Loading...
HomeMy WebLinkAboutCAG2024-445 - Original - Washington State Department of Transportation - Meet Me on Meeker - Thompson Avenue to Interurban Trail - 9/18/24 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form DirAsst: • For Approvals,Signatures and Records Management Dir/Dep: KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (Optional) WASHINGTON Sheet forms. (Print on pink or cherry colored paper) Originator: Department: Karin Bayes for Drew Holcomb Public Works Date Sent: Date Required: c 09/12/2024 9/19/2024 Q Mayor or Designee to Sign. Date of Council Approval: Q Interlocal Agreement Uploaded to Website 2/21/2023 Budclet Account Number: Grant? Yes ✓ NoF—] R20134 (678) Budget?❑✓ Yes N Type: State Vendor Name: Category: Washington State Department of Transportation (WSDOT) Contract Vendor Number: Sub-Category: Original 0 W Project Name: Meet Me on Meeker - Thompson Ave to Interurban Trail 3- Project Details: The project will construct a roundabout at the intersection of Meeker Street and Lincoln Avenue, a multi-modal promenade along the south side of West Meeker Street that includes a two-way separated bikeway, and sidewalk with buffer and amenity zones. See attached. C Agreement Amount: $6,100,000 Basis for Selection of Contractor: Interlocal Agreement E *Memo to Mayor must be attached 1 Start Date: Upon Execution Termination Date: a Local Business? Yes F]No*If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Business License Verification: ❑Yes In-Process F1 Exempt(KCC 5.01.045) Authorized Signer Verified Notice required prior to disclosure? Contract Number: Yes❑No CAG2024-445 Comments: The project is estimated to cost $6,100,000; $4,757,500 will come from federal funding; $1,192,500 state funds and $150,000 in local matching IM funds. � c IM rw 3 0 Date Received:City Attorney: 9/16/24 Date Routed:Mayor's Office 9/18/24 City Clerk's Office 9/18/24 adccW22373_7_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20221201 8.J 1�# KENT DATE: February 21, 2023 TO: Kent City Council SUBJECT: Puget Sound Regional Council Grant for Meet Me on Meeker - Thompson Avenue to Interurban Trail - Authorize MOTION: Authorize the Mayor to accept grant funds from the Puget Sound Regional Council's Regional Grant for the Meet Me on Meeker - Thompson Ave to Interurban Trail, in the amount of $4,757,500, amend the budget, authorize expenditure of the grant funds accordingly, authorize expenditure of up to $1,342,500 in local matching funds from the B&O fund, and authorize the Mayor to sign all necessary documents, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: The Puget Sound Regional Council (PSRC) issues a merit-based project selection process as part of the Regional Transportation Improvement Program every two years. At the start of each funding cycle, PSRC adopts a Policy Framework to guide selection of projects which support the region's growth strategy and transportation plan. Since 2002, the adopted policy focus for PSRC's federal funds has been to support the development of centers and the corridors that serve them. The project selection process includes four countywide and one regional forum responsible for coordinating the competitions and recommending projects to the PSRC Transportation Policy Board, which includes representatives of member jurisdictions from across the region. In March 2022, the City applied to PSRC for design and construction funds for improvements on Meeker Street between Thompson Avenue and the Interurban Trail. The project will add a two-way bike facility on West Meeker Street, enhanced pedestrian crossing facilities, and a compact roundabout at the intersection with Lincoln Avenue. The project will be built to the Meet Me on Meeker Street design standards adopted in 2016 through extensive public engagement. The improvements will support the link between neighborhoods and downtown Kent, and transportation users of all modes with pedestrian crossing facilities, lighting, and separated bicycle facilities. The project is estimated to cost $6,100,000, including a local match of 20% ($1,342,500) with design work to begin in October 2024. Staff proposes the required matching funds be paid from B&O funds. Packet Pg. 196 8.J BUDGET IMPACT: Estimated budget impact is $724,500 from B&O funds to match Federal grant funds. SUPPORTS STRATEGIC PLAN GOAL: Innovative Government - Delivering outstanding customer service, developing leaders, and fostering innovation. Evolving Infrastructure - Connecting people and places through strategic investments in physical and technological infrastructure. Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and inviting parks and recreation. Sustainable Services - Providing quality services through responsible financial management, economic growth, and partnerships. Inclusive Community - Embracing our diversity and advancing equity through genuine community engagement. ATTACHMENTS: 1. Meet Me on Meeker Award Letter (PDF) 02/06/23 Public Works Committee MOTION PASSES RESULT: MOTION PASSES [UNANIMOUS]Next: 2/21/2023 7:00 PM MOVER: Satwinder Kaur, Councilmember SECONDER: Marli Larimer, Councilmember AYES: Brenda Fincher, Satwinder Kaur, Marli Larimer Packet Pg. 197 Adft CAWashington State iDepartment of Transportation Local Agency Agreement Agency City of Kent CFDA No.20.205-Highway Planning and Construction (Catalog of Federal Domestic Assistance) Address 220 Fourth Ave. S Kent, WA 98032 Project No. Agreement No. For WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply,with the terms and conditions set forth in (1)Title 23, U.S. Code Highways, (2)the regulations issued pursuant thereto, (3)2 CFR Part 200, (4)2 CFR Part 180—certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5)the policies and procedures promulgated by the Washington State Department of Transportation, and (6)the federal aid project agreement entered into between the State and Federal Government, relative to the above project,the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3,without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Meet Me on Meeker-Thompson Ave to Interurban Trail Length 0.19 miles Termini Thompson Ave to approximately 200 feet east of the Interurban Trail Description of Work The project will construct a roundabout at the intersection of Meeker Street and Lincoln Avenue, a multi-modal promenade along the south side of West Meeker Street that includes a two-way separated bikeway, and sidewalk with buffer and amenity zones. Further enhancements include curb bulb-outs, on-street parking, enhanced pedestrian crossings at the roundabout, a new crossing at the Interurban Trail, pedestrian amenities, and a widened sidewalk with buffer zone along the north side of Meeker Street. Project Agreement End Date 12/31/2027 Claiming Indirect Cost Rate Proposed Advertisement Date ❑Yes V No Estimate of Fundin Type of Work (1) (2) (3) Estimated Total Estimated Agency Estimated Federal Project Funds Funds Funds PE a.Agency 493,500.00 493,500.00 b.Other Federal Aid c. Other Consultant(State MAWA$ 4,500.00 4,500.00 Participation d.State Services 2,000.00 2,000.00 Ratio for PE 500,000.00 500,000.00 0.00 e.Total PE Cost Estimate a+h+c+d Right of Way f.Aciency .Other Federal Aid h.Other Participation Ratio for RW i.State Services .Total R/W Cost Estimate f+ +h+i 0.00 0.00 0.00 Construction k.Contract 1.Other m.Other Federal Aid n.Other Participation o.A enc Ratio for CN p. State Services q.Total CN Cost Estimate k+l+m+n+o+ 0.00 0.00 0.00 r.Total Pro'ect Cost Estimate a+'+ 500,000.00 500,000.00 0.00 Agency Official Washington State Department of Transportation uignairy signea oy unaa osier, By Chad Bieren Date:2024.09.1216:00:52-0 By Title Public Works Director Director, Local Programs Agency Date 9/12/24 Date Executed DOT Form 140-039 Page 1 Revised 04/2022 Construction Method of Financing (Check Method Selected) State Ad and Award Method A-Advance Payment-Agency Share of total construction cost (based on contract award) Method B - Withhold from gas tax the Agency's share of total construction coast (line 5, column 2) in the amount of $ at $ per month for months. Local Force or Local Ad and Award Method C -Agency cost incurred with partial reimbursement The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the federal funds obligated, it accepts and will comply with the applicable provisions set forth below.Adopted by official action on Resolution/Ordinance No. Provisions I. Scope of Work The Agency shall provide all the work, labor, materials, and services necessary to perform the project which is described and set forth in detail in the"Project Description"and "Type of Work." When the State acts for and on behalf of the Agency,the State shall be deemed an agent of the Agency and shall perform the services described and indicated in "Type of Work"on the face of this agreement, in accordance with plans and specifications as proposed by the Agency and approved by the State and the Federal Highway Administration. When the State acts for the Agency but is not subject to the right of control by the Agency,the State shall have the right to perform the work subject to the ordinary procedures of the State and Federal Highway Administration. II. Delegation of Authority The State is willing to fulfill the responsibilities to the Federal Government by the administration of this project.The Agency agrees that the State shall have the full authority to carry out this administration.The State shall review, process, and approve documents required for federal aid reimbursement in accordance with federal requirements. If the State advertises and awards the contract, the State will further act for the Agency in all matters concerning the project as requested by the Agency. If the Local Agency advertises and awards the project,the State shall review the work to ensure conformity with the approved plans and specifications. III. Project Administration Certain types of work and services shall be provided by the State on this project as requested by the Agency and described in the Type of Work above. In addition,the State will furnish qualified personnel for the supervision and inspection of the work in progress. On Local Agency advertised and awarded projects,the supervision and inspection shall be limited to ensuring all work is in conformance with approved plans, specifications, and federal aid requirements.The salary of such engineer or other supervisor and all other salaries and costs incurred by State forces upon the project will be considered a cost thereof.All costs related to this project incurred by employees of the State in the customary manner on highway payrolls and vouchers shall be charged as costs of the project. IV.Availability of Records All project records in support of all costs incurred and actual expenditures kept by the Agency are to be maintained in accordance with local government accounting procedures prescribed by the Washington State Auditor's Office, the U.S. Department of Transportation, and the Washington State Department of Transportation.The records shall be open to inspection by the State and Federal Government at all reasonable times and shall be retained and made available for such inspection for a period of not less than three years from the final payment of any federal aid funds to the Agency. Copies of said records shall be furnished to the State and/or Federal Government upon request. V.Compliance with Provisions The Agency shall not incur any federal aid participation costs on any classification of work on this project until authorized in writing by the State for each classification.The classifications of work for projects are: 1. Preliminary engineering. 2. Right of way acquisition. 3. Project construction. Once written authorization is given,the Agency agrees to show continuous progress through monthly billings. Failure to show continuous progress may result the Agency's project becoming inactive, as described in 23 CFR 630, and subject to de-obligation of federal aid funds and/or agreement closure. If right of way acquisition, or actual construction of the road for which preliminary engineering is undertaken is not started by the close of the tenth fiscal year following the fiscal year in which preliminary engineering phase was authorized, the Agency will repay to the State the sum or sums of federal funds paid to the Agency under the terms of this agreement(see Section IX). If actual construction of the road for which right of way has been purchased is not started by the close of the tenth fiscal year following the fiscal year in which the right of way phase was authorized,the Agency will repay to the State the sum or sums of federal DOT Form 140-039 Page 2 Revised 04/2022 funds paid to the Agency under the terms of this agreement(see Section IX). The Agency agrees that all stages of construction necessary to provide the initially planned complete facility within the limits of this project will conform to at least the minimum values set by approved statewide design standards applicable to this class of highways, even though such additional work is financed without federal aid participation. The Agency agrees that on federal aid highway construction projects,the current federal aid regulations which apply to liquidated damages relative to the basis of federal participation in the project cost shall be applicable in the event the contractor fails to complete the contract within the contract time. VI. Payment and Partial Reimbursement The total cost of the project, including all review and engineering costs and other expenses of the State, is to be paid by the Agency and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation Act, as amended, 2 CFR Part 200.The State shall not be ultimately responsible for any of the costs of the project.The Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal Government. Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal participation in this project. The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws.The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred costs. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with the regulations outlined in 2 CFR Part 200- Uniform Admin Requirements, Cost Principles and Audit Requirements for Federal Awards, and retained for audit. The State will pay for State incurred costs on the project. Following payment,the State shall bill the Federal Government for reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly allocable to this project.The State shall bill the Agency for that portion of State costs which were not reimbursed by the Federal Government(see Section IX). 1. Project Construction Costs Project construction financing will be accomplished by one of the three methods as indicated in this agreement. Method A—The Agency will place with the State,within (20)days after the execution of the construction contract, an advance in the amount of the Agency's share of the total construction cost based on the contract award.The State will notify the Agency of the exact amount to be deposited with the State.The State will pay all costs incurred under the contract upon presentation of progress billings from the contractor. Following such payments,the State will submit a billing to the Federal Government for the federal aid participation share of the cost.When the project is substantially completed and final actual costs of the project can be determined, the State will present the Agency with a final billing showing the amount due the State or the amount due the Agency.This billing will be cleared by either a payment from the Agency to the State or by a refund from the State to the Agency. Method B—The Agency's share of the total construction cost as shown on the face of this agreement shall be withheld from its monthly fuel tax allotments.The face of this agreement establishes the months in which the withholding shall take place and the exact amount to be withheld each month.The extent of withholding will be confirmed by letter from the State at the time of contract award. Upon receipt of progress billings from the contractor,the State will submit such billings to the Federal Government for payment of its participating portion of such billings. Method C—The Agency may submit vouchers to the State in the format prescribed by the State, in duplicate, not more than once per month for those costs eligible for Federal participation to the extent that such costs are directly attributable and properly allocable to this project. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead shall not be eligible for Federal participation unless claimed under a previously approved indirect cost plan. The State shall reimburse the Agency for the Federal share of eligible project costs up to the amount shown on the face of this agreement.At the time of audit,the Agency will provide documentation of all costs incurred on the project.The State shall bill the Agency for all costs incurred by the State relative to the project.The State shall also bill the Agency for the federal funds paid by the State to the Agency for project costs which are subsequently determined to be ineligible for federal participation (see Section IX). VII.Audit of Federal Consultant Contracts The Agency, if services of a consultant are required, shall be responsible for audit of the consultant's records to determine eligible federal aid costs on the project.The report of said audit shall be in the Agency's files and made available to the State and the Federal Government. An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United States; WSDOT Manual M 27-50, Consultant Authorization, Selection, and Agreement Administration; memoranda of understanding between WSDOT and FHWA; and 2 CFR Part 200.501 -Audit Requirements. If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred, the Agency shall reimburse the State for the amount of such overpayment or excess participation (see Section IX). Vill. Single Audit Act The Agency, as a subrecipient of federal funds, shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as well as all applicable federal and state statutes and regulations.A subrecipient who expends$750,000 or more in federal awards from all sources during a given fiscal year shall have a single or program-specific audit performed for that year in accordance with the provisions of 2 CFR Part 200.501. Upon conclusion of the audit,the Agency shall be responsible for ensuring that a copy of the report is transmitted DOT Form 140-039 Page 3 Revised 04/2022 promptly to the State. IX. Payment of Billing The Agency agrees that if payment or arrangement for payment of any of the State's billing relative to the project(e.g., State force work, project cancellation, overpayment, cost ineligible for federal participation, etc.) is not made to the State within 45 days after the Agency has been billed,the State shall effect reimbursement of the total sum due from the regular monthly fuel tax allotments to the Agency from the Motor Vehicle Fund. No additional Federal project funding will be approved until full payment is received unless otherwise directed by the Director, Local Programs. Project Agreement End Date-This date is based on your projects Period of Performance(2 CFR Part 200.309). Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement.All eligible costs incurred prior to the Project Agreement End Date must be submitted for reimbursement within 60 days after the Project Agreement End Date or they become ineligible for federal reimbursement. X.Traffic Control, Signing, Marking, and Roadway Maintenance The Agency will not permit any changes to be made in the provisions for parking regulations and traffic control on this project without prior approval of the State and Federal Highway Administration.The Agency will not install or permit to be installed any signs, signals, or markings not in conformance with the standards approved by the Federal Highway Administration and MUTCD.The Agency will, at its own expense, maintain the improvement covered by this agreement. XI. Indemnity The Agency shall hold the Federal Government and the State harmless from and shall process and defend at its own expense all claims, demands, or suits,whether at law or equity brought against the Agency, State, or Federal Government, arising from the Agency's execution, performance, or failure to perform any of the provisions of this agreement, or of any other agreement or contract connected with this agreement, or arising by reason of the participation of the State or Federal Government in the project, PROVIDED, nothing herein shall require the Agency to reimburse the State or the Federal Government for damages arising out of bodily injury to persons or damage to property caused by or resulting from the sole negligence of the Federal Government or the State. XII. Nondiscrimination Provision No liability shall attach to the State or Federal Government except as expressly provided herein. The Agency shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any USDOT- assisted contract and/or agreement or in the administration of its DBE program or the requirements of 49 CFR Part 26.The Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of USDOT-assisted contracts and agreements.The WSDOT's DBE program, as required by 49 CFR Part 26 and as approved by USDOT, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the Agency of its failure to carry out its approved program, the Department may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S. C. 3801 et seq.). The Agency hereby agrees that it will incorporate or cause to be incorporated into any contract for construction work, or modification thereof, as defined in the rules and regulations of the Secretary of Labor in 41 CFR Chapter 60,which is paid for in whole or in part with funds obtained from the Federal Government or borrowed on the credit of the Federal Government pursuant to a grant, contract, loan, insurance, or guarantee or understanding pursuant to any federal program involving such grant, contract, loan, insurance, or guarantee, the required contract provisions for Federal-Aid Contracts(FHWA 1273), located in Chapter 44 of the Local Agency Guidelines. The Agency further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided,that if the applicant so participating is a State or Local Government,the above equal opportunity clause is not applicable to any agency, instrumentality, or subdivision of such government which does not participate in work on or under the contract. The Agency also agrees: (1)To assist and cooperate actively with the State in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and rules, regulations, and relevant orders of the Secretary of Labor. (2)To furnish the State such information as it may require for the supervision of such compliance and that it will otherwise assist the State in the discharge of its primary responsibility for securing compliance. (3)To refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965,with a contractor debarred from, or who has not demonstrated eligibility for, government contracts and federally assisted construction contracts pursuant to the Executive Order. (4)To carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the State, Federal Highway Administration, or the Secretary of Labor pursuant to Part II, subpart D of the Executive Order. In addition, the Agency agrees that if it fails or refuses to comply with these undertakings,the State may take any or all of the following actions: (a)Cancel,terminate, or suspend this agreement in whole or in part; (b) Refrain from extending any further assistance to the Agency under the program with respect to which the failure or refusal occurred until satisfactory assurance of future compliance has been received from the Agency; and DOT Form 140-039 Page 4 Revised 04/2022 (c)Refer the case to the Department of Justice for appropriate legal proceedings. XIII. Liquidated Damages The Agency hereby agrees that the liquidated damages provisions of 23 CFR Part 635, Subpart 127, as supplemented, relative to the amount of Federal participation in the project cost, shall be applicable in the event the contractor fails to complete the contract within the contract time. Failure to include liquidated damages provision will not relieve the Agency from reduction of federal participation in accordance with this paragraph. XIV.Termination for Public Convenience The Secretary of the Washington State Department of Transportation may terminate the contract in whole, or from time to time in part,whenever: (1)The requisite federal funding becomes unavailable through failure of appropriation or otherwise. (2)The contractor is prevented from proceeding with the work as a direct result of an Executive Order of the President with respect to the prosecution of war or in the interest of national defense, or an Executive Order of the President or Governor of the State with respect to the preservation of energy resources. (3)The contractor is prevented from proceeding with the work by reason of a preliminary, special, or permanent restraining order of a court of competent jurisdiction where the issuance of such order is primarily caused by the acts or omissions of persons or agencies other than the contractor. (4)The Secretary is notified by the Federal Highway Administration that the project is inactive. (5)The Secretary determines that such termination is in the best interests of the State. XV.Venue for Claims and/or Causes of Action For the convenience of the parties to this contract, it is agreed that any claims and/or causes of action which the Local Agency has against the State of Washington, growing out of this contract or the project with which it is concerned, shall be brought only in the Superior Court for Thurston County. XVI. Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The approving authority certifies, to the best of his or her knowledge and belief, that: (1)No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,to any person for influencing or attempting to influence an officer or employee of any federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with the awarding of any federal contract, the making of any federal grant,the making of any federal loan,the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. (2) If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this federal contract, grant, loan, or cooperative agreement,the undersigned shall complete and submit the Standard Form-LLL, "Disclosure Form to Report Lobbying,"in accordance with its instructions. (3)The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers(including subgrants, and contracts and subcontracts under grants, subgrants, loans, and cooperative agreements)which exceed $100,000, and that all such subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification as a prerequisite for making or entering into this transaction imposed by Section 1352,Title 31, U.S. Code.Any person who fails to file the required certification shall be subject to a civil penalty of not less than$10,000 and not more than $100,000 for each such failure. XVII.Assurances Local agencies receiving Federal funding from the USDOT or its operating administrations(i.e., Federal Highway Administration, Federal Transit Administration, Federal Aviation Administration)are required to submit a written policy statement, signed by the Agency Executive and addressed to the State, documenting that all programs, activities, and services will be conducted in compliance with Section 504 and the Americans with Disabilities Act(ADA). Additional Provisions DOT Form 140-039 Page 5 Revised 04/2022 AM � Washington State Local A enc Federal Aid TI/ Department of Transportation g y Project Prospectus Prefix Route ( ) Date 9/6/24 Federal Aid DUNS Number 020253613 Project Number LocalAgency 23-3018 r WSDO y 1 Federal Employer 91-6001254 Project Number ` Use Only J Tax ID Number Agency CAAgency Federal Program Title City of Kent ❑✓ Yes ❑ No ❑✓ 20.205 ❑ Other Project Title Start Latitude N 47.381410 Start Longitude W-122.245136 MMOM-Thompson Ave to Interurban Trail* End Latitude N 47.381450 End Longitude W-122.241367 Project Termini From-To Nearest City Name Project Zip Code(+4) Thompson Ave 200' E Interurban Trail Kent 98032-5895 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A 0.19 miles ❑✓ Local❑Local Forces❑State❑Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 1068 N/A N/A 0615 17 KING WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Region 33 9 80389 Total Local Agency Phase Start Phase Estimated Cost Funding Federal Funds Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. 500,000 500,000 0 10 2024 R/W 100,000 100,000 0 11 2024 Const. 5,500,000 742,500 4,757,500 4 2026 Total 6,100,000 1,342,500 4,757,500 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 41' 2 Meeker is currently 2 lanes with a bike lane on both sides of the road. The turn to Lincoln Ave currently has a triangular traffic island and thru traffic on Meeker is forced to make a sharp turn to continue straight. Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) The project will construct a roundabout at the intersection of Meeker Street and Lincoln Avenue, a multi-modal promenade along the south side of West Meeker Street that includes a two-way separated bikeway, and sidewalk with buffer and amenity zones. See attached. Local Agency Contact Person Title Phone Drew Holcomb Project Engineer 2535611587 Mailing Address City State Zip Code 220 4th Ave S Kent WA 98032 � uigrtauy signea ay unaa bieren ■EI By Chad Bieren Date:2024.09.12 16:01:38-07'00' Project Prospectus Approving Authority Title Public Works Director Date 9/12/24 DOT Form 140-101 Page 1 Revised 01/2022 Previous Editions Obsolete Agency Project Title Date City of Kent MMOM-Thompson Ave to Interurban Trail* 9/6/24 Type of Proposed Work Project Type(Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑✓ Path /Trail ❑ 3-R 40 ft 2 ❑✓ Reconstruction ❑✓ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑✓ Principal Arterial Federal ❑✓ Urban ❑✓ Minor Arterial ❑❑✓ Urban Minor Arterial ❑ Collector El Collector Functional ❑ Rural ❑ Rural ❑ Major Collector ❑ Major Collector Classification ❑ NHS ❑ Minor Collector ❑ NHS ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑✓ Flat ❑ Roll ❑ Mountain ❑✓ Flat [:] Roll [—] Mountain Posted Speed 30 35 Design Speed N/A N/A Existing ADT 19,912 29,000 Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency City of Kent % 100 Construction Will Be Performed By Contract Agency Contractor 100 % ova Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations None DOT Form 140-101 Page 2 Revised 01/2022 Previous Editions Obsolete Agency Project Title Date City of Kent MMOM-Thompson Ave to Interurban Trail* 9/6/24 Right of Way ❑ No Right of Way Needed ❑✓ Right of Way Needed *All construction required by the ❑�/ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑ No utility work required ❑✓ No railroad work required ❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of of the construction contract the construction contract ❑✓ All utility work will be completed in coordination ❑All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Adjust existing utility structures to proposed grade. Install lateral storm drains due to shift in curb alignment on the south side of Meeker St. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑Yes ❑✓ No Remarks * MMOM-Meet Me on Meeker PE phase is state and local funded. RW phase is state and local funded. CN phase is state, local and federally funded. This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Da 09/18/2024 MayorlCh iirperso DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete