Loading...
HomeMy WebLinkAboutCAG2023-292 - Change Order - #4 - Scarsella Brothers, Inc - 2023 Watermain Replacement - 10/18/24 Agreement Routing Farm ■ For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet Forms. W A 5 H I N G T O N (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: > 10/15/2024 0 L CL a Authorized to Sign: Date of Council Approval: a ❑Director or Designee El Mayor 4/18/2023 Budget Account Number: Grant? El Yes 0 No W20108.64110.330 Budget? 0 Yes ❑ No Type: N/A Vendor Name: Category: Scarsella Bros., Inc. Contract Vendor Number: Sub-Category: C 34547 Change Order#4 0 Project Name: 2023 Watermain Replacement E CProject Details:Compensation for 7 days force account work required to tear out and reconstruct S. 196th Street because of the 10-inch watermain break that occurred on December 29, 2023. C do E Agreement Amount: $89,483.87 Basis for Selection of Contractor: Bid Go i Start Date: N/A Termination Date: 93Working Days cm a Local Business? ❑Yes ❑No* *Ifineets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes IZI No CAG2023-292 Date Received by City Attorney: 10/15/24 Comments: O1 C 3 o0c N •� L �. M Cps Date Routed to the Mayor's Office: 10/18/24 of Date Routed to the City Clerk's Office: 10/18/24 aa«W22373 1 20 Visit Documents.KentWA.gov to obtain copies of all agreements 4400.� • KENT WA-NGTON CHANGE ORDER NO. #4 NAME OF CONTRACTOR: Scarsella Bros. Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: 2023 Watermain Replacement ORIGINAL CONTRACT DATE: May 5, 2023 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Change Order No. 3 is amended as follows: Original Contract Sum, $1,346,673.84 (including applicable alternates and WSST) Net Change by Previous Change Orders $76,"� �84j7T90 (incl. applicable WSST) Current Contract Amount $1,430,851.74 (incl. Previous Change Orders) Current Change Order $16,704.29 Applicable WSST Tax on this Change $1,687.13 Order Revised Contract Sum $1,449,243.16 2. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Compensation for 7 days of force account work required to tear out and reconstruct S. 196th Street because of the 10-inch watermain break that occurred on December 29, 2023. Cost include FA sheets 9 - 15. 3. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: CHANGE ORDER - 1 OF 3 Original Contract Sum, $1,346,673.84 (including applicable alternates and WSST) Net Change by Previous Change Orders $102,569.32 (incl. applicable WSST) Current Contract Amount $1,449,243.16 (inch Previous Change Orders) Current Change Order $81,201.33 Applicable WSST Tax on this Change $8,282.54 Order Revised Contract Sum $1,538,727.03 Original Time for Completion 80 working days (insert date) Revised Time for Completion under 86 working days prior Change Orders (insert date) Days Required (f) for this Change Order 7 working days Revised Time for Completion 93 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CHANGE ORDER - 2 OF 4 CONTRACTOR- CITY OF KENT: By: By: k�. - - _- signat (signature) Print Name: Print Name: Dana Ralph Its if Its Mayor DATE: X�l• (t�tfLe� DATE: 10/18/2024(title) ATTEST: APPROVED AS TO FORM: (applicable if Mayors signature required) ouk%—rjE-- Kent City Clerk Kent Law Department C[In this field,you may enter the electronic Fllepath where the contract has been saved] CHANGE ORDER - 3 OF 4 File No. 200.2 KENT CHANGE ORDER WORKSHEET NO. 4 Construction Engineering Division - Public Works Project: 2023 Watermain Replacement Project No: 22-3002 Project Engineer: Almaroof Abdulnaser Fed-Aid No: N/A Capital Projects Josh Harris Contractor: Scarsella Brothers Manager; Date: 7/17/2024 I. Proposed Change Create pay item to compensate for 7-days of force account work required to tear out and reconstruct S 196th St as a result of the 10-inch watermain break that occurred on December 29, 2023. Costs include the following FA sheets: 9- 15 II. Reason and Background for Change The City of Kent tasked Scarsella Bros with cleanup and repair of S 196th Street caused by the emergency watermain break (ref. CO 3). To achieve this, the existing roadway asphalt, curb, gutter and sidewalk all had to be removed and replaced in the effected area. Subcontractors (RL Alia Company, Icon Materials and SPM) came in to pour back curb, gutter and sidewalk, repave the asphalt road and restripe the lanes. This will be for force account sheets 9-15 for a total of $81,201.33 III. Method of Payment NEW PAY ITEMS ❑Notapplicable Schh. Item Description Total Est. Unit Unit Price Total Estimated Cost of No Qty Item II Restoration of S 196th St caused by 10-inch watermain 1 FA $81,201.33 $ 81,201.33 break (CO 3). New Pay Items Total: $ 81,201.33 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑� Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ $ Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not applicable Page 1 Sch Bid Item No. Item Description No Qty Unit Unit Price Cost of Item 4$ Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER:1 $81,201.33 *Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 80 Due This Change Order: 7 Previous Total: Explanation/Justification for Additional Working Days: r, *TOTAL WORKING DAYS: "ge *This Change Order+ Previous Total Capital Projects Manager: Ir Date: 1.' Josh H�r is Construction Engineering Date: Supervisor: ��� ' Jasd Barry l Construction Manager: _ -�:' Date: Eric Connor Page 2 FA Sheet No.: 9 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermaln Replacement Project No: 22-3002 Item No.: C04 Date: Tuesday 11212024 Description of Work: Tear out curb and gutter that was displaced from watermaln break. Pre subgrade for Alia to come pour back curb.Saw cut asphalt on 196th for removal. Work by Subcontractor?: No Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Jay Krler 113-14 Foreman 8 95.69 5 765.52 Zachery Schlicker Lead Pipelaver 8 6953 $ 556.24 Josh Ford 113.14 Fortran 8 9265 $ 741.20 Morgan Koch 226.39 Operator 8 90.66 $ 725.28 Kyle Sparring Laborer 8 6596 $ 527.68 Bambi Gannon 113.02 TCS 8 63.33 $ 506.64 Sara Watson 113-01 Flagger 8 5583 $ 446-64 $ SUBTOTAL-LABOR: 5 4,269.20 LABOR OVERHEAD&PROFIT @ 31% $ 1.323-45 LABOR TOTAL S 5,592,05 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs (Hourly Rate Hrs Standby Rate AMOUNT 2-299 Ford F-250 Pickup 8 33.63 $ 269.04 17-244 Cat 314 8 98.26 $ 786.08 3-121 Ford F450 Tool Truck 8 36.04 $ 28832 13.09 $ 13.09 $ - 15-112 Ca1938 8 77.87 $ 622.96 84.71 $ 2-210 F-150 8 20.23 $ 161.84 SUBTOTAL-EQUIPMENT $ 2.128.24 EQUIPMENT OVERHEAD&PROFIT @ 21% 5 446,93 EQUIPMENT TOTAL $ 2.575.17 lIAA1 ERIALSISERYIGESIRENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Del-Mar Concrete Cutting 1 LS $ 1,054.94 $ 1,054.94 SUBTOTAL $ 1.054.94 OVERHEAD&PROFIT @ 21% $ 221.54 TOTAL $ 1,276.48 Verification of Hours Worked: TOTAL: $ 9,444.30 12%MARKUP (for prime when subcontract work) $ Contractor's Representative Dale SHEET TOTAL: $ 9,444.30 Owner's Representative Date Pay Estimate Entered: Date: By: W W H G z o z z :) z D K X w Q w Q ER EF3 K3 e» 61) 613 e3 613 FR 63 «3 e3 (f3 63 e» 6q e�r e» 6c3 H3 <» E/3 U� E9 613 K3 64 Vi VD, c+� (Fi 6F3 V) 63 Ef3 z aQ� 0� 0 0 z z Q a uj w rj O O m m w w E 0 p Q z O w ¢ Q 2 2 w w a O D V ¢ Q Q J m 5 5 ¢ Q = O g Q p 0 0 rn J Q z z O w J a Q H � Q p OU OU M 2 Q U p Y J O o� a� F— (+� m o O� Q CO 2 ~O V 0� m CO of CO m m m m m m m F— Y fl w p w p w p w p w p w p w p w ❑ w ❑ w p O Ix O cq O cn O U O cn O cn O U O U O O 0 O cn H o 4 Z H p w J � o o Ql- o a W w 1 �J 11 W J O00E- oT a N a o HQOO � O '4— -r W U W ❑ U � O z N ' ' ! Q 1— O W V O O p p W N ^ QQ Z Z W ! 1 w O Z m X F w Ew w Q Q [�+ Q UO 0 ❑ of Efl ER 69j EA 603 H9 v) 6p3 6-3 Ef3 6f> H3 EA Qf' Ef3 Efl 63 6e, Uf, w- Ef3 9 Ef)b ffl 6F3 H3 Uf, p ❑ U o Q O W Q J J U J Q (� n OJ Q H oH m H O O O z O (�O � N m U U. m Om1 D U M J x ( � c� t (Dtz (D (D (D C� � (DC a o � W O w O W O W O W O W O w O w O w O W 0 O a UM) o I (If � x � ( 0� 0� 0� w w F 4 F- z z w w w w WCL y v�T \i •� � � fir'' � ~ E � ) L z z lNI I I I I ) fq co 0 DEL-MAID CONCRETE Invoice 41654 CUTTING & CORING 152 lOOth St. S.Tacoma, WA 98444 Ph # (253) 537-O 9SCNNNED FAX 0 (253) 535-0507 TO C �5 �! �`�� DATE 1 — 2 G JOB NO. a 3300d e; 94 I CONTACT PERSON -- W�I'r /f/c/l k—9r JOB LOCATION �/y/7— TERMS: NET 30 DAYS,UNLESS OTHERWISE NOTED. DATE DESCRIPTION AMOUNT � 02 L•�, � yr.�.� -`l`� �9n ` - / ow, A FINANCE CHARGE OF 1.5% ON THE UNPAID PREVIOUS BALANCE WILL BE COMPUTED AT THE END OF EACH MONTH. IF CUSTOMER DEFAULTS OR IF SUIT IS BROUGHT TO COLLECT ANY OF THE PRINCIPAL OR INTEREST DUE OR OWING �� UNDER THIS BILL, DEL-MAR MAY CHARGE CUSTOMER REASONABLE ATTORNEY r FEES AND COLLECTION COSTS. [ FA Sheet No.: 10 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Wednesday 113/2024 Description of Work: Load and haul out concrete and asphalt removed on 1-2-24 Work by Subcontractor?: NO Prime Contractor: Scarsella Bros Sub-Contractor: i A50R STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs i65.961 Hrs OT Rate AMOUNT Ja Krier 113.14 Foreman 3 $ 287.07 ,TimothyZuanich Truck Driver 4 $ 326.04 ,Josh Ford 113.14 Forman 3 $ 277.95 !Morgan Koch 226 39 Operator 3 $ 271.98 Kyle S errin Laborer 3 $ 19788 $ Bambi Gannon 11302 TCS 3 6333 $ 189.99 Sara Watson 11301 Flagger 3 55.83 $ 16749 $ $ SUBTOTAL-LABOR: $ 1.718.10 LABOR OVERHEAD&PROFIT @ 31% S 53270 LABOR TOTAL $ 2,261.10 EQUIP MEW- EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Slandby Rate AMOUNT 2-299 Ford F-250 Pickup 3 33.63 $ 100.89 17-244 Cat314 3 98.26 $ 294.78 3-121 Ford FA50 Tool Truck 3 36.04 $ 108.12 15-112 Cat 938 3 77.87 $ 23361 9-106 Mack Dump Truck 4 105.59 $ 422.36 2-210 F-150 3 20.23 $ 60.69 SUBTOTAL-EQUIPMENT $ 1.220.45 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 25629 EQUIPMENTTOTAL $ 1,476.74 MATERIALSISERVICESIRENTALS - MATERIALS I SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Renton Concrete Recvclers Invoice#6016 1 LS $ 434.70 $ 434.70 $ is - SUBTOTAL $ 43470 OVERHEAD&PROFIT @ 21°/ $ 91 29 TOTAL $ 525.99 'Verification of Hours Worked: TOTAL: $ 4,253.83 12%MARKUP (for prime when subcontract work) $ contractor's Representative Dale SHEET TOTAL: $ 4,253.83 Owner's Representative Date Pay Estimate Entered: Date: By: W W 0 Z_ a Z w 0 w O X X wa wa -� W W F H Q a Q Q Z Z O z y w O O Q Q > w w m D v U U -� J a a �- w Z 0 Y � W J Z Z Q � W W Q j � J Q Q J m < Y O m m ❑ Y O a = M �1 Iv1 O CO Z) Q O co g U oII H > � CO Q D I m m Of m Of m m l> m m m m W m Y ` W ❑ W ❑ W ❑ W ❑ W ❑ W ❑ W ❑ W ❑ W ❑ W ❑ O P� 0co0UOco0m0m0cn0UOUOUOcn 00 D J U) G ° a z z 3 Z o w 9 V O n M Iza w Y o a - `U D v O W J Z0H � � a , `� 1� w X Z Z O p ` W ¢ U o W U) H Of a zz � N CO W X w oO O � � � � � � � UY � 6s � � ea � � � � 6 � � � � � � � 69 �V ~ 0 � Q W m O LU 0 J Q qU o J O p z 2 O o LL r N ❑ m m CO ❑ JQ m 0IM M U) o Q m ptp !7 (D !t (Dt (DtcD !7c-Dtz (D (Dt (D ! W p w p w p W p w p w 0 w 0 w p w p w p o CL U) o � 0� ofOf W- Q m > > > < < v F 0 w w Cl) w c a a m v z_ � Q CO) m z z w \� z w o ► \^ o �5 �� o z ` 1 v cUn 0 SCANNED Renton Concrete Recyclers LLC 22121 17th Ave SE STE 117 Bothell,WA 98021 425-481-9101 INVOICE 6016 rr°weatitTr PAGE 1 DATE 1/3/2024 ACCOUNT NO. 92 TERMS Net 30 Days SOLD TO SCARSELLA BROTHERS PO BOX 68697 233002/13ENSON HWY SEATTLE,WA 98168 Fee Tax Ticket Date P.O. Product Qty Rate Amount Amount Amount Total 18487 1/312024 233002 Concrete Haulback 2'and Smaller 36.00 11.50 414.00 20.70 000 434.70 i 18487 1/3/2024 233002 Waste Disposal Fee 1.00 0.00 0.00 000 0.00 0.00 Subtotal 37.00 "' 414.00 20.70 000 434.70 Invoice Total 37.00 414.00 20.70 0.00 434.70 Total Invoice-----> 434.70 FA Sheet No.: 11A DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermain Rel2lacement Project No: 22-3002 Item No.: C04 Date: Friday 1/512024 Description of Work: Scarsella crews setup traffic control and assited Alia with grading and fours for curb and gutter Work by Subcontractor?: NO Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Jay Krier 113.14 Foreman 8 95.69 $ 765.52 Zachery Schlicker Lead Pipelaver 69.53 $ - JoSh Ford 113 14 Forman 9265 $ Morgan Koch 226.39 Operator 8 9066 $ 72528 Kyle Sperring Laborer 65.96 $ - Bambi Gannon 113 02 TCS 8 6333 $ 506.64 Sara Watson 11301 Fla ger a 55.83 $ 446.64 $ SUBTOTAL-LABOR: $ 2,444,08 LABOR OVERHEAD&PROFIT @ 31% $ 757.66 LABOR TOTAL S 3.201.74 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATE❑ STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Slandby Rale AMOUNT 2-299 Ford F-250 Pickup 8 33.63 $ 269.04 17-244 Cat 314 8 98.26 $ 786.08 $ 2-210 F-150 8 20.23 $ 161.84 SUBTOTAL-EQUIPMENT 5 1,216.95 EQUIPMENT OVERHEAD&PROFIT @ 21°/ $ 255.56 EQUIPMENT TOTAL S 1.472.52 Mi4T ERiAtr3f S EFt V ICES.IRE NTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT $ $ SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL $ Verification of Hours Worked: TOTAL: $ 4,674.26 12%MARKUP (for prime when subcontract work) $ Canlractor's Representative Dale SHEET TOTAL: $ 4,674.26 Owner's Representative Dale Pay Estimate Entered: Date: By: 0 z 0 z Z 0 Z 0 w O w O w Q w a EA ER EA EA EA 6s Uf ER 614 (A K3 Ef3 ff3 Ef3 VD. 6a Ef3 613 Ef3 E03 613 EA e3 Ef3 6a LI) 0] EA EFT ER ER b9 613 EA ER z Q � w 0 0 z z ¢ Q O O Z N w o o a a 2 2 w w a _ a T ¢ to O < 0 0 0 W 0 0 ¢ D H O O o co m CO c O 0' m ¢ ~ = coU) cn m ¢ 0 O � 0 o }pdy } } } } } } w } } F Y U=j COdu)CO mdu) Co m m m W co m � }m Wp ❑ W p W W W ❑ pW p W ❑ O a a F- a a a ¢Inon0cn0cn0cnO0u) On c ` 2 J Cn o N oQ Z O K a W O Z N J 1 0 a Q w J •• 5� LLI LLI Y Q Z Q o o N N w W U p U g O Z a W X z Z O w Q � U ° oZ N Zz W w 0 ,Z I-- w w w w Q Q ¢ 0 O ❑ d3 69 Ef3 613 6a 69, 60 613 ER fR V> EA EA Efl Efl ff3 EA fA Ef3 ER EA fA 691 EF} 6q EA Ef3 613 ❑ ❑ U ~ 0 0 Q w o W a J a U Ow J < J 0 0 H m O P O 0 O Z _ tmp N N (0) m C) LL m rn m m 0 1 m >Q O (n 0a wpwpwpw p pw p w p O n O LL H m >LLJ Z Z W W W CO o d w a w Z 0 S ` C/5 0 r E V m Z d m W CA m ¢ z N u�] 0 FA Sheet No.: 11B DAILY REPORT OF FORCE ACCOUNT WORKED r Project Name: 2023 Watermain Replacement Project No: 22.3002 Item No.: C04 Date: Friday 1/5/2024 Description of Work: Alia Company forming and pouring curb and gutter along S 196th St Work by Subcontractor?: Yes Prime Contractor: Scarsella Bros Sub-Contractor: Alla Com an LA6DR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Leith Foreman 7 954 $ 667.80 Jose Foreman 7 869 $ 608-30 Roberto .Mason 7 83.45 $ 58415 Jordan Laborer 7 70.26 $ 491.82 Ulies Mason 7 83-45 $ 58415 $ $ SUBTOTAL-LABOR: $ 2.936.22 LABOR OVERHEAD&PROFIT @ 31% $ 910-23 LABOR TOTAL 5 3,84GAS EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT F-350 7 28.32 $ 198-24 F-550 7 33.36 $ 23352 Crew Truck 7 24.42 $ 17094 SUBTOTAL-EQUIPMENT 5 602.70 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 12657 EQUIPMENT TOTAL $ 729.27 MATER#ALSISERVICESIRENTALS MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Corliss Resources Inovoice#31027045 1 LS $ 897-50 $ 89750 Is SUBTOTAL $ 897.50 OVERHEAD&PROFIT @ 21% $ 188.48 TOTAL $ 1,085.98 Verification of Hours Worked: TOTAL: $ 5,661.70 12%MARKUP (for prime when subcontract work) $ 679-40 Contractor's Representative Date SHEET TOTAL: $ 6,341.101 owner's Representative Dale Pay Estimate Entered: Date: By: Extra Work Order (Project Name: 2023 Watermain (Project Number: 10.23 Owner: "S �y 'Weather: ILi p �3 � Date: 1/5/2024 Description: Set,poured,and stripped 80 feet of curb at the intersection of 196th and 68th Ave S. Labor: (Name: Class: 5/T Hours:110T Hours: DT Hours: S/T Rate: OT Rate: DT Rate: I Total: ILeith Foreman 7 $95.40 $131.31 $667.80 (Raul Foreman $89.46 $122.40 $0.00 lose Foreman 7 $86.90 $119.11 $608.30 (Roberto Mason 7 $83.45 $113.96 $584.15 Andreas Mason $83.45 $113.96 $0.00 (Lawrence Laborer $70.26 $96.47 $0.00 Jordan Laborer 7 $70.26 $96.47 $491.82 IUlies Mason 7 $83.45 $113.96 $584.15 .lake Johnson Laborer 60% $48.56 $63.91 $0.00 Joel Foreman $90.27 $122.64 $0.00 IBrendon Carpenter $84.39 $113.82 $0.00 (Parker Apprentice $53.14 $70.30 $0.00 Jacob Carpenter $84.391 $113.82 $0.00 $0.00 Equipment: (Description: Equip.Number: Reg,Hours: STBY Hours: Reg.Rate: STBY Rate: Total: Leith Truck F350 7 $28.32 $198.24 (Raul Truck F550 $25.46 $0.00 (Roberto Truck F550 7 $33.36 $233.52 Crew Truck 7 $24.42 $170,94 .Joel Truck F550 $24.23 $0.00 $0.00 Materials: .Supplier: Ticket/Invoice#: Material QTY Units Unit Price Total: Corliss 31027045 Concrete 5 CY $179.50 $897.53 $0.00 $0.00 $0.00 Subcontractors: (Name: Ticket/Invoice#: Material/Service: CITY: Units: Unit Price: 'Total: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal MU% Total (Labor: $2,936.22 31% $3,846.45 (Equipment: $602.70 21% $729.27 Materials: $897.50 21% $1,085.98 Subcontractors: $0.00 12% $0.00 Grand Total: $5,661.69 1 10 •Z 3 Invoice Number; 010 Invoice SINCE 1892 CORLISS Invoice Dale: 1/05/2025/2024 � Page- 1 �°1 Z Terms of Sale: Net30 O 2oS RESOURCES Customer Number: 10141641 i® Customer Job: 2023 WATERMAIN REPLACEMENT Corliss Resources LLC _ Tax Code: 46 To ENSURE PROPER CREDIT,PLEASE INCLUDE THE in VO►CE HU&INER WITH YOUR PAYMENT �9 RL ALIA COMPANY REMIT TO: � 15620 Collection Center Drive 10831 SE 181ST STREET Chicago,IL 60693-0156 _ RENTON WA 98055 Tax ID# 41-2061261 -Dellve Address Lot/81ook Purchase Order Customer Job 1► Order# Pfgject# 6840 S 196T 1 ST KENT PW-YES INT#13312 21 5288 Ticke Product Date "` Plant Number Product Description Quantity UOM Unit Price Extension 01-05-24 C4000A COMMERCIAL CLASS 4000 W/AIR 5.00 cy $124.50 $622.50 01-05.24 9000306 HOT WATER 5.00 ea $7.00 $35.00 Vtn 01-05-24 9000114 1%POZZ NC534 5.00 ea $7.00 $35.00 M 01-05-24 11000317 SHORT LOAD DELIVERY CHARGE 1.00 ea $150.00 $150.00 01-05-24 11000330 READYMIX ENVIRONMENTAL CHARG 5.00 cy $6.00 $30.00 01-05-24 11000325 REDIMIX FUEL SURCHARGE 1.00 ea $25.00 $25.00 "`TICKET(S)FROM PLANT SUMNER 10025036 Subtotal- $897.50 Total qly: Total Tax: TAX- $0.00 5.00 $0.00 Guestlons?Please call Customer Cure at 88"98 3938 Invoice Total: $697.50 This invoice is subjcr:t 10 the terms set Forth m the CreoII Application andfor Goneral Terms and Conditions tll Safe,as well as any additional leans and conditions conialned in the OuotaUun or Order Acknowledgement.Any additional or dilforent farms proposed by Buyer are hereby deemed to be a material alleraiinn and are hereby objected to.All items relumed aro subject to cartage and handling charges.Accounts are due anti payable by the above slated terms.Past dire accounts are subject to service charges as outtined in the.Credil Application andfor General Terms and Condikons of Sale. FA Sheet No.: 12A DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Monday 1/8/2024 Description of Work: Scarsella crew prepped sidewalk grade for Alia and set traffic contol up and broke traffic control down at the end of the day Work by Subcontractor?: NO Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Mrs OT Rate AMOUNT Jay Krier 113 14 Foreman 4 95.69 $ 382,76 David Jacobs Operator 4 91.6 $ 366.40 $ Case Ford 22639 Operator 6 9066 $ 54396 Yorbin Martinez Apprentice Laborer 6 60.94 $ 36564 $ $ $ $ SUBTOTAL-LABOR: $ 1.658.76 LABOR OVERHEAD&PROFIT @ 31% $ 51422 LABOR TOTAL $ 2,172.98 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-299 Ford F-250 Pickup 4 33.63 $ 134.52 17-244 Cat 314 4 98.26 $ 393.04 3-121 Ford F-450 Tool Truck 6 36.04 $ 216.24 $ 15-112 Cat 938 6 77,87 467.22 $ SUBTOTAL-EQUIPMENT $ 1,21102 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 254.31 EQUIPMENT TOTAL $ 1,465.33 MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Is SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL $ - Verification of Hours Worked: TOTAL: $ 3,638,31 12%MARKUP (for prime when subcontract work) $ - contractor's Representative Date SHEET TOTAL: $ 3,638.31 Owner's Representative Date Pay Estimate Entered: Date: By: 0 z 0 z z :3 z :) w O W O x X W ¢ w ¢ fA EA EA ER fA Efl 64 EA 63 EA 69 Va.6S EH Efl EA fA 6F1 ER 6s EA Ef3 64 Ef3 Ef3 U3 64 ut3 Uri 6g EFT EA 6F) 64 EA z Q w w 0 O O 0 z z Q Q z w � z y w O O Q Q 2 2 w w a O V Q Q Q a Q Q x a w J Z Z p Y J M x to O O H < -J a a D H < } p p p CO 2 < Y p � Q 2 O m C O O a � 2 O w a I w o� } } } } } } } } } } c Y (n c Of m of m 0 m � m � m m m m m m W p W p W p W p W p W p W p W p W p W p O aF- a � aFIL a a a a � aF a � a 0cn0m0cn000m000w0cn0m0m fn D N ti co oW 3 � N � � a Ek LU � o w O W a O0p � Ow a 3`- N N a Z I- a o 0 O rid N W W Q m p W z I— Q � C0a X z z p 0 W C) v o °w � .� z � n] Z Z w W Z p F O w w Op w W O p Q 6S 6S Uf EA SS 6f3 6S Ef) U33 Gq Ef) 69 ff) Efl Efl EA 6F> 6R ff3 6e U3 6-3 Gq Efl V), EA EA Ef3 V ° o W ¢ p V J o O p z o m xI F- o n w LL m M '� cf) N x m O C OH (9 !zOO C O ~ O C CCD tz O JF- x W p p wp wpw a OO mfn O LL ~ V In > > � Q Q H Q A W LLI w w m M O CL w W m U Z En I � V - O p E m ¢ R z ,C z } w U IY Z v � Q � � um=i [¢0+7 0 FA Sheet No.: 12B DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Monda 1/812024 Description of Work: Alla Company forming and potiring and stripped sidewalk on 196th St Work by Subcontractor?: YES Prime Contractor: Scarsella Bros Sub-Contractor. Alia Company LA00FZ - STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Leith Foreman 8 95.4 $ 763.20 Jose Foreman 8 86.9 $ 695.20 Roberto Mason 8 83.45 $ 667.60 Jordan Laborer 8 70.26 $ 562.08 Ulies Mason 8 83.45 $ 66T60 $ $ $ $ S SUBTOTAL-LABOR: $ 3,355.68 LABOR OVERHEAD&PROFIT @ 31% S 1.040.26 LABOR TOTAL S 4,395.94 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment DeSrfgftn Hrs Hourly Rate Hrs Standby Rate AMOUNT F-350 8 2832 $ 22656 F-550 8 33.36 $ 266.88 Crew Truck 8 24.42 $ 195.36 $ $ $ $ SUBTOTAL-EQUIPMENT S 688.80 EQUIPMENT OVERHEAD&PROFIT @ 21% 5 144-65 EQUIPMENTTOTAL 5 833.45 MATERIALS/SERVICESIR£NTALS - MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Corliss Resources Invoice#31027089 1 LS $ 1,268.75 $ 1.268.75 $ SUBTOTAL $ 1.268-75 OVERHEAD&PROFIT @ 21% $ 1 266.44 TOTAL $ 1,535.19 'Verification of Hours Worked: TOTAL: $ 6,764.58 12%MARKUP (for prime when subcontract work) $ 811.75 contractor's Representative Date SHEET TOTAL: $ 7,576.33 I Owner's Representative Dale Pay Estimate Entered: Date: By: Extra Work Order Project Name: 2023 Watermain O Project Number: 10.23 Owner: 'Weather: 0 0 Date: 1/8/2024 ❑ascription: Set,poured,and stripped 5 foot sidewalk at the intersection of 196th and 68th Ave S. Labor: (Name: Class: S/T Hours: OT Hours: DT Hours: SIT Rate: CIT Rate: DT Rate: Total: (Leith Foreman 8 $95.40 $131.31 $763.20 Raul Foreman $89.46 $122.40 $0.00 .lose Foreman 8 $86.90 $119.11 $695.20 (Roberto Mason 8 $83.45 $113.96 $667.60 Andreas Mason $83.45 $113.96 $0.00 Lawrence Laborer $70.26 $96.47 $0.00 lordan Laborer 8 $70,26 $96.47 $562.08 Ulies Mason 8 $83.45 $113.96 $667.60 lake Johnson Laborer 60% $48.56 $63.91 $0.00 Joel Foreman $90.27 $122.64 $0.00 Brendon Carpenter $84.39 $113.82 $0.00 Parker Apprentice $53.14 $70.30 $0.00 lacob Carpenter S,84.39 $113.821 $0.00 $0.00 Equipment: Description: Equip.Number: Reg.Hours: ISTBY Hours: Reg.Rate: STBY Rate: Total: ]_eith Truck F350 8 $28.32 $226.56 Raul Truck F550 $25.46 $0.00 Roberto Truck F550 8 $33.36 $266.88 Crew Truck 8 $24.42 $195.36 Joel Truck P F550 $24.23 $0.00 $0.00 Materials: Supplier: Ticket/Invoice#: Material QTY Units Unit Price Total: Corliss Concrete 7.5 CY $169.17 $1,268.75 $0.00 $0.00 $0.00 Subcontractors: Name: Ticket/Invoice#: Material/Service: CITY: Units: Unit Price: Total: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 :Subtotal MU% Total Labor: $3,355.68 31% $4.395.94 Equipment: $688.80 21% $833.45 Materials: $1,268.75 21% $1,535.19 Subcontractors: $0.00 12% $0.00 Grand Total: $6,764.58 1 10.23 m 7 SINCE 1892 Invoice Number: 31027089 it 8 Invoice IInvvoiceDate: 01/08/2024 v _ CORLISS Page: 1 Terms of Sale: Net 30 RESOURCES Customer Number: 101416.41. t� Customer Job: 023 WATERM�N REPLACEMENT � Tax Code: t _ Corliss Resources LLC TOSVSIJRE PROPER CREDIT PLEA SEINCLUDE tlll� RL ALIA COMPANY RECEIVED REMIT TOC6NWIQ$EawITil YOUR PAYMEIVT = 10831 SE 181ST STREET JAN 16 2024 15620 Collection Center Drive Chicago,IL 60693-0156 RENTON WA 98055 BY: S C Tax ID# 41-2061261 Delivery Address LotlSlock Purchase Order Customer Job# Order ill! Project# 6840 S 196TH ST KENT PW-YES INT#13312 34 5288 Ticket Product Date Ticket Plant Number Product Description Quantity UOM Unit Price Extension 01-08-24 C4000A COMMERCIAL CLASS 4000 W/AIR 7.50 cy $124.50 $933.75 01-08-24 9000306 HOT WATER 7.50 ea $7.00 $52.50 01-08-24 9000114 1%POZZ NC534 7.50 as $7.00 $52,50 01-08-24 6000505 112 X 2 X 200'EXPAN JNT 2.00 ea $80.00 $160.00 01-08-24 11000330 READYMIX ENVIRONMENTAL CHARG 7.50 cy $6.00 $45.00 01-08-24 11000325 REDIMIX FUEL SURCHARGE 1.00 ea $25.00 $25.00 "-TICKET(S)FROM PLANT SUMNER 10025061 Subtotal- $1,268.75 Total 01y: Total Tax: TAX- $0.00 7.50 S0.00 Ouestions7 Pleas*call Customer Care at 88"95-3938 Invoice Total: $1,268.75 This invoice is subject to the terms sat torlh in the Creail Applicalion andfor General Terms and Condwons of Sale,as wall as any additional terms and condilions conlnimCb in the Quatalien or Order Acknowledgement.Any addilionaf or differanl leans proposed by Buyer are hereby deemed to be a malarial altorallon and are hereby objr:eted to.All Items returned are subject to cartage and handling charges.Accovnts are due and payable by the above slated terms.Past due accounts are subject to service charges as ouitined in the Credit Applicafim andlor General Terms and Condilions of Safe. FA Sheet No.. 13 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Wednesday 1/10/24 Description of Work: Scresella crews dug out area of ash alt that had broken out during the main break.Crews propped Su rade and temp patched. Work by Subcontractor?: No Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Firs Hourly Rate Hrs OT Rate AMOUNT Jay Krier 11314 Foreman 7 95.69 $ 669.83 David Jacobs Operator 7 916 $ 641.20 Ivan Crum ton Truck Driver 7 822 $ 575.40 Case Ford 226.39 Operator 7 90.66 $ 634.62 Yorbin Martinez Apprentice Laborer 7 60941 $ 426.58 $ $ $ $ $ SUBTOTAL-LABOR: $ 2,947.63 LABOR OVERHEAD&PROFIT @ 31% $ 913.77 LABOR TOTAL $ 3,861.40 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs I Hourly Rate Hrs Standby Rate AMOUNT 2-299 Ford F-250 Pickup 71 33.63 $ 23541 17-244 Cat314 3 98.26 $ 29478 114 Dump Truck 7 105.59 $ 739.13 3-122 Ford F-450 Tool Truck 7 36.04 $ 252.28 15-92 Cat 938 21 77.87 $ 155.74 $ Is - SUBTOTAL-EQUIPMENT $ 1.677.34 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 35224 EQUIPMENT TOTAL $ 4029.58 MATERIALS/SERVI CESIRENTALS MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Is SUBTOTAL $ - OVERHEAD&PROFIT @ 21% $ - TOTAL $ - Verification of Hours Worked: TOTAL: $ 5,890.98 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 5,890.98 Owner's Representative Date Pay Estimate Entered: Date: By: 0 0 y W H W F- a z 0 z z m z m w a w a } z Q w w 0 0 Z O O z Q Q z O W z y0 w Q Q w w m D ¢ ¢ a a ¢ a = o � w Q z z O W W Q 7 H co H O O O m < Y O Q O O C� m m ❑ COo O w m a o _ m N D � U � m D � o Cl) J a D co � m m m mOfmwmwmTfm � mafm � Y 1 W p W ❑ W ❑ W ❑ w p w ❑ W ❑ W p W p W p 1M O wo � a a a a o a a a a H a O O0Owow0000OwOwOcnocn Co 2 ti ` co o -1 N. z 9 PINz C O tn 1 3t o Oa o o^ LU 3 p c z �- ON O N V W J �� J Q o0E- o � a o LU Q WUDOO cyZ Cv en N � �•o a7 2 a W i a I- a cn LL - M X z Z o 0 W F- O � o cv, ` U U F- W z IL Z ti O Z U ~ ® W ~ U w W O Q a o a O p Hi d3 VD EA 6s Ef3 H} 6a K} UB, 6r} Ef3 Ef3 E13 W ff3 Ef} EA EA Ef3 Ef3 EFT H3 EfJ Efl EA EA ffl ❑ ❑ U 0 Q 0 Q O LLJ U O a J � J � F- H M H o rn = O z O cc60 N O N UI m �..� M M M D M Q O _J xo = J a m d v (D C O` C O` ~ O I O C O` C ( C O C O` C C7 C Q m x W W 0 W 0 W 0 W W 0 W o w o W 0 W o O m w W v z V a w G w w to Z ecc U O O r d �� V m m q o Z �, � z 0 , U W m v m fn (D 0 FA Sheet No.. 14A DAILY REPORT OF FORCE ACCOUNT WORKED ENr Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Thursday 202024 Description of Work: Tore out and hauled away asphalt roadway on S 196th st Work by Subcontractor?: NO Prime Contractor: Scarsella Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rale Hrs I OT Rate AMOUNT Zachary Schlicker Lead Pipela er 8 69.53 $ 556.24 David Jacobs 22647 Operator 8 91.6 $ 73280 Ivan Crum ton Truck Driver 8 82.2 2 110.33 S 878.26 Yorbin Martinez 113.18 Apprentice Laborer 8 60.94 $ 487.52 Philip Norie. a 113.08(Laborer 8 65.96 2.5 9049 $ 753.91 Bambi Gannon 113.02 TCS 8 63.33 2.5 86.57 S 723.07 Sara Watson 11301 Flagger 58.83 1 5 75.4 $ 113.10 $ S SUBTOTAL-LABOR: $ 4,244-90 LABOR OVERHEAD&PROFIT @ 31% $ 1,315.92 LABOR TOTAL $ 5,560.82 _ EQUIPMENT t EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 2-210 Ford F150 Pickup 10 2023. $ 202.30 17-244 Cat 314 8 98.26 $ 786.08 9-106 Dump Truck 10 105.59 S 1,055.90 3-121 Ford F-450 Tool Truck 8 36.04 $ 288.32 26-66 Dump Truck Trailer 2 11 93 $ 23.86 15-112 Cat 938 4 77.87 S 311 48 $ SUBTOTAL-EQUIPMENT $ 2,66794 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 56027, EQUIPMENT TOTAL $ 3,228.2.1 fi ATIERI Al S1SERVIC1wSJRENTALS MATERIALS I SERVICES Quantity Units I Unit Price DOLLAR AMOUNT Delmar Concrete Cutting INV#41706 1 LS $ 520.00 S 520.00 Herc Rental INV#34353079-001 1 LS $ 1,133.47 $ 1,133.47 Alpine Products Inc,INV#TM-222025 1 LS $ 292.00 $ 29200 Herc Rental INV#34295473-001 1 LS $ 3,406.19 $ 3,40619 S SUBTOTAL $ 5,35166 OVERHEAD&PROFIT @ 21% $ 1,123 85 TOTAL $ 6,475.51 Verification of Hours Worked: TOTAL: $ 15,264.54 12%MARKUP (tor prime when subcontract work) $ Contractor's Representative Date SHEET TOTAL: $ 15,264.54 Owner's Representative Date Pay Estimate Entered: Date: By: 'DATE: Thursday,February 8,2024 DAILY FORCEACCOUNT FIELD DOCUFIENTATION PROJECT NAME or WP#: 'Wastewater Capacity Improvements FORCEACCOUNT BID ITEM OR CO t. 9003 CONTRACTOR DATE WORK PERFORMED:1 2/8/2024 'PERFORMING WORK: Scarsella Bros,Inc. REPORT#: (REPORTED BY: (Ben Blanchard CONTRACTOR TRACKING#: DESCRIPTION: (Emergency Watedlne Repair LABOR STRAIGHTTIME OVERTIME NAME TRADE/CLASSIFICATION HOURS RATE HOURS RATE AMOUNT David Jacobs Operator 8.0 $ 91.60 $ 123.28 $ 732.80 Zachery Schlicker Lead Plpelayer 8.0 $ 69.53 $ 95.81 $ 556.24 Philip Norlega Laborer 8.0 $ 65.96 2.5 $ 90.49 $ 753.91 Yorbin Martinez Apprentice Laborer 8.0 $ 60.94 $ 83.02 $ 487.52 Ivan Crumpton Truck Driver 8.0 $ 82.20 2.0 $ 657.60 Bambl Gannon TCS 8.0 S 63.33 1 2.5 $ 86.57 $ 723.07 Sara Watson Flagger $ 55.83 1 1.5 $ 75.40 $ 113.10 TOTALLABOR$ $ 4,024.23 .MATERIALS DESCRIPTION(Include Size,Type,Manufacturer,Etc..) VENDOR UNIT QTY PRICE AMOUNT I TOTAL MATERIALS$ EQUIPMENT HOURS CONTR.OWNED RENTED (EQUIPMENT NUMBER DESCRIPTION IN USE IDLE BLUE BOOK RATE RENTAL RATE AMOUNT 2-210 F-150 10.00 $ 20.23 $ 202.30 3-121 Tool Truck F-450 8.00 $ 36.04 $ 288.32 9-106 Dump Truck 10.00 $ 105.59 $ 1,055,90 15-112 Cat 938 Loader 4.00 $ 77.87 $ 311.48 17-244 Cat 314 Excavator 8.00 $ 90.26 $ 786.08 26-66 Dump Truck Trailer 2001. $ 11.93 $ 23.86 TOTALEQUIPMENT$ $ 2,667.94 $ SUBCONTRACTOR DESCRIPTION(include Size,Type,Manufacturer,Etc..) VENDOR UNIT QTY PRICE AMOUNT TOTAL SUBCONTRACTOR SUBTOTAL SUBCONTRACTORS: $ _ 7%MARKUP FOR SUBCONTRACTOS: $ - SUBTOTAL LABOR: $ 4,024.23 31%MARKUP LABOR: $ 1,247.51 SUBTOTAL EQUIPMENT: $ 2,667.94 21%MARKUP EQUIPMENT: $ 560.27 SUBTOTAL MATERIAL: $ 21%MARKUP MATERIAL: $ SUBTOTAL: $ 8.499.95 7%PRIME MARKUP: 'SUBMITTED BY-CONTRACTOR/PRINT NAI REQUIRED-OWNER REPJ PRINT NAME TOTAL$j$ 8,499.95 SUBMITTED BY-CONTRACTOR/SIGN&DA REQUIRED-OWNER REPJ SIGNATURE&DATE GC SIGNATURE FOR SUBS(optional) Owner Rep to Mark it Applicable: Workwltnessed but entitlement to be paid as extrawork has not been determined The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. The owners representative verities that this Is a fair and reasonable listing of the labor,material and equipment quantities used but R Is not an -authorization for payment until all backup for costs are submitted,verified and approved bythe Resident Engineer r� I�b_ti 1 DEL-MAR CONCRETE Invoice 41706 CUTTING & CORING 152 1 OOth St. S. SCANNED Tacoma, WA 98"4 Ph # (253) 537-0109 FAX # (253) 535-0507 /I r m _ � 7 TO t DATE �' JOB NO. 1 -L CONTACT PERSON X10 d+ D� JOB LOCATION TERMS: NET 30 DAYS, UNLESS OTHERWISE NOTED. DATE DESCRIPTION Arviotjw A FINANCE CHARGE OF 1.5% ON THE UNPAID PREVIOUS BALANCE WILL BE COMPUTED AT THE END OF EACH MONTH. IF CUSTOMER DEFAULTS OR IF SUIT i I IS BROUGHT TO COLLECT ANY OF THE PRINCIPAL OR INTEREST DUE OR OWINGIPA N UNDER THIS BILL, DEL-MAR MAY CHARGE CUSTOMER REASONABLE ATTORNEY FEES AND COLLECTION COSTS. FINAL INVOICE HercPen ta INVOICE NO. INVOICEr DATE 34353079-001 02/07/2024 27500 Riverview Center Blvd INVOICE AMOUNT CURRENCY Suite 100 Bonita Springs,FL 34134 $ 1133.47 USD For correspondence only(no payments) CUSTOMER NO. TEAMS CA N N E V 6677366 ACIH PAY'MENTue Upon Receipt U Beneficiary's Bank: Wells Fargo BILL TO: RTN/ABA#: 121000248 Acct#: 4217127869 Beneficiary's Name: Herc Rentals CHECK PAYMENT ONLINE PAYMENT SCARSELLA BROTHERS INCORPORATE HERC RENTALS INC, CONTROL PO BOX 68697 P.O. Box 936257 By Her,N.W, SEATTLE,WA 98168-0697 Atlanta, GA 31193 ww a cRentals.com PAY BY PHONE UESTIONS:877-953-8778 AMOUNT ENCLOSED: To ensure accurate and timely posting,detach and send top portion with your payrnerti[ f PO # RES. UQTE I CUSTOMER# SALES REP WILL CALL- FIFE 55700605 1 6677366 RONNY MURPFIY ORDERED-By I DEI.:IVERI D-BY SIG ED 1'1Y CLOSED BY GINO SCARSELLA CUSTOMER WET SIGNATURE I EASTON ORESSEL JOB*SrrE MAIN 51•I0P TY EQUIPMENT Al lUgp1miNimuff HOUR DAY I WEEK 1 4 WEEK I AMOUNT I PLATE COMPACTOR 28IN 1000 TO 1100LB 41 264.00 44.00 264.00 1012.00 2180.00 1012.00 REVE IC#: 800250395 CAT/Class: 1501580 Make: WACKER Model: DPU6555HE Ser#: 10881757 Hours Free: 8 40 160 HR OUT: 223.000 HR IN: 223.000 TOTAL: 0 FREE: 40.000 EXCESS: 0 HRS CHG: 25.300 WA EQUIPMENT RENTAL TAX 2217999990 12.65 SALES ITEMS: QTY ITEMS UNIT PRICE AMOUNT 1 SMALL ENGINE PREFUEL EA 6.00 6.00 3761000001 - PROCONTRACfOR PREPAID FUEL To ensure accurate payment processing,please include a remittance mth your payment. II paying by ACH/Wire,send remittance to HercTimeChecks@hercrentals.com. heck fraud is on the rise-making secured payments through Pro Control Next Gen is the best/safest way to makes ayments to Here Rentals. To enroll please talk with your sales representative or call 1-877-953-8778,opt 1, 1.You can iso visit www.HercRentals.com TH S INVOICE IS SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL A43REEMIENT Ori in Ad ustment -total SAP TO: RENTED FROM: RENTAL CHARGES 10.2.00 1012.00 SHOP HERC RENTALS 722 OTHER CHARGES 18.65 18.65 19440 84TH AVE S 4403 20TH STREET EAST TAXABLE CHARGES 1018.0n 1018.00 KENT, WA 98032 FIFE, WA 98424 TAX 102.82 102.82 PH: 253-922-3852 TOTAL CHARGES 1133.47 1133.47 RENTAL DAYS/HOURS: 4/ 3.28 INVOICE FROM: 2/03/24 10:01 INVOICE TO: 2 07 24 13:17 RENTAL START DATE: 2/03/24 10:00 LATE CHARGES MAY APPLY CUSTOMER#:6677366 RES/QUOTE #:55700605 INVOICE#:34353079-001 INVOICE DATE:02/07/2024 Page 1 of 1 KENII I F0 Alpine Products Inc. INVOICE fvww.al pine markinKs.com SCANNED 550 3RD ST SW,BL DG C �. • AUBURN,WASHINGTON 98001 PH: (253)351-9828 FAX: (253) 735-6303 W12024 TM-222025 TOLL FREE: (800)591-9466 Federal Tax I.D.#91-1508305 BILL TO: SHIP TO SCARSELLA BROTHERS INC. SCARSELLA BROTHERS INC. P.O. BOX 68697 19440 84TH AVE. S SEATTLE, WA 98168-0697 KENT, WA 98032 253-872-7173 Gracc Warranty Service Center•WSDOT Approved Traffic Sign Shop-Manufacturers and Suppliers of:Traffic Paint.Thermoplaslic•Glass Beads•TemooraryiPermanenl Pavemcnl Marking Tapes•Reflective Pavement Markers•Traffic Buttons•Epoxy/Bituminous Adhesive•Safety Barrels/Cones•Pavement Marking Eqwpmonl•Removal Equipment •Arrow Boards•Flexible Delineator Posts-Equipment Rental•Traffic Control Products•Construction Signs•Regulatory Signs.Sign Hardware • • • _below Net 30 GCS WILL CALL auburn CODE DESCRIPTION PRICE EACH • 2 TEMP TAPE-... V X 300'- SWARCO - WHITE TEMP. 73.00 146.00T TAPE (4" X 30V FC-Wr-100 YD ROLL 2 TEMP TAPE- 4'X 300'- SWARCO - YELLOW TEMP 73.00 146.00T TAPE (40 x 300'FC-Y)*****100 YD ROLL p.o. city of kent Aubum in KC 1702 Sales Tax 10.20% 29.78 Print Name: F S Signet c f f t - ' r ,r r Company Nwne: J S S e �321.78 TERMS PAYABLE WITHIN 30 DAYS TO AVOID SERVICE CHARGE OF 1-11'%PER MONTH f CREDIT CARD CHARGES SUBJECT TO 3%CONVENIENCE FEE ITEMS RETURNED MAY BE SUBJECT TO A RESTOCKING FEE FINAL INVOICE HefcRen tals' INVOICE NO. INV0ICIE DATE 34295473-001 01/29/2024 27500 Riverview Center Blvd SCANED INVOICExTNO[INT C�IRRENCY Suite100Bonila Springs,FL 34134 $ 3406.19 USD For correspondence only(no payments) CUSTOMER NO. TERMS 6677366 Due Upon Receipt ACH PAYMENT Beneficiary's Bank: Wells Fargo BILL TO: RTN/ABA#: 121000248 Acct#: 4217127869 Beneficiary's Name: Herc Rentals CHECK PAYMENT I ONLINE PAYMENT SCARSELLA BROTHERS INCORPORATE HERO RENTALS INC. CONTROL PO BOX 68697 P,O. Box 936257 By 14-R.M& SEATTLE,WA 98168-0697 Atlanta, GA 31193 PAY BY PHONE UESTIONS:877-953-8778 AMOUNT By To ensure accurate and timely posting.detach and send top portion with your payment PO 0 RIESIOUUM# CUSTOMER# SALES REP 55638698 6677366 TRANSITIONAL PRIMARY REP ORDERED BY DELIVERED BY i SIGNED'.BY CLOSED BY KRIER JAY HERC WET SIGNATURE DREW NEIDIGH JOB * SITE 1 - KENT JOB 7Y EQUIPMENT tHRS/MINIMUMI HOUR I DAY I WEEK 1 4 WEEK I AMOUNT 1 ROLLER RIDE-ON SMOOTH 471N DBL 3 TON 8/430.00 71.67 430.00 11396.00 2630 CO 7630.00 DSL IC#:800425758 CAT/Class: 1502860 Make:VOLVO Model: DD25B Ser#:VCEOD25BVOS271371 Hours Free: 8 40 160 HP,OUT: 20.300 HR IN: 21.000 TOTAL: .700 FREE: 160.000 EXCESS: 0 HRS CHG: 16.438 WA EQUIPMENT RENTAL TAX 2217999990 32.68 SALES ITEMS: QTY ITEMS UNIT PRICE AMOUNT 1 TRANS SRVC SURCHARGE 35.15 35.15 3710000001 -TRANS SERVICE SURCHARGE 1 TRANS SRVC SURCHARGE 35.15 35.15 3710000001-TRANS SERVICE SURCHARGE THIS INVOICE IS 5UB3ECT TO THE TERMS AHD'CONDITIONS.OIF THE RENTAL AGREEMENT Ori inal Ad'ustment Total SFIIP TO: RENTED FROM: RENTAL CHARGES 2630.00 2630.00 KENT JOB HERC RENTALS 717 OTHER CHARGES 103.18 103.18 6040 S 196TH ST 22868 PACIFIC HIGHWAY SOUT DELIVERY/PICK UP 370.00 370.00 KENT,WA 98032 DES MOINES, WA 98198 'TAXABLE CHARGES 3000.00 3000.00 PH: 253-796-5070 TAX 303.01 303.01 TOTAL CHARGES 3406.19 3406.19 RENTAL DAYSIHOURS: 16/22.48 INVOICE FROM: 1/09/24 12:01 INVOICE TO: 1 26 24 11:29 RENTAL START DATE: 1/09/24 12:00 LATE CHARGES MAY APPLY CUSTOMER#:6677366 RES/QUOTE #:55638698 INVOICE#:34295473-001 INVOICE DATE:01/29/2024 Page 1 of 1 FA Sheet No.: 14B DAILY REPORT OF FORCE ACCOUNT WORKED � >HT Project Name: 2023 Watermaln Replacement Project No: 22-3002 Item No.: C04 Date: Thursday 2-8-24 Description of Work: Icon Crew paved back 2.5 lane$on S 196th St from watermain break Work by Subcontractor?:Yes Prime Contractor Scarsella Bros Sub-Contractor: Icon Materials LABOR STRAIGHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT ,Jacob Webster Operator Foreman 6 100.1 $ 600,60 Carlos Riestra operator 4 95.02 $ 380.08 Emmanuel Jimenez Operator 5 95.02 $ 475.10 Mauricio Ramos Grade Chk 4 72 17 $ 288.68 Melissa Rushton Operator 4 93.42 $ 373.68 Ronald Boyd operator 4 95.02 $ 380.08 Truck Driver 7.73 93 $ 718.89 -Truck Driver 572 93 $ 531.96 Truck Driver 8.88 93 $ 825.84 $ SUBTOTAL-LABOR: $ 4,574.91 LABOR OVERHEAD&PROFIT @ 31% S 1,418.22 LABOR TOTAL $ 5.993.13 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hflurly Rate Hrs Standby Rate AMOUNT 51.0596 2020 Pertbuilt 773 9200 $ 711-16 62 Cat AP555E 5 225.00 $ 1.125.00 64.5274 Cat CB2.7 3 55.00 $ 165-00 645274 Cal CB4,0 4 70.00 $ 280.00 51.0099 Peterbuilt 567 5.72 92.00 $ 52s.24 51.0597 Peterbuilt 567 8.88 92.00 $ 816.96 SUBTOTAL-EQUIPMENT $ 3,624.30 EQUIPMENT OVERHEAD&PROFIT @ 21% S 761-12 EQUIPMENT TOTAL S 4.3615.48 M AT ER I AL SI S E R V ICESIREN TALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT 1l2"PG 70-22 Asphalt 1 LS $ 8,001 75 $ 8,001.75 $ $ SUBTOTAL $ 8,001.75 OVERHEAD&PROFIT @ 21% $ 1,680.37 TOTAL $ 9,682.12 Verification of Hours Worked: TOTAL S 20,060.73 12%MARKUP (for prime when subcontract work) $ 2,407.29 Contractor's Representative Dale SHEET TOTAL: $ 22,46$.02 Owner's Representative Date Pay Estimate Entered: Date: By: ICON MATERIALS EXTRA WORK ORDER 1508 VALENTINE AVE CONFIDENTIAL INFORNMATION D PACIFIC,WA 98047 FOR INTENDED RECIPIENT ONLY (206) 575-3200 Office . (206) 575-3207 Fax DO NOT DISCLOSE ICON Job# 523315 ICON Foreman : Steve Nelson ICON EWO# 5293i0 Owner City of Burien Contractor Ref# Project Name 2023 Overlay program Date 2/8/2024 DESCRIPTION OF EXTRA WORK PERFORMED 2/8/24-Perform Pavement repairs per City of Kent. LABOR Hours Worked Overtime Hours Worked Quantity Classification Quantity Unit Rate Quantity Unit Rate Total Jacob Webster Operator Foreman 6 HR $ 100.10 HR $ 600.60 Carlos Riestra Excavating Equip.-Mid-Size 4 HR $ 95.02 HR $ 380.08 Emmanuel Jimenez Excavating Equip.-Mid-Size 5 HR $ 95.02 HR $ 475.10 IMauricio Acebedo Ramos Grade Chk./Raker/Pipe 4 HR $ 72.17 HR $ 288.68 Melissa Rushton Dozers,AC Rollers,Grade 4 HR $ 93.42 HR $ 373.68 Ronald Boyd Excavating Equip.-Mid-Size 4 HR $ 95.02 HR $ 380.08 Mob.&Dump Truck Teamsters 7.73 HR $ 93.00 $ 718.89 Dump Truck 51.0099 Teamsters 5.72 HR $ 93.00 HR $ 531.96 Demob&Dump Truck ITeamsters 8.88 HR $ 93.00 HR $ 825,84 HR HR $ Total: $ 4,574.91 MATERIAL&RENTALS Material Description Quantity Unit Cost Tax% Cost Total 1/2"PG 70-22 106.69 ton $ 75.00 0.00% $ $ 8,001.75 Total: $ 8,001.75 EQUIPMENT Regular Hours Worked Hours on Standby Equipment Description(Make/Model/Year) EQ# Quantity Unit Cost Quantity Unit Rate Total Mobilization 2020 Peter 51.0596 7.73 HR $ 92.00 HR $ 711.16 Paver Cat AP555E 62.0125 5 HR $ 225.00 HR $ 1,125.00 Roller Cat CB4.0 64.5274 3 HR $ 55.00 HR $ 165.00 Roller Cat CB2.7 64.5254 4 HR $ 70.00 HR $ 280.00 Dump Truck Pete567 51.0099 5.72 HR $ 92.00 HR $ 526.24 Dump Truck Pete567 51.0597 8.88 HR $ 92.00 HR $ 816.96 Total: $ 3,624,36 SUBCONTRACTORS Name Service Quantity Unit Cost Total EA Total: $ - i hereby cE. fy that this Extra WGrh Order represents the true and correct quanhhes at Work TOTAL.COSTS AND MARKUPS pea- -d ring this period and that prevailing wages have been paid to all laborers,workers or a cs on this project in accordance with the Statement of Intent on file with the District. LABOR $ 4,574.91 29.00% $ 5,901.63 MATERIAL&RENTALS $ 8,001,75 21.00% $ 9,682.12 ZO+e,l ra or EQUIPMENT : $ 3,624.36 21.00% $ 4,385.48 SUBCONTRACTOR $ - 12.00% $ BOND MARKUP 0.00% $ IALS Total: $ 19683 FA Sheet No.: 15 DAILY REPORT OF FORCE ACCOUNT WORKED KF_NX Project Name: 2023 Watermain Replacement Project No: 22-3002 Item No.: C04 Date: Frida 3/15124 Description of Work: SPIM crew striped S 196th St Work by Subcontractor?:Yes Prime Contractor: Scarsetla Bros Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Hate Hrs OT Rate AMOUNT Leo Vega Forman 1 91 54 $ 9154 Chris Kruis Journey 1 89.54 $ 8954 Fernando Elvir Apprentice 1 69.53 $ 6953 $ $ $ SUBTOTAL-LABOR: 5 25061 LABOR OVERHEAD&PROFIT @ 31% 5 77 69 LABOR TOTAL S 328.30 EQUIPMENT = EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equlpment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 1482 Mini Mac 1 6963 $ 69.63 1709 MMA Truck 1 54275 $ 542.75 1737 2017 Chevy Silverado 1 29.11 $ 29.11 $ $ SUBTOTAL-EQUIPMENT $ 641 49 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 134.71 EQUIPMENTTOTAL $ 776.20 MA 1145RIi�,LMEF6 C TAi S. MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT MMA/Thermo Plastic 1 LS $ 304.47 $ 304.47 $ $ SUBTOTAL $ 304.47 OVERHEAD&PROFIT @ 21% $ 63.94 TOTAL $ 368.41 Verification of Hours Worked: TOTAL: $ 1,472.91 12%MARKUP (for prime when subcontract work) $ 176.75 Contractor's Representative Date SHEET TOTAL: $ 1.649.66 Owner's Representative Dale Pay Estimate Entered: Date: By: Specialized Pavement Marking,Inc. Force Account Work - Manpower Contract: 23-0193-2023 Watermain Improvements-Kent Work Completed: 3/1 512 024 Hours Rates Marked Up MANPOWER Re"iar Overtime Standby Regular Overtime Standby Amount Mark Up Amount On Site Workers 29% - Leo Vega F) 1.00 91.54 91.54 29% 118.09 Chris Kruis J 1.00 89.54 89.54 29% 115.51 Fernando Elvir 1.00 - - 69.53 69.53 29% 89.69 - 29% - 29% - - 29% - _ - 29% - _ 29% - 29% - _ - 29% - - 29% Total On Site Cost $_ 250.61 $ 323.29 Mobilization&Sh4>z Workers 29% - 29% 29% 29% - 29% 29% - 29% 29% Total Mobilization Cost $ Total Manpower Cost $ 250.61 323.29 MANPOWER �p Specialized Pavement Marking, Inc. FORCE ACCOUNT WORK SUMMARY Contract: 23-0193-2023 Watermain Improvements -Kent Work Completed: 3/15/2024 MARKED UP WORKERSIEQUIPMENT/MATERIAL Amount AMOUNT On Site _Workers $ 250.61 $ 323.29 Equipment $ 642.00 $ 776.82 Materials $ 304.47 $ 368.40 Total On Site Cost $ 1,197.08 $ 146851 Mobilization Workers $ - $ Equipment $ $ Total Mobilization Cost - $ - TOTAL COSTS $ 1,197.08 $ 1,468.51 SUMMARY 4P Specialized Pavement Marking, Inc. Force Account Work - Materials Contract: 23-0193-2023 Watermain Improvements - Kent Work Completed: 3/15/2024 Cost per Marked Up MATERIAL Units Used Unit Type Unit Amount Mark Up Amount - 21% - Thermoplastic 75.00 LBS 1.04 7823 21% 94.65 MMA White 5.00 GL 32.32 161.60 21% 195.54 MMA Yellow 1.00 GL 32.32 32.32 21% 39.11 BCOMP 1.00 GL 32.32 32.32 21% 39.11 - 21% - - 21% - Total Material Cost $ 304.47 $ 368.40 MATERIALS