Loading...
HomeMy WebLinkAboutCAG2024-157 - Original - Puget Sound Energy - Washington Avenue Pump Station - Electrical Service - 4/8/2024 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form DirAsst: • For Approvals,Signatures and Records Management Dir/Dep: KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional) WASHINGTON Sheet forms. (Print on pink or cherry colored paper) Originator: Department: Karin Bayes for Stephen Lincoln Public Works Date S!: 11 Date Required: c 03/26/2024 March 29, 2024 fl. Mayor or Designee to Sign. Date of Council Approval: a Q Interlocal Agreement Uploaded to Website N/A Budget Account Number: Grant? Yes Nom D20019 Budget? Yes E]No Type: N/A Vendor Name: Category: Puget Sound Energy Contract Vendor Number: Sub-Category: = Original 0 Project Name: Washington Avenue Pump Station - Electrical Service cProject Details: The Washington Avenue Pump Station project is replacing an existing c pump station with an improved pump station and larger service area. c Basis for Selection of Contractor: AgreementAmount• 51,099.40 � Other E Memo to Mayor must be attached i Start Date: April 8, 2024 Termination Date: 12/31/2025 Q Local Business? Yes F-]No*If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Business License Verification: ❑YesElln-ProcessElExempt(KCC 5.01.045) ElAuthorized Signer Verified Notice required prior to disclosure? Contract Number: ElyesONo CAG2024-157 Comments: IA L a+ 3 Date Received:City Attorney: 3/27/24 Date Routed:Mayor's Office 3/27/24 City Clerk's Office 3/27/24 adccw22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20221201 DocuSign Envelope ID:E8CF88C7-8BD8-4E50-9E2F-AAE52EB562D7 Date ruuc► COMMERCIAL ELECTRIC FACILITIES CONTRACT 3/20/2024 ' SOUND ENERGY Contract is subject to revision after 90 days CUSTOMER(OWNER)NAME City Of Kent CO-OWNER NAME(IF APPLICABLE) SERVICE ADDRESS 524 Washington Avenue South CITY Kent STATE WA ZIP 98032 BILLING ADDRESS CITY STATE ZIP 220 4th Avenue South Kent WA 98032 PHONE 253-856-5552 EMAIL SLincoln@kentwa.gov PSE WORKORDER NO. 105103704 Summary of Charges: Brief Description of Work: Construction Costs: $ 29,660.53 Primary line extension, new transformer, connect new Transformation Charges: $ 19,018.51 services Less Applicable Margin Allowance: $ 0 Sub-Total (Potential Refundable Costs): $ 48,679.04 Permitting Fees*: $ 2,420.36 Relocation/Removal of Existing Facilities: $ 0 Other Non-Refundable Construction Charges: $ 0 Brief Description of Other Costs: Sub-Total (Non-Refundable Costs): $ 2,420.36 Less Deposit Paid in Advance: $ 0 Total Amount to be Billed Under This Contract: $ 51,099.40 Customer Initials DR *If the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service charges below after the service is energized. SECONDARY SERVICE CHARGES(PERMANENT AND TEMPORARY)ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual work performed. Base Costs, in the table below, are based on the current tariff pricing as of the date of installation and include the Schedule 87 tax effect.These charges also do not include permitting fees,trenching and other excavation related work that is your responsibility.The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill. Secondary Service Type 480 Volta a or Below Cost w/Schedule 87 tax effect Single wire run to handhole or transformer $912.07 Each additional run of wire(per circuits $189.92 Customer Each additional trip beyond 15t trip due to customer needs $564.25 per trip Initials: Hourly rate for additional engineering at customer's request $246.24 Underground Temporary Service Charge $230.00 DR Overhead Temporary Service Charge $474.00 Overhead to Overhead Permanent Service Charge $914.28 Underground to Underground Permanent Service Charge $749.75 Overhead to Underground Permanent Service Charge $1,401.23 By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon receipt of a signed contract, PSE will bill you for the amount indicated on the "Total Amount to Be Billed Under This Contract" line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the project may result in additional charges, and/or delays to your project. Signature: � c� D ��� Name: Dana Ralph Title: Mayor Date: 03/27/2024 DocuSign Envelope ID: E8CF88C7-8BD8-4E50-9E2F-AAE52EB562D7 TERMS AND CONDITIONS PROJECT INFORMATION 1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the number below. This is attached as Exhibit A. 2. Additional construction-related information and information on metering and service entrance requirements areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the handbook please contact me at the number below. It is your responsibility to provide your project manager, site superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their work in support of your project. 3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and returned to me along with a signed copy of this contract. This is attached as Exhibit B. 4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor (continuous) temporary power uses, such as electric heaters for dry-out. Fault currents for non- residential transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative listed on this contract immediately if you believe there are conflicts between this design and your project. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any information from this correspondence and it's attachments that apply to their work. 5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements must be signed by the project owner or designee and returned along with a signed copy of this contract. This is attached as Exhibit C. POTENTIAL REFUNDS Margin Allowance: If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85. Refund requests must be made within six (6)years of the date on which the facilities installed under this contract are energized. Customers are responsible for making the one-time refund request. DIM Refund: Other refunds associated with the line extension charge may be available if additional permanent service hook-ups are made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which your line extension is initially energized. It is the customer's responsibility to make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at Schedule85refundrequests@pse.com. RATE SCHEDULE 85 All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com. This cost information is valid for 90 days from the Date Issued, and is subject to being updated after that time. I have read both pages and agree to the terms and conditions outlined in this contract and its attachments. The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund will result to account for the difference. DocuSign Envelope ID: E8CF88C7-8BD8-4E50-9E2F-AAE52EB562D7 Vruur 1 SOUND ENERGY REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on-site approval by that representative, and local jurisdiction. 3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One-Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right-of-way trenching and facility placement. The One-Call Locate number is 1-800-424-5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off-site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. 10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. Customer Initials: DR 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys'fees) arising out of, or in connection with, the above mentioned trenching activities. Customer Initials: DR I AGREE TO ADHERE TO THE ABOVE CONDITIONS Service Address: 524 Washington Avenue South Kent 98032 Work Order Number: 105103704 Signature:—_DQov�� Name: Dana Ralph Title: Mayor Date: 03/27/2024 DocuSign Envelope ID: E8CF88C7-8BD8-4E50-9E2F-AAE52EB562D7 PUCIt I ' SOUND ENERGY PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. 1. Developer is responsible for acquiring utility locates by calling One-Call, 1-800-424-5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and any foundation on Developer's property. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities. 8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages resulting from dig-ins due to changes or variations in grade that are made after the installation of PSE's facilities. FINAL GRADE CERTIFICATION By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights-of-way, or from digging without adequate rights on adjoining properties. Service Address: 524 Washington Avenue South Kent 98032 Work Order Number: 105103704 Signature: i a,r,, , Name: Dana Ralph Title: Mayor Date:03/27/2024 2806 08/15 I -I SITE SPECIFIC NOTES CUSTOMER DEVELOPMENT NOTES: POWER GENERAL NOTES-COMMERCIAL PROJECT RCUIT FEET ADDED E.P-1— T=" P-1 ATM 3-05- 5 S I T F P R F P:,A.T1 T. Z IA"I 1'1'=-I—' �N—.T-—...T. ...EF T.�T ro —T—T-.-T nF L--. T.—I.R. —IT.1 T-1—I—. Q,:,E— DE��,4 CRU EDF AT Z' d. "I ED T"= T_. _..,..U. AT— ILL SPAN SPECIFIC NOTES .—D 1—1— ......T. 0 T AT, A— V7==F— i§xevZZ 3830 'Tye^ CIRCUIT LOADING TABLE I' '—.`E'E TFANSFORMER INMD-AION E —o�MA6 S R 1— IA IE IIIAL y — T. A—E Vol ea IVA �TTT=—L-ll 113111014"ll 1 LROL FEQUIREM—S o___T.- "PE E R —T- -1—.——I.DICTI.N R—IRE.E.T. —A-T---RE.--ET. =E� —MEN— DL IN AF­ PLAN FAULT CURRENT TABLE PRIMARY CABLE S,CONDUIT TABLE I-- I gin" —E—----EAC.lLETF IRU� - 1—,lT­END.- TTOT&�� TW 1 wse9.4 NiLTI, =IN.T I)RUN—GI—LE— —P —T CABLE DIAGRAM ;ice N!lTltLEl—U JOB SITM. --.lT— JOB SITE