HomeMy WebLinkAboutCAG2023-447 - Change Order - #5 - Strickland & Sons - 108th & SE 264th Compact Roundabout - 7/9/2024 Agreement Routing Form
KEN T For Approvals,Signatures and Records Management
This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H a N G T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required:
7/9/2024 N/A
L
aAuthorized to Sign: Date of Council Approval:
Q 0 Director or Designee ❑Mayor 8/24/2023
Budget Account Number: Grant? 0 Yes ❑No
R20098.64110.1200
Budget? 0 Yes ❑ No Type: Federal
Vendor Name: Category:
Strickland & Sons Contract
Vendor Number: Sub-Category:
C 2536287 Change Order#5
0
0 Project Name: 108th & SE 264th Compact Roundabout
E
402 Project Details:Delete Bid Item 1295 "Pedestrian Railing" and replace with new item CO #5
C
C
"Galvanized Steel Pedestrian Railing".
C
d Agreement Amount:$10,000.00 Basis for Selection of Contractor: Bid
d
i Start Date: N/A Termination Date: 87 Working Days
Q
Local Business? ❑Yes ❑No*
*Ifineets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce.
Notice required prior to disclosure? Contract Number:
❑Yes 0 No CAG2023-447
Date Received by City Attorney: Comments:
Ch
C
30
p11 Date Routed to the Mayor's Office:
in
Date Routed to the City Clerk's Office: y
ad((W22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements
•
KENT
W A 5 H I N O T O N
CHANGE ORDER NO. 5
NAME OF CONTRACTOR: Strickland & Sons ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 108t" & 264th Compact Roundabout
ORIGINAL CONTRACT DATE: August 24, 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Delete Bid Item 1295 "Pedestrian Railing" and replace with new item CO
#5 "Galvanized Steel Pedestrian Railing".
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,184,513.74
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $74,106.84
(incl. applicable WSST)
Current Contract Amount $1,258,620.58
(incl. Previous Change Orders)
Current Change Order $11,687.04
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $1,270,307.62
CHANGE ORDER - 1 OF 3
Original Time for Completion 75 working days
(insert date)
Revised Time for Completion under 12 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 00 working days
Revised Time for Completion 87 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Digitally signed by Chad Bieren
Chad B i e re n Date:2024.07.08
1 T M,9-0T00'
By:
BY
(signature) (signature)
Print Name:Anna Johns Print Name: Chad Bieren,P.E.
Its Manager Its Public Works Director
(title) (title)
DATE: 07/03/2024 DATE
AF EC
KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
lam/ Kent Law Department
Kent City Clerk
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
•
KENT
W.s� .o.o
CHANGE ORDER WORKSHEET NO. 05
Construction Engineering Division - Public Works
Project: 108th & 264th Compact Roundabout Project No: 21-3004
Project Engineer: Thomas Lehrer Fed-Aid No: HISP-1129(001)
Capital Projects Sean Flint, KBA, Inc. Contractor: Strickland &Sons
Manager:
Date: 6/14/2024
I. Proposed Change
Delete Bid Item 1295 "Pedestrian Railing" and replace with new item CO 05 "Galvanized Steel Pedestrian
Railing"
II. Reason and Background for Change
The Pedestrian Railing specified in Contract 21-3004 Special Provisions section 8-27 "Handrails" is not the
preferred type for this application. Contractor has been directed to provide Pedestrian Railing in accordance
with Kent Standard Plans 6-41a, 6-41b, and 6-41c.
III. Method of Payment
NEW PAY ITEMS El Notapplicable
Sch. Total Est. Total Estimated Cost of
No Item Description t Unit Unit Price Item
I Galvanized Steel Pedestrian Railing 104 LF $385.26 $ 40,067.04
$
i
$ -
New Pay Items Total: $ 40,067.04
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Notapplicable
Sch gid Item No. Item Description Qty Unit Unit Price Cost of Item
No. T
Page 1
I 1295 Pedestrian Railing
-110 LF $258.00 $ (28,380.00)
Delete Existing Pay Items Total: $ (28,380.00)
INCREASE/DECREASE TO EXISTING PAY ITEMS) Q Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$ -
$ -
Increase / Decrease to Existing Pay Items Total: $
*TOTAL ESTIMATED COST OF CHANGE ORDER:F $11,687.04 -I
*Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 75 Due This Change Order: 0 Previous Total: 87
Explanation/Justification for Additional Working Days:
No additional working days will results due to this change.
*TOTAL WORKING DAYS: 87
*This Change Order + Previous Total
Capital Projects Manager:
Date: 6/24/2024
Sean Flint (KBA, Inc)
Construction Engineering Date:
Supervisor:
Ja Barry
Construction Manager: �. Date:
E is Connor
Page 2
Barry, Jason
From: Peterson, Kelly
Sent: Monday,June 24, 2024 10:03 AM
To: Connor, Eric
Cc: Barry,Jason; Bieren, Chad
Subject: RE: 08th/264th Roundabout - Pedestrian Rail Revision Pricing
Eric-
Chad and I discussed this issue. Please proceed with the galvanized rail.
Thank you,
Kelly
From: Connor, Eric<EConnor@kentwa.gov>
Sent: Monday,June 24, 2024 8:02 AM
To: Peterson, Kelly<KPeterson@kentwa.gov>
Cc: Barry,Jason<J Barry@ kentwa.gov>
Subject:08th/264th Roundabout- Pedestrian Rail Revision Pricing
Good Morning Kelly,
The attached CO Worksheet adds 104 LF or Galvanized Steel Pedestrian Railing and deletes 110
LF of Aluminum Pedestrian Railing. The net add for this plan change is $11,687.04. Are you
okay with proceeding with this change order?
Please let me know if you have any questions or need any additional information.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Barry,Jason<JBarry kentwa.gov>
Sent: Friday,June 21, 2024 3:03 PM
To: Connor, Eric<EConnor kentwa.gov>
Subject: FW: 108th/264th Ped Rail Costs
Hi Eric,
I still haven't got to all my backed up emails, so if this one is answered already I apologize. Is
this one good to process?
i
i
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
a Phone 253-856-5546 i Cell 253-797-8462
K�NT i arrv0 KentWA.gov
Wn�N.wp•qN Y
www KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From:Sean Flint<sflint@kbacm.com>
Sent: Friday,June 21, 2024 10:49 AM
To: Barry,Jason<JBarrV kentwa.gov>
Subject: Fw: 108th/264th Ped Rail Costs
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISPOKentWA.aov with any
questions.
Good Morning Jason,
Paul with Strickland reached out to me earlier this week,Van Dam would like to start fabricating the pedestrian
railing for 108th. I asked him to hold off until you had a chance to review the Change Order and get confirmation
from the City before proceeding. Please let me know when they can get started,thanks.
Sean Flint
425.365.3469 ( sflint@kbacm.com
KBA, Inc. I Construction Management Professionals
Teams That Build Trust
From:Sean Flint<sflint@kbacm.com>
Sent: Friday,June 14, 2024 1:12 PM
To:jbarry<jbarrv@kentwa.gov>
Subject: Re: 108th/264th Ped Rail Costs
Good Afternoon Jason,
Attached is a draft Change Order 05 for the pedestrian railing. Please let me know if you have any changes you'd
Like me to make.
Sean Flint
425.365.3469 1 sflint@kbacm.com
KBA, Inc. I Construction Management Professionals
Teams That Build Trust
._....... ...............
From: Barry,Jason<JBarry kentwa.gov>
Sent: Friday,June 14, 2024 10:56 AM
To: Sean Flint<sflint@kbacm.com>
Subject: RE: 108th/264th Ped Rail Costs
2
We're gonna go with $385.26/1-17.
From:Sean Flint<sflint@kbacm.com>
Sent: Friday,June 14, 2024 9:25 AM
To: Barry,Jason<JBarry kentwa.gov_>
Subject: Re: 108th/264th Ped Rail Costs
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISP@)KentWA.gov with any
questions.
Good Morning Jason,
I double checked the math and came up with$382.26 per foot, so there is a small difference from$382.50.
Sean Flint
425.365.3469 1 sflint@kbacm.com
KBA, Inc. I Construction Management Professionals
Teams That Build Trust
_........_........ .
From: Barry,Jason<JBarry kentwa.gov>
Sent: Friday,June 14, 2024 6:29 AM
To: Sean Flint<sflint kbacm.com>
Subject: Fwd: 108th/264th Ped Rail Costs
Can you look at that?
Get Outlook for iOS
..._...._..._... ....__......... ...... .
From:Connor, Eric<EConnor@kentwa.gov>
Sent:Thursday,June 13, 2024 3:26:27 PM
To: Barry,Jason<J Barry@ kentwa.gov>
Subject: FW: 108th/264th Ped Rail Costs
My math isn't matching up with Strickland's numbers...am I missing something?
From: Barry,Jason<JBarrv@kentwa.gov>
Sent:Thursday,June 13, 2024 10:22 AM
To: Connor, Eric<EConnor kentwa.pov>
Cc:sflint@kbacm.com; Cameron Bloomer(cbloomer@kbacm.com) <cbloomerpkbacm.com>
Subject: FW: 108th/264th Ped Rail Costs
Hi Eric,
Attached is Strickland's cost proposal for the desired ped railing at the 108th/264th roundabout.
Regarding price evaluation, on 76th Ave north segment, bid prices averaged $279/LF for 623 LF
in July 2022, and the average bid prices of the 218th widening bidders was $403/LF for 200 LF
in April 2024. Change order pricing of $343/-W/LF for 104 LF appears reasonable.
` 3
Let us know if we can begin preparation of a change order deleting BI 1295 11OLF @ $258/LF
and replacing with CO Ped Rail 104LF @ $382.50/1-F.
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
ENT jba`rr KentWA.gov
W&a NINa ToN
www KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From:Sean Flint<sflint@kbacm.com>
Sent:Wednesday,June 12, 2024 3:50 PM
To: Barry,Jason<JBarry kentwa.gov>
Subject: Re: 108th/264th Ped Rail Costs
This message originated outside the City of Kent. Use caution when following links or opening
attachments as they can be malicious. Please contact IT Security at ISP KentWA.aov with any
questions.
Good Afternoon Jason,
Attached is Paul's pricing at$382.50/1-F. He emailed this to me one minute before you inquired!
Sean Flint
425.365.3469 1 sflint(@kbacm.com
KBA, Inc. I Construction Management Professionals
Teams That Build Trust
From: Barry,Jason<JBarry c kentwa.gov>
Sent:Wednesday,June 12, 2024 2:53:56 PM
To:Sean Flint<sflint@kbacm.com>
Subject: 108th/264th Ped Rail Costs
Has Paul gotten back on cost for the revised ped rail up there at the RAB? If not, please remind
him.
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
4
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
MOZIta
KENT wwwi.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
5
CONTRACTOR:Van Dam Welding Date: 6-12-2024
CONTRACT: HSIP-1129(001) Project#21-3004
CHANGE NUMBER:
REFERANCE TO QUOTE:
REFERANCE TO FORCE ACCOUNT:
CHANGE DESCRIPTION: Pedestrian Hand Rail$386.26 per LF -3£N
xc AV.�T■ O 1"
SUB CONTRACTOR'S WORK EXCLUDING MARKUPS Revisions/Comments
1. Direct Materialsi $31,616.00
2. Direct Labor (", I i �'f' $0.00
3. Direct Supervision(hourly workers) 0.00% of line 3 t �'9 I' I GPI $0 00
5. Rental Equipment $0.00
6. Sales Tax on Material 10,20% of line 5 $3,224.83
7. Owned Equipment $0.00
8. SUB CONTRACTOR SUBTOTAL(Add Lines 1.7) $34,840.83
Remarks:
SUB CONTRACTOR NAMES&TOTALS EXCLUDING PRIME MARKUPS Revisions/Comments
13.
$0.00
14.
$0.00
15. ,
16.
17.
18.
19. SUB CONTRACTORS'SUBTOTAL(Add lines 13-26) $0.00
Remarks:
SUB CONTRACTOR MARKUPS Revisions/Comments
20. Prime Contractor's Work(from line 12) $34,840.83
21. Subcontractor's Work(from line 19) $0,00
22. SUBTOTAL(add lines 20-21) $34,840.83
23. Prime's Fee on Self-Performed Work 0.00% of line 20 $0.00
24. Prime's Fee on Sub tier Work 15.00% of line 21 $5,226,12
25. TOTAL COST(Add Lines 22-24) $40,066.96
This proposal is based solely on the usual cost elements such as labor, material,equipment and normal markups.
Signature&Title Project Manager
Page 1 of 1
1 I 1 1 I 1 1 I 1 i 1 1 I 1 1 1 1 1 1 I 1 1 1 I I 1 1
1 1 1 I 1 1 I 1 1 1 1 I I 1 I I 1 1 i I i I i 1 1 1 1
i t 1 I i 1 1 1 1 I 1 i i 1 1 1 I I 1 1 1 1 1 1 1 I 1
1 I I 1 1 1 i 1 I 1 1 1 I 1 r 1 i 1 1 1 I i 1 I I 1 i
0 1 1 1 1 1 1 I 1 1 1 1 I I 1 1 I 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 I 1 1 I 1 1 I 1 I 1 1 1 1 1 1 1
1 I 1 1 1 1 1 1 1 I 1 1 1 1 1 1 I I I 1 I 1 I OOG.. I t 1 I
I I 1 I I 1 I 1 I 1 1 I 1 1 1 1 I I 1 1 1 1 I « 1 1 I I
I I 1 1 I 1 1 I 1 1 1 1 I 1 1 1 1 1 I I 1 I 1 7 1 I I 1
--
I
�-
1 t 1 I 1 I 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1
1 1 i 1 I I 1 1 1 1 I I 1 1 1 I 1 1 1 I I 1 I I 1 1 1
1 1 I i 1 I 1 I i I 1 I 1 1 1 1 1 I I i 1 I I I f 1 1
1 1 1 1 1 1 1 1 i 1 1 I 1 I I 1 I I I i 1 1 i 1 I 1 1
W
1 I I 1 1 1 1 1 1 1 1 I 1 1 1 I I 1 I 1 I 1 i I 1 I 1 J
1 1 1 1 1 i 1 1 i 1 I I i I 1 1 1 1 I 1 1 1 1 1 I I 1 Q
i I 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 I 1
I i I I 1 I I I i I I I 1 I i 1 1 1 1 1 I I 1 I I I 1 Q
r�'7..T..T..r..i._T...1...1...T_.T..T''T"r'-T��1'"1'--
1 1 I i I I 1 1 I 1 1 1 1 t 1 I I 1 1 1 I 1 I I I 1 1
m
1 I 1 1 I 1 I 1 1 1 1 1 I 1 i 1 i I I 1 1 1 I 1 1 1 I U)
1 1 1 1 1 I I 1 I I 1 1 1 I I I 1 I I I i I 1 I 1 1 I I 1 I 1
-yr I 1 1 i I 1 1 I I 1 1 1 1 i I 1 I 1 1 I 1 I I 1 I 1 1 1 1 1 1
y I i I 1 I I 1 I 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 I 1 1 1 1 1 1 1
'jV2j I 1 1 1 I I 1 I I I 1 1 I 1 I 1 I 1 1 I I 1 1 1 I 1 I 1 I I 1
1 1 1 1 1 1 I 1 I I 1 i 1 I I 1 1 1 1 I 1 I I i I I 1 1 1 1 1
i 1 I 1 1 I I I I 1 i 1 1 1 I 1 1 1 1 I 1 I I 1 I I 1 I 1 I 1
I 1 1 I 1 I I 1 I 1 1 1 1 I 1 1 1 1 1 1 I 1 1 I 1 1 1 I 1 1 1
1 I 1 1 I I I I I I I I 1 1 1 1 1 I 1 1 1 1 i 1 1 i 1 1 1 I I
1 1 1 1 1 I I I 1 1 1 i I 1 1 I 1 1 I 1 1 I 1 1 1 1 1 1 1 1 1
1 I 1 I 1 I 1 I 1 t 1 1 1 1 I 1 I I 1 i I 1 1 I I 1 1 1 i 1 1
1 I 1 1 1 1 1 1 1 1 I I I I I i I 1 i 1 I 1 1 I 1 I 1 1 I 1 1
1 1 I 1 I 1 1 I 1 I 1 1 1 I t I I 1 1 1 1 I I 1 1 1 I I I 1 1
-'-p.. ._y_.y__'�'__h._r..y"y__.p__r...*__y__'y"...p_.y..'y.'__h..�..y__y..._r__r_..
I 1 1 1 I I 1 1 I 1 1 1 1 1 I 1 1 1 1 1 1 I I 1 1 I 1 1 1 I 1
1 1 1 I 1 I 1 1 1 i 1 1 1 1 I i i 1 t I 1 I 1 I 1 1 1 I I 1 1
1 1 1 I 1 1 1 1 1 1 1 1 1 I 1 I i 1 1 1 I I 1 I 1 1 1 I I t 1
1 I 1 I I 1 I 1 I 1 I 1 1 I t 1 I 1 1 1 1 1 1 1 1 1 I I 1 1 1
1 I I I I I 1 I I 1 1 1 1 I 1 I 1 1 1 1 1 1 1 I 1 i 1 I 1 1 I
I 1 I I 1 I 1 1 I 1 1 I 1 1 1 I 1 1 1 1 I 1 i I 1 I t i I 1 I
I 1 i 1 t 1 I I 1 1 1 i I 1 I 1 1 1 1 1 1 1 1 I 1 1 I I I 1 1
1 i 1 1 I 1 1 1 1 I 1 1 1 1 1 1 I 1 1 1 I 1 1 1 1 1 I I 1 1 1
1 1 I 1 1 I I 1 1 1 1 I i 1 1 I 1 I t i 1 1 1 1 1 1 I 1 1 I I
I 1 1 1 1 1 1 I I 1 1 I I I 1 1 1 I 1 1 1 i 1 1 1 1 I 1 I 1 1
1 1 1 1 1 1 1 i i i 1 1 1 1 i 1 1 1 i 1 1 1 I 1 i i I 1 1 1 I
1 1 1 1 1 I 1 1 1 I 1 I 1 1 i 1 1 1 1 t 1 1 1 1 1 I 1 1 1 I I
1 1 I I 1 1 I 1 I I I 1 1 1 1 1 1 1 I 1 1 1 1 I I 1 1 1 1 1 I
1 1 I 1 I I 1 1 1 1 1 1 1 i t 1 I I I 1 1 1 I 1 1 1 1 I I 1 1
I I 1 1 1 1 t 1 i 1 I 1 I I I i i 1 1 1 1 1 I 1 I 1 1 1 1 i 1
I 1 1 1 t 1 1 I 1 1 I 1 I 1 1 I 1 1 1 1 i i I I 1 1 1 I 1 i 1
1 I I 1 1 1 I I I 1 i 1 I 1 1 I I I 1 1 r 1 I I i I I i 1 1 I
i I 1 1 I I I 1 1 I I 1 1 i 1 I I I 1 1 1 1 i 1 I 1 1 1 1 I I
1 1 1 1 I I 1 1 1 I 1 1 i 1 I 1 1 I 1 t 1 1 I 1 1 1 1 I I 1 i
1 1 i I 1 1 I I I I I 1 1 I 1 1 1 1 I 1 i i 1 1 1 1 1 1 1 1 1
I 1 I I I I I 1 1 I i 1 I 1 1 1 1 1 I I I 1 1 I 1 I 1 I I I I
1 1 1 i 1 I 1 1 1 1 i 1 i 1 I I 1 I 1 I 1 1 1 1 1 1 I 1 1 1 I
1 1 1 1 1 I 1 1 1 1 1 1 1 1 I 1 i I i I I I 1 I 1 1 1 1 1 1 I
I I I I 1 I I 1 I 1 1 i I i 1 1 1 1 I 1 I i 1 1 1 I 1 I 1 1 1
1 1 1 I 1 1 1 1 1 I 1 1 1 1 1 t 1 1 1 1 1 1 i 1 1 I 1 1 1 1 I
1 1 1 1 1 I I I I 1 1 1 1 1 1 1 1 1 1 I 1 1 I 1 1 1 1 I I 1 1 ^
1 1 I i I I i 1 I I I 1 t 1 1 i I I i 1 I i 1 1 1 1 I I I I
1 1 I I I 1 I I 1 1 1 i I 1 1 I 1 1 1 I 1 1 t 1 1 1 1 I I 1 1
I I 1 I 1 I 1 1 1 1 I 1 1 I 1 1 1 1 1 i I 1 1 1 1 I 1 1 1 I
1 I 1 I I I 1 1 1 1 1 I I 1 1 i i 1 1 i 1 1 1 1 1 I I 1 1 I
t l I 1 1 1 I 1 I i 1 1 i I 1 1 1 1 1 1 1 1 I r 1 1 1 I I 1 1 m
1 1 1 1 1 1 I 1 I 1 I 1 I i 1 r 1 1 I 1 I 1 I 1 t I I 1 I r 1 m
I I 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 i 1 1 1 I I I I I 1 i 1 1 I d 1 1 I 1 1 1 1 1 1 1 f 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I i
O I I i I 1 1 1 I 1 1 1 1 1 1 I I 1 t i I I 1 1 I 1 1 1 1 I 1 J
i 1 I 1 1 1 I 1 r 1 1 I 1 1 1 1 1 1 1 i I 1 1 1 1 I t 1 1 1 I
I 1 1 i I I 1 1 1 1 1 I I 1 1 I 1 1 I 1 I 1 1 1 1 1 1 1 1 I 1
M I 1 1 1 i 1 1 I 1 1 1 1 I i 1 1 I I I I 1 1 I 1 1 1 1 1 1 1 1 Q
M i I 1 i 1 1 1 1 1 1 1 1 I 1 i I 1 1 1 1 1 1 I 1 1 I 1 I 1 1 I
m I 1 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 t 1 1 I 1 I
1 1 1 I i 1 1 1 I I 1 1 1 i 1 I 1 1 1 1 1 I 1 1 1 1 1 I 1 1 1
1 I 1 i 1 I I 1 I I 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I I 1 1 1 1 1 /n 1 I 1 i I I 1 1 1 1 1 1 1 I I 1 I I 1 1 1 1 i I i 1 i 1 1 1 I
1 1 I 1 1 1 1 t i 1 I 1 I I 1 1 1 1 1 I 1 1 1 1 I I 1 1 1 1 1
1 1 1 I I I 1 i 1 1 1 I t 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 i 1 Q
LL
1 1 1 1 I 1 1 1 1 1 I 1 1 1 1 1 i 1 1 1 I 1 I 1 I I 1 I I 1 1
1 I i 1 1 1 1 1 I I 1 1 1 1 1 I 1 I 1 1 1 1 1 1 1 1 I I 1 I 1
1 1 1 1 I 1 I 1 I 1 1 1 1 i 1 1 1 1 1 1 1 1 1 I 1 i I I 1 11. I
T__T_'T"T-'r_'T_'T._y_..T...T..7._T•-T�'r-'i__T•'1"'I'__I'__T��l�_T_'r•_7_.T..r_.T..T_..I._. __i..
I I 1 I I I I 1 I I 1 1 1 1 1 I 1 1 1 1 1 1 1 I 1 I 1 I I I I OZ
1 1 1 1 1 1 1 1 I i I i I 1 1 1 1 1 1 1 1 I i 1 1 1 1 1 1 I 1
1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 I i 1 1 1 1 1 I 1 1 1 i I 1 1 U
I 1 I I 1 i 1 1 I 1 1 1 t 1 1 1 f 1 1 I 1 1 1 1 1 I 1 i I 1 1
1 1 I i I I 1 t 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 I i 1 I 1 1 1 1 m
1 I 1 1 1 I I I I 1 1 I 1 1 1 1 I I 1 1 1 1 1 1 1 1 I 1 1 I
1 1 1 I 1 i I 1 I 1 1 1 1 1 I 1 I 1 1 1 1 1 1 1 I I 1 i I 1 1 N
I 1 1 I I I I 1 1 1 1 i i 1 1 1 1 I 1 I 1 1 I 1 1 1 1 I 1 I 1
1 1 1 1 1 I 1 1 i I 1 1 1 I I 1 1 1 I 1 1 1 1 I 1 1 1 1 1 1 1
I 1 1 I I 1 1 1 1 I 1 I 1 I 1 I 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1
I 1 I 1 I 1 1 1 1 1 I 1 1 1 1 1 f 1 1 I 1 1 I 1 1 1 1 1 1 I 1 W
I f 1 1 1 1 I 1 1 i 1 1 1 I 1 1 1 1 1 1 1 1 1 1 I 1 1 1 I I I
1 1 1 1 I 1 1 1 1 I 1 I 1 1 1 1 I I 1 i 1 I 1 1 1 1 I I I 1 1
1 t 1 1 1 1 I 1 1 1 1 1 1 1 1 1 i I 1 1 I I I I 1 I t 1 1 1 1
i 1 I 1 I I 1 1 1 1 t 1 1 I I 1 1 1 1 1 1 1 i 1 1 1 1 1 1 i I
1 1 1 I 1 1 I 1 1 I 1 I I 1 1 I 1 1 1 I i I 1 1 I 1 1 1 1 1 1
1 I I I 1 1 1 1 1 I 1 I I I I 1 1 I 1 1 1 I 1 1 I I 1 1 I 1 1
1 i I I 1 1 1 1 1 i 1 1 1 1 1 1 1 I 1 1 I 1 1 1 1 1 1 1 I 1 1
LL
I 1 1 i I 1 1 I 1 1 I 1 1 1 1 1 I 1 1 1 1 1 I 1 1 i 1 I 1 I 1
I 1 I I 1 I 1 1 1 1 I 1 1 I 1 i 1 I I 1 I 1 I I 1 I 1 I 1 1 1
i I I 1 1 I 1 1 I 1 1 1 1 1 1 1 1 1 1 1 I I i 1 1 1 1 1 1 1 1
1 1 I I 1 1 1 I I 1 1 I 1 1 i i 1 1 1 I 1 1 1 I I I I 1 1 1 I
i i 1 I 1 1 I 1 1 1 I 1 I 1 1 1 I 1 I I 1 1 I 1 1 1 I I 1 I 1
I 1 1 I 1 I 1 1 I 1 1 1 I 1 I 1 1 1 I 1 I 1 1 1 1 1 I 1 I 1 1
I 1 1 1 I 1 1 1 1 I 1 I 1 1 1 I I 1 1 1 1 I i 1 1 1 1 I 1 I 1
I 1 I 1 I i 1 I I I I 1 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1
t I I t 1 1 1 I I 1 i 1
i I 1 I I 1 1 1 1 1 i 1 1 1 I 1 I 1 1 1 1 1 1 1 1 I 1 1 1 1
i 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 I 1 I 1 I 1 I 1 I I I I 1 i 1
1 1 1 I I I I 1 I 1 1 I 1 I 1 I 1 I 1 1 1 1 1 I 1 1 1 I I i 1
C I I 1 I 1 I 1 1 1 1 1 I i 1 I I 1 I I I I i 1 1 1 1 1 I I 1 I
m l 1 1 I 1 1 1 1 I 1 1 1 I 1 1 1 1 I 1 I 1 i 1 I 1 1 1 1 1 I 1
I 1 1 1 1 I I I 1 1 1 1 1 1 I 1 1 1 1 I I 1 1 1 1 i 1 1 1 i 1
Ill
�I
I I 1 1 i 1 I I I 1 I 1 1 I 1 1 1 1 i 1 I 1 1 1 1 1 1 I I 1 1
d l 1 I 1 I 1 1 1 1 I I i 1 1 1 1 I 1 1 1 1 1 1 1 I f 1 1 I 1 1
Q,1 I 1 1 1 1 1 1 I I 1 1 1 i I I 1 I 1 1 I 1 i I 1 1 I I I i I
= • CONSTRUCTION FIELD MEMO
Project: 108th Ave SE and SE 264th St Compact Roundabout Dote: 5/13/2024
Owner: City of Kent ProJW NO: 21-3004
C ontraCtor: Strickland and Sons Excavation Red Aid No: HIP 1129(001)
q
ubjilCt: Field Directive 012-Pedestrian Railing
'Ifie=bapplicatIon.
rian Rsiling apedfled In KSP 8-27 included in Project 21-3004 Special Provisions Is the Incorrect specification
far Delete Bid 1295"Padestirtan Railing"and provide pricing to supply and Install 102 Unear Feet of
Pedestrian Railing In accordance with attached Revised section 8-27.
Reply By(date): Date ®As Soon as Possible 0 No Reply Is RegLired
Sean Mt 5/13/20"
NamwTW*(pr6*po) Signature Data
Response
Resporm
NarroMde(prinUt") Slgnswre Dabs
1 of 1 P-31(Ray.2010 Ma)
Paul Bean
From: Brock Akers <Brock@vandamwelding.com>
Sent: Friday, May 31, 2024 8:21 AM
To: Paul Bean
Cc: Luke Jackson
Subject: Kent Railing
Follow Up Flag: Flag for follow up
Flag Status: Flagged
Hi Paut,
Appreciate your patience on this one.
Pricing-$304 per ft w/o tax
Price includes approval drawings, material,fabrication, galvanizing and installation of approximately
104LF of Kent standard pedestrian railing per their spec. Anchor bolts to be 5/8" dia Hilti, Using HIT-HY
200 A V3 epoxy for the install.Alt material to be domestic.
Price does not include and traffic control or lifting equipment to set rail sections into place if needed.
Thanks,
Brock Akers I Estimator/Project Manager
C. 253.632.1679 1 D. 360.761.7297
www.vandamweldine.com
i
i