HomeMy WebLinkAboutCAG2023-595 - Change Order - #5 - Larson Berger Companies Construction, LLC - FAC23-27 City of Kent Courtroom Refurbishment - 05/21/2024 FOR CITY OF KENT OFFICIAL USE ONLY pvk
Sup/Mgr: WM
Agreement Routing Form DirAsst: K;rlz_
For Approvals,Signatures and Records Management Di r/Dep:BL
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (Optional)
W A S H I N G T O N Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Leah Bryant for Nate Harper Parks, Recreation & Community Services
Date Sent: Date Required:
> 05/07/2024 5/14/2024
0
CL Authorized to Sign: Date of Council Approval:
Q W]Mayor or Designee 11/7/2023
Budclet Account Number: Grant? Yes NOW]
F00056.64110.9412
Budget?W]Yes ONO Type: N/A
Vendor Name: Category:
Larson Berger Companies-Construction,LLC, DBA LBC Contract
Construction
Vendor Number: Sub-Category:
C 2536711 Change Order
Project Name:
Cityof Kent Courtroom Refurbishment FAC23-27
3. Project Details: As described in attached Exhibit A, incorporated herein,the contractor shall provide all labor
0 and material to paint the ceilings in 4 courtrooms, adding and rerouting electrical conduits and
C outlets, drywall repairs as needed, and swapping outlets to white from ivory.
C
Basis for Selection of Contractor:
� Agreement Amount: 123,236.56 Bid
*Memo to Mayor must be attached
Start Date: November 2023 Termination Date: 9/27/2024
Q Local Business?E]Yes Who*If meets requirements per KCC3.70.100,please complete'Vendor Purchase-Local Exceptions'form on Cityspace.
Business License Verification: W1 Yes In-Processo Exempt(KCC 5.01.045) W1Authorized Signer Verified
Notice required prior to disclosure? Contract Number:
F—]YeswI No CAG2023-595
Comments:
V1
C C
N 3
3 0
cc
Date Received:City Attorney: 5/21/24 Date Routed:Mayor's Office 5/21/24 City Clerk's Office 5/22/24
adccW22373_7_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20221201
t,
KE •NT
WASHINGTON
CHANGE ORDER NO. 5
NAME OF CONTRACTOR:Larson Berger Companies - Construction, LLC, DBA LBC Construction.
("Contractor")
CONTRACT NAME & PROJECT NUMBER: City of Kent Courtroom Refurbishment FAC23-27.
ORIGINAL CONTRACT DATE: 11/28/2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
The cost for painting the ceilings in each of the four courtrooms. This proposal does not include the cost for
rental either scaffolding or an electric lift for the 15' ceilings.
Electrical includes rerouting conduit runs in the North Wall. Electrical added two empty conduits for future
use. Electrical added outlets to the shared wall for Courtroom 3 &4. Electrical outlets in all courtrooms and
jury rooms were changed to a white outlet.
Casework had to make an additional box to hide conduit runs that were not located under the dais as
assumed.
Drywall needed to be removed and reinstalled and finished in the courtrooms for the conduit runs for the
electrical work.
LBC is requesting a 4-week time extension for the contract time for this work.
This includes the swapping of old ivory outlets to new white outlets. Switching the old ivory switches to new
white switches.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $678,216.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $62,255.95
(incl. applicable WSST)
Current Contract Amount $740,471.95
(incl. Previous Change Orders)
Current Change Order $111,829.91
Applicable WSST Tax on this Change $11,406.65
Order
Revised Contract Sum $863,708.51
CHANGE ORDER - 1 OF 3
Original Time for Completion 8/31/2024
(insert date)
Revised Time for Completion under NA
prior Change Orders
(insert date)
Days Required (f) for this Change Order 28 calendar days
Revised Time for Completion 9/27/2024
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By: k - - --- -
Print Name: Nathan Larson
Print Name: Dana Ralph
Its Vice President Its: Mayor
DATE: May 14,2024 DATE: 05/21/2024
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
jjv�t- 0'tji
eU� klV�
Kent City Clerk Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
Exhibit A
Change Order Proposal
Kent Municipal Court Refirbishment
To: City of Kent Date: 5/3/2024
400 West Gowe Project No.: 24-01
Kent,WA 98032 Change Proposal No.: 005
Attn: Nathen Harper REV: 2
CO Title: CCD 002 Changes
Detail Proposed Item
CSI 1 (L/M/E/S) Qty Unit Rate Cost
SCOPE
Painting Ceiling Painting in Courtrooms S 1 LS $5,076.00 $ 5,076.00
Painting Rental Lift/Scaffold for Courtrooms E 0 EA $800.00 $ -
Drywall Patch Drywall S 2 LS $2,134.00 $ 4,268.00
Casework New Box Enclosures for Coundit Runs S 1 LS $4,854.00 $ 4,854.00
Electrical Electrical Modifications for Room S 1 LS $70,260.99 $ 70,260.99
ral Contractor On-site Supervision L 2 WK $6,363.60 $ 12,727.20
$ -
SUBTOTAL $ 97,186.19
FEE&OVERHEAD
GC Markup(Self-Perform) 1 LS 15% $ 1,909.08
GC Markup(Sub-Contractor) 1 LS 10% $ 8,445.90
SUBTOTAL $ 107,541.17
TAXES&INSURANCE
Liability Insurance 1 LS 0.550% $ 591.48
Builders Risk Insurance 1 LS 0.200% $ 215.08
State&Local B&O tax 1 LS 0.571% $ 614.06
Payment&Performance Bond 1 LS 2.667% $ 2,868.12
SUBTOTAL $ 111,829.91
WSST
as ington State Sales I ax I 1 I LS 1 0.00% $ -
TOTAL CHANGE: Subject to terms and conditions of main contract. TOTAL $ 111,829.91
Contractor LBC Construction Architect DLR Group Owner City of Kent
Signed:/tl�a� Signed. Signed:
Title: Vice President Title: Principal he Firm Title: a ital Pro'e is Manager
Date: May 2, 2024 Date: s/6/2o24 Date: 5/6/2024
005
Kent Municipal Court Refirbishment
ASSUMPTIONS&EXCLUSIONS
This proposal includes the cost for painting the ceilings in each of the four courtrooms as shown on CCD01 sheet AV.
This proposal does not include the cost for rental either scaffolding or a electric lift for the 15'ceilings.
Electrical includes rerouting counduit runs in the North Wall. Electrical added two empty counduits for future
use. Electrical added outlets to the shared wall for Courtroom 3&4. Electrical outlets in all courtrooms and
jury rooms were were changed to a white outlet.
Casework had to make an addional box to hide conduit runs that were not located under the dias as
assumed.The new box detail is CCD A11.1 Detail 1D.
Drywall needed to be removed and reinstalled and finished in the courtrooms for the conduit runs for the
electrical work.This price was given to us on a T&M basis and we are carrying and additional lump sum to
cover Phase II work as this work was for only Phase I.
LBC is requesting a 4 week time time extention for the contract time for this work.
Revision 1 includes the swapping of old ivory outlets to new white outlets.Switching the old ivory switches to new white
switches.
005
Signature: W.WL �n�409:2e Signature: Kent Park vis,zo
Email: wmoore@kentwa.gov Email: parkscontracts@kentwa.gov
Signature: L&afilda=
Brian I avanhagan fMav 14 70 1734 PDX
Email: bjlevenhagen@kentwa.gov