CAG2024-139 - Change Order - #6 - Bayley Construction, LP - FAC23-09C KEHOC Warehouse and Office Building - 10/1/24
FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr://y Agreement Routing Form Dir. Assist: 2 -_ KI • For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover y, WASHINGTON Sheet forms. Dir/Dep Dir: BL BL Originator: Department: Leah Bryant for Nate Harper Parks, Recreation & Community Services Date Sent: Date Required: > 09/24/2024 9/30/2024 0 Q Authorized to Sign: Date of Council Approval: QDirector or Designee 3/5/2024 Budqet Account Number: Grant? Yes FV(]No F20098.64110.9476 Budget?[Z]YesEl No Type: N/A Vendor Name: Category: Bayley Construction LP Contract Vendor Number: Sub-Category: = 2548901 Change Order 0 'M Project Name: FAC23-09C KEHOC Warehouse and & Office Building E L Project Details:As described in the attached Exhibit A,CE 097 Panel&Circuit for Fire Sprinkler Air Compressor; CE 135 Shift 12 Striping&Light Pole Base at NW Edge of Building;CE 140 Rack Receptacle; CE 173 Elevator Cab Interior Finish C Revisions per Submittal #142400-2;CE 063 Comcast&Comms Service Entry Locations; CE 106 Water Tower and Green Building Electrical Re-feed;CE 115 Debris-Filled Soil at NW Site; CE 172 Remove 16 Strobe Devices C E Agreement Amount: $201,660.49 Basis for Selection of Contractor: Bid *Memo to Mayor must be attached Start Date: March 2024 Termination Date: 7/31/2026 Im Q Local Business'El Yes VNo* If meets requirements per KCC3.70.100,please complete'Vendor Purchase-Local Exceptions"formonCityspoce. Business License Verification:YesElln-ProcessElExempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: F]YesQNo CAG2024-139 Comments: Im Change Order 6 3 0 �) N C � Date Routed to the City Clerk's Office: 10/8/24 adccW223R_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 10*,000� • 11� KENT WASHINGTON CHANGE ORDER NO. 6 NAME OF CONTRACTOR: Bayley Construction LP ("Contractor") CONTRACT NAME & PROJECT NUMBER: FAC2309-C-KEHOC Warehouse and Office ORIGINAL CONTRACT DATE: 3/18/2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: As described in attached Exhibit A: • CE 097 Panel & Circuit for Fire Sprinkler Air Compressor • CE 135 Shift Striping & Light Pole Base at NW Edge of Building • CE 140 Rack Receptacle • CE 173 Elevator Cab Interior Finish Revisions per Submittal #142400-2 • CE 063 Comcast & Comms Service Entry Locations • CE 106 Water Tower and Green Building Electrical Re-feed • CE 115 Debris-Filled Soil at NW Site • CE 172 Remove 16 Strobe Devices 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $29,900,294.10 (including applicable alternates and WSST) Net Change by Previous Change Orders $502,727.25 (incl. applicable WSST) Current Contract Amount $30,403,021.35 (incl. Previous Change Orders) Current Change Order $182,995.00 Applicable WSST Tax on this Change $18,665.49 Order Revised Contract Sum $30,604,681.84 CHANGE ORDER - 1 OF 3 Original Time for Completion 7/31/2026 (insert date) Revised Time for Completion under NA prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 7/31/2026 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: stSvhen GYatlo By Stephen trasso(Sep 27,2024 09:58 PDT) By:Julie0raurascondo[a(Oct 1,202416:04 PDT) Print Name:Stephen Grasso Print Name: Julie Parascondola Its CEO Its: Parks Director DATE: Sep 27, 2024 DATE: Oct 1, 2024 CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Wk Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] Signature: Email: nharper@kentwa.gov CHANGE ORDER - 3 OF 3 AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #097 - RFI-080 - Panel & Circuit for Fire Sprinkler Air Compressor Origin: RFI#80:Panel&Circuit for Fire Sprinkler Air Compressor Date Created: 9/13/2024 Created By: Nils Brian Nilsson Status: Open Scope: Out of Scope Type: Owner Change Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 26-100-000.S VECA ELECTRIC& Is 1.0 $2,841.37 $2,841.37 $2,841.37 1.0 $2,841.37 $2,841.37 $2,841.37 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: Addition of air compressor circuit for sprinkler dry system.Air compressor supplied by others. 26-100-000.S VECA ELECTRIC& Is 1.0 $1,139.08 $1,139.08 $1,139.08 1.0 $1,139.08 $1,139.08 $1,139.08 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: Addition of 1 annunciator panel per KCC FD. 01-450-120.S hours 4.0 $200.00 $800.00 $800.00 4.0 $200.00 $800.00 $800.00 $0.00 Surveyor.Commitments- Subcontracts Description: Layout 03-100-0201 hours 4.0 $95.00 $380.00 $380.00 4.0 $95.00 $380.00 $380.00 $0.00 Concrete Foreman.Labor and Labor Tax Description: Foreman Bayley Construction, LP Page 1 of 2 Printed on:9/13/2024 at 10:49AM PDT Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 01-740-0991 hours 4.0 $50.00 $200.00 $200.00 4.0 $50.00 $200.00 $200.00 $0.00 Weekly cleanup.Labor and Labor Tax Description: Cleanup 01-740-125.PO Is 1.0 $110.00 $110.00 $110.00 1.0 $110.00 $110.00 $110.00 $0.00 Du mpsters.Purchase Order and All Other Costs Description: Dumpster 00-000-000.PO Is 1.0 $821.00 $821.00 $821.00 1.0 $821.00 $821.00 $821.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractor Fee Grand Totals $6,291.45 $0.00 $6,291.45 $6,291.45 $0.00 $0.00 $0.00 $6,291.45 $0.00 $0.00 Bayley Construction, LP Page 2 of 2 Printed on:9/13/2024 at 10:49AM PDT Change Proposal { Project Name: KEHOC Warehouse&Office Building CE# 097 Project No.24507 Doc#: RFI-080 Work Description: RFI-080-Panel&Circuit for Fire Sprinkler Air Compressor Date: 6/10/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs Veca-Addition of air compressor for sprinkler dry 1 LS $ $ $ 2,841.37 $ 2,841 $ 2,841 system Veca-Addition of 1 annunciator panel per KCC FD. 1 LS $ $ $ 1,139.08 $ 1,139 $ 1,139 Layout 4 HR $ $ $ 200.00 $ 800 $ 800 Foreman 4 F55. $ 380 $ $ $ - $ 380 Cleanup 4 $ 200 $ $ $ $ 200 Dumpster 1 LS $ - $ 110.00 $ 110 $ $ 110 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8 $ $ 580 $ $ 110 $ 4,780 Clarification,Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 5,470 Excludes WSST. General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 821 GRAND TOTAL is 6,291 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 9/13/2024 Owner's Representative Date Bayley Construction Date v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 5 VECA Electric And Technologies LLC Date: 6/18/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description Pricing reflects costs associated with the response to RFI #80 in Procore and the addition of(1) air compressor for the fire sprinkler dry system located in the Riser Room, which was not depicted in the original drawings or schedules. Pricing includes providing infrastructure and circuity for(1) dedicated 20A circuit from Panel LM11 N to Riser Room with connections on both ends. The proposed air compressor is understood to be less than 1 HP per the RFI response and submittal, however if a larger air compressor is required later down the road, then an alternate cirucit of voltage could be required and would have an additional cost impact. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 3/4"CONDUIT-EMT 160 107.06 C 171.30 4.40 C 7.04 3/4"CONN SS STL-EMT 4 36.00 C 1.44 12.50 C 0.50 3/4"COUPLING SS STL- EMT 16 44.00 C 7.04 0.00 C 0.00 3/4" 1-H STRAP-EMT-STEEL 19 19.07 C 3.62 6.75 C 1.28 #12 THHN BLACK 528 179.00 M 94.51 6.44 M 3.40 WIRE CONN RED 6 27.12 C 1.63 7.50 C 0.45 4x 1 1/2"SQ BOX COMB KO 2 179.06 C 3.58 20.00 C 0.40 4"SQ BLANK COVER 2 72.88 C 1.46 3.13 C 0.06 #8 TO#1 Ox 7/8 PLAS ANCHOR(3/16) 23 4.62 C 1.06 7.50 C 1.73 #10x 1 P/H SELF-TAP SCREW 23 5.05 C 1.16 3.75 C 0.86 Totals 783 286.80 15.72 Summary General Materials 286.80 Material Total 286.80 CHANGE_NOTICF DEN# 5 Client Address: Date: 6/18/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 Summary(Corl CRAFTSMAN LABOR (15.72 Hrs @$119.02) 1,870.99 FOREMAN @ 15% (2.36 Hrs @$128.08) 302.27 Overhead (@ 10.000 %) 246.01 Markup (@ 5.000 %) 135.30 Subtotal 2,841.37 Final Amount $2,841.37 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 5 Final Amount: $2,841.37 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 13 VECA Electric And Technologies LLC Date: 8/9/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description CO reflects costs associated with the Fire Alarm Plan Review Comments by King County Fire Department. Per the Fire Department, (1) additional Annunicator Panel shall be required and installed in the Fire Sprinkler Riser Room. This CO reflects costs for both providing and installing the additional Annunicator Panel per the KCC FD. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. F/A REMOTE ANNUNCIATOR 1 0.00 E 0.00 2.50 E 2.50 Totals 1 0.00 2.50 Summary FIRE ALARM 640.00 Material Total 640.00 CRAFTSMAN LABOR (2.50 Hrs @$119.02) 297.55 FOREMAN @ 15% (0.38 Hrs @$128.08) 48.67 Overhead (@ 10.000 %) 98.62 Markup (@ 5.000 %) 54.24 Subtotal 1,139.08 Final Amount $1,139.08 CONTRACTOR CERTIFICATION CHANGE_NOTICF CCN#Client Address: Date: 8/8/9/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 13 Final Amount: $1,139.08 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. DATE: July 31, 2024 TO: Steven Mascorro smascorro@guardiansecurity.com SUBJECT: CONSOLIDATED CORRECTION LETTER PROJECT NAME: 743301 KEHOC PERMIT NUMBER: FIRE2024 2663 Dear Steven Mascorro: Plan review has been completed for the permit application referenced above and corrections have been requested. The purpose of plan review is to verify code compliance, to the extent possible and reasonable, given the information provided on the plans. Please provide a response and corrected plans for the comments listed below and/or on the plans: Fire Review: Scott Webster, swebster@pugetsoundfire.org, (253) 856-4409 1. Per KCC the FACP shall be in the riser room. In lieu of this, a fully functional annunciator shall be in the riser room. 2. What is the purpose of the heat detector in Mech. Room 154? Non-required devices shall not be installed. Contact the plan reviewers individually if you have questions or need clarification of the above plan review comments. How to Download Reviewed Plans 1. Log in to the portal. 2. Click on the Detail button next to the applicable project application. 3. Click on Supporting Documents from the top menu or scroll down to the Supporting Documents section. 4. Click the green "Download" button next to each document and save the files to your computer. Once all items listed in this correction letter have been addressed, please resubmit the necessary items through the citizen portal at https://permitportal.KentWA.gov. Your resubmittal package shall include: • A Response Letter outlining how each individual correction comment has been addressed • A full resubmittal package including both corrected plans and any other required documents for your application • PDF files of all required documents formatted in accordance with our Electronic Submittal Standards How to Resubmit in Your Portal 1. Log in to the portal. 2. Click on the Detail button next to the applicable project application. 3. Click on Supporting Documents from the top menu or scroll down to the Supporting Documents section. 4. Upload all required items by selecting the Document Type from the drop- down menu, click Browse, select the file you want to upload, and then click the green "Upload Document" button. 5. Once all documents have been uploaded to the portal, click the blue "Resubmit" button to send your resubmittal to the permit center. We have placed the above application ON HOLD until the corrected plans for the permit are received. The City reserves the right to stop review of a resubmittal that does not address all requested items. This application will expire in one hundred eighty (180) days from the date of this letter if the corrected information is not received (KCC 12.01.110 / IBC 105.3.2). Further comments or corrections may be necessary because of submitting additional information. Please note: If you are resubmitting for a third time or more, additional review fees will be assessed and billed upon receipt of a complete resubmittal. These fees must be paid within 15 days. Plan review will commence once payment has been received. Please contact the permit center if you have questions regarding how to submit your corrections. The City looks forward to working with you to successfully complete your project. Sincerely, City of Kent Permit Center permitcenter@kentwa.gov Main: 253-856-5300 AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #80: Panel & Circuit for Fire Sprinkler Air Compressor Status Open To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jun 3,2024 Due Date Jun 17,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number P4.1 Reference VECA RFI#23 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Jon Bosshart(VECA ELECTRIC& TECHNOLOGIES, LLC),Dave Brock(City of Kent), Ken Brumley(SCI INFRASTRUCTURE, LLC), Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers),Thomas Evans(Insulpro Projects), Derrek Gunn(Pipe Construction, Inc.), Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson(Sound Glass), Noah Kennard(Smith Fire Systems, Inc.),Jon Marks(Bayley Construction,LP) ,Gene Mayhall(Mayhall's Painting),Will Moore(City of Kent), Mike Nelson(Delta Mechanical),Christian Nicholson(Corona Steel), Nils Brian Nilsson(Bayley Construction,LP), Leah Sandberg(Washington Architectural Hardware),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE, LLC),Arlan Smith(VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& TECHNOLOGIES, LLC),Mike Yeung(Fastsigns of Kirkland) Bayley Construction, LP Page 1 of 2 Printed On:Jun 10,2024 10:38 AM PDT RFI#80-Panel&Circuit for Fire Sprinkler Air Compressor Project:24057 Kent East Hill Operations Center Activity Question Question from Bryce Nelson Bayley Construction,LP on Monday,Jun 3, 2024 at 09:14 AM PDT Sheet P4.1 depicts an air compressor for the fire sprinkler dry system.This equipment is not shown on any electrical drawing, panel schedule or plumbing schedule. Please see the attached sheet P4.1 &provide panel and circuit information for this air compressor. Attachments RFI 080 Backup.pdf Official Response Response from Bryce Nelson Bayley Construction,LP on Monday,Jun 10, 2024 at 10:28 AM PDT Please see attached response from Smith Fire Systems. Please provide a dedicated circuit with the given information provided. Attachments RFI 80-SFS Response.pdf Official Response Response from Sam Scarmardo Wagner Architects and Planners on Friday,Jun 7,2024 at 10:54 AM PDT See attached document Attachments KEHOC-rfi#80-panel_&_circuit_for_fire_sprinkler_air_compressor-202406031615_TW E.pdf All Replies Response from Bryce Nelson Bayley Construction,LP on Monday,Jun 10, 2024 at 10:28 AM PDT Please see attached response from Smith Fire Systems. Please provide a dedicated circuit with the given information provided. Attachments RFI 80-SFS Response.pdf Response from Sam Scarmardo Wagner Architects and Planners on Friday,Jun 7, 2024 at 10:54 AM PDT See attached document Attachments KEHOC-rfi#80-panel_&_circuit_for_fire_sprinkler_air_compressor-202406031615_TW E.pdf James Chong -Tres West Engineers-2024-06-12 Compressor is understood to be less than 1 hp. Provide dedicated circuit from LM11 N-57. If a larger compressor is required, an alternate circuit or voltage will be required. Bayley Construction,LP Page 2 of 2 Printed On:Jun 10,2024 10:38 AM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #80: Panel & Circuit for Fire Sprinkler Air Compressor Status Open To Brandon Cook(Smith Fire Systems, Inc.) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Mercer Island,Washington 98040 Date Initiated Jun 3,2024 Due Date Jun 17,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number P4.1 Reference VECA RFI#23 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Jon Bosshart(VECA ELECTRIC& TECHNOLOGIES,LLC),Dave Brock(City of Kent), Ken Brumley(SCI INFRASTRUCTURE, LLC), Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers),Thomas Evans(Insulpro Projects), Derrek Gunn(Pipe Construction, Inc.), Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson(Sound Glass), Noah Kennard(Smith Fire Systems, Inc.),Jon Marks(Bayley Construction,LP) ,Gene Mayhall(Mayhall's Painting),Will Moore(City of Kent), Mike Nelson(Delta Mechanical),Christian Nicholson(Corona Steel), Nils Brian Nilsson(Bayley Construction,LP), Leah Sandberg(Washington Architectural Hardware),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE, LLC),Arlan Smith(VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC),Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& TECHNOLOGIES,LLC),Mike Yeung(Fastsigns of Kirkland) Bayley Construction, LP Page 1 of 2 Printed On:Jun 10,2024 08:12 AM PDT RFI#80-Panel&Circuit for Fire Sprinkler Air Compressor Project:24057 Kent East Hill Operations Center Activity Question Question from Bryce Nelson Bayley Construction,LP on Monday,Jun 3, 2024 at 09:14 AM PDT Sheet P4.1 depicts an air compressor for the fire sprinkler dry system.This equipment is not shown on any electrical drawing, panel schedule or plumbing schedule. Please see the attached sheet P4.1 &provide panel and circuit information for this air compressor. Attachments RFI 080 Backup.pdf Awaiting an Official Response Answer: Brandon Cook Smith Fire Systems, Inc. Final compressor size will be determined after calculations and design is complete. I believe the compressor will be smaller than 1 hp. A dedicated 115/230-60-1 circuit will be sufficient. Please see the attached product data sheet for reference. Bayley Construction,LP Page 2 of 2 Printed On:Jun 10,2024 08:12 AM PDT WAGNER TO WET SYSTEM SPRINKLER ARCHITECTS HEADS.DO NTITY OF ZONES AS P L A N N E R S REQUIRED TO DRY SYSTEM I91a RIXE YLHcE NOTES: SPRINKLER HEADS TO FIRE S1ATTLI WA 7/1♦]I 1.WHERE SPRINKLER HEADS ARE LOCATED IN REMOVABLE GRID CEILING,THE HEADS SHALL T T T p EL__ !H 6 1��I 1 r•F TEDONTHE CENTERLINE AXIS OF EITHER THE LONG OR SHORT SIDE DIMENSION MAINTENANCE [SEE DETAIL BE Vq,WITH THE HEAD CANOPYA MINIMUM OF 4'FROM EDGE OF PANEL. AIR COMPRESSOR IN ROOMS WHERE MULTIPLE HEADS ARE NEEDED.HEADS SHALL BE LINED UP.NOT IN ALARM 2.RANDOM PATTERN, GONG 3 DUCTWORK,AIR TERMINALS AND LIGHTING LOCATIONS TAKE FIRST PRIORITY OVER FIRE pRY VALVE WITH SPRINKLING SYSTEM.COORDINATION SHALL BE FIRE SPRINKLER CONTRACTOR'S RESPONSIBILITY. CONVEMIONAL TRIM WALL OE 4.SYSTEM DRAINAGE POINTS MUST BE CAREFULLY COORDINATED WITH ARCHITECT,IF NOT T» �0-1"1-1023 COORDINATED,FIRE SPRINKLER CONTRACTOR SHALL REMOVE AND REWORK LOCATIONS TO TO FIRE ALARM - CHECK uw'wm. ARCHITECTS SATISFACTION. PANEL(TYPICAL) FLOW VALVE M_ SWITCH / r S.HE ADS MUST BE LOCATED IN SUCH A MANNER THAT HEAT FROM A DIFFUSER,DUCT.FLUE. (TYPICAL) TO FIRE /C KILN,FF THE I PIPE,ENGINE EXHAUST,OR OTHER HEAT GENERATING DEVICE,WILL NOT TAMPER BET OFF THE FIRE PROTECTION SYSTEM. TEST ALARM SWITCH DRAINS n PANEL (TYPICAL) RESPRINKLERTEST PROVIDE SCHEDULE 40 a.m DRAIN FUNNEL GALVANIZED STEEL PIPE TRES WEST ENGINEER$,INC. FSH INIEDEFLOOR.INSTALL 2 �t Q 0' WITH MODULAR SEALS. TOSANITARVSEWER DOUBLESSECK (TYPICAL) TION � PERREQUIREMEN TO FIRE REQUIREMENTS LMMJ�J+ Q DEPARTMENT OF AHJ SUPPLY MAIN TION CONNECTION �- ESCUTCHEON(TYPICAL) NOTES: 4' 1.PROVIDE PIPE SUPPORTS AND ANCHORS AS REQUIRED TO SUPPORT ENTIRE VALVE ASSEMBLES, 2,THIS DIAGRAM IS PRESENTED AS AN AID TO CONTRACTOR.IT DOES NOT RELIEVE CONTRACTOR FROM MEETING ALL REQUIREMENTS OF NFPA 13 AND LOCAL AUTHORITIES. UCEILING PANEL FIRE SPRINKLER HEAD LOCATIONS U FIBRE SPRINKLER RISER DIAGRAM sc D TDs�AL DT Ds� 10EMT KEHOC Warehouse&Office Building J__�IPRINKUEFTESTIRMN 12607 SE 248TH ST B=ORT KENT,WA 10'o PVC STAND PIPE FOR 6'0 WASTE PIPING, WALL O I PROVIDE MAXIMUM I2"MESH SCREEN AT OPENING FOR RODENTPRooFING. 98030 SECTION 312.12.,2018 UPC. SUPPORT STRAP - 6'OHUBLESS CAST IRON CONSOLIDATED PIPE TO THIS POINT. PIPE SLEEVE CAULK&FIRE STOP SET VENT PIPING;SEE PLAN 0. 20223 FINISHED FLOOR FOR SIZE AND LOCATION PIPE SLEEVE MUCH 19,21N.NOTICE TO PROCEED TO TRAP PRIMER ill'TRAP PRIMER CONNECTION WASTE PIPING; SIZE AS SHOWN ON PINS FIRE SPRINKLER HEADER FUNNEL DRAIN FIRE PROTECTION scAtF.rvoT To scuE DETAILS °mlw".am P4.1 F-30 (4-10) GAST UL Listed Oilless Piston Air Compressors for Dry Sprinkler Systems Tankless / Tank Mounted W- 4LCB-55S-M450GX 6LCF-46S-M616NEX 7LDE-46S-M750X UL1450 Listed No lubrication required Fully automatic Direct Drive Corrosion resistant internal parts Compact, easy to install Oi 0 High cycle rating pressure switch 4LCB-46T-M450GX U L1450 Listed Gast Oilless Piston Air Compressors All air compressors shown have open motors.Single phase motors have internal thermal protection. Dual voltage motors are shipped pre-wired for the higher voltage. All tank units are wired for 115 volts. Tankless/Automatic air compressors have inlet filters,a safety valve,pressure switch,check valve,tubing and fittings. SINGLE CYLINDER MODEL TWIN CYLINDER MODEL I ® A � A B C B C For low pressure air maintenance devices FREE AIR FLOW POWER OPERATING VOLTAGE DIMENSIONS PIPE SHIP MODEL at 13 PSI RATING FREQUENCY INCHES SIZE WT. NUMBER CFM HP HZ A B C IN.NPT LBS U4L AA-55S-M1000X 1.0 1/6 115-60-1 7.67 13.75 9.17 1/4 23.0 FM-55S-M345EX 1.5 1/4 115-60-1 7.67 14.81 9.37 1/4 29.7 CB-55S-M450GX 1 2.0 1/3 115-60-1 1 6.05 16.09 13.29 1/4 40.0 Factory setting:cut-in 13 psi±2 psi/cut-out 18 psi±2 psi For Dry Sprinkler systems Maximum Gallons FREE AIR FLOW POWER OPERATING VOLTAGE DIMENSIONS PIPE SHIP MODEL in System to Pump at 40 PSI RATING FREQUENCY SIZE WT. NUMBER to 40 PSI in 30 Min. INCHES In support of NFPA Standard 13 CFM HP HZ A B C IN.NPT LBS 1LAA-46S-M100GX 90 1.0 1/6 115-60-1 8.31 15.25 9.75 1/4 22.5 2LAF-46S-M200EX 150 1.5 1/4 115-60-1 8.31 15.59 9.75 1/4 24.2 3LBA-46S-M300GX 180 2.0 1/3 115-60-1 8.31 15.55 12.35 1/4 30.2 3LEM-46S-M345EX 180 2.0 1/3 115-60-1 9.63 14.81 9.37 1/4 29.2 4LCB-46S-M450GX 300 3.1 1/2 115/230-60-1 8.81 16.09 13.32 1/4 39.5 5LCA-46S-M550GX 400 4.2 3/4 115/230-60-1 8.81 16.96 13.37 1/4 47.5 6LCF-46S-M616NEX 600 5.9 1 115/208-230-60-1 8.79 18.91 13.43 3/8 55.2 7LDE-46S-M750X 800 7.9 11/2 115/230-110/220-60-1 9.80 25.25 12.50 3/8 73.0 8LDF-46S-M850X 1000 8.84 2 115/230-50/60-1 9.80 25.90 12.60 3/8 90.0 Factory setting:cut-in 40 psi±2 psi/cut-out 50 psi±2 psi UL e Protection ASME Coded Tank Packages ❑ __ Tank mounted compressors include gauge,pressure switch, e shut off valve,drain valve,check valve and safety valve. B All tank units are wired for 115 volts. For Dry Sprinkler systems A n Maximum Gallons FREE AIR FLOW POWER OPERATING VOLTAGE DIMENSIONS PIPE SHIP TANK MODEL in System to Pump at 40 PSI RATING FREQUENCY SIZE WT. SIZE NUMBER to 40 PSI in 30 Min. INCHES In support of NFPA Standard 13 CFM HP HZ A B C IN.NPT LBS GALLON 1 LAA-46T-M 100GX 90 1.0 1/6 1 15-60-1 19 18 9 1/4 44 2 2LAF-46T-M200EX 150 1.5 1/4 115-60-1 26 21 13 1/4 78 12 3LBA-46T-M300GX 180 2.0 1/3 115-60-1 26 21 13 1/4 80 12 3LEM-46T-M345EX 180 2.0 1/3 115-60-1 26 21 13 1/4 83 12 4LCB-46T-M450GX 300 3.1 1/2 115/230-60-1 33 26 17 1/4 109 20 5LCA-46T-M550GX 400 4.2 3/4 115/230-60-1 33 26 17 1/4 115 20 6LCF-46T-M616NEX 600 5.9 1 115/208-230-60-1 33 25.5 17 1/4 169 30 7LDE-46T-M750X 800 7.9 11/2 115/230-110/220-60-1 38 28.6 18 3/8 185 30 8LDF 46T-M850X 1000 8.84 2 115/230-50/60 1 38 29.1 18 3/8 200 30 Factory setting:cut-in 30 psi±2 psi/cut-out 50 psi±2 psi Part Used On AT670 Number Description (See charts for full model number) Compressor Mounting Bracket 55S 46S 46T AT670A AJ550 Check Valves/4'NPTfemale 1LAA-55S ILAA-46S 1LAA-46T 3LEM-55S 2LAF-46S 2LAF-46T 4LCB-55S 3LBA-46S 3LEM-46T 3LEM-46S 3LBA-46T 4LCB-46S 4LCB-46T 5LCA-46S 5LCA-46T 6LCF-46T AJ550A Check Valve3/8'NPTfemale 6LCF-46S 7LDE-46S 7LDE-46T 8LDF-46S 8LDF-46T For mounting all 55S and 46S tankless models AF631 Shock/isolation mounts 1 LAA-55S 1 LAA-46S 1 LAA-46T to all shapes and sizes of riser pipes. /4-20 thread both ends 3LEM-55S 2LAF-46S 2LAF-46T 3LBA-46S 3LBA-46T 3LEM-46S 3LEM-46T Comes complete with all the hardware and AF633 Shock/isolation mounts 4LCB-55S 4LCB-46S 4LCB-46T adjustable stainless steel straps. 5/16-18 thread both ends 5LCA-46S 5LCA-46T 6LCF-46S 6LCF-46T Contact your local sprinkler supply company 7LDE-46S 7LDE-46T or Gast distributor to order. 8LDF-46S 8LDF-46T AS188 Pressure Switch All 55S tankless models (cut-in 13 psi,cut-out 18 psi) AK620D Pressure Switch All 46S tankless models (cut-in 40 psi,cut-out 50psi) AE163F Pressure Switch All 46T tank models (cut-in 30 psi,cut-out 50 psi) AF634 15"hose assy. 1/4'NPT Fittings All models with 1/4'NPT Fittings AH332 16"hose assy. 3/8°NPT Fittings All models with 3/8'NPT Fittings System Air Capacity per 1'pipe (Based on actual internal diameter) Diameter(in.) 1/2 3/4 1 11/4 11/2 2 21/2 3 31/2 4 5 6 8 Gallons .016 .028 .045 .078 .106 .174 .248 .383 .513 .660 1.04 1.50 2.66 AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #80: Panel & Circuit for Fire Sprinkler Air Compressor Status Open To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jun 3,2024 Due Date Jun 17,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number P4.1 Reference VECA RFI#23 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Jon Bosshart(VECA ELECTRIC& TECHNOLOGIES, LLC),Dave Brock(City of Kent), Ken Brumley(SCI INFRASTRUCTURE, LLC), Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers),Thomas Evans(Insulpro Projects), Derrek Gunn(Pipe Construction, Inc.), Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson(Sound Glass), Noah Kennard(Smith Fire Systems, Inc.),Jon Marks(Bayley Construction,LP) ,Gene Mayhall(Mayhall's Painting),Will Moore(City of Kent), Mike Nelson(Delta Mechanical),Christian Nicholson(Corona Steel), Nils Brian Nilsson(Bayley Construction,LP), Leah Sandberg(Washington Architectural Hardware),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE, LLC),Arlan Smith(VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& TECHNOLOGIES, LLC),Mike Yeung(Fastsigns of Kirkland) Bayley Construction, LP Page 1 of 2 Printed On:Jun 3,2024 09:15 AM PDT RFI#80-Panel&Circuit for Fire Sprinkler Air Compressor Project:24057 Kent East Hill Operations Center Activity Question Question from Bryce Nelson Bayley Construction,LP on Monday,Jun 3, 2024 at 09:14 AM PDT Sheet P4.1 depicts an air compressor for the fire sprinkler dry system.This equipment is not shown on any electrical drawing, panel schedule or plumbing schedule. Please see the attached sheet P4.1 &provide panel and circuit information for this air compressor. Attachments RFI 080 Backup.pdf Awaiting an Official Response James Chong -Tres West Engineers-2024-06-03 Sprinkler Contractor is responsible for determining electrical requirements and providing circuit for air compressor per Section 21 13 00 -2.06C. Bayley Construction,LP Page 2 of 2 Printed On:Jun 3,2024 09:15 AM PDT WAGNER TO WET SYSTEM SPRINKLER ARCHITECTS HEADS.DO NTITY OF ZONES AS P L A N N E R S REQUIRED TO DRY SYSTEM I91a RIXE YLHcE NOTES: SPRINKLER HEADS TO FIRE S1ATTLI WA 7/1♦]I 1.WHERE SPRINKLER HEADS ARE LOCATED IN REMOVABLE GRID CEILING,THE HEADS SHALL T T T p EL__ !H 6 1��I 1 r•F TEDONTHE CENTERLINE AXIS OF EITHER THE LONG OR SHORT SIDE DIMENSION MAINTENANCE [SEE DETAIL BE Vq,WITH THE HEAD CANOPYA MINIMUM OF 4'FROM EDGE OF PANEL. AIR COMPRESSOR IN ROOMS WHERE MULTIPLE HEADS ARE NEEDED.HEADS SHALL BE LINED UP.NOT IN ALARM 2.RANDOM PATTERN, GONG 3 DUCTWORK,AIR TERMINALS AND LIGHTING LOCATIONS TAKE FIRST PRIORITY OVER FIRE pRY VALVE WITH SPRINKLING SYSTEM.COORDINATION SHALL BE FIRE SPRINKLER CONTRACTOR'S RESPONSIBILITY. CONVEMIONAL TRIM WALL OE 4.SYSTEM DRAINAGE POINTS MUST BE CAREFULLY COORDINATED WITH ARCHITECT,IF NOT T» �0-1"1-1023 COORDINATED,FIRE SPRINKLER CONTRACTOR SHALL REMOVE AND REWORK LOCATIONS TO TO FIRE ALARM - CHECK uw'wm. ARCHITECTS SATISFACTION. PANEL(TYPICAL) FLOW VALVE M_ SWITCH / r S.HE ADS MUST BE LOCATED IN SUCH A MANNER THAT HEAT FROM A DIFFUSER,DUCT.FLUE. (TYPICAL) TO FIRE /C KILN,FF THE I PIPE,ENGINE EXHAUST,OR OTHER HEAT GENERATING DEVICE,WILL NOT TAMPER BET OFF THE FIRE PROTECTION SYSTEM. TEST ALARM SWITCH DRAINS n PANEL (TYPICAL) RESPRINKLERTEST PROVIDE SCHEDULE 40 a.m DRAIN FUNNEL GALVANIZED STEEL PIPE TRES WEST ENGINEER$,INC. FSH INIEDEFLOOR.INSTALL 2 �t Q 0' WITH MODULAR SEALS. TOSANITARVSEWER DOUBLESSECK (TYPICAL) TION � PERREQUIREMEN TO FIRE REQUIREMENTS LMMJ�J+ Q DEPARTMENT OF AHJ SUPPLY MAIN TION CONNECTION �- ESCUTCHEON(TYPICAL) NOTES: 4' 1.PROVIDE PIPE SUPPORTS AND ANCHORS AS REQUIRED TO SUPPORT ENTIRE VALVE ASSEMBLES, 2,THIS DIAGRAM IS PRESENTED AS AN AID TO CONTRACTOR.IT DOES NOT RELIEVE CONTRACTOR FROM MEETING ALL REQUIREMENTS OF NFPA 13 AND LOCAL AUTHORITIES. UCEILING PANEL FIRE SPRINKLER HEAD LOCATIONS U FIBRE SPRINKLER RISER DIAGRAM sc D TDs�AL DT Ds� 10EMT KEHOC Warehouse&Office Building J__�IPRINKUEFTESTIRMN 12607 SE 248TH ST B=ORT KENT,WA 10'o PVC STAND PIPE FOR 6'0 WASTE PIPING, WALL O I PROVIDE MAXIMUM I2"MESH SCREEN AT OPENING FOR RODENTPRooFING. 98030 SECTION 312.12.,2018 UPC. SUPPORT STRAP - 6'OHUBLESS CAST IRON CONSOLIDATED PIPE TO THIS POINT. PIPE SLEEVE CAULK&FIRE STOP SET VENT PIPING;SEE PLAN 0. 20223 FINISHED FLOOR FOR SIZE AND LOCATION PIPE SLEEVE MUCH 19,21N.NOTICE TO PROCEED TO TRAP PRIMER ill'TRAP PRIMER CONNECTION WASTE PIPING; SIZE AS SHOWN ON PINS FIRE SPRINKLER HEADER FUNNEL DRAIN FIRE PROTECTION scAtF.rvoT To scuE DETAILS °mlw".am P4.1 WAGNER ARCHITECTS TO WET SYSTEM SPRINKLER PLANNER S HEADS.DO NTITY OF ZONES AS REQUIRED TO DRY SYSTEM I91a RIXE YLHCE NOTES: SPRINKLER HEADS TO FIRE S1ATTLI WA 7/1♦]I 1.WHERE SPRINKLER HEADS ARE LOCATED IN REMOVABLE GRID CEILING,THE HEADS SHALL T T T p EL__ !H 6 1��I 1 r•F TEDONTHE CENTERLINE AXIS OF EITHER THE LONG OR SHORT SIDE DIMENSION MAINTENANCE [SEE DETAIL BE Vq,WITH THE HEAD CANOPYA MINIMUM OF 4'FROM EDGE OF PANEL. AIR COMPRESSOR IN ROOMS WHERE MULTIPLE HEADS ARE NEEDED.HEADS SHALL BE LINED UP.NOT IN ALARM 2.RANDOM PATTERN, GONG 3 DUCTWORK,AIR TERMINALS AND LIGHTING LOCATIONS TAKE FIRST PRIORITY OVER FIRE PRY VALVE WITH SPRINKLING SYSTEM.COORDINATION SHALL BE FIRE SPRINKLER CONTRACTOR'S RESPONSIBILITY. CONVEMIONAL TRIM WALL DE 4.SYSTEM DRAINAGE POINTS MUST BE CAREFULLY COORDINATED WITH ARCHITECT,IF NOT T» �0-1"1-1023 COORDINATED,FIRE SPRINKLER CONTRACTOR SHALL REMOVE AND REWORK LOCATIONS TO TO FIRE ALARM - CHECK uw'wm. ARCHITECTS SATISFACTION. PANEL(TYPICAL) FLOW VALVE M_ SWITCH / r S.HE ADS MUST BE LOCATED IN SUCH A MANNER THAT HEAT FROM A DIFFUSER,DUCT.FLUE. (TYPICAL) TO FIRE /C KILN,FF THE I PIPE,ENGINE EXHAUST,OR OTHER HEAT GENERATING DEVICE,WILL NOT TAMPER BET OFF THE FIRE PROTECTION SYSTEM. TEST ALARM SWITCH DRAINS n PANEL (TYPICAL) RESPRINKLERTEST PROVIDE SCHEDULE 40 a.m DRAIN FUNNEL GALVANIZED STEEL PIPE TRES WEST ENGINEER$,INC. FSH INIEDEFLOOR.INSTALL 2 �t Q 0' WITH MODULAR SEALS. TOSANITARVSEWER DOUBLESSECK (TYPICAL) TION � PERREQUIREMEN TO FIRE REQUIREMENTS LMMJ�J+ Q DEPARTMENT OF AHJ SUPPLY MAIN TION CONNECTION �- ESCUTCHEON(TYPICAL) NOTES: 4' 1.PROVIDE PIPE SUPPORTS AND ANCHORS AS REQUIRED TO SUPPORT ENTIRE VALVE ASSEMBLES, 2,THIS DIAGRAM IS PRESENTED AS AN AID TO CONTRACTOR.IT DOES NOT RELIEVE CONTRACTOR FROM MEETING ALL REQUIREMENTS OF NFPA 13 AND LOCAL AUTHORITIES. UCEILING PANEL FIRE SPRINKLER HEAD LOCATIONS U FIBRE SPRINKLER RISER DIAGRAM sc D TDs�AL DT Ds� 10EMT KEHOC Warehouse&Office Building J__�IPRINKUEFTESTIRMN 12607 SE 248TH ST B=ORT KENT,WA 10'o PVC STAND PIPE FOR 6'0 WASTE PIPING, WALL O I PROVIDE MAXIMUM I2"MESH SCREEN AT OPENING FOR RODENTPRooFING. 98030 SECTION 312.12.,2018 UPC. SUPPORT STRAP - 6'OHUBLESS CAST IRON CONSOLIDATED PIPE TO THIS POINT. PIPE SLEEVE CAULK&FIRE STOP SET VENT PIPING;SEE PLAN 0. 20223 FINISHED FLOOR FOR SIZE AND LOCATION PIPE SLEEVE MUCH 19,21N.NOTICE TO PROCEED TO TRAP PRIMER ill'TRAP PRIMER CONNECTION WASTE PIPING; SIZE AS SHOWN ON PINS FIRE SPRINKLER HEADER FUNNEL DRAIN FIRE PROTECTION scAtF.rvoT To scuE DETAILS °mlw".am P4.1 AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #135 - CCD-011 - RFI-139 - Shift Striping @ Light Pole Bases at NW Edge of Building Origin: RFI#139: Light Pole Relocation Proposals Date Created: 9/13/2024 Created By: Nils Brian Nilsson Status: Open Scope: Out of Scope Type: Change Order Request Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 02-300-001.S SCI INFRASTRUCTURE,LLC Is 1.0 $4,800.00 $4,800.00 $4,800.00 1.0 $4,800.00 $4,800.00 $4,800.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: Remove and Reinstall 3 Lightpole Bases(Remove 3 @$800/EA,Install 3 @$800/EA) 26-100-000.S VECA ELECTRIC& Is 1.0 $5,903.08 $5,903.08 $5,903.08 1.0 $5,903.08 $5,903.08 $5,903.08 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: Costs associated with moving(3)light pole bases that have already been installed and the existing rough-in associated with each light pole,per the response to RFI#139 01-450-120.S hours 8.0 $200.00 $1,600.00 $1,600.00 8.0 $200.00 $1,600.00 $1,600.00 $0.00 Surveyor.Commitments- Subcontracts Description: Layout 03-100-0201 hours 4.0 $95.00 $380.00 $380.00 4.0 $95.00 $380.00 $380.00 $0.00 Concrete Foreman.Labor and Labor Tax Description: Foreman Bayley Construction, LP Page 1 of 2 Printed on:9/13/2024 at 03:16PM PDT Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 01-740-099.1- hours 4.0 $50.00 $200.00 $200.00 4.0 $50.00 $200.00 $200.00 $0.00 Weekly cleanup.Labor and Labor Tax Description: Cleanup 01-740-125.PO Is 1.0 $110.00 $110.00 $110.00 1.0 $110.00 $110.00 $110.00 $0.00 Du mpsters.Purchase Order and All Other Costs Description: Dumpster 32-170-230.S $ $0.00 $0.00 $ $0.00 $0.00 $0.00 Pavement Markings.Commitments- Subcontracts Description: Shift Striping-No Cost 00-000-000.130 Is 1.0 $1,949.00 $1,949.00 $1,949.00 1.0 $1,949.00 $1,949.00 $1,949.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractors Fee Grand Totals $14,942.08 $0.00 $14,942.08 $14,942.08 $0.00 $0.00 $0.00 $14,942.08 $0.00 $0.00 Bayley Construction, LP Page 2 of 2 Printed on:9/13/2024 at 03:16PM PDT Change Proposal Project Name:KEHOC Warehouse&Office Building CE# 135 Project No.24507 Doc#: CCD-011 Work Description:CCD-011-RFI-139-Shift Striping&Light Pole Base at NW Edge of Building Date: 7/24/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs SCI-Remove and Reinstall 3 Lightpole Bases Remove 3 $800/EA,Install 3 $800/EA 1 LS $ $ $ 4,800.00 $ 4,800 $ 4,800 Veca-RFI-139-costs associated with moving(3)light pole bases that have already been installed and the existing rough-in associated with each light pole. 1 LS $ $ $ 5,903.08 $ 5,903 $ 5,903 Shift Striping-No additional cost $ $ $ $ - incl. Layout 8 HR $ $ $ 200.00 $ 1,600 $ 1,600 Foreman 4 95.00 $ 380 $ $ $ - $ 380 Cleanup 4 50.00 $ 200 $ $ $ $ 200 Dumpster 1 LS $ - $ 110.00 $ 110 $ $ 110 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8 $ 580 $ $ 110 $ 12,303 Clarification,Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 12,993 Excludes WSST. General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 1,949 GRAND TOTAL $ 14,942 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 9/13/2024 Owner's Representative Date Bayley Construction Date CONSTRUCTION From: x OWNER CHANGE ARCHITECT DIRECTIVE CONTRACTOR FOR KENT EAST HILL FIELD OPERATIONS CENTER OTHER PROJECT; KEHOC Warehouse&Office wilding DIRECTIVE NO: CCD-011 (naive, address) 12607 5E 24Bth Street Kent, WA 98030 DATE, 712412024 TO CONTRACTOR: Bayley Construction PROJECT NUMBER: I"AC 23.09C (name, address) 8005 SE 28th Street Mercer Island, VVA 98040 CONTRACT DATE: NTP 3119/2024 0I l2IECTEI)CHANGES TO SCOPE OF WORK You are hereby directed to make the following change(s)in this Contract: 1 Shift striping and light pole base at NW edge of building to align with striping and tight pole bases at SVV edge of building Attachments: C5.01 & C5.02 ADJUSTMENT'S TO CONTRACT SUM AND CONTRACT TIME 1 Bayley Construction agrees to calculate proposed adjustments to the Contract Sum and Contract Time consistant with Section 00 72 00-Part 7&0126 GO-1.08 of the Contract Documents. 2 Bayley Construction agrees to provide an estimate of proposed adjustments to the Contract Sum and Contract Time within 2 weeks of racipt of this CCO, 3 Bayley Construction agrees to provide monthly updates on completion and potential impact to the ContraCt Sum and Contract Time. Provide additional documentation on an attached sheet to support time and cost par 00 72 00 - Part 7&01 26 00-1.06 i When signed by the Owner and Architect and received by the Signature by the Contractor indicates the Cortractor,this dgcUment becomes effective IMMEDIATELY Contractor's agreement with the proposed stall proceed with the change(s)described above, adjustments in Contract Sum and Contract Time set forth in this Construction Change Directive(CCD . Wagner Architects_ City_of Kent Bayley Construction ARCHITECT OWNER CONTRACTOR 1916 pike Place#221 400 West Cowe 8005 SE 28th Street 1_7 Kent,WA 98032 Mercer Island,WA 98040 Y BY POW DATE DATE 7/24/24 WAS ------------ ---- ---- ----� rS RC WAGNER a : n PLANNER5 ® Isla PIS7 •LACC - -- -- - - _�_ 124THAVENLESE SCAE1`--M A veal -- - — - -- - I Lgad J 11 rr rr-ism ('�. w lw- jcaka""m P O R T E R a LUKOEEPI neael.c�ase ��� ICEWT :aria.ws I w mac w _ _ o - -- - - — — -—_ - - - J m xtlrc IIIt � � a � 1 �-SE LxffMM STRWING AND SK3!�E I I } — PLAN T _--_._________—__ — —_—__ -LMITNhIIIED-��HeFfL�5-0] —————————----.__________=_-J I 5.0 + ~ CM Setae Vau LIS-0-14 x 1 lD6 S3555� doe I. ----------- ----------_—_--_ + ARCHITECTS J — _------� v Fir r #LANN€KS -i4r4 NSE !Lh6E SSCALE 1'=W WTLf Mi 9tIDl MOM T E R LUNDEEN � Gi��l6l mlSiAM I 1 a I Y�. rvs.r..a G4L W ' -in U` � 12A17��7F a'7 1 �ET • E I .•i I k - d llllf! M �a s*3lvaaE _ I Ft&w 5.0 —COPMNLEn-SEEWEETCS{� --------______-------- --- . CiF9ekra YSu W&1-1 cir1 EU7 F?#SS:5 J¢d ftaarsSgtiae�7SA(° v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 16 VECA Electric And Technologies LLC Date: 8/19/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description CO reflects costs associated with moving (3) light pole bases that have already been installed and the existing rough-in associated with each light pole, per the response to RFI #139. CO excludes all earthwork associated with the UG and light pole base removal/install. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 1" CONDUIT-PVC40 TRENCH 100 83.25 C 83.25 3.50 C 3.50 1 1/2"CONDUIT-PVC40 TRENCH 100 135.87 C 135.87 3.75 C 3.75 1" ELBOW 90 DEG- PVC40 18 166.12 C 29.90 27.50 C 4.95 1 1/2" ELBOW 90 DEG- PVC40 9 312.64 C 28.14 42.50 C 3.83 1" COUPLING- PVC 30 30.70 C 9.21 0.00 C 0.00 1 1/2"COUPLING- PVC 15 57.11 C 8.57 0.00 C 0.00 LABOR FOR RELOCATING (3) LIGHT POLE BASES 1 0.00 E 0.00 18.00 E 18.00 Totals 273 294.94 34.02 Summary General Materials 294.94 Material Total 294.94 CRAFTSMAN LABOR (34.03 Hrs @$121.87) 4,147.24 FOREMAN @ 15% (5.10 Hrs @$131.12) 668.71 Overhead (@ 10.000 %) 511.09 Markup (@ 5.000 %) 281.10 Subtotal 5,903.08 CHANGE_NOTICF CCN# 16 Client Address: Date: 8/19/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 Summary(Cont'd) Final Amount $5,903.08 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 16 Final Amount: $5,903.08 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #139: Light Pole Relocation Proposals Status Closed on 08/16/24 To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) Abigail Purnapuspita(Wagner Architects and 8005 SE 28th Street Planners) Mercer Island,Washington 98040 Date Initiated Aug 14,2024 Due Date Aug 28,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number OA1.0 Reference Linked Drawings Received From Jon Bosshart(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Bedsaida Osuna(Nelson Adams NACO), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE,LLC), Brandon Crain(Pavement Markings),Savanna Delgado(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg(Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving&Construction), Derrek Gunn(Pipe Construction, Inc.),Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Delta (Sub to Ramsett)),Chris Hansen(SCI INFRASTRUCTURE, LLC), Nathan Harper(City of Kent),Cory Hehr(Pipe Construction, Inc.),Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson (Sound Glass Sales, Inc.),Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent(Pipe Construction, Inc.), Matt Laukala(Caliber Concrete Construction, Inc.), Mark Leavitt(Expert Drywall Inc) ,Jon Marks(Bayley Construction, LP), Elaine Mayhall(Mayhall's Painting),Gene Mayhall(All- Wayz Painting),Mike Nelson(Delta Mechanical), Christian Nicholson(Corona Steel),Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez (Bayley Construction, LP),Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Delta (Sub to Ramsett)), Eric Trofimchik(VECA ELECTRIC&TECHNOLOGIES,LLC), Ken Wais Bayley Construction, LP Page 1 of 2 Printed On:Sep 13,2024 03:04 PM PDT RFI#139-Light Pole Relocation Proposals Project:24057 Kent East Hill Operations Center (SIEMENS INDUSTRY INC),Mike Yeung (Fastsigns of Kirkland) Activity Question Question from Bryce Nelson Bayley Construction,LP on Wednesday,Aug 14, 2024 at 02:38 PM PDT There are several light poles that the electrician has noted in the attached marked up sheet OA1.0 that are shown to be moved,as directed by the design team. -In the attached drawing,three light poles are indicated to remain where they are at per CCD#11,but per the most recent site CAD files provided by the architect via RFI#116,the light poles will need to move 6 ft.to the West. Please confirm that the contractors shall proceed with moving these poles -Three light poles are pointed out in the attached drawing at the edge of the property in the Southwest corner. Per the most recent CAD files provided by the architect via RFI#116,these light poles are also shown to move.The electrician proposes keeping these lights at their current location because they believe this will not have any impact on parking/striping. Please confirm how the contractors shall proceed. -CP-007 showed a light pole being moved near the mineral bins on the Southeast corner of the building.The electrician is recommending locating the light pole to be located even with the north edge of the mineral bins,T-6"to the East of the bins. Please confirm if the contractors shall proceed with this. Please note that the relocation of any light poles will have additional costs included.Please also provide updated CAD dwgs if the design team or Owner determines any different locations for the light poles than already shown. Attachments RFI#139 Backup.pdf Official Response Response from Bryce Nelson Bayley Construction,LP on Friday,Aug 16, 2024 at 07:53 AM PDT Please review the attached RFI. Bayley Construction requires a response to this correspondence no later than three(3) working days from the date of this transmission.Failure to reply by this date will negate your rights to request for additional money and/or time as related to this document. If the attached document has costs or schedule implications,you are required to provide,but not limited to,the following: COP: Reference the document number and a description of the added scope of work Detailed cost breakdown with quantities,labor,and materials. Effect on current project schedule including anticipated duration. Bond,insurance,and OH&P per contract terms. You must submit a complete COP within seven(7)working days from the date of original transmission. Failure to do so will negate your rights to request for additional money and/or time as it relates to this change. If you have any question,please contact Brian Nilsson at(206)549-8342 or Bryce Nelson at(509)969-2824 Official Response Response from Sam Scarmardo Wagner Architects and Planners on Thursday,Aug 15, 2024 at 04:53 PM PDT See attached document Attachments KEHOC_x_ARCH_SITE.dwg, KEHOC-rfi#139-light_pole_relocation_proposals-Response.pdf Bayley Construction,LP Page 2 of 2 Printed On:Sep 13,2024 03:04 PM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #139: Light Pole Relocation Proposals Status Open To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) Abigail Purnapuspita(Wagner Architects and 8005 SE 28th Street Planners) Mercer Island,Washington 98040 Date Initiated Aug 14,2024 Due Date Aug 28,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number OA1.0 Reference Linked Drawings Received From Jon Bosshart(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC),Brandon Cook(Smith Fire Systems, Inc.), Jason Craig(SCI INFRASTRUCTURE,LLC), Brandon Crain(Pavement Markings),Savanna Delgado(SCI INFRASTRUCTURE, LLC),Jodi Drost (Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg (Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving& Construction), Derrek Gunn(Pipe Construction, Inc.) ,Zac Gurule(SCI INFRASTRUCTURE,LLC),Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Bedsaida Osuna(Nelson Adams NACO),Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson (Sound Glass Sales, Inc.),Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent(Pipe Construction, Inc.), Matt Laukala(Caliber Concrete Construction, Inc.), Mark Leavitt(Expert Drywall Inc) ,Jon Marks(Bayley Construction, LP), Elaine Mayhall(Mayhall's Painting),Gene Mayhall(All- Wayz Painting),Mike Nelson(Delta Mechanical), Christian Nicholson(Corona Steel),Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez (Bayley Construction, LP),Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.), Eric Trofimchik(VECA ELECTRIC&TECHNOLOGIES,LLC), Ken Wais Bayley Construction, LP Page 1 of 2 Printed On:Aug 14,2024 02:46 PM PDT RFI#139-Light Pole Relocation Proposals Project:24057 Kent East Hill Operations Center (SIEMENS INDUSTRY INC),Mike Yeung (Fastsigns of Kirkland) Activity Question Question from Bryce Nelson Bayley Construction,LP on Wednesday,Aug 14, 2024 at 02:38 PM PDT There are several light poles that the electrician has noted in the attached marked up sheet OA1.0 that are shown to be moved,as directed by the design team. -In the attached drawing,three light poles are indicated to remain where they are at per CCD#11,but per the most recent site CAD files provided by the architect via RFI#116,the light poles will need to move 6 ft.to the West. Please confirm that the contractors shall proceed with moving these poles -Three light poles are pointed out in the attached drawing at the edge of the property in the Southwest corner. Per the most recent CAD files provided by the architect via RFI#116,these light poles are also shown to move.The electrician proposes keeping these lights at their current location because they believe this will not have any impact on parking/striping. Please confirm how the contractors shall proceed. -CP-007 showed a light pole being moved near the mineral bins on the Southeast corner of the building.The electrician is recommending locating the light pole to be located even with the north edge of the mineral bins,T-6"to the East of the bins. Please confirm if the contractors shall proceed with this. Please note that the relocation of any light poles will have additional costs included.Please also provide updated CAD dwgs if the design team or Owner determines any different locations for the light poles than already shown. Attachments RFI#139 Backup.pdf Awaiting an Official Response It is confirmed that the 3 light poles at the west of the site will need to move 6' to the west. It is confirmed that the current location of the 3 light poles at the SW corner of the site do not have any impact on parking/striping, and leaving them in their current location is acceptable. The light pole at the SE of the site is shown in the approximate location described by the contractor, even with the north edge of the mineral bins and slightly to the east. The proposed location can be verified in the field by the owner, but the intent is to be roughly equidistant from the mineral bins to the west, the proposed concrete slab to the east, and the proposed chain-link fence enclosure to the south. An updated CAD file has been attached for use by the surveyor. The location of the light poles that are intended to remain in place at the SW corner have been updated to the location described by the Bayley. -sam scarmardo, architect Bayley Construction,LP Page 2 of 2 Printed On:Aug 14,2024 02:46 PM PDT f OF STREET 9 — — — 124Eh AVENUE BE — — — — 1 — — — — — — — STREET TR WAGNER AREA sTREE ARCHITECTS Thislight pole base is currently 24.d par surveyors layout IMPERVIOUS 419,203$F based on"B Site Plan 314 2026 tlwg.g." —"—"—"— '�^ — — — — — — — —"—" PLANNER S PAVEMENT 374,220 SF W —� 1Ple P[RF "ACE Per KEHOC z ARCH SITE dwg"distributed 8/13/24,this light These(3)light pole bases era currently.,Wll,d per surveyor's U - ¢I ATTl"s WA GRAVEL 0 SF pole rise i.to move 1 6"to the west layout based on'B S'[e Plan 3.14 2024 dwg. Q '" t 0 e•A 4 e 791,01 i e TOTAL 374,2205E I CCD-011 stated that the two southern poles were"ok to stay'. �— N BUILDING 44,983 SF I P —ARCH ARGH SITE tlwg d irbutetl 8/13124,all — 7i - crew - 7 th light poles nsed t ve 6'0 the west ®_ - 'Elsl TOTAL 419,203 SF § - 1.9 C TECT r41 = I 'IW✓ FENCE 552 LIN.FT. it 2 _ I u: aNER 2 I i 3 Al. T I I I I I T _ fl.. COVERED.. T. ,------ ------- F I These(2)light pole bases are currently nstalled p......yors --- — -------------- Move6 to the West layout basetl on Bste Plan 3142024tlwg' 170'-a" 38fl-S per.uP.Did CAD plan : 413'-10" Per KEHOC x ARCH SITEdwg"distrbuted 8/1M4,both Keep I.the ex sb.g I I Iocaton peru dated, light poles need to move 11 W the north. CAD plan '� I 9I "' ;A1. _ mg I $ PROPOSED OPERATIONS CENTER LEGEND: TA"= m _______ _______________; NJLOING EDGE I LIGHT POLE 1 COVERED ----I I•` �_—.... -------- _ —x— NEW FENCE T EDGE OF ROOF 2 - 1 S EXISTING FENCE - / —�19 a _ I 4 I I r — — PROPERTY LINE - >f--� E �l oA17TO " T _ NEW 7 PAVEMENTAREA KEHOC j 1. 31 I N NEW CONCRETE z / I A15 - N Warehouse 8 Office Building NEWLANDSCAPEDAREA (SEE LANDSCAPE PLANS) 12807 SE 248TH ST KENT,WA LEGEND I —DP i 3 I 98030 "'re -t�� o lr J�oo�o��ori1rq,JP/�rio�oa���,p,� `' _ - i' CONSOLIDATED — J MAIN ENTRY I SET No. 20z25 A1. MARCH19,=4 NOMCETOPROCEED OA1. a 1�\\ 4 I Ofi.052024REMSIONfi See upletsd CAD file OA15 Confine this light pole is to be Installed even with the north Nedge of the mineral bins,TV" — - east of the bins. n _ 2 a (I— _ Al SITE PLAN EXISTINGWAIERT — - 219'-01/2' 739-910 B 4 BERM - EXISTING m W A T E R T 0 W E R -L- J J n 958'-912- i R SCALE IN FEETk e SITE PLAN £fop - 0 25 50 100 200 ®Z OA1 .0 NOTED SCALE ISBASEDON FULLSI2EDRAWINGSTHATAREFORM7EDAT22X34 AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #140 - RFI-114 - Rack Receptacle Revisions Origin: RFI#114:Rack Receptacle Date Created: 9/13/2024 Created By: Nils Brian Nilsson Status: Open Scope: In Scope Type: Change Order Request Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 26-100-000.S VECA ELECTRIC& Is 1.0 $17,753.26 $17,753.26 $17,753.26 1.0 $17,753.26 $17,753.26 $17,753.26 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: Supply&Install(1)new 100A panelboard,(32)new 30A 2P breakers,(16)20A 1 P breakers,and(1)additional 100A feeder. 01-450-120.S hours 4.0 $200.00 $800.00 $800.00 4.0 $200.00 $800.00 $800.00 $0.00 Surveyor.Commitments- Subcontracts Description: Layout 03-100-0201 hours 4.0 $95.00 $380.00 $380.00 4.0 $95.00 $380.00 $380.00 $0.00 Concrete Foreman.Labor and Labor Tax Description: Foreman 01-740-0991 hours 4.0 $50.00 $200.00 $200.00 4.0 $50.00 $200.00 $200.00 $0.00 Weekly cleanup.Labor and Labor Tax Description: Cleanup Bayley Construction, LP Page 1 of 2 Printed on:9/13/2024 at 12:03PM PDT Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 01-740-125.PO Is 1.0 $110.00 $110.00 $110.00 1.0 $110.00 $110.00 $110.00 $0.00 Du mpsters.Purchase Order and All Other Costs Description: Dumpster 00-000-000.PO Is 1.0 $2,887.00 $2,887.00 $2,887.00 1.0 $2,887.00 $2,887.00 $2,887.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractors Fee Grand Totals $22,130.26 $0.00 $22,130.26 $22,130.26 $0.00 $0.00 $0.00 $22,130.26 $0.00 $0.00 Bayley Construction, LP Page 2 of 2 Printed on:9/13/2024 at 12:03PM PDT Change Proposal Project Name:KEHOC Warehouse&Office Building CE# 140 Project No.24507 Doc#: RFI-114 Work Description:RFI-114-Rack Receptacle Date: 9/4/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs Veca-RFI-114-Rack Receptacle Changes 1 LS $ $ $ 17,753.26 $ 17,753 $ 17,753 Layout 4 HR $ $ $ 200.00 $ 800 $ 800 Foreman 4 95.00 $ 380 $ $ $ - $ 380 Cleanup 4 50.00 $ 200 $ $ $ $ 200 Dumpster 1 LS $ $ 110.00 $ 110 $ $ 110 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8 $ 580 $ $ 110 $ 18,553 Clarification.Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 19,243 Excludes WSST General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 2,887 GRAND TOTAL is 22,130 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by FX I Bayley Construction. To prevent delays and further impacts please approve by: 9/13/2024 Owner's Representative Date Bayley Construction Date v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 15 VECA Electric And Technologies LLC Date: 8/19/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description CO reflects costs associated with the changes made to the rack receptacles in the MDF room per RFI #114 response. CO includes providing and installing (1) new 100A panelboard, (32) new 30A 2P breakers, (16) 20A 1 P breakers and (1) additional 100A feeder. Lead time for the new panelboard is --4 weeks after submittal approval. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 3/4"CONDUIT- EMT 360 92.33 C 332.39 4.40 C 15.84 1 1/2"CONDUIT-EMT 60 294.77 C 176.86 8.00 C 4.80 1 1/2" ELBOW 90 DEG- EMT 2 1,227.00 C 24.54 50.00 C 1.00 3/4"CONN SS STL-EMT 32 36.00 C 11.52 12.50 C 4.00 1 1/2"CONN SS STL- EMT 4 171.00 C 6.84 20.00 C 0.80 3/4"COUPLING SS STL- EMT 36 44.00 C 15.84 0.00 C 0.00 1 1/2"COUPLING SS STL-EMT 8 200.00 C 16.00 0.00 C 0.00 1 1/2" BUSHING- PLASTIC 4 95.36 C 3.81 6.50 C 0.26 3/4" 1-H STRAP-EMT-STEEL 56 30.88 C 17.29 6.75 C 3.78 1 1/2" 1-H STRAP- EMT-STEEL 6 312.26 C 18.74 9.75 C 0.58 #10 THHN BLACK 1,188 274.50 M 326.11 7.06 M 8.39 #2 THHN BLACK 260 1,852.90 M 481.75 15.50 M 4.03 #2/0 THHN WHITE 60 3,104.00 M 186.24 20.25 M 1.22 #8 THHN GREEN 60 521.60 M 31.30 8.75 M 0.53 WIRE CONN RED 48 26.40 C 12.67 7.50 C 3.60 4x 1 1/2"SQ BOX COMB KO 16 176.56 C 28.25 20.00 C 3.20 4"SQ BLANK COVER 16 72.98 C 11.68 3.13 C 0.50 1/4-20x 1 3/4 WEDGE ANCHOR- 1 1/8" MIN DEPTH 6 0.00 C 0.00 10.00 C 0.60 #8 TO#1 Ox 7/8 PLAS ANCHOR(3/16) 88 4.59 C 4.04 7.50 C 6.60 #10 TO#12x 1 PLAS ANCHOR(1/4) 4 4.79 C 0.19 8.75 C 0.35 CHANGE_NOTICF CCN# 15 Client Address: Date: 8/19/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 Description Qty Net Price U Total Mat. Labor U Total Hrs. #10x 1 P/H SELF-TAP SCREW 92 11.68 C 10.75 3.75 C 3.45 30A 250V 3WIRE 1PH TW-LOCK REC 16 41.88 E 670.08 0.38 E 6.08 100A 4W-24CCT RCSD BREAKER BPB 1 0.00 E 0.00 3.75 E 3.75 #8 WIRE POWER TERM 2 0.00 E 0.00 0.18 E 0.36 #2 WIRE POWER TERM 6 0.00 E 0.00 0.31 E 1.86 #2/0 WIRE POWER TERM 2 0.00 E 0.00 0.44 E 0.88 Totals 2,433 2,386.88 76.45 Summary General Materials 2,386.88 DISTRIBUTION 2,163.00 Material Total 4,549.88 CRAFTSMAN LABOR (76.45 Hrs @$121.87) 9,316.96 FOREMAN @ 15% (11.47 Hrs @$131.12) 1,503.95 Overhead (@ 10.000 %) 1,537.08 Markup (@ 5.000 %) 845.39 Subtotal 17,753.26 Final Amount $17,753.26 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 15 Final Amount: $17,753.26 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #114: Rack Receptacle Status Closed on 08/13/24 To Sam Scarmardo(Wagner Architects and Planners) From Angel Nunez(Bayley Construction, LP) (Response Required) 8005 SE 28th St. Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jul 29,2024 Due Date Aug 12,2024 Location Cost Impact TBD Schedule Impact No Spec Section 27 10 00-Telecommunications Systems Cost Code Drawing Number E8.0, E9.4 Reference VECA RFI#37 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Bedsaida Osuna(Nelson Adams NACO), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE,LLC), Brandon Crain(Pavement Markings),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg(Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving&Construction), Derrek Gunn(Pipe Construction, Inc.),Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Delta (Sub to Ramsett)),Chris Hansen(SCI INFRASTRUCTURE, LLC), Nathan Harper(City of Kent),Cory Hehr(Pipe Construction, Inc.),Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson (Sound Glass Sales, Inc.),Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent(Pipe Construction, Inc.), Mark Leavitt(Expert Drywall Inc) ,Jon Marks(Bayley Construction, LP), Elaine Mayhall(Mayhall's Painting),Gene Mayhall(AII- Wayz Painting),Mike Nelson(Delta Mechanical), Christian Nicholson(Corona Steel),Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez (Bayley Construction, LP),Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Delta(Sub to Ramsett)), Eric Trofimchik(VECA ELECTRIC& Bayley Construction, LP Page 1 of 2 Printed On:Sep 13,2024 11:51 AM PDT RFI#114-Rack Receptacle Project:24057 Kent East Hill Operations Center TECHNOLOGIES, LLC), Mike Yeung(Fastsigns of Kirkland) Activity Question Question from Angel Nunez Bayley Construction,LP on Monday,Jul 29, 2024 at 11:57 AM PDT In the revise and resubmit submittal comments,there's a note"-Provide APC AP8641 Metered PDU(2 per rack). Replace 30A/3P circuit breakers in Panel LU12N and LU21N with 30A/2P circuit breakers for 1-6-30R." Sheet E8.0 depicts(13)L21-30R receptacles in the MDF room and(3)L21-30R receptacles in IDF 239.Please confirm all (16)of the L21-30R receptacles are to change to L6-30R receptacles. Sheet E9.4 depicts(16)30A 3/P breakers in panels LU12N and LU21N for rack receptacles.Confirm all(16)of these breakers are to change to 30A 3/P breakers. Attachments Rack receptacles RFI.pdf Official Response Response from Angel Nunez Bayley Construction,LP on Tuesday,Aug 13, 2024 at 11:30 AM PDT Please review the attached RFI. Bayley Construction requires a response to this correspondence no later than three(3) working days from the date of this transmission.Failure to reply by this date will negate your rights to request for additional money and/or time as related to this document. If the attached document has costs or schedule implications,you are required to provide,but not limited to,the following: COP: Reference the document number and a description of the added scope of work Detailed cost breakdown with quantities,labor,and materials. Effect on current project schedule including anticipated duration. Bond,insurance,and OH&P per contract terms. You must submit a complete COP within seven(7)working days from the date of original transmission. Failure to do so will negate your rights to request for additional money and/or time as it relates to this change. If you have any question,please contact Brian Nilsson at(206)549-8342 or Bryce Nelson at(509)969-2824 Official Response Response from Sam Scarmardo Wagner Architects and Planners on Tuesday,Aug 13, 2024 at 10:39 AM PDT See attached document Attachments KEHOC-rfi#114-rack receptacle-202407292038_TWE.pdf Bayley Construction,LP Page 2 of 2 Printed On:Sep 13,2024 11:51 AM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #114: Rack Receptacle Status Open To Sam Scarmardo(Wagner Architects and Planners) From Angel Nunez(Bayley Construction, LP) (Response Required) 8005 SE 28th St. Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jul 29,2024 Due Date Aug 12,2024 Location Cost Impact TBD Schedule Impact No Spec Section 27 10 00-Telecommunications Systems Cost Code Drawing Number E8.0, E9.4 Reference VECA RFI#37 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC),Brandon Cook(Smith Fire Systems, Inc.), Jason Craig(SCI INFRASTRUCTURE,LLC), Brandon Crain(Pavement Markings),Jodi Drost (Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg (Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving& Construction), Derrek Gunn(Pipe Construction, Inc.) ,Zac Gurule(SCI INFRASTRUCTURE,LLC),Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Bedsaida Osuna(Nelson Adams NACO),Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson (Sound Glass Sales, Inc.),Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent(Pipe Construction, Inc.), Mark Leavitt(Expert Drywall Inc) ,Jon Marks(Bayley Construction, LP), Elaine Mayhall(Mayhall's Painting),Gene Mayhall(AII- Wayz Painting),Mike Nelson(Delta Mechanical), Christian Nicholson(Corona Steel),Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez (Bayley Construction, LP),Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& Bayley Construction, LP Page 1 of 2 Printed On:Jul 29,2024 01:37 PM PDT RFI#114-Rack Receptacle Project:24057 Kent East Hill Operations Center TECHNOLOGIES, LLC), Mike Yeung(Fastsigns of Kirkland) Activity Question Question from Angel Nunez Bayley Construction,LP on Monday,Jul 29, 2024 at 11:57 AM PDT In the revise and resubmit submittal comments,there's a note"-Provide APC AP8641 Metered PDU(2 per rack). Replace 30A/3P circuit breakers in Panel LU12N and LU21N with 30A/2P circuit breakers for 1-6-30R." Sheet E8.0 depicts(13)L21-30R receptacles in the MDF room and(3)L21-30R receptacles in IDF 239.Please confirm all (16)of the L21-30R receptacles are to change to L6-30R receptacles. Sheet E9.4 depicts(16)30A 3/P breakers in panels LU12N and LU21N for rack receptacles.Confirm all(16)of these breakers are to change to 30A 3/P breakers. Attachments Rack receptacles RFI.pdf Awaiting an Official Response James Chong -Tres West Engineers-2024-08-05 Each rack/cabinet requires 2 PDUs. Provide the following changes to support 2 PDUs per rack. Replace (13) 30A/3P circuit breakers in Panel LU12N with (13) 30A/2P circuit breakers and (13)20A/1 P circuit breakers. Replace (13) L21-30R receptacles in MDF 122 with (13) L6-30R receptacles. Provide (13) additional L6-30R receptacles to be supplied from new panel described below. Provide a new 208Y/120V, 3-phase, 4-wire, 100A MCB Panel LU13N with 200% neutral to support second PDU on each rack. Panel to include (13) 30A/2P circuit breakers. Remaining breakers shall all be 20A/1 P. New panel to be fed from existing 100A spare breaker in Panel LU11 N. PDUs on each rack to be fed from two separate panels, LU12N and LU13N. Replace (3) 30A/3P circuit breakers and (3) 20A/1 P circuit breakers in Panel LU21 N with (6) 30A/2P circuit breakers. Replace (3) L21-30R receptacles in OF 239 with (3) L6-30R receptacles. Provide (3)additional L6-30R receptacles in OF 239. PDUs on each rack to be fed from separate circuits from Panel LU21 N. Bayley Construction,LP Page 2 of 2 Printed On:Jul 29,2024 01:37 PM PDT SUBMITTAL REVIEW 27 10 00-2.0 - Telecommunications - PD Tres West Engineers, Inc. Project: KEHOC 2702 South 42Id St.Suite 301 Project Number: 230311 Tacoma,WA 98409 Reviewer(s): RBC/JJC Phone:(253)472-3300 Date: 7/25/2024 Fax:(253)363-9402 Spec Tag Number or Section Paragraph Item Code NOTES Number 27 10 00 Cable Runway NE Radius Drop Cross Member 27 10 00 Butt-Splice Kit NE 27 10 00 Junction-Splice Kit RA - Provide 1-1/2" Junction-Splice Kit for cable runway. 27 10 00 Runway Ground NE Strap Kit 27 10 00 EA-3014-C Vertical RA - Provide APC AP8641 Metered PDU (2 PDU per rack). Replace 30A/3P circuit breakers in Panel LU12N and LU21 N with 30A/2P circuit breakers for L6-30R. 27 10 00 Rack Mount Kit NE 27 10 00 Secondary Bonding NE Busbar 27 10 00 12848-706 Vertical RA - Provide APC AP8641 Metered PDU (2 PDU Power Strip per rack). Replace 30A/3P circuit breakers in Panel LU12N and LU21 N with 30A/2P circuit breakers for L6-30R. 27 10 00 12850-706 Vertical RA - Provide APC AP8641 Metered PDU (2 Mount Power Strip per rack). Replace 30A/3P circuit breakers in Panel LU12N and LU21 N with 30A/2P circuit breakers for L6-30R. 27 10 00 Cube-IT Wall Mount RA - Provide 26RU cabinet. Cabinet 27 10 00 Cube-IT Dual-Fan & NE Filter Kit 27 10 00 Cube-IT Vertical NE Cabling Sections 27 10 00 Cube-IT Cable Port NE Brush Kit This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component.Submittal review comments have been made within this format and not on the submittal sheets according to the following: SUBMITTAL RESPONSE CODES: NE—NO EXCEPTIONS NOTED NN—NO EXCEPTIONS,REFER TO NOTES,NO RESUBMITTAL REQUIRED RA—REJECTED AS NOTED, RESUBMITTAL REQUIRED RN—REJECTED, REFER TO NOTES, NO RESUBMITTAL REQUIRED CA—CONTRACTOR COMMENT ACKNOWLEDGED, RESUBMITTAL FOR ITEMS NOTED REQUIRED Page 4 of 5 FIRE ALARM NARRATIVE WAGNER A�O ARCHITECTS PLETEpRE PLANNIERS 191e PIXE Yl>•CE cans-z1 MOUNRING HARDWARE AS REGUIRED FOR SIATTLI WA 74101 CONTRACTORS SCOPE SHALL INCLUDE SUIT NOT SE LIMITED TO THE ® O ,REMOTE UTLTY METER DEDGDNWTa zrGo) &.21 .10 � LP 0 1.1.FOLLOWING u"" LNx M„s .AND A� 239 x Lz, ,x Ts° HOP, IDP uz, TRIF ,s.z,,°z° .m..m ftBA NO CE EVACUATION ALARM DEVICCEES. LE a AND CONTROL GRAPHIC INNUNIIATIR AS � DWTHTHEFIREALARM ® sysTEM. , F-121P INTED LEVEL 2 IDF ROOM LEVEL 1 ELECTRICAL ROOM 153 A ELECTRICAL' L scar=v4-,� U scar=v4-,a IESaUNSINU°E TO SAT 1 THIS aEoulaeMEry LL EITERIOR s DPs „ryy TVP , S BO%EE ANDWEATHERPROOF GASKETS AS `nm wef $ RNI `oaxme RE-RED. E TRES WEST ENGINEERS.INC. v _ �� C,S 4 IL,FOR Flae x 01 5°kv z 1 2,3 211 ° R FER TAG HSHUrvE ODETAIL TRIP FOR .ELEVATORww.Hn:xwen.wm . CORR —2 ELEC ❑ _ s, aFFFaT,H"U`D1='TAILa Foa aunt ®� L LP2+N_ EQUIPMENT SNOT-DOWN wlR GDIAGRAM. dh P,°N t4 GENERAL NOTES Iry Lue EP12 Mz - HM21 ELEC. ,. corvrRouED REwarACLES IN STANDALONE utzz aooME as coNraousO vu Low-voLTncE SWITCH AND DCCUPANCY �-1 N L PROVIDE 4'OuaESASQUAR MOUNT N wTIONLO� , XT EXP MDF 3 LEVEL 2 ELECTRICAL ROOM 212 LEVEL 2 ELECTRICAL ROOM 211 WE NERPRQGF. s�"HE ° KEHOC ROOM L-14 scsHe.v4-ta scuE.w-ta O Warehouse&ice RECEPTAGUE Building mP) 3 3.3 214-14� DUPLEX REQEPTAQLEINAQGMMQN�,QHxQ 12607 SE 248TH ST u12N- 12N 1°1s+ KENT,WA eAQ�D R: �P Q °N J�N-°xx Lu,zN LP2P wFATaERPRQOFRECEPTACLEs. FOR ALL 98030 Y , -'°a, LP25��'f1 PLAN NOTES CONSOLIDATED N mP O °R',.x �I a Pam' aEGFPTA.4 °.°,°GTQNEMENTA xt. SET � LEVEL2ELECTRICALROOM O«°GTDNE L2,3°NNECEPTACLC Y R O M WRCH19,2024 NOTICETOPROCEED 123 Q DER "E"-'-0 �NEA D SHALL IF°AN-1 FINISHED Ofi.O5SO44-RE SIONfi FL _ RIM M a°woaN��aEAaaN GE AF= ENLARGED MAIN ELECTRICAL&MDF ROOM PE FNNENMA rs�K LssaALLHE NAMPILATE11TUEAS HIGH PIGS P, ❑ ED.PROVIDE ENGRAVED /'"o Dw NE :1_TE. G TA„DA wGSTED A RER R E;,ENCL ..�.. Dl i N L sNAu ENLARGED ELECTRICAL EV ELEC EN.1,FTc80 PLANS TR_ O SERVICE MFTEN PENPSE NEQDINEMENTs. HM„ O MOUNTING. TRC1-C FON PANELSOARD On PANI WITH P—ER OSUPPLV SELO CONTROL PANEL WITH POWER LEVEL 1 ELECTRICAL ROOM 107 GTPPL BELOW. s. J scaE.u4-,a E8.0 1.- -.1-E-- -I I.-IN-1- LU11N LU12N ... .... WAGNER 1. . ARCHITECTS I 11-L-1 I... I.. JA I N A R PLANNERS I D -E.CO-I PANEL l -L 7 -EL L-I I SClS A .1 1 SEC-CO111OL111EL A I Iw-w,�"-ft D 'C" SAO A m I= p I S I-MWITED CAINNET 1. 11 SPARE IT 1�SIAN. A M S SPARE 11 4--o- m I S SPARE 1. 17 D A SPARE 1. E ll S- sSON A . SPARE 2. 1- m A $NS ICSt .1 A SPARE 2. ll SPARE A -1 A SPARE D I- A ll SEAP. S - . SPARE 2. ll E- s 20IT C SOH S SPARE SO C �1 SPANE M A SOH 6 SPARE SO D enlAiXa - M 31 S.N. C =1 S SPARE 37 SPIRE A I IDDS D SPD(NC-1) C I W A 41 E- S D '2 Al PHASE LOAD PEASE A- 7- P-E S= PHASE C= A43 NIN, PHASE IHAET A- 1-T.- .11 T R US WEST ENGINEERS.T,� INC. 4l� LOAD TYPE L P E� . A LA -A LOADS -E L N A L"DA LU1 IN C. .SO I SO .DO S SO 3.00 N,N, ANP Ol I Il I --'.A'-"ll 2 111.41111. -LL12N 1 0. .. CDC IS. i-1 11 ANP PIHEL L121N 00 1 . COO C. ... 0. a, 0.00 11.ANP SO 0. 1'. 0 C SO C; I- CALC LOAD l 2 TO .. "C ANP N.C.....-CO.T.. l nor - NEUTRAL 1)C-11HATE SE,EP-A NANUI-wNLR ""i XI"T LOCATION IWRM239 2-1 WLT. 1.1 SCIC 1- PAN W-01:ELECIM107 �11 A PANEL LT :"p LU21N .-l- HM11N S.-N. I ZAS. P I.DIA-.11. A -UNIIN. UAPACE 1111RO1 A MV.I.G SUREACE KEHOC .ATJ LOAD DESCRIPTION TIRE -A AIP PHASE SIP Warehouse&Office A I -131 El A A l PANEL LEIIN 1 .7 171 A L- l Building I A -1 -INE A I SPARE A ll DO IS A 12607 SE 248TH ST KENT,WA 1. ll EIAHNE I A PANE 98030 C SPARE 1. 1A D A 11 Al. -U CONSOLIDATED . SET ll SPIRE S SPARE E111 EI I z4 zaI -U l. 27 SIANC S SPARL l. J:NO. 2E S.NE S l SPARE IS �1 SPARE 8 s SPARE 11 il m Ill A I,, x - MARCH19,2024 NOTICETOPROCEED S.N. SPARE 36 SPIRE A SPARE C .1 A - . SPARE CS 31 SPANC A DO- ll SEAP. S -1 .1 S SPARE .0 .SPARE 41 SEARS S I I - SPARE .2 41 SPARE E Zl� PHASE- INISE A= 1L54 PEARE 1= 1LS4 PMS1 C=- IM PHASE P-C= P.-LLSIN 0 1 C DO 00 C SO 0 DO S SO SO 0.. -1- 11.ANP 1ANCLIM111 110 000 11811 COO 0 W 0 M 0 SO 0 DO �,11 INSM InA CC0- ANP PANEL LPI1N - - .2 11 C. - 1- 0 SO IS. - -1 1 -.11 A.1 Amp A.1 SO CONN LOAD I Cl .DO SO DO S SO SO --w.Amp l4 COO .11 1-1 Ell 1.7�1 -A.- -.31-1 PANEL SCHEDULES I SO C CALD LOAD I DO DDC IHM AMP CAW.CNND 0 1 �l E2 210 S4 C. - I'S. �IRED A"AMAZ PANEL SCHEDULE INDEX PANEL_MM.E I P-ELN-E UL_ LU12N E9.4 -IN AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #173 - Elevator Cab Interior Finish Revisions per Submittal #142400-2 Origin: Date Created: 9/17/2024 Created By: Nils Brian Nilsson Status: Open Scope: In Scope Type: Change Order Request Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 14-240-000.S TK ELEVATOR CORPORATION Is 1.0 $7,192.00 $7,192.00 $7,192.00 1.0 $7,192.00 $7,192.00 $7,192.00 $0.00 Hydraulic 24057-4010 Elevators.Commitments- Subcontracts Description: Change applied panel cab interiors from plastic laminate to 5WL per submittal review. 00-000-000.PO Is 1.0 $1,079.00 $1,079.00 $1,079.00 1.0 $1,079.00 $1,079.00 $1,079.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractor Fee Grand Totals $8,271.00 $0.00 $8,271.00 $8,271.00 $0.00 $0.00 $0.00 $8,271.00 $0.00 $0.00 Bayley Construction, LP Page 1 of 1 Printed on:9/17/2024 at 11:08AM PDT Change Proposal { Project Name: KEHOC Warehouse&Office Building CE# 173 Project No.24507 Doc#: Submittal#142400-2 Work Description: Elevator Cab Interior Finish Revisions per Submittal#142400-2 Date: 9/9/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs TKE-Change applied panel cab interiors from plastic laminate to 5WL per submittal review. 1 LS $ $ $ 7,192.00 $ 7,192 $ 7,192 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0 $ $ $ $ 7,192 Clarification,Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 7,192 Excludes WSST General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 1,079 GRAND TOTAL is 8,271 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 9/17/2024 Owner's Representative Date Bayley Construction Date 1 K�_ _l Subcontract Change Order Request Date: 07/16/2024 PROJECT NUMBER: 254362 CONTRACT DATE: 5/28/2024 CHANGE ORDER NUMBER: 1 PROJECT NAME: KENT EAST HILL OPS CTR PROJECT ADDRESS: 12607 SE 248TH ST KENT, WA, 98030 CONTRACTOR NAME: Bayley Construction LP CONTRACTOR ADDRESS: 8005 SE 28th Street Mercer Island, WA, 98040 SUBCONTRACTOR NAME: TK ELEVATOR CORPORATION SUBCONTRACTOR ADDRESS: 12530 135th Ave Kirkland, WA, 98034 This request for a formal Change Order is made for the above-referenced Contractor and specifically intends to modify and amend the work, price and/or terms set forth in above-referenced Subcontract as follows: Material Changes: [Change applied panel cab interiors from plastic laminate to 5WL]. Bayley Construction LP agrees to issue a formal change order to TK Elevator for the described work before any associated material will be ordered. Total Amount of this Change Order to be added to the contract price: $7,192.00 In the event of any conflict between the work, price and/or terms and conditions of the above-referenced Subcontract or prior change orders thereto and this Change Order,this Change Order shall be final. Please sign two (2) copies of this Change Order and return two (2) copies to TK Elevator. A fully executed copy of this Change Order will be returned to you for your files. Signed Acceptance: By signing this Change Order where indicated below, the Contractor's signatory hereby acknowledges(a)that the Contractor agrees to all of the terms and conditions contained herein, (b) that the signatory has the authorization necessary to bind the Contractor to agreements of this nature, and (c) that this form is valid and binding notwithstanding any conflicts with procedures and/or forms required by the original Subcontract referenced above which are deemed to have been waived. This change order/notice scope of work requires the anticipated or current project schedule, and associated time frames, to be adjusted commensurate with the time necessary for the engineering, material procurement and additional labor. TK Elevator will provide a revised project schedule on expedited schedule change order/notice scope of work to the purchaser upon request. Subcontractor: Contractor: TK Elevator Corporation Bayley Construction LP By: Travis Bortolazzo Date:07/16/2024 By: Brian Nilsson Date: Title New Installation Sales Title: Project Manager AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 Submittal #14 24 00-2.0 - MRL Elevator PD 14 24 00 - MRL Hydraulic Passenger Elevators Distribution Summary Distributed by Bryce Nelson(Bayley Construction,LP)on Jun 26, 2024 To Sam Scarmardo(Wagner Architects and Planners),Travis Bortolazzo(TK ELEVATOR CORPORATION), Nathan Harper(City of Kent),Angel Nunez(Bayley Construction, LP), Bryon Halsey(Wagner Architects and Planners), Dave Brock(City of Kent) Message None Attachments Name Response Attachments Comments Sam Scarmardo Approved as Noted KEHOC-submittal#2-rev-0- See attached document (Wagner Architects and Planners) mrl elevator pd- 202406202156.pdf Revision 0 Submittal Manager Nils Brian Nilsson(Bayley Construction, LP) Status Closed Date Created Jun 20,2024 Issue Date Jun 20,2024 Spec Section 14 24 00-MRL Hydraulic Passenger Elevators Responsible TK ELEVATOR CORPORATION Received From Travis Bortolazzo(TK ELEVATOR CORPORATION) Contractor Received Date Jun 20,2024 Submit By Final Due Date Jul 4,2024 Lead Time Sub Job Cost Code 14-240-000-Hydraulic Elevators Location Elevator Pit Type Product Data Approvers Abigail Purnapuspita(Wagner Architects and Planners),Sam Scarmardo(Wagner Architects and Planners) Ball in Court Distribution Angel Nunez(Bayley Construction, LP),Bryon Halsey(Wagner Architects and Planners),Dave Brock(City of Kent),Jon Marks (Bayley Construction, LP),Mike Yeung(Fastsigns of Kirkland), Nathan Harper(City of Kent),Sam Scarmardo(Wagner Architects and Planners),Will Moore(City of Kent) Description Submittal Workflow Name Sent Date Due Date Returned Date Response Attachments General Information 142400-02-0-MRL Elevator-Submittal.pdf Attachments Abigail Purnapuspita Jun 20,2024 Jul 4,2024 Pending Sam Scarmardo Jun 20,2024 Jul 4,2024 Jun 25,2024 Approved as Noted KEHOC-submittal#2-rev-0-mrl_elevator pd- 202406202156.pdf(Current) Comment See attached document Bayley Construction, LP Page 1 of 1 Printed On:Sep 17,2024 11:04 AM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 Submittal #14 24 00-2.0 - MRL Elevator PD 14 24 00 - MRL Hydraulic Passenger Elevators Revision 0 Submittal Manager Nils Brian Nilsson(Bayley Construction, LP) Status Open Date Created Jun 20,2024 Issue Date Jun 20,2024 Spec Section 14 24 00-MRL Hydraulic Passenger Elevators Responsible TK ELEVATOR CORPORATION Received From Travis Bortolazzo(TK ELEVATOR CORPORATION) Contractor Received Date Jun 20,2024 Submit By Final Due Date Jul 4,2024 Lead Time Sub Job Cost Code 14-240-000-Hydraulic Elevators Location Elevator Pit Type Product Data Approvers Abigail Purnapuspita(Wagner Architects and Planners),Sam Scarmardo(Wagner Architects and Planners) Ball in Court Abigail Purnapuspita(Wagner Architects and Planners),Sam Scarmardo(Wagner Architects and Planners) Distribution Angel Nunez(Bayley Construction, LP),Bryon Halsey(Wagner Architects and Planners),Dave Brock(City of Kent),Jon Marks (Bayley Construction, LP),Mike Yeung(Fastsigns of Kirkland), Nathan Harper(City of Kent),Sam Scarmardo(Wagner Architects and Planners),Will Moore(City of Kent) Description Submittal Workflow Name Sent Date Due Date Returned Date Response Attachments General Information 142400-02-0-MRL Elevator-Submittal.pdf Attachments Abigail Purnapuspita Jun 20,2024 Jul 4,2024 Pending Sam Scarmardo Jun 20,2024 Jul 4,2024 Pending Bayley Construction, LP Page 1 of 1 Printed On:Jun 20,2024 02:56 PM PDT BAYLEY Submittal Review Form 142400-02-0 To: Wagner Architects &Planners From: Bayley Construction 1916 Pike Place 8005 S.E. 28th St. Seattle, WA 98101 Mercer Island, WA 98040 Phone: (206)384-3317 Phone: (509)969-2824 Fax: (206)343-7728 Attn: Sam Scarmardo By: Brian Nilsson Email: sam wagnerarchitects.com Email: brian.nilsson(aDbayley.net Email: Cell: (206)549-8342 Project: KEHOC Warehouse&Office Building Subcontractor: TK Elevator Date: June 20, 2024 12530 135th Ave NE Respond By: July 5, 2024 Kirkland, WA 98034 Specification: 14 24 00-MRL Hydraulic Passenger Supplier: Elevators Paragraph 11.02 C, 1.021), 1.02E Subm. Type Finish Selections Manufacturer: JTK Elevator SUBMITTAL REVIEW + a ' ° ° ° G ` T This submittal has been checked for general ❑ o ? r 't: 2 m compliance with the contract documents as follows: f Lei Ztz ❑ m 9 N No Exceptions Taken � 2 °' ° > m ' G �, - :Em m U o g m LLJ W W a m L, 6 E Corrections as Noted a oLU G J� „ UJI o y y n O Revise and Resubmit to w r ? a W (a ofm� � � � -C ° co REJECTED as Unacceptable ¢ ? p a 8 n E x. Ir Z a V R CU Void N❑D r . g ?-° N - o E Reviewed, For Information Only ti m rQnm Note:In no way does this review relieve o 6, c as > Subcontractor of responsibility for making all m.s c F a °, JD m necessary dimensional and job checks c` m �°, N0, C required for the complete and satisfactory ❑ n = n = 5 installation of work covered under the terms IL W .` .m E m Ix of the Subcontract. m H Z) u3 ❑ 06 Ei — BAYLEY CONSTRUCTION o a a ro ; w N ,g F- a �8o =ten, o �.. a. ❑ m z s u. By: Date: L) 0 Z ro R__€ =z 0 04 W C) 8 Noa CDC c c c tl ❑ l!1 �] u� mmt o� _ z W < Enac%v �a w ❑0❑ ti 3 rn�v � 'ag n Notes: TIC CAB FINISHES GUIDE First impressions last, so we give you choices. i MOVE BEYOND BEAUTY . VARIETY . SUSTAINABILITY . Whether the goal is making a strong first impression or simply beautifying the elevator system,TK Elevator offers a complete line of elevator interiors to choose from.Customers can pick the color and finish of their choice to create appealing designs. By personalizing their elevators,they can stay true to the building's aesthetics. - Beyond simply creating attractive interiors,our products feature environmentally conscious options that support your efforts to"go green."TK Elevator offers elevator interiors that are free from wood products containing urea formaldehyde,utilize powder coating instead of solvent-based paint,and are third-party validated as low- emitting by Underwriters Laboratories(UL).We are the only elevator company that can say this. r On the cover: Featured on the cover is a steel shell wall with applied panel design.Based on the elevator car capacity,more applied panels may be required. 1. r ' 02 CAB FINISHES GUIDE irr all 4. 1 p Aa A t 1 • dw lb - REW - $ (6 t O U N U E N _ _0 0) N + - 000 O Q O U U 73 N U -0 �0 O + U N 0 r^ O N p Q _ n//' N E W LL O t N p r ' � '� O ■ Y N -O E 'O O � f0 m cB cB cn m -0 U U i "a O N Z3 N cu N U O T C pN Q ,� cn I _U O 0 -0 co O li a O u ,5 'O Woods PIF White Painted Wood* Waxed Maple* Fox Teakwood 8902 8905 8907 Danish Maple* Planked Deluxe Pear* Select Cherry 8906 6206 7759 i }II M Blackened Fiberwood Walnut Fiberwood* Storm Teakwood 8916 8915 8908 "Not available on 100 level product lines. Check with your sales representative for pricing. Colors and patterns may vary slightly from the printed representations above. CAB FINISHES GUIDE 05 s Ot. 00 I I Plastic laminates Pictured:Sarum Twill(8827) — - Displayed cab interior is a wood core laminate wall — design used on engineered product lines,such as — the synergy and momentum. Y_ _-_-_ -- _ - - _ - ---�' r3f '�•� - -_ --•- - -r�� - - A. _jLM Solids Dover White Graystone Enamel 7197 464 8794 Matrix Blue* Winter Sky Stop Red 8795 8792 839 Patterns Neutral Twill Sarum Twill Bubble Art 8826 8827 8958 "Not available on 100 level product lines. Check with your sales representative for pricing. Colors and patterns may vary slightly from the printed representations above. CAB FINISHES GUIDE 07 1 r • • 5 6 I Powder coats Pictured: Blue Patina(F-130) Powder coat is a durable,scratch-resistant yet environmentally preferable alternative to solvent-based paint. It is free from volatile organic compounds(VOCs) and creates less waste.It can be easily recycled and requires less energy to cure. It also provides protection from UV fading and has a lifetime of 10+years. Displayed cab interior is a steel shell wall design used on pre-engineered product lines,such as the evolution and endura. F Solids Toasted Cotton Smoked Silver Field Coat Elephant Ear F-132 F-131 F-127 F-129 Prairie Grass Reclaimed Gray Blue Patina Chai F-128 F-133 F-130 F-125 Mustard Seed Hibiscus Coral Cables Whistle Red F-126 F-120 F-124 F-122 Clover Cedar Brown Chalkboard Pitch Black F-121 F-105 F-119 F-112 Check with your sales representative for pricing. Colors and patterns may vary slightly from the printed representations above. CAB FINISHES GUIDE 09 Metals Pictured: Brushed Stainless Steel We offer you choices,whether you need vandal-resistant durability or want to retain a sleek polished interior. Displayed cab interior is a steel shell wall design used on pre-engineered product lines,such as the evolution and endura. - _ 1 Textures #4 Brushed Stainless Steel #8 Polished Stainless Steel' 5WL Stainless Steel' #4 Brushed Bronze1z #8 Polished Bronze'Z 'These metal finishes are only available for applied panel finishes. P Availability may be limited on some product lines. Check with your sales representative for pricing. CAB FINISHES GUIDE 11 AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #063 - RFI-014 - Comcast & Comms Service Entry Locations Origin: RFI#14:Comcast&Comms Service Entry Locations Date Created: 9/6/2024 Created By: Nils Brian Nilsson Status: Submitted, Not Proceeding Scope: In Scope Type: Owner Change Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 26-100-000.S VECA ELECTRIC& Is 1.0 $11,405.63 $11,405.63 $11,405.63 1.0 $11,405.63 $11,405.63 $11,405.63 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: CO reflects costs associated with the response to RFI-014 and the request for VECA to provide(2)264-TA Communication vaults.Pricing only includes the cost of the(2)264-TA vaults and excludes the earthwork scope and setting of the vaults. 02-300-001.S SCI INFRASTRUCTURE,LLC ea 2.0 $1,000.00 $2,000.00 $2,000.00 2.0 $1,000.00 $2,000.00 $2,000.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: Install 2 264-TA vaults. 01-450-120.S hours 2.0 $200.00 $400.00 $400.00 2.0 $200.00 $400.00 $400.00 $0.00 Surveyor.Commitments- Subcontracts Description: Layout 03-100-0201 hours 4.0 $95.00 $380.00 $380.00 4.0 $95.00 $380.00 $380.00 $0.00 Concrete Foreman.Labor and Labor Tax Description: Foreman 01-740-0991 hours 4.0 $50.00 $200.00 $200.00 4.0 $50.00 $200.00 $200.00 $0.00 Bayley Construction, LP Page 1 of 2 Printed on:9/6/2024 at 02:14PM PDT Revenue Cost Budget Code Vendor I Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. Weekly cleanup.Labor and Labor Tax Description: Cleanup 01-740-125.PO Is 1.0 $110.00 $110.00 $110.00 1.0 $110.00 $110.00 $110.00 $0.00 Du mpsters.Purchase Order and All Other Costs Description: Dumpster 00-000-000.PO Is 1.0 $2,175.00 $2,175.00 $2,175.00 1.0 $2,175.00 $2,175.00 $2,175.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractor's Fee Grand Totals $16,670.63 $0.00 $16,670.63 $16,670.63 $0.00 $0.00 $0.00 $16,670.63 $0.00 $0.00 Bayley Construction, LP Page 2 of 2 Printed on:9/6/2024 at 02:14PM PDT Change Proposal Project Name:KEHOC Warehouse&Office Building CE# 063 Project No.24507 Doc#: RFI-014 Work Description:RFI-014-Comcast&Comms Service Entry Locations Date: 5/28/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs eca-CO reflects costs associated with a response to RFI-014 and the request for VECA to provide(2) 264-TA Communication vaults.Pricing only includes the cost of the(2)264-TA vaults and excludes the earthwork scope and setting of the vaults. 1 LS $ $ $ 11,405.63 $ 11,406 $ 11,406 SCI-Install 2 264-TA vaults, 2 EA $ $ $ 1,000.00 $ 2,000 $ 2,000 Layout 2 HR $ - 200.00 $ 400 $ $ - $ 400 Foreman 4 95.00 $ 380 $ - $ $ $ 380 Cleanup 4 50.00 $ 200 $ $ $ $ 200 Dumpster 1 LS $ - $ 110.00 $ 110 $ $ 110 $ $ $ $ $ $ $ $ $ $ 8 $ $ 580 $ 400 $ 110 $ 13,406 Clarification,Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 14,496 Clarification:Comm vaults were not in the bid documents and were specified for the first time in this RFI response.Supply and Installation of conduits was in the original scope.Excludes WSST. General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 2,175 GRAND TOTAL $ 16,671 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 9/6/2024 Owner's Representative Date Bayley Construction Date v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 11 VECA Electric And Technologies LLC Date: 8/6/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description CO reflects costs associated with the response to RFI-014 and the request for VECA to provide (2) 264-TA Communication vaults. Pricing only includes the cost of the (2)264-TA vaults and excludes the earthwork scope and setting of the vaults. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Summary VAULTS 9,875.00 Material Total 9,875.00 Overhead (@ 10.000%) 987.50 Markup (@ 5.000%) 543.13 Subtotal 11,405.63 Final Amount $11,405.63 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CHANGE_NOTICF CCN#Client Address: Date: 8/8/6/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 CLIENT ACCEPTANCE CCN # 11 Final Amount: $11,405.63 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #14: Comcast & Comms Service Entry Locations Status Open To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Apr 4,2024 Due Date Apr 18,2024 Location Cost Impact TBD Schedule Impact No Spec Section Cost Code Drawing Number E6.2, E1.0 Reference Linked Drawings Received From Justin Taylor(VECA ELECTRIC& TECHNOLOGIES, LLC) Copies To Brian Butler(Corona Steel),Jon Bosshart(VECA ELECTRIC&TECHNOLOGIES,LLC), Ken Brumley (SCI INFRASTRUCTURE,LLC), Leah Bryant(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC),Stacy Compton(Pipe Construction, Inc.), Jason Craig(SCI INFRASTRUCTURE, LLC),Zac Garule(SCI INFRASTRUCTURE, LLC), Derrek Gunn(Pipe Construction, Inc.),Chris Hansen(SCI INFRASTRUCTURE, LLC), Nathan Harper(City of Kent), Ryan Jackson(Sound Glass),Will Moore (City of Kent),Christian Nicholson(Corona Steel), Nils Brian Nilsson(Bayley Construction, LP),Sam Scarmardo(Wagner Architects and Planners),Mark Scoccolo(SCI INFRASTRUCTURE, LLC),Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC) Activity/ Question Question from Bryce Nelson Bayley Construction,LP on Thursday,Apr 4, 2024 at 04:53 PM PDT Please confirm that the Comcast service entry point is located in the Main Electrical Room and the Comms demarcation point is located in the MDF room as depicted on sheet E6.2 and E1.0,which are attached.The electrician wants to confirm that these entry points have been coordinated with service providers. Attachments RFI 014 Backup.pdf Awaiting an Official Response See comments per Will Moore via Teams on 5.13.2024 @ 3:42PM Sam scarmardo, architect 5.13.2024 Bayley Construction, LP Page 1 of 1 Printed On:Apr 4,2024 04:55 PM PDT WAGNER ARCHITECTS PLANNERS Ivle EIkE ElAck 5 1 ATTtl 911+01 3n o �PATCH PANEL II O CONNECTOR STRIP o `—MUM LENGTH OF CONDUCTOR PAIR EXPOSED BEYOND CABLE JACKET NOTTO EXCEED in'(1P.) MAINTAIN TIGHT PAIR TWIST UP TO POINT OF TERMINATION(TYP.EACH ♦♦♦♦ PAIR) TEiWEE TELECOMMUNICATIONSYPILINSATELLITE OF PCO S. BUS BAR TYPICAL IN SATELLITE OF ROOMS. P Q TRES WEST ENGINEERS,INC. TELECOMMUNICATIONS MAIN o Q CENTER CABLETYN 2 UTH 43N05TBEK Ot TO B TMGB GROUNDING BUS BAR IN MOF ROOM, N Q Q 110 TERMINALS(TYP) ACW.W,wA NNosn Q T P e:w2e5t3.4n,Jm3Wt5 #6 AWG CU. Q 110 TERMINATION PROTECTION TBB BCT ®� Q QQ O COVER SUPPLIED WITH PANEL PATCH PANEL #1 AWG cu. OBUILOINGcaOuuOING Q Q Q BEE ATE IN FLOOR EMARKLANtS FOR LOCATIONS. ALL IDFS BC GROUNDING SYSTEM TO 11 AWGICU CO �b. t GROUNDING CONDUCTORS S—L BE MINIMUM OF#S AwG CU.INSUTATED WIRE. IAN4110"COPPERGROUNDBAR WITH WALL MOUNTING BRACKETS ANDINSUTATORS O NO UTSIDE ABLEMINIMUM 4 METER.ES MRSUCABLE BEND RADIUSSUPPORT VELCRO STRAPS. OUTSIDE CABLE DIAMETER. BAR SUPPLIED WITH PANEL FCETIT GROUND SYSTEM DIAGRAM Z GROUND BUS BAR ASSEMBLY 3 UNIVERSAL PUNCH DOWN DETAIL KEHOC SALE,NTS SALE,NTS f N Warehouse&Office Building 12607 SE 248TH ST KENT,WA 98030 a CONSOLIDATED R°° °°F SET (1)3'C wl(6)4-PAIR CAT 6 1 2'C wl 12STRAND FIBER RJa6 RJaS 12q"C JOB NO. 20223 M1NRCH 19,2024-NOTICE TO PROCEED Doc Roots zoe D D 'DF ROOM 2" (1)2'C wl(6N-PAIR CAT6 (1#"C wl 112 PAIRCAT6 (1)2-C w112-STRAND FIBER .+ L T'-' 6 (1)CC W 24- NO FIBER ,EIQED — LOO 2ND FL— BUJI LWK 122 OM y�tVyy 1 sT FLoo ST LOO EWIPMENTDETAIL- PROVIDE JA BLANK WITE)Cov>=RS FOR ALL NON - - COMMUNICATIONS POPULATED PORT LOCATIONS. Comcas[? (214"C UTILITY BACKBONE (1)1"CS RE 2ON t21 OOM (1)1"C wl 4-STRAND FIBER DRAWING SYMBOL� TO UTILItt PO LE TO Utility VaUlt? (2)4'C Utility Backbone 'L'w�ww�^�iJe ram.wa 4 DATA OUTLET DETAIL 5 LOW-VOLTAGE RISER DIAGRAM E6.2 RM,Will be dillti-Illy bored tD me hand Nd,f aLroBB the Btr L GENERAL NOTES General Note: All conduit indicated Th'IBI,nm1OBayle ,,p,.The DOmmunlcatipnB—It ilh(2)4" CES IT WAGNER on project site in Bayley scope of LnndaitB that.Dnn.Ltm me bNilding VIDE ro,m ACMUs in Bayley, ' ELECTRICAL( )CONTACT work to remain. Dva.the same Vaneor boring me ebM o me Wane note'i"be °NATHAN FETE AT E oGM ARCHITECTS F 1 xy� n[ sresponsibleforbringingthefibertothe MCFthrough the contluit that Eas®Ps. p L A I,1�E R Ba le has installed. uno„s _ ___ IVte P1kF YLHCE ©O ESE VauI[no longer 12)4'c SERVICE W CASTE CONTACT MATTHE 31 ATTL1 WA 741♦11 1 al INS location per MATTH _GO.FINNA RINGTONDOW®COMCAST.COMEl-D W AN us RFI- - - I/ s RESPECTIVE PROVIDER PRIOR TO WORH1.E WITH 1 PIE I24•T 121 - a. PROVIDE AND PULL WIRINCICABLINGAS 1 THAN LE CONDUITO,PROVIDE PULL STRING IN ULEMPtt T O I N LPis Conduit Tema ns S COR EW ALL ONCRETE ENCASED. BE THAT ROUTEIp S LLL scrvPcebs inober In ervce comcast s 'ae� ALL CONDUIT ROUTNG IS DIAGRAMMA71CAL, —E BUILDING FlIrvREBUILOI - Uh ibeing from existing u11 TORDINATEROV 11ER. 1—IG WITH GINILANO Sstalled at this time. pmeer pole at this I 1 7. I C ERE A,LAR.LAR. I _ AND DRAWINGSCIVIL PRIOR TO WORK "� I Ij_ ^A M TOE RN IIL ALL EXTERIORCONIU1TSSHALLBEMINIMUM �'U1r BE GALVANIZED RIGID STEEL. "Dugs sR I � plmXFgO ,o. REFER TO SHEET 0.S FOR TRENCHING DETAILS TRES WEST ENGINEERS.INC. EL CTRICAL I I MINIMUM M 11. x,ocoFEER UNLESS NDTED DTHERwIBE x a, LocATION of IT Roots ww.lr�wen.wm I I PROPOSED BUILDING I I ITLE 7� PANEL °` a PLAN NOTES TwNAND p�9q, NoscAPE DESIGNER li)r L VITYnroirR z Oz Pao�wDEIurvO_ORTOROUGWGrt UNDCINDUIE aA IRE (t)rc COMM TO MOF RM, I ,gPl (,)c s RET,ELE zRONI C-JE`ti EL cqM,a lv Q IV WITH CIVIL FIR ORT PPRR OF PVIOE(2))t-C FOR POWERAND CONTROL OGATEDP R( CW H KEHOC ANDTM,n•L WITH TWO CAT 6 CABLESCOORDINATE Warehouse&Office ARD READER WITH ARCHITECT TIONOF Building III °DTEDONLONDUIT.APPROPRIATE ROOM 12607 SE 248TH ST s 211 ABM �ProwDErvE-SHE 1111" OR GAMDUIPMENTBox ND s KENT,WA 1'1' 98030 (Ix• OMOERM NEE Inze coMM TO AIDE RM,zz cE+L aac NvaxE TO L DDInoNALINE°RMS, E 'FOR ° S12' Q NTMBENE CONSOLIDATED —_—_ M zO M SHEETE,.4 FOR PRIMARY VAULT LOCATION. D RACE—PER FEE REQU=EWS SEE SET E e P,BN2a27 �ooW MENTBOxAN OO RE IN HT O JOB NO. Y0121 © TIF"RGB zEORnPRTER ALINUO'.EENEH Eat DE MAROH1g..NOTIOETORROCEED 17 /(tl•OOMM CCESSTO PAGE RM 122 CONTRL 2 H u - - N (') ° FUTURE FUEIfWASH (11 t-trz'C FIR O„O ('1 C �H IH 1,1 x•c COMMT Mgp M R M�(zl rc Pax MAINTENANCE BUILDING (,1 rC ASPARE T CCESS oELEC Li121 R Conduit hand holeAND 11E1AY PER PSERE1UIRE"ENT1 SEE LOCATION. RcoMMUNICATIONs vaulT (,12'C ACCESS In Bayley's rvPce stnober O n O o being XF.RH/ ca, w stalletl at this time. O 101 USED.USED O NO V OEANK RANDROLE WITH POWER To WATER SITE PLAN ELECTRICAL EXISTING BUUILDING Q NE POWER ASTING A RTOWERG,B O uIAERA cOORDUNATE REMOVu of POLE AND CAMERA WITH OMER AND SERVING—LITY, SITE PLAN ELECTRICAL POWER =ABQ FIL -O—ONOFEXISTINGSERVBn ZAN s� E1.0 AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #106 - RFI-089 - Water Tower and Green Building Electrical Re-feed Origin: RFI#89:Water Tower and Green Building Electrical Re-feed Date Created: 8/15/2024 Created By: Nils Brian Nilsson Status: Open Scope: Out of Scope Type: Owner Change Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 26-100-000.S VECA ELECTRIC& Is 1.0 $2,496.19 $2,496.19 $2,496.19 1.0 $2,496.19 $2,496.19 $2,496.19 $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: Provide and install(1)NEMA 3R 200A fused disconnect with appropriate fuses. 00-000-000.PO Is 1.0 $375.00 $375.00 $375.00 1.0 $375.00 $375.00 $375.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractor Fee Grand Totals $2,871.19 $0.00 $2,871.19 $2,871.19 $0.00 $0.00 $0.00 $2,871.19 $0.00 $0.00 Bayley Construction, LP Page 1 of 1 Printed on:8/15/2024 at 09:09AM PDT Change Proposal { Project Name: KEHOC Warehouse&Office Building CE# 106 Project No.24507 Doc#: RFI-089 Work Description: RFI-089-Water Tower and Green Building Electrical Re-feed Date: 6/10/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs Veca-Providing and install(1)NEMA 3R 200A 1 LS $ $ $ 2,496.19 $ 2,496 $ 2,496 fused disconnect with appropriate fuses. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1$ - $ 2,496 Clarification,Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 2,496 Excludes WSST. General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 375 GRAND TOTAL is 2,871 Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 8/15/2024 Owner's Representative Date Bayley Construction Date v-c' ELECTRIC&COMMUNICATIONS CHANGE NOTICE CCN# 6 VECA Electric And Technologies LLC Date: 6/28/2024 5614 7th Ave S Project Name: JT-628887-KEHOC Seattle, WA 98108 Project Number: JT-628887-KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island,WA 98040 USA Contact: Brian Nilsson Work Description CO reflects costs associated with the reponse to RFI 089 and the addition of providing and installing (1) NEMA 3R 200A fused disconnect with appropriate fuses. This CO excludes the housekeeping pads and bollards required to accommodate the equipment and provide physical protection. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 200A 250V DSN SW FUSIBLE-NEMA 3R 1 833.25 E 833.25 2.50 E 2.50 200A FUSE 600V TIME DELAY CLASS RK5 3 104.88 E 314.64 0.13 E 0.39 #4 WIRE POWER TERM 2 0.00 E 0.00 0.26 E 0.52 #3/0 WIRE POWER TERM 8 0.00 E 0.00 0.49 E 3.92 Totals 14 1,147.89 7.33 Summary General Materials 1,147.89 Material Total 1,147.89 CRAFTSMAN LABOR (7.33 Hrs @$119.02) 872.42 FOREMAN @ 15% (1.10 Hrs @$128.08) 140.89 Overhead (@ 10.000 %) 216.12 Markup (@ 5.000 %) 118.87 Subtotal 2,496.19 Final Amount $2,496.19 CHANGE_NOTICF DEN# 6 Client Address: Date: 6/28/2024 y Project Name: JT-628887-KEHOC VECA Electric And Technolonipc LLC Project Number: JT-628887-KEHOC 5614 7th Ave S"-"'- Bayley Construction Page Number: 2 Seattle, WA 98108 8005 SE 28th St. Mercer Island,WA 98040 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 6 Final Amount: $2,496.19 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #89: Water Tower and Green Building Electrical Re-feed Status Closed on 06/27/24 To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jun 7,2024 Due Date Jun 21,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number E7.1, E7.2 Reference VECA RFI#29 Linked Drawings E7.1 Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Jon Bosshart(VECA ELECTRIC& TECHNOLOGIES, LLC),Dave Brock(City of Kent), Ken Brumley(SCI INFRASTRUCTURE, LLC), Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg(Washington Architectural Hardware),Thomas Evans(Insulpro Projects), Derrek Gunn(Pipe Construction, Inc.), Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson(Sound Glass Sales, Inc.), Noah Kennard (Smith Fire Systems, Inc.),Jon Marks(Bayley Construction,LP), Elaine Mayhall(Mayhall's Painting),Will Moore(City of Kent), Mike Nelson (Delta Mechanical),Christian Nicholson(Corona Steel),Nils Brian Nilsson(Bayley Construction,LP), Sam Scarmardo(Wagner Architects and Planners), Tyson Schiessl(Masco Corporation), Mark Scoccolo (SCI INFRASTRUCTURE,LLC),Arlan Smith(VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& TECHNOLOGIES, LLC),Mike Yeung(Fastsigns of Kirkland) Bayley Construction, LP Page 1 of 2 Printed On:Aug 15,2024 09:12 AM PDT RFI#89-Water Tower and Green Building Electrical Re-feed Project:24057 Kent East Hill Operations Center Activity Question Question from Bryce Nelson Bayley Construction,LP on Friday,Jun 7, 2024 at 03:37 PM PDT 1.The existing water tower panel is currently fed from an automatic transfer switch and backed up by a generator.There is no space available inside the water tower electrical room to install the new transformer T-WT1.There is a hand hole just outside the building with the existing normal power feeder running through it.VECA proposes mounting the new transformer just outside of the building and tie it into the existing hand hole.Please confirm if VECA's proposal is acceptable,as well as if a fused disconnect will be required to protect the transformer's secondaries. In addition, please confirm that a housekeeping pad and bollards will be required in this scenario. 2.The green building is currently fed by an overhead electrical service,with a 150A fused service disconnect located on the other side of the wall from the meter.VECA proposes mounting the new transformer T-GB1 outside of the building,below the exiting meter.The existing meter enclosure can be replaced with a junction box to re-feed the green building.Please confirm if VECA proposal is acceptable.Please also confirm that a housekeeping pad and bollards will be required in this scenario. Attachments RFI 089 Backup.pdf Official Response Response from Angel Nunez Bayley Construction,LP on Thursday,Jun 27, 2024 at 02:43 PM PDT Please review the attached RFI. Bayley Construction requires a response to this correspondence no later than three(3) working days from the date of this transmission.Failure to reply by this date will negate your rights to request for additional money and/or time as related to this document. If the attached document has costs or schedule implications,you are required to provide,but not limited to,the following: COP: Reference the document number and a description of the added scope of work Detailed cost breakdown with quantities,labor,and materials. Effect on current project schedule including anticipated duration. Bond,insurance,and OH&P per contract terms. You must submit a complete COP within seven(7)working days from the date of original transmission. Failure to do so will negate your rights to request for additional money and/or time as it relates to this change. If you have any question,please contact Brian Nilsson at(206)549-8342 or Bryce Nelson at(509)969-2824 Official Response Response from Sam Scarmardo Wagner Architects and Planners on Wednesday,Jun 26, 2024 at 02:13 PM PDT See attached document Attachments KEHOC-rfi#89-water_tower_and_g reen_buildi ng_electrical_re-feed-202406072240_TW E.pdf Bayley Construction,LP Page 2 of 2 Printed On:Aug 15,2024 09:12 AM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #89: Water Tower and Green Building Electrical Re-feed Status Open To Sam Scarmardo(Wagner Architects and Planners) From Bryce Nelson(Bayley Construction, LP) (Response Required) 8005 SE 28th Street Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Jun 7,2024 Due Date Jun 21,2024 Location Cost Impact Yes(Unknown) Schedule Impact No Spec Section Cost Code Drawing Number E7.1, E7.2 Reference VECA RFI#29 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Jon Bosshart(VECA ELECTRIC& TECHNOLOGIES, LLC),Dave Brock(City of Kent), Ken Brumley(SCI INFRASTRUCTURE, LLC), Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC), Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers),Thomas Evans(Insulpro Projects), Derrek Gunn(Pipe Construction, Inc.), Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Pipe Construction, Inc.),Chris Hansen (SCI INFRASTRUCTURE,LLC), Nathan Harper (City of Kent),Cory Hehr(Pipe Construction, Inc.), Jason Howard(SIEMENS INDUSTRY INC), Ryan Jackson(Sound Glass), Noah Kennard(Smith Fire Systems, Inc.),Jon Marks(Bayley Construction,LP) ,Gene Mayhall(Mayhall's Painting),Will Moore(City of Kent), Mike Nelson(Delta Mechanical),Christian Nicholson(Corona Steel), Nils Brian Nilsson(Bayley Construction,LP), Leah Sandberg(Washington Architectural Hardware),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE, LLC),Arlan Smith(VECA ELECTRIC&TECHNOLOGIES,LLC), Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Jessie Teague(VECA ELECTRIC& TECHNOLOGIES, LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Pipe Construction, Inc.),Eric Trofimchik(VECA ELECTRIC& TECHNOLOGIES, LLC),Mike Yeung(Fastsigns of Kirkland) Bayley Construction, LP Page 1 of 2 Printed On:Jun 7,2024 03:39 PM PDT RFI#89-Water Tower and Green Building Electrical Re-feed Project:24057 Kent East Hill Operations Center Activity Question Question from Bryce Nelson Bayley Construction,LP on Friday,Jun 7, 2024 at 03:37 PM PDT 1.The existing water tower panel is currently fed from an automatic transfer switch and backed up by a generator.There is no space available inside the water tower electrical room to install the new transformer T-WT1.There is a hand hole just outside the building with the existing normal power feeder running through it.VECA proposes mounting the new transformer just outside of the building and tie it into the existing hand hole.Please confirm if VECA's proposal is acceptable,as well as if a fused disconnect will be required to protect the transformer's secondaries. In addition, please confirm that a housekeeping pad and bollards will be required in this scenario. 2.The green building is currently fed by an overhead electrical service,with a 150A fused service disconnect located on the other side of the wall from the meter.VECA proposes mounting the new transformer T-GB1 outside of the building,below the exiting meter.The existing meter enclosure can be replaced with a junction box to re-feed the green building.Please confirm if VECA proposal is acceptable.Please also confirm that a housekeeping pad and bollards will be required in this scenario. Attachments RFI 089 Backup.pdf Awaiting an Official Response James Chong -Tres West Engineers-2024-06-26 1. The existing handhole with the existing normal power feeder is understood to be fed from a power pole that is to be removed. The new transformer can be installed as noted and tied into the existing handhole but feeder shall homerun to MSB1. Contractor to verify conduit fill. Provide 200A NEMA 3R fused disconnect switch with 200A fuses on exterior of water tower for building/structure outside feeder disconnecting means. Provide housekeeping pad and bollards for equipment protection. 2. Proposed approach is acceptable. Provide housekeeping pad and bollards for transformer protection. Bayley Construction,LP Page 2 of 2 Printed On:Jun 7,2024 03:39 PM PDT GENERAL NOTES SEE CONTINUATION ON SHEET E7.3 1, PROVIDE VERTICAL CABLE SUPPORT AS WAGNER REQUIRED BY CODE. ARCHITECTS G. BREAKERS TG BE SET PER COORDINATION P L A N N E R S Existing PaneI,ATS, STUDY. IV1E PI)<F Yl>•Cf and generator 3. FEEDERS MAY BE UPSIZED TO ACCOMODATE SIATTLI WA 74101 VOLTAGE DROP.PROVIDE LUGS TO ACCEPT !B h 4 1 11 LARGER CONDUCTOR SIZES. •'•" "'^I'^"""'^ L 4, PROVIDE METERS PER 2021 WASHINGTON - V t EV12 LV 3 ENERGY CODE,END-USE METERING REQUIRED FOR HTINGL OADS LEADS, LEADS,NG LOADS, LIGHTING LOADS,PLUG LOADS,AND PROCESS 480V LOADS. NEMA NEM NEMA ISIGA G 5. PROVIDE SPD ON ALL EMERGENCY PANELS. +st%1'�R� we�tP 6. =NGFORSHAFTPREESURIZATION SYSTEMS EVATORS SHALL BE KEPT ENTIRELY INDEPENDENT OF ALL W IRING AND EQUIPMENT T 1Evtt _ 1Evi2 "" AND SHALL NOT ENTER THE SAME RACEWAYS, ptN cu a1mcUCRpGEEPOINT T atacu CABLES,BOXES,AND CABINETS WITH OTHER GG GENERAL WIRING. 11l2'., ,l G 12 z PLAN NOTES U)3/4TO 'sPARECONGUIT INEMA t GROUND TO BUILDING STRUCTURE PER NEC. F w3eddi3oGHono O � PANEL WITH PULL provide iscOnnect 0f PUGET SOUND ENERGY(PSE)REMOTE MOUNTED to SIRING12 [he[rens(onners SINGLE METER.PROVIDE PER FEE contlarys REQOIREMErvrs.GURRErvr Tw.rvSFQRMER TRES WEST ENGINEERS.11N C. LENGTH SHALL NOT EXCEED 50 FEET. 2 pPROVIDE SHUNT-TRIP BREAKER FOR AUTOMATIC '211111DISCONNECT OF LOAD BANK. O PROVIDE SAFETY INTERLOCK MECHANISM TO ALLOW ONLY PERMANENT GENERATOR CIRCUIT OR PORTABLE GENERATOR CIRCUIT BREAKER TO BE NON"AT A TIME. I.G CU O PRO VIDE ARC FLASH ENERGY REDUCTION PER NEC O PROVIDE SOLID STATE CIRCUIT BREAKER WITH GROUND FAULT PROTECTION OF EQUIPMENT PER NEC 230.A5. O OWNER METER PER 2021 WASHINGTON STATE S ENERGY CODE. pK«2GCuO O F MF PROVIDE INDICATION ONLY GROUND FAULT PROTECTION. KEHOC Bt,2 48pY/2]N. O PROVIDE PBE TAMPER PROOF SECTION.SECTION Warehouse&Office SHALL BE LOCKABLE BY PRE.COORDINATE ( ) EXACT REGUIREMENTE WITH PSE. Building PR -i14 VIDE 1 'C WITH CONTROL WIRING FOR MHI N $ ] $ O ENGINE START TO PARALLELING SWITCHBOARD. 12607 SE 248TH ST I COORDINATEGABLE REQUIREMENTS WITH KENT,WA I yypp GENERATOR MANUFACTURER PRIOR TO CA -/d•C ROUGH-IN, 98030 21® I O SEE ON BHEET E]2 CONTINUATION tot PROVIDE I-tl4'C WITH CONTROL WIRINGTO PARALLELING SWITCHBOARD.COORDINATE I N 825kVA k CABLE REQUIREMENTS WITH GENERATOR CONSOLIDATED O4-OE MANUFACTURER PRIOR TO ROUGH-IN. SET WNCU O PROVIDE I-1AVC WITH CONTROL WIRING ELGENERATORS.COORDINATE CABLE REQUIREMENTS WITH GENERATOR JOB NO, 20228 MANUFACTURER PRIOR TO ROUGH-IN. UTILtt PAD pGO CU 5 (rvP OF 3) t�a EXISTING SERVICE WATER TOWER PANELBOARD. M1WRCH1B,2024NOTCE iO PROCEED IPU ET BOUND REM OVENEUTRAIGROUND BOND FROM ENERGY) O EXISTING PANEL. NK LOAD O PV SERVICE DISCONNECT.SEE SHEET E8.0 FOR UTIL9 GEN. LOCATION. POLE GO.SERVICE POINT 4W ,SO.4W. CONNECT PV SYSTEM TO SUPPLY SIDE OF '.EN XG211211"PF SO 851W C EQUIPMENT GROUND FAULT PROTECTION PER O NEC]05. xa/o cu O d ONE-LINE DIAGRAM E7.1 LEVEL GENERAL NOTES WAGNER � { SEE CONTINUATION ON SHEET ET.3 SEE CONTINUATION ON SHEET E7.3 SEE CONTINUATION ON SHEET ET.3 SEE CONTINUATION ON SHEET E7.3 1, PROVIDE VERTICAL CABLE SUPPORT AS W A G N E R REQUIRED BY CODE. ARCHITECTS S. BREAKERS TO BESET PER COORDINATION P L A N N E R S STUDY. I91E 1,0;1 YlHCE 3. FEEDER SMAYSEUPSIZEDTOACCOMODATE 5 1ATT11 WA +1/1�1 VOLTAGE DROP.PROVIDE LUGS TO ACCEPT LARGER CONDUCTOR SIZES. • �•'•�•^I'^"""'^ 4. PROVIDE METERS PER—WASHINGTON ENERGY CODE.END-USE METERING REQUIRED FOR HVAC LOADS,WATER HEATING LOADS, LIGHTING LOADS,PLUG LOADS,AND PROCESS (/•� LOADS. � 5. PROVIDE SPDONALLEMERGENCYPANELS. a'+scve'�er e•+P O 6. =NG FOR SHAFT PRESSURIZATION SYSTEMS EVATORS SHALL BE KEPT ENTIRELY HN ROOM INDEPENDENT OF ALL W IRING AND EQUIPMENT ROOM AND SHALL NOT ENTER THE SAME RACEWAYS, awl' CABLES,BOXES,AND CABINETS WITH OTHER 6a —E PLAN NOTES P O 0 0 0 0 O 0 O PROVIDE BUSSMANN ELEVATOR DISCONNECT {� r POWERMODULESHUNIT TRIP SWITCH WITHLPIIS Up"' lllL>IWOf DUAL-ELEMENT,TIME-DELAYTYPE FUSES. -a C�NBFY A CONNECT ELEVATOR SHUNT TRIP TO FIRE ALARM SYSTEM, TRES WEST ENGINEERS.INC. TLP1t3 MCE Yw CU - O ELEVATORCONTROLLERSHALLBERATEDFOR S 6t p6 cU AVAILABLE FAULT CURRENT.THE CERTIFICATION OF THE CONTROLLER'S SHORT-CIRCUIT AINA CURRENT RATING(SCCR)TO MEET THE AISOA AVAILABLE FAULT CURRENT SHALL BE EVALUATED BY A THIRD PARTY ENGINEER. 11/ ELECTRICAL CON TRACTORSHALLCOORDINATE CONTROLLER'S INTERNAL OVERCURRENT 2 (2N 1/YC PROTECTIVE DEVICE TYPES WITH ELEVATOR O CONTRACTOR AND ENGAGE A THIRD PARTY NA(MIB) -M• ENGINEER FOR TESTING AND CERTIFYING. _ SOKCM, M SIPA INS PROVIDE REVERSE-FED CIRCUIT BREAKER FOR NA(SIB) O PHOTOVOLTAIC SYSTEM.PHOTOVOLTAIC INPUT U,N *AV SYSTEM TO BE CONNECTED TO THE BREAKER FURTHEST FROM THE MAIN BREAKER.PROVIDE PERM ANENT WARNING LABEL ADJACENT TO ••— PASS BACK-FED BREAKER FROM INVERTER SUPPLY kAIC STATING•WARNING:POWER SOURCE OUTPUT NUV CONNECTION-DO NOT RELOCATE THIS 114'1O OVERCURRENT DEVICE' KEHOC 1%SGSN" SOSY' SN" O OWNER METER PER 2021WASHINGTONSTATE Warehouse&Office ENERGY CODE. Budding T1P>>u O EXISTING SERVICE GREEN BUILDING PANELBOARD.REMOVE NEUTRAL-GROUND BOND AINA pv6 cU FROM EXISTING PANEL. 12607 SE 248TH ST O PRO VIDE ARC FLASH ENERGY REDUCTION PER KENT,WA NEC 240.87. 98030 AIIIIIA CONSOLIDATED SET D�� ZON JOB NO. ZOZ1J tn6G cu M4RCH 19,2024 NOTICE TO PROCEED 111241 ,_A ZVY1120V NEMAI 1 O F 10AA A SEE CONTINUATION ON 7 .1 3 xfi cu cai 0 A,Cu CU 1n4GCU < 8 ONE-LINE DIAGRAM (YPl MDP1.1666A.46oY N.30. NIU,IC E7 2 LEVEL "A 1 r 4� 4 i. t Y JIM pq at K- MW ZOO �, e*�•a"!r,! ; -7�' 4 .r �r � �:� 40 .PoLt 1 . Vp fZI— R • of. • y� • w 14y, rM�r 4 + ,i t ,, n 1 r •.;"✓�!.� 'f, ;, �^+ 4„l1,����ctrtY�,".. 'S'� r''�k"4AS+•1�� j� y jd I S i , 1'v � I r A j a, •1�l �, tM., ,{�`4'4�'b�v}N ';�prr� t�y�r �al�l�kry���,k��1•�`'7 i r� ,7N ����r' rah ��Y, ��r ,, - k I r.":r ,l r 4� i.:- 1.`,.. }, r Y t, �t ,� tir� - � t J /• ��C,. - �, t I .`i R� r $ x{f'f�P� i - a i ir��,>'4��`•� �it i- ��h'� � �., .4 r - s t� r I, � `[I �r r C I �1 ! 5' :r �n k;� r a 'aqt{• J rm jale 2 iT C A ����y'1•'� }� , .�r ,YY NNECr :rgSRI �is f )IN 041so y r 5 4. t , r :I Ae i 4 i t - 11. i4 f"r tllril, r •%.,. d '/ �41� A`Y}0.rlla a7Fa�jf "h'r����IS1�P''3}'Y Existing WT r f,� � Rom.• T ', panel A 1 4.'rk a •i YVfi4IJ � - r� 1 y� r 'ylle ill OK i; iIi, - i. 01. ; s �.' I' It Tee 11. 'i� nl» °1"1(1Y 6.�- f l u ey.1y,, e'xer3Y yy�� r aA RBI` � C r' I!-..ad"A�5 �1 'of c 1 l ' Dram ocro 4A.-mm" g� rremA owvqu WABNdNG WMWN& 5 I 1 r oal"ae� 1 1 fA •.'fti�R ev �f�tA�,� �wa7}tl�fi'T ,S T Oil— I�k L F'.,Ill i L^;t•�� 5 �``!..i��+�::. 7,• i r I I Id dp II� eF91 loll■ ■ Existing 150A fused P service disconnect ' U t _ 4L jjj GENERAL NOTES SEE CONTINUATION ON SHEET E7.3 1, PROVIDE VERTICAL CABLE SUPPORT AS WAGNER REQUIRED BY CODE. ARCHITECTS G. BREAKERS TG BE SET PER COORDINATION P L A N N E R S Existing PaneI,ATS, STUDY. IV1E PI)<F Yl>•Cf and generator 3. FEEDERS MAY BE UPSIZED TO ACCOMODATE SIATTLI WA 74101 VOLTAGE DROP.PROVIDE LUGS TO ACCEPT !B h 4 1 11 LARGER CONDUCTOR SIZES. •'•" "'^I'^"""'^ L 4, PROVIDE METERS PER 2021 WASHINGTON - V t EV12 LV 3 ENERGY CODE,END-USE METERING REQUIRED FOR HTINGL OADS LEADS, LEADS,NG LOADS, LIGHTING LOADS,PLUG LOADS,AND PROCESS 480V LOADS. NEMA NEM NEMA ISIGA G 5. PROVIDE SPD ON ALL EMERGENCY PANELS. +st%1'�R� we�tP 6. =NGFORSHAFTPREESURIZATION SYSTEMS EVATORS SHALL BE KEPT ENTIRELY INDEPENDENT OF ALL W IRING AND EQUIPMENT T 1Evtt _ 1Evi2 "" AND SHALL NOT ENTER THE SAME RACEWAYS, ptN cu a1mcUCRpGEEPOINT T atacu CABLES,BOXES,AND CABINETS WITH OTHER GG GENERAL WIRING. 11l2'., ,l G 12 z PLAN NOTES U)3/4TO 'sPARECONGUIT INEMA t GROUND TO BUILDING STRUCTURE PER NEC. F w3eddi3oGHono O � PANEL WITH PULL provide iscOnnect 0f PUGET SOUND ENERGY(PSE)REMOTE MOUNTED to SIRING12 [he[rens(onners SINGLE METER.PROVIDE PER FEE contlarys REQOIREMErvrs.GURRErvr Tw.rvSFQRMER TRES WEST ENGINEERS.11N C. LENGTH SHALL NOT EXCEED 50 FEET. 2 pPROVIDE SHUNT-TRIP BREAKER FOR AUTOMATIC '211111DISCONNECT OF LOAD BANK. O PROVIDE SAFETY INTERLOCK MECHANISM TO ALLOW ONLY PERMANENT GENERATOR CIRCUIT OR PORTABLE GENERATOR CIRCUIT BREAKER TO BE NON"AT A TIME. I.G CU O PRO VIDE ARC FLASH ENERGY REDUCTION PER NEC O PROVIDE SOLID STATE CIRCUIT BREAKER WITH GROUND FAULT PROTECTION OF EQUIPMENT PER NEC 230.A5. O OWNER METER PER 2021 WASHINGTON STATE S ENERGY CODE. pK«2GCuO O F MF PROVIDE INDICATION ONLY GROUND FAULT PROTECTION. KEHOC Bt,2 48pY/2]N. O PROVIDE PBE TAMPER PROOF SECTION.SECTION Warehouse&Office SHALL BE LOCKABLE BY PRE.COORDINATE ( ) EXACT REGUIREMENTE WITH PSE. Building PR -i14 VIDE 1 'C WITH CONTROL WIRING FOR MHI N $ ] $ O ENGINE START TO PARALLELING SWITCHBOARD. 12607 SE 248TH ST I COORDINATEGABLE REQUIREMENTS WITH KENT,WA I yypp GENERATOR MANUFACTURER PRIOR TO CA -/d•C ROUGH-IN, 98030 21® I O SEE ON BHEET E]2 CONTINUATION tot PROVIDE I-tl4'C WITH CONTROL WIRINGTO PARALLELING SWITCHBOARD.COORDINATE I N 825kVA k CABLE REQUIREMENTS WITH GENERATOR CONSOLIDATED O4-OE MANUFACTURER PRIOR TO ROUGH-IN. SET WNCU O PROVIDE I-1AVC WITH CONTROL WIRING ELGENERATORS.COORDINATE CABLE REQUIREMENTS WITH GENERATOR JOB NO, 20228 MANUFACTURER PRIOR TO ROUGH-IN. UTILtt PAD pGO CU 5 (rvP OF 3) t�a EXISTING SERVICE WATER TOWER PANELBOARD. M1WRCH1B,2024NOTCE iO PROCEED IPU ET BOUND REM OVENEUTRAIGROUND BOND FROM ENERGY) O EXISTING PANEL. NK LOAD O PV SERVICE DISCONNECT.SEE SHEET E8.0 FOR UTIL9 GEN. LOCATION. POLE GO.SERVICE POINT 4W ,SO.4W. CONNECT PV SYSTEM TO SUPPLY SIDE OF '.EN XG211211"PF SO 851W C EQUIPMENT GROUND FAULT PROTECTION PER O NEC]05. xa/o cu O d ONE-LINE DIAGRAM E7.1 LEVEL GENERAL NOTES WAGNER � { SEE CONTINUATION ON SHEET ET.3 SEE CONTINUATION ON SHEET E7.3 SEE CONTINUATION ON SHEET ET.3 SEE CONTINUATION ON SHEET E7.3 1, PROVIDE VERTICAL CABLE SUPPORT AS W A G N E R REQUIRED BY CODE. ARCHITECTS S. BREAKERS TO BESET PER COORDINATION P L A N N E R S STUDY. I91E 1,0;1 YlHCE 3. FEEDER SMAYSEUPSIZEDTOACCOMODATE 5 1ATT11 WA +1/1�1 VOLTAGE DROP.PROVIDE LUGS TO ACCEPT LARGER CONDUCTOR SIZES. • �•'•�•^I'^"""'^ 4. PROVIDE METERS PER—WASHINGTON ENERGY CODE.END-USE METERING REQUIRED FOR HVAC LOADS,WATER HEATING LOADS, LIGHTING LOADS,PLUG LOADS,AND PROCESS (/•� LOADS. � 5. PROVIDE SPDONALLEMERGENCYPANELS. a'+scve'�er e•+P O 6. =NG FOR SHAFT PRESSURIZATION SYSTEMS EVATORS SHALL BE KEPT ENTIRELY HN ROOM INDEPENDENT OF ALL W IRING AND EQUIPMENT ROOM AND SHALL NOT ENTER THE SAME RACEWAYS, awl' CABLES,BOXES,AND CABINETS WITH OTHER 6a —E PLAN NOTES P O 0 0 0 0 O 0 O PROVIDE BUSSMANN ELEVATOR DISCONNECT {� r POWERMODULESHUNIT TRIP SWITCH WITHLPIIS Up"' lllL>IWOf DUAL-ELEMENT,TIME-DELAYTYPE FUSES. -a C�NBFY A CONNECT ELEVATOR SHUNT TRIP TO FIRE ALARM SYSTEM, TRES WEST ENGINEERS.INC. TLP1t3 MCE Yw CU - O ELEVATORCONTROLLERSHALLBERATEDFOR S 6t p6 cU AVAILABLE FAULT CURRENT.THE CERTIFICATION OF THE CONTROLLER'S SHORT-CIRCUIT AINA CURRENT RATING(SCCR)TO MEET THE AISOA AVAILABLE FAULT CURRENT SHALL BE EVALUATED BY A THIRD PARTY ENGINEER. 11/ ELECTRICAL CON TRACTORSHALLCOORDINATE CONTROLLER'S INTERNAL OVERCURRENT 2 (2N 1/YC PROTECTIVE DEVICE TYPES WITH ELEVATOR O CONTRACTOR AND ENGAGE A THIRD PARTY NA(MIB) -M• ENGINEER FOR TESTING AND CERTIFYING. _ SOKCM, M SIPA INS PROVIDE REVERSE-FED CIRCUIT BREAKER FOR NA(SIB) O PHOTOVOLTAIC SYSTEM.PHOTOVOLTAIC INPUT U,N *AV SYSTEM TO BE CONNECTED TO THE BREAKER FURTHEST FROM THE MAIN BREAKER.PROVIDE PERM ANENT WARNING LABEL ADJACENT TO ••— PASS BACK-FED BREAKER FROM INVERTER SUPPLY kAIC STATING•WARNING:POWER SOURCE OUTPUT NUV CONNECTION-DO NOT RELOCATE THIS 114'1O OVERCURRENT DEVICE' KEHOC 1%SGSN" SOSY' SN" O OWNER METER PER 2021WASHINGTONSTATE Warehouse&Office ENERGY CODE. Budding T1P>>u O EXISTING SERVICE GREEN BUILDING PANELBOARD.REMOVE NEUTRAL-GROUND BOND AINA pv6 cU FROM EXISTING PANEL. 12607 SE 248TH ST O PRO VIDE ARC FLASH ENERGY REDUCTION PER KENT,WA NEC 240.87. 98030 AIIIIIA CONSOLIDATED SET D�� ZON JOB NO. ZOZ1J tn6G cu M4RCH 19,2024 NOTICE TO PROCEED 111241 ,_A ZVY1120V NEMAI 1 O F 10AA A SEE CONTINUATION ON 7 .1 3 xfi cu cai 0 A,Cu CU 1n4GCU < 8 ONE-LINE DIAGRAM (YPl MDP1.1666A.46oY N.30. NIU,IC E7 2 LEVEL "A 1 r 4� 4 i. t Y JIM pq at K- MW ZOO �, e*�•a"!r,! ; -7�' 4 .r �r � �:� 40 .PoLt 1 . Vp fZI— R • of. • y� • w 14y, rM�r 4 + ,i t ,, n 1 r •.;"✓�!.� 'f, ;, �^+ 4„l1,����ctrtY�,".. 'S'� r''�k"4AS+•1�� j� y jd I S i , 1'v � I r A j a, •1�l �, tM., ,{�`4'4�'b�v}N ';�prr� t�y�r �al�l�kry���,k��1•�`'7 i r� ,7N ����r' rah ��Y, ��r ,, - k I r.":r ,l r 4� i.:- 1.`,.. }, r Y t, �t ,� tir� - � t J /• ��C,. - �, t I .`i R� r $ x{f'f�P� i - a i ir��,>'4��`•� �it i- ��h'� � �., .4 r - s t� r I, � `[I �r r C I �1 ! 5' :r �n k;� r a 'aqt{• J rm jale 2 iT C A ����y'1•'� }� , .�r ,YY NNECr :rgSRI �is f )IN 041so y r 5 4. t , r :I Ae i 4 i t - 11. i4 f"r tllril, r •%.,. d '/ �41� A`Y}0.rlla a7Fa�jf "h'r����IS1�P''3}'Y Existing WT r f,� � Rom.• T ', panel A 1 4.'rk a •i YVfi4IJ � - r� 1 y� r 'ylle ill OK i; iIi, - i [1+1 1,f 'i� nl» °1"1(1Y 6.�- f l u ey.1y,, e'xer3Y yy�� r aA RBI` � C r' I!-..ad"A�5 �� �1 'of c 1 l ' Dram ocro 4A.-mm" g� rremA owvqu WABNdNG WMWN& 5 I 1 r oal"ae� 1 1 fA •.'fti�R ev �f�tA�,� �wa7}tl�fi'T ,S T Oil— I�k L F'.,Ill i L^;t•�� 5 �``!..i��+�::. 7,• i r I I Id dp II� eF91 loll■ ■ Existing 150A fused P service disconnect ' U t _ 4L jjj AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #115 - CCD-013R1 - Debris Filled Soil at NW Site Origin: Date Created: 7/30/2024 Created By: Nils Brian Nilsson Status: Open Scope: Out of Scope Type: Change Order Request Change Reason: Unforeseen Condition Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Cost Over/ Budget Price Under Mod. 02-300-001.S SCI INFRASTRUCTURE,LLC Is 1.0 $99,042.00 $99,042.00 $99,042.00 $99,042.00 1.0 $99,042.00 $99,042.00 $99,042.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: CE-115-Haul Spoils from Carpinito's 02-300-001.S SCI INFRASTRUCTURE,LLC Is 1.0 $0.00 $0.00 $0.00 $0.00 1.0 $0.00 $0.00 $0.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: CE-115-Place soils on East Berm 02-300-001.S SCI INFRASTRUCTURE,LLC Is 1.0 $0.00 $0.00 $0.00 $0.00 1.0 $0.00 $0.00 $0.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: CE-115-Sweeper Truck 02-300-001.S SCI INFRASTRUCTURE,LLC Is 1.0 $0.00 $0.00 $0.00 $0.00 1.0 $0.00 $0.00 $0.00 $0.00 Earthwork 24057-4005 Sub.Commitments- Subcontracts Description: CE-115-Hydroseed Bayley Construction, LP Page 1 of 2 Printed on:9/25/2024 at 01:12PM PDT Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Cost Over/ Budget Price Under Mod. 32-310-130.S hours 1.0 $1,500.00 $1,500.00 $1,500.00 $1,500.00 1.0 $1,500.00 $1,500.00 $1,500.00 $0.00 Chain Link Fences and Gates.Commitments- Subcontracts Description: Install 12'Wide Gate as Indicated 01-450-120.S hours 4.0 $200.00 $800.00 $800.00 $800.00 4.0 $200.00 $800.00 $800.00 $0.00 Surveyor.Commitments -Subcontracts Description: Layout 03-100-0201 hours 4.0 $95.00 $380.00 $380.00 $380.00 4.0 $95.00 $380.00 $380.00 $0.00 Concrete Foreman.Labor and Labor Tax Description: Foreman 01-740-125.PO Is 1.0 $110.00 $110.00 $110.00 $110.00 1.0 $110.00 $110.00 $110.00 $0.00 Du mpsters.Purchase Order and All Other Costs Description: Dumpster 00-000-000.130 Is 1.0 $15,275.00 $15,275.00 $15,275.00 $15,275.00 1.0 $15,275.00 $15,275.00 $15,275.00 $0.00 Fee(Profit).Purchase Order and All Other Costs Description: Contractors Fee Grand Totals $117,107.00 $117,107.00 $117,107.00 $117,107.00 $0.00 $0.00 $0.00 $117,107.00 $0.00 $0.00 Bayley Construction, LP Page 2 of 2 Printed on:9/25/2024 at 01:12PM PDT Change Proposal Project Name:KEHOC Warehouse&Office Building CE# 115 Project No.24507 Doc#: CCD-013 Work Description:CCD-013R1-Debris-Filled Soil at NW Site Date: 7/30/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs SCI-Haul Spoils from Carpinito's 1 LS $ $ $ 99,042.00 $ 99,042 $ 99,042 SCI-Place soils on East Berm. 1 LS $ $ $ $ - Included SCI-Sweeper Truck 1 LS $ $ $ $ Included SCI-Hydroseed 1 LS $ $ $ $ Included SCI-Adjust Man-hole Rim as Necessary 1 LS $ $ $ $ Included Install 12'Wide Gate as Indicated 1 LS $ $ $ 1,500.00 $ 1,500 $ 1,500 Layout 4 HR $ $ $ 200.00 $ 800 $ 800 Foreman 4 95.00 $ 380 $ $ $ - $ 380 Dumpster 1 LS $ - $ 110.00 $ 110 $ $ 110 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4 $ 380 $ $ 110 $ 101,342 Clarification.Assumptions&Exclusions: SUBTOTAL COST OF WORK $ 101,832 Excludes WSST General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency 0.00% $ Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 15.00% $ 15,275 GRAND TOTAL $ 117,107 Time Request: Bayley Construction reserves our right to request additional time due to the 3- X We have proceeded on this change proposal on Owner's verbal direction/RFI response week impact on construction of the north parking lot. F1We will proceed with this change proposal when a copy,signed by an authorized representative,is received by Bayley Construction. To prevent delays and further impacts please approve by: 9/25/2024 Owner's Representative Date Bayley Construction Date fr,t�� ud COP Summary Project Name: Kent East Hill Operations Center(KEHOC) # Project No. Document Reference: Date: 9/16/2024 To Gen Contractor: Bayley Construction,Inc. Contractor Rof.No. Description: 06128/24-08/28/24-Handling plastic contaminated soil from Carpintla Brothers and back from dump site and costs for placing an West Berm, 1. CRAFT LABOR COSTS Itemize al€costson attached COP Cost Breakdown form. Direct Labor Costs: a, Crew(apprentices,journeymen,&laborers) $ 22,171.68 b. Direct Supervision(Not to exceed 15%of labor) $ 3,325.75 c. Safety allowance on direct labor at 2% $ 443.43 d. Small tool allowance on direct labor at 3% $ 665.15 1.CRAFT LABOR COSTS $ 26,606.02 2, MATERIAL COSTS a. Material costs $ 10,402.60 Use Tax on Materials(When applicable) 2,MATERIAL COSTS $ 10,402.50 3. EQUIPMENT COSTS a, SCI owned equipment $ 34,842.84 3.EQUIPMENT COSTS $ 34,B42.84 SUBTOTAL 1 thru 3 $ 71,851.36 4. SCI's FEE ON OWN WORK a, 16.00% 10,777.70 4.GC PERFORMED WORK TOTAL $ 82,029.00 Sub's Fee, Subcontractor Insurance Subcontractor 5, TIER SUBCONTRACTORS subtotal and Bond total a. .Hydroseeding&Bark Blowers $ 7,750.00 $ $ 7,750.00 b. Car initos - - $ 6,525.00 $ $ 6,525.00 c. $ $ $ d. $ $ $ e. $ $ $ f. $ $ $ g• $. $ $ h. $ $ $. J. $ $ $ S.SUBCONTRACTORS $ 14,275,00 6. SCI's FEE ON TIER WORK a. 5.00% $ 2,141,25 6.TIER PERFORMED WORK TOTAL $ 16,416.25 TOTAL FEE $ 12,919.00 7. INSURANCE a. liability Insurance 0.000°!°of 1.6 $ 7,INSURANCE $ 8. BOND a. bond 0.000%of 1.7 $ B.BOND $ TOTAL COST(4,5,6,7,8,9) $ 99,045,00 KEHOCCO-CarpinitoDirt Page or Issued9/iII/2024 E COP Cost Breakdown Project Name: Kent East Hill operations Center PCO 9 0 i Project No. 2405 Date: 9116/2024 Contractor: SCI Infrastructure,LLC Contractor Ref,No. i Unit Labor Material E u1 ment Total Description Quantity Type Unit$ Unit$ Cost Unit$ Cost Cost Project Manager hrs $150.00 $ $ $ $ Field Engineer hrs $125.00 $ $ $ $ Foreman 27.5 hrs $104.68 $ 2,878.70 $ $ $ 2,878.70 Pi ela er hrs $73.48 $ $ $ $ Flagging Supervisor hrs $69.30 $ $ $ $ Fla er hrs $61.17 $ $ $ $ Operator 128 hrs $100.40 $ 12,851,20 $ $ $ 12,861.20 Teamster 34 hrs $92,96 $ 3,160.64 $ $ $ 3,160.64 Grade Engineer Mrs $99.50 $ $ $ $ Laborer 19 hrs $72.18 $ 1,371.42 $ $ $ 1,371.42 Overtime Rate Foreman OT 3 hrs $136.52 $ 409.56 $ $ $ 409.56 PI ela er OT hrs $97,0B $ $ $ $ - Flagger OT hrs $79.55 $ $ $ $ Operator OT 2 hrs $130,43 $ 260.86 $ $ $ 260.86 Teamster OT 5 hrs $118.72 $ 593.60 $ $ $ 593,60 Grade En ineer OT 5 hrs $129.14 $ 645.70 $ $ $ 645.70 Laborer OT bra $92.50 $ $ $ $ - Equipment Alr Compressor/Jackhammer hrs $ $ $38,92 $ $ 160 Grader hrs $ $ $179.56 $ $ 138 Excavator hrs $ $ $117.92 $ $ JD 310 Backhoe hrs $ $ $69.09 $ $ Tool Truck hrs $ $ $51.59 $ - $ Foreman Pick-up 30.5 hrs $ $ $35.70 $ 1,088.85 $ 1,088,65 Dump frock&Trailer 38 hrs $ $ $131.01 $ 5,109.39 $ 5,109.39 125-145 061 Dozer 47 hrs $ $ $225.34 $ 10,590.98 $ 10,690.98 200-162 336 Excavatorwlgear 21.5 hrs $ $ $148.68 $ 3,198.62 $ 3,196,02 200-166 PC 120 Excavator 10 hrs $ $ $92.70 $ 927.00 $ 927.00 Water Truck hrs $ $ $59.68 $ - $ - Skid Steer hrs $ $ $96.62 $ - $ 2 02-1 09111 6 Mini-Excavator 24 hrs $ $ $64.41 $ 1,545.84 $ 1,545.84 450 dozer I hrs $ $ $68.66 $ $ - 650 dozer hrs $ $ $120.61 $ $ 700 dozer hrs $ $ $138,57 $ $ 850 dozer hts $ $ $226.59 $ $ Plate Com actor hrs $ $ $14.23 $ $ 84"Roller hm $ $ $111,20 $ $ 60"to 66"Roller hrs $ $ $93,59 $ $ 150-109/110 Articuiste Dump 34 hrs $ $ $364.24 $ 12,384.16 $ 12,38416 930 Loader his $ $ $80.92 $ $ Side Dum hrs $ $ $90.69 $ $ Generator and Pump hrs $ $ $32.55 $ $ Motor Grader hrs $ $ $136.01 $ $ Materials/Services/Rentals 2521 Barreirs Trucking 1 is $ $2,010,00 $ 2,010,00 $ $ 2,010.00 7224SCIKEHOO 1MR Trucking 1 Is $ $3,435,00 $ 3,435,00 $ $ 3,435.00 12077 MowatlTruckin 1 Is $ $1,600.00 $ 1,600.00 $ $ 1,600.00 5120 Carbon Gan on Trucking 1 Is $ $1,600.00 $ 1,600.00 $ $ 1,600.00 1426,toe Jacobsen Trucking 1 Is $ $1,757,50 $ 1,757,50 $ $ 1,757.60 $ $ $ $ $ 22,171.68 $ 10,402.60 $ 34,842.84 $ 67,417.2 KEHOC CO-C.,&Ito Dh Ng.-Di Issued 91iWo24 CONSTRUCTION From: x OWNER CHANGE ARCHITECT DIRECTIVE CONTRACTOR FOR KENT EAST HILL FIELD OPERATIONS CENTER OTHER PROJECT: KEHOC Warehouse Bi Office Building DIRECTIVE NO. CCO-013 R1 (name, address) 12607 5E 248th Street Kant, VVA 98030 DATE: 811512024 TO GONTRACTOR: BayJey Construct{on PROJECT NUMBER: 1=AC 23-09C (name,address) 8005 SE 281h Street Mercer Island, WA 98040 CONTRACT GATE: NTP 311W024 DIRECTED CHANGES TO SCOPE OF WORK You are hereby directed to make the following r-bange(s)in thin Contract: 9 Haul debris-filled sod from Carpinatos 2 Plane debris-filled soil on east berm. Remove small alders, fncluding stumps. 3 Utilize Sweeper Truck to collect& mitigate migration of debris from soil from leaving the fill area. 4 Hydreseed berm with Pollinator Sutlerfly, Bee,and Bird mix. 5 Adjust roan-bole rim as necessary 6 install the 12'wide gate as indicated. Attachments: Marked Up GIS Plan(1 sheet) ADJUSTMENTS TO CONTRACT SUM AND CONTRACT TIME 1 Bayley Construction agrees to calculate proposed adjustments to the Contract Sum and Contract Time consistent with Section 00 72 00-Part 7&01 26 00-1.06 of the Contract Documents. 2 Bayley Construction agrees to provide an estimate of proposed adjustrnsnts to the Contract Sum and Contract Time within 2 weeks of recipt of this CCD. 3 Bayley Construction agrees to provide monthly updates on completion and potential impact to the Contract Sumrn and Contract Time, Frovide additional doc rumentallon on an attached sheet to suppori time and cast per 00 72 00- Part 7& 01 26 00- 1.06 When signed by the Owner and Architect and received by the Signature by the Contractor indicates the Contractor, this document becomes effective IMMEDIATELY Cantractflr's agreement w illh the proposed shall proceed with the change(s)described above. adjustments in Contract Sum and Contract Time set forth in this Construction Change Directive(CCD). Wagner Architects City of!Cent BayJey Construction ARCHITECT OWNER CONTRACTOR 1915 Pike Place#221 400 West Gowe 8005 SE 28th Street qSea Kent,WA 98032 Mercer Island, WA 98040 l3YBY DATE 8.16.2024 !]ATE 8/16/24 lip- 4 . 4lip -Remove Irees in - Soil relocation area outlined in -`blue box aluding green. Maintain 3:1 slope as stunve._ �. r much as practicable from top of .rAft y .: ~....., t . ��' :, slope to ditch. Hydro-seed area •'. v r ;�y and adjacent disturbed soil ■rr1 � l � �. � l�.y Remove and dispose of large • woody debris in relocated soil. , --,- At Contractor to propose erosion t control BMP's for Owner art.10 �■nrr� • r• review/approval. * re Remove treks in r blue box t including �+ stumps. -4 4 IL Install 1 2' wide gate ' centered over sewer line. ti " A... { r �• ` Match existing fence height, 06 materials, etc. mjl Adjust sewer Mi H 1 RIM as necessW. _'1r�.w+�� `: ram. -�.� Mi��'CS()t.tl City of Kant GJSi Gi t Kent, WA, AYLEY Bayley Construction,LP Project:24057-Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 CHANGE EVENT #172 - CCD-015 - RFI-157 - Remove 16 Strobe Devices Origin: Date Created: 9/25/2024 Created By: Nils Brian Nilsson Status: Open Scope: In Scope Type: Change Order Request Change Reason: Client Request Description: Attachments: CHANGE EVENT LINE ITEMS Revenue Cost Budget Code Vendor/Contract UOM QTY Unit Cost ROM Prime PCO Latest QTY Unit Cost ROM RFQ Commit. Non-Commit. Latest Over/ Budget Price Cost Under Mod. 26-100-000.S VECA ELECTRIC& Is 1.0 ($5,287.87) ($5,287.87) ($5,287.87) 1.0 ($5,287.87) ($5,287.87) ($5,287.87) $0.00 Electrical.Commitments- TECHNOLOGIES,LLC Subcontracts 24057-4004 Description: CCD-015-RFI-157-Remove 16 Strobe Devices Grand Totals ($5,287.87) $0.00 ($5,287.87) ($5,287.87) $0.00 $0.00 $0.00 ($5,287.87) $0.00 $0.00 Bayley Construction, LP Page 1 of 1 Printed on:9/25/2024 at 12:10PM PDT Change Proposal Project Name:KEHOC Warehouse&Office Building CE# 172 Project No.24507 Doc#: CCD-015 Work Description:CCD-015-RFI-157-Remove 16 Strobe Devices Date: 9/9/2024 Labor Material Equipment Subcontractor TOTAL Description Quantity Unit Prod. Hours ROM $/hour Cost $/Unit Costs $/Unit Costs $/Unit Costs Veca-Remove 16 EA Stobe Devices 1 LS $ $ $ -5,287.87 $ (5,288) $ (5,288) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0 $ $ $ $ (5,288) Clarification.Assumptions&Exclusions: SUBTOTAL COST OF WORK $ (5,288) Excludes WSST General Conditions Incl. Design/Estimating Contingency Incl. Course of Construction Contingency Incl. Insurances Incl. B&O Taxes Incl. Builders Risk Insurance Incl. Contractors Fee 0.00% $ GRAND TOTAL $ (5,288) Time Request: We have proceeded on this change proposal on Owner's verbal direction/RFI response We will proceed with this change proposal when a copy,signed by an authorized representative,is received by FX I Bayley Construction. To prevent delays and further impacts please approve by: 9/25/2024 Owner's Representative Date Bayley Construction Date CHANGE NOTICE CCN# 21 VECA Electric And Technologies LLC Date: 9/24/2024 5614 7th Ave S Project Name: JT-628887- KEHOC Seattle,WA 98108 Project Number: JT-628887- KEHOC Telephone: 206-919-0850 Page Number: 1 E-mail:jtaylor@veca.com Client Address: Bayley Construction Contact: Brian Nilsson 8005 SE 28th St. Mercer Island, WA 98040 USA Contact: Brian Nilsson Work Description This CO is a deductive CO related to CCD-015 and the response to RFI #157 for the removal of(16) strobe devices from all single user offices per the approval from PSR Fire AHJ. If it is determined during the final inspection(s)that any of these (16) strobe devices need to be installed due to lack of coverage, VECA reserves the right to provide a CO based on the direction of the fire marshal. We reserve the right to correct this quote for errors and omissions. Itemized Breakdown Description Qty Net Price U Total Mat. Labor U Total Hrs. 3/4"CONDUIT- EMT -288 86.80 C -249.98 3.52 C -10.14 3/4"CONN SS STL-EMT -32 36.00 C -11.52 10.00 C -3.20 3/4"COUPLING SS STL-EMT -16 44.00 C -7.04 0.00 C -0.00 3/4"CONDUIT SUPPORT FOR ROD OR FLNG -16 78.86 C -12.62 5.10 C -0.82 1/2 OR 3/4"SNAP CLOSE CLIP-SIDE MNT TO MTL -32 294.29 C -94.17 7.20 C -2.30 #14 THHN BLACK -1,280 113.90 M -145.79 4.30 M -5.50 WIRE CONN YEL -64 19.39 C -12.41 0.00 C -0.00 4x 1 1/2"SQ BOX COMB KO -16 170.30 C -27.25 15.00 C -2.40 4"SQ 1 G PLSTR RING 5/8" RISE -16 103.33 C -16.53 2.50 C -0.40 #10x 1 P/H SELF-TAP SCREW -48 11.68 C -5.61 3.00 C -1.44 F/A STROBE-WALL MNT -16 0.00 E -0.00 0.50 E -8.00 F/A VERIFICATION-PER SIGNALLING DEVICE -16 0.00 E -0.00 0.00 E -0.00 Totals -1,840 -582.92 -34.20 Summary General Materials -582.92 FIRE ALARM -537.00 CHANGE NOTICE DEN#Client Address: Date: 9/9/24/2024 VECA Electric And TechnoloniPG Ll C Project Name: JT-628887- KEHOC 'Ba le Construction Project Number: JT-628887- KEHOC 5614 7th Ave S y y Page Number: 2 Seattle,WA 98108 8005 SE 28th St. Mercer Island, WA 98040 Summary(Cont'd) Material Total -1,119.92 CRAFTSMAN LABOR (-34.20 Hrs @$121.87) Final Amount $-5,287.87 CONTRACTOR CERTIFICATION Name: Date: Signature: I hereby certify that this quotation is complete and accurate based on the information provided. CLIENT ACCEPTANCE CCN # 21 Final Amount: $-5,287.87 Name: Date: Signature: Change Order#: I hereby accept this quotation and authorize the contractor to complete the above described work. CONSTRUCTION From: x' OWNER CHANGE ARCHITECT DIRECTIVE CONTRACTOR FOR KENT EAST HILL FIELD OPERATIONS CENTER OTHER PROJECT: KEHOC Warehouse&Office Building DIRECTIVE NO: CCD-016 (name,address) 12607 SE 248th Street Ken],WA 98030 DATE: 91312024 TO CONTRACTOR: Bayley Construction PROJECT NUMBER: FAC 23.09C (narne, address) 6005 SE 28th Street Mercer Island,WA 98040 CONTRACT DATE: NTP 31IW2024 DIRECTED CHANGE$TO$COPE OF WORK You are hereby directed to make the following change(s)in this Contract' 1 Remove strobes or hom/strobes From nJl Individual (single user}offices per attached approval fro PSR Fire Authority Attachments: Attached email from Puget Sound Regional Fire Authority ADJUSTMENTS TO CONTRACT SUM AND CONTRACT TIME 1 Bayley Construction agrees to calculate proposed adjustments to the Contract Sum and Contract Time consistant with Section 00 72 00- Part 7&01 26 00- 1.06 of the Contract Documents, 2 Bayley C❑nstructbn agrees to provide an estimate of proposed adjustments to the Contract Sum and Contract Time within 2 weeks of recipt of this CCD, 3 Bayley Construction agrees to provide in❑nthly updates on compietion and potential impact to the Contract Sum and Contract Time. Provide additional docurnantation on an attached sheet to support time and cost per 00 72 00 - Part 7&01 26 00- 1.05 When signed by the Owner and Architect and received by the Signature by the Contractor indicates the Contractor,this document becomes effective IMMEDIATELY Contractor's agreement with the proposed shall proceed with the change(s)described above. adjustments in Contract Sum and Contract Time set Forth in this Construction Change Directive(CCD). Wagner Architects _ City of Kent Bayley_Construction ARCHITECT OWNER CONTRACTOR 1916 Pike Place#221 400 Vilest Gowe 8005 SE 28th Street _ Se Kent,WA 98032 Mercer Island,WA 98M Y BY 13Y DATE q . [DATE .2 G. n 0 A DATE 9/9/24 Sam Scarmardo To: Harper, Nathen Subject: RE: KEHOC Horn Strobes From: Webster, Scott<SWebster@PugetSoundFire.org> Sent:Thursday,August 29, 2024 8:28 AM To: Harper, Nathen <NHarper@kentwa.gov> Subject: RE: KEHOC Horn Strobes This message originated outside the City of Kent. Use caution when following links or opening attachments as they can be malicious. Please contact IT Security at ISP@KentWA.aov with any questions. Hi, Correct, all the individual office do not require strobes or horn/strobes. Scott Webster, CFM Assistant Fire Marshal Puget Sound Regional Fire Authority I Fire Prevention 400 W.Gowe Street,Suite 414, Kent WA 98032 Main 253.856.4400/Direct 253.856.4409 Professionally and compassionately helping people. Visit Us Online At: U130 Facebook Twitter Website Customer Survey Electronic Privacy Notice:This e-mail,and any attachments,contains information that is,or may be,covered by electronic communications privacy laws,and may be confidential and proprietary in nature.If you are not the intended recipient,please reply to the sender that you have received this communication in error,and then immediately delete it. From: Harper, Nathen <NHarper@kentwa.gov> Sent:Thursday,August 29, 2024 7:54 AM To:Webster, Scott<SWebster@PugetSoundFire.org> Subject: KEHOC Horn Strobes CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. 1 Hi Scott, during the review process of the KEHOC plans you had mentioned that the horn strobes could be eliminated in the individual offices. Before I mention this to the contractor I wanted to make sure that I understood this correctly. Is that still the case? Thanks, Nathen Harper, FMP Facilities Capital Projects Manager Facilities I Parks Recreation &Community Services 400 West Gowe, Kent, WA 98032 Direct Line 253-856-5082 1 Fax 253-856-6080 nharper@KentWA.gov City of Kent Washington 2 AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #157: Rooms Impacted by CCD-15 Status Closed on 09/18/24 To Sam Scarmardo(Wagner Architects and Planners) From Angel Nunez(Bayley Construction, LP) (Response Required) 8005 SE 28th St. Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Sep 11,2024 Due Date Sep 25,2024 Location Cost Impact TBD Schedule Impact No Spec Section Cost Code Drawing Number 1A2.6B, 1A2.7B Reference VECA RFI#52 Linked Drawings FA-05, FA-07 Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC),Terri Combs(Frontier Door&Cabinet), Bedsaida Osuna(Nelson Adams NACO),Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC), Brandon Crain (Pavement Markings), Elizabeth Curtis(Washington Architectural Hardware),Konan Davies(Frontier Door&Cabinet),Savanna Delgado(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg(Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving&Construction), Derrek Gunn(Pipe Construction, Inc.),Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Delta (Sub to Ramsett)),Chris Hansen(SCI INFRASTRUCTURE, LLC), Nathan Harper(City of Kent),Cory Hehr(Pipe Construction, Inc.),Weston Heywood(Caliber Concrete Construction, Inc.), Ryan Jackson(Sound Glass Sales, Inc.), Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent (Pipe Construction, Inc.), Dave Krah(SECURE A SITE), Matt Laukala(Caliber Concrete Construction, Inc.),Mark Leavitt(Expert Drywall Inc),Jon Marks (Bayley Construction, LP),Elaine Mayhall(Mayhall's Painting),Gene Mayhall(All-Wayz Painting),Mike Nelson(Delta Mechanical),Christian Nicholson (Corona Steel), Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez(Bayley Construction,LP), Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Bayley Construction, LP Page 1 of 2 Printed On:Sep 25,2024 12:04 PM PDT RFI#157-Rooms Impacted by CCD-15 Project:24057 Kent East Hill Operations Center Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Delta (Sub to Ramsett)), Eric Trofimchik(VECA ELECTRIC&TECHNOLOGIES,LLC), Ken Wais (SIEMENS INDUSTRY INC),Mike Yeung (Fastsigns of Kirkland) Activity Question Question from Angel Nunez Bayley Construction,LP on Wednesday, Sep 11, 2024 at 12:45 PM PDT CCD-15 calls for the removal of the horn/strobe devices from the single occupancy offices.After reviewing the furniture& equipment plans,we've identified 16 offices that will be affected by this change. Rooms#114, 115, 116, 117,217,221,222, 250,251,252,254,256,258,259,260,and 261. Please confirm that the listed room numbers capture all single occupancy offices and subsequently are approved to have the strobe devices removed. Please confirm that there aren't any other rooms impacted. Please confirm that the PSR fire authority accepts the listed rooms as single-user offices. Attachments RFI 157 Backup.pdf Official Response Response from Bryce Nelson Bayley Construction,LP on Wednesday, Sep 18, 2024 at 01:48 PM PDT Please review the attached RFI. Bayley Construction requires a response to this correspondence no later than three(3) working days from the date of this transmission.Failure to reply by this date will negate your rights to request for additional money and/or time as related to this document. If the attached document has costs or schedule implications,you are required to provide,but not limited to,the following: COP: Reference the document number and a description of the added scope of work Detailed cost breakdown with quantities,labor,and materials. Effect on current project schedule including anticipated duration. Bond,insurance,and OH&P per contract terms. You must submit a complete COP within seven(7)working days from the date of original transmission. Failure to do so will negate your rights to request for additional money and/or time as it relates to this change. If you have any question,please contact Brian Nilsson at(206)549-8342 or Bryce Nelson at(509)969-2824 Official Response Response from Sam Scarmardo Wagner Architects and Planners on Tuesday, Sep 17, 2024 at 04:15 PM PDT See attached document Attachments KEHOC-rfi#1 57-rooms_impacted_by_ccd-1 5-RESPONSE.pdf Bayley Construction,LP Page 2 of 2 Printed On:Sep 25,2024 12:04 PM PDT AYLEY Bayley Construction,LP Project:24057 Kent East Hill Operations Center B8005 S.E.28th St 12607 SE 248th ST Mercer Island ,Washington 98040 Kent,Washington 98030 P: (206)621-8884 RFI #157: Rooms Impacted by CCD-15 Status Open To Sam Scarmardo(Wagner Architects and Planners) From Angel Nunez(Bayley Construction, LP) (Response Required) 8005 SE 28th St. Abigail Purnapuspita(Wagner Architects and Mercer Island,Washington 98040 Planners) Date Initiated Sep 11,2024 Due Date Sep 25,2024 Location Cost Impact TBD Schedule Impact No Spec Section Cost Code Drawing Number 1A2.6B, 1A2.7B Reference VECA RFI#52 Linked Drawings Received From Eric Trofimchik(VECA ELECTRIC& Sub Job TECHNOLOGIES, LLC) Copies To Jorge Acosta(Pipe Construction, Inc.), Brian Butler (Corona Steel),Guy Baryo(Overhead Innovations), Brandon Bell(Overhead Innovations),Jon Bosshart (VECA ELECTRIC&TECHNOLOGIES,LLC), Dave Brock(City of Kent),Ken Brumley(SCI INFRASTRUCTURE, LLC),Adam Campbell(City of Kent),Taylor Cobaugh(SCI INFRASTRUCTURE, LLC),Terri Combs(Frontier Door&Cabinet), Bedsaida Osuna(Nelson Adams NACO),Brandon Cook(Smith Fire Systems, Inc.),Jason Craig(SCI INFRASTRUCTURE, LLC), Brandon Crain (Pavement Markings), Elizabeth Curtis(Washington Architectural Hardware),Konan Davies(Frontier Door&Cabinet),Savanna Delgado(SCI INFRASTRUCTURE, LLC),Jodi Drost(Precision Rebar&Accessories, Inc.),Jermaine Edwards(Epic Building Detailers), Leah Sandberg(Washington Architectural Hardware),Thomas Evans(Insulpro Projects),Andrew Falaniko(Green City,inc.),Jake Gehring(Puget Paving&Construction), Derrek Gunn(Pipe Construction, Inc.),Zac Gurule(SCI INFRASTRUCTURE, LLC), Brian Henderson(Delta (Sub to Ramsett)),Chris Hansen(SCI INFRASTRUCTURE, LLC), Nathan Harper(City of Kent),Cory Hehr(Pipe Construction, Inc.),Weston Heywood(Caliber Concrete Construction, Inc.), Ryan Jackson(Sound Glass Sales, Inc.), Noah Kennard(Smith Fire Systems, Inc.),Justus Konwent (Pipe Construction, Inc.), Dave Krah(SECURE A SITE), Matt Laukala(Caliber Concrete Construction, Inc.),Mark Leavitt(Expert Drywall Inc),Jon Marks (Bayley Construction, LP),Elaine Mayhall(Mayhall's Painting),Gene Mayhall(All-Wayz Painting),Mike Nelson(Delta Mechanical),Christian Nicholson (Corona Steel), Nils Brian Nilsson(Bayley Construction,LP),Angel Nunez(Bayley Construction,LP), Magali Santos(Nelson Adams NACO),Sam Scarmardo(Wagner Architects and Planners),Tyson Schiessl(Masco Corporation), Mark Scoccolo(SCI INFRASTRUCTURE,LLC), Tyler Severson(Vibetech Specialties),Arlan Smith (VECA ELECTRIC&TECHNOLOGIES,LLC), Bayley Construction, LP Page 1 of 2 Printed On:Sep 17,2024 04:11 PM PDT RFI#157-Rooms Impacted by CCD-15 Project:24057 Kent East Hill Operations Center Kevin Sodano(Pipe Construction, Inc.),Justin Taylor (VECA ELECTRIC&TECHNOLOGIES,LLC), Kelli Thomas(Delta Mechanical), Michael Thomas(Delta (Sub to Ramsett)), Eric Trofimchik(VECA ELECTRIC&TECHNOLOGIES,LLC), Ken Wais (SIEMENS INDUSTRY INC),Mike Yeung (Fastsigns of Kirkland) Activity Question Question from Angel Nunez Bayley Construction,LP on Wednesday, Sep 11, 2024 at 12:45 PM PDT CCD-15 calls for the removal of the horn/strobe devices from the single occupancy offices.After reviewing the furniture& equipment plans,we've identified 16 offices that will be affected by this change. Rooms#114, 115, 116, 117,217,221,222, 250,251,252,254,256,258,259,260,and 261. Please confirm that the listed room numbers capture all single occupancy offices and subsequently are approved to have the strobe devices removed. Please confirm that there aren't any other rooms impacted. Please confirm that the PSR fire authority accepts the listed rooms as single-user offices. Attachments RFI 157 Backup.pdf Awaiting an Official Response It is confirmed that there are no other rooms impacted. It is confirmed that the use of the rooms indicated are planned as single-user offices per the attached furniture plans, and that PSR fire authority has accepted that single-user offices are not required to have strobes or horns. -sam scarmardo, architect 9.17.2024 Bayley Construction,LP Page 2 of 2 Printed On:Sep 17,2024 04:11 PM PDT 7 APPROVED 8 , C, Ln ` WALL OI OI P__T________-__—I___—________T___I_T_____________I___r________T_�________ SEE VESTIBUL€118 SEE RISERIROOM 120 w a PO AIL BLOW-UP AIL p p p — L_J—_J ----- — 119 RISER ROOM 2 Z TIBULE O o U U �o" _ i O1 t ABDC <I< e Q' ECH,ROOMPW GQ cQc SIGNS 140 I_1 cF—� aj C,G SOLIDIWASTE PVI NAGE s —� 121 L—J F y/ R I ' IS EE R L_J 0 L117 OFFICE 136 II ssca 122 I I I I CORR. MDF II WAREHOUSE e° R II HousE ice\ LJ Dsrs — I�— �� P 6 FFI -- _ 13� _ _ _ _ ~ OPEN MS OFFICE — '< S" - r--- VESTIBULE 119 ® BLOW-UP DETAIL " „ , „ 3=I 134 I I 116 = \\� 0 �� SCALE. 1/2 1 0 s 1a1 ROOAUNDRM W ENS OFFICE rc OM ROOM N ® arll WOMEN'N'S WC 123 ��'L(,,'7•�(J�ryj�' DRYING WORKOUT RAM ROOM ll SHOWER s �0 )TIT - a 114 13] )III du WAREHOUSE p OFFICE F s, ee m 1f4 P9R ORR. OPEN s ueL----J _ OFFICE wa sz 10— ,a FAA Z ® 128 MEWS WC 11 106 ro s MIENS W ROOM -- [ID = — sGs —=7 m LL S -_J W az iz --� 1Ds U CO __-- DS TOR, LLLL W WA J °� D --- PARKS RISER ROOM 120 o;N w ER PW WATER EL CORR. KITCHENETTE N ® 3T Rom, BLOW-UP DETAIL w¢�_ + ® d FIRSTo SCALE: 1/2"=1'0" j a wa 0 II 142 E1.7 LEC'sce AID �Ir i� O u�Z II WATER) IT W W O ® ® II Y IIII STREETVEG. 13 FLAG NOTES: cc71 STOR. I ?) V F pAy3 s _ PROVIDE SIGN STATING'FIREALARM CONTROL PANEL"MOUNTED ON THE Q OUTSIDE OF DOOR LEADING TO THE FIRE ALARM CONTROL PANEL LOCATION. U W 03 O /S WATER ELECTRICAL CONTRACTOR TO PROVIDE 120VAC DEDICATED POWER,BREAKER = �•/ LEST TAB o❑ LOCK-ON AND CIRCUIT BREAKER BRANCH IDENTIFICATION. W ER FIELD LOCATE.COORDINATE WITH ELECTRICAL/MECHANICAL/FIRE Y JJJ II I CONFERENCE PROTECTION/FIRE ALARM CONTRACTORS. Z e 101 ROOM ---- w 1.111YAVAITING s >FIELD LOCATE RELAY MODULE FOR PADDLE FAN SHUTDOWN.COORDINATE wr a WITH MECHANICAL CONTRACTOR. — AS NO TED _ I � DESIGNED fiY: _a________�_ ' STEVE SENDLAKOWSKI A M.WADE _—________ __ DATF:03 31 24 NICET LEVEL III 31CXAWXD PUN HpYDFD B! ENLARGED GROUND LEVEL B-FIRE ALARM PLAN M - ------- --- -- Rr.#1lsaaz ExP.o1ro1/zoza 0 o e o e o JOR NDMBER:)4330—I SCALE: 1/8"=1'0" " FA-05 Pro riem b:Confiesntial,Co ri M 2012 b Guardian Securil S stems Inc.All Ri nts Reserved FIRE2024 2663 APPROVED O O Scott Webster - I 08/19/2024 W 3 LL 0 m 219 21] r W W OFFICE OFFICE OFFICE C Z Z 232 a MMg OFFICE ti n J J PIN DRAINAGE PWSTORM OFFICE �O BVEG DRAINAGE Jj CORR : FLAG NOTES: �sce L__J 15CO c 215 >PROVIDE SIGN STATING'FIRE ALARM CONTROL PANEL"MOUNTED ON THE a OPEN OUTSIDE OF DOOR LEADING TO THE FIRE ALARM CONTROL PANEL LOCATION. 213 OFFlCE s ELECTRICAL CONTRACTOR TO PROVIDE 120VAC DEDICATED POWER,BREAKER c,sca III 225 Mfg Mfg CORR c LOCK-ON AND CIRCUIT BREAKER BRANCH IDENTIFICATION. s COPYRAAIL CORR 21 oil]s x --- — — CONP GONF. EL 3 FIELD LOCATE.COORDINATE WITH ELECTRICAL/MECHANICAL/FIRE PROTECTION/FIRE ALARM CONTRACTORS. CORK s DI TI >FIELD LOCATE RELAY MODULE FOR PADDLE FAN SHUTDOWN.COORDINATE _ram_ _ _ _ _ _��r _ _ WITH MECHANICAL CONTRACTOR. 227 STREET — AN o 8 o \ 201A sca O 231 a 20]A ME NG �MENE 203 STORAGE e H J� \ 236 CORR SCAOA STOR. WC CORR rc WAREHOUSE 201 u�i SMALL PPRTS r _ LUNCH ]sm MMq 208s ROOM i sz sz-sa , _s NIS s It ,sm ,sca 202 w\ ------SOURCE------ ------- ------- I I SUPPLY& I I C KRCHEN I sa M PUMPSTATIONS ] II — __ -- BOOM---_ ------ 6 C — o __ — —---- ---- D " _ ORR ,sca , 3 c s"ca -----------_ _-- _ ry�•,, 1 e HYDRANTS OF&METERS OL' Z Q / W J 4, 0 KITCHENETTE oco sca ® 210 v m LL OOC sew STOR , z r SBYEMV — — _ ROOM _ INI L — — r/ ILL!T— J rF I I L LL — — 0 ti W 245 ,sue Y y0 > coRR atf �Z LLB El M2d8 ss� sca an a c CON ERENCE M55 STIXL 0 OFFICE OFFICE O¢no3 Z 20] azc CORR ~ O\\ ]sca OOM r— Ir CORR 20.T W LL�Y U \ L L CONFERENCE cc �'/) EEI \ STREETS Q \ &VEG ,sca isce 24S U W O �R V ---- 2d2 2dd isCe 248 ,sce Y J PWWATER PWSIGNS& WELLNESS s 250 251] 252a 254 2 255 sism 82250 w OFFICE SOLID WASTE + OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE _---- ---------------- G DRAWN BY: 0.GARCIA B DESIGNED BY: STEVE SENDLAKOWSKI M.WADE DATF:03 31 24 NICET LEVEL III BNCXBWXD F4N FIpYOFD BY ENLARGED SECOND LEVEL B- FIRE ALARM PLAN CERT.#115442 EXP.01/01/2024 A DBNDMBfR:)433D-1 SCALE: 1/8"=1'0" N SxfTT Pro rW k Co"fidaNtial,C,pyright 2012 by Guardian S"cur fly Systems, Inc.All Ri his R"sarve0 FA-07 FIRE2024 2663 l 8 1 (7) j l (4) 3- ow4NERFPME DT WEGENDEDIQFOD WAGNER �1- --I__—a--__—_ —_I_—�-------------1_-->--------T—_ ZZ �. �— -----� A DESK,72x96,WI RETURN,TASK CHAIR B ROLLING CAB, ARCHITECTS 11 � JL B CORNER DESK,72008,WI TASK CHAIR 8 ROLLING CAB. P L A N N E R S -- —— ° _ _ _ _ _ ° 1P1E PLRF "ACE GENERALNarE _ _ _ _C CONFERENCE TABLE,3fix72,Wl2 CHAIRS -- sEArns wA pe1o1 I OVERHEAD EQUIPMENT NOT DESIGNATED III Z�I Z Z Z Z ZI {___} D TABLE,38x72,WI6 CHAIRS _ L —J E MICROWAVE NP.SEE REFLECTED NOT PLAN AND ��o��ia=ex• x.�+ I MEP DRAWING$FOR FURTHER Z I 2 `0 H MODULAR WORKSTATION B TASK CHAIR ,c' COORDINATION 4—� /2� J DESK,24.48,WI TASK CHAIR re[c1=TcreEO F�9 K DESK,2460 nRairtECT I Z F z 1 Y'4 C Fy�I�/✓ NO C p1 L TREADMILL 83x35 IjAi yER Z Z L z H Cl B M LATERAL FILE,3 DRAWER P CONF.TABLE,72.168,W/12 CHAIR$ c°^•"°^` r H AC WB48 0 CONF.TABLE,480,Wl4 CHAIRS I I F l II II l•G I I I I AR R PALLET RACK Ir --I I C� C II U EXAMINATIONTABLE S I_ 4� II X TABLE,72x72,WITH 12 CHAIRS I r _�4I IV H B II AS FABRICATION TABLE,96x144 L-------L __ AC SHOP DESK,30x60,Wl TASK CHAIR I =_ -- WE-08 AE DOC CART,48x72 — — — — — — — — — — —c _ Fyn — H am —— — WBkB AF TABLE 48'ROUND o I « AC L W W�I AG POWER/CABLE SWITCH o -AH MAGNET IC MAP,48Hx120W B6 AJ TABLE,36x72,W14 CHAIRS AND GROMMETS BE,Ir�I BE,IJ L L r e C AL DRYING RACK,18x4x24 I J _ L LI IL / L J L T AN INCUBATOR,12.6x14x16 I ❑ 1 / ❑ Ad IN F C, C p1 AP AUTOCLAVE,11x24x14 I 3 ---- /— 1 r— _ B AD VACUUM PUMP,6x8x17 IIS I ) / I / / _�r�n I _ AR MULTIFUNCTION PRIMER III I L�U BCL�—L J W _A9 WIDE FORMAT PLOTTER L AT BOOKSHELF,12x36 rST F- -----� 9E�� Al FORKLIFT,48x108 € T r,J — — --J — — — — — — — — — — — — _�._ AV FORKLIFT CHARGING STATION,2448 KEHOC AW TASKCHAIR _ eI, E F Warehouse 8 Office - BA ELLIPTICAL,80x28 a I ' WB96 AVC BB STAIR CLIMBER,5902 Building IN A BF BC RECUMBAM BIKE,65x23 12873E 248TH BT VC BD UPRIGHT BIKE.43x27 sF KENT,WA 1�I D D BE WEIGHT STATION,53x48,WI BENCH,54x30 A I / 'B_F,' BF ROLLING CABINET,16x20 98030 I 0 0 0 0 0 0 T A sP BG CONF.TABLE,72.120,W19 CHAIRS I — — — — L-- — A CONTRACTOR FURNISHED CONTRACTOR INSTALLED ICFCp CONSOLIDATED VC ar AD DOC TABLE,6046,SEE 1A4.4 SET o _ AK HOOD,42)Q427 0 I AX FREE-STANDING GLASS WASHER oo R20223 ' I — U Al WALK-IN COOLER a N MWCH 79,2@9NO110ET0 PROCEE;;G D I IL�j III WB WHITEBOARD,40H,WIOTH(WI VARIES 0fi.05.2024REVISI0N6 I II D IF D I� OWNER FURNISHED I CONTRACTOR INSTALLED(OFCI) IIII AK] B-m FJ FI II F REFRIGERATOR 2 F� r� �� G RANGFJOVEN F I V 4 POST RACK Z t— = S STORAGE PACK,VARIES I AL W 72 WB-96 WB-72 T SMALL TOOLS DRAWER,2406AO s.,c I W 2 POST RACK r ICE MAKER FURNITURE& D Ni AA WA CEAKBDRVER,EA30x32 EQUIPMENT PLAN, GROUND LEVEL'B' AY DISHWASHER I ° r AM DISTILLER,10x13x34 3 I N 75'MONITOR W _ OTHER EQUIPMENT IN CONTRACT �Z ' Z SEEMECHFLEC - o ae = e -- __ee� q B 0 ENLARGED FURNITURE PLAN NORTH GROUND LEVEL 1 A2.6 B 6 .,�4 NOTED SCALE IS BASED ON FULL SIZE DRAWINGS THAT ARE FORMATTED AT 22X3/ EQUIPMENT LEGEND WAGNER OWNER FURNISHED I OWNER INSTALLED(OFOp 1 A DESK,72x96,WI RETURN,TASK CHAIR&ROLLING CAB, ARCHITECTS B CORNER DESK,72008,WI TASK CHAIR&ROLLING CAB. P L A N H E R S C CONFERENCE TABLE,38x72,WI 2 CHAIRS 1p1p PLKF PLACE OVERHEADGEINERALNOTEEQUIPMENT SI lY TTl"L WA "I'll TLC- ATE D TABLE,36x72,WI6 CHAIRS A A C •o� c s i•2 i 2^ OVERHEAD EQUIPMENTNOT ING PLAN AND pppp B� /OB I NP.SEER FLECTED CEILING PLAN AND �p ,Y'0 �066 !"A d't 0 yp ® � E MICROWAVE •' ' ""'�^ MEP DRAWINGS FOR FURTHER T Tom'Ny y,4/ `�' 3 C C 3 CFH HOB? H b'x' B _ H MODUL4R WORKSTATION&TASK CHAIR COORDINATION SIFTK K BF BF K K BF T[reco M M AT Wade J DESK,24x48,WI TASK CHAIR AW AW L AW AW WB-0B N q�OECT _ _ BF BF HQ --- K DESK,21,11 g^� L TREADMILL 1101 �N� BF AW _J J AW BF ' AW J J AW O H IR -�F BFBF r--, BF BF _ BF 9F Q M LATERALFILE,3DRAWER AW -J-T BF AW BF AW J J AW - 2H* Oq M erl ell q °�G Y H LAR J Q QDNF,TABLE,480,W14 CHAIRS F®IAW C'J J 3 AW C BF BF 3 AW CJ J Z BFBF BF "-"BF AW BF $ o TVQ Z t��q� R PALLET RACK I B_F KLAW AW K F _F AW J J�, AW SF BF AW J J AW `- 1 3 BG Z Z H HO H- U EXAMINATION TABLE ' TV _ N BF T1 Z N X TABLE,72x72,WITH 12 CHAIRS AW BF BF AW F_ F I W548 WB4B L F Wg48 WBdB T —T— — — WB-96 WB-72 LZJ ___ AB FABRICATION TABLE,96x144 BF J J J,� — — --- AC SHOP DESK,30.60.WI TASK CHAIR BFAW BF J J J AE DOC CART,48.72 BF AF TABLE48"ROUND o I BF AW 0BF0 OBF �F WB-96 ©I F 1 WB-0B WB-08 i_�rY, N_ D�11 ,� D�11 AG POWERICABLE SWITCH o AW ® l�L�-��'1,1+ l�L�- -J1+ AH MAGNETIC MAP,48Hx120W BF AW J',;J J L _ -I EFF L- J[]J JAW AW AWC BFAWAWEBF AJ TABLE,36x72,WI 4 CHAIRS AND GROMMETS BF BF � _ ,_ AL DRYING RACK,18x4x24 WB-0ONWBdB 1F F, AW AW�'I6F BF AW AW BFAJ ,�I-,, ,�I�, AN INCUBATOR,12.5x14.16 SyS S F BF -1 L_ IN „T 1-„ „T 1-„ qp AUTOCLAVE,BF AWAW BF U-LIy iLlI�l SI - AJ AJ F AQ VACUUM PUMP,6x8x11 AW AW L L� o r'- F � - _ i� BF K K BF AR MULTIFUNCTION PRINTER WB- AS WIDE FORMAT PLOTTER I- —————————————————— ———— T T — —— _�� ___ ___ UJ� Uf� CL—pEL—p -- — -- -- --- I AT BOOKSHELF,72x36 K€WT T ST ST ST ST S �� B II AU FORKUFT48x108 %BFI I BF BF BF: I BF: Bd8AV FORKLIFT CHARGING STATION,24x48HOC --- — BFAi 1 Kp/BF WB AW TASKCHAIRKEse&AW W , AW --- AW I- AW_m - ---- - A --- --- - -�V- - - --- --- --- Warehouse80frice Al K AW AW AW AW __ _ _ -- - Building a � I- NI J BA ELLIPTICAL,BOx28 BF BF T1I M,u AW '�I — F BE STAIR CLIMBER,59x32 w I AT F F F —Z BF AW AW B_F AD AW BC RECUMBAM BIKE,65x23 12607 SE 248TH ST AT BF BF IN IN AW AW� N rri_ Fn rri _Fn BD UPRIGHT BIKE,41,21 l'L��O Lkjl' 1L��0 Lkll' BE WEIGHT STATION,53x48,WI BENCH,54x30 KENT,WA -1 AW - BF AW BF;_-_:BF AW I BF 1 AJ AJ AW 98080 c�.1I K AW AW AW A - -' J J `- BF ROLLING CABINET,i8x20 EI F— B BF AW J J AWE BF 11N AE AF NII BG CONF.TABLE,72.120,W19 CHAIR$ BFL��BF� �BFL�� LF -f AW BF'' 'BF `- AS D D CONTRACTOR FURNISHED I CONTRACTOR INSTALLED ICFCI) CONSOLIDATED BF WB-48 N WBd8 LF - ( BF Bd8 N W. FI LYJ —N— ❑ WB-96 WB-96 AD DOC TABLE,60x96,SEE 1AA.4 SET AW _ — o - BF BF — AK HOOD,42)Q427 0 BF 3 AW Ij I j I J'L AX FREE-STANDING GLASS WASHER "1 No. 20 23 BF AWBF BF ___ _—_—_— AZ WALK-IN COOLER MARCH 79,ID29NO110ETO PROCEED - BF`- F M48 TV W13 - F WB-08 N WB — WBdB WB-72 - WB WHITEBOARD,40H,WIDTH(WI VARIES BF 1 BF AW AW F AWBF , AW"LLOS OWNER FURNISHED I CONTRACTOR INSTALLED IOFCI) BF BFJ j J J[ AW LF F0AW CJ J3 pVy BF BF' qW J J AW BF 0 F REFRIGERATOR BFAWJ I'�J J�� BF_ _-BF -� BF - BF -� P N — CG RANGFJOVEN BF AW BF BF AW OF F�(=QAW �'J-J�' �`_ BF AW J J AWV fiF _ V 4POST RACK pW AW F F�W CJJ3' LBF JJ VARIES BF K K - - BF;_ _-BF CI BF - AW BF-_- BF AWE 9F T SMALL TOOLS DRAWER,24x36 AW 3 IL r� FJ�AW �J..J. F �J.J� BF W 2POST RACK FURNITURE& 3 q q 3 F AW AWCBF AW AW Y ICE MAKER EQUIPMENT PLAN, AW r- AW W �� 1)1) AA WASHER&DRYER,EA 30x32 K K BF BF K AlK BF C q q C C q C C C Al DISHWASHER SECONDLEVEL'B' ,,//pp ,,pppp m5 m3 B�pB S`J/_� �_ B LA BN �e 10 � C � N 775,MONIAM TORx13x34 OTHER EQUIPMENT INCONTRACT Z 1 2 SEE MECH.rELEC 0 ENLARGED FURNITURE PLAN NORTH SECOND LEVEL A B 1 A2.7 B .oax o 0 0 o NOTED SCALE IS BASED ON FULL SIZE DRAWINGS THAT ARE FORMATTED AT 22XU FAC23-09C-KEHOC Warehouse and Office Building - C06 Signature Pages Final Audit Report 2024-09-27 Created: 2024-09-26 By: Leah Bryant(Ibryant@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAARJtu6aMJaBigFscAfzg3XOXa5kGvdsW_ "FAC23-09C-KEHOC Warehouse and Office Building - C06 Si gnature Pages" History Document created by Leah Bryant(Ibryant@kentwa.gov) 2024-09-26-10:52:44 PM GMT Document emailed to nharper@kentwa.gov for signature 2024-09-26-10:53:39 PM GMT Email viewed by nharper@kentwa.gov 2024-09-27-3:59:33 PM GMT Signer nharper@kentwa.gov entered name at signing as Nathen C. Harper 2024-09-27-4:01:07 PM GMT Document e-signed by Nathen C. Harper(nharper@kentwa.gov) Signature Date:2024-09-27-4:01:09 PM GMT-Time Source:server Document emailed to steveg@bayley.net for signature 2024-09-27-4:01:11 PM GMT Email viewed by steveg@bayley.net 2024-09-27-4:58:06 PM GMT Signer steveg@bayley.net entered name at signing as Stephen Grasso 2024-09-27-4:58:37 PM GMT Document e-signed by Stephen Grasso (steveg@bayley.net) Signature Date:2024-09-27-4:58:39 PM GMT-Time Source:server Agreement completed. 2024-09-27-4:58:39 PM GMT Powered by Adobe EHT Acrobat Sign Signature: �'� Signature: �YlGtn L2V21'1GlGtGl21? Kent Parks(Oct 1,202412:22 PDT) Brian Levenhagen(Oct 1,2024 1 :45 PDT) Email: parkscontracts@kentwa.gov Email: bjlevenhagen@kentwa.gov