HomeMy WebLinkAboutCAG2023-006 - Change Order - #4 - Rodarte Construction, Inc. - Washington Avenue South Stormwater Pump Station - 1/10/25 140 Agreement Routing Form
• For Approvals,Signatures and Records Management
E1T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H I N G T O N (Print on pink or cherry colored paper)
Originator: Department:
S.Anderson PW Engineering
Date Sent: Date Required:
> 1/13/25
0
L
al:Authorized to Sign: Date of Council Approva
a 0 Director or Designee ❑Mayor 6/06/2023
Budget Account Number: Grant? ❑Yes l7 No
D20119.64110.120
Budget? 0 Yes ❑No Type: N/A
Vendor Name: Category:
Rodarte Construction, Inc. Contract
Vendor Number: Sub-Category
c Change Order#4
0
Project Name: Washington Avenue South Stormwater Pump Station
E
L
C Project Details:install approximately 110 LF of City provided no-cut fence along 1st Avenue near the Larc property.Supply
and install replacement decorative fence panels along BNSF railroad tracks just south of the Smith Street
4.0 crossing removed by others.
C
d
E Agreement Amount:$8,330.01 Basis for Selection of Contractor: Bid
W
541
Start Date: N/A Termination Date: 330 Working Days
a
Local Business? ❑Yes ❑No*
*Ifineets requirements per KCC3.70.700,pleosecomplete"Vendor Purchase-Local Exceptions"form on Cityspace.
Notice required prior to disclosure? Contract Number:
❑Yes 0 No CAG2023-006
Date Received by City Attorney: Comments
Im
C
.� d
d L
l0
Cn Date Routed to the Mayor's Office:
t%Y
Date Routed to the City Clerk's Office. 1/13/25
adaW22373 1 20 Visit Documents.KentWA.gov to obtain copies of all agreements
■
KENT
W A 5 M I.G T G.
CHANGE ORDER NO. #4
NAME OF CONTRACTOR: Rodarte Construction Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Washington Avenue South Stormwater Puml2 Station
ORIGINAL CONTRACT DATE: June 21 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
i. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Install approximately 110 LF of City provided no-cut fence along 1st
Avenue near the Larc property. Supply and install replacement
decorative fence panels along BNSF railroad tracks just south of the
Smith Street crossing removed by others.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $4,063,673.19
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $109,988.18
(incl. applicable WSST)
Current Contract Amount $4,173,661.37
(incl. Previous Change Orders)
Current Change Order $7,558.99
Applicable WSST Tax on this Change $771.02
Order
Revised Contract Sum $4,181,991.38
CHANGE ORDER - 1 OF 3
Original Time for Completion 330 working days
(insert date)
Revised Time for Completion under 0 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 working days
Revised Time for Completion 330 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Digitally signed by Chad Bieren
Chad B i e re n 0 to 2025.01.10 13:18:35-08'00'
13y (signature) By (signature)
Print Name: 44PF-w Print Name: Chad Bieren P.E.
Its 12 n Its Public Works Director
(title) (title)
DATE: G DATE:
EC
KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
WASHINGTON
CHANGE ORDER WORKSHEET NO. 4
Construction Engineering Division - Public Works
Project: Washington Ave Pump Station Project No: 19-3031
Project Engineer: Stephen Lincoln TIB-Aid No: N/A
Capital Projects Jason Bryant Contractor: Rodarte
Manager:
Date: 12/20/2024
I. Proposed Change
Install approximately 110 LF of City provided no-cut fence along 1st Ave near the Larc property. Supply
and install replacement decorative fence panels along BNSF railroad tracks just south of the Smith St
crossing removed by others.
II. Reason and Background for Change
The City requested Rodarte's subcontractor C&P Fencing install approximately 110 LF of City provided
no-cut fence along the BNSF Railroad tracks just south of the Larc property. This fence closes a gap in
track access not included under Kent's original 23-3028.1 Railroad Quiet Zone BNSF Railroad Trespass
Fencing project. The City of Kent's 23-2028.3 BNSF Quiet Zone project included installation of
decorative fence along the railroad tracks. A revision added conduit trenching work requiring temporary
removal of two fence panels and a post. These removed materials ended up being stolen from site. The
BNSF Quiet Zone Contractor, Global Contractors, LLC, after repeated requests was unable to execute
replacement. To prevent further delay, the City requested C&P Fencing supply and install the missing
panels.
III. Method of Payment
NEW PAY ITEMS ❑ Notapplicable
Sch. Item Description Total Est. Unit Unit Price Total Estimated Cost of
No Item
1 Supply and install additional fence panels, 1 LS $7,558.99 $ 7,558.99
Install modified type 3 fence.
F-1
New Pay Items Total: $ 7,558.99
Page 1
DELETE EXISTING PAY ITEMS) per 1-09.5 0 Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$ -
$ -
$
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$ -
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $7,558.99
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 330 Due This Change Order: 0 Previous Total: 330
Explanation/3ustification for Additional Working Days:
*TOTAL WORKING DAYS: 330
* This Change Order + Previous Total
Capital Projects Manager: �� Date: -
Jason S' an /
Construction Engineering
Date.
Supervisor: t Z
] on Barry
Construction Manager: _ Date:
Eric Connor
Page 2
CHANGE ORDER PROPOSAL
Lblw CONTRACTOR:
Rodarte Construction
SUBCONTRACTOR:C&P Fencing DATE 1/7/2025
r_c.,rnrwrcrrty.
Change Order for Fencing on BNSF Crossing Improvements Based on C&P Qoute.
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG HRS OT HRS REG RATE OT RATE AMOUNT
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LABOR SUBTOTAL $0.00
29%OVERHEAD AND PROFIT,BONDING,INSURANCE $0.00
TOTAL LABOR L4.011
EQUIPMENT
EQUIPMENT TYPE EQUIPMENT SIZE REGHRS STANDBYHRS REGRATE STNDBYRATE AMOUNT
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
EQUIPMENT SUBTOTAL $0.00
21%OVERHEAD AND PROFIT,BONDING,INSURANCE $0.00
TOTAL EQUIPMENT $0.00
MATERIALS I SERVICE
VENDOR/INVOICE#/MATERIAL Unit Quantity Unit Price I AMOUNT
$0.00
$0.00
$0.00
$0.00
$0.00
MATERIALS SUBTOTAL $0.00
21%OVERHEAD AND PROFIT,BONDING,INSURANCE $0.00
TOTAL MATERIALS $0.00SUBCONTRACTORS
SUB/INVOICE#/WORK PERFORMED Unit Quantity Unit Price AMOUNT
C&P Fencina 1 LS 1 $5,316.80 $5,316.80
C&P Fencing 2 LS 1 $1,432.30 $1.432.30
$0.00
$0.00
$0.00
SUBCONTRACTORS SUBTOTALF $6,749.10
12%OVERHEAD AND PROFIT,BONDING,INSURANCEI $809.89
TOTAL SUBCONTRACTORS1 $7,658.99
TOTAL COST $7,558.99
C&P Fencing Invoice
1516 Chinook Avenue
Enumclaw WA 98022 Date Invoice#
Phone 360-802-1059
Fax 360-450-5464 in12025 1320-3
Bill To
Rodarte Construction Inc
17 E Valley Highway East
Auburn WA 98092
P.O. No. Terms Project
Net 45 Washington Ave S Stormwa..
Quantity Description Rate Amount
WASHINGTON AVE S STORMWATER
ADDITIONAL FENCING FOR CITY OF KENT
10 if 6 ft Modified Type 3 Non-Cut Chain Link Fence 33.23 332.30
I ea,Install 2 Wire Works Panels 1,100.00 1,100.00
Less Retention -71.62 -71.62
We appreciate your prompt payment. Total $1,360.68
C &P Fencing Invoice
1516 Chinook Avenue
Enumclaw WA 98022 Date Invoice#
Phone 360-802-1059
Fax 360-450-5464 11/25/2024 1320-2
Bill To
Rodarte Construction Inc
17 E Valley Highway East
Auburn WA 98092
P.O. No. Terms Project
Net 45 Washington Ave S Stormwa...
Quantity Description Rate Amount
WASHINGTON AVE S STORMWATER PUMP STATION
160 If of 6'Modified Type 3 Non-Cut Chain Link Fence 33.23 5,316.80
Less Retention -265.84 -265.84
We appreciate your prompt payment. Total $5,050.96
Bryant, Jason
From: Shields, Brian
Sent: Tuesday, March 26, 2024 1:11 PM
To: Hallock,Toby
Cc: Bryant,Jason; Barry,Jason
Subject: RE: Larc Fencing
Toby,
Do you have the map showing where the fence at LARC goes? I scoured my email earlier and
couldn't find it.... Any help would be appreciated!
Brian Shields, Capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cel1 253-293-4973 1 Desk 253-856-6510
bshie1ds5KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.aov Facebook YouTube
From: Barry,Jason<JBarry@kentwa.gov>
Sent:Tuesday, March 26, 2024 10:42 AM
To:Shields, Brian<BShields@kentwa.gov>
Cc: Bryant,Jason<J Bryant@ kentwa.gov>
Subject: RE: Larc Fencing
Thanks Brian. Is the location laid out in the field or who knows where it's going? What is the
footage we're looking to have priced?
From:Shields, Brian<BShields kentwa. ov>
Sent:Tuesday, March 26, 2024 10:00 AM
To: Barry,Jason<JBarrv@kentwa.g-oy>
Cc: Bryant,Jason<JBryant@kentwa.gov>
Subject: RE: Larc Fencing
LARC fencing info. Details in plans. Submittal attached.
The extra fence is at KEHOC; Rick knows where it is at, but Scott Schroeder does as well.
Everything should be there except tension wire and nuts/bolts. Contractor will want to inventory
what they need and include the extra parts in their pricing.
1
Brian Shields, Capita/Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6510
bsh iel_d_s_@KentWA.goy
CITY OF KENT,WASHINGTON
KentWA.gov Facebook YouTube
From: Barry,Jason<J Barry@ kentwa.gov>
Sent:Tuesday, March 26, 2024 9:32 AM
To:Shields, Brian<BShields@kentwa.gov>
Subject: Larc Fencing
Did you get Jason Bryant the info on the added fencing?
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
KENT ]harry@KerntWA.gov
w"'.-OTO" www.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
2
t 1516 Chinook Avenue, Enumclaw WA 98022
Ph 360-802-1059 Fax 360-450-5464
Contractor License CPFENPF882ME
SCS Certification#1670
Enumclaw, WA Date: 8/12/2024
Rodarte Const
Project: 2023 RR QZ BNSF Crossing Improvements
Kent, WA
Attention: Hayden
We hereby propose to furnish the materials and perform the labor necessary for the completion of this project:
Scope of Work To Be Completed:
BID# DESCRIPTION QTY UNIT PRICE EXTENSION
1257 6 FT Coated Modified Type 3 No-Cut Chain Link Fence 129 $ 33.23 $ 4,286.67
Note. All Materials to be supplied by the City of Kent and Picked up by C&P
Fencing.Any Materials needed to complete the fence supplied by C&P
Fencing will be invoiced at the Washington State DOT Force Account
Rate and Formula.
TOTAL COST OF THIS ESTIMATE $ 4,286.67
We Acknowledge Addendum Number 0. King County Prevailing Wage Rates.
Exclusions:Clearing and grading,concrete saw cutting and core drilling,bonding,surveys,signs,electrical grounding of fences,traffic control,Fall
Protection Anchor Points,painting and staining of wood fencing,permits,surveying,labor agreements,staking the fence line,hazardous waste training
or removal,temporary fence,concrete mowing strips,post sleeves/setting of post sleeves,damage to irrigation lines,padlocks,knox box,fence removal,
sales tax,use tax.
SUBMITTALS MUST BE APPROVED AND RETURNED PRIOR TO ORDERING MATERIAL
THIS ESTIMATE IS TO BE INCLUDED AS AN EXHIBIT IN THE CONTRACT
All material costs over$1,000.00 will be subject to a joint check agreement provided by our supplier
C&P Fencing requests that retainage be paid 30 days after their work has been completed,provided that all paperwork,warranties,payroll reports,
releases,etc.have been satisfied.
"Quote good for 45 days.Materials must be ordered and shipped immediately in order to guarantee price.Material orders not received immediately are
subject to any price increase initiated by our suppliers.
IN WITNESS OF WHEREOF,the parties have hereunto caused this Agreement to be executed.
Respectfully Submitted: Date: 8/12/2024
By: Paul Pohlman, Cell No. 253 740-5841, ppohlman@comcast.net
Note: This proposal may be withdrawn by us if not accepted within 45 Days.
Accepted Date:
Title:
Bryant, Jason
From: Krier, Rick
Sent: Thursday,August 1, 2024 10:05 AM
To: Hayden Larson
Cc: Barry,Jason; Bryant,Jason
Subject: RE: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Attachments: IMG_6273 jpg; IMG_6271 jpg
Hayden the fabric for this type of fence is a close mesh and is very heavy. I have included a few pictures, if Paul would
like to look at it let me know and ill show him the location it is stored at.
From: Hayden Larson<hayden@rodarteconstruction.com>
Sent:Wednesday,July 31,202412:51 PM
To: Krier, Rick<RKrier@kentwa.gov>
Subject: Fwd: 1st Ave.fence Rev. 3 Washington Ave pump sta.
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISP@KentWA.uov with any
questions.
Can you answer his question?
Thank You,
Hayden Larson
Rodarte Construction Inc.
253-204-9494
From: Paul Pohlman<Pcohlman@comcast.net>
Sent:Wednesday,July 31, 2024 12:50:08 PM
To: Hayden Larson<harden@rodarteconstruction.com>
Subject: RE: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden,
need clarification on the "No Cut Chain Link Fabric" (Not a fencing term).
would assume that they mean a 3/8" or a 5/8" Coated Chain Link Fabric but I need to be clear.
Thank you,
Paul Pohlman
Estimator/Project Manager
C & P Fencing
1516 ChinookAvenue
Enumclaw, WA 98022
Office: 360 802-1059
i
Fax: 360 450-5464
Cell 253 740-5841
From: Hayden Larson<harden@rodarteconstruction.com>
Sent:Wednesday,July 31,2024 11:38 AM
To: Paul Pohlman<ppohlman@comcast.net>
Subject: FW: 1st Ave.fence Rev.3 Washington Ave pump sta.
Paul,
Can you quote the labor to install this?
Thanks,
Hayden Larson
Rodarte Construction Inc.
Cell: (253)204-9494
L
RODAME
CONSTRUCTION INC.
17 East Valley Hwy East
Auburn,WA 98092
From: Krier, Rick<RKrier@kentwa.gov>
Sent: Monday,July 22, 2024 9:59 AM
To: Hayden Larson<harden@rodarteconstruction.com>
Cc: Barry,Jason<JBarry@kentwa.go >; Bryant,Jason<}Bryant@kentwa.gov>
Subject: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden: Please see the attached plans for the added fence on 15t Ave N,The City would like to add this to your existing
contract work for the pump sta.This work is for install only,the city will supply the chain link fabric and posts, you
would have to pick up the martials at the city's yard on the east hill. Could you please supply the city a quote and
schedule as soon as possible. If you have any questions, please call.
253-350-1325
AlIVAiel-
City of Kent Sr. Inspector
Capital Projects
z
Bryant, Jason
From: Barry,Jason
Sent: Monday,August 12, 2024 3:16 PM
To: Bryant,Jason
Cc: Krier, Rick;Connor, Eric
Subject: FW: Larc Fencing - Potential Add to WA Ave PS
Looks like we're good to go. Thanks for the help!
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
400e Phone 253-856-5546 1 Cell 253-797-8462
KENT iba,,&KentWA.ao�
w" "°" www.KentWA.gov n e
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent: Monday,August 12, 2024 2:00 PM
To:Connor, Eric<EConnor@kentwa.gov>
Cc: Barry,Jason<JBarry@kentwa.gov>; Bieren, Chad<CBieren@kentwa.gov>
Subject: RE: Larc Fencing-Potential Add to WA Ave PS
Please proceed.
Thank you,
Kelly
From: Connor, Eric<EConnor@kentwa.gov>
Sent: Monday,August 12, 2024 1:54 PM
To: Peterson, Kelly<KPeterson@kentwa.g v_>
Cc: Barry,Jason<JBarry@kentwa.gov>
Subject: Larc Fencing-Potential Add to WA Ave PS
Good afternoon Kelly,
Our contractor on Washington Avenue Pump Station was able to get their fencing subcontractor
to provide pricing for the fencing that is needed along the Larc Property on 1st Ave. They have
proposed to install approximately 129 LF of City of Kent provided fencing for $4,801.07. This
includes 12% GC markup.
Are you okay with preparing and issuing a change order for this work?
1
Please let me know if you have any questions or need any additional information.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-SS33 I Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Barry,Jason<JBarrv@kentwa.gov>
Sent: Monday,August 12, 202412:57 PM
To:Connor, Eric<EConnor@kentwa.gov>
Cc: Krier, Rick<RKrierekentwa.gov>; Bryant,Jason<JB ant kentwa. ov>
Subject: FW: Fence
Looks fair to me Eric. You good?
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
�- Phone 253-856-5546 1 Cell 253-797-8462
KENT jbarry@KentWA.gov
W/�0-OTON www.KentWA.gov 93
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Bryant,Jason<JBryant@kentwa.gov>
Sent: Monday,August 12, 2024 12:05 PM
To: Barry,Jason<JBarrv@kentwa.gov>
Cc: Krier, Rick<RKrier@kentwa.gov>; Connor, Eric<EConnor@kentwa.gov>
Subject: RE: Fence
Jason,
Attached is the quote for the fence work near LARK. Let us know if you would like to proceed?
Thank you,
Jason Bryant, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 2S3-856-5541 I Cell 253-261-5663
18rvant@KentWA.g-ov
CITY OF KENT,WASHINGTON
KentWA.gov YouTube
2
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Hayden Larson<havden@rodarteconstruction.com>
Sent: Monday,August 12,202411:49 AM
To: !Crier, Rick<RKrier@kentwa.gov>; Barry,Jason<1Barry@kentwa.gov>; Bryant,Jason<J Bryant kentwa. ov>
Subject: RE: Fence
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISP@KentlNA.cou with any
questions.
See attached Change order for fencing on bnsf.
Thanks,
Hayden Larson
Rodarte Construction Inc.
Cell: (253)204-9494
L11
RODARTE
CONSTRUCTION INC.
17 East Valley Hwy East
Auburn,WA 98092
From: Krier, Rick<RKrier@kentwa.gov>
Sent:Wednesday, August 7, 2024 2:11 PM
To: Hayden Larson<hayden@rodarteconstruction.com>; Barry,Jason<JBarry@kentwa.gov>
Subject: Fence
Hayden: any word on the fence for 1 st Ave N
Thanks
Get Outlook for iOS
3
Bryant, Jason
From: Barry,Jason
Sent: Wednesday, September 25, 2024 8:37 AM
To: Hayden Larson; Bryant,Jason
Cc: April Rodarte; Krier, Rick
Subject: RE: 1 st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden,
Can you please get a date confirmation from your subcontractor for installation of this fence?
This work is becoming a high priority with our Department management. Please let us know as
soon as possible.
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-SS6-SS46 I Cell 253-797-8462
K E N T rr [alKentWA.aoy
W.Jk °�°" www.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Hayden Larson<hayden@rodarteconstruction.com>
Sent:Tuesday,September 24,2024 1:15 PM
To: Bryant,Jason<JBryant@kentwa.gov>
Cc:April Rodarte<april@rodarteconstruction.com>; Barry,Jason<JBarry@kentwa.gov>; Krier, Rick
<RKrier@kentwa.gov>
Subject: Re: 1st Ave.fence Rev. 3 Washington Ave pump sta.
{ This message originated outside the City of Kent. Use caution when following links or opening
1 attachments as they can be malicious. Please contact IT Security at ISPOKentWA.gov with any
questions.
I have not.
Thank You,
Hayden Larson
Rodarte Construction Inc.
253-204-9494
From: Bryant,Jason<JBrvant@kentwa.gov>
Sent:Tuesday,September 24,2024 8:46:25 AM
To: Hayden Larson<hayden@rodarteconstruction.com>
1
Cc.April Rodarte<april@rodarteconstruction.com>; Barry,Jason <JBarry@kentwa.gov>; Krier, Rick
<R Krie r@ ken_twa_gav>
Subject: RE: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden,
Have you heard back from the fence sub?
Thank you,
Jason Bryant, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5541 1 Cell 253-261-5663
]Bryant@ KentWA.aov
CITY OF KENT,WASHINGTON
KentWA.gov Facebook _ YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Bryant,Jason
Sent: Friday,September 13, 2024 7:43 AM
To: Hayden Larson<hayden@rodarteconstruction.com>
Cc:April Rodarte<april@rodarteconstruction.corn>; Barry,Jason<J8arry@kentwa.gov>; Krier, Rick
<RKrier@kentwa.gov>
Subject: FW: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden,
Have you heard back from the fence sub contractor? We would like to get this done. I recall
there was a little bit of clearing that was necessary. Is the sub going to be able to take care of
that as well?
Thank you,
Jason Bryant, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5541 1 Cell 253-261-5663
]Bryant@KentWA.00v
CITY OF KENT,WASHINGTON
KentWA.gov Facebook ', -:r YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Bryant,Jason
Sent: Friday, September 6, 202411:30 AM
To: Hayden Larson <hayden@rodarteconstruction.com>
Cc: Krier, Rick<RKrier@kentwa.gov>; Barry,Jason<J Bar ry@kentwa.eov>;April Rodarte
<a ril rodarteconstruction.com>
Subject: FW: 1st Ave.fence Rev. 3 Washington Ave pump sta.
2
Hayden,
Have you heard back from the fence sub contractor? We would like to get this done. I recall
there was a little bit of clearing that was necessary. Is the sub going to be able to take care of
that as well?
Thank you,
Jason Bryant, capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-SSG-SS41 I Cell 253-261-5663
]]swanL@ KentWA.aou
CITY OF KENT,WASHINGTON
KentWA.gov Facebook 7 i,:r..� YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Krier, Rick<RKrier@kentwa.gov>
Sent: Monday,July 22, 2024 9:59 AM
To: Hayden Larson<hayden@rodarteconstruction.com>
Cc: Barry,Jason<1Barry@kentwa.gov>; Bryant,Jason<JBryant@kentwa.goy>
Subject: 1st Ave.fence Rev. 3 Washington Ave pump sta.
Hayden: Please see the attached plans for the added fence on 15Y Ave N,The City would like to add this to your existing
contract work for the pump sta.This work is for install only,the city will supply the chain link fabric and posts, you
would have to pick up the martials at the city's yard on the east hill. Could you please supply the city a quote and
schedule as soon as possible. If you have any questions, please call.
253-350-1325
Z65WAI,i-
City of Kent Sr. Inspector
Capital Projects
3