HomeMy WebLinkAboutCAG2024-450 - Original - Puget Sound Energy - KEHOC PSE Commercial Electric - 9/20/24 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr: Z X_
Agreement Routing Form DirAsst: KP
• For Approvals,Signatures and Records Management Dir/Dep: BL�L
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional)
W A S H I N G T O N Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Leah Bryant for Nate Harper Parks, Recreation & Community Services
Date Sent: Date Required:
> 08/23/2024 8/30/2024
0
fl. Authorized to Sign: Date of Council Approval:
aMayor or Designee 8/20/2024
Budget Account Number: Grant? Yes NOW]
F20098
Budget?ZYes E]No Type: N/A
Vendor Name: Category:
Puget Sound Energy Contract
Vendor Number: Sub-Category:
= 37086 Original
Project Name:
KEHOC PSE Commercial Electric
a- Project Details: PSE to provide power to the Kent East Hill Operations Center(KEHOC).The City will drill bore conduits and
0 excavate and backfill the vaults,intercepts and bore pits required to bring power from theintersection of 124th
4— Ave SE and SE 256th Street to the KEHOC site.This contract will pay PSE to install the wire,switch,
C transformer,vaults and other power infrastructure required for power service at KEHOC.
C
Basis for Selection of Contractor:
� AgreementAmount: 543,150.50 Other
N *Memo to Mayor must be attached
i� Start Date: September 2024 Termination Date: 12/31/2024
Q Local Business? Yes Who*If meets requirements per KCC 3.70.100,please complete'Vendor Purchose-Locol Exceptions"form on Cityspace.
Business License Verification: ❑Yes In-Process 1:1 Exempt(KCC 5.01.045) Authorized Signer Verified
Notice required prior to disclosure? Contract Number:
Yes W1 No CAG2024-450
Comments:
This passed consent on 8/20/224
iContract will be routed to the Mayor for signature via Docusign.
3
c c
0
iz 0
3 0
a,
a,
oc
Date Received:City Attorney: 9/5/24 Date Routed:Mayor's Office 9/20/24 City Clerk's Office 9/20/24
adccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20221201
Docusign Envelope ID:5F47E120-4B82-4476-A16D-F97056F858FA Date
ruuc► COMMERCIAL ELECTRIC FACILITIES CONTRACT 7/18/2024
' SOUND
ENERGY Contract is subject to revision after
90 days
CUSTOMER(OWNER)NAME City of Kent CO-OWNER NAME(IF APPLICABLE)
SERVICE ADDRESS 12607 SE 248th ST CITY Kent STATE WA ZIP 98030
BILLING ADDRESS CITY STATE ZIP
400 West Gowe St Kent WA 98032
PHONE 2535611587 EMAIL dholcomb@kentwa.gov PSE WORKORDER NO. 105104565
Summary of Charges: Brief Description of Work:
Construction Costs: $ 359,356.85 Please see design
Transformation Charges: $ 73,581.07
Less Applicable Margin Allowance: $ 0
Sub-Total (Potential Refundable Costs): $ 432,937.92
Permitting Fees*: $ 1,335.19
Relocation/Removal of Existing Facilities: $ 0
Other Non-Refundable Construction Charges: $ 121,680.06
Brief Description of Other Costs:
Sub-Total (Non-Refundable Costs): $ 123,015.19 Service connection fee at transformer to be paid post
construction
Less Deposit Paid in Advance: $ 12,802.61
Total Amount to be Billed Under This C +I�ct: $ 543,150.50
Customer Initialsla__
*If the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service
charges below after the service is energized.
SECONDARY SERVICE CHARGES(PERMANENT AND TEMPORARY)ARE NOT INCLUDED IN THE SUMMARY OF CHARGES
ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual
work performed. Base Costs, in the table below, are based on the current tariff pricing as of the date of installation and include the
Schedule 87 tax effect.These charges also do not include permitting fees,trenching and other excavation related work that is your
responsibility.The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill.
Secondary Service Type 480 Volta a or Below Cost w/Schedule 87 tax effect
Single wire run to handhole or transformer $912.07
Each additional run of wire(per circuits $189.92 Customer
Each additional trip beyond 1st trip due to customer needs $564.25 per trip n'fials:
Hourly rate for additional engineering at customer's request $246.24
Underground Temporary Service Charge $230.00
Overhead Temporary Service Charge $474.00
Overhead to Overhead Permanent Service Charge $914.28
Underground to Underground Permanent Service Charge $749.75
Overhead to Underground Permanent Service Charge $1,401.23
By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon
receipt of a signed contract, PSE will bill you for the amount indicated on the "Total Amount to Be Billed Under This Contract"
line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges
prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station.
Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the
project may result in additional charges, and/or delays to your project.
DocuSigned by:
Signature: 06UAA fdflName: Dana Ralph Title: Mayor Date:09/20/2024
93E99D67ED24442...
Docusign Envelope ID: 5F47E120-4B82-4476-A16D-F97056F858FA
TERMS AND CONDITIONS
PROJECT INFORMATION
1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground
electrical facilities required to provide electrical service to your project. Fault current information for transformers
associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible
to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are
conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the
number below. This is attached as Exhibit A.
2. Additional construction-related information and information on metering and service entrance requirements
areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the
handbook please contact me at the number below. It is your responsibility to provide your project manager, site
superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their
work in support of your project.
3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and
returned to me along with a signed copy of this contract. This is attached as Exhibit B.
4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor
(continuous) temporary power uses, such as electric heaters for dry-out. Fault currents for non- residential
transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative
listed on this contract immediately if you believe there are conflicts between this design and your project. It is
your responsibility to provide your project manager, site superintendent, and subcontractors with any information
from this correspondence and it's attachments that apply to their work.
5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements
must be signed by the project owner or designee and returned along with a signed copy of this contract. This is
attached as Exhibit C.
POTENTIAL REFUNDS
Margin Allowance:
If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and
refund the Margin Allowance, subject to Schedule 85. Refund requests must be made within six (6)years of the date on
which the facilities installed under this contract are energized. Customers are responsible for making the one-time refund
request.
DIM Refund:
Other refunds associated with the line extension charge may be available if additional permanent service hook-ups are
made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project
is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time
within six (6) years of the date on which your line extension is initially energized. It is the customer's responsibility to
make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at
Schedule85refundrequests@pse.com.
RATE SCHEDULE 85
All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies
between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains
more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of
Rate Schedule 85 can be viewed at PSE's website www.pse.com.
This cost information is valid for 90 days from the Date Issued, and is subject to being updated after that time. I have read
both pages and agree to the terms and conditions outlined in this contract and its attachments.
The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires
customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is
complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund
will result to account for the difference.
Docusign Envelope ID:5F47E120-4B82-4476-A16D-F97056F858FA
Vruur 1
SOUND
ENERGY
REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET
SOUND ENERGY, INC. EASEMENTS
The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way
or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE
permit or easement must comply with these requirements.
1. All trench construction must be performed by a Washington State licensed and bonded contractor.
2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated
representative, and receive on-site approval by that representative, and local jurisdiction.
3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through
Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction
is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to
trenching. Penalties for failure to comply with this requirement will be borne by the customer.
4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility
facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements.
5. PSE, all participating utilities, and One-Call Locate, must be notified a minimum of 72 hours in advance of the
date and time for right-of-way trenching and facility placement. The One-Call Locate number is 1-800-424-5555.
State law requires locating service notification.
6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris
shall be removed off-site each day, in accordance with local regulatory requirements. All erosion control
requirements in accordance with local regulatory requirements are the responsibility of the customer.
7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select
backfill material in accordance with local regulatory requirements.
8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction
testing, the cost of said testing is the responsibility of the customer.
9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications
and satisfaction.
10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume
trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and
joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the
company for costs should PSE perform the trenching.
DS
Customer Initials:
11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable
attorneys'fees) arising out of, or in connection with, the above mentioned trenching activities.
DS
Customer Initials: Eur
I AGREE TO ADHERE TO THE ABOVE CONDITIONS
Service Address: 12607 SE 248th ST Kent 98030 Work Order Number: 105104565
DocuSigned by:
Signature: Name: Dana Ralph Title: Mayor Date:09/20/2024
93E99D67ED24442...
Docusign Envelope ID:5F47E120-4B82-4476-A16D-F97056F858FA
I-VOL 1
' SOUND
ENERGY
PSE ELECTRICAL FACILITIES
EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION
PURPOSE
This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is
providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating
rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be
the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction.
EXCAVATION REQUIREMENTS
The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a
condition of receiving electrical service for your project. If you need additional information, please call the PSE contact
person listed below.
1. Developer is responsible for acquiring utility locates by calling One-Call, 1-800-424-5555 at least 48 hours (two full
working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative
Code and Safety Standards.
2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation.
3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum
trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility
coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical
facilities and other utilities within a joint trench.
4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and
shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages
caused by improper backfill or compaction.
5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and
any foundation on Developer's property.
6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid
level bottom with a 6 inch deep layer of crushed rock bedding.
7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify
and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities.
8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside
the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages
resulting from dig-ins due to changes or variations in grade that are made after the installation of PSE's facilities.
FINAL GRADE CERTIFICATION
By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full
responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold
harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all
claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate
within easement areas or rights-of-way, or from digging without adequate rights on adjoining properties.
Service Address: 12607 SE 248th ST Kent 98030 Work Order Number: 105104565
DocuSigned by:
Signature: ONAA rdflName: Dana Ralph Title: Mayor Date:09/20/2024
93E99D67ED24442...
2806 08/15
-INSTALL (6) 15KV 750KCMIL AL CS LUG TERM 6041.3000 (TER750C)
-INSTALL CABLE TAGS AOACD716, BOACD717& COACD718 FROM SW1
-INSTALL SWITCH#U92141
-INSTALL GRID#
FAULT CURRENT TABLE
AT PV2 (NEI/l): 313962-166761 30 PM TRANSFORMERS (480Y/277V)
-INSTALL 575 PULL VAULT W/PC H2O 6051.1500 (SVTB20)
-INSTALL (3) 1/0 CABLE SPLICES 6041.2000 (SPL10J) 277V WINDINGS 480V WINDINGS
-INSTALL GRID NUMBER MIN. FAULT MIN. FAULT
-INSTALL CABLE TAGS LOCATION SIZE R/X %Z CURRENT %Z CURREN
AT J01 (NEM: 314047-166763 Vol 1500kVA 0.1 - - 5.30 34,000
-INSTALL (1) 30 575 12kV 4-POS J-BOX 6055.1030 (JBOX15L)
-INSTALL (1) 4'-8"X 7'X 5'HH W/2-3'SQ DOORS (MID: 7663200)
-INSTALL (3) J-BOX 200A 15KV 4 BUSHINGS W/HDWR (MID: 7625900)
-INSTALL (9) 12KV UB ELBOW KITS 604 1.1000 (ELB10J)
-INSTALL (3) 12KV DUST CAPS (MID: 7804000)
-INSTALL CABLE TAGS PER ONE-DRAWING
-INSTALL GRID NUMBER TRANSFORMER INSTALLATION (PM)
AT J02(EXISTING): 314042-166752 Installed at site: Vol
-EXISTING VAULT&30 JBOX TO REMAIN Grid Number: 314101-166774
-INSTALL (3) 12kV UB ELBOW KITS 6041.1000 (ELB10J) kVA Rating: 1500kVA 277/480V
-INSTALL CABLE TAGS PER ONE-DRAWING
Material ID#: 6259400
Foreman to redline the following information
AT V01 (NEW):314101-166774 Company ID#:
-INSTALL (1) 30 776 DP VAULT W/GROUNDS 6045.5000 (PM3P12D)
-INSTALL (1) 7'X 7'X 6'-2"HH W/60"X 24"ACCESS (MID: 7918000) Primary phase connected to:
-INSTALL (1) GALVANIZED CABLE SUPPORT LADDER (MID: 9997916) Tested Secondary Voltage /
-INSTALL (1) 1500kVA 2771480V PADMOUNT TRF(MID: 6259400)
-INSTALL (3) 12kV ELBOW KITS 604 1.1000 (ELB10J)
-INSTALL (12) 4-RUN 501-750 KCMIL SECONDARY CONNECTOR BARS (MID: 7651003)
-INSTALL (32) MOUNTING BOLT KITS (MID: 7651008)
-INSTALL CABLE TAGS ACCORDING TO ONE-LINE DIAGRAM
-INSTALL GRID NUMBER
-CONNECT 10-RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 600KCML SVC
AT M01:NEW METER BASE
-PSE METER DEPARTMENT TO INSTALL 2500A CT METER
SPAN SPECIFIC NOTES
FROM SW1-PV1
-RE-DIRECT EXISTING 30 FEEDER TO NEW VAULT @ SW2 & TRIM EXCESS
-SEE SITE PLAN, ONE LINE DRAWING AND TABLES FOR ADDITIONAL REMOVALS & INSTALLS
ji
is
i .
9 12613 12619 Cn
ji m
t
ji
Y
n
60'
' _ ROW
SE 256TH ST
t�110T^11ACO ^XA/AICM AKIM IAICTA1 1 C11 CCt�/1AIMAON/ \A/IOC TAQI 0
i
I 1-RUN 30 1/0 AL JKT BP3 PV2 4" 1 740 X 0 0 0 0 CONDUIT ONLY
�UG PRI CABLE
AO-EJM209 SW2 PV2 CABLE ONLY 1229 1550 PRI 12KV 1/0 UG 890 EJM209 EJM210 EJM211
l BO-EJM210
CO-EJM211 PV2 J01 4" 1 850 X 0 0 0 0 483.1 544.1 PRI 12KV 1/0 UG 870 EJM209 EJM210 EJM211
2-55 (890)
RE-DIRECT EXISTING BP4 J02 4" 1 35 X 0 0 0 0 CONDUIT ONLY
I
30 FEEDER& RE-USE
CABLE TAGS J01 J02 CABLE ONLY 305.2 329.8 PRI 12KV 1/0 UG 160 EJM212 EJM213 EJM214
IAD-ACD716
I BG—ACD717 J01 BP5 4" 1 560 X 0 0 0 0 CONDUIT ONLY
CO—ACD718
--- BP5 V01 4" 1 100 X 0 1 0 0 CONDUIT ONLY
L `
S J01 Vol CABLE ONLY 187.2 232.5 PRI 12KV 1/0 UG 680 EJM215 EJM216 EJM217
SW PV1
U92141 6" SCH80 FT= 20 30 12KV 1/0 CBL = 2810
—166741 —166765 313873-166836 4" SCH80 FT= 165
92141
4" HDPE FT= 2245
DIAGRAM
Service
Conduit
to M01
OO�OC s j 70 O OOp� O 0o O�
o 0 0
b op°c
Primary
gjopo - Conduit
to J 01
�oo oo� 11'
Oc�rJ�u
Qo� 07.
(�dFb82�C No Secondary >0 0
00 00 0 0o vo 0 0 of o0 00 0
11'
PLAN VIEW
CONDUIT PLACEMENT @ V01
Not to scale
//\\ Al
MIN�MIN � t-
MAX MAX L
GUARD POST LOCATIONS ROAD OR
REQUIRED
GUARD POST INSTALLATION 5' MIN PARKING AREA
The following styles of guard posts are approved for Puget Sound Energy transformers: WORK SPACE
AREA
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days. CURB OR EDGE OF PAVEMENT
The exposed portion of the post Shall be painted traffic yellow. MINIMUM CLEARANCES FOR PM T R F & VAULT
- 6 ft x 9 in. diameter precast steel-reinforced concrete post. Not to scale
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
GUARD POST INSTALLATION @ V01
Not to scale 0700.1600-03
ROAD SIDE (PREFERRED)
3'MIN
3'MIN 3'MIN
TOP VIEW VAULT LID
I I
0
MIN
Proposed Existing 4"
4" to V01
FIELD SIDE(PREFERRED)
TOP VIEW VAULT LID @ J02
Not to scale 6775.0035.02
Proposed 4"
Proposed 4" to J01
Proposed 4" to PV2 Existing 4"
to J02
Existing 6" -XI EE
J-BOX B-FLY DETAIL (J01) J-BOX B-FLY DETAIL (J02)
SCALE: NONE SCALE: NONE
314042-166752
r
BREAKLINE ± 520' N I
�AO-EJM209 —
BO-EJM210 _ - 314042-166752-
I CO-EJM211
I
AO-EGP605
313962-166761
w SE 253RD ST (PVT)
� I
J
d
M I —
313968-166749
313964-166741 UNK(40T)
37.5kVA 120/240V I N SK00494
BREAKLINE ± 500' N
B038301 /�A038309 �
Af�38309
/ m
w
I o w
(0 >
�AO-EJM209 1+1 =
AOACD744 � BOl-EJM210 Z ti
BOACD745 CO-EJM211 Y
COACD746 Q
ui
00 —
40hr—r1728 AO-EJM206
BOACD739 BO1-EJM207 SE 256TH ST I AO-ACD716 _
Cf�ACD740 CO-EJM208 B�-ACD716
CO-ACD716
2 16: 313878-166765
AOJACD710 S
BOlACD711 U92141� 313875-166741 �
COACD712AOACD741 F-V2W6 .
a J 313873-166836
166836 BOACD742 TCOACD743313874-166741 313874-166742 18AOACD747 3372-166836
66836 BOACD748 O
\rJ—
I,313873-166835
COJACD749 37.5kVA 1201240V
•OV AOACD774 I ui
UG CIRCUIT MAP - POST CONSTRUCTION
SCALE: NTS -
.;
I' ��•�� X1330X12301 X3857' ox �•� 3�? B'•100T 30 X7452�' �3 X34�2~ 12131516
TL ..r X34�5 ' 300 `�'..
SE 240 ST —
:.B...., A B LMD X4 OOT X1124. ;•� — — —
e X3448 — —
�A.. 13 SE? ;B � 100T cV; 1
+• swi
3 T �. q } � t C°��°� 3 313875-166741 S I
B •Q B - ` U2586
• N N 313874-166741
CLARK °�o� • )T ^ ^ h 313874-166742
C: 30 ^ 65Tg B• B"'`
;SE?gs 100T A:.
3�:'. . ......
6 T ••30 : 3� PRE/POST CONSTRUCTIC
..... q A, •-
cBC ;q• X1620 : • ' SCALE: 1" = 50'
4nr i.. �I. __. ., _-.. ._
FAC-082324-PSE-KEHOC Power
Final Audit Report 2024-09-04
Created: 2024-08-27
By: Leah Bryant(Ibryant@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA1R3gDcH3cW_r0-kKDjPMtdAnnfPVEAdJ
"FAC-082324-PSE-KEHOC Power" History
Document created by Leah Bryant(Ibryant@kentwa.gov)
2024-08-27-8:15:09 PM GMT
Document emailed to nharper@kentwa.gov for signature
2024-08-27-8:18:47 PM GMT
Email viewed by nharper@kentwa.gov
2024-08-27-8:22:28 PM GMT
Signer nharper@kentwa.gov entered name at signing as Nathen C. Harper
2024-08-27-8:26:12 PM GMT
ca Document e-signed by Nathen C. Harper(nharper@kentwa.gov)
Signature Date:2024-08-27-8:26:14 PM GMT-Time Source:server
Document emailed to Kent Parks (parkscontracts@kentwa.gov)for signature
2024-08-27-8:26:22 PM GMT
3 Email viewed by Kent Parks (parkscontracts@kentwa.gov)
2024-08-29-8:50:55 PM GMT
Document e-signed by Kent Parks (parkscontracts@kentwa.gov)
Signature Date:2024-08-29-8:51:20 PM GMT-Time Source:server
Document emailed to bjlevenhagen@kentwa.gov for signature
2024-08-29-8:51:24 PM GMT
Email viewed by bjlevenhagen@kentwa.gov
2024-09-04-11:56:20 PM GMT
EY Signer bjlevenhagen@kentwa.gov entered name at signing as Brian Levenhagen
2024-09-04-11:56:54 PM GMT
Powered by
r � Adobe
T Acrobat Sign
Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov)
Signature Date:2024-09-04- 11:56:56 PM GMT-Time Source:server
Agreement completed.
2024-09-04-11:56:56 PM GMT
POWL-md by
Adobe
KENT Acrobat Sign