 100 150 ------- ------- ------- Total 250 100 150 Capital Funds Needed 250 100 150 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 1 Other Operating Costs ------� ------- ------1 _1 Total J BACKGROUND �) Mill Creek Canyon Earthworks and park development in the mouth of the canyon has been completed and is drawing thousands of people to the park each year. There have been numerous requests to develop a trail up the canyon to allow for nature walks and exploring the park. There is no adequate access to the park from this neighborhood. In addition, there is no public parking nor a developed picnic area along Crow Road. FACTORS SUPPORTINGPROJECT - - 1 . The project is identified in the Mill Creek Canyon Site Master Plan. 2. The public wants the project. 3. The Park Committee recommended the project. ALTERNATIVES TO PROJECT ----------------------- 1 . Develop at a later date. r� City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 6 PARKS PROJECT TITLE: Lake Fenwick Park Development -------------- PROJECT DESCRIPTION ------------------- Extend the park development between the parking lot and the State Game Department boat launch area. Develop a trail along the entire shoreline of the park and to the lake island. Provide night/security lighting. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 250 100 150 ------- ------- ------- _ Total 250 100 150 Capital Funds Needed 250 100 150 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 2 2 2 2 Other Operating Costs ------- ------- ------- ------- Total 2 2 2 2 BACKGROUND The parking lot is very secluded and cannot be seen from Lake Fenwick Road. As a result, the park often draws the wrong type of crowd and there has been numerous complaints from the neighborhood of wild parties. Citizens of West Hill have requested that the park have additional development so that it will become visible from the road. FACTORS SUPPORTING PROJECT -------------------------- 1 . The public wants the project. 2. Park Committee recommendation as a 1985 project. 3. Additional development will provide and encourage participation by a different segment of the population. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 7 PARKS PROJECT TITLE: Ball Fields Lights -------------- PROJECT DESCRIPTION ------------------- Lights installed on Field #2 at Russell Road Park and upgrading the lights at Kent Memorial Park, Field #2. To date, $15,000 has been spent on this project. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 65 65 Total 65 65 Capital Funds Needed 65 65 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND Of the five fields at Russell Road Park, only Field #2 does not have lights for night play. Lights on Field #2 at Kent Memorial Park are substandard. Two additional light poles need to be added. FACTORS SUPPORTINGPROJECT - - 1 . Increased use of the fields. 2. Lighting a field is equivalent to building a new unlit field. 3. Kent Memorial Field #2 lighting is actually unsafe for night play because there are no lights directed at the home plate area. ALTERNATIVES TOPROJECT - - 1 . Phase project over two years. �J I � �J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 8 PARKS PROJECT TITLE: East Hill Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Develop East Hill Neighborhood Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 500 300 200 ------- ------- ------- Total 500 300 200 Less: Dedicated Funding Sources IAC Grant 100 100 Capital Funds Needed , 400 200 200 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 1 Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 2 2 2 2 BACKGROUND A neighborhood park located in this area, next to Sequoia Junior High School , should contain all of the standard neighborhood park facilities. It would serve existing and proposed single-family and multi-family developments in the area. FACTORS SUPPORTING PROJECT -------------------------- 1 . The project is identified in the Comprehensive Park and Recreation Plan. ALTERNATIVES TO PROJECT ----------------------- 1 . Locate park between James Street and 256th, East of Benson. r City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 9 PARKS PROJECT TITLE: South Scenic Hill Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Develop South Scenic Hill Neighborhood Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 50 Total 50 50 Capital Funds Needed 50 50 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 1 Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 2 2 2 2 BACKGROUND Scenic Hill Park is located adjacent to Scenic Hill Elementary School and has never had any formal development. The combination park school site would be developed to provide all the standard facilities for a neighborhood park. FACTORS SUPPORTING PROJECT 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- 1 J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 10 PARKS PROJECT TITLE: Riverfront Dike Blacktop -------------- PROJECT DESCRIPTION ------------------- Construct a ten-foot wide asphalt path on top of the flood control dike at three locations: Brisco Park, Soames/Neely property, and around new Golf Course/Lopez property. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 115 75 40 ------- ------- ------- Total 115 75 40 Capital Funds Needed 115 75 40 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 1 Other Operating Costs ------- ------- ------- ------- Total 1 1 1 1 BACKGROUND This is a phase project with the first phase having been completed in 1983. Uplands Industries donated the Brisco dike property several years ago with the understanding that it would be developed by the City. FACTORS SUPPORTING PROJECT -------------------------- 1 . Safety--provides a jogging/bicycle trail away from the main road. 2. These are important links in developing a bike trail along the Green River utilizing dike top wherever possible. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 11 PARKS PROJECT TITLE: Uplands Park Parking Lot -------------- PROJECT DESCRIPTION ------------------- Develop a donated site into a parking lot and access point for the Green River and Brisco Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 30 30 Total 30 30 Capital Funds Needed 30 30 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND Property was donated to the City as part of the Southcenter Corporate Park plat to provide parking for users of the Green River bike trail and Brisco Park. FACTORS SUPPORTING PROJECT -------------------------- I 1 . The donator expects this property to be developed. �J ALTERNATIVES TO PROJECT None identified ----------------------- J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 12 PARKS PROJECT TITLE: Upper Mill Canyon Park -------------- PROJECT DESCRIPTION ------------------- Acquire approximately seven acres in Upper Mill Creek and a trail through the property connecting the existing Mill Creek Park trail to the upper pond area at 104th Avenue. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 290 290 Site Improvements 50 50 ------- ------- ------- _ Total 340 290 50 Less: Dedicated Funding Sources Donation 130 130 Capital Funds Needed 210 160 50 ------- ------- ------- ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 1 Other Operating Costs ------- ------- ------- ------- Total 1 1 1 1 BACKGROUND The City owns approximately 100 acres in the Mill Creek Canyon. This property is a vital link in continuing the trail from the mouth of the canyon to 104th Avenue. FACTORS SUPPORTING PROJECT -------------------------- 1 . The project supports Mill Creek Canyon Park Master Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 13 PARKS PROJECT TITLE: Riverfront Parking Lot -------------- PROJECT DESCRIPTION ------------------- Develop the parking lot located at Riverfront Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 65 65 Total 65 65 Capital Funds Needed 65 65 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs /Total BACKGROUND A make shift parking area has been developed at Riverfront Park. It does not meet City codes requiring parking areas to be paved and landscaped. The lot is filled to capacity on nice spring and summer days. FACTORS SUPPORTING PROJECT -------------------------- 1 . More cars could be accommodated if the lot were paved and striped. 2. The improved parking would meet City codes. 3. This project would represent the first phase of the development of a park purchased in the early 1970's. ALTERNATIVES TO PROJECT None identified ----------------------- J J J i City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 14 PARKS PROJECT TITLE: Green River Restrooms -------------- PROJECT DESCRIPTION ------------------- Permanent restrooms along the Green River. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Bldg. & Bldg. Imp. 150 75 75 ------- ------- ------- _ Total 150 75 75 Capital Funds Needed 150 75 75 ------- ------- ------- OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 2 2 2 2 Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 3 3 3 3 BACKGROUND During the year, approximately fifteen major events (fun runs, jog-a-thons, bike-a-thons, etc. ) are held on the Green River bike route. The starting point of these events is Russell Road Park which has the only public restroom along the 26-mile course. In addition to major events, the course attracts many individual groups and families. FACTORS SUPPORTING PROJECT -------------------------- 1 . Restrooms on the west side of the river would encourage more families to use the course. ALTERNATIVES TO PROJECT ----------------------- 1 . Portable restrooms. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 15 PARKS PROJECT TITLE: Garrison Creek Park Improvements -------------- PROJECT DESCRIPTION ------------------- Handball/racquetball court repairs, improvements and expansion. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 70 70 Total 70 70 Capital Funds Needed 70 70 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND These outdoor handball/racquetball courts are too small and are potentially dangerous to players. The walls separating the courts need to be extended to prevent players from swinging a racquet and hitting a player in the next court. d FACTORS SUPPORTING PROJECT -------------------------- _J 1 . Petition signed by 42 people requesting this project be funded. 2. Safety factors. 3. The Park Committee recommended that this project be submitted in the 1982 Budget. However, it was not funded. ALTERNATIVES TO PROJECT None identified _1 ----------------------- »J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 16 PARKS PROJECT TITLE: Glenn Nelson Park Expansion -------------- PROJECT DESCRIPTION ------------------- Acquire approximately seven acres adjacent to Glenn Nelson Park. Clear and grub the underbrush to make the property usable. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 420 420 Site Improvements 80 80 Total 500 500 Capital Funds Needed 500 500 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 15 15 15 15 Other Operating Costs 15 15 15 15 ------- ------- ------- ------- Total 30 30 30 30 BACKGROUND West Hill residents have requested that the City acquire this property to expand the park and prevent a convenience store from being built on the the site which is zoned commercial . FACTORS SUPPORTING PROJECT -------------------------- 1 . The public wants it. 2. The population in this neighborhood warrants a neighborhood park larger than the existing ten acre Glenn Nelson Park. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 17 PARKS PROJECT TITLE: Commons Playfield Expansion/Parking -------------- PROJECT DESCRIPTION ------------------- Acquire approximately four acres between Fourth Avenue and Commons Playfield to develop an entrance, and parking and picnic facilities for Commons Playfield. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 200 200 Site Improvements 100 100 Total 300 300 Capital Funds Needed 300 300 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 2 2 2 2 2 Other Operating Costs 1 1 1 1 1 Total 3 3 3 3 3 BACKGROUND Kent Commons Playfield has six baseball and soccer fields, a children playground, and a jogging trail . People using this facility must park at either the Metro Park and Ride lot or the Kent Commons parking lot, thus requiring them to cross James Street. There has been many requests for parking adjacent to the Commons Playfield. FACTORS SUPPORTING PROJECT -------------------------- 1 . Safety. 2. Numerous requests from the public. 3. Many people use the Commons Playfield. a ALTERNATIVES TO PROJECT ----------------------- 1 . Install a pedestrian light at the James Street/Interurban crosswalk. t 2. Acquire two rather than four acres. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 18 PARKS PROJECT TITLE: Performing Arts Center -------------- PROJECT DESCRIPTION ------------------- Construct a Cultural and Performing Arts Center. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Bldg. & Bldg. Imp. 3,400 3,400 Total 3,400 3,400 Capital Funds Needed 3,400 3,400 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 300 300 300 300 Other Operating Costs 100 100 100 100 Less Revenue Generated (250) (250) (250) (250) ------- ------- ------- ------- Total 150 150 150 150 BACKGROUND There is no performing arts center in the Kent .area with the exception of a 500-seat theater at Kentwood High School . There is a need for 1 ,000 to 1 ,200-seat center to serve the growing demands of the cultural and performing art needs. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified as a need in the Parks and Recreation Comprehensive Plan. 2. Popularity of the programs offered by the Cultural Division and the Kent Arts Commission. ALTERNATIVES TO PROJECT ----------------------- 1 . Limit programs to utilize alternate facilities as available and affordable. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 19 PARKS PROJECT TITLE: Russell Road Park Expansion -------------- PROJECT DESCRIPTION ------------------- Acquire 22 acres just East of Russell Road Park. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) 1991 & Total 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 1 ,760 1 ,760 Total 1 ,760 1 ,760 Capital Funds Needed 1 ,760 1 ,760 OPERATIONAL FINANCIAL NEEDS -------------------------- Salaries & Benefits 30 30 30 30 Other Operating Costs 18 18 18 18 ------ ------- ------- ------- Total 48 48 48 48 BACKGROUND The property is vacant and for sale. Acquisition of this site would allow Russell Road Park to almost double its facilities. The popularity of slow pitch has maximized the use of the Russell Road complex. FACTORS SUPPORTING PROJECT 1 . Increased use of Russell Road Park to development pressures threaten site which is zoned multi-family. JALTERNATIVES-TO-PROJECT 1 . Develop ballfields on Riverfront Park which was acquired with IAC funds to serve as a passive park. Special authority would have to be received from IAC to permit this changed in use. J J .1 City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 20 PARKS PROJECT TITLE: Campus Community Park -------------- PROJECT DESCRIPTION ------------------- Develop the 15 acre Campus Community Park on East Hill . Include trail development, picnicing and playground development. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 50 ----- ----- - Total 50 - Capital Funds Needed 50 50 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 3 3 3 3 Other Operating Costs 1 1 1 1 ------- ------- ------- ------- Total 4 4 4 4 BACKGROUND The majority of the site will remain wooded to form a buffer between the active recreation fields at Kent Meridian High School and the residential development to the West. The development should include children's playground, picnicing, and trail improvement including an extension of a proposed trail to connect to the Garrison Creek trail . FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 21 PARKS PROJECT TITLE: South Willis Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Purchase five acres on Valley floor for park. Costs include parking and bank cut for access to Green River. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 50 50 Bldg. & Bldg. Imp. 10 10 Total 60 60 Capital Funds Needed 60 60 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 Other Operating Costs 1 1 1 ------ ------- ------- Total 2 2 2 BACKGROUND A park site on the river South of the Willis neighborhood would serve that existing single-family residential area and would also provide increased access to the river system for the entire Valley community. In addition to the standard neighborhood park facilities, the proposed park would also require tree planting, parking for the Green River trail system, and a bank cut for increased access to the river. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- �J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 22 PARKS PROJECT TITLE: Good News Bay Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Acquire 7 acres on the Valley for a park. Develop in 1988. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 420 420 ---- ---- Total 420 420 Less: Dedicated Funding Sources Donations 420 420 Capital Funds Needed 0 0 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 Other Operating Costs 2 2 2 ------- ------- ------- Total 3 3 3 BACKGROUND The area immediately adjacent to the proposed site is zoned multi-family residential and will be developed in the near future. This site would serve that additional population and like other neighborhood parks along the river, would provide increased access to the river system for the entire community. This park should include all standard neighborhood park facilities as well as off-street parking and additional planting. FACTORS SUPPORTING PROJECT -------------------------- 1 . Development pressure threatens the site. 2. Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 23 PARKS PROJECT TITLE: Riverfront Park Phase I -------------- PROJECT DESCRIPTION ------------------- Develop Riverfront Park, which is located across Russell Road from Russell Road Park. Improvements to include picnicking, playfields, parking, riverfront amenities, trails, etc. . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 1 ,000 500 500 ------- ------- ------- Total 1 ,000 500 500 Capital Funds Needed 1 ,000 500 500 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 10 10 10 Other Operating Costs 5 5 5 ------- ------- ------- Total 15 15 15 BACKGROUND The park was acquired in the early 1970's and has undergone not any development with the exception of a makeshift parking lot built by City crews. FACTORS SUPPORTING PROJECT -------------------------- 1 . Would add to and complement the Russell Road athletic complex. ALTERNATIVES TO PROJECT None identified ----------------------- J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 24 PARKS PROJECT TITLE: Orillia Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Acquire five acres on the Valley floor and develop a park in a commercial/industrial area. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 250 250 Total 250 250 Capital Funds Needed 250 250 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 1 Other Operating Costs 1 1 1 ------- ------- ------- Total 2 2 2 BACKGROUND This park would provide a rest stop/picnic area for both the Green River trail system and the Interurban Trail . Located in the rapidly expanding commercial and industrial area between Tukwila and Kent, it would also serve the recreational needs of that daytime population. It should contain the standard facilities for commercial/industrial district parks. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 25 PARKS PROJECT TITLE: Green River Frontage Trails -------------- PROJECT DESCRIPTION ------------------- Acquire select parcels along the Green River to complete a portion of the Green River riverfront trail system. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- La I nd 100 100 Total 100 100 Capital Funds Needed 100 100 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 1 Other Operating Costs ------- ------- Total 1 1 BACKGROUND Implementation of the entire system will require close coordination and cooperation between many jurisdictions. The development of the system of roads and dikes into a viable bike, hiking, and jogging trail will depend primarily on the property owners and easement rights along the river. As the system comes into being, some of the facilities to be added should include benches, viewpoints, fencing and underpasses where required, and fishing and boating access points. Development money will be requested in 1990 and beyond. FACTORS SUPPORTING PROJECT ----------------------- 1 . Identified in the Comprehensive Park Plan ALTERNATIVES TO PROJECT None identified ----------------------- I J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: A PARKS PROJECT TITLE: Sunnycrest Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Establish a five acre neighborhood park on West Hill . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND ----------------------------------------------- ------- Land 50 Site Improvements 210 Total 260 Capital Funds Needed 260 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 Other Operating Costs 1 Total 2 BACKGROUND The Sunnycrest area of West Hill is currently not well served with neighborhood park facilities. Linda Heights is a small park with little room for expansion due to the proximity of Interstate 5 on the west side and developed residential areas on all other sides. A Sunnycrest neighborhood park should contain all of the standard neighborhood facilities except for athletic fields which are provided by Sunnycrest Elementary School . If the Washington National Guard Army becomes available for this park, the existing structures would provide additional facilities for future expansion of many of Kent's cultural and educational programs. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: B PARKS PROJECT TITLE: Clark Community Park -------------- PROJECT DESCRIPTION ------------------- Establish 35 acre park on East Hill . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 1000 Total 1 ,000 Less: Dedicated Funding Sources IAC Grant 150 Capital Funds Needed ----850 OPERATIONAL FINANCIAL NEEDS 20 Salaries & Benefits Other Operating Costs ----_6 Total 26 BACKGROUND Though residential development is taking place on East Hill , a good deal of open space still exists around and near Clark Lake. This special resource site could be linked by rltrails to Meridian Junior High School and King County Woodlands property, both located to the north. The recreational opportunities afforded by the combination of park types would serve as a community center for the central and western portions of the East Hill suburbia. FACTORS SUPPORTING PROJECT 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT ----------------------- 1 . Purchase on a contract. J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: C PARKS PROJECT TITLE: Mill Creek Woods Green Belt -------------- PROJECT DESCRIPTION ------------------- Develop green belt/rest stop at the intersection of Mill Creek and the Green River. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /=------ Land 120 Total 120 Capital Funds Needed 120 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 Other Operating Costs Total ------- BACKGROUND One of the last remaining riparian woods is located at the intersection of Mill Creek (West Hill ) and the Green River. It should become a natural area along the Green River trail system and provide a rest stop along the nearby Interurban Trail . Development would be minimal . Short trails and picnic facilities should be provided with some parking just off West Valley. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: D PARKS PROJECT TITLE: Westside Ponds and Wetlands -------------- PROJECT DESCRIPTION ------------------- Acquire 60-85 acres for green belt/park on the valley floor. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 600 Total 600 Less: Dedicated Funding Sources Donations 500 Capital Funds Needed 100 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits I Other Operating Costs _ 1 Total ` ) BACKGROUND J Regulation and acquisition of this section of land along the west side of Green River would provide a green belt along the Green River trail system and act as a buffer between the trail and proposed multi-family residential development to the west. Development of this site would be minimal but should include an access trail , some open meadows, and some wildlife viewing and picnicking facilities. JFACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: E PARKS PROJECT TITLE: Panther Lake Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Establish a neighborhood park, rest stop, and picnic area in conjunction with Panther Lake Elementary School . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 75 Site Improvements 10 Total 85 Capital Funds Needed 85 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 Other Operating Costs 1 Total 2 BACKGROUND Panther Lake is another rapidly growing section of East Hill and this neighborhood park would serve an increasing population in conjunction with Panther Lake Elementary School . The park should provide all standard neighborhood facilities and a rest/picnic area on the proposed trail along South 208th Street. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan . ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: F PARKS PROJECT TITLE: Springbrook Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Establish a neighborhood park, possibly in conjunction with King County and/or Renton, on East Hill . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 75 Site Improvements 100 Total 175 Less: Dedicated Funding Sources King County 75 Capital Funds Needed 100 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 Other Operating Costs 1 Total 2 BACKGROUND Located in another area of increased residential development, this park in conjunction with Springbrook Elementary site should accommodate all of the neighborhood recreation needs of that expanded population. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: G PARKS PROJECT TITLE: T - Bridge Green Belt �- -------------- PROJECT DESCRIPTION ------------------- _ Rest area for Green River and Interurban trails, open meadows, restrooms, picnic, trails, parking. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 80 Total 80 Capital Funds Needed 80 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 1 Other Operating Costs 1 Total 2 BACKGROUND This section of the river has some riparian vegetation. The area would serve as a stopping point along the Green River trail system and a rest stop for travelers on the nearby Interurban Trail . Some open meadows should be provided as well as restrooms, picnic facilities, trails and some off-street parking. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: H PARKS PROJECT TITLE: South Meridian Community Park -------------- PROJECT DESCRIPTION ------------------- East Hill Community Center pool , gym, auditorium, meeting rooms, etc. , active recreation. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 525 Other Capital Outlay Total 525 Less: Dedicated Funding Sources I 200 AC Capital Funds Needed 325 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 60 Other Operating Costs 15 Total 75 BACKGROUND This 35-acre site is to provide active recreation facilities for the growing East Hill area. The site is physically related to the Meridian Junior High and to the proposed Clark Lake Natural Resource Park. The site is also well suited for the location of a future East Hill community center facility to include a pool , gymnasium, auditorium, meeting room, etc. . FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified I ----------------------- J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: I PARKS PROJECT TITLE: Interurban North Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Commercial/industrial park, rest stop and picnic area along Interurban Trail . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 Total 50 Capital Funds Needed 50 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 3 Other Operating Costs 2 Total 5 BACKGROUND Like Valley Center, O'Brien and Orillia this would be a commerciall/industrial neighborhood park located to provide a rest stop and picnic area along the Interurban Trail . FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: J PARKS PROJECT TITLE: Interurban Central Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Commercial /industrial neighborhood park, rest stop and picnic area along Interurban Trail . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 Total 50 Capital Funds Needed 50 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 3 Other Operating Costs 2 Total 5 BACKGROUND This park would be a standard commercial/industrial neighborhood park. Located along the Interurban Trail , it would serve as a rest stop/picnic area for the users of that trail and the proposed Cross Valley Trail on South 228th Street. FACTORS SUPPORTING PROJECT -------------------------- 1 . Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- �J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: K PARKS PROJECT TITLE: Interurban O'Brien Neighborhood Park -------------- PROJECT DESCRIPTION ------------------- Commercial/industrial neighborhood park, rest stop and picnic area along the Interurban Trail . CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Site Improvements 50 Total 50 Capital Funds Needed 50 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND This park would be standard commercial/industrial neighborhood park. FACTORS SUPPORTING PROJECT -------------------------- 1 . Use of Interurban trail . 2. Identified in the Comprehensive Park Plan. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Appendix K-5 Capital Improvement Program General Government Proposal (Amounts in Thousands and in 1985 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND Capital Expenditures by Priority * 1 . Library 2,150 150 2,000 2. City Hall Expansion 450 150 300 3. Telecommunication System 425 85 85 85 85 85 4. Geocoding System 300 100 200 5. Computer Systems Enhancement 1 ,125 225 225 225 225 225 Total Capital Expenditures 4,450 460 2,560 810 310 310 Debt Expenditures Voted City Hall G.O. 173 86 87 Non Voted City Hall 185 37 37 37 37 37 Total Debt Expenditures 358 123 124 37 37 37 Total Expenditures 4,808 583 2,684 847 347 347 Dedicated Revenue for Debt Service Property Taxes - Excess Levy 173 86 87 Dedicated Revenue for Capital Exp. Telecommunication Savings 425 85 85 85 85 85 Total Ded. Rev. for Cap. Exp. 425 85 85 85 85 85 Total Dedicated Revenue 598 171 172 85 858 85 JCity Funding Needed 4,210 412 2,512 762 262 262 *Indicates project has received prior funding. J J J J J City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 1 GENERAL GOVERNMENT PROJECT TITLE: New Library -------------- PROJECT DESCRIPTION ------------------- Construct a new 20,000 square foot library building, freeing up the current location for future City Hall consolidation and expansion. In 1984, $150,000 was set aside for land acquisition. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Land 150 150 Bldg. & Bldg. Imp. 1 ,600 1 ,600 Site Improvements 200 200 Other Capital Outlay 200 200 ------- ------- ------- Total 2,150 150 2,000 Less: Dedicated Funding Sources Capital Funds Needed 2,150 150 2,000 OPERATIONAL FINANCIAL NEEDS --------------------------- Operational costs will be paid for by King County with the City of Kent contributing a fixed amount adjusted annually based on the potential increase in the City's property tax levy. With this formula, there will be no incremental operational costs as a result of this project. BACKGROUND The City Hall Master Plan completed in 1983 indicates the need to expand City Hall work space by 1985. The Library Board noted in December of 1983 that they would be out of room soon in their 16,000 square foot site and recommended construction of a new 20,000 square foot facility. At this time the best alternative appears to be the construction of a new library allowing the expansion of City Hall work space into the current library building. FACTORS SUPPORTING PROJECT -------------------------- 1 . The Library would require additional space by 1986. 2. Building, Planning and Engineering could be located in one building. 3. Additional space will be needed by other City departments in 1986. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 2 GENERAL GOVERNMENT PROJECT TITLE: City Hall Expansion (Remodeling) -------------- PROJECT DESCRIPTION ------------------- Remodel the old library space in 1987 to accomplish the City Hall expansion. The Engineering, Planning, and Fire/Building Departments will relocate to the old library space. Phase II of this project involves the remodeling of City Hall . $150,000 will be set aside for this project in 1987. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Bldg. & Bldg. Imp. 400 150 250 Site Improvements 5 50 ------- ------- ------- Total 450 150 300 Capital Funds Needed 450 150 300 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits Other Operating Costs Total BACKGROUND The City Hall Master Plan was completed in December 1983. The plan identified the City Hall expansion needs to the year 2000 noting that based on historical growth, there will be a need for additional space. One of the options identified in the plan was the use of the Library facility for the expansion of City Hall . This alternative allows the entire City Hall complex to remain in one place but requires the building of a new Library which is described in another capital improvement sheet. The best use of the library, as identified in the City Hall Master Plan study, would be to house the Engineering, Planning, and Fire/Building Departments. This concept would allow better coordination of activity between these departments. FACTORS SUPPORTING PROJECT -------------------------- 1 .. It meets the City Hall space needs to the year 2000. J2. The project would allow for better coordination of the departments that serve the building community. 3. The community would benefit from having a new and more modern library facility. ALTERNATIVES TO PROJECT None identified ----------------------- City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 3 GENERAL GOVERNMENT PROJECT TITLE: Citywide Telecommunication System -------------- PROJECT DESCRIPTION ------------------- Purchase or lease/purchase a Citywide Telecommunication System to include simultaneous voice and data transmission. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEY014D -----------------------------------------------/ /------- Other Capital Outlay 425 85 85 85 85 85 ------- ------- ------- ------- ------- ------- Total 425 85 85 85 85 85 Less: Dedicated Funding Sources Costs savings 425 85 85 85 85 85 Capital Funds Needed 0 0 0 0 0 0 OPERATIONAL FINANCIAL NEEDS --------------------------- The costs associated with the one half-time person for traffic analysis and the contract for maintenance services on the system will be made-up by savings on a five-year lease purchase agreement. BACKGROUND With the divestiture of AT&T and the deregulation of the telecommunications industry, the City has acquired the responsibility for the total management of its communication system. Preliminary studies indicate that a network of microcomputers, communicating with one another and with the main frame, would provide the City with a modern cost efficient telecommunications system. The increase in labor productivity is expected to be quite substantial . FACTORS SUPPORTING PROJECT -------------------------- 1 . The City has the capability to manage its own system. 2. Cost savings. 3. Need for office automation. ALTERNATIVES TO PROJECT ----------------------- 1 . Purchase our existing system from Pacific Northwest Bell . City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 4 GENERAL GOVERNMENT PROJECT TITLE: Geocoding System (Geographical Based Information System) -------------- PROJECT DESCRIPTION ------------------- Obtain a complete stand-alone geographical based information computing system. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 300 100 200 Capital Funds Needed 300 100 200 OPERATIONAL FINANCIAL NEEDS --------------------------- Salaries & Benefits 15 Other Operating Costs 18 Total 33 BACKGROUND At this time Kent land use data cannot be updated easily since there is no computer storage system. The geocoding system would provide the computer storage system needed to allow updating on a regular basis. Since land use data are needed often, for for such projects as the recently completed, East Hill Plan, West Hill Plan, West Hill P1an,Design Study, Zoning Code, Agricultural Program, Central Business District, Adult Use Water Quality Program, and Community Profile, the current collection cost is high. In addition, the geocoding system would facilitate the analysis of data. Types of data collected and analyzed would be: land use, demographic (household size, population, low and moderate income by census tracts) , employment, housing stock, natural systems (creeks, vegetation, soils) , status of projects (landscaping, off street parking) , vacant land and data from special studies such as affordable housing and agricultural preservation. FACTORS SUPPORTING PROJECT -------------------------- 9 P _ 1 . Quantifiable dollar savings through nondu licative data collection would have been approximately $130,000 on the recently completed projects listed above. 2. Readily available for use by other departments when operational . J3. System will partially pay for itself through sale of data to the general public. l ALTERNATIVES TO PROJECT `� 1 . Wait until the County gets a system and buy into it. City of Kent Final Priority: CAPITAL IMPROVEMENT PROJECTS Department Priority: 5 GENERAL GOVERNMENT PROJECT TITLE: Computer Systems Enhancement -------------- PROJECT DESCRIPTION ------------------- Provide improved computer systems for all City departments, as outlined in the Automation Plan. Since the Plan is due in mid 1985, figures shown below represent preliminary estimates at this time and are in addition to computer-related requests shown elsewhere in this document. The final figures will depend on several factors including: the number and scope of systems approved for implementation, timing and availability of "off-the-shelf" solutions, the degree of complexity related to "integration needs" between different City systems and users, etc. . Estimates include hardware, software, consultant(s), contractor(s), and minor facility changes. Excluded are supplies, maintenance and any departmental personnel costs. CAPITAL FINANCIAL NEEDS ----------------------- (Amounts in Thousands and in 1986 Dollars) Total 1991 & 1986-90 1986 1987 1988 1989 1990 BEYOND -----------------------------------------------/ /------- Other Capital Outlay 1 ,125 225 225 225 225 225 Capital Funds Needed 1 ,125 225 225 225 225 225 OPERATIONAL FINANCIAL NEEDS --------------------------- Increased departmental operations costs should be offset or absorbed by decreased costs elsewhere as productivity improves. Supporting operations costs . from Information Services depend on overall system complexities/inter-relationships and levels of support required for effective operation. Automation Plan will address this matter more specifically. BACKGROUND An Automation Committee has been organized representing all City departments. This committee, with the assistance of a consultant, is now developing an Automation Plan to indentify: where we are, where we need to be and why/when, evaluate alternatives and costs, and formulate a Plan. FACTORS SUPPORTING PROJECT -------------------------- 1 . Substantial decreases in cost of computer technology as compared to increasing manpower cost. 2. Dollar savings through nonduplicative data collection. ALTERNATIVES TO PROJECT None identified -----------------------