Loading...
HomeMy WebLinkAboutCAG2024-289 - Change Order - #1 - Evergreen Asphalt & Concrete Construction Inc. - Tennis court asphalt patching at Glenn Nelson & gate install at North Meridian Park - 06/24/24 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form Dir. Assist: • For Approvals,Signatures and Records Management KE N T This form combines&replaces the Request for Mayor's Signature and Contract Cover WASHINcroN Sheet forms. Dir/Dep Dir: Originator: Department: Ron Lashley - Ben Levenhagen Parks, Recreation & Community Services Date Sent: Date Required: > 06/24/2024 ASAP 0 CL Authorized to Sign: Date of Council Approval: QDirector or Designee N/A Budget Account Number: Grant?E]YesFNo P21082.64190.5xxx 851 W Budget?w]YesEl No Type: N/A Vendor Name: Category: Evergreen Asphalt&Concrete Construction Inc. Contract Vendor Number: Sub-Category: = 213355 Change Order R0 Tennis court asphalt patching at Glenn Nelson &gate install at North Meridian Park Project Name: 3- Project Details:Change Oder 1 extending time for vendor to install gate at North Meridian 0 = Park and patch/reseal tennis court at Glenn Nelson Park. c a� Agreement Amount: 0 Basis for Selection of Contractor: Other `Memo to Mayor must be attached Start Date: 05/23/2024 Termination Date: 10/31/2024 Im Q Local Business?IzYesF--]No* If meets req uiremen ts per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace. Business License Verification:Yes El In-Process El Exempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: FlYesONo CAG2024-289 Comments: Im https://documents.kentwa.gov/WebLink/DocView.aspx?id=274842&dbid=0&repo=CityO C fKent a) H •� i N 3 f0 C V1 Date Routed to the City Clerk's Office: 6/24/24 ,c«w»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 • KENT WASHINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR: Evergreen Asphalt & Concrete Construction Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:Gate install at North Meridian and patch/reseal tennis court at Gleen Nelson Park ORIGINAL CONTRACT DATE: 6/11/2024 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Extending time for vendor to install gate at North Meridian Park and patch/reseal tennis court at Gleen Nelson Park 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $41,297.45 (including applicable alternates and WSST) Net Change by Previous Change Orders $N/A (incl. applicable WSST) Current Contract Amount $41,297.45 (incl. Previous Change Orders) Current Change Order $N/A Applicable WSST Tax on this Change $N/A Order Revised Contract Sum $41,297.45 CHANGE ORDER - 1 OF 3 Original Time for Completion 7/15/2024 (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (f) for this Change +108 calendar days Order Revised Time for Completion 10/31/2024 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By 5hane��on(Jun 24,2024 10:43 PDT) By:Garin Lee(Jun 2�024 08:40 PDT) Print Name:Shane Gilbertson Print Name: Garin Lee Its President Its: Park Operations Superintendent DATE:Jun 24,2024 DATE: Jun 24,2024 CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 Signature: k1w kowo�o Kim Komoto(Jun 25,202410:45 PDT) Email: cityclerk@kentwa.gov 1 ARF-CO1 -CAG2024-289 Final Audit Report 2024-06-25 Created: 2024-06-24 By: Ronald Lashley(rlashley@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAAjZSlj1N78deZpSrrbxjnLGkpfEYsWBm5 "1_ARF-001 -CAG2024-289" History Document created by Ronald Lashley (rlashley@kentwa.gov) 2024-06-24-3:32:14 PM GMT Document emailed to glee@kentwa.gov for signature 2024-06-24-3:36:22 PM GMT Email viewed by glee@kentwa.gov 2024-06-24-3:40:18 PM GMT d4 Signer glee@kentwa.gov entered name at signing as Garin Lee 2024-06-24-3:40:44 PM GMT �a Document e-signed by Garin Lee (glee@kentwa.gov) Signature Date:2024-06-24-3:40:46 PM GMT-Time Source:server Document emailed to evergreen.shane@comcast.net for signature 2024-06-24-3:40:48 PM GMT Email viewed by evergreen.shane@comcast.net 2024-06-24-5:42:59 PM GMT d4 Signer evergreen.shane@comcast.net entered name at signing as Shane Gilbertson 2024-06-24-5:43:54 PM GMT �p Document e-signed by Shane Gilbertson (evergreen.shane@comcast.net) Signature Date:2024-06-24-5:43:56 PM GMT-Time Source:server Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature 2024-06-24-5:43:58 PM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2024-06-24-5:45:42 PM GMT Powered by Adobe ` ENT Acrobat Sign �p Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date:2024-06-24-5:46:00 PM GMT-Time Source:server Document emailed to cityclerk@kentwa.gov for signature 2024-06-24-5:46:02 PM GMT Email viewed by cityclerk@kentwa.gov 2024-06-25-5:43:14 PM GMT Signer cityclerk@kentwa.gov entered name at signing as Kim Komoto 2024-06-25-5:45:20 PM GMT dp Document e-signed by Kim Komoto (cityclerk@kentwa.gov) Signature Date:2024-06-25-5:45:22 PM GMT-Time Source:server Q Agreement completed. 2024-06-25-5:45:22 PM GMT Powered by Adobe ` ENT Acrobat Sign