HomeMy WebLinkAboutCAG2024-190 - Original - WSDOT - Canyon Dr & Weiland St Access Control - 04/18/2024 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr:
Agreement Routing Form DirAsst:
• For Approvals,Signatures and Records Management Dir/Dep:
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (Optional)
WASHINGTON Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Toby Hallock Public Works
Date Sent: Date Required:
> 04/16/2024 4/19/2024
0
CL Mayor or Designee to Sign. Date of Council Approval: r-f
a
Q Interlocal Agreement Uploaded to Website 10/18/2022
Budget Account Number: Grant? YesWl NoEl
R20128
Budget? Yes❑No Type: Federal
Vendor Name: Category:
WSDOT Grant: Non-Real Property
Vendor Number: Sub-Category:
38319 Original
O
Project Name: Canyon Dr & Weiland St Access Control
£ Project Details: Grant funds for installation of linear curb or curb and pylon system and a
O
small median island to restrict left-turns out of Weiland St onto Canyon Drive.
C
O Basis for Selection of Contractor:
E� Agreement Amount: $111,000 Bid
*Memo to Mayor must be attached
i Start Date: 4/16/24 Termination Date: 12/31/2027
Q Local Business?❑Yes[—]No*lfmeets requirements per KCC 3.70.100,pleasecomplete"Vendor Purchase-Local Exceptions"form on Cityspace.
Business License Verification: 1-1 Yes F1 In-Process F1 Exempt(KCC5.01.045) ❑Authorized Signer Verified
Notice required prior to disclosure? Contract Number:
Yes❑No CAG2024-190
Comments:
GJ
s.
7
C C
'v1 3
O
Date Received:City Attorney:4/17/24 Date Routed:Mayor's Office City Clerk's Office 4/19/24
ad«W22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20221201
AW
Washington State Local Agency Federal Aid
Department of Transportation Project Prospectus
Prefix Route ( ) Date 4/15/2024
Federal Aid DUNS Number 020253613
Project Number
Local Agency r WSDOT 1 Federal Employer 91-6001254
Project Number ` Use Only J Tax ID Number
Agency CAAEs [:]]
Federal Program Title
City of Kent No Z 20.205 [:]Other
Project Title Start Latitude N 47.380852 Start Longitude W-122.218945
Canyon Dr&Weiland St Access Control End Latitude N NA End Lon itude W NA
Project Termini From-To Nearest City Name Project Zip Code(+4)
N/A N/A Kent 98032-5895
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A N/A Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
SR 516 N/A N/A 0615 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 33rd 9th 80389
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
$21,000 03/2024
P.E. $21,000
R/W
Const. $90,000 $90,000 09/2024
Total $111,000 $111,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
55-feet 5
The roadway is 2 lanes in each direction with a center turn lane. Vehicles are prohibited from turning left from
Weiland Street to Canyon Drive, but there are no physical barriers to prevent them.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
Install linear curb or curb and pylon system and a small median island to restrict left-turns out of Weiland
Street onto Canyon Drive.
Local Agency Contact Person Title Phone
Toby Hallock Design Engineer 3 253-856-5536
Mailing Address City State Zip Code
220 Fourth Avenue S Kent WA 98032
By
Project Prospectus Approving Authority
Title Public Works Director Date y�l� Pa_(
Page 1
DOT Form 140-101 Previous Editions Obsolete
Revised 01/2022
[Agency Project Title Date
City of Kent Canyon Dr&Weiland St Access Control 4/15/2024
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
W New Construction ❑ Path /Trail ❑3-R 55-feet 5
❑ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking ❑ Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑✓ Principal Arterial ❑ Principal Arterial
❑ Minor Arterial ❑ Minor Arterial
Federal []✓ Urban ❑✓ Urban El collector
❑Collector Rural
Functional ❑ Rural ❑ Major Collector El ❑ Major Collector
Classification ❑ NHS NHS
❑ Minor Collector El Minor Collector
❑ Local Access W Local Access
Terrain [:] Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑Mountain
Posted Speed 40 MPH
Design Speed 40 MPH
Existing ADT 28,000
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent/Consultants 50 % 50 %
Construction Will Be Performed By Contract Agency
Contractor 100 % 0
Environmental Classification
❑Class I - Environmental Impact Statement (EIS) ✓0 Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
Page 2
DOT Form 140-101 Previous Editions Obsolete
Revised 01/2022
Agency Project Title Date
City of Kent Canyon Dr &Weiland St Access Control 4/15/2024
Right of Way
�✓ No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
Z✓ No utility work required ❑✓ No railroad work required
❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑All utility work will be completed in coordination ❑All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
The project will include surface construction, not impacting existing utilities
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑Yes Z✓ No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Ager
By _
Date 04/18/2024 Maior/Cha6 erson
Page 3
DOT Form 140-101 Previous Editions Obsolete
Revised 01/2022
8.H
KENT
W A S H I N G T p N
DATE: October 18, 2022
TO: Kent City Council
SUBJECT: Highway Safety Improvement Grant for Canyon Drive and
Weiland Street Access Control - Authorize
MOTION: I move to authorize the Mayor to take all action and sign all
documents necessary to accept grant funding from the WSDOT Highway
Safety Improvement Program to design and construct safety
improvements at the intersection of Canyon Drive (SR 516) and Weiland
Street, amend the budget, and authorize expenditure of the funds in
accordance with the grant's terms.
SUMMARY: In March 2022, the City of Kent applied for funding from the
Washington State Department of Transportation (WSDOT) Highway Safety
Improvement Program. WSDOT evaluates projects submitted by agencies from
across the state and selects projects they feel have the best safety benefit. The
projects are selected from the City's 2022 Local Road Safety Plan. RevThe City's
project at the intersection of Canyon Dr (SR 516) and Weiland Street was selected
for funding.
This project will construct median curb to physically restrict left turns out of
Weiland Street onto Canyon Drive, but still allow left-turns into Weiland Street from
Canyon Drive. This is an existing restriction that is currently established through
signing. The total project cost is estimated at $111,000. The amount awarded by
the WSDOT is $111,000, with no City match required if all phases are obligated by
April 30, 2026.
BUDGET IMPACT: Additional revenue of $111,000 that will cover the cost of the
project.
SUPPORTS STRATEGIC PLAN GOAL:
Evolving Infrastructure - Connecting people and places through strategic investments in physical
and technological infrastructure.
Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and
inviting parks and recreation.
ATTACHMENTS:
Packet Pg. 292
8.H
1. HSIP Canyon & Weiland Award Letter (PDF)
10/03/22 Public Works Committee MOTION PASSES
RESULT: MOTION PASSES [UNANIMOUS]Next: 10/18/2022
7:00 PM
MOVER: Marli Larimer, Councilmember
SECONDER: Satwinder Kaur, Councilmember
AYES: Brenda Fincher, Satwinder Kaur, Marli Larimer
Packet Pg. 293