Loading...
HomeMy WebLinkAboutCAG2024-457 - Change Order - #1 Siemens Industry, Inc. - FAC24-23 Commons Fire Alarm Replacement - 12/19/2024 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form Dir. Assist: • For Approvals,Signatures and Records Management KE N T This form combines&replaces the Request for Mayor's Signature and Contract Cover WASHINcroN Sheet forms. Dir/Dep Dir: Originator: Department: Leah Bryant for Nate Harper Parks, Recreation & Community Services Date Sent: Date Required: > 12/19/2024 12/26/2024 0 CL Authorized to Sign: Date of Council Approval: Q Director or Designee 9/17/2024 Budget Account Number: Grant? Yes WINo F20099.64190.9473 Budget?W]YesEl No Type: N/A Vendor Name: Category: Siemens Industry, Inc. Contract Vendor Number: Sub-Category: = 33599 Change Order 0 FAC24- 23 Commons Fire Alarm Replacement - Change Order 1 Project Name: p g 3- Project Details:Time and Labor to convert old building drawings into CAD drawings for 0 = engineering design work c a� E Agreement Amount: $4 794.82 Basis for Selection of Contractor: Other `Memo to Mayor must be attached Start Date: 10/1/2024 Termination Date: 9/30/2026 Im Q Local Business?F--]YeslzNo* If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace. Business License Verification:Yes In-Process Exempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: FTesQNo CAG2024-457 Comments: a1 C Change Order 1 a� H •� i N 3 f0 C V1 Date Routed to the City Clerks Office: 1 2/1 9/24 ,c«w»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 Exhibit A PROPOSAL CO Kent Commons 44OP-387662 PREPARED BY Siemens {�i�l� r�inco " ttff6't PREPAR R • KING COU T.A.Unform i n the Everyda�,g DELIVERED ON December 13, 2024 skit v+�•rat�lii 41 lk ` t tww Z ;N _ • NL 9 i w r 1 � 1 � SIEMENS Table of Contents SIEMENS PROPOSAL ....................................................................................................... 3 ContactInformation .............................................................................................. 3 Conditionsof Request............................................................................................ 4 Scopeof Work ....................................................................................................... 5 Inclusions.............................................................................................................. 5 Exclusions ............................................................................................................. 6 Clarifications ......................................................................................................... 7 SellPrice................................................................................................................ 8 PaymentTerms...................................................................................................... 9 Termsand Conditions................................................................................................... 10 Terms & Conditions Link(s) .................................................................................. 10 SignaturePage............................................................................................................. 11 SignaturePage .................................................................................................... 11 Page 2 of 11 SIEMENS Contact Information Proposal #: 9407461 Date: December 13, 2024 Sales Executive: Liz Barlow Branch Address: 15900 SE Eastgate Way, WA Bellevue , WA 98008 Telephone: 425.615.8780 Email Address: liz.barlow@siemens.com Customer Contact: Nathen Harper Customer: KING COUNTY DIRECTORS'ASSOCIATION Address: 18639 80TH AVE S KENT WA 98032-1003 Services shall be provided at: PARK, RECREATION & COMMUNITY SVC 400 W GOWE ST KENT WA 98032-6019 Page 3 of 11 SIEMENS Conditions of Request We transmit herewith the above referenced price request for Change Order 1 to the contract between Siemens Industry, Inc. ("Siemens") and KING COUNTY DIRECTORS'ASSOCIATION for Kent Commons (the "Agreement"). This price request is based on information received from your company and is subject to the following conditions: 1. No change in contract price. 2. X Change of$ $4,351.02 in contract price. 3. days of extension of contract. Retention shall be extended only on value of price request. 4. We are not proceeding until we received a change order. 5. Work is proceeding as authorized. 6. Please forward a cost event& change order to this office since the work has been completed. This proposal covers the present ascertainable direct costs at this time. It does not include any extra costs associated with the impact of this Change Order on the project schedule, labor productivity or their factors affecting the cost of performance. Siemens reserves the right to amend this proposal if and when such impact costs become reasonably determinable. The Description of Changes is attached hereto and made apart hereof. The Agreement is incorporated by reference, modified only to the extent modified herein. Page 4 of 11 SIEMENS Scope of Work 1. Siemens to create CAD files for record drawing set. Exclusions and Clarifications Work to be performed on regular time Inclusions 1. Sales Tax (if tax exempt please provide tax exempt certification) 2. Freight 3. Engineering 4. Project Management for Siemens Scope of work 5. System Commissioning and Final Pretest 6. Final AHJ Testing and certification 7. Fire Alarm Submittal to customer 8. Fire Alarm Submittal to AHJ 9. Fire Alarm Permit or Electrical Permit or costs associated with this project 10. Professional Engineers stamp which may be required 11. Overtime (as specifically noted) 12. Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment 13. As interpreted in the specifications, as shown on drawings, and as defined in this proposal 14. Demolition of the existing fire alarm system 15. Price is based on Auto-CAD electronic drawings for the project being supplied to us by others 16. DACT 17. One (1) year warranty 18. Customer training 19. Final wiring terminations to the control panel 20. Three (3) submittals 21. Three (3) 0&M manuals 22. Programming Page 5 of 11 SIEMENS Exclusions 1. Offsite system monitoring fees 2. Cost associated with multiple trips to the job site due to incompletion by others 3. Working in areas containing hazardous materials or confined space 4. Cost associated with schedule acceleration or multiple unplanned phases 5. Telephone line for DACT and/or IP Network Connection 6. Costs associated with bypassing the system during construction 7. Building and construction permit fees 8. Creating base building auto cad drawings for the project 9. Ceiling and/or wall removal, replacement, patching, and painting 10. Per project aggregate general liability insurance 11. Overtime (except as specifically noted) 12. After hours work (except as specifically noted) 13. Additional testing due to others 14. Dedicated phone lines 15. Dedicated IP Network Drop 16. 120 VAC power 17. Conduit raceway, Electrical boxes and supports 18. Performance or payment bonds 19. Bonding or special insurance 20. Fire caulking 21. Scaffolding and lifts (except as specifically noted) 22. Knox box 23. Shunt trip breakers 24. Security system interface or door lock release 25. Back boxes for devices are not included unless listed in this proposal's provided equipment list 26. Fire Watch or other costs associated with temporary measures while the system is down or impaired Page 6 of 11 SIEMENS Clarifications 1. Siemens will be providing parts and smarts to the selected electrical contractor for this project. 2. Siemens will provide the fire alarm permit, review and inspection fees. 3. Siemens will need to be provided with architectural backgrounds in Auto CAD files, 4. approved fire protection report, and full set of construction documents, free of charge. 5. Siemens will provide submittal sets of drawings, as well as two construction sets, and two as built sets. An electronic and hard set of approved and stamped as builds will be provided to the Owner upon the project completion. 6. Owner will need to allow Siemens full and complete access to the property for the duration of the project. 7. All scheduling and phasing will need to have the Owner's input and will require the Owner's cooperation to complete during the allotted time. 8. Submittals may take between 4-6 weeks for approval through the Fire Department. 9. All work to be performed during normal working hours of Monday thru Friday, 6:OOam to 4:OOpm. 10. If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of equipment used, and a detailed input/output matrix or sequence of operations. In the event that such information is provided post-award or such information is discovered by Siemens during installation of the scope, a change order for additional time and an increase in cost may be required due to the information differing from assumptions that Siemens had to make in developing the scope. Page 7 of 11 SIEMENS Sell Price Total Quote Price $4,351.02 This price is firm for 30 days from the date of this proposal. Page 8 of 11 SIEMENS Payment Terms Payment Terms Acceptance Agreement The total price of: $4,351.02 and the estimated return on investment are based on the items outlined in this proposal. ANY STATEMENTS MADE HEREIN REGARDING SAVINGS THAT MAY BE ACHIEVED BY IMPLEMENTING THE SERVICES OFFERED IN THIS PROPOSAL ARE ESTIMATES ONLY. NO WARRANTY, EITHER EXPRESSED OR IMPLIED, SHALL BE CONSTRUED TO ARISE FROM SUCH STATEMENTS, NOR SHALL SUCH STATEMENTS BE CONSTRUED AS CONSTITUTING A GUARANTEE BY SIEMENS THAT SUCH SAVINGS WILL OCCUR IF THE SERVICES ARE IMPLEMENTED. The Buyer acknowledges that when accepted by the Buyer as proposed by Siemens Industry, Inc., this Proposal and the Siemens RAM Projects Business Standard Terms and Conditions, (together with any other documents incorporated into the forgoing) shall constitute the entire agreement of the parties with respect to its subject matter. BY EXECUTION HEREOF, THE SIGNER CERTIFIES THAT(S)HE HAS READ ALL OF THE TERMS AND CONDITIONS AND DOCUMENTS, THAT SIEMENS OR ITS REPRESENTATIVES HAVE MADE NO AGREEMENTS OR REPRESENTATIONS EXCEPT AS SET FORTH THEREIN, AND THAT (S)HE IS DULY AUTHORIZED TO EXECUTE THE SIGNATURE PAGE ON BEHALF OF THE BUYER. Proposal is valid for thirty(30) days from the delivery date of December 13, 2024. Payment is due within 30 days of invoice date. Payment Terms:25% mobilization in advance, progress payments Total:$4,351.02 Siemens Industry, Inc. invoices paid by credit card may be subject to a surcharge of up to 2%. Page 9 of 11 SIEMENS Terms & Conditions Link(s) Terms and Conditions (Click to download) Terms&Conditions(Unrestricted) (www.siemens.com/sta nda rd-terms-project-u n restricted) Price Escalation. If, during the term of this Contract, the price of various materials or labor or logistics are increased as reflected by CRU/IHS Markit/CMAI/COMEX market index, then Siemens may increase the Contract Sum or apply a surcharge to Customer accordingly. As a result of the global Covid-19 Virus outbreak, temporary delays in delivery, labor or services from Siemens and its sub-suppliers or subcontractors may occur. Among other factors, Siemens' delivery is subject to the correct and punctual supply from sub-suppliers or subcontractors, and Siemens reserves the right to make partial deliveries or modify its labor or services. While Siemens shall make every commercially reasonable effort to meet the delivery or service or completion date mentioned above, such date is subject to change. To the extent applicable, the following Addendum(s) are incorporated and made part of the Siemens Standard Terms and Conditions: Click on addendum below to read/download Fire Life Safety (www.siemens.com/fls-addendum) Mass Notification (www.siemens.com/mass-notification-addendum) Monitoring (www.siemens.com/monitoring-addendum) Software License Warranty (www.siemens.com/software-license-addendum) Consulting (www.siemens.com/rider-consulting) Page 10 of 11 SIEMENS Signature Page Proposed by: Accepted by: Siemens Industry, Inc. KING COUNTY DIRECTORS'ASSOCIATION Company Company Liz Barlow Tona Khau Name Name (Printed) 9407461 Toga kha" Tona Khau(Dec 19,202414:17 PST) Proposal # Signature $4,351.02 Facilities Superintendent Proposal Amount Title December 13, 2024 Dec 19,2024 Date Date 182273 Purchase Order# ❑PO for billinglpmnt only ❑PO not required Page 11 of 11 Signature: C&tkfi�811 Christine Brooks(Dec 19,202414:32 PST) Email: cityclerk@kentwa.gov CAG2024-457 - Original - Siemens Industry, Inc - FAC24-23 - Commons Fire Alarm Replacement -Change Order 1 Final Audit Report 2024-12-19 Created: 2024-12-19 By: Leah Bryant(Ibryant@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAACTIE6hLkhGWPNPM6AU-aCXKopCHyLaIT "CAG2024-457 - Original - Siemens Industry, Inc - FAC24-23 - C ommons Fire Alarm Replacement -Change Order 1 " History Document created by Leah Bryant(Ibryant@kentwa.gov) 2024-12-19-10:07:47 PM GMT Document emailed to tkhau@kentwa.gov for signature 2024-12-19-10:11:16 PM GMT Email viewed by tkhau@kentwa.gov 2024-12-19-10:11:41 PM GMT dp Signer tkhau@kentwa.gov entered name at signing as Tona Khau 2024-12-19-10:17:36 PM GMT 4 Document e-signed by Tona Khau (tkhau@kentwa.gov) Signature Date:2024-12-19-10:17:38 PM GMT-Time Source:server Document emailed to cityclerk@kentwa.gov for signature 2024-12-19-10:17:40 PM GMT Email viewed by cityclerk@kentwa.gov 2024-12-19-10:32:15 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Christine Brooks 2024-12-19-10:32:51 PM GMT 140 Document e-signed by Christine Brooks (cityclerk@kentwa.gov) Signature Date:2024-12-19-10:32:53 PM GMT-Time Source:server Adobe Acrobat Sign Agreement completed. 2024-12-19-10:32:53 PM GMT Adobe Acrobat Sign