Loading...
HomeMy WebLinkAboutCAG2024-166 - Change Order - #8 - Boyce Construction, Inc - FACV23-31 City of Kent Commons Renovations - 10/01/24 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: - lf Agreement Routing Form Dir.Assist: �L • For Approvals,Signatures and Records Management Dir/Dep Dir: EL KENT B` This form combines&replaces the Request for Mayor's Signature and Contract Cover WASHINGTON Sheet forms. Originator: Department: Leah Bryant for Nate Harper Parks, Recreation & Community Services Date Sent: Date Required: c 09/26/2024 9/30/2024 CL Authorized to Sign: Date of Council Approval: CL Q QDirector or Designee 2/20/2024 Budqet Account Number: GrantTles ZNo F20099.64190.9473 Budget?[Z]YesEl No Type: N/A Vendor Name: Category: Boyce Construction, Inc Contract Vendor Number: Sub-Category: 2548106 Change Order 0 Project Name: FAC23- 31 City of Kent Commons Renovations E i Project Details:The following changes are necessary in the change order: CE 011 - Power revisions; CE 012-Water valve replacement in Room 121; CE 013- Exhaust duct in Storage 105; CE 014R- Revised smooth duct for dryer duct; C CE 015- Ductwork revisions; CE 016-Spiral ductwork in Room 123; CE 017-CMU demolition in Rooms 102 and 106; CE 018-Tempered water lines; and CE 019-Wall faucet replacement,as outlined in Exhibit A attached. C GJ E Agreement Amount: $56,484.66 Basis for Selection of Contractor: Bid *Memo to Mayor must be attached Start Date: March 2024 Termination Date: 5/13/2025 Im Q Local Business?F--]YeSFv(-]No* If meets requirements per KCC3.70.700,pleose complete'Vendor Purchase-Locol Exceptions"form onCityspoce. Business License Verification:YesElln-ProcessElExempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: ElYesQNo CAG2024-166 Comments: Change order 8 _ 0 a� H •� i N 3 f0 C Vf Date Routed to the City Clerk's Office: Oct 1,2024 adccW22313_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 • KENT W A s H i N G T o N CHANGE ORDER NO. #8 NAME OF CONTRACTOR: Boyce Construction Inc ("Contractor") CONTRACT NAME & PROJECT NUMBER: FAC23- 31 City of Kent Commons Renovations ORIGINAL CONTRACT DATE: 4/3/2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: The following changes are necessary in the change order: CE 011 - Power revisions; CE 012 - Water valve replacement in Room 121; CE 013 - Exhaust duct in Storage 105; CE 014R - Revised smooth duct for dryer duct; CE 015 - Ductwork revisions; CE 016 - Spiral ductwork in Room 123; CE 017 - CMU demolition in Rooms 102 and 106; CE 018 - Tempered water lines; and CE 019 - Wall faucet replacement 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,502,831.99 (including applicable alternates and WSST) Net Change by Previous Change Orders $76,691.28 (incl. applicable WSST) Current Contract Amount $1,582,523,28 (incl. Previous Change Orders) Current Change Order $51,256.50 Applicable WSST Tax on this Change $5,228.16 Order Revised Contract Sum $1,639,007.94 CHANGE ORDER - 1 OF 3 Original Time for Completion 12/31/2024 (insert date) Revised Time for Completion under 4/30/202S prior Change Orders (insert date) Days Required (f) for this Change Order 13 calendar days Revised Time for Completion 5/13/2024 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: 1Z i ISM"-AA By:PoberlB—CH(Sep 26,202413:59 PDT) By:Juli arasmndola(Oct 1,202416:05 PDT) Print Name:Robert Bowe[[ Print Name: Julie Parascondola Its President Its: Director-Parks DATE: Sep 26,2024 DATE: Oct 1,2024 CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 Exhibit A BOYCE Monday,July 29,2024 =C0NS'PRU T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 11 Nate Harper RFP# 11 City of Kent Scope of Work: Power Revisions Power revisions per attached marked up drawings. Boyce Construction Scope Hours Rate Cost Project Manager 2 $98.00 $196.00 Project Engineer 0 $75.00 $0.00 Supervision 2 $95.00 $190.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $386.00 Sub-Contractor Costs(Lump Sum) Electrical $18,837.92 Sub-Total $20,931.02 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $21,317.02 Overhead $1,065.85 Fee $895.31 Insurance,B&O Taxes $465.56 Sub-Total $23,743.75 WSST(10.2%) $2,421.86 Total adjustment to contract $26,165.61 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: 1 week Approved: Date: Northern outlet conduit needs I B re-routing. l 1 2 0 Existing route comes through new `T sub-floor,not along wall. Leave outlets at current height and o-- BURGESS DESIG Iti rework supply conduit to work with new layout. I I ' I ' I � I � I � I mmnlo Tenant: KENT COMMONS RENOVATIONS CITY OF KENT,WA I 525 4th AVE N Le end KENT,WA 9W32 3 - New Dedicated Power o-- ' III ' ll II 10 - New Standard Duty Power I I 2 - Revise Existing Power/Switch o-- 5 - New Data o-- — 4 I—WIRemi- Dale REVIEW SET 05.30.23 PRICING SET W.01.23 LEVEL 2 DEMOLITIONN PLAN PERMIT SET W.21.23 Boyce Markups in Blue 7/1/24 118=,A. BID 12.2.23 BID SET 12.2].23 City Of Kent Comments 7/22/24 FLOOR DEMOLITION SYMBOLS KEYED FLOOR DEMOLITION SHEET NOTES IrvTgIN rvaiw comanci,Micl wexa.ev.*o�m. GENERAL FLOOR DEMOLITION NOTES TO EORwaTa ROE.00ry �O sOO rvarvn O T,wRrvO, .>uTREw.. OrveTOrvTOPREP EFORREwFOO"ElOR R1-1OOK INIROO S—T.- SECOND FLOOR REMT .OROTRERw�E rvOOATEO rv.RE rv11 RTFORMOaROROO SMEDASROTIry DEMOLITION PLAN w. AD 102 1 2 T T T T . T . T A c rvpa�/O oa Fe0lPoxNI ©pO c26 L BURGESS DESIGN �,EN3L�ppN o s o` o` o G e GB 0 ® 0 C ®s Roeloocale swRCM1es �`� 1 IHer sitle of o" tloer a°erwmlY T6a6m 3�E OE ;�;eor6�e_ 26 KENT COMMONS RENOVATIONS CITY OF KENT,WA ®6 cvOcs 52541H AVEN KENT,WA W32 CDsOE rOn IV SDZt PD21 OP17. OF6 E ® I o c GF-, IQ�a �N M P ' OF-- OF- ® E F W2 1 G EiD ® c T o $G c G16 16 G 6 `__ �__—__ �aQC136TL3Q'F' RI I LG-2 OxprtFo1 LG2 LG-2 ® LG-2 G-1-77 m OF-1]c OF-1h (l!lRO­ RI ELECTRICAL LIGHTING PLAN GENERAL NOTES EXISTING PANEL G EXISTING PANEL LG 1. RC2 CONTROLSZONES A B B.RCI CONTROLS ZONE C. EXISTING LIGHTING LOAD: NEW LIGHTING LOAD: EXISTING LIGHTING LOAD: PLAN NOTES x = x = xB6w=7- ILI- OCO FIELD VERIFY = G_25 FUTURES x 31W=I_ TOTAL FIIX-RVS Me.mTsmmpwsem LOCATION=VOLTAGE PRIOR TO ANY WORK. G]:6FIXTURES rc80W=4— G-14:1,FIXTURES.31W=341W O EXTEND EXISTING RACQUET BALL COURT LIGHT SWITCH WIRING G12: x x . =,56.4W TO NEW LOCATION,PROVIDE PILOT LIGHT STYLE SWITCHES. x - x 11- UR Ge: FIXTURES e0W-240W G_3FIXTURES ]e ZW=23] G25FI—RESrc114W=92WW O C NO.IT NGARIEA LIGHTING CONTROL TEO INTO THE G=4:6 FI%TURESx120W=]20W G10:3FIMURESx 33W=99W LGd:d FIXTURES x,SAW=1.6W O SWITCH CONTROLS EXISTING FIXTURES IN SPACE. G15:6 FIXTURES.]OW=420W G-26:]FIXTURESM1aW,=90WW OT2E xSIDW=124W TOTAL G=9:3 FIXTURES.—=360W -00'W m�N G.D. ^°I°°'w°'MO G25:,5FI%TURESx40W=600W ` = ELECTRICAL LIGHTING PLAN G30:6 FIXTURES.50W=30M TOTAL=6,560W E2.0 n 59 2 3 4 5 6 84"from left""and RO"AFF T ♦) Please provide height and location PLAN NOTES A o ,�PR MOUNTED RECEPTACLE AND DATA.GTLE o ORECONNECTT NEW RECEPTACLE TO EXISTING CIRCUIT.FIELD VERIFY CIRCUIT AND LOCATION. 2 o O6o0N 6 w B O WITH MECHANICAL CONTRACTOR PRIOR TON 14 MV ROUGH IN, BURGESS DESIGN -lV 14 O P R isa robry rimer switch for EasO N coxOcE -.TREOUSRCIALE"EMENFSSENSORS There the Diherfan outlets tD match. OF-1 PRIOR TO ROUGHI INTE E PI de sFt 20A nondedicatedai O REINSTALL FIRE ALARM DEVICE,CONNECT TO Please confirm existing oF3s sameheightaspihem EXISTING FIRE CABLING. switch to match ants 8F3 LOCATEDA DA OPERATOR EXTEND coNDUIT ` 2dadicated zoA centered between oFt °0� Please provide 0 ntvD coNoucTORS TO THIS LocnnoN. tloors a[same AFFasotM1ersmsame F11 power requirements ❑ COORDINATowNERTPRIORFPUSH B TO UTTONS WITH OF-3a cIRO hallway. 8F:3 ARCHITECOFSS a PRO%IMATE LOCATION OF DATA RACK ALL OL y O DATA CABLING SHOWN ON PLANS TO RE ALL TO THIS LOCATION. o�ile�aid 2 DATA a. '© Does this outlet R Tenam: D standard heightnFF need to remain? 0 s°M, KENT COMMONS RENOVATIONS 0 Conduit comes CORE DRIVING AND SUPPORTS AS NECESSARY CI OF KENT,WA FOR INSTALLATION.REFER TOONE-LINE DIAGRAM CITY OF AVE IN OF: from under slab ON SHEET ESDFORADDITIONA INFORMATION. 525 KENT,WA W32 II.,m. woO6a QF-2 OFOF70 O CEILING FAN.C CEILING OORDINATEGEXACT lTA`RECEPTACLE LOCATION WITH ARCHITECT AND OWNER PRIOR IF F. �F- F TO ROUGH IN. yF-6, oF-0 D 3 4 5 ° E o_EW EILING DF- MDDNTE DWE DREDEPTAGLETDPR F Plea confirm locations O Ex UT RECEPTAND CLE EXTEND 1 Need�powerand DATAto Ns(4) NECTINGC. TORS AS wtll n d 4 DATAjacks.Need D, r Ill._ d,iftlmounting for.untin the O RE INSTALL RECEPTACLEEXTEND EXISTING suits will mndownm Ming hardware to N's CONDUIT AND CONDUCTORS AS NECESSARY. u . D T 10 o PROMDECONNE TIONTONEW WALLHEATER xoITOFcoN PARE ExTEND EXISTING CONDUIT AND CONDUCTORS d OF-31 A6 NECESSARY. cl6 z OF-24 op Please confirm scope for all y,R�set iw existing outlets along this wall 1 believe this is already done but only the Please provide eXrewg in wau nanet remalne and all aorta e power requirements eDnt gaaa away. 1-3 and location Please verify power 2onm helghup nondedIlatedaNdets'ftom Please confirm height and Please provide requirements and install e—nda maim distance away from nearest wall heights and locations design into casework Theca two are already in the bid pricing so please ba Please provide height ore they are not an added cost.(except new switch) First set Is 14'fiom left comer.second Floor receptacle approx.5'tlown .centered on new wall,wall mounted ootle'2h down set is 22'from left wmer.both 80"AFF. from top of mmp and set back 12" and location from ceiling witM1 rotary timer switcM1 below at regular from etlge of ramp. switch height k10 wall mounted outlet aft from ceiling, 1F 8"from le corner and 80"AFF 1ft from right corner. ❑ W am ELECTRICAL POWER AND DATA PLAN g ELECTRICAL POWER AND DATA PLAN . E3.0 D' as SYSTEM SOLUTIONS OF WASH INGTO r �� PO B ax �� INA�aH I NGY�N LYNNur�oo,WA fr OFFICE; 425.�249, LL_ECTQ+CAt r_OWFRACTLgf Providing 10% D i s c o u n tYSTEM U O NSW COP Subcontractor Breakdown Summary PROJECT NAME: Kent Commons SSW COP No. 6 Architects Tracking number: Project No: Date: 7/2/24 Company Name: System Solutions of Washington Inc. Rev: Revised: DESCRIPTION: Per RFI#6 SSW has been requested to provide cost to add outlets in 17 locations, and extend 4 switch locations in addition to 4 phone data outlets.This also includes demo and rerouting power for upstairs outlet that need to be moved in order to put flooring down. EXCLUSIONS: Standard contract exclusions,CUT,PATCH,PAINT HRS RATE 1. CRAFT LABOR COSTS a. Electrician 48.0 125.00 $ 6,000.00 b. Lead electrician 48.0 135.00 $ 6,480.00 c. Electrician OT 0.0 187.5 $ - d. Lead Electrician OT 0.0 202.5 $ - e. PM 1.0 135.00 $ 135.00 f. site survey 1.0 135.00 $ 135.00 DIRECT LABOR SUBTOTAL $ 12,750.00 Direct costs g.truck 0 8.37 $ - h.travel(if applicable,itemize and provide backup) $ 1.CRAFT LABOR COSTS: $ 12,750.00 2. MATERIALS COSTS a. material costs $ 3,722.91 b.Airfreight c. Quoted materials $ - d. Quoted materials $ - 2.MATERIAL COSTS: $ 3,722.91 3. EQUIPMENT COSTS a. owned equipment small tool $ 150.00 b. rental equipment Lift $ - 3.EQUIPMENT COSTS: $ 150.00 4. INSURANCE a. Insurance $ 4.INSURANCE: $ - 5. PERMIT $ 5.PERMIT: $ 6. FEE LABOR 15% 6.FEE $ 1,912.50 FEE MATERIALS 15% $ 558.44 FEE EQUIPMENT 15% $ 22.50 FEE INSURANCE&PERMIT $ Sub Total w/fee $ 19,116.35 7. SUB-SUBCONTRACTORS a. ITG $ 1,309.00 7. SUB-SUBCONTRACTORS: $ 1,309.00 8. FEE on Subcontractor 15% 8.FEE on Subcontractor $ 196.35 9. Subtotal Sub 10% discount ($2,093.10) applied 9.Sub contractor w/fee $ 1,505.35 10.Sub TOTAL per final City of Kent Markups 10.Sub TOTAL $ 20,621.70 11. B&O 7/22/24 a. 1.5% 11. B&O $ 309.33 12.TOTAL 12.TOTAL $ �9 934.93- 13.Time impact because of change of scope as noted above $1 8,837■92 Please add days to contract 1.0 DAYS ��YY Description Quantity Trade Price Unit Disc% Net Cost DB Labor Labor Unit Total Material Total Hours 1 3/4"CONDUIT-EMT 90 394.48C 35 256.41 4 4C 230.77 3.6 21" CONDUIT-EMT 40 657.23 C 35 427.2 5.06 5.06 C 170.88 2.02 3 3/4"CONN SSSTL-EMT 10 395.09C 20 316.07 12.5 12.5C 31.61 1.25 41" CONNSSSTL-EMT 8 650.92C 20 520.74 15 15C 41.66 1.2 5 3/4"COUPLING SS STL-EMT 7 464.31 C 20 371.45 5 5 C 26 0.35 61" COUPLINGSSSTL-EMT 4 692.5C 20 554 6.25 6.25C 22.16 0.25 7 3/4"1-H STRAP-EMT-STEEL 12 89.06 C 20 71.25 6.75 6.75 C 8.55 0.81 8 1/2 OR 3/4"CONDUIT SNAP CLOSE CLIP W/1/4-20 THRD HOLE 3 89.15 C 10 80.24 7.13 7.13 C 2.41 0.21 91" SNAP CLOSE CLIP-SIDEMNTTO MTL STUD SUPPORT 8 362.93C 10 326.64 9.88 9.88C 26.13 0.79 10 1/2 OR 3/4"CONDUIT+BOX SUPPORT W/9/32"MNTG HOLE 1 796.04C 10 716.44 9.75 9.75C 7.16 0.1 11 1/2"FLEX-ALUMINUM 10 147.32 C 20 117.86 3.75 3.75 C 11.79 0.38 12 1/2"CONN FLEX DC SQUEEZE STRAIGHT 1 211.67 C 20 169.34 12.5 12.5 C 1.69 0.13 13#12THHN BLACK 337 1,630.32 M 30 1,141.22 6.44 6.44 M 384.59 2.17 14#12THHN GREEN 68 1,630.32 M 30 1,141.22 6.44 6.44 M 77.6 0.44 15#12/2C SOLID CABLE MC-STLARMOR 852 1,310.40M 30 917.28 21.75 21.75M 781.52 18.53 16 3/8"CONN SADDLEGRIP DC FOR FLEX/AC-90/MC 44 148.68 C 20 118.94 7.5 7.5 C 52.33 3.3 17 1-H STRAP#14/2&#12/2 68 57.82 C 20 46.26 5.75 5.75 C 31.46 3.91 18 1-H CABLE STRAP 3 0 C 0 0 2.5 2.5 C 0 0.07 19 3/8"CABLE SUPPORT FOR ROD OR FLNG 78 86.25 C 10 77.63 4.75 4.75 C 60.55 3.71 20 WIRE CONN RED 57 27.29 C 20 21.83 7.5 7.5 C 12.44 4.28 21 DEV BOX 21/2"DEEP 1/2"KO W/FLAT BRKT 17 3,977.92 C 50 1,988.96 27.5 27.5 C 338.12 4.67 22 4x 1 1/2"SQ BOX COMB KO 30 2,694.84 C 50 1,347.42 28.75 28.75 C 134.74 2.88 23 4x 1 1/2"SQ BOX COMB KO W/FLUSH MTL STUD BRKT 4 3,596.69 C 50 1,798.35 28.75 28.75 C 71.93 1.15 24 4"SQ 1G PLSTR RING 5/8"RISE 8 1,720.06 C 50 860.03 3.13 3.13 C 68.8 0.25 25 4"SQ BLANK COVER 6 1,002.15 C 50 501.08 3.13 3.13 C 30.06 0.19 26 17/8"DEEP HANDY BOX 1/2"KO 1 2,312.63 C 50 1,156.32 27.5 27.5 C 11.56 0.28 27 HANDY BOX TGLSW COVER 1 865.99 C 50 433 3.13 3.13 C 4.33 0.03 28 GROUND SCREWW/INSUL#12 LEAD 21 923.78C 20 739.02 3.75 3.75C 155.19 0.79 29 1/4-20 MACHINE SCREW ANCHOR 4 52.21 C 20 41.77 10 30 C 1.67 0.4 30 1/4"THREADED ROD-PLTD 13 131.51 C 20 105.21 3.13 3.13 C 13.68 0.41 31 1/4-20 HEX NUT-PLTD STL 5 4.38 C 20 3.5 2.5 2.5 C 0.17 0.13 32#8x 3/4 P/H SELF-TAP SCREW 102 18.07 C 20 14.46 3.25 3.25 C 14.75 3.31 33#8x 1 P/H SELF-TAP SCREW 5 19.32 C 20 15.46 3.5 3.5 C 0.77 0.17 34#10x 1 P/H SELF-TAP SCREW 20 25.44 C 20 20.35 3.75 3.75 C 4.07 0.75 35#8x 1/2 WAFER HEAD SELF-TAP STUD SCREW-12G 2 8.3 C 20 6.64 3 3 C 0.13 0.06 36 SUPPORT HANGER FOR 1/4"ROD OR FLNG 5 89.29 C 10 80.36 6.25 6.25 C 4.02 0.31 37#8x 1/2 WAFER HEAD SHEET MTL SCREW 16 10.76 C 30 9.68 1.88 1.88 C 1.55 0.3 38 DROP WIRE TO T-BAR SECURING CLIP 83 230.73C 10 207.66 6.25 6.25C 172.36 5.19 39 CEILING CLIP W/27mm STD NAIL-STL/CONC 83 0 C 0 0 11.25 11.25 C 0 9.34 40#3 BOOSTER 0.27 CALIBER-SHORT 10x MAG 83 0 C 0 0 0 0 C 0 0 41#12 CEILING WIRE 248 0 C 0 0 2.5 2.5 C 0 6.2 421GTGL SWITCH PLATE-PLASTIC IVY 4 88.45C 20 70.76 3.75 3.75C 2.83 0.15 43 1G DECORATOR PLATE-PLASTIC IVY 17 184.05 C 20 147.24 3.75 3.75 C 25.03 0.64 44 20A 120-277V S/P SW-TOGGLE IVY(SG) 4 3,080.00 C 20 2,464.00 17.5 17.5 C 98.56 0.7 45 15A 120V S/P SW-TOGGLE IVY(GP)L/GRID 1 193 C 20 154.4 15 15 C 1.54 0.15 46 20A125VDUPREC-GFCI IVY W/AUDIBLE ALARM 17 4,307.00C 20 3,445.60 31.25 31.25C 585.75 5.31 47#12/2C+GRD MOTOR TERM 1 0 E 0 0 0.61 0.61 E 0 0.61 48 Demo 1 0 E 0 0 0 4 E 0 4 3722.91 95.87 �r Inte rated Technolo ies Group Change Order: 5201 - 1 / Date: 6/17/2024 Project Number: 24023 Customer The Integrated Technologies Group System Solutions PO Box 1267 PO Box 5308 Bothell, WA Lynnwood, WA 98041, US 98046 206.235.8580 Amber Campbell Prepared By: 425.249.2076 Keagan Shatos AmberC@systemsolutionswa.com 2063592101 keagan.shatos@theitgroup-inc.com Project: Kent Commons Renovations Scope of Work Telecom outlet revisions as outlined in drawings recieved 6/17/24. • (4) work area outlets consisting of(2) Category 6 rated UTP cables terminated to modular information outlets and installed in a single gang faceplate COP-1 Quantity J-HOOK 2" 13 ea J-HOOK 2"ASSEMBLY 5 ea 2-PORT CAT 6 WALL DROP PC CLARITY 4 ea CABLE, CAT 6 CMP 1,000 ft Notes Summary Contract Adjustment $1,309 Accepted By Date $1 ,309 .................................................... ............................. BOVCE Monday,August 19,2024 CONSTRUCTION= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 18 Nate Harper RFP# 18 City of Kent Scope of Work: Tempered Water Lines 1/2"Tempered water to be supplied to water heaters WH-6 and WH-7 Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Holmberg Mechanical $1,204.00 Sub-Total $1,204.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $1,204.00 Overhead $60.20 Fee $50.57 Insurance,B&O Taxes $26.30 Sub-Total $1,341.06 WSST(10.2%) $136.79 Total adjustment to contract $1,477.85 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: Approved: Date: 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORING MXRESS Date: 8/14/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 008 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Holmberg RFI #18- Electric Tankless Water Heaters Please accept our proposal in the amount of $ 1,204.00 for the additional costs associated with this change. This proposal is based on the requirements described in Holmberg RFI #18 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager 4 khe - MECHAAI C AL 9UMM6 S9S M ENSURING AW6RESS Date: 8/14/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 008 Scope of Work of the Change Proposal Description: Run tempered water for water heaters (WH-6&WH-7) Inclusions: Install tempered water lines for water heaters WH-6&WH-7. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 008 12001 SE 9th Place Date Submitted: 8/14/2024 Bellevue,WA 98005 Subject: Holmberg RFI#18-Electric Tankless Water Heaters Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 4.0 $ 595.42 $ 150.00 $ 745.42 Equipment(See Detail Sheet) 0.0 $ - $ - $ - Tools&Rentals(See Detail Sheet) 0 $ - $ 23.82 $ 23.82 Direct Subtotals 4.0 $ _ 595.42 $__ 173.82 $_ _ 769.24 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 0.5 $ - $ - Warranty(Direct Labor only) $ 595 2.00% $ 11.91 Direct Costs Subtotal $ _ 11.91 Admin Labor Labor Hours I Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 1,024 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ - Balancing TAB $ - SubcontroctorSubtotal $ - Total(Labor, Material,Admin,Subcontractors): $ 1,024 Markups Percentage Cost Liability Insurance 1.30% $ 13.31 Subcontractor Markup 5.00% $ - Overhead 10.00% $ 102.36 Profit 5.00% $ 56.30 B&O 0.68% $ 8.16 Use Tax 0.00% $ - Markups Subtotal $ 180.13 TOTAL CHANGE PROPOSAL $ 1,204.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 008 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Installation and materials. 1.0 $ $ 150.00 4.0 A $ 148.86 30% $ 595.42 $ $ - $ - 30% $ - $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing $ 148.86 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal $ 140.75 $ Delivery Driver/Warehouse $ 105.10 $ $150.00 4.0 $595.42 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 008 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 23.82 $23.82 $0.00 BOYCE Monday,August 19,2024 CONSTRUCTION= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 19 Nate Harper RFP# 19 City of Kent Scope of Work: Wall Faucet/Hose Bibs Remove hose bibbs and use same tempered line to install new hose bibbs at the location marked on the attached sheet. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Holmberg Mechanical $5,670.00 Sub-Total $5,670.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $5,670.00 Overhead $283.50 Fee $238.14 Insurance,B&O Taxes $123.83 Sub-Total $6,315.47 WSST(10.2%) $644.18 Total adjustment to contract $6,959.65 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: Approved: Date: MECHANI C AL EOLOM S*T M5.ERSUMAU PROGRESS Date: 8/19/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 009 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Boyce RFI #38- Existing Hose Bibs in Rooms 103 and 104 Please accept our proposal in the amount of $ 5,670.00 for the additional costs associated with this change. This proposal is based on the requirements described in Boyce RFI #38 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager MECHANI C AL MLONG SYSUN5..FNSGRwa AMRM Date: 8/19/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 009 Scope of Work of the Change Proposal Description: Remove hose bibbs and use same tempered line to install new hose bibbs at the location marked on the attached sheet. Inclusions: Installation of hose bibbs, extension of tempered line, and new(2) hose bibbs. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 009 12001 SE 9th Place Date Submitted: 8/19/2024 Bellevue,WA 98005 Subject: Boyce RFI#38-Existing Hose Bibs in Rooms 103 and 104 1 Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 26.0 $ 3,782.74 $ 569.10 $ 4,351.84 Equipment(See Detail Sheet) 0.0 $ - $ - $ - Tools&Rentals(See Detail Sheet) 0 $ - $ 151.31 $ 151.31 Direct Subtotals 26.0 $__ __ 3,782.74 $__ 720.41 $ ___ 4,503.15 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 3.3 $ - $ - Warranty(Direct Labor only) $ 3,783 2.00% $ 75.65 Direct Costs Subtotal $ 75.65 Admin Labor Labor Hours I Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 4,821 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ - Balancing TAB $ - SubcontroctorSubtotal $ - Total(Labor, Material,Admin,Subcontractors): $ 4,821 Markups Percentage Cost Liability Insurance 1.30% $ 62.68 Subcontractor Markup 5.00% $ - Overhead 10.00% $ 482.13 Profit 5.00% $ 265.17 B&O 0.68% $ 38.44 Use Tax 0.00% $ - Markups Subtotal $ 848.42 TOTAL CHANGE PROPOSAL $ 5,670.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 009 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Installation and testing. $ - $ - 24.0 A $ 148.86 30% $ 3,572.54 Materials(see quote). 1.0 $ 569.10 $ 569.10 $ - 30% $ - $ - $ - - $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing $ 148.86 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal - $ 140.75 $ Delivery Driver/Warehouse 2.0 $ 105.10 $ 210.20 $569.10 26.0 $3,782.74 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 009 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 151.31 $151.31 $0.00 X') Job Name rs � AWinsopplyCompany 4354 Kent Commons RFI 38 Hose Bibb 13500 NE 124TH ST KIRKLAND, WA 98034-8010 Quote No. Date Page PHONE (425) 821-8494 FAX (425) 821-9101 0005616 8112124 1 Expiration Date 9111124 Revised Date 8112124 Quoted' Ta Customer Bid Due Date 8/12/24 HOLMBERG CO MECH CONTRACTORS 12001 SE 9TH PL STE 300 BELLEVUE, WA 98005-3656 Quot9a ??' Phone (425) 822-2233 Nickolas Godin Fax (425) 827-5735 nickolas.godin@rosenplumbing.com (253) 682-5922 Customer Payment Terms Quoted To Salesperson FOB 003510 2% 10TH, NET 25TH Nickolas Godin ROSEN SUPPLY S Unit ExtenTe7 Line Qty. D e s c r i ,p t i o n Price UOM Price 1.0 2 24P1/2-BR 1/2 RGH BRS WALL FCT 53.2698 EA 106.54 WOODFORD 24P 1/2 WALL 076289150 Spec Sheet: https://pi=edia.wimupplyinc.co./pim/SPEC/112017/WOODFORD-MFG-CO-17CP3-20-MH 76289150_SPEC.pdf 2.0 30 3/4 X 10 L HARD COPPER TUBE 5.1512 FT 154.54 3/4 L-HARD COPPER 1OFT CBL14600 3.0 10 1/2 X 10 L HARD COPPER TUBE 3.1560 FT 31.56 1/2 L- HARD COPPER LOFT CBL14400 4.0 1 APOLLO 77VLF-104-01 43.9000 43.90 5.0 5 77022 3/4 PXP 90DEG ELBOW 4.8285 EA 24.14 261077022 Spec Sheet: SPEC.pdi 6.0 1 77392 3/4X1/2X1/2 PXPXP TEE 12.7771 EA 12.78 261077392 7.0 5 77317 1/2 PXP 90 CE200 2.9942 EA 14.97 261077317 Spec Sheet: https://pimmedia.wimupplyinc.com/pim/SPEC/102019/_77317_261077317_SPEC.pdf 8.0 1 79215 1/2 PXMA MALE ADAPTER 3.4571 EA 3.46 261079215 9.0 1 79300 1/2 PXF NPT FEMALE ADAPT 4.3142 EA 4.31 261079300 10.0 1 1/2X6 BRASS NIPPLE IMP 6.7142 EA 6.71 1/2X6 BRASS NIPPLES 1337NBRO36 11.0 1 1/2XCL BRASS NIPPLE IMP 1.8571 EA 1.86 1/2XCLO BRASS NIPPLES 1337NBR03CL 12.0 1 1/2 LF BRASS 90 ELBOW IMP 6.7239 EA 6.72 1/2 BRASS 90 1337BL9003LF 13.0 6 2304 3/4 ( 7/8) CTS STRUT CLAMP 1.0228 EA 6.14 3/4 COPPER STRUT CLAMP 05322304 14.0 4 2303 1/2 5/8 CTS STRUT CLAMP .9442 EA 3.78 61 �?) \ ,9 Job Name Awinsupplycompany 4354 Kent Commons RFI 38 Hose Bibb Quote No. Date Rage 0005616 8112124 2 Expiration Date 9111124 Revised Date 8112124 Bid Due Date 8112124 Unit ', Extended'. Line Qty. D e a c r I p t I o n pri Ce UOM 'rice 1/2 COPPER STRUT CLAMP 05322303 15.0 10 S1011GG 1-5/8X1-5/8X10 STRUT 4.8357 FT 48.36 GOLD 0532S1011GG Spec Sheet: https://pi=edia.winsupplyinc.com/pim/SPEC/072023/ 0532S1011GG_SPEC.pdf 16.0 10 1-5/8" STRUT RUBBER SAFETY CAP 9.9333 99.33 Tax Area Id Net Sales 569.10 480330330 Frei ht . 00 Tax . 00 notation Total 569.10 BOYCE Monday,July 29, 2024 CONSTRUCTION Job# 6300 628 South Brandon Street RFI: 38 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Existing Hose Bibs in Rooms 103 and 104 Please verify what to do with the existing hose bibs in rooms 103 and 104. See attached Holmberg RFI for reference. To avoid schedule delays, please respond no later than: Friday,August 2, 2024 Response BD: REFER TO CLIENT COMMENTS BELOW Please remove hose bibs and use same tempered line to install new hose bibs at the location marked on the attached sheet. Also while on site plumber advised that they intend to use the deluge shower line to supply other fixtures. I he deluge shower can be permanently removed to make this easier and cleaner. Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 1 ec[.1949 Request For Information M E C H A N I&CA L Phone: 425-822-2233 BUILDING SYSTEMS.ENSURING PROGRESS. Fax: 425-82 7-5 73 5 TO: Boyce Construction Inc. Date Initiated: 7/29/24 628 South Brandon Street RE Job: Kent Commons Renovation Seattle,WA 98108 Job#: 4354 Attn: Bryce Bowell Request No. HM-016 Desc. Item: Existing Hose Bibbs in 103& 104 Ref Dwg or Spec: P2.0 Description of(Clarification)(Variation) Request: The(2)existing hose bibbs in rooms 103 and 104 are not shown on the plumbing drawings.Are the hose bibbs and piping to remain?If the hose bibbs and piping are to remain, Holmberg recommends replacing the hose bibbs due to them leaking.See the attached marked up drawing for reference. Cost Impact TBD No Cost Impact Reply Required by: August 5,2024 Signed by: Originator: Daniel Timmons, Project Manager Date 7/29/2024 Approval: Date ------------------------------------------------------------------- Clarification: Variation: Approved: Disapproved Remarks: Received By: Date: Approval: Date: 1 � V 3 4 5 6 7 , /P ( z A UP.ToVTR M�B �amM �xNFI BP, rnP P rE �WW— r�P 9S SN BURGESS DESIGN 7-7 C PSA (E(z.VrR � � P EXACT LOCATION New 1,GlU.io-heea elbs.(2)One aB each ® aBOc[ ae oiwell. P-, -- 0 0 P-0 (E)1-41 E 3 6 MB O TBBBm TYP.eP tE)+'+ KENT COMMONS RENOVATIONS (Elz-irz•vTR CITY OF KENT,WA 5254TH AVEN T ill o KENT,WA W32 P o AETI 1-2 E� V V— B F. I��... (Elz-,rs•v SERVICE -A'(' reR RE P3 to -, F1M&MEEp O(E)1 uPTo ivPo ,� P al a f� TRES WEST ENGINEERS 'N C. P3 L LP 3Ba z o NILBBBv Bo G aB M - �� � �� Tr www.uHwH+.�an nomcxwc xca s OF3 - Jy 0(EIN4• ,.uz•veN �� �Ia�BD,BBn � LEVEL 1-PLUMBING PIPING PLAN A PLAN NOTES (D EXISTING PIPING REMAIN IN SERVICE. ,n CW, W WITHIN IS OF I-AVATORv STOPS T02MEET SEC REQUIREMENTS. (D EXISTINGPLUMBING FIXTURE&ASSOCIATED PIPING REMAIN IN SERVICE. O1•CW&1-1 VDN. (D TO POINT OF USE WATER HEATER&F1)UNDERVLAVATORY. OHEATER W�H� WH-Tl UNDERSINK.SETO E BETALO�UB6E WATER a0 o•CW.1rz•TEMPERED WATER&1- VDIN PROVIDE 1—W Q3M•Cw DN TO TP— m www�em POINT OF USE WATER HEATER UHI UNDER LAVATORv. ro Cw 3oFusEwAETIW,Ea,WX3DN.PROVIBE,n^CW �sTOPS io MEET SEC REQUIREMNTS. T"Irv1roFLAVATORv (_'UNDER LAVATORY. ROUTE 31'TEMPERED WATER TO SHOWER. a A—NECT1rz•CW.HWTON 11. Al RECONNECT EXISFUNG PIPING TO NEW WATER CLOSET. (D 2•CW&2'VDN.ROUTEFULLSIZE PIPING TO PLUMBING FIXTURES INCHASE,SEE PLUMBING FIXTURE SCHEDULE FOR RUNOUTSIZES. �^^✓SCM ,*Ynx+w tlAM O,rz CW&,rz TEMPERED WATER DIC M"Ix''2)9NB'W O-CW.1-1 V&3la•TEMPEREDWATERDN,ROUTEPIPINGIN CHASE TO PLUMBING FIXTURES. lTl2% RED WATER&1-w VDNPROVIDE—CW � LEVEL 1- � ".,DNDERa^'°RY. PLUMBING O TOPOI'NTrz Fuse WATER HEATER16YH-5DIN UNDER-INVATOUE CW PIPING PLAN (HV UNDER a CONNECT,a^HwC&HW TO EXISTING PIPING.SEE oETA L ^ 2RAO.1.FIELD VERIFY EXACT LOCATION OF EXISTING PIPING. z P2.0 ^1a0 a Ba BOYCE Monday,July 29,2024 =C0NS'PRU T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 12 Nate Harper RFP# 12 City of Kent Scope of Work: Water Valve Replacement-Storage Room 121 Replace 2-1/2"existing gate valve with new ball valve. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Water Valve Replacement $3,434.00 Sub-Total $3,434.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $3,434.00 Overhead $171.70 Fee $144.23 Insurance,B&O Taxes $75.00 Sub-Total $3,824.93 WSST(10.2%) $390.14 Total adjustment to contract $4,215.07 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: 1 day Approved: Date: BOYCE Friday,August 2,2024 =C0NS'1rRtJ T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 13 Nate Harper RFP# 13 City of Kent Scope of Work: Storage 105 Exhaust duct Provide and install(2)duct transitions for exhaust ductwork per RFI#24. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Mechanical $1,564.00 Sub-Total $1,564.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $1,564.00 Overhead $78.20 Fee $65.69 Insurance,B&O Taxes $34.16 Sub-Total $1,742.05 WSST(10.2%) $177.69 Total adjustment to contract $1,919.73 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: N/A Approved: Date: 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORING PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 004 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Boyce RFI #24-Storage 105 Exhaust Duct Please accept our proposal in the amount of $ 1,564.00 for the additional costs associated with this change. This proposal is based on the requirements described in Boyce RFI #24 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORIMG PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 004 Scope of Work of the Change Proposal Description: Provide (2) duct transitions for exhaust duct. Inclusions: Installation of(2) new 36" x 8" duct transitions. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 004 12001 SE 9th Place Date Submitted: 7/29/2024 Bellevue,WA 98005 Subject: Boyce RFI#24-Storage 105 Exhaust Duct Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 6.0 $ 941.90 $ 88.88 $ 1,030.78 Equipment(See Detail Sheet) 0.0 $ - $ - $ - Tools&Rentals(See Detail Sheet) 0 $ - $ 37.68 $ 37.68 Direct Subtotals 6.0 $_____ _ 941.90 $_ _ 126.56 $ ___ 1,068.45 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 0.8 $ - $ - Warranty(Direct Labor only) $ 942 2.00% $ 18.84 Direct Costs Subtotal $ _ 18.84 Admin Labor Labor Hours UM Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 1,330 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ - Balancing TAB $ - SubcontroctorSubtotal $ - Total(Labor, Material,Admin,Subcontractors): $ 1,330 Markups Percentage Cost Liability Insurance 1.30% $ 17.29 Subcontractor Markup 5.00% $ - Overhead 10.00% $ 132.98 Profit 5.00% $ 73.14 B&O 0.68% $ 10.60 Use Tax 0.00% $ - Markups Subtotal $ 234.01 TOTAL CHANGE PROPOSAL $ 1,564.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 004 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Fabrication and materials. $ $ 88.88 - B $ 127.00 4.0 30% $ 660.40 Installation. $ $ - 2.0 B $ 140.75 - 30% $ 281.50 $ $ $ - 30% $ - $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing $ 148.86 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal $ 140.75 $ Delivery Driver/Warehouse $ 105.10 $ $88.88 2.0 4.0 $941.90 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 004 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 37.68 $37.68 $0.00 QuoteSoft Duct 4.1.4 Folder Name: 2024-SPG Bids Report Date:07/15/2024 Folder Number: 00023 Estimator:Makala Clemenson Job Name: Kent Commons Job Number: 4354 Zones Included: shwr room,M102 Base Bid,M103 Base Bid,M101A OPTION,M102A OPTION,Add 5 M101 BASE BID,Add 5 M102 BASF BID,Add 5 M103 BASE BID,Add 5 M101A OPTION,Add 5 M102A OPTION,Add 5 M103A OPTION Bid Date: 07/15/2024 Name Dimensions Item Count Gauge Weight Fab Labor Install Labor Other Labor Material Cost Labor Cost Grand Total SubZone System Phase Area Lined Duct Square To Round 36x8-12 1 24 35.426 1.905 1.017 0.100 $ 44.44 $ - $ 44.44 Square To Round 36x8-12 1 24 35.426 1.905 1.017 0.100 $ 44.44 $ - $ 44.44 Job Total 2 70.852 3.810 2.034 0.200 $ 88.88 $ $ 88.88 QuoteSoft Duct 4.1.4 BOYCE Friday,June 21, 2024 CONSTRUCTION= Job# 6300 628 South Brandon Street RFI: 24 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Storage 105 Exhaust Duct Per new Drawings MD1.0 and M1.0 see attached RFI from Holmberg Mechanical. To avoid schedule delays, please respond no later than: Thursday,June 27, 2024 Response Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 1 ec[.1949 Request For Information M E C H A N I&CA L Phone: 425-822-2233 BUILDING SYSTEMS.ENSURING PROGRESS. Fax: 425-82 7-5 73 5 TO: Boyce Construction Inc. Date Initiated: 6/20/24 628 South Brandon Street RE Job: Kent Commons Renovation Seattle,WA 98108 Job#: 4354 Attn: Bryce Bowell Request No. HM-007 Desc. Item: Add#3-2.02.24-Storage 105 Exhaust Duct Ref Dwg or Spec: MD1.0, M1.0 Description of(Clarification)(Variation) Request: Per new drawings MD1.0 and M1.0(ADD#3 2/02/24),it shows new exhaust duct to be supplied to Men's Restroom/Shower 102,Women's Restroom/Shower 106, Family Room 103,and Storage 104.Holmberg Mechanical recommends providing a duct transition on the west side of the wall from 36"x 8" rectangular duct to the 12" round duct. This would avoid coring through the CMU wall.See attached drawing for markups.Please confirm if this is acceptable. Cost Impact TBD No Cost Impact Reply Required by: June 27,2024 Signed by: Originator: Daniel Timmons, Project Manager Date 6/20/2024 Approval: Date ------------------------------------------------------------------- Clarification: We take no exceptions to the use of a duct transition - Variation: Approved: Disapproved Remarks: Received By: Date: Approval: Date: 1 2 3 4 q T T 7 T IIIIIII II i �� o 0 0 0 0 0 WG-21((Ej 3- T BOO CFM _i (E) OS A-1 I IE) R 4 (E)36.8 CFM -z (E)RL-z ()EEXH-, e BURGESS DESIGN 8IXI18 TYP OF 2 I I 4 (E)—IN SOFFIT o (E)R ___ _— —rT_I—r B?�'� 'L IEjyRU '� 1;IEY RG J LJ L IIE)PB GR L 1 (E7 6x6 CG 1 1 TT-, 6I, r l - - -'- BS CFM C IE - - - - _ 1 T4J—r� Lt ]6'0 � (E),zx6 L 11 11 6 CFM -IE) (E136x8�.'R-z 3 J Ir,l IrJ J r7_I—I T LJ L7 (E)EF (E) (El e•e PS �EI1712• J I),�x6kWR-2 JI_L I IF 11 l T-1� - - - - (E11z J(Ej,fi"x,z• Fz(E),o•x,z• KENT COMMONS RENOVATIONS D TWG2B 1HOa CITY OF KENT,WA BOO CFM 5254TH AVE N (E)20'x1 lO(EI CH-1 KENT,WA W32 _L_L_ _ lel cFM �2 IE)cW O2 TYP OTwRz (E)6 TYP.OF I I I .1 (Eo,64 F3 FE�4xVI P CFM�CFM CFM y TW (E)36x6 NJG2 1 iEl'�4">1241 _-- 'E)HG '`OIY06 cFM 1 zo cFm _ _ _ _ r-a—r -- -aE)z E IE11B•0 IE),B• TRE3 WEST ENGINEERS,INC. IF (E)LD A 440 CFM�� 1 Di li .OF3 �(E)tex'12 TWG-z LFM •@_x- - ' ' IEI1 I I I I I G T{ J ' 1 ML M. MECHANICAL DEMOLITION PLAN LEGEND ®HATCHING INDICATES EXTENT OF DEMOLITION PLAN NOTES aom O DEMOLISH(E)DUCTWORK B EXHAUST GRILL,PATCH REMAIN(E) DUCTWORK AS REQUIRED. O DEMOLISH(E)SIDEWALL SUPPLY TRANSFER GRILL. O3 (PEj SUPPLY AIR DIFFUSER AND FLEX DUCT TO BE DEMOLISHED, ATCH REMAIN(E)DUCTWORK AS REQUIRED. 4O(E)DRYER VENT AND ROOF CAP TO REMAIN IN SERVICE. O DEMO LISH(E)WALLHEATER,TS ANDASSOCIATEDCOMOL sd Ames WM WIRING. penes.p.OWOm Y O DEUCRYORKAR AS RE. . REOTO BE DEMOLISHED.PATCH REMAIN(E) (D pqj CUPPRLlIiR1IFFUSERANDDUCTWORKTOBEDEMOLISHED. MECHANICAL E)DUCTWORK AS REQUIRED. �(E)THERMOBTATTOBEDEMOLISHED. DEMOLITION PLAN E � z MD1 .0 1 2 3 4 5 6 7 8 Ao �(E)%%TwG2 + o o my (E)D VERQ 600 CFM oN 4gIXpSA-' WELL (E)8SP36x6 WR-2 NEn3LoR�M (E)RL-2 HETERTG ER I B BURGESS DESIGN TYP OF 2 I I sOE (E120x01N SOFFIT F (E)RL1 "r o 36"z B" %rc10 1(E)RG (E)RG1 } }(E)% Provide x6 TWG-2 1 T TYP.OF 6 to tansi°on 12' 2 cw CCuntl tluct 2201CFM co O6[ TY (E),2x6 TWR-2 I P.z IRS OF (E),e ,6• � n oPOcE (E)EF (E)16• 4 (El,ex,z t0x0CEN ❑ O eRo n o 3 0` _ (E)6'G W I N I zE6)n1cFn,Twc.2 OE T6n>,m� (E)GXR _ * EXPOSED KENT COMMONS RENOVATIONS DE. ()Hw SPIRAL DUCT CITY OF KENT,WA 800 CFM a 5254h AVEN _ fE120'x1Y KENT,WA W32 (E)t6x6 TWR-2 (E)22xe P.OF3 -SR ®R60 (E)24'G TYP50 COF4 .121E ,2x6 eO TYP.OF 3 N14 UP 116 STR ET /�n ;P.oF2 1 I EING, sx,a„BE RE {�x��4x��'YYYIII IIIVVVrrr (E)36x8_S ( (E)%ze TW { E)24'Y24' I O y1�BYlLSI 800 CFM %e CFM (ESR E orms (E IS-0 (E)I— t40 TRES WEST ENGINEERS,INC. F (E)t6=,2,WG_z +rG o� �.0 CFM (E)24'G 0 (E)6x6 G (E)DR.UP . DPToD6a m. On6nP03ooM UP (E)90#2 UP H u 6 Film, .UsET LEVEL 1-MECHANICAL PLAN A PLAN NOTES 1O THERMOSTAT-CONNECT TO MISTING UNIT CONTROLLER. O(E)DRYER VENT AND ROOF CAP TO REMAIN IN SERVILE. O 4'0 DUCT DR.TO DRYER VENT CONNECTION BOX. pe++eTsm.owsem LEVEL 1- MECHANICAL PLAN M 1 .0 a BOYCE Monday,August 19,2024 =C0NS'PRtJ T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 14R Nate Harper RFP# 14R City of Kent Scope of Work: Dryer Vent Smooth Duct-Revised Provide and install new smooth ductwork for dryer vent. New ductwork to be connected to existing vent through exterior wall penetration below new floor line. Includes relocating and re-using existing exhaust fan for laundry room. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Mechanical $2,090.00 Sub-Total $2,090.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $2,090.00 Overhead $104.50 Fee $87.78 Insurance,B&O Taxes $45.65 Sub-Total $2,327.93 WSST(10.2%) $237.45 Total adjustment to contract $2,565.37 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: N/A Approved: Date: MECHANI C AL EOLOM S*T M5.ERSUMAU PROGRESS Date: 7/30/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 005 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Boyce RFI #25- Dry Vent and Exhaust Fan Please accept our proposal in the amount of $ 2,090.00 for the additional costs associated with this change. This proposal is based on the requirements described in Boyce RFI #24 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORIMG PROGRESS Date: 7/30/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 005 Scope of Work of the Change Proposal Description: Per RFI #25 and email on 7/12/24,terminate new smooth sheetmetal dryer duct with existing wall penetration above the ceiling. Inclusions: Install dryer duct in existing location with smooth sheet metal. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 005 12001 SE 9th Place Date Submitted: 7/30/2024 Bellevue,WA 98005 Subject: Boyce RFI#25-Dry Vent and Exhaust Fan Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 9.0 $ 1,364.14 $ 88.88 $ 1,453.02 Equipment(See Detail Sheet) 0.0 $ - $ - $ Tools&Rentals(See Detail Sheet) 0 $ - $ 54.57 $ 54.57 Direct Subtotals 9.0 $__ __ 1,364.14 $_____ _____ 143.45 $ ___ 1,507.59 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 1.1 $ - $ - Warranty(Direct Labor only) $ 1,364 2.00% $ 27.28 Direct Costs Subtotal $ 27.28 Admin Labor Labor Hours UM Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 1,777 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ - Balancing TAB $ - SubcontroctorSubtotal $ - Total(Labor, Material,Admin,Subcontractors): $ 1,777 Markups Percentage Cost Liability Insurance 1.30% $ 23.11 Subcontractor Markup 5.00% $ - Overhead 10.00% $ 177.74 Profit 5.00% $ 97.76 B&O 0.68% $ 14.17 Use Tax 0.00% $ - Markups Subtotal $ 312.77 TOTAL CHANGE PROPOSAL $ 2,090.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 005 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Fabrication and materials. $ $ 88.88 - B $ 127.00 4.0 30% $ 660.40 Installation. $ $ - 2.0 B $ 140.75 - 30% $ 281.50 Demo of exhaust fan. $ $ 3.0 B $ 140.75 30% $ 422.25 $ $ - $ - 30% $ - $ $ - $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing $ 148.86 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal $ 140.75 $ Delivery Driver/Warehouse $ 105.10 $ $88.88 5.0 4.0 $1,364.14 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 005 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 54.57 $54.57 $0.00 QuoteSoft Duct 4.1.4 Folder Name: 2024-SPG Bids Report Date:07/15/2024 Folder Number: 00023 Estimator:Makala Clemenson Job Name: Kent Commons Job Number: 4354 Zones Included: dryer vent-low gal,M102 Base Bid,M103 Base Bid,M101A OPTION,M102A OPTION,Add 5 M101 BASE BID,Add 5 M102 BASE BID,Add 5 M103 BASE BID,Add 5 M101A OPTION,Add 5 M102A OPTION,Add 5 M103A OPTION Bid Date: 07/15/2024 Dimensions Item Count Gauge Weight Fab Labor Install Labor Other Labor Material Cost Labor Cost Grand Total SubZone System Phase Area Lined Duct Spiral Pipe 4-1'10" 1 28 1.708 0.050 0.630 0.020 $ 1.71 $ - $ 1.71 Spiral Pipe 4-0'1" 1 28 0.078 0.050 0.630 0.020 $ 0.08 $ - $ 0.08 Spiral Pipe 4-6'S" 1 28 5.978 0.050 0.630 0.020 $ 5.98 $ - $ 5.98 90'Gored Elbow 40 1 28 1.459 0.003 0.568 0.100 $ 1.74 $ - $ 1.74 90'Gored Elbow 40 1 28 1.459 0.003 0.568 0.100 $ 1.74 $ - $ 1.74 90'Gored Elbow 40 1 28 1.459 0.003 0.568 0.100 $ 1.74 $ - $ 1.74 Job Total 6 12.141 0.159 3.594 0.360 $ 12.97 $ - $ 12.97 QuoteSoft Duct 4.1.4 BOYCE Friday,June 21, 2024 CONSTRUCTION= Job# 6300 628 South Brandon Street RFI: 25 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Dryer Vent and Exhaust fan See attached RFI from Holmberg Mechanical regarding existing dryer vent. To avoid schedule delays, please respond no later than: Thursday,June 27, 2024 Response Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 1 ec[.1949 Request For Information M E C H A N I&CA L Phone: 425-822-2233 BUILDING SYSTEMS.ENSURING PROGRESS. Fax: 425-82 7-5 73 5 TO: Boyce Construction Inc. Date Initiated: 6/20/24 628 South Brandon Street RE Job: Kent Commons Renovation Seattle,WA 98108 Job#: 4354 Attn: Bryce Bowell Request No. HM-008 Desc. Item: Conference 122 Dryer Vent and Exhaust Fan Ref Dwg or Spec: MD1.0, M1.0 Description of(Clarification)(Variation) Request: The current drawings show that the existing dryer vent is to be reused.If the existing dryer vent is to be reused it will get covered during pourback for the new slab. Please provide direction on an alternate routing. In addition,there is an existing exhaust fan above the vent. Is this to be demoed or is it to remain in place? Cost Impact TBD No Cost Impact Reply Required by: June 27,2024 Signed by: Originator: Daniel Timmons, Project Manager Date 6/20/2024 Approval: Date ------------------------------------------------------------------- Clarification: — Terminate dryer duct with new wall penetration above the ceiling, directly above the - - existing termination (minimum 3' from OSA louver/door). Patch wall at existing - - termination. Demolish room exhaust fan — Variation: Approved: Disapproved Remarks: Received By: Date: Approval: Date: - -JOE Ak Drawings show to connect to existing dryer vent. '.j- If it stays in place it will get buried in pour back. Pr Jl i i f 1 r , t � - �-fir ,� 1• `•y• :' `• *. z•i;C r. 1 ,'` -� �a - t i.._ - i�• "f }}.�i _ .#. sty.- _�`4• • i• - - •"+;4'�_- • H JF1W 7- � �~ 't. '..*� -• , �y._ , 'fin s � - L t.+ Demo? room getting turned into conference room. K� r�� r From: Luis Perez<LuisP@BurgessPNW.com> Sent: Friday,July 12, 2024 9:52 AM To: Bryce Bowell<Bryce@boyceconstruct.com> Cc:Alex Phipps<a phi pps()boyceconstruct.com>; Harper, Nathen <NHarper kentwa.gov> Subject: FW: Kent Commons RFI 25- Boyce Response Hi Bryce, Please find the engineer response to this below. Thanks, Luis Perez O 206.587.71201 ■ C 206.739.3260 1200 5th Avenue,Suite 400 Seattle,WA 98101 From: David Moore<dmm@treswest.com> Sent: Friday,July 12, 2024 9:42 AM To: Luis Perez<LuisP@BurgessPNW.com> Cc: 'Matthew Gray' <mlg(cbtreswest.com> Subject: RE: Kent Commons RFI 25- Boyce Response Luis, As the floor will be joist/plywood and not slab. It is acceptable to reuse the penetration. The ductwork shall be new smooth sheet metal(not the flexible duct) David Moore P.E., LEED BD+C Principal Tres West Engineers, Inc. DBE•SCS• MWBE C: 360-701-6219 www.treswest.com From: Luis Perez [mailto:LuisP(q)BurgessPNW.com] Sent:Wednesday,July 10, 2024 9:17 AM To: David Moore Cc: 'Matthew Gray' Subject: FW: Kent Commons RFI 25- Boyce Response HI David, Please see GC comments regarding this RFI. Thanks, Luis Perez From: Bryce Bowell<Bryce@boyceconstruct.com> Sent: Monday,July 8, 2024 2:53 PM To: Luis Perez<LuisP _ BurgessPNW.com>; Nate<Nate@nwwi.biz> Cc:Alex Phipps<a phi pps(@boyceconstruct.com> Subject: FW: Kent Commons RFI 25- Boyce Response Hi Luis, Mechanical did not realize we were going to infill this floor with joists/plywood.They also did not realize we were removing the door shown in the RFI photo. Knowing this info, is it acceptable with all parties to leave the dryer vent duct and exterior penetration in the existing location, leaving it under the floor? If not, I believe we would need to figure out a small chase wall for the new route. Bryce Bowell Project Manager BOVCE a tnz�~�R�rr�wM�s From: Luis Perez<LuisP@BurgessPNW.com> Sent:Wednesday,July 3,2024 1:39 PM To:Alex Phipps<aphipps«boyceconstruct.com>; Bryce Bowel[<Bryce boyceconstruct.com> Cc: Harper, Nathen <NHarper@kentwa.gov> Subject: FW: Kent Commons RFI's 24, 25&26 Hi Alex and Bryce, Please find attached the responses to these. Thanks, Luis Perez BOYCE Friday,August 2,2024 =C0NS'1rRtJ T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 15 Nate Harper RFP# 15 City of Kent Scope of Work: Ductwork Revisions Rooms 122 and 123 Connect 2 new diffuser with 10"ducts per RFI#26. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Mechanical $2,059.00 Sub-Total $2,059.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $2,059.00 Overhead $102.95 Fee $86.48 Insurance,B&O Taxes $44.97 Sub-Total $2,293.40 WSST(10.2%) $233.93 Total adjustment to contract $2,527.32 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: N/A Approved: Date: 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORING PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 006 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Boyce RFI #26- Duct Routing Please accept our proposal in the amount of $ 2,059.00 for the additional costs associated with this change. This proposal is based on the requirements described in Boyce RFI #26 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORIMG PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 006 Scope of Work of the Change Proposal Description: Per RFI #26, connect (2) new diffusers with 10" ducts. Inclusions: Install duct re-routing in Open Office 123. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 006 12001 SE 9th Place Date Submitted: 7/29/2024 Bellevue,WA 98005 Subject: Boyce RFI#26-Duct Routing Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 9.0 $ 1,291.09 $ 139.92 $ 1,431.01 Equipment(See Detail Sheet) 0.0 $ - $ - $ - Tools&Rentals(See Detail Sheet) 0 $ - $ 51.64 $ 51.64 Direct Subtotals 9.0 $__ __ 1,291.09 $__ 191.56 $_ _ 1,482.65 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 1.1 $ - $ - Warranty(Direct Labor only) $ 1,291 2.00% $ 25.82 Direct Costs Subtotal $_ 25.82 Admin Labor Labor Hours UM Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 1,751 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ - Balancing TAB $ - SubcontroctorSubtotal $ - Total(Labor, Material,Admin,Subcontractors): $ 1,751 Markups Percentage Cost Liability Insurance 1.30% $ 22.76 Subcontractor Markup 5.00% $ - Overhead 10.00% $ 175.10 Profit 5.00% $ 96.30 B&O 0.68% $ 13.96 Use Tax 0.00% $ - Markups Subtotal $ 308.12 TOTAL CHANGE PROPOSAL $ 2,059.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 006 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Fabrication and materials. $ $ 139.92 - B $ 127.00 1.0 30% $ 165.10 Installation. $ $ - 8.0 B $ 140.75 - 30% $ 1,125.99 $ $ $ - 30% $ - $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing I $ 148.86 1 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal $ 140.75 $ Delivery Driver/Warehouse $ 105.10 $ $139.92 8.0 (10 $1,291.09 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 006 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 51.64 $51.64 $0.00 QuoteSoft Duct 4.1.4 Folder Name: 2024-SPG Bids Report Date:07/15/2024 Folder Number: 00023 Estimator:Makala Clemenson Job Name: Kent Commons Job Number: 4354 Zones Included: Duct routing RFI 26,M102 Base Bid,M103 Base Bid,M101A OPTION,M102A OPTION,Add 5 M101 BASE BID,Add 5 M102 BASE BID,Add 5 M103 BASE BID,Add 5 M101A OPTION,Add 5 M102A OPTION,Add 5 M103A OPTION Bid Date: 07/15/2024 Name 'Dimensions Item Count Gauge Weight Fab Labor Install Labor Other Labor Material Cost Labor Cost Grand Total SubZone System Phase Area Lined Duct Takeoff-Adh-Conical w/Damper 10 1 2.030 0.000 0.349 0.050 $ 23.08 $ - $ 23.08 Spiral Pipe 10-2'5" 1 28 5.628 0.050 0.810 0.020 $ 5.63 $ - $ 5.63 Spiral Pipe 10-7'8" 1 28 17.855 0.050 0.810 0.020 $ 17.86 $ - $ 17.86 90'Gored Elbow 10x10 1 28 6.057 0.008 0.729 0.100 $ 6.75 $ - $ 6.75 90'Gored Elbow 10X10 1 28 6.057 0.008 0.729 0.100 $ 6.75 $ - $ 6.75 Takeoff-Adh-Conical w/Damper 10 1 2.030 0.000 0.349 0.050 $ 23.08 $ - $ 23.08 Spiral Pipe 10-2'S" 1 28 5.628 0.050 0.810 0.020 $ 5.63 $ - $ 5.63 Spiral Pipe 10-7'8" 1 28 17.855 0.050 0.810 0.020 $ 17.86 $ - $ 17.86 90'Gored Elbow 10X10 1 28 6.057 0.008 0.729 0.100 $ 6.75 $ - $ 6.75 90'Gored Elbow 10X10 1 28 6.057 0.008 0.729 0.100 $ 6.75 $ - $ 6.75 Spiral Pipe 10-8'6" 1 28 19.796 0.050 0.810 0.020 $ 19.80 $ - $ 19.80 Job Total 11 95.050 0.282 7.664 0.600 $ 139.92 $ $ 139.92 QuoteSoft Duct 4.1.4 BOYCE Friday,June 21, 2024 CONSTRUCTION= Job# 6300 628 South Brandon Street RFI: 26 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Duct routing See attached RFI from Holmberg Mechanical. To avoid schedule delays, please respond no later than: Thursday,June 27, 2024 Response Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 1 ec[.1949 Request For Information M E C H A N I&CA L Phone: 425-822-2233 BUILDING SYSTEMS.ENSURING PROGRESS. Fax: 425-82 7-5 73 5 TO: Boyce Construction Inc. Date Initiated: 6/20/24 628 South Brandon Street RE Job: Kent Commons Renovation Seattle,WA 98108 Job#: 4354 Attn: Bryce Bowell Request No. HM-009 Desc. Item: Open Office 123 Duct Routing Ref Dwg or Spec: M1.0 Description of(Clarification) (Variation) Request: Please reference the attached drawing for clarifications and markups.The existing duct shown in Open Office 123 does not exist and is routed per the attached drawings and pictures.The layout for this area needs to be refined for accurate routing. Please revise the drawings to account for the existing conditions. In addition, is the existing VAV to remain?Is the heater to be capped? Cost Impact TBD No Cost Impact Reply Required by: June 27,2024 Signed by: Originator: Daniel Timmons, Project Manager Date 6/20/2024 Approval: Date ------------------------------------------------------------------- Clarification: - For open office 123 connect the 2 new diffusers to with 10" ducts as suggested. Regarding - the entryway, the existing vav box and heater shall remain to serve the space Variation: Approved: Disapproved Remarks: Received By: Date: Approval: Date: 1 2 3 4 5 6 7 A Demo or leave in ° ° ° ° place ERO (E)30zB TWG2 I 2e (E)D v 600 CFM ° _ RELOCA EL e E)) OSA-1 EATENT TYR 6 R� I MEn'sL 1p1 iRCOM (E)RL-2 H((E) HERE MN_t HER I R` BIJRGE55 DESIGN ASSo IE) 1 18 (E)28x01N SOFFIT 0F RL-2 3fix10 1 �(E)RG (E)IRS +IF)%z6TWG2 P.OF S Ci Duct tloea nat exist (E)13xe TWR-2 2xeS 16p CFM T1P DF F I Duot heater 12'0 10' ®M _ (E)10.0 (E),p (E)t0x6 TWR-2 0 12'0 p•0 peouuno0 -1-� a 445 CFM 1z»6 TYR. Fz E)( 1zx6TWG-2 6To E " 2CC cFM2W ® --r Tenam� O (E)12,6 (E)15"x E)IC•z12 KENT COMMONS RENOVATIONS G-2 )— CITY OF KENT,WA 800 Cl. 24X6 RG 5254TH AVE N E)20N1I a4 PCOFMS KENT,WA W32 (E)i6x6 TWR-2 (E)I TWR-2 )z4•m 35 aDOMa 1 ze exe SR TYP ��y—_' TYP.OF 2 I i , N[ 14 UP 1 16 9� T E Demo to here and run /Sh (E)HG 210'runs aver tap of 10x14"m RA Ductwork and (E)S6x0 NJG2 1 TW I E)2-4' ( I 0 keep tight to I— (E)38zB E r E TgEyyT S.CFM I (E)CFM Se �_G`EIM�IEEM confirm sizing )10•0 top CFM TRES WEST ENGINEERS INC. F p, (E)1.12TWGz +rm '.0 CFM (E)24'0 Demo or leav In ( Place (E)10•m UP (E)18'm uP O o M A1. pIT6. GF H � W❑ ,2.2�a LEVEL 1-MECHANICAL PLAN PLAN NOTES ,O THERMOSTAT-CONNECT TO MISTING UNIT CONTROLLER. O(E)DRYER VENT AND ROOF CAP TO REMAIN IN SERVILE. O 4"0 DUCT DN.TO DRYER VENT CONNECTION BOX. r artwawvu Mauotwwmtlm LEVEL 1- MECHANICAL PLAN M 1 .0 a 1 s r i�: ".ram - ,�x':��..,,�'h.SS :.w�:r�: - w'. i __ -- b i � � _ -- r� - - �,. �••, v + - - -_ _�_ 1 ,�:. _ .a�-. _. ��.. � �� �f� r ,i�" al ...�< o:�.._ _ Y - � � —: f- -_ I�E.� '�y' �• • • • - �� 4• � .�• � i '''� Z s �_My }i BOYCE Friday,August 2,2024 =C0NS'1rRtJ T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 16 Nate Harper RFP# 16 City of Kent Scope of Work: Spiral Ductwork Room 123 Provide and install new spiral ductwork per updated mechanical plans and RFI#32. Boyce Construction Scope Hours Rate Cost Project Manager 0 $98.00 $0.00 Project Engineer 0 $75.00 $0.00 Supervision 0 $95.00 $0.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $0.00 Sub-Contractor Costs(Lump Sum) Mechanical $3,992.00 Sub-Total $3,992.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $3,992.00 Overhead $199.60 Fee $167.66 Insurance,B&O Taxes $87.19 Sub-Total $4,446.45 WSST(10.2%) $453.54 Total adjustment to contract $4,899.99 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: N/A Approved: Date: 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORING PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 007 Dear Bryce Bowell This cost proposal is submitted for the additional costs associated with: Boyce RFI #32-Changes to Plumbing and Mechanical Plans Please accept our proposal in the amount of $ 3,992.00 for the additional costs associated with this change. This proposal is based on the requirements described in Boyce RFI #32 for changes in the work and a detailed breakdown is attached for your review. A schedule extension of 0 days is also requested. Attached to this is a scope of work, summary of hours and costs, detailed labor and costs breakout and supplier quotes. We reserve the right to re-evaluate the cost of this change proposal should conditions and requirements develop that change the intended materials, equipment and/or labor, or, if any adjustment to the contract schedule becomes necessary. We also reserve the right to assess the cumulative impact of this change. We exclude all work that is not associated with our base contract obligations. This change proposal value is valid for 15 days. Beyond 15 days Holmberg reserves the right to re-evaluate the price of the change order and adjust the value based on market pricing changes and/or site conditions change. If you have any questions regarding this proposal please do not hesitate to contact the undersigned. Sincerely, Holmberg Mechanical L6aniel Ybmmons Daniel Timmons Project Manager 4 khe - MECHAAI C AL 9U UNK SYSTEMS.WORIMG PROGRESS Date: 7/29/2024 Company: Boyce Construction Attention: Bryce Bowell Project: Kent Commons Renovation Subject: CP- 007 Scope of Work of the Change Proposal Description: Per RFI #32, add new 14" round duct and (2) new diffusers for the supply duct. Inclusions: Install new duct routing. Exclusions: Off-hours work and overtime. Engineering. Cutting, patching, and painting. Holmberg Mechanical CP#: 007 12001 SE 9th Place Date Submitted: 7/29/2024 Bellevue,WA 98005 Subject: Boyce RFI#32-Changes to Plumbing and Mechanical Plans Mat, Equip,Tool, Direct Costs Labor Hours Labor Costs Rental Costs Cost Materials (See Detail Sheet) 13.0 $ 1,854.08 $ 1,187.11 $ 3,041.19 Equipment(See Detail Sheet) 0.0 $ - $ - $ - Tools&Rentals(See Detail Sheet) 0 $ - $ 74.16 $ 74.16 Direct Subtotals 13.0 $__ __ 1,854.08 $__ _ 1,261.27 $_ _ 3,115.36 Direct Costs Labor Rate Percentage Cost Parking(Total Hours/8) 1.6 $ - $ - Warranty(Direct Labor only) $ 1,854 2.00% $ 37.08 Direct Costs Subtotal $ _ 37.08 Admin Labor Labor Hours UM Rate Cost Project Executive 0 Hours $ 175.00 $ - Project Manager 1 Hours $ 125.00 $ 125.00 Project Engineer 0.5 Hours $ 85.00 $ 42.50 Engineering Manager 0 Hours $ 180.00 $ - Professional Engineer 0 Hours $ 155.00 $ - Estimating 0 Hours $ 118.00 $ - Safety 0 Hours $ 95.00 $ - Purchasing 0.5 Hours $ 85.00 $ 42.50 Accounting 0.5 Hours $ 65.00 $ 32.50 Admin Labor Subtotal 2.5 $ 242.50 Total(Labor, Material,Admin): $ 3,395 Subcontractor Name Cost Excavation $ - Core Drilling $ - Insulation $ - Controls $ Balancing TAB $ Subcontractor Subtotal $__ - Total(Labor, Material,Admin,Subcontractors): $ 3,395 Markups Percentage Cost Liability Insurance 1.30% $ 44.13 Subcontractor Markup 5.00% $ Overhead 10.00% $ 339.49 Profit 5.00% $ 186.72 B&O 0.68% $ 27.07 Use Tax 0.00% $ - Markups Subtotal $ 597.42 TOTAL CHANGE PROPOSAL $ 3,992.00 JOB NAME: Kent Commons Renovation Service: Materials CP#: 007 MATERIAL ONSITE LABOR LABOR SHOP LABOR SHOP LABOR MATERIAL DESCRIPTION QUANTITY EACH MATERIAL HOURS CLASS LABOR RATE HOURS BURDEN LABOR COST Fabrication and materials. $ $ 872.11 - B $ 127.00 1.0 30% $ 165.10 Installation. $ $ - 12.0 B $ 140.75 - 30% $ 1,688.98 (2)Suudply diffusers. $ $ 315.00 - $ - 30% $ - $ $ - $ 30% $ $ $ - $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Storage $ $ $ 30% $ Foreman-Plumbing $ 148.86 $ Foreman-Pipe Fitting $ 148.86 $ Foreman-Sheet Metal $ 140.75 $ Detailer-Plumbing $ 148.86 $ Detailer-Pipe Fitting $ 148.86 $ Detailer-Sheet Metal $ 140.75 $ Delivery Driver/Warehouse $ 105.10 $ $1,187.11 12.0 1.0 $1,854.08 JOB NAME: Kent Commons Renovation Service: Tools and Rentals CP#: 007 TOOLS& SHOP LABOR SHOP LABOR TOOLS&RENTALS DESCRIPTION QUANTITY TOOLS EA RENTALS LABOR HOURS LABOR CLASS LABOR RATE HOURS BURDEN LABOR COST Scissor Lift $ $ $ 30% $ Manlift-JLG $ $ $ 30% $ Warehouse Forklift $ $ $ 30% $ All-terrain Forklift $ $ $ 30% $ Welding Machine $ $ $ 30% $ Generator $ $ $ 30% $ Smoke Machine $ $ $ 30% $ Trimble $ $ $ 30% $ Duct Jack $ $ $ 30% $ Jobsite Trailer $ $ $ 30% $ Connex $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ $ $ $ 30% $ Freight Shipping $ $ $ 30% $ Small Tools(4%of Direct Labor Cost) 4% $ 74.16 $74.16 $0.00 MECHANICAL & HVAC SALES HELPmr. BUILDINGS THRIVE 40 KENT COMMONS RENOVATIONS QUOTE NO: 76251 QUOTE DATE: 02/05/2024 PLAN DATE: 12/28/2023 TO: CUSTOMER ADDENDUM: 1, 2, 3, ATTENTION: ESTIMATOR PREPARED BY: DESCRIPTION QTY PRICE GRD'S - PRICE INDUSTRIES 13 $2,200.00 TAGS: CD-03 SR INCLUDES: oo STANDARD WHITE FINISH. oo ALUMINUM CONSTRUCTION. EXCLUDES: SPECIAL FINISHES, SQUARE TO ROUNDS, DIFFUSER BOXES, FILTERS, EQUALIZING GRIDS, EARTHQUAKE TABS, EXTRACTORS, REMOTE OPERATORS, OPPOSED BLADE AND VOLUME DAMPERS, BLANKOFFS AND SCREENED OPENINGS. NOTES: 00 QUOTED AS ALTER TE TO SCHEDULED MANUFACTURER. ADD QTY 2 - PRICE 18"x8" 620 W/ OBD TAG: SR $315 GRAND T L $2,200.00 TERMS AND CONDITIONS: https://www.acimechsales.com/Termsr-Cond itions Price for added G RDs PORTLAND OFFICE SEATTLE OFFICE SPOKANE OFFICE 6821 NE COLUMBIA BLVD#14 6100 6TH AVE S 3633 EAST ROWAN AVE PORTLAND,OR 97218 SEATTLE,WA 98108 SPOKANE,WA 99217 PHONE:503.238.6900 PHONE:206.767.2600 PHONE:509.467.8082 BOYCE Thursday,June 27, 2024 CONSTRUCTION= Job# 6300 628 South Brandon Street RFI: 32 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Changes to Plumbing and Mechanical Plans Please have engineer cloud/highlight changes to plans and provide a written narrative of changes. To avoid schedule delays, please respond no later than: Monday,July 8, 2024 Response sheets MD1.0 M1.0 Revised existing restroom area wall grilles partial ductwork, extend new ducts and added new wall return grilles to serve men's restroom shower 102, family room 103 and storage 104. connected new duct to existing exhaust fan. Fixed some directional arrows that were showing exh/supply incorrectly in restroom area Demolished existing rectangular ductwork wall grilles and replace with new spiral duct, new supply registers to serve open office Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 MECHANICAL GENERAL NOTES MECHANICAL LEGEND PLUMBING ABBREVIATIONS 1, STAN I III =NA`L`T`=`N`I U�'NZT.1'1A IL.ITDI SYMBOL DESCRIPTION SYN.. DESIRUPDON AG.— .—HURIK). ALL A LOCAL "L SNOT SSECON$'ORSECI, EaUI'MENT TESDNoSEE ERww� RP"ASE ER wwi c AIa PENT AS, IrvAI --- acMWc, WITH OWNERS REPRESENTAnvE FOR ANY W RIA"Ces. ElSAN. SUPPLYDUCTDOWNAP, IESACT CODE TO AUTHORITY RI$GICTIoN UPON ovcuEourGoc " c W .& �xG,uR PRGEIS uMETSIN0MPLIx1 T =="=I'"'L N THIR­IDElp"�'BETU. 1K=AIN Y.TBA':�-NCI..'FF��Eo I._UDIN. — PIPE DOWN ­­AIR DUCT DOWN 'L.. =ETE BURGESS DESIGN DHNEG DUCT ° 111111E WATER'Y=N'C—'A NO GHOWNo"P WG.TE A"DE�WPEALLErEOWG "G DHIaoD" R BLDG E ING ENGINEERS INC. n° NE OR I R AT" OR FOR Ell CH-TOP CONNECTION DUCT THE" B Roo coalETEIFU�PERA,IGSYSTE SIaT ax. MEasuxNTDIIING II-SERB,I°wx°rvR�LBECooR°INATEo - DOWN(R°ux°) — BELOW PPDR1-TELEswDHoTNERTRADEs. Ta WNHP�APEMENTCHLIGHTRIUNEs � PIPE REOGREDBroxAPTER.oFTHEIMo. xEMNMDM —DIRECTOR C.N. CGNNE.TIGN IAOD,ON UNFACE ATHeRwIBe"TeD G"�BEINPBDDEDGN EGG �I G,BI"GIP EG RU ER NGOTIET� MAN--�DE,I AIM M,oEIaEE`a �I 1UNC �m xT.lx CONTROLS SHALL Au FOR OFTIMUM START. HO D MEN T&Ram� c«4TRAPTOR III PeSIaTDeeDONeBrTHEAENEaABOH 1EAL I TEST 11TWIRI AS RE LIKED PER WC,WREC Ea If .U1(CO� -PER NO) KENT COMMONS RENOVATIONS T D IN POsrTI1N SHALL REALLouIREMSHESTE"rs.Ductwoax DESIGN PaEWURE IS z. LiL R ooF Ma) CITY OF KENT,WA BE sEcuRELY FASTENED IN PvcE. 5254h AVEN e saTHe z5, LOU STATE erveasv CODE. vE IGv� "„ ER IBDG, :LED LE NK KENT,WA 98032 aeoulaEMENTs oFTHE SPECIFICAnorvs. TABLES caoa.tG.,.,AND uos.tB.t.z O.DI LL IIMPLI EQUAL ME FIRE—ING OF TIE MATE PENETRArsO. AUCT coxsmucno"srnrvoaaos.cuaasrvr EAmoN. A $ ., TLINING x$F'rvt y_//��1�F'A1�F�;.cnuLNfl PLASHULvexETRAnorvs PER PARE. MT0 z ELeowI LROurvDZ Piece ArvDREC"N.ULARso DesaEE ��� vE(Pave O ataN(FD�RE AN �TaBa OPERATING CONDITION "'LEAVEENGRE sysTEM IN ze ALL DUCT-ES SH—N ARE CLEAR wsmE LI.ENsorvs ' VE Icv)NG O. CMiOS aarv(FarD) IT FEET I NN11 11E TRE3 WEST ENGINEERS,INC. t aseoaD DRAwINes,&( ER TRAINING PER P21FICDON, z usEas.PRovIDECMnxIMUM LErvcTx OF aexlsLe � VEIN ❑ xx lPs) GAS LOL1ry zTAC °l CODE )BUNIMUM Aucr. BB MBIwuBxvoaAxT lPw'xl 4 VENT UW.MAP) HF HEAT P,HORSEP.— AN NIEI CAL PANEL eoaALrsEr s ALL AIR RLF.L EA NECTr. T OUCT CONNECnorvs TO uE lr&PV) 7 eiy'®n°'a `fGS s PRESSURE GAUI t PIPIrvGANGroR GucrvuoRKAS REAAIREG. LeD 3 —ENANCT.AS NOT.IN HRAE a"D ae°ulaeD IN x 4 M cAGEFAR SEISMI—WAYBRAcwG. H.CDOMESI—TWATERTIA" `IRCuunNG $�,� FLIMP THERMOMETER HE IN—T IN NCH GCCDPANCYANDPERIAGBOFGEMANG.CUNCU'AT ON HA_L HA UT." N aaeDD" GIFFDBERBINAGGITIONTOOPP-11 AT ALLEGG—EGAMPERa.GRILLES RED y IS PDUND x RELIEF.— METER LAV _ATI11 t 'HALL MAxIMUM LEAKAGE RATE OF4.==AGE FOOT AT,.o WO � IB, ECHL �a��o,:T��� vIAEG.No MFR FER A A, A sIMULTANEous nEArwGr000uNG ULowED. ,� us OUTDSC OOR CONGIDONS.PIPING ExaosBO DIRECTLY ro a EQUIPMENT IS NOT RUNNING IN COMPLIANCE WITH C403,7Aa WHEN �I` G ALLINI NEW I POC MINT OF CCN.­ PE TABLE C404.3.1-HOT WATER PIPING VOLUME&MAXIMUM PIPE LENGTHS Io" TAB IESTING,AM WATER HAMMER ARRESTOR WATER HAMMER ARRESTOR NOMIINAALLAPIPEG E (LIQu M­MUM PIPING LENGTH REMARKS RE GA"GBAtANCI"G SIZING SCHEDULE(BELLOWS) SIZING SCHEDULE(PISTON) 0 o B ao sm R. WATER ILR­ ER® ® "I VENT ® o WREC AaHINGTAN STATE ENERGY CODE UN ® &,„B B D ® &,„B D ALL HOT AND COLD WATER $ANITARY WASTE AND ® „4, Eo,o ® „d, fl UoANT ,EDGM.KERFEISTMT RATED s HORIZONTAL AND VERTICAL ASSEMBLIES SHALL BE CCORDANCEWIT1S021PROTECTED BY SECTIONT,4 1ED PEN AxaraEMa I oMM pow � � � PIPING MATERIALS ' DOMESTIC CW.III HWP D MECHANICAL GENERALTYPE K ELOW GRACE ' SANITARY—1 PIPING AND VENT " H B CASTIRON NOTES,ABBREVIATIOS s PIPING SCHEDULE STEEL � mo.O p' PLUMBING FIXTURE SCHEDULE TRAP PRIMER SCHEDULE TWO OXT.F. F-RE NOTES TWO I ...A.GO.L W EG WATERR G­1 I' I' I- _E'-HBO """""SUDAN SENIOR 1111"IM1111 AS 11 T­ .-,1 1-1 4_1 BEAT.1.FRONT LESS UG.R HE.l.S��_ HANDS. lENTICA-CON­PPORT. NOTES INISI.-II-PECIISE.- 11.. ANI STANDAND 1-1"1 111LEA1 8EAT0 F,FAY"_'B AGA FRONT.LESS COI/EF;SENEKE NO,RGSE­ W.CC_C..G C=­­XT OF.­POP LRC FROM WI.0­C OF WATFF C­1 A- HANDICAPPED-MOUNTING H El GHT FROM FLOOR TO TOP OF SEAT SHALL BE A M­M OF I T AN C MIN IMU M OF I r GRINAL ....­TF.,.1-L MODEL WOLE I­I.I 1 1. -11POWEROD BURGESS DESIGN FLUSH VALVE MANUW_HEU'Al..NTE'NAL WITH"=OMETER 0,125 OFF CAFR-DURN 11-MCONIOD PLATC TYPE­GIC_RINA1 CARTIOR P­ 1. .... WALL HUNG;V EOUS CHINA.URINAL&F-USHOMETER COMBO SYSTEM,BLOM.MODEL WEUS 1000­1 1 1. BATTERY POWERED ADA 'U­"NUAL.EU ETER 0­.11 HANGC1 INTEGRAL WITH CAIR11H I—TLOOR MOUNTED PLATE TYPE SINGLE URINAL CARRIER WITH BF-C ILATI Il III P I 11L�ITI�l 1"111T111.=1 INNI-111 N-111 11111NI NO 1111111 ,, 1 11 ­ :�RIILGE W I PALO i"'N C'­­ GPE"TE.1AUUET.T­ZSO B G C, C '_N.ON ErR WITH BELOW I—T­EF.G­C.I.,V_ LET..T ,�.DEI�Il I P. LM ACA MPLANT. I OR S TRAPS­11POCIA MIGUIRE OR SO CACT IRASE P-D-NO­1PIECE SUPPLIES LoCCE KEY U�R­TJRN BALL STOP WITH­BRAIDED STAINLESS STEEL RISERS;RASSCRAFT P4A 1­T.RI WALL HUNG,C, AGA FAUC-SUDAN­­ OF TED F ET 12:- . C­ _M­ ADA COMPLA.1, UPPYTRAR "'.`H 1UPPUE1 LIGGE 1EY QUARTES-1 SALL STOP WITH ITAIED STAINLESS STEEL 111GIS;STAR— PROVIDEIRS-ONONTRAPAND UPPLIESPER-IFICATIONS I T­,t PH GH-ER ENCL SURE BYOTHERS,SEE ARCHITECTURAL PLANS KENT COMMONS RENOVATIONS TFIMA�LOCATE P I B GPM 4E.1Y1R­ORIGINS SH-R SYSTEM THIN CITY OF KENT,WA 525 4TH AVE N DA 011 PICI AQ1A'C A RB 1 TRM.IS GPM WATERSE­LABELED sHoWER H­ 2 In 112 1G KENT,NS W32 IYMMINI ILIDED 24'I'D 1%.- Z W. C'RT.N Fo PR=1 NO RECESS OPTION,AND PBER-1AS SILAS.11ARD C ALL RUBBER COLLAPSIBLE THRESHO P., npn1.1 GPM 16 12L P1111 TAIT AE RATTURCLEG I-SERECK IPOUT.BAEKET STRANER.CHICAGO FAUCETS NO I 111GNSAEI STAB. r 1 1 4AAr TRARE 4 TA ECES MCGUIRFOR SUPPLIES L��GE KEY aUARTER4URN BALL STOP WITH FLEMBLE BRAIDED STAINLESS STEEL RISERS.BRABSCRAFT !!-"FHTTV"AIL"'LMPUT' BASIN GLARD OR E.U. ,'A ApA NO HANIIES,GOOSENECK APOLDEEL.11.11-11I 11LA�1I1NA1j11o1- FAUCETA CENTERS,FINGIF WI T PASKE1 ATRANER 1;OF .4 c� O-ONBLI Ij_ TRES WEST,I NEE 1'"C. G"VZOIlL'EBM UW 'ANTA'THARS-11I.E. .GURRE=UAL 1-1-HONIF-ATEDCAST.-P-THAP-PIECE. SUPPL F$"`$F KEY QUAITII�e­�FALL=DloTR EF�EXIIII IRAIIFI STAINIF$$STEEL FIBERS,-RAFT MISC PROVDIE ADA SH ELD TRU Ho $IN UAL P.S WATER TYPE,MFR,NO EL HIIO WATER COO-ER FILTERED REFRIGERATED.STAINLESS STEEL BABIN(HANDICAPPED),ELCAY LZSTLMNSSK.WITH FLEM GUARD STREAMEWOER r POWER CONNECTION C__ IUIILIR LEAD IFFI,IN—G IIKER 1.UC.LFES-LE H­STATION,N,PUBHEAR A.- - ON,1 .ISTE..ANTI.ICF..I.LAMINAIi F- L'".SYSTEM MISCELLANEOUS SpoUT HEIGHT FOR UOW FOUNTAIN TO BE-IR AFF,MEET ALL ADA REQUIREMENTS IN 2010 ADA STANDARDS AND COA117 IOIDS ..THI MR 11PPI I WASTE 1CH­11.1A ATEPI;ILY'GRAY­T­­111PIETC 1ITI CIFFIGION RFRISTANT E­NNlsN. r v + v C­ED IN WALL wASHER PC I.R.SMITH FIGURE..RY ROUND TOP;NICKEL H.--NER HEAD G­CAST INCH xEAD. PERPILAN PERPLANI ELECTRIC TANKLESS WATER HEATER SCHEDULE AIR TERMINAL SCHEDULE SYMBOL AIR TERMINAL-SIZES AS NOTED ON PLANS N_ TURN 5 VOI-TS KIN TOTAL =.','ZE o %THN' NOTES ON 63 UNIT MANUFACTURER MODEL AREA PM ASIP RID. W1`RE`S`1ZE EFFICIENCYQC I NO CD CEILING DIFFUSER,OUTSIDE AIR CEILINGOIFFUSER TITUS MODEL TDCA AD.USTABLE DIFFUSER FOR INS LAT ON IN.ANUFACTURER�AL SERVIED (GPM) DRAW BREAKERSUIE (75-CICU) I (IN) (POUNDS) - R CEILINGS.PFROVIDE 24.12 OR-PMS AS REQUIRED�SUIT CEILING PARELE B STANDARD WHI-1 EENAX SPEX1812T RESTROOM 10Z 0.2 SB. 1. 1G 15 (1­) 14 AiNG GG% 1- 3E ITH MERMOSTAT SET AT 11 D� FI­HITE FINISH.INCLUDE O-SED-BI-ADE VOLUME C,IWPER-INDICATES THROW-RN WHII EENAX G­ RESTROOM IO2 0.2 35° 1. IS 1E (1.16) m­GETAT11O' SIR 'DUL'BLY REGI-R.'NTUD=LY'A F1'F1R INITA.L'I.TE101 ON I DPAZIRI 1.1 SH-,SM'BIDE SPACING, EFLE.T, ,I D USTABLE G'FRI LE'T ORT DIMENSION,INCLUDE AIHI EEMAX GPEX1812T RESTROOM 102 0.2 15- 1. IS IS (IX15) 14 AND .% i-S 3.E WITH THERMOSTAT SET AT I I O° OPPOSED DI-ADE­UME-PER.MANUFAUITUREITS STANCARD O-HITE FINISH IN— EE- SPEX1812T RESTROOM 106 0.2 31. 1. IS 1' (1.15) A Aw. ERR wil A MERMOSTAT SET AT I I O° WRGFR.ON GFUHTE­HR�ICRL IDIELIRILE=E1�1EFL.ECT IMNILIERL'IERE SPACED MANUFACTURERS RESTROOM 10801 31' 1. IS 1E (1.15) ­G .1 1- A E ATIIS' B ANDA 1F_W E FIRIS LU ED PC U DA "T M:M:::ETAT11V WH. SEN. SPEX1812T CONFERENCE122 0.2 IS. 1. 1B 1E (1­) 14 WAS GG% 1- WITH TH HMO T WHI EEIVAX SPEX1812T LAUNDRv,25 0.2 31' 1. IS 11 (1XI5) 14 AWG GR% I-AS 3G WITH THERMOSTAT SET AT I I PUMP SCHEDULE ILA­ UN' SIR I MODEL I SERVICE I TYPE DR. HP NWTARNTS­R NO TES NO BY ­1 SSO I ECOCIR-11 I(E)WATER HEATER I IN-LINE 4 11 1.1 1­1 ,1 1,, NOTES:1,ALL STAINLESS STEEL CONSTRUCTION FOR POTAS-E WATER�ED.MOTOR 3.I-IDEWITHE-TINALTE.PS-RESENOOR SON INN EXPANSION TANK SCHEDULE UNIINI I MMN1­I MUDELISERVICE -I D""N"'"IN' ERATIN.NK �),T IT(P11111) m CEPTAN.E DII"­­ -1 1 AMT-L -C E.GTNG WATCR HEATCR I OB I I �O MECHANICAL SCHEDULES Mo.i F-C 11% PwmGIrvG x>REPS Iory TANK corvrvscT ro RUMR OR. _ �CW SUPPLY RA To wnu F,�� ��,sZ'NO SHOWNOETFCCJUTATION- PRIMER CON*LLERIIgCCESS PANEL;C00RDINATE HOT wvnroNY P1 VACUUMLOCATION WI ARCHITECTURAL EXISTINGCOLDBREAKE PLANS COLD WATERPIPING ELECTRONICTRAPBURGESS DESIGN BPRCLITPRIMER VALVEBALL VALVE NI sFISMIESGDTGHEory RAGE(TYP.) EATS RIBUTION HEADER UNION OR TUBING TO FLOOR DRAINS oTANKLEll NOTES: WAT ER PowER FLOOR 1.COLDWATER PIPING TO TRAP PRIMER SHALL BE OFFSET UP,THEN DOWN,PRIOR TO CONNECTING TO PRIMER ASSEMBLY. 2.COORDINATE POWER WITH ELECTRICAL. �j1 INSTANT FLOW WATER HEATER DETAIL �,G1/EXISTING ELECTRIC WATER HEATER DETAIL ELECTRONIC TRAP PRIMER DETAIL TaPem NOT TO SCALE �/ NOT TO SCALE NOTTOSCALE KENT COMMONS RENOVATIONS CITY OF KENT,WA 5254h AVEN KENT,WA W32 ADJUSTABLESTRAINER =,MEET METAL LAR CUT 1-1/2'RIGID INSULATION HEAD oMlUJS BE LE_ oL FLEKIBLE DUCT A ME AS V� TO FIT.ATTACH WITH DUCT FINISHED GROUT(BY G.C.) D AEU oEncNrCK, TAPE SLOPED FLOOR CAULK ____________ FLASHING ---- TRES WEST ENGINEERS,INC. CAULK P FLASHING COLLAR WITHCEILING mFwsER, DUCTTAPE WEEP HOLES FINISHED CEILING-' REGISTER OR GRILLE TRAP PRIMER CONCRETE BY G.C. CONCRETE BY G.C. Iory Iry CONNECTION V CONSTRICTED CEILING SPACES CT :IIJ FLOOR DRAIN BODY PIPE SIZE AS NOTED ON PLANS INSTALL STRAINER,STRAINER REMOVE STRAINER,STRAINER HEAD,AND FLASHING COLLAR �+ HEAD,AND FLASHING COLLAR. (SET FINAL ELEVATION) FLEXIBLE DUCT STORE FOR LATER IN �°FBC%sTLe'�.cq� DURING CONCRETE POUR(STEP#1) AFTER CONCRETE HARDENS(STEP#2) �ionei 4' NOTES: 1.COMPLETE INSTALLATION OF FLOOR DRAIN AND SETTING OF FINAL FINISHED CEILING FFUSER. ELEVATION WILL NOT BE ALLOWED DURING INITIAL CONCRETE POUR. REGISTER OR GRILLE 2.DO NOT ALLOW GROUT PENETRATE WEEP HOLES AND FILL UP TRAP. 3.IF ARCHITECT IS USING A WATERPROOF MEMBRANE SYSTEM THEN USE COLLAR TO CLAMP TO THAT MEMBRANE. THERE EN.FLEXIBLE G P Ero KEEP KINKS OFLOOR DRAIN INSTALLATION SUPPLY/RETURN AIR CAN CONNECTION 4 NOT TO SCALE NOT TO SCALE MECHANICAL DETAILS g � MO.2 s= a� 1 2 3 4 q T T 7 T IIIIIII II i �� o 0 0 0 0 0 1((E13WG-2- T BOO CFM ' (E) OS A-1 I IE) R 4 (E)36.8 CFM -z (E)RL-z ()EEXH-, e BURGESS DESIGN 8IXI18 TYP OF 2 I I 4 (E)2exe IN SOFFIT 0 (E)R 4 B?�'� r'L TIE)`Rq '� 1;IEY RG J LJ L IIE)P6GR L 1 (E7 6x6 CG r T 6I, r l - - -'- BS CFM C IE - - - - _ 1 LJ_�T FJ_L 4J—r� L 6'0 + 1 J T (E)12x6TWR-2 FI M32 6 OF (E)14 (E)36x0 —L I I r-I-r' TN I BTMOPCFMU R2 3 r .OF z - rt� IrJ iJ r�--1 L F. LI (E)EF ](E) (Ej 6.0 �EI1B"�2 LJ I)I=IWRI L 1 Cl-mI l I T—t (El,z (E)s"x,2• F2 1E,o•x,2• KENT COMMONS RENOVATIONS CDTVJG2B 'E.' 1Hw CITY OF KENT,WA 800 CFM 6264hi AVEN - - -i i` (E120'x1 lO(EI CH-1 KENT,WA W32 (E)C6.6 FMMR-2 (E)cW TwRz (E)36x8 TWR-2 IE)�k4'� ',L IYP.OF4 TYP OF3 16)tdxl (Eo16x4 TW �COFM2 _ _ _iL_ __ FE�I4xVI P STD CFM 2A CFM eE�36x6 TWG2 1 y iE)�4�41 _-- 'E)HG '`O—I — cFM 1 zoo cFm ` - - - - r-a-r -- IF IE11 B•0 (E)1B• TRES WEST ENGINEERS,INC. E)LD A F -- - - - - - rY_ _ _I_r 440 CFMS 1 OF Di li . 12 SSD CF LFM ' ' IEI1 I I I I I G T{ J 1 + ML M. I XDC I MECHANICAL DEMOLITION PLAN LEGEND ®HATCHING INDICATES EXTENT OF DEMOLITION PLAN NOTES aom O DEMOLISH(E)DUCTWORK B EXHAUST GRILL,PATCH REMAIN(E) DUCTWORK AS REQUIRED. O DEMOLISH(E)SIDEWALL SUPPLY TRANSFER GRILL. O3 (PEj SUPPLY AIR DIFFUSER AND FLEX DUCT TO BE DEMOLISHED, ATCH REMAIN(E)DUCTWORK AS REQUIRED. 4O(E)DRYER VENT AND ROOF CAP TO REMAIN IN SERVICE. O DEMO LISH(E)WALLHEATER,TS ANDASSOCIATEDCOMOL sd Ames WM WIRING. penes.p.OWOm Y O DEUCRYORKAR AS RE. . REOTO BE DEMOLISHED.PATCH REMAIN(E) (D pqj CUPPRLlIiR11FFUSERANDDUCTWORKTOBEDEMOLISHED. MECHANICAL E)DUCTWORK AS REQUIRED. �(E)THERMOBTATTOBEDEMOLISHED. DEMOLITION PLAN E � z MD1 .0 1 2 3 4 5 6 7 8 Ao )r o 0 6a, (E)ovER� 600 CFM oN 46)x26�' E()W (E)36x6 wR-2 NE93Lo6�M (E)RL-2 ;��TD EBELL I s BURGESS DESIGN nP OF 2 I Fj aOE (E)20x01N SOFFIT (E)RLI PT %rc10 (E)RG (E)RG1 } }(E)%x6S.-2 nP.OF 3 RF zzo'D M No6E CC (E),2x6TWR-2 I Gua nP.z ,66CFM (E)14, zrce� — m nPO F Y oFEOcE RFI432 (E)EF oo (E)11 (E)10 I,ryS.SIR 12'0 aRaO (E)eG; i)'I 0 FM OLCFU O ® T606M' (E)12, = - _ nEwEXPOSED KENT COMMONS RENOVATIONS p TwG2 F. (E)Hw 1 DUCT CITY OF KENT,WA 800 CFM a 5254h AVEN _ (E)20'x1YCF. KENT,WA W32 (E),6x6 TWR-2 RE)—TW exS SR ®R60 (E) 3 24.0 nPCOF(4 SED CFM .12 '� 2O nP.OF2 I I 1 T1P.OF3 N14 UP I,e' TO STR ET RE /fin (E)RG ,9xt4"B F {��,��4,"'YYYIII IIIVVVrrr (E)36x8 nJ S (E)% TW E)24Y24' �i I11 O yT�6YlLST eaD CFM %o cFM (E E x 'ts orms (E),e•B (E)18-0 too TRE3 WEST ENGINEERS,INC. ]_(E) .0 CFM E)24'O Q (E)6x6 G RE)18.G UP . UP (E)S—UP H a1t<N LEVEL 1-MECHANICAL PLAN A PLAN NOTES 1O THERMOSTAT-CONNECT TO MISTING UNIT CONTROLLER. O(E)DRYER VENT AND RCOF CAP TO REMAIN IN SERVICE. O 4'0 DUCT DN.TO DRYER VENT CONNECTION BOX. M%mem.sumowmum LEVEL 1- T MECHANICAL PLAN M 1 .0 All 6 (E)S.2 17 L BURGESS DESIGN CC Q fl @ T-1 O KENT COMMONS RENOVATIONS CITY OF KENT,WA 525 4TH AVE IN KENT,WA W32 D D ----------i L (E) orms --- TRE3 WEST ENGINEERS,INC. OE UL4�'�D01 (E)1 4 --- &G — CH B— LEVEL 1-PLUMBING DEMOLITION PLAN A LEGEND HATCHING INDI—ES EXTENT OF DEMOLITION GENERAL NOTES 1. SAWCUT FLOOR AS REQUIRED TO INSTALL NEW WASTE PLZOTES O(E)PLUMBING FIXTURE&ASSOCIATED PIPING REMAIN IN SERVICE. O(E)WASTE PIPING REMAIN-SERVICE. QDEI R UG LOCATION TO NEW FIX"I W T,_.__,TUBE ON I=ROUGH N GC.NNE. sdn m AND PIPE ROUTING FOR NEW WALL HUNG URINALS. D—PLUM11"I I XTURI AND —1—11,VENT AND D.MEST NO CAPEX'ST'I NO PATCH AT FLOOR/CEIU FLOOR/CEILING AS REQUIRED. O DEMO ISH(E)T W UP TO E)PST FIXTURE LOWED IN LEVELl- =1SCA- RE=CAP EXISTING PIPING AT FLOOR.PATCH PLUMBING DEMOL SH(E)FLOOR D—CAP EXISTING PIPING AT FLOOR.—H DEMOLITION PLAN FLOOR AS REQUIRED, (D=I HITL,IATPEAA CLOSE T.-N'N DGAESNS1.1=I NI IAlI TO MAIN..NEWE.N. PD1 .0CHASENEREPARE REMAINING ENDS FOR RECONNECTION. 51 1 2 3 4 5 6 7 (EI6'22 Ao ® o o L -i (E)6"O ® BURGESS DESIGN o INN.I Ew (E14,O2 CHASE C (E)S'WTOFEGONNECT— SZ 4" AA ® (EI6.O �O O s i , T6A>,m O ® KENT COMMONS RENOVATIONS CITY OF KENT,WA ( 4.02 5254h AVEN (E)a1rz•vrR KENT,WA W32 O E VI a z O orms F S O TRE3 WE 0 ST ENGINEERS,'N C. O(E)4 Q(e14• ROUTE r,a�,Ww G a1.1<.N BID- 6'Q PLUMBING FOUNDATION PLAN A ire.=I�N. GENERALNOTES PLAN NOTES O Ex CONNED ION&P-TRAP AND PIPE ROUPING FOR NEW WALPIHUNG WATER CLOSET. 2D EXISTING WASTE PIPING REMAIN IN SERVICE. O P�ERIOUIINGFORNREWW.E=UPG IURINALSNECTIONSIP-TRAPANC d..aw sdn Amax,.y 6MN O P•WUP. Menw.2)AWO.W O 2•WA1-112-V UP. ©4'W UP. � PLUMBING �1-la FOUNDATION O 6•W REDGNNEDT 6•W TO EXI-ING PLUM6ING FI-URE PLAN LOCATE.IN MECHANICAL ROOM. o EXISTINGPLUMBING FIXTURE AND ASSOCIATED PIPING REMAIN IN P 1�.0 SERWGE lE 1 2 3 4 5 6 7 8 T�IEI z-uz•, ME �(EICW O xsLO ao FJ WgTER iO � W=S B soa" TYP. BURGESS DESIGN P-m Er'VTR RIF C (E11-RIP 1 IE canoe[ 3' .o M p o E P-0 O WOE. (E11-1l��Dx o ,6 Mo s T6B6M ryP.ep.PD O 6ao� (E)1 1 KENT COMMONS RENOVATIONS (EIZ-1/Z•vTR CITY OF KENT,WA P'f-- 52541H AVE N vrd�s�"BA A O KENT,WA W32 MO I P, M_ a'.IN AT" Oz-,rs•v IIINSEE-.`T CE I cciA P-2 E orm& 18 uPTo p-3 P. TRES WEST ENGINEERS,INC. OIE)1' TYPO z p� IS Lld P-3 Ta/ nBSY pO 11 C' cp M - I ' Tv. npnO"' 2 T OF3 v�N whw.veswesc�om QIE)Ne,—I PE •cw& M ,�,'=N 1plao n �� Ton.& LEVEL 1-PLUMBING PIPING PLAN P, PLAN NOTES (D EXISTING PIPING REMAIN IN SERVICE. 0,n CW, W WITHIN,r OF uvATORv STOPS TOZMEET SEC REQUIREMENTS. (D EXISTINGPLUMBING FIXTURE&ASSOCIATED PIPING REMAIN IN SERVICE. O 1•CW&1-,Ir'V DN, O TO POINT OF USE WATER HEATER&FWl)UNDERVLAVATORY. OHEATER W�H WH-Tl UNDERSINK.SEE BETALO�Up6E WATER —1G'TEMPRED WATER&1-,rrV DN,PROVIDE 1—W ©a14•CW DN TO TPa1. POINT oP USE WATER HEATER U�UNDER uvq 0— ro POIN3�oTEMP REED WAFER ER WX 3DN.PROVIDE,n^CW �s*oPS TO mEET sec aEouIRLE.E s wITHw lr oFuvATORv 1_IUNDER LAVATORY. ROUTE 314'TEMPEREDWATERTO(21SHOWER. 1Oe RECONNECTII2CW.HWTONEWP-1. ©,•CW&11/r V DN. o RECONNECT EXISTING PIPING TO NEW WATER CLOSET. (D 2•CW&r'VDN.ROUTEFULLSIZE PIPING TO PLUMBING FIXTURES INCHASE,SEE PLUMBING FIXTURE SCHEDULE FOR RUNOUTSIZES. °m"°e SCM ,*nna+w 6MM Oe TC CW&,/Z TEMPERED WATER DIC N"Ix''b9Np'W O SN'CW.1-1 V&—TEMPEREDWATERDN.ROUTEPIPINGIN CHASE TO PLUMBING FIXTURES. ' oMOFEMPEREDW�E .WATER V ON,PROVIDE,a•CW � LEVEL 1- � W",DNDERa^'°RY. PLUMBING a- POINT%F USE WATER HEATERWH--5j UNDER PIPING PLAN I I UNDER LIDS-Gv. CONN HW ECT,a^HWC& TO EXISTING PIPING.SEE DETA L ^ 2RA0.1.FIELD VERIFY EXACT LOCATION OF EXISTING PIPING. $ P2.0 Pb BOYCE Friday,August 2,2024 =C0NS'1rRU T1Di= Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate(CE)Worksheet Project Name: Kent Commons Renovation CE# 17 Nate Harper RFP# 17 City of Kent Scope of Work: CMU Demo for Plumbing&Electrical Remove approx 5'w x 4'h of existing CMU at sinkk locations in Mens RR 102 and Womens RR 106. Includes pourback of smooth concrete after electrical and plumbing install. *Excludes urinal locations in Mens 102,those walls muct be furred for plumbing vents. *Requires removal of all items and shelves in Janitors closet and boiler room. Boyce Construction Scope Hours Rate Cost Project Manager 2 $98.00 $196.00 Project Engineer 0 $75.00 $0.00 Supervision 8 $95.00 $760.00 Labor 40 $85.17 $3,406.80 Materials Concrete $270.00 Plywood forms and pins $55.00 Sub-Total $4,687.80 Sub-Contractor Costs(Lump Sum) Sub-Total $0.00 Rentals,Dumpsters,Lifts $0.00 Sub-total $0.00 Sub-Total $4,687.80 Overhead $234.39 Fee $196.89 Insurance,B&O Taxes $102.38 Sub-Total $5,221.46 WSST(10.2%) $532.59 Total adjustment to contract $5,754.05 Excludes: Permits,Permit Fees,Overtime&Weekend Work Duration: 5 days Approved: Date: T 2 3 PLAN NOTES � D PROMOS CEILING MOUNTED RECEPTACLE AND O RECONNEC NEW RECEPTACLE TO EXISTING CIRCUIT.FIELD VERIFY CIRCUIT AND LOCATION. A 0 UNDEREIKK�..ROI�;.WE R as ION WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH IN. BURGESS DESIGN F-333 OIPN TO ROUGH IN XAC.I:EoLIRE.EMSRS S Iry N=cooaDlrvaTe E MEN'S LOCKER ROOM H Os REINSTALL FIRE ALARM DEVICE,CONNECT TO 101 q(QOF-21 9 1 EXISTING FIRE CABLING. I H ORELOCATED ADA OPERATOR EXTEND CONDUIT ANDCONOUCTORSTO THISLOCATION. COORDINATE LOCATION OF PUSH BUTTONS WITH 0 ARCHTEC—NER PRIOR TO ROUGH IN. ENS RESTROOM/ R PROXIMATe Locanary of DATA RACK ALL SHOWER 5 OF-35 ODOTTH SILO LA 'H.=ON PLANS TO BEROUTED 102 C, F OTION S NAXFMR oHUPPERFLooRCvaovloeoz u`oa KEN CDR EDRniING AND SUPPORTS ASNECESSARY KENT COMMONS RENOVATIONS FOR INSTALLATION.REFER TO ONE-LINE DIAGRAM CITY OF KENT,WA ON SHEET ESD FOR ADDITION&INFORMATION. 5254TH AVE N CEILING MOUD To P-R KENT,WA m32 4 0 NEW CEILING FAN.Coo DINATECEXACT RECEPTACLE LOCATION WITH ARCHITECT AND OWNER PRIOR TOR UGH IN. Existing cores ONEW EILINGMOUNTED RECEPTACLE TOPDWER •New cores N. OF-25 —Conduit fez UTAND CONDUcroas As STORAGE —MC' NECESSARY rvD 104 O REINSTALL RECEPTACLE EXTEND EXISTING CONDUIT AND CONDUCTORS A$NECESSARY. O PR �wna D EXTENDDECorvrvNG CONNECTION NEW CONDUCTORS � AS NECEE.Rl 5 O gaacssM e° WOME RESTROOM 3 I SHOWER SHOWER 4 Tzn.n 0p0 9 10 F-34 OF-34 OF-36 OF-36 4 29 F-34 OF-36 F CONDITIONING ROOM bb 1p9 2 ME H ELECTRICAL POWER AND DATA PLAN Ae g 1 ELECTRICAL POWER AND DATA PLAN . E3.0 D U BOYCE Thursday,July 11, 2024 CONSTRUCTION Job# 6300 628 South Brandon Street RFI: 34 Seattle,WA 98108 Kent Commons Renovation Request for Information (RFI) Attn: Luis Perez Burgess PNW Question/Information Request: Restroom 102 & 106 Wall Demo Please see the attached RFI from Holmberg Mechanical regarding wall demo at 102 and 106. To avoid schedule delays, please respond no later than: Wednesday,July 17, 2024 Response BD: PLEASE PROVIDE PRICING / FEASIBILITY FOR BOTH OPTIONS NOTED IN ORDER TO EVALUATE THEM AND MAKE A DECISION. Direct any questions to: Project Manager Email: Bryce@boyceconstruct.com Phone: (206) 264-8085 1 ec[.1949 Request For Information M E C H A N I&CA L Phone: 425-822-2233 BUILDING SYSTEMS.ENSURING PROGRESS. Fax: 425-82 7-5 73 5 TO: Boyce Construction Inc. Date Initiated: 7/10/24 628 South Brandon Street RE Job: Kent Commons Renovation Seattle,WA 98108 Job#: 4354 Attn: Bryce Bowell Request No. HM-014 Desc. Item: Restroom 102 &106 Wall Demo Ref Dwg or Spec: P1.0, P2.0 Descri tion of Clarification Variation Reauest: In Restrooms 102 and 106,in order to relocate the waste,vent,and water piping to work with the new layout and new plumbing fixtures,the CMU walls need to be partially demoed to gain access to the existing plumbing to make tie-ins. To conceal the piping in-wall,Holmberg Mechanical recommends framing out the walls in front of the existing CMU walls. If framing out the walls in front of the CMU walls is not feasible then sections of CMU wall will need to be demoed and framing installed inside the CMU walls to give enough room for plumbing rough-in activities.See attached marked up drawing with pictures. Cost Impact TBD No Cost Impact Reply Required by: July 17,2024 Signed by: Originator: Daniel Timmons, Project Manager Date 7/10/2024 Approval: Date --------------------------------------------------------------- Clarification: BD: PLEASE PROVIDE PRICING / FEASIBILITY FOR BOTH OPTIONS NOTED IN ORDER TO EVALUATE THEM AND MAKE A Variation: Approved: Disapproved DECISION. Remarks: Received By: Date: Approval: Date: 2 3 4 5 6 LB t ( 6•Q2 � o 0 0 0 0 L -i EI6 BURGESS DESIGN o � IN CHASE 4 4" AA v 5 TaA>,m� D ® KENT COMMONS RENOVATIONS CITY OF KENT,WA 4.02 5254TH AVEN (E)2-1a•VTR KENT,WA W32 ® M_ 0 E� h 1 O FNOMEEp Oc ' TRES WEST ENGINEERS BIT o Q(El4• ROUTE Wom�W.a I"WALL .P.P—N. .111 ,E,6.2 PLUMBING FOUNDATION PLAN A ire._1�N. GENERALNOTES Mauoea.wwvem T O E% PING CONNECTIONS/P-TRAP ANO PIPE ROUTING FOR NEW WALL HUNG WATER CLOSET. 2O EXISTING WASTE PIPING RE—N IN SERVICE. O PPIER'OUIINGFORNREWWA LLHUNG'URINALSNECTIONSIP-TRAPANO d..w sdn Amax,.y 6NN O AWO.W T W UP. Menw.2) O 2•W11-112•V UP. © PLUMBING,"WUP. �1-,a•Vup. FOUNDATION € PLAN a O L.1 UP MECHANICAL ROOM%ISTING PLUMBING FI%TURF Y a EXIGTINGPLUMBINGFIXTUREANDASSOCIATEDPIPINGREMAININ P 1�.0 SERWGE Na 1 2 3 4 5 6 ALAP o 0 0 0 0 0 0 oMY/-(E)—(D I B M�a R Ro z TYP. E ° BURGESS DESIGN Das�own C 6® P-SA (EI,-,IC, (F(�.�" canOce r y EXACT LOCATON (Ely°'O1 .oM 6oE 0 0 Way. (EI1-fl� ,6 MB (E)I I Ten6 M' Tw.eI'D Q,(El z• KENT COMMONS RENOVATIONS (E12-irz•vTR CITY OF KENT,WA -- 5254TH AVE N "'A 'sPM-,A KENT,WA W32 E-) l� V V- 8 F.... (E12-0rz'v SERVICE -n'1' P-3A (�T(afwE HEAreR REMA IN Ps tB -, FNOMEEp (EI' uPTo ivPo P al B f� TRES WEST ENGINEERS INC. P3 L L - r6 z o P 3 NTooLo66. u, o T „3„ Z IIIIIIIIIIIIIIIIIIIII,-EmNB.S CMU-11 � OF3 rn�w.ti Q(E, 4'� N-Ne--11I rz•vBN H, �IB�BaDOB 7 Hill _. m o'P G)STLN�y$� 11 777 LEVEL 1-PLUMBING PIPING PLAN PLAN NOTES (D EXISTING PIPING REMAIN IN SERVICE. ,n 2 W WITHIN TS OF LAVATORY STOPS TO MEET SEC REQUIREMENTS. (D EXISTINGPLUMBING FIXTURE&ASSOCIATED PIPING REMAIN IN SERVICE. O 1-1—VEIN, O TO POINT OF USE WATER HEATER ry!H-,1 UNDERVLAVATORY. O HEATER W�H� WH-Tl UNDER SINK.SETO E BETA POINT�U66E WATER a0 o•CW.1(1 TEMPERED WATER&1-11TV DN,PROVIDE 1—W Q 3M'CW DIN TO TPa1, m www�em POINT OF USE WATER HEATER UHI UNDER LAVATORY. ro CW 3oFusEwAETIW,Ea,WX3DN.PROVIOE,n'CW �sTOPS io MEET SEC REQUIREMNTS. T"Irv1roFLAVATORv �1 UNOFR LAVATORY. ROUTE 31'TEMPERED WATER TO SHOWER. a RECONNE.TII'CW.HWT.N-11. Al RECONNECT EXISTING PIPING TO NEW WATER CLOSET. (D 2•C I-N.ROUTEFULLSIZE PIPING TO PLUMBING FIXTURES INCHASE,SEE PLUMBING FIXTURE SCHEDULE FOR RUNOUTSIZES. °"'"°e SCM F*Ye Mvy tlAM O,rz CW&,rz TEMPERED WATER DN. M"IA''b9WU'W OL CW.1-1 V&3/a'TEMPEREDWATERDN,ROUTEPIPINGIN CHASE TO PLUMBING FIXTURES. o112oTEMPEREDW�TER&1-w VDNP—IDE,a'CW � LEVEL 1- � USE ".,DNDERLANATORY. PLUMBING O TO POI'NTT F use WATER HEATER6VH-5 EN,UNDER-kVATOCW PIPING PLAN I H-s(UNDERLAvnTORY. a CONNECT,a'HwC&HW TO EXISTING PIPING.SEE DETA L ^ 2RA0.1.FIELD VERIFY EXACT LOCATION OF EXISTING PIPING. z P2.0 ^1a0 a Ra Signature: � �% j Signature: Email: nharper@kentwa.gov Email: rlashley@kentwa.gov Signature: 51-iah Leveilhaam Signature: Kum KOOv O v- Brian Levenhagen(Oct 1,20241 :45 PDT) Kim Komoto(Oct 1,202416:57 PDT) Email: bjlevenhagen@kentwa.gov Email: cityclerk@kentwa.gov CAG2024-166 - Change Order - #8-Boyce Cons truction-FAC23-31 Kent Commons Renovations Final Audit Report 2024-10-01 Created: 2024-09-26 By: Leah Bryant(Ibryant@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAAdd-8Qg3f2zfaxACNtxaP9XJOpww-RKiN "CAG2024-166 - Change Order - #8-Boyce Construction-FAC23 -31 Kent Commons Renovations" History Document created by Leah Bryant(Ibryant@kentwa.gov) 2024-09-26-8:42:36 PM GMT Document emailed to nharper@kentwa.gov for signature 2024-09-26-8:51:29 PM GMT Email viewed by nharper@kentwa.gov 2024-09-26-8:52:22 PM GMT &Q Signer nharper@kentwa.gov entered name at signing as Nathen C. Harper 2024-09-26-8:54:32 PM GMT dp Document e-signed by Nathen C. Harper(nharper@kentwa.gov) Signature Date:2024-09-26-8:54:34 PM GMT-Time Source:server Document emailed to Robert Bowell (bbowell@boyceconstruct.com)for signature 2024-09-26-8:54:40 PM GMT Email viewed by Robert Bowell (bbowell@boyceconstruct.com) 2024-09-26-8:59:34 PM GMT &5g Document e-signed by Robert Bowell (bbowell@boyceconstruct.com) Signature Date:2024-09-26-8:59:56 PM GMT-Time Source:server Document emailed to Kent Parks (parkscontracts@kentwa.gov) for signature 2024-09-26-9:00:01 PM GMT Email viewed by Kent Parks (parkscontracts@kentwa.gov) 2024-10-01 -7:18:36 PM GMT Powered by Adobe �� KENT Acrobat Sign ID Document signing delegated to Ronald Lashley(rlashley@kentwa.gov) by Kent Parks (parkscontracts@kentwa.gov) 2024-10-01 -7:28:09 PM GMT Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date:2024-10-01 -7:28:31 PM GMT-Time Source:server Document emailed to bjlevenhagen@kentwa.gov for signature 2024-10-01 -7:28:35 PM GMT Email viewed by bjlevenhagen@kentwa.gov 2024-10-01 -7:45:19 PM GMT dg Signer bjlevenhagen@kentwa.gov entered name at signing as Brian Levenhagen 2024-10-01 -7:45:43 PM GMT �p Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date:2024-10-01 -7:45:45 PM GMT-Time Source:server Document emailed to Julie Parascondola Qparascondola@kentwa.gov) for signature 2024-10-01 -7:45:51 PM GMT Email viewed by Julie Parascondola (jparascondola@kentwa.gov) 2024-10-01 -11:04:58 PM GMT d4 Document e-signed by Julie Parascondola Qparascondola@kentwa.gov) Signature Date:2024-10-01 - 11:05:14 PM GMT-Time Source:server Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature 2024-10-01 -11:05:20 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2024-10-01 -11:54:11 PM GMT Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date:2024-10-01 -11:54:24 PM GMT-Time Source:server Document emailed to cityclerk@kentwa.gov for signature 2024-10-01 -11:54:30 PM GMT Email viewed by cityclerk@kentwa.gov 2024-10-01 -11:57:28 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Kim Komoto 2024-10-01 -11:57:46 PM GMT Powered by Adobe �� KENT Acrobat Sign 55Q Document e-signed by Kim Komoto (cityclerk@kentwa.gov) Signature Date:2024-10-01 -11:57:48 PM GMT-Time Source:server Q Agreement completed. 2024-10-01 -11:57:48 PM GMT Powered by Adobe ��KENT Acrobat Sign