Loading...
HomeMy WebLinkAboutCAG2023-156 - Amendment - #3 - KPG Psomas, Inc. - Naden Ave Trail Interurban Trail Improvements - 04/19/2024 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: TT Agreement Routing Form Dir Asst: RL RL • For Approvals,Signatures and Records Management Dir/Dep: 3L BL KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. (Optional) W A 5 H I N G T O N Originator: Department: KateLynn Jennings for Terry Jungman Parks, Recreation & Community Services Date Sent: Date Required: > 4/17/2024 4/24/2024 0 Q Authorized to Sign: Date of Council Approval: Q [ZDirector or Designee Mayor N/A Budget Account Number: Grant? Yes❑✓ No P21079 Budget?w]YesE]No Type: N/A Vendor Name: Category: KPG Psomas Inc. Contract Vendor Number: Sub-Category: 2479959 Amendment Project Name: Naden Ave Interurban Trail Improvements -Amendment 3 E i = Project Details: Amendment 3 for design services through 60% a.+ C N Agreement Amount: $48,395 Basis for Selection of Contractor: E Other W *Memo to Mayor must be attached 3- Start Date: 10/29/2020 Termination Date: 8/31/2024 Q Local Business? Yes[ZNo* If meets requirements per KCC3.70.700,pleosecomplete"VendorPurchase-Locol Exceptions"form onCityspoce. Business License Verification:Yes Elln-Process ElExempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: F—]YesONo CAG2023-156 Comments: p1 C n 30 a, N > i Date Received by City Attorney: N/A R p� Date Routed to the Mayor's Office: N/A Vf Date Routed to the City Clerk's Office: adccW22313_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20200218 • KENT WASHINGTON AMENDMENT NO. # 3 NAME OF CONSULTANT OR VENDOR: KPG Psomas Inc. CONTRACT NAME & PROJECT NUMBER: Naden Ave Interurban Trail Improvements- CAG2023-156 ORIGINAL AGREEMENT DATE: 03/14/2023 This Amendment is made between the City and the above-referenced Consultant or Vendor and amends the original Agreement and all prior Amendments. All other provisions of the original Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force and effect. For valuable consideration and by mutual consent of the parties, Consultant or Vendor's work is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, the Consultant or Vendor shall: As described in the attached Exhibit A, incorporated herein, provide 60% design services for landscape architectural and trail design for the existing Interurban Trail segment between Willis Ave and Meeker Street, aligned with the future corridor for Naden Ave 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are modified as follows: Original Contract Sum, $50,339 including applicable WSST Net Change by Previous Amendments N/A including applicable WSST Current Contract Amount $50,339 including all previous amendments Current Amendment Sum $48,395 Applicable WSST Tax on this $0 Amendment Revised Contract Sum $98,734 AMENDMENT - 1 OF 2 Original Time for Completion 06/30/2023 (insert date) Revised Time for Completion under 7/31/2024 prior Amendments (insert date) Add'1 Days Required (f) for this 31 calendar days Amendment Revised Time for Completion 8/31/2024 (insert date) The Consultant or Vendor accepts all requirements of this Amendment by signing below, by its signature waives any protest or claim it may have regarding this Amendment, and acknowledges and accepts that this Amendment constitutes full payment and final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Amendment, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and warranty provisions of the original Agreement. All acts consistent with the authority of the Agreement, previous Amendments (if any), and this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this Amendment, which is binding on the parties of this contract. IN WITNESS, the parties below have executed this Amendment, which will become effective on the last date written below. CONSULTANT/VENDOR: CITY OF KENT: By:ELizabee ibson(AvJX,2024 16:51 PDT) By Qi arascondola(Apr 19,2024 22:27 PDT) Print Name: Elizabeth Gibson Print Name: Julie Parascondola, CPRE Its Vice President, Urban Design/LA Manager Its Parks, Recreation &Community Svcs Director DATE: 04/19/24 DATE: 4-19-24 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) k�;u A�XA Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] AMENDMENT - 2 OF 2 Exhibit A City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements Exhibit A—Scope of Work April 15T" 2024 Project Description and Background The City of Kent Parks, Recreation and Community Services (Parks) is requesting 60% design services for landscape architectural and trail design for the existing Interurban Trail segment between Willis Ave and Meeker Street, aligned with the future corridor for Naden Ave. Conceptual Design through 30% has been completed and this effort will provide plans, specifications and engineers cost estimate based on the completed 30% design. The outcome of this project will be to rehabilitate the trail surfacing, landscape, and shoulders alongside of the existing trail section, similar to other sections to the north and south, using low maintenance plant material and/or grass, coordinate design with the future Naden Ave Design, future Meet Me on Meeker improvements, and proposed PSE Substation improvements to provide formalize access to the substation site and stormwater management for PSE site runoff. The following tasks are identified for 60% design associated with the Naden Ave Trail Improvements: o Develop 60%design plans, specifications, and construction estimate, to continue towards final design and construction, including the following: ■ 60%Trail Improvement Plans, including site elements (benches, trash cans, bike racks) ■ 60% layout of pedestrian-scale lighting for the trail with light bollards (limited use of pedestrian illumination poles and fixtures at intersections/crossings if appropriate) ■ Provide for stormwater management, formalized maintenance access for PSE sub-station, utilizing paved shared-use trail and coordination with PSE for access. ■ Tree and shrub palate shall be drought tolerant and low maintenance, supporting groundwater-surface water interface (GSI) where applicable, along with the revegetation plan for the trail. ■ Grass re-establishment along the shoulders of the trail ■ Provide for the trail section and shoulders to be brought up to established multi- use non-motorized trail design standards including AASHTO, NACTO, and MUTCD guidelines. ■ Provide for coordination and adjustments between the future Naden Ave Design and future Meet Me on Meeker design. ASSUMPTIONS • The scope of this work is through 60% design to be completed by end of July 2024. 100% design, permitting and bid phase to be completed under a later contract. • The trail will remain 10' width, per agreement between King County and PSE, with 2' shoulders each side (total of 14' width) and in relatively the same location as existing. This width will be the assumed design width unless otherwise determined. • Scope of work does not include detailing of the trail plaza connection and crossing at the intersection of Meeker and Naden/7th. Layout of the trail head will remain as shown at 30%, with minor adjustments to accommodate 60% design changes, and information included from the future Naden Ave design if available. Page 1 1 Naden Ave Interurban Trail Improvements KPG Psomas Exhibit A (Cont.) City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements • Minor trail realignment is anticipated, any increase in impervious surfacing will be kept to a minimum, per the 30% design. Trail width is 10' under the agreement between King County and PSE, • Coordination with KC Parks as needed, will be provided by City • The project will remove some of the impervious gravel areas reducing the total amount of impervious surfacing and improving infiltration of stormwater in the area (majority of the existing gravel areas to the east of the trail) • Stormwater facilities are to include treatment for stormwater runoff from the existing PSE substation, currently under design for improvements. • The work is being performed in the PSE ROW trail easement,so will require continued coordination and approval/review from PSE. • Draft Illumination Report will be included at 60%. • Stormwater design work will utilize available information from nearby previous projects. • Survey has already been completed and available from the City • Wayfinding Signage will be included, standards to be provided by the City. • Public involvement or outreach materials will not be required. • At the end of the project, documents will be submitted to the City for records, in the format they were created in, i.e. InDesign,Word and Excel for cost estimates. Project deliverables will be in PDF and AutoCAD Civil 3D format • The Consultant will set up and maintain the project .ftp site for the project team. PROVIDED BY KPG PSOMAS • 60% design for: o Trail Improvements, including minor trail realignment and connections, trail section rehabilitation, trail amenities (benches, bike racks and trashcans TBD) and trail corridor revegetation. o Stormwater Design, including PSE substation storm water treatment. o Pedestrian illumination design o Revegetation of trail corridor(grass or tree and shrub plantings where appropriate) o Preliminary establishment irrigation o Wayfinding Signage design • 60%cost estimate • Draft Specifications, WSDOT format • See deliverables lists for individual Tasks PROVIDED BY THE CITY The City will provide or obtain the following items: • Review of 60% design submittal • Site Survey information (already provided at 30%) • Any additional information on upcoming development along the trail and Naden Ave, including access to the development (Public Works) • Design information for Meet Me on Meeker improvements, if available. • Current plans for the new Naden Ave project, including right-in-right-out. • Infiltration testing and geotechnical recommendations for stormwater LID facilities, if required Page 12 Naden Ave Interurban Trail Improvements KPG Psomas Exhibit A (Cont.) City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements TASK 1 - MANAGEMENT/ADMINISTRATION/COORDINATION Task 1 Objective: Management of project team throughout the duration of the project, coordination with PR&CS, Public Works, coordination with project team, development of invoices, project schedule and QA/QC. Consultant will attend up to (6) meetings with City Staff and PSE for project review (over approx. 3-month period), discussion of design and coordination, either in person or teleconferencing as necessary and one site visit - for review as required for the design. The Consultant will also assist with coordination for PSE and Olympic Pipeline as necessary. Task 1 Work Elements: 1.1. Project Management/QA/QC 1.2. Monthly Progress Reports and Invoicing 1.3. Project Coordination Meetings (up to 6, including coordination meetings with PSE) and site visit. Task 1 Deliverables: • Monthly progress reports including invoices, emailed. • Meeting agendas and minutes, including summary of decisions made/needed resulting from design coordination meeting. Task 1 Assumptions: • The Consultant will provide timely and immediate notification of any work items or project developments constituting a change to the written scope of work and fee budget estimate and schedule. • The work of this task is estimated to be up to 3-months. TASK 2—60% Design PSE Task 2 Objective: Consultant shall provide 60% documents including plans, specifications and estimate for the Interurban bicycle trail from the Willis crossing connection to Meeker, east of the future proposed Naden Ave street section. Task 2.160% Design (Plans,Specifications and Estimate) will be based on the approved 30% plans and will include: ■ Trail Improvement and Restoration Plans, including site prep, clearing, and grading limits, pavement/trail TESC needs, removal, typical pavement sections and horizontal and vertical trail layout. ■ Stormwater Plans and Typical Details, with locations of proposed stormwater treatment, sections, and draft stormwater report ■ Site elements (benches, trashcans etc.), pavement treatments ■ Trail Revegetation and Soil Improvement Plan, including recommended (minimal) tree and plant revegetation and soil improvement areas and sections, plant schedule and typical details. ■ Preliminary irrigation, showing POC connection, type of irrigation (temporary, establishment or standard spray) standard equipment schedule and detail sheets. Page 3 Naden Ave Interurban Trail Improvements KPG Psomas Exhibit A (Cont.) City of Kent Parks, Recreation and Community Services Naden Ave Interurban Trail Improvements ■ Pedestrian scale luminaire design, utilizing equivalent fixture to the Willis Greenway (lighted bollards), with draft illumination report. Illumination service connection will be utilized from new Naden Ave project. ■ 60% Construction Cost Estimate. ■ 60%draft WSDOT/APWA Specifications and city standards. Task 2 Deliverables: • 60% Plans, specifications and Cost Estimate Package - including: o Cover Sheet, Index, Abbreviations, Survey Control and Alignment Data o TESC&Site Prep (3 Plan sheets and 1 Detail sheet) o Trail Improvements (6 plan sheets, 3 detail sheets), including wayfinding locations and draft signage details o Stormwater Plans (3 plan sheets, 2 detail sheets) o Trail Revegetation/Soil Improvement Plan (3 plan sheets, 3 detail sheets) o Irrigation Plan (3 plan sheets, 2 detail sheets) o Pedestrian Trail Illumination Design ((3 plan sheets, 2 detail sheet) o Updated Illustrative Plan for City use. • Draft Stormwater Technical Report with basis of design • Draft Illumination Report Task 2 Assumptions: • City will provide example contract front end for specifications. • Replaced impervious for the trail will be equivalent or close to existing. Other impervious areas within the project limits may be reduced by removing existing crushed rock areas,thereby reducing the requirements for any additional stormwater facilities. • Drawings and sketches will be provided in .pdf format and/or power-point format for meetings, if required. • Illumination will utilize new service connection included in the Naden right-in/right-out improvement project. • Illumination design will be based on National IES and City of Kent Standards. • Project management is part of Task 1. • Updated Illustrative Plan will be based on plan Consultant provided to City at Conceptual/30% Phase. Other Services The City may require other services of the Consultant.These Services could include other work tasks not included in the scope of work, such as Survey, Geotechnical or facilitation of Public Involvement. The scope of these services will be determined at the sole discretion of the City. At the time these services are required, the Consultant shall provide a detailed scope of work and estimate of costs.The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. Page 14 Naden Ave Interurban Trail Improvements KPG Psomas Exhibit A (Cont.) K� EXHIBIT A PRIME CONSULTANT COST COMPUTATIONS Client:City of Kent Parks Department Project Name:Naden Ave Interurban Trail Imp.60%Design KPG Psomas Inc.Project Number:9KEN010100 Date: 12-Apr-24 Labor Hour Estimate d d a a z— c c y d v = a a m E Total Hours and Labor M •� 'a •a d w c a; c d u c V Q a Cost Computions by Task m m c c c m A m .- of 'c Task c c w w w c c 's L o Task Description o A cj w se No. cE 8 o w u° o ai'u VJ O w N ww a a m $226.00 $194.00 $205.00 $139.00 $220.00 $155.00 $166.00 $105.00 $139.00 $177.00 $139.00 $110.00 Hours Totals Task 1-Project Management/Meetings and Coordination 1.1 Project Management (approx.3 Months 8 8 $ 1,760.00 1.2 Monthly Project Reports and Invoicing 3 3 1 2 9 $ 1,550.00 1.3 Project Coord.Meetings(6),Site Visit(1) 2 1 8 4 6 8 1 1 28 $ 5,418.00 Task Total 2 8 4 6 19 0 0 0 0 3 1 2 45 $ 8,728.00 Task 2 60%DESIGN PSE 2.1 60%Plans 4 4 $ 556.00 Trail Improvements and Restoration Plans and Details 8 28 2 4 8 50 $ 7,388.00 Stormwater Plans and Details and Drainage Report 8 40 4 4 56 $ 8,240.00 Trail Revegetation,Soil Improvement,Irrigation Plans and Details) 4 8 40 52 $ 6,320.00 Pedestrian Luminaire Plan,Details and Draft Illumination Report 8 40 48 $ 7,368.00 Updated Illustrative Plan 1 4 5 $ 586.00 QA/QC 2 2 2 8 2 16 $ 3,342.00 60%Sped ications 2 2 2 2 4 2 1 2 1 1 1 16 $ 3,050.00 60%Estimate 1 2 1 4 2 2 2 2 16 $ 2,667.00 Task Total 13 1 14 1 13 1 114 1 20 1 16 1 11 58 4 0 0 0 263 $ 39,517.00 Total Labor Hours and Feel 15 1 22 1 17 1 120 1 39 1 16 1 11 58 4 3 1 2 308 $ 48,245.00 Reimbursable Direct Non-Salary Costs Mileage at current IRS rate $ 150.00 Reproduction Allowance Total Reimbursable Expense $ 150.00 Management Reserve $ - Total Estimated Budget $ 48,395.00 Signature: Signature: LAj ,-U 1,'• Terry Jun a (Apr 18,202414:07 PDT) Ronald Lashley Jr.(Apr 19,20 410:57 PDT) Email: tjungman@kentwa.gov Email: parkscontracts@kentwa.gov Signature: 13r0?7 Signature: Off( koP of o Brian Levenhagen(Apr19,20241 .28 PDT) Kim Komoto(Apr 22,202415:39 PDT) Email: bjlevenhagen@kentwa.gov Email: cityclerk@kentwa.gov PPD-KPG-Naden Ave Trail-CAG2023-156 AM D3 Final Audit Report 2024-04-22 Created: 2024-04-18 By: KateLynn Jennings(kjennings@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAAwNxPiQZGpkFbMRwVZzTrEsRxTHGFOgX5 "PPD-KPG-Naden Ave Trail-CAG2023-156 AMDY History Document created by KateLynn Jennings (kjennings@kentwa.gov) 2024-04-18-1:36:01 PM GMT-IP address: 146.129.252.126 Document emailed to Terry Jungman (tjungman@kentwa.gov) for signature 2024-04-18-1:36:53 PM GMT Email viewed by Terry Jungman (tjungman@kentwa.gov) 2024-04-18-9:07:12 PM GMT-IP address: 104.47.65.254 Document e-signed by Terry Jungman (tjungman@kentwa.gov) Signature Date:2024-04-18-9:07:56 PM GMT-Time Source:server-IP address: 146.129.252.126 Document emailed to Kent Parks (parkscontracts@kentwa.gov) for signature 2024-04-18-9:07:57 PM GMT Email viewed by Kent Parks (parkscontracts@kentwa.gov) 2024-04-19-5:56:19 PM GMT-IP address: 104.47.64.254 Signer Kent Parks (parkscontracts@kentwa.gov) entered name at signing as Ronald Lashley Jr. 2024-04-19-5:57:11 PM GMT-IP address: 146.129.252.126 d4 Document e-signed by Ronald Lashley Jr. (parkscontracts@kentwa.gov) Signature Date:2024-04-19-5:57:13 PM GMT-Time Source:server-IP address: 146.129.252.126 Document emailed to bjlevenhagen@kentwa.gov for signature 2024-04-19-5:57:15 PM GMT Email viewed by bjlevenhagen@kentwa.gov 2024-04-19-8:27:44 PM GMT-IP address: 104.47.64.254 Powered by Adobe ` ENT Acrobat Sign 60 Signer bjlevenhagen@kentwa.gov entered name at signing as Brian Levenhagen 2024-04-19-8:28:04 PM GMT-IP address: 146.129.252.126 dp Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date:2024-04-19-8:28:06 PM GMT-Time Source:server-IP address: 146.129.252.126 C'► Document emailed to liz.gibson@psomas.com for signature 2024-04-19-8:28:08 PM GMT Email viewed by liz.gibson@psomas.com 2024-04-19-11:44:55 PM GMT-IP address: 104.47.58.126 d Signer liz.gibson@psomas.com entered name at signing as Elizabeth Gibson 2024-04-19-11:51:27 PM GMT-IP address: 174.21.68.7 d4 Document e-signed by ELizabeth Gibson (liz.gibson@psomas.com) Signature Date:2024-04-19-11:51:29 PM GMT-Time Source:server-IP address: 174.21.68.7 Document emailed to Julie Parascondola (jparascondola@kentwa.gov) for signature 2024-04-19-11:51:31 PM GMT Email viewed by Julie Parascondola Qparascondola@kentwa.gov) 2024-04-20-5:26:43 AM GMT-IP address: 172.56.108.56 Document e-signed by Julie Parascondola Qparascondola@kentwa.gov) Signature Date:2024-04-20-5:27:16 AM GMT-Time Source:server-IP address: 172.56.108.56 Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature 2024-04-20-5:27:18 AM GMT Email viewed by Kim Komoto (kkomoto@kentwa.gov) 2024-04-22-2:52:17 PM GMT-IP address: 104.47.65.254 da Document e-signed by Kim Komoto (kkomoto@kentwa.gov) Signature Date:2024-04-22-2:52:43 PM GMT-Time Source:server-IP address: 146.129.252.126 Document emailed to cityclerk@kentwa.gov for signature 2024-04-22-2:52:45 PM GMT Email viewed by cityclerk@kentwa.gov 2024-04-22-10:39:10 PM GMT-IP address: 104.47.65.254 dp Signer cityclerk@kentwa.gov entered name at signing as Kim Komoto 2024-04-22-10:39:29 PM GMT-IP address: 146.129.252.126 d4 Document e-signed by Kim Komoto (cityclerk@kentwa.gov) Signature Date:2024-04-22-10:39:31 PM GMT-Time Source:server-IP address: 146.129.252.126 Powered by Adobe ` ENT Acrobat Sign Agreement completed. 2024-04-22-10:39:31 PM GMT Powered by Adobe ��KENT Acrobat Sign