Loading...
HomeMy WebLinkAboutCAG2024-166 - Change Order - #5-Boyce Construction-FAC23-31 Kent Commons Renovations - 7/15/24 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form KP • For Approvals,Signatures and Records Management This form combines&replaces the Request for Mayor's Signature and Contract Cover K E N T WASHINGTON Sheet forms. Originator: Department: Leah Bryant for Nate Harper Parks, Recreation & Community Services Date Sent: Date Required: > 07/10/2024 7/17/2024 0 CL Authorized to Sign: Date of Council Approval: Q Director or Designee 2/20/2024 Budget Account Number: Grant? Yes WINo F20099.64190.9473 Budget?W]YesEl No Type: N/A Vendor Name: Category: Boyce Construction, Inc Contract Vendor Number: Sub-Category: = 2548106 Change Order 0 y Project Name: FAC23- 31 Cit of Kent Commons Renovations 3- Project Details:Provide all labor and materials necessary to complete the structural 0 = upgrades for the pass-through wall in the weight room, as described in the *, attached Exhibit A c 40 40 Agreement Amount: $1 8 61 6.45 Basis for Selection of Contractor: Bid `Memo to Mayor must be attached Start Date: March 2024 Termination Date: 1/23/2025 Im Q Local Business?F--]YeslzNo* If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace. Business License Verification:YesEl In-ProcessEl Exempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: FTesONo CAG2024-166 Comments: c Change order 5 a� H •� i N 3 f0 C V1 Date Routed to the City Clerk's Office: 7/1 5/24 ,c«w»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 • KEN T WASHINGTON CHANGE ORDER NO. #5 NAME OF CONTRACTOR: Boyce Construction Inc ("Contractor") CONTRACT NAME & PROJECT NUMBER: FAC23- 31 City of Kent Commons Renovations ORIGINAL CONTRACT DATE: 4/3/2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide all labor and materials necessary to complete the structural upgrades for the pass-through wall in the weight room, as described in the attached Exhibit A 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,502,831.99 (including applicable alternates and WSST) Net Change by Previous Change Orders $47,933.65 (incl. applicable WSST) Current Contract Amount $1,550,765.64 (incl. Previous Change Orders) Current Change Order $16,893.33 Applicable WSST Tax on this Change $1,723.12 Order Revised Contract Sum $1,569,382.09 CHANGE ORDER - 1 OF 3 Original Time for Completion 12/31/2024 (insert date) Revised Time for Completion under 1/16/2025 prior Change Orders (insert date) Days Required (f) for this Change Order 7 calendar days Revised Time for Completion 1/23/2025 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: 51-tice EoweU artanz Herz By:Bryce (Jul 11,202407:24 PDT) By:Brian Levenhagen)Jul 12,202 8 56 PDT) Print Name: Bryce Bowel[ Print Name: Brian Levenhagen Its Project Manager Its: Deputy Parks Director DATE: Jul 11, 2024 DATE: J u 112,2024 CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 Exhibit A BOYCE Tuesday,June 18, 2024 CONSTRUCTION = Job# 6300 628 South Brandon Street Seattle,WA 98108 Change Estimate (CE)Worksheet Project Name: Kent Commons Renovation CE# 08 Nate Harper RFP# 08 City of Kent Scope of Work: Hollow Wall Structural Revisions Revisions associated with the C-channel installation at conditioning room 109 per RFI#22 and SSK-02. Boyce Construction Scope Hours Rate Cost Project Manager 3 $98.00 $294.00 Project Engineer 0 $75.00 $0.00 Supervision 4 $95.00 $380.00 Labor 0 $85.17 $0.00 Materials $0.00 Sub-Total $674.00 Sub-Contractor Costs(Lump Sum) Wall Scanning $1 000.00 Steel Revisions $7,897.00 Wall Grouting $5,130.00 Electrical Safe-off& Reconnect $465.75 Sub-Total $14,492.75 Rentals, Dumpsters, Lifts $0.00 Sub-total $0.00 Sub-Total $15,166.75 Overhead $758.34 Fee $637.00 Insurance, B&O Taxes $331.24 Sub-Total $16,893.33 WSST(10.2%) $1,723.12 Total adjustment to contract $18,616.45 Excludes: Permits, Permit Fees, Overtime&Weekend Work Duration: Approx. 1 Week Approved: Date: Structural Imaging LLC Invoice 150 Southmill Lane Senoia, GA 30276 US (206) 290-7439 STRUCTURAL uv@structuralimagingllc.com structuralimagingllc.com IMAGING BILL TO SHIP TO Boyce Construction Inc Boyce Construction Inc 628 S Brandon St 525 4th Ave N Seattle,WA 98108 Kent,WA 98032 INVOICE# DATE TOTAL DUE DUE DATE ENCLOSED 31 154 05/17/2024 $1,000.00 06/16/2024 P.O. NUMBER SALES REP 6300 Joe ACTIVITY DESCRIPTION RATE AMOUNT 2 Hour min.for PVW 2 hr. min: Scanning for rebar, conduits, pipes, and 1,000.00 1,000.00 PVW abnormalities for the purpose of anchoring and saw cutting into the slab and a wall section. (Work completed 5-16-24) other Work Description: Chris C has an area of slab and a section 0.00 0.00 of wall to scan (206) 450-1671 other Work Resolution: Scanning for the purpose of saw cutting the 0.00 0.00 slab and anchoring through a wall. Rebar marked in black. Due to an interference in the first 1 1/4" of the wall not all areas could be fully scanned. A accurate scan could only be achieved in areas where there was rebar present. Stay 1"off rebar to avoid. Pipes, Conduits, and questionable objects are marked in red. Stay 2" off Pipes, Conduits, and questionable objects to avoid. Depths of objects are given when applicable. Stay 1" above given depths to avoid. Recommend avoiding all objects if at all possible. Recommend further investigation into the make up of the wall that was scanned. Cannot collect data 3" off walls or obstructions. Disclaimer: Due to the nature of Slab on Grade scanning not all objects can be guaranteed as found. Must saw cut at own risk. Job: Kent Commons 525 4th Ave N Kent Job#6300 Thank you for your business. BALANCE DUE $1 ,000.00 Kent Commons Renovations 525 4th ave N Kent,WA Contractor: Riverside Steel Erectors RFI # 22 325 Washington Ave S Kent WA 98032#18 ASI/CCD/PR# RSE Project No. 2405 Office 253 236 5632 Date 5/23/2024 GC: Boyce Construction Description: Material and labor costs for changed condition as id as RFI 22 project remoblize with two scizzor lift hilti equipment install two channels add weld 1/4 plate 1. Direct Craft Labor Costs 24 Hrs @ $ 103.95 a.Crew(Apprentices,Journeyman,Foreman,Forklift operator,craft supterendent) $2,495 b.Safety at 2%of direct labor 50 c.Small tools at 5%of direct labor 125 d.Indirect field Supervision at 15% 374 f.Task Consumables 1.Total of Craft Labor Costs $ 3,044 2. Material Costs a.1/4"x 15"x 8'flat plate 2. Total Material Costs $ 1,050 3. Equipment Costs Project mobilation/demobation flat fee Labor equipemnt trucking $2,500 3. Total Equipment Costs $ 2,500 4. Sub Contractors Overhead & Profit a.Overhead NTE 12%on first 50k is$ 791 b.Overhead NTE 4%on remainder is$ NA c.Profit NTE 6%is$ 433 4.Total of Overhead & Profit $ 1,224 7. Insurance a.Payroll driven liability insurance at$ 3.28 per hr $ 79 7.Total Cost of Insurance $ 79 TOTAL COST OF RFI 22 $ 7,897 GENERq�c CIDgGCa ■ ■ s d' �WASHING��,o I rsidE S T E E L E R E C T O R S Boyce Construction June 17, 2024 628 S Brandon Street Seattle WA 98108 ATTN : Bryce Bowell PM RE: RSE's additional costs associated with RFI#22 on the Kent Common Project Good afternoon,Bryce Just wanted to give a quick synopsis on the events and associated costs related to RFI#22 and SSk-02. On Tuesday May 21,2024,RSE's two-man crew unloaded two scissors' lifts with other necessary support equipment and two steel channels with hardware onto the Kent Common Project site. The crew began installing the channels near the ceiling as per plans and specifications to reinforce an existing wall. During the channel anchor bolt installation process RSE's crew discovered voids in the existing wall that were designed to be solid. RSE crew notified Boyces field supervision of the change of condition issue and since there was no quick fix for wall voids,RSE crew removed the partially installed channel for safety concerns. Then the crew reloaded RSE's small tools into the company truck to finish the shift. Basically,no meaningful contract work was completed other than the discovery of the hidden voids in the wall.RSE paid the crew 16 hours for their time on the project. RSE patiently waited for a timely engineered solution,thus RFI 22 was created. A couple of days passed with no solution,RSE needed our two scissors lift to support our crew working on another project, and reloaded the idle scissors lifts onto a trailer and moved the lifts to RSE's Woodinville project. Basically, RSE is now completely mobilized off the site. On May 25'2024 the design team issued an written solution but there was a constructability issues solution to RFI 22 and additional time was required to determine the correct fix. Today,June 17 RSE has determined it now believes we have the information to successfully install the channels as to SSK#02. To do so RSE now must remobilize with scissor lifts and additional plate material to complete the wall reinforcement and requests monetary compensation for spent labor and mobilization fees along with the additional material and labor(two men at 4hrs)to supply and install the new plate.Please see attached RFI #22 cost summary for a total of$7,897. 325 Washington Ave S #18 Kent,WA 98032 Phone: (253)236-5632 WCL:RIVERSIDE 904J2 Fax: (253)236-5633 SBR`CpRfCRLNCC op*ff06 ��C '� N ■��■9 Bid Proposal Scope Division 4 Masonry 3 4527 Orchard Street South 0 mmm Tacoma,WA.98466 � Base Bid ■��■,�4 $ 5,130.00 253-473-3997 Fax 253-473-0140n?gSON Cps` page one of two Project: Kent Commons This proposal is valid for 30 calendar days from this submittal date. Jed Olafson Bid date: June 13,2024 Bid time: 2:00 PM F Estimators: Rick Johnston Addendum Acknowledged: Per Prints Dated: This proposal INCLUDES the following: 'See page two for added scope/alternates 01. Furnish and install masonry related scaffolding(NOT for use by the GC or other trades)on a compacted solid base provided by others. Scaffolding to be placed inside or outside of structure at Mason's option. 02. Furnish and install joint reinforcement and masonry anchors(where applicable)per structural details. 03. Place loose reinforcing steel(G.C.to offset,pull and place in general area to be installed). 04. Furnish and place grout in masonry walls and H.M.frames(in masonry only)H.M.frames furnished and preset by others. 05. Furnish and install self-adhered thru wall flashing only(metal flashing by others.(See Page 2)). 06. Install anchor bolts,iron embeds and loose lintel angle iron(not to exceed 25 lbs.)-furnished by others. 07. Installation of mortarset,precast concrete or cast stone only.(Furnished by others.) 08. Washing of masonry will be performed immediately after installation of masonry&prior to scaffold dismantling.The mason contractor is not responsible for efflorescence after initial washing. This proposal DOES NOT INCLUDE the following(except where noted on g.2): 01. Furnishing resteel.Placing&bracing of tied resteel,cutting and tying of all resteel,rebar capping and protection. 02. Furnishing and/or installing anchor slots,templates,expansion bolts,buck or frame anchors,C channel,door frames,or any other miscellaneous metals. 03. Furnishing and/or installing copper fabric and sheet metal flashing;welding,saw cutting for reglets,attached or bolted angle iron. 04. Furnishing and/or installing pre-cast concrete,CIP concrete,furnishing and/or installing pavers,retaining wall blocks,splash blocks or manholes. 05. Wood forming temporary supports,shoring for lintels,soffits,or overhead masonry;bracing of walls. 06. Engineering and layout,grades:control lines,snap lines,wall lines,bench and grade marks,elevation and any other related layout requirements;including layout of work specified in other divisions. 07. Sales tax, performance or payment bonds,permits,inspection,testing and related costs,eco pans and dumpsters for debris removal. 08. Furnishing and/or installing water repellents,damp-proofing,caulking,sealants,fire safing,non-shrink grout,dry-pack,backer rods,seismic joint covers,expandable fillers,graffiti protection,building paper or any other form of vapor barrier. 09. This proposal includes completion of one punch list,additional punch lists will be billed accordingly for services and travel. 10. Furnishing and/or installing rigid insulation. 11. Concrete preparation,drilling,dowels,retrofitting or grouting of beam pockets,demolition,restoration,patching of existing masonry or toothing of infills. 12. G.C.shall provide structural design,shop drawings,as-built drawings,coordination drawings;and-conformed contract documents including two sets of paper drawings not less than half scale. GENERAL CONDITIONS and work required of others: 01. This bid is conditioned upon execution of an AGC of Washington Subcontract,2002 edition with no bond required and payment not contingent on owner payment and a mutually acceptable schedule.The use of this proposal in the acquisition of a contract with any owner constitutes completed acceptance of the items and conditions of this bid and shall become an attachment to the contract. 02. This bid is based on only one mobilization.Any additional will be charged accordingly. 03. G.C.will provide all-weather free access to work,a prepared compacted base for scaffold,traffic control,flagging and street cleanup related to subcontractor's work. 04. G.C.to furnish weather protection of all masonry(per W ISHA requirements)to include all cover,heat,cool,framework,as necessary to maintain project schedule (other than covering walls at end of the day.) 05. G.C.to furnish temp.power and pressurized water(to be within 50 ft.of masons work area)and adequate lighting for masonry installation. 06. G.C.to furnish suitable hoist and operator for mason work over 35 feet or inaccessible by mason's forklift. 07. G.C.to cover openings to prevent water from entering building due to mason cleaning operation,if required. 08. The mason reserves the right to review and provide input and acceptance of masonry reinforcing at no additional cost to the mason contractor. 09. No back charges will by accepted by the mason unless he has received advanced,four(4)working days,written notice of any intended back charge and been given reasonable time to amend any action. Failure of Contractor to submit this notification constitutes a waiver of any right to assert a back charge against the mason. 10. GC superintendent and/or Project Manager have full authority to order extra or changed work in writing.GC shall issue a written change order for any such work no later than ten days after the written direction by the Superintendent or project manager. 11. Proposal based on the Mason's standard insurance coverage and should an indemnification clause be required,it shall not be broader in breadth and scope than is required of the G.C.by the owner. Additional named insureds,if required,will only be the G.C.and the owner. Each party's comprehensive general liability insurance will be considered"primary as to its own interest". 12. Mason shall not be subject to any conditions more stringent than G.C.is bound to the owner by the main contract,general conditions,supplementary conditions to include but not limited to change orders,schedules,disputes,damages,progress payments,final payment and retention(including interest on retention). Retainage is to be held to an equal to or less than percentage rate as the General Contractor but not to exceed 5%. 13. This bid is based on quality standards as defined by ASTM C 90-09,ASTM C210-10 and ACI 530.1 where applicable. 14. This bid includes all costs for Mason to comply with all OSHA/W ISHA safety standards.Costs incurred by Mason to comply with General Contractor Safety requirements in excess of OSHA/W ISHA standards shall be reimbursed by General Contractor upon request by Mason." 15. Use of the scaffold is at the sole discretion of the Mason Contractor. Mason contractors name Johnston Construction Company, Inc. Job name Kent Commons Pagetwo Additional Mason scope in Base Bid to Base bid$Included** $Add ** Furnish metal flashing in masonry Install metal flashing in masonry Furnish pre-cast concrete or cast stone Furnish and install copper fabric flashing. Furnish and install pavers Furnish and install masonry cavity wall insulation Furnish masonry reinforcing Furnish & install weather protection Provide P/P Bond Furnish and install water repellant on exterior masonry Sales tax on material **If no $ value is listed for any item above, that item is excluded. **All furnish values are valid only upon the acceptance of the related Install values! Alternate#1 - Alternate#2 - Our proposal is based on solid grouting the open cores of the precast panel below the channel and two cores to the right of the main panel. Signature: � �% j Signature: Kent Parks 11,202' Email: nharper@kentwa.gov Email: parkscontracts@kentwa.gov Signature: Kim Komafo Kim Komoto(Jul 15,2024 09:52 PDT) Email: cityclerk@kentwa.gov CAG2024-166 - Change Order - #5 - Boyce Construction Inc. - Kent Commons Renovations Final Audit Report 2024-07-15 Created: 2024-07-10 By: Leah Bryant(Ibryant@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAAKrnCUMie5J-DeUeTmv-DOXk2u9Ow47r6 "CAG2024-166 - Change Order - #5 - Boyce Construction Inc. - Kent Commons Renovations" History Document created by Leah Bryant(Ibryant@kentwa.gov) 2024-07-10-6:36:54 PM GMT Document emailed to nharper@kentwa.gov for signature 2024-07-10-6:39:02 PM GMT Email viewed by nharper@kentwa.gov 2024-07-10-7:33:42 PM GMT &Q Signer nharper@kentwa.gov entered name at signing as Nathen C. Harper 2024-07-10-7:35:16 PM GMT dp Document e-signed by Nathen C. Harper(nharper@kentwa.gov) Signature Date:2024-07-10-7:35:18 PM GMT-Time Source:server Document emailed to Bryce Bowell (bryce@boyceconstruct.com) for signature 2024-07-10-7:35:21 PM GMT Email viewed by Bryce Bowell (bryce@boyceconstruct.com) 2024-07-11 -2:22:24 PM GMT &5g Document e-signed by Bryce Bowell (bryce@boyceconstruct.com) Signature Date:2024-07-11 -2:24:04 PM GMT-Time Source:server Document emailed to Kent Parks (parkscontracts@kentwa.gov) for signature 2024-07-11 -2:24:07 PM GMT Email viewed by Kent Parks (parkscontracts@kentwa.gov) 2024-07-12-0:08:51 AM GMT Powered by Adobe �� KENT Acrobat Sign �p Document e-signed by Kent Parks (parkscontracts@kentwa.gov) Signature Date:2024-07-12-0:09:59 AM GMT-Time Source:server Document emailed to bjlevenhagen@kentwa.gov for signature 2024-07-12-0:10:02 AM GMT Email viewed by bjlevenhagen@kentwa.gov 2024-07-12-3:56:01 PM GMT Signer bjlevenhagen@kentwa.gov entered name at signing as Brian Levenhagen 2024-07-12-3:56:33 PM GMT dg Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date:2024-07-12-3:56:35 PM GMT-Time Source:server Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature 2024-07-12-3:56:39 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2024-07-15-2:26:17 PM GMT Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date:2024-07-15-2:26:26 PM GMT-Time Source:server Document emailed to cityclerk@kentwa.gov for signature 2024-07-15-2:26:29 PM GMT Email viewed by cityclerk@kentwa.gov 2024-07-15-4:50:43 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Kim Komoto 2024-07-15-4:52:30 PM GMT da Document e-signed by Kim Komoto (cityclerk@kentwa.gov) Signature Date:2024-07-15-4:52:32 PM GMT-Time Source:server D Agreement completed. 2024-07-15-4:52:32 PM GMT Powered by Adobe L�KEN7 Acrobat Sign