Loading...
HomeMy WebLinkAboutCAG2023-369 - Change Order - #3 - Rodarte Construction, Inc. - Washington Avenue South Stormwater Pump Station: Project Number 19-3031 - 03/04/2024 Agreement Routing Form For Approvals,Signatures and Records Management This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KEN T W A S H I N G T O N (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: > 3/5/2024 N/A 0 �. Authorized to Sign: Date of Council Approval: fl' 0 Director or Designee ❑ Mayor 6/06/2023 Q Budget Account Number: Grant? ❑Yes 0 No D20119.64110.120 Budget? 0 Yes ❑No Type: N/A Vendor Name: Category: Rodarte Construction, Inc. Contract Vendor Number: Sub-Category: Change Order#3 Project Name: Washington Avenue South Stormwater Pump Station E c Project Details:Provide and install temporary hot mix and cold mix asphalt. this work was tracked on FA sheets #17, 20, 21, and 23. c Agreement Amount: $45,746.48 Basis for Selection of Contractor: E Bid 4) i Start Date: N/A Termination Date: 330 Working Days Q Local Business? ❑Yes []No* *If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: CAG 2 0 2 3-3 6 9 ❑Yes 0 No - Date Received by City Attorney: Comments: p1 C 3 0 a, N a, 4, �a p� Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: aa«W22323_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements • KENT WAl NI MOTON CHANGE ORDER NO. ##3 NAME OF CONTRACTOR: Rodarte Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Washington Avenue South Stormwater Pump Station ORIGINAL CONTRACT DATE: June 21, 2023 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide and install temporary hot mix and cold mix asphalt. This work was tracked on force account sheets #17, 20, 21, and 23. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $4,063,673.19 (including applicable alternates and WSST) Net Change by Previous Change Orders $64,241.70 (incl. applicable WSST) Current Contract Amount $4,127,914.89 (incl. Previous Change Orders) Current Change Order $41,549.94 Applicable WSST Tax on this Change $4,196.54 Order Revised Contract Sum $4,173,661.37 CHANGE ORDER - 1 OF 3 Original Time for Completion 330 working days (insert date) Revised Time for Completion under 0 working days prior Change Orders (insert date) Days Required (t) for this Change Order 0 working days Revised Time for Completion 330 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: rp Digitally signed by Chad Bieren (( Chad B I a.I G n Date:2024.03.04 By: By: 14:31:18-0600' (signature) (signature) Print Name: D!! u A, w AL-!. .t Print Name: Chad Bieren, P.E. Its C,rm,Nel Z11 Its Public Works Director title) (title) DATE: ��2fl�9tf DATE: AT EC KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayors signature required) Ke t City Cler Kent Law Department Dl� C[In this field.you may enter the electronic Rlepath where the contract has been saved) CHANGE ORDER- 3 OF 3 File No. 200.2 KENT W._� .�.o. CHANGE ORDER WORKSHEET NO. 3 Construction Engineering Division - Public Works Project: Washington Ave Pump Station Project No: 19-3031 Project Engineer: Stephen Lincoln TIB-Aid No: Capital Projects Jason Bryant Contractor: Rodarte Manager: Date: 10/31/2023 I. Proposed Change Provide and install temporary hot mix and cold mix asphalt. This worked was tracked on force account sheets #17, #20, #21, and #23 II. Reason and Background for Change The original contract did not include bid items for temporary hot mix or cold mix asphalt for roadway trench patches. During construction activities cold mix placement was necessary to allow trafiic to flow. Upon completion of the trenching hot mix HMA was placed. The hot mix HMA placed is temporary while we wait for the paving window to open in April. This worked was tracked on force account sheets # 17, #20, #21, #23. III. Method of Payment NEW PAY ITEMS ❑ Not applicable SNh. Item Description Total Est. Unit Unit Price Total Estimated Cost of o Qty Item 1 Install temporary HMA 1 FA $29,245.04 $ 29,245.04 1 Supply temporary Cold Mix 1 FA $12,304.90 $ 12,304.90 New Pay Items Total: $ 41,549.94 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not applicable .No Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. Page 1 Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ - Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $41,549.94 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 330 Due This Change Order: 0 Previous Total: 330 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 330 * This Change Order + Previous Total Capital Projects Manager: ._w,_.. Date: '' ]as6�4;ry` Construction Engineering Date: Supervisor: Z Z Jaso . Barry Construction Manager: Date: �7 Z41 Eric Connor Page 2 FA Sheet No.: 17 DAILY REPORT OF FORCE ACCOUNT WORKED �_T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#3 Date: 1/10/2024 Description of Work: Temp pave Washington Ave due to weather forecast Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT Sergio Laborer 6.5 68.25 $ 443.63 Joel Laborer 6.5 68.25 $ 443.63 Jesus Laborer 6.5 68.25 $ 443.63 Andy Operator 94.72 $ - Mac Foremen 6.5 98.23 $ 638.50 Mark Operator 6.5 94.72 $ 615.68 Joel Truck Driver 6.5 85.59 $ 556.34 SUBTOTAL-LABOR: $ 3,141.41 LABOR OVERHEAD&PROFIT @ 31% $ 973.84 LABOR TOTAL $ 4,115.25 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 175.80 $ - Hamm HD-12 roller 3 91.02 $ 273.06 346 Komatsu 228 6.5 124.39 $ 808.54 338 Komatsu Loader 4 83.01 $ 332.04 41 Sweeper 3 24.061 $ 72.18 2173 Dump Truck 6.5 84.42 $ 548.73 SUBTOTAL-EQUIPMENT $ 2,034.55 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 427.26 EQUIPMENT TOTAL $ 2,461.81 MATE RIALS/S E RV IC ES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3725881 1 ea $ 2,670.83 $ 2,670.83 $ Is - SUBTOTAL $ 2,670.83 OVERHEAD&PROFIT @ 21% $ 560.87 TOTAL $ 3,231.70 Verification of Hours Worked: TOTAL: $ 9,808.76 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 9,808.76 Owner's Representative - Date 2- Pay E m ntered: Date: By: FA Sheet No.: 17 DAILY REPORT OF FORCE ACCOUNT WORKED E�_ T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: 1355 Date: 1/1 012 024 Description of Work: Temp pave Washington Ave due to weather forecast Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT Sergio Laborer 6.5 68.25 S 443.63 Joel Laborer 6.5 68.25 S 443.63 Jesus Laborer 6.5 68.25 S 443.63 Andy Operator 94.72 S - Mac Foremen 6.5 98.23 $ 638.50 Mark Operator 6.51 94.72 S 615.68 Joel ITruck Driver 1 6.51 85.59 1 S 556.34 SUBTOTAL-LABOR: S 3,141.41 LABOR OVERHEAD&PROFIT @ 31% S 973.84 LABOR TOTAL S 4,115.25 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs I Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 175.80 $ Hamm HD-12 roller 3 91.02 S 273.06 346 Komatsu 228 6.5 124.39 1 $ 808.54 338 Komatsu Loader 4 83.01 S 332.04 41 Sweeper 3 24.061 1 S 72.18 2173 Dump Truck 6.5 84.42 $ 548.73 SUBTOTAL-EQUIPMENT S 2,034.55 EQUIPMENT OVERHEAD&PROFIT @ 21% S 427.26 EQUIPMENT TOTAL $ 2,461.81 MATERIALSIS ERVIC ESIRENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3725881 1 ea $ 2,670.83 S 2,670.83 S S S S SUBTOTAL $ 2,670.83 OVERHEAD&PROFIT @ 21% S 560,87 TOTAL S 3,231.70 Verification of Hours Worked: TOTAL: $ 9,808.76 12%MARKUP (for prime when subcontract work) $ Contractors Representative �' Date{,45 SHEET TOTAL: $ 9,808.76 Owners Representative Date Pay Estima E d: Date: By: Customer No: 60455 Invoice No: 3725881 Inv Date: 01110/24 ® Page: Page 1 of 1 •• Customer PO: 2305 15C8 Valentine Ave H Pacific,`NA 98047 Return Service Requested 9416000093 <> ICON Materials 1508 Valentine Ave SE Pacific,WA 98047 t RODARTE CONSTRUCTION 206-575-3200 17 E VALLEY RWY E AUBURN WA 98092-5531 Delivered To: KENT Date CEode - Material Descrir CITY UM Unit Price Matl Total Tax Total Plant:04504 Seattle Asphalt JOB#IPO# t2305 01/10124 12164230.11T PG 58H-22(64-22) 30.06 TON 88.50 2,660.31 0.00 2,660.31 01/10124 467750•Fuel Surcharge-Ton 30.06 TON 0.35 10.52 0.00 10.52 01/10124 90147-Escalation Adjustment-HMA 30.06 EA 0.00 0.00 0.00 0.00 Total Invoice: 90.18 2,670.83 0.00 2,670.83 Ticket number(s)shipped from plant 04504-Seattle Asphalt `45443688 We Appreciate You and Your Business! New Portal Website as of Sept. 2021-https://mycentralpremix.myaniatportaLcom!Questions?Accounts Receivable Department Contact 509-536-3042. Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State-'s Lawful Amount Invoice Amount: 2,670.83 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3725881 Date: 01/10/24 Remit Payment To: ICON Materials PO Box 742421 Customer PO: 2305 Los Angeles,CA 90074 Due Date: 02/09/24 Pleaso provide your—li addross hMftw if—+—,:in lik— r , OFFICE COPY Ticket: 45443688 04504-Seattle Asphalt Date: 1/10/2024 y Time: 9:49:30AM ' 1115 South 96th Vehicle: ROD213 Seattle,WA 98108 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp 4: Pounds Tons Job: Gross 104,680 52.34 Address&Instructions: P.O.: 2305 KENT Tare 44,560 22.28 Net 60,120 30.06 Weighmaster: Curtis Stone Product Loads Total Qty Ticket Qty UOM 12164230 1/2"PG 58H-22(64-22) 1 30.06 30.06 Ton Signature: Thank you for your business! WARNING:HOT MIX ASPHALT IHMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropiatr prntcrtive P.quipmnnt when working with HMA.SP.e rmerse Ada fprwarranry.nd shipment delivery mndMons. CUSTOMER COPY Ticket: 45443688 04504-Seattle Asphalt Date: 1/10/Z024 1115 South 96th. Time: 9:49:30AM Seattle,WA98108 Vehicle: ROD213 um Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp tt: Pounds Tons Job: Address&Instructions: P.O.: 2305 Gross 104,680 52.34 KENT Tare 44,560 22.28 Net 60,120 30.06 Weighmaster: Curtis Stone Product Loads Total Otv Ticket Qty UOM 12164230 112"PG 58H-22(64-22) 1 30.06 30.06 Ton Thank you for your business! WARNING:HOT MIX ASPHALT(14MA)TEMPERATURES CAN EXCEED 33D DEGREES.Use appropriate prote—,Mulpmnniwhen workingwlth HMA.See reverseslde for wartanry and shipment delivery condltinns. CUSTOMER COPY Ticket: 45443688 04504-Seattle Asphalt Date: 1/10/2024 1115 South 96th Time: 9:49:30AM ' Seattle,WA98108 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp tt: Pounds Tons Job: Address&Instructions: P.O.: 2305 Gross 104,680 52.34 KENT Tare 44,560 22.28 Net 60,120 30.06 Weighmaster: Curtis Stone Product Loads Total Qt Ticket Qtv UOM 12164230 112"PG 58H-22(64-22) 1 30.06 30.06 Ton Thank you for your business! WARNING:HOT MIX ASPHAIT(HMA)TEMPERATURES CAN FXCEFD 330 DEGREES.Use approprme proteaiveeWpment when working with HMA. See reverse side for warranty and shipment delivery conditions. FA Sheet No.: 20 DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#3 Date: 2/2/2024 Description of Work: Place temporary HMA on Washington Ave Work by Subcontractor?: n0 Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Macario Operator 6.5 94.72 $ 615.68 Mark Laborer 6.5 94.72 $ 615.68 Wylie Laborer 6.5 68.25 $ 443.63 Peyton Laborer 6.5 68.25 $ 443.63 Jos he Truck Driver 6.5 86.57 $ 562.71 LJ Foremen 6.5 98.23 1 $ 638.50 Brandon Operator 6.5 94.72 $ 615.68 Dave Foremen 6.5 98.23 $ 638.50 SUBTOTAL-LABOR: $ 4,574.01 LABOR OVERHEAD&PROFIT @ 31% $ 1,417.94 LABOR TOTAL $ 5,991.95 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 6.5 175.80 $ 1,142.70 Ham Roller 4 56.82 $ 227.28 Sweeper 4 24.06 $ 96.24 338 Komatsu Loader 6.5 83.01 $ 539.57 41 Ford Flatbed 24.06 $ - 2173 Dump Truck 6.5 84.42 $ 548.73 SUBTOTAL-EQUIPMENT $ 2,554.52 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 536.45 EQUIPMENT TOTAL $ 3,090.97 MAT E R IAL S/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3732421 1 ea $ 4,097.88 $ 4,097.88 Is - SUBTOTAL $ 4,097.88 OVERHEAD&PROFIT @ 21% $ 860.55 TOTAL $ 4,958.43 Verification of Hours Worked: TOTAL: $ 14,041.35 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date s SHEET TOTAL: $ 14,041.35 Owner's Representative Date f Pay Es' a tered: Date: By: FA Sheet No.: 20 DAILY REPORT OF FORCE ACCOUNT WORKED f ENT Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#2 Date: 2/2/2024 Description of Work: Place temporary HMA on Washington Ave Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT Macario Operator 6.51 94.72 $ 615.68 Mark Laborer 6.5 94.72 $ 615.68 Wylie Laborer 6.5 68.25 S 443.63 Peyton Laborer 6.5 68.25 S 443.63 Jos he ITruck Driver 6.5 86.57 S 562.71 LJ Foremen 6.5 98.23 $ 638.50 Brandon Operator 6.51 94.72 S 615.68 Dave Foremen 1 6.51 98.23 S 638.50 SUBTOTAL-LABOR: S 4,574.01 LABOR OVERHEAD&PROFIT @ 31% S 1,417,94 LABOR TOTAL $ 5,991.95 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 6.5 175.80 $ 1.142.70 Ham Roller 4 56.82 S 22728 Sweeper 4 24.06 S 96.24 338 Komatsu Loader 6.5 83,01 S 539.57 41 Ford Flatbed I 1 24.061 1 S 2173 Dump Truck 6.5 84.42 S 548.73 SUBTOTAL-EQUIPMENT S 2,554.52 EQUIPMENT OVERHEAD&PROFIT @ 21% S 536.45 EQUIPMENT TOTAL S 3,090.97 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3732421 1 ea $ 4,097.88 S 4,097.88 S - S S S - SUBTOTAL S 4,097.88 OVERHEAD&PROFIT @ 21% S 860.55 TOTAL S 4,958.43 Verification of Hours Worked: TOTAL: $ 14,041.35 12%MARKUP (for prime when subcontract work) $ - Contractors Representative t��&"Date SHEET TOTAL: $ 14,041.35 01 Owners Representative Date /"i Pay Estim a red: Date: By: Customer No: 60455 Invoice No: 3732421 Inv Date: 02/02/24 Page: Page 1 of 1 1508 Valentine Ave SE Customer Job: 2305 Pacific,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: KENT Date CEode - Material Descrip CITY UM Unit Price Matl Total Tax Total Plant:04500 Auburn Asphalt 02/02i24 12144230-1/2"PG 581-1-22(64-22) 58.25 TON 70.00 4,077.50 0.00 4,077.50 02/02/24 467750-Fuel Surcharge-Ton 58.25 TON 0.35 20.38 0.00 20.38 02/02/24 90147-Escalation Adjustment-HMA 58.25 EA 0.00 0.00 0.00 0.00 Total Invoice: 174.75 4,097.88 0.00 4,09T88 Ticket number(s)shipped from plant 04500-Auburn Asphalt *45093879 *45093887 *45093894 *45093896 We Appreciate You and Your Business? New Portal Website as of Sept.2021-https://mycentralpremix.myamatportaLcom/Questions?Accounts Receivable Department Contact 509-536-3042. Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 4,097.88 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3732421 Date: 02/2/24 Remit Payment To: ICON Materials Customer Job: 2305 PO Box 742421 Los Angeles,CA 90074 Due Date: 03103/24 Please provide your email address below it you would like to start receiving your invoices via email ICON Materials OFFICE COPY r Ticket: 45093879 04500-Auburn Asphalt Date: 2/2/2024 Time: 7:52:38AM 4040 Kersey Way ' Vehicle: ROD213 Auburn,WA 98092 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 2305 Gross 63,120 31.56 Address&Instructions: P.O.: Tare 29,860 14.93 KENT Net 33,260 16.63 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qtv UOM 12144230 1/2"PG 581-1-22(64-22) 1 16.63 16.63 Ton Signature: Thank you for your business! WARNING:HOT MIX ASPIIALT IIIMA)TEMPERATURTS CAN EXCEED 330 DEGREES.LISP apor--ate on—dive equipment when working with ItMA. $er rrvrrsr•udrEpr warranty and shipment dnlivrry con[lnions. r ICON Materials CUSTOMER COPY Ticket: 45093879 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 7:52:38AM u Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 63,120 31.56 KENT Tare 29,860 14.93 Net 33,260 16.63 Weighmaster: Crystal Swartz Product Loads Total Qtv Ticket Qtv UOM 12144230 112"PG 5811-22(64-22) 1 16.63 16.63 Ton Thank you for your business! WARNING:HOT MIX ASPHAL7tHMA)TEMPERATURFSCAN EXCEED 330 DEGREES.Usn approprla[r prnteenvr rquipmrni when working with HMA. See tree;sr 5ldr fnr warranty and;tf:pmrni Crlrvrry r.nnCitrnnc. ICON Materials CUSTOMER COPY Ticket: 45093879 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 7:52:38AM ' Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 63,120 31.56 KENT Tare 29.860 14.93 Net 33,260 16.63 Weighmaster: Crystal Swartz Product Loads Total Qt Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 1 16.63 16.63 Ton Thank you for your business! WARNING:HOT MIXASPHAIT IHMAi TFMPrRATURt5 CAN EXCEFD 33n WGREFS,Use appropriate protective egvipmen[when working with HMA See reverse side for warranty and shipment deliver''vcon6tions ICON Materials OFFICE COPY Ticket: 45093887 04500-Auburn Asphalt Date: 2/2/2024 U Time: 9:47:13AM 4040' Kersey Way Vehicle: ROD213 Auburn,WA 98092 Driver: Customer: 60455 order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 2305 Gross 62,960 31.48 Address&Instructions: P.O.: Tare 29,860 14.93 KENT Net 33,100 16.55 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 2 33.18 16.55 Ton Signature: Thank you for your business! WARNING:HOT MIX ASPHALT(HMA)TEMPFRATURES CAN EXCEED 330 DEGREES.Uxc apprnp'late pro[e.ctive equipment when working with HMA.5-reverse vde for warranty and shipment dalivery con611l1,,11. ICON Materials CUSTOMER COPY Ticket: 45093887 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 9:47:13AM M Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp N: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 62,960 31.48 KENT Tare 29,860 14.93 Net 33,100 16.55 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 2 33.18 16.55 Ton Thank you for your business! WARNING:HOT MIX A5PHAiT fHMA)TEMPE RATURFS CAN EXCEED 330 DEGREES.Use,,pro aI,protectrve equipment vuhen wo.rking with HMA. See roverce side for warranty and o.pmont Oel,vcry r-eltionc. ICON Materials CUSTOMER COPY Ticket: 45093887 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 9:47:13AM I Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp 11: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 62,960 31.48 KENT Tare 29,860 14.93 Net 33,100 16.55 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 2 33.18 16.55 Ton Thank you for your business! WARNING:HOT MIX A5PHAtT(HNAA)TEMPrRATURfS CAN rXCFFD 330 DEGRFrs,Use appropriate protective equipment when working wAh HMA. See reverse side for warranty and Ship—M delivery—oiti.,II ICON Materials OFFICE COPY Ticket: 45093994 �r 04500-Auburn Asphalt Date: 2/2/2024 Time: 10:51:16AM 4040 Kersey Way ' Vehicle: ROD213 Auburn,WA98092 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 2305 Gross 57,760 28.88 Address&Instructions: P.O.: Tare 29,860 14.93 KENT Net 27,900 13.95 Weighmaster: Crystal Swartz Product Loads Total QtV Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 3 47.13 13.95 Ton Signature: Thank you for your business! WARNING:HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appro,iate protective equipment when working with HMA.See reverse side for warranty tnd Shipment delivery Cor,dMfl— ICON Materials CUSTOMER COPY Ticket: 45093894 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 10:51:16AM I Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 230S Address&Instructions: P.O.: Gross 57,760 28.88 KENT Tare 29,860 14.93 Net 27,900 13.95 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qty UOM 12144230 112"PG 581-1-22(64-22) 3 47.13 13.95 Ton Thank you for your business! WARNING'HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use apprnpriate.protective r Ipment when working with HMA.See reverse side for warranty and shipment delivery conditions. ICON Materials CUSTOMER COPY Ticket: 45093894 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 10:51:16AM m Auburn,WA98092 Vehicle: ROD213 Driver: Customer: 60455 Order: _ Cust.Name: Rodarte Construction Disp#: Pounds Tans Job: 2305 Address&Instructions: P.O.: Gross 57,760 28.88 KENT Tare 29,860 14.93 Net 27,900 13.95 Weighmaster: Crystal Swartz Product Loads Total Qt Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 3 47.13 13.95 Ton Thank you for your business! WARNING:HOT MIX ASPHALT IHMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate Drotective epWpment when working with HMA, See reverse side for warranty and shipmentdoiverv—ditions. ICON Materials OFFICE COPY Ticket: 45093896 04500-Auburn Asphalt Date: 2/2/2024 1. Time: 12:30:46PM 4040 Kersey Way Vehicle: ROD213 ' Auburn,WA 98092 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: 230S Gross 52,100 26.05 Address&Instructions: P.O.: Tare 29,860 14.93 KENT Net 22,240 11,12 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qty UOM 12144230 1/2"PG 58H-22(64-22) 4 58.25 11.12 Ton Signature: Thank you for your business! WARNING:HOT MIX ASPHALT IHMA)TF.MPERATURESCAN EXCEED 330 DEGREES.Usr approp'iate proter[Ive equipmrm w•Itpn working vri[h IIN1A.Spl+.reverfp:ids for warranty and 5hipmonl tlpllvery mnd:Tlpns. ICON Materials CUSTOMER COPY Ticket: 45093996 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 12:30:46PM ' Vehicle: ROD213 Auburn,WA 98092 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp a: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 52,100 26.05 KENT Tare 29,860 14.93 Net 22,240 11.12 Weighmaster: Crystal Swartz Product Loads Total Qtv Ticket Qtv UOM 12144230 1/2"PG 58H-22(64-22) 4 58.25 11.12 Ton Thank you for your business! WARNING:HOT MIX ASPHA1701MA)7E1,IPERATURESCAN EXCEED 33G DEGREES.Use approprlatr proip�i:vr.rquipmrni whin working with llMA. Sep rrver�r side fpt warranty and shipmrnt CMivrry pnnGiNnn.�. ICON Materials CUSTOMER COPY Ticket: 45093996 04500-Auburn Asphalt Date: 2/2/2024 4040 Kersey Way Time: 12:30:46PM ' Auburn,WA 98092 Vehicle: ROD213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp R: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 52,100 26.05 KENT Tare 29,860 14.93 Net 22,240 11.12 Weighmaster: Crystal Swartz Product Loads Total Qt Ticket Qty UOM 12144230 112"PG 58H-22(64-22) 4 58.25 11.12 Tan Thank you for your business! WARNING:HOT MIX ASPHAI T I HNIA)TEMPFRATURfS CAN rXCEFD 330 DrGRFr.S.Use appropfate protective eoWpment when working-11 HMA. See reverse side fnr warranty and 5l'.ipment deliverymnditions. FA Sheet No.: 21 DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#3 Date: 2/7/2024 Description of Work: Place temporary HMA on Washington Ave Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Macarl0 Operator 4 94.72 $ 378.88 Mark Laborer 4 94.72 $ 378.88 Wylie Laborer 68.25 $ - Peyton Laborer 4 68.25 $ 273.00 Joseph Laborer 4 68.25 $ 273.00 LJ Foremen 98.23 $ - Brandon Operator 1 41 94.72 $ 378.88 Dave Foremen 41 98.23 $ 392.92 SUBTOTAL-LABOR: $ 2,075.56 LABOR OVERHEAD&PROFIT @ 31% $ 643.42 LABOR TOTAL $ 2,718.98 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 3 175.80 $ 527.40 Ham Roller 2 56.82 $ 113.64 Sweeper 2 24.06 $ 48.12 338 Komatsu Loader 3 83.01 $ 249.03 41 Ford Flatbed 24.06 $ - 2173 Dump Truck 84.42 $ - SUBTOTAL-EQUIPMENT $ 938.19 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 197.02 EQUIPMENT TOTAL $ 1,135.21 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3733578 1 ea $ 1,273.34 $ 1,273.34 $ Is - SUBTOTAL $ 1,273.34 OVERHEAD&PROFIT @ 21% $ 267.40 TOTAL $ 1,540.74 Verification of Hours Worked: TOTAL: $ 5,394.93 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 5,394.93 Owner's Representative Date Z Pay Esti c red: Date: By: FA Sheet No.: 21 DAILY REPORT OF FORCE ACCOUNT WORKED �-f F_14T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#2 Date: 2/7/2024 Description of Work: Place temporary HMA on Washington Ave Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT Macario Operator 4 94.72 $ 378,88 Mark Laborer 4 94.72 $ 378.88 Wylie Laborer 68.25 S Peyton Laborer 4 68.25 S 273.00 Joseph Laborer 4 68.25 S 273.00 LJ Foremen 98.23 S Brandon Operator 4 94.72 S 378.88 Dave Foremen 1 41 98.23 S 392.92 SUBTOTAL-LABOR: S 2,075.56 LABOR OVERHEAD&PROFIT @ 31% S 643.42 LABOR TOTAL $ 2,718.98 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 3 175.80 $ 527.40 Ham Roller 2 56.82 S 113.64 Sweeper 2 24.06 S 48.12 338 Komatsu Loader 3 83.01 1 S 249.03 41 Ford Flatbed 24.06 S - 2173 Dump Truck 84.42 S - SUBTOTAL-EQUIPMENT S 938.19 EQUIPMENT OVERHEAD&PROFIT @ 21% S 197.02 EQUIPMENT TOTAL $ 1,135.21 MATERIALSIS ERVICES/RENTALS MATERIALS!SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3733578 1 ea S 1,273.34 S 1,273.34 S - S - S - S SUBTOTAL S 1,273.34 OVERHEAD&PROFIT @ 21% S 267.40 TOTAL $ 1,540.74 Verification of Hours Worked: TOTAL: $ 5,394.93 12%MARKUP (for prime when {{ subcontract work) $ - Contractors Representative & Date SHEET TOTAL: $ 5,394.93 Owner's Representative Date / Pay Esti ate tered: Date: By: Customer No: 60455 Invoice No: 3733578 Inv Date_ 02/07/24 Page: Page 1 of 1 Customer PO: #2305 1508 Valentine Ave SE Pacific,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: Kent Date CEode - Material Descrip CITY UM Unit Price Mat[Total Tax Total Plant:04500 Auburn Asphalt JOB#1 PO# !#2305 02/07/24 12144230-1/2"PG 58H-22(64-22) 18.10 TON 70.00 1,267.00 0.00 1,267.00 02107i24 467750-Fuel Surcharge-Ton 18.10 TON 0.35 6.34 0.00 6.34 02/07/24 90147-Escalation Adjustment-HMA 18.10 EA 0.00 0.00 0.00 0.00 Total Invoice: 54.30 1,273.34 0.00 1,273.34 Ticket number(s)shipped from plant 04500-Auburn Asphalt *45093974 We Appreciate You and Your Business! Register for our Customer Portal at mycentralpremix.myamatportal.com. Would you like your invoices emailed or to make a payment on the phone?Contact Accounts Receivable at 509.536.3042 Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 1,273.34 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3733578 Date: 0217/24 Remit Payment To: ICON Materials PO Box 742421 Customer PO: #2305 Los Angeles,CA 90074 Due Date: 03/08/24 Please provide your email address below it you would like to start receiving your invoices via email ICON Materials OFFICE COPY Ticket: 45093974 04500-Auburn Asphalt Date: 2/7/2024 Time: 8:37:53AM 4040' Kersey Way Vehicle: RODARTE213 Auburn,WA 98092 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: Gross 65,900 32.95 Address&Instructions: P.O.: tt2305 Tare 29,700 14.85 Kent Net 36,200 18.10 Weighmaster: Mike Morris Product Loads Total Qtv Ticket Qty UOM 12144230 1/2"PG 581-1-22(64-22) 1 18.10 18.10 Ton Signature: Thank you for your business! WARNING.HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use apprapria[e prntacilve equipment when working with HPAA.seenrevere+sidT Ear warranty and shipment delivery cpndITlons. ICON Materials CUSTOMER COPY Ticket: 45093974 04500-Auburn Asphalt Date: 2/7/2024 4040 Kersey Way Time: 8:37:53AM Auburn,WA 98092 Vehicle: RODARTE213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Job: Address&Instructions: P.O.: #230S Gross 65,900 32.95 Kent Tare 29,700 14.85 Net 36,200 18.10 Weighmaster: Mike Morris Product Loads Total Qtv Ticket Qtv UOM 12144230 112"PG 581-1-22(64-22) 1 18.10 18.10 Ton Thank you for your business! WARNINC:HOT MIX ASPHAiT(HMA)TEMPERATURES CAN EXCEED 33D DEGREES.Use apprppria!a prptcctrvc nVulpmrn[whan working with HMA. See reverse side For svarraniy'and xhipmcn[tlnlivery cpndi[ipns. ICON Materials CUSTOMER COPY Ticket: 4SO93974 04500-Auburn Asphalt Date: 2/7/2024 4040 Kersey Way Time: 8:37:53AM ' Auburn,WA 98092 Vehicle: RODARTE213 Driver: Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp Jt: Pounds Tons Job: Address&Instructions: P.O„ #2305 Gross 65,900 32.95 Kent Tare 29,700 14.85 Net 36,200 18.10 Weighmaster: Mike Morris Product Loads Total Qt Ticket Qtv UOM 12144230 1/2"PG 581-1-22(64-22) 1 18.10 18.10 Ton Thank you for your business! WARRING:HOT MIX ASPHAIT(Hr„1A)TEMPERATURES CAN FXCEFD 330 DEGRFE.S,Use appropriate protective eVuipmen[+vhen working w+th HMA. 5ee reverse sill✓far warranty and Shipment delivery conditions. FA Sheet No.: 23 DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#3 Date: 1-1-2024/2-7-2024 Description of Work: Cold Mix Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Macario Operator 94.72 $ Mark Laborer 94.72 $ Wylie Laborer 68.25 $ Peyton Laborer 68.25 $ JOS he Truck Driver 86.57 $ LJ Foremen 98.23 $ Brandon Operator 94.72 $ Dave Foremen 98.23 $ SUBTOTAL-LABOR: $ LABOR OVERHEAD&PROFIT @ 31% $ LABOR TOTAL $ EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 175.80 $ Ham Roller 56.82 $ Sweeper 24.06 $ 338 Komatsu Loader 83.01 $ 41 Ford Flatbed 24.06 $ 2173 Dump Truck 84.42 $ SUBTOTAL-EQUIPMENT $ EQUIPMENT OVERHEAD&PROFIT @ 21% $ EQUIPMENT TOTAL $ MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3723116 38.48 ton $ 93.35 $ 3,592.11 Icon#3726886 20.2 ton $ 93.35 $ 1,885 ,(p—i Icon#3731577 30.79 ton $ 100.85 $ 3,105.Y� ,�g Icon#3731113 15.73 ton $ 100.85 $ 1,586. ?� SUBTOTAL $ 10,169.34 OVERHEAD&PROFIT @ 21% $ 2,135.56 TOTAL $ 12,304.90 Verification of Hours Worked: TOTAL: $ 12,304.90 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 12,304.90 Owner's Representative --- Date Z z Pay Estimate"Entered: Date: By: FA Sheet No.: 23 DAILY REPORT OF FORCE ACCOUNT WORKED '---I ENT Project Name: Washington Ave Pump Station Project No: 19-3031 Item No.: Change Order#3 Date: 1-1-2024/2-7-2024 Description of Work: Cold Mix Work by Subcontractor?: no Prime Contractor: Rodarte Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Macari0 Operator 94.72 S Mark Laborer 94.72 s Wylie Laborer 68.25 s Peyton Laborer 68.25 S JOS he Truck Driver 86.57 s LJ Foremen 98.23 S Brandon Operator 94.72 $ Dave Foremen 98.23 $ SUBTOTAL-LABOR: S LABOR OVERHEAD&PROFIT @ 31% S LABOR TOTAL S EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 323 Cat 335 175.80 s Ham Roller 56.82 S Sweeper 24.06 S 338 Komatsu Loader 83.01 Is 41 Ford Flatbed 24.061 1 s 2173 Dump Truck 84.42 S SUBTOTAL-EQUIPMENT S EQUIPMENT OVERHEAD&PROFIT @ 21% S EQUIPMENT TOTAL $ MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Icon#3723116 38.48 ton S 93.35 S 3,592.11 Icon#3726886 20.2 ton S 93.35 S 1,885j&Sr Icon#3731577 30.79 ton S 100.85 $ 3,105. .118 Icon#3731113 15.73 ton $ 100.85 Is 1,586.,3;K S SUBTOTAL S 10,169.34 OVERHEAD&PROFIT @ 21% S 2,135.56 TOTAL S 12,304.90 Verification of Hours Worked: TOTAL: $ 12,304.90 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative ate SHEET TOTAL: $ 12,304.90 Owner's Representative Date Z Pay Estim6te E1tered: Date: By: Customer No: 60455 Invoice No: 3723116 Inv Date: 01/02/24 Page: Page 1 of 1 1508 Valentine Ave SE Customer Job: 2305 Pacfic,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: KENT Date CEode - Material Descrip CITY UM Unit Price Matl Total Tax Total Plant:04500 Auburn Asphalt 01102/24 1910-COLD MIX 38.48 TON 93.00 3,578.64 0.00 3,578.64 01/02124 467750-Fuel Surcharge-Ton 38.48 EA 0.35 13.47 0.00 13.47 01/02/24 90147-Escalation Adjustment-HMA 38.48 EA 0.00 0.00 0.00 0.00 Total Invoice: 115,44 3,592,11 0.00 3,592.11 Ticket number(s)shipped from plant 04500-Auburn Asphalt `150056108 *150056218 We Appreciate You and Your Business! New Portal Website as of Sept.2021-https://mycentralpremix.myamatportaLcom/Questions?Accounts Receivable Department Contact 509-536-3042. Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 3,592.11 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3723116 Date: 01/2/24 Remit Payment To: ICON Materials Customer Job: 2305 PO Box 742421 Los Angeles,CA 90074 Due Date: 02/01/24 Please provide your email address below it you would like to start receiving your Invoices via email ICON Materials CUSTOMER COPY Ticket: 150056108 01500-Auburn S&G Date: 1/2/2024 4040 Kersey Way SE Time: 10:17:33AM ' Auburn,WA 98092 vehicle: ROD205 Customer; 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Gross 72,280 -6,irk KENT P.O.: Tare 28,700 1,1.35 Net 43,580 2179 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qjy UOPA 1910 COLD MIX 1 21.79 21.79 Ton Thank you for your business! WARNING:HOT Mix ASPHALT(IiMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate protective equipment when working with H?VA. See reverse side for warranty and shipment delivery conditions. ICON Materials CUSTOMER COPY Ticket: 150056108 01500-Auburn S&G Date: 1/2/2.024 i 4040 Kersey Way SE Time: 10:17:33ANA ' Auburn,WA 98092 vehicle: ROD205 Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Gross 72,280 36.14 KENT P.O.: Tare 28,700 14.35 Net 43,580 21.79 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Q UOM 19-10 COLD NVX 1 21.79 21.79 Ton Thank you for your business! 7ERATURES ", Ea 'p appropriate protectt:e,:Tent when workirg with HMA. See reverse side far wan.,ty and shipment de4r+erq conditions- +NARNIN6'.N4TMUlA�x •�' r• ,� ICON Materials CUSTOMER COPY Ticket: 150056218 01500-Auburn S&G Date: 1/2/2024 4040 Kersey Way SE Time: 2:24:04PM IAuburn,WA 98092 Vehicle: ROD206 Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust,Name: Rodarte Construction Disp#: Pounds 1'ons Address&Instructions: Job: 2305 Gross 62,690 31.34 :ENI P.O.: Tare 29,300 1-:.65 Net 33,380 16.69 Weighmaster: Crystal Swartz Product Load Total Qty Ticket Qty UOM 1910 COLD MIX 2 38.48 16.69 Ton Thank you for your business! '.,_M.L .:..A)TEMPERATURES CAN EKELD330DEGREES.w arproprijtt,vmt.c,:¢n rp w.pmen;when wo,kng-tn HNIA See rec sdr forwar.artp and Shipment rde!-rycp�C;':cr< ICON Materials CUSTOMER COPY Ticket: 150056218 01500-Auburn S&G Date: 1/2/2024 4040 Kersey Way SE Time: 2:24:04PM ' Auburn,WA 98092 Vehicle: ROD206 Customer: 60455 order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Grass 62,680 3 ., KENT p,0.: Tare 29,300 i-; 6S Net 33,380 1 a.69 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket Qtv UOM 1910 COLD MIX 2 38,48 16.69 Ton Thank you for your business! 7 i' �.'J RE$CAN a'._, �EGncES.Use approprie!e pm:ecti+e egwpmr n:.when v+ertar g dh HMA. ..d th'p--1 de.ery^OOO'IlGns. .F Customer No: 60455 Invoice No: 3726886 Inv Date: 01/16124 Page: Page 1 of 1 1508 Valentine Ave SE Customer Job: 2305 Pacific,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: WASHINGTON&WILLIS,KENT Date CEode - Material Descrip QTY UM Unit Price Matl Total Tax Total Plant:04500 Auburn Asphalt 01/16/24 1910-COLD MIX 20.20 TON 93.00 1,878.60 0.00 1,878.60 01/16/24 467750-Fuel Surcharge-Ton 20.20 EA 0.35 7.07 0.00 7.07 01/16/24 90147-Escalation Adjustment-HMA 20.20 EA 0.00 0.00 0.00 0.00 Total invoice: 60.60 1,885.67 0.00 1,885.67 Ticket number(s)shipped from plant 04500-Auburn Asphalt *150057912 We Appreciate You and Your Business? New Portal Website as of Sept.2021-https://mycentralpremix.myamatportal.com/Questions?Accounts Receivable Department Contact 509-535-3042. Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 1,885.67 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3726886 Date: 01/16124 Remit Payment To: ICON Materials Customer Job: 2305 PO Box 742421 Los Angeles,CA 90074 Due Date: 02/15/24 Please provide your email address below it you would like to start receiving your Invoices via email r ICON Materials OFFICE COPY Tket: 1SM57912 0L5A0-AutRrn Sib Date: 1/16/2024 Time: 7:46:44AM 4040 Kersey Way SE Vehicle: RDb206 Auburn,WA96092 Driver: OAtomer: 60455 Order: RODART2301.2021 AGG VOL PRICE(FOB)3.L2023 Cult,name: Rodarte Consmaim Dish V. Pounds Tors Job: 2305 Gross 70,660 35.33 Address&krstrue ions: P.O.: WASHINGTDN&WILLIS,KENT Tare 30,260 15.13 REP IS00579US 0 738 AM Net 40AM 2010 Weighmaster: Crystal Swartz Product Loads Total Qtf Ticket Qt UOM 1910 COLD MIX 1 20.20 20.20 Ton s"d1t,re: Thank you for your businessl wANtlIG:NoruaunNerlNM4 n'.ANfAAtMESW EIUIDS�014k6.uv rirrat»at ppsctlrttouprmrt Wen wmYnlwmlMlw SR steerM otle krmarh SM t^.w.rn dNnery tanda:ma. r . ICON Materials CUSTOMER COPY Ticket LS0057912 t11508-Attbvtt sib Date: 1/16/2024 4040 Kersey Way SE Time: 7:46:44AM D Vehicle: R00206 Auhum,WA98092 Driver: Customer: 60455 Order: RODART2301-2023 AG G VOL PA ICE(FOB)3.1.2023 Cu#.Name: Rodarte Construction Disp It: Pounds Tons Job: 2305 Address&Instructions: P.O.: Gross 7D,660 15.33 WASHINGTON&WILLIS,KENT Tare 30,260 15.13 REP 150057908 @ 738 AM Net 40,400 20.20 Weighmsster: Crystal Swartz Product LQ 10 Total QtV Ticket Qtv UOM 1910 COLD MIX 1 20.20 20.20 Ton Thank you for your business! wAIXWG:IWT 6MtA41iNT(NWJIF (7MBGt{9170 K6alri i1V.laPaiVK rrote(I�tr�Myhn r✓JV+n,a XMA.SeererNrei'M Fb alrrNiraro Y�DIrrCN tNenytbltOm. ICON Materials CUSTOMER COPY Ticket: IS0057912 01500-Ai6m s&G Date: 1/16/2024 ED4040 Kersey Way SE Time: 7:46:44AM Auburn,WA98M Vehicle: R00206 Driver: Customer. 60455 Order. RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.tame: Rodarte Construction Disp It Pounds Tons Joy: 2305 Address&Instructions: P.O.: Gross 70,660 35.33 WASHINGTON&WILLIS,KENT Tate 30,260 15.13 REP 1SO057908 @ 738 AM Net 40,400 20.70 Weighmaster, Crystal Swartz Product Loads Tony Ticket QV UOM 1910 COLD MIX 1 20.20 20.20 Ton Thank you for your business! Customer No: 60455 Invoice No: 3731577 Inv Date: 02/01/24 Page: Page 1 of 1 1508 Valentine Ave SE Customer Job: 2305 Pacific,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: KENT Date CEode - Material Descrip CITY UM Unit Price Mat[Total Tax Total Plant:04500 Auburn Asphalt 02/01/24 1910-COLD MIX 30,79 TON 100.50 3,094.40 0.00 3,094.40 02101/24 467750-Fuel Surcharge-Ton 30.79 EA 0.35 10.78 0.00 10.78 02/01/24 90147-Escalation Adjustment-HMA 30.79 EA 0.00 0.00 0.00 0.00 Total Invoice: 92.37 3,105.18 0.00 3,105A8 Ticket number(s)shipped from plant 04500-Auburn Asphalt *150060818 We Appreciate You and Your Business! New Portal Website as of Sept.2021-https:/lmycentralpremix.myamatportai.coml Questions?Accounts Receivable Department Contact 509-536-3042. Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 3,105.18 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3731577 Date: 02/1/24 Remit Payment To: ICON Materials Customer.lob: 2305 PO Box 742421 Los Angeles,CA 90074 Due Date: 03/02/24 Please provide your email address below It you would like to start receiving your Invoices via email I OFFICE COPY Ticket: 150060818 a ICON Materials Date: 2/1/2024 01500-Auburn S&G Time: 7:39a0AM 4040 Kersey Way SE Vehicle: ROD209 IAuburn,WA 98092 Customer: 604SS Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp 4: Pounds Tons Address&Instructions: lob: 2305 Gross 104,740 52.37 KENT P.O.: Tare 43,160 21.58 Net 61,580 30.79 Weighmaster: Crystal Swartz F'rodlict Loads Total QtyQty Tick UOM 1910 COLD MIX 1 30.79 30.79 Ton Thank you for your business! ij WARN W Cc HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions. r t; CUSTOMER COPY Ticket: 150060818 �;. ICON Materials Date: 2/1/2024 01500-Auburn S&G Time: 7;39:10AM 4040 Kersey Way SE 1 Vehicle: ROD209 Auburn,WA 99092 Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp ti: Pounds Tons Address&Instructions: Job: 2305 Gross 104,740 52.37 KENT P.O.: Tare 43,160 21.58 Net 61,580 30,79 Weighmaster: Crystal Swartz Prod Loads Total Qjy Ticket t UOM 1910 COLD MIX 1 30.79 30.79 Ton Thank you for your business! .eh irJi:+G HUT MIX ASPHA 7(HMA)TEMPERATURES CAN EXCEED 330DCGREES.Use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions. A' ICON Materials CUSTOMER COPY Ticket: 150060818 A� Date: 2/1/2024 - 01500-Auburn S&G Time: 7:39:10AM 4040 Kersey Way SE A Vehicle: ROD209 Auburn,WA Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023 Cust.Name: Rodarte Construction Disp ii Pounds Tons Address&Instructions: Job: 230S Gross 104,740 52,37 KENT P.O.: Tare 43,160 21.53 Net 61,580 30.79 Weighmaster: Crystal Swartz Product Loads Total t Ticket Qty UOM 1910 COLD MIX 1 30.79 30.79 Ton 1 i Thank you for your business! V.ARNING:HUT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate protective equipment when working with HMA, See reverse side for warranty and shipment delivery conditions. OFFICE COPY Ticket: 150060977 I� ICON Materials Date: 2/1/2024 01500-Auburn S&G i t Time: 2:27:53PM 4040 Kersey Way SE T Vehicle: GNW130 Auburn,WA 98092 Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Gross 59,360 29.68 WASHINGTON ST,KENT P.O.: Tare 28,620 14.31 Net 30,740 15.37 Weighmaster: Crystal Swartz Product Loads Total Qty Ticket UOM 1910 COLD MIX 1 15.37 15.37 Ton Thank you for your business! WARNAG:HO;WX ASPHALT tHMA)TEMPERATURES CAN EXCEED 33D DEGREES, use appropriate protective equipment when working with HMA. see reverse side for warranty and shipment delivery conditions. .� CUSTOMER COPY Ticket: 150060977 ICON Materials Date: 2/1/2024 01500-Auburn S&G Time: 2:27:53PM 4040 Kersey Way SE '} A Vehicle: GNW130 Auburn,WA Customer: 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Gross 59,360 29.GS WASHINGTON 51,KENT P.O.: Tare 28,623 14.?1 Net 30,74J 15.37 Weighmaster: Crystal Swartz Proodd ct Loads Total Qty Ticket Qty UOM 1910 COLD MIX 1 15.37 15.37 Ton Thank you for your business! WARNNG:HOT MIX ASPHALT(HMAi TEMPERATURES CAN EXCEED 330 DEGREES.use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment deivery conditions. ICON Materials CUSTOMER COPY Ticket: 150060977 ?• 01500-Auburn S&G Date: 2/1/2024 Time: 2:27:53PM 4040 Kersey Way SE I A Vehicle: GNW130 Auburn,WA Customer. 60455 Order: - Cust.Name: Rodarte Construction Disp#: Pounds Tons Address&Instructions: Job: 2305 Gross 59,360 29.68 WASHINGTON ST,KENT P.O.: Tare 28,620 14,31 Net 30,740 15.37 Weighmaster. Crystal Swartz Product Loads Total Qty Ticket ty UOM 1910 COLD MIX 1 15.37 15.37 Ton Thank you for your business! WARNING:HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions. Customer No: 60455 Invoice No: 3731113 Inv Date: 01/31/24 Page: Page 1 of 1 1508 Valentine Ave SE Customer Job: 2305 Pacific,WA 98047 RODARTE CONSTRUCTION ICON Materials 17 East Valley Hwy E 1508 Valentine Ave SE Auburn WA 98092-5531 Pacific,WA 98047 206-575-3200 Delivered To: KENT Date 06ode - Material Descrip CITY UM Unit Price Matl Total Tax Total Plant:04500 Auburn Asphalt 01/31/24 1910-COLDMIX 15.73 TON 100.50 1,580.87 0.00 1,580.87 01/3V24 467750-Fuel Surcharge-Ton 15.73 EA 0.35 5.51 0.00 5.51 01/31/24 90147-Escalation Adjustment-HMA 15.73 EA 0.00 0.00 0.00 0.00 Total Invoice: 47.19 1,586.38 0.00 1,586.38 Ticket number(s)shipped from plant 04500-Auburn Asphalt *150060567 We Appreciate You and Your Business! New Portal Website as of Sept.2021-https://mycentralpremix.myamatportaLcoml Questions?Accounts Receivable Department Contact 509-536-3042. s Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount Invoice Amount: 1,586.38 Amount Paid: Customer Name: RODARTE CONSTRUCTION Customer No: 60455 If you have any questions about your invoice please call 206-575-3200 Invoice#: 3731113 Date: 01/31f24 Remit Payment To: ICON Materials Customer Job: 2305 PO Box 742421 Los Angeles,CA 90074 Due Date: 03/01f24 Please provide your email address below it you would like to start receiving your invoices via email ' ICON Materials OFFICE COPY rK 0060 ket: 15567 Date: 1/31/2024 01S00-Auburn S&G Time: 7.33:13AM 4040Kersey Way SE Vehicle: ROD211 ' Aubum,WA 98092 Driver: Cxtomer 60455 order: RODART23D1.2023 AGG VOL PRICE(FOBI3.1.2023 CusLName: RodarteConstruakm DISPth Pounds Tons Job: 23C5 Gross 62,760 31.38 Address&Instructions: P.O.: Tare 31,300 25.65 KENT Net 31,460 15.73 Weighmaster. Crystal Swartz p Loads Total oN Ticket t UOM 1910 COLD MIX 1 15.73 15.73 Ton Signature: Thank you for your businessl N'IutMlW.wrrax aslNw.r iMW n�wrurlS CYt lYCI't037a rQ4rt[1 uv app00/-dtfp/ttrcarl raltpn�rrwlt+�a1n2'�ttn MM4 fee n!uery sex Yrwx•sm a+A'r a+rn,dNmrr ealM.cam. ICON Materials CUSTOMER COPY Ticket: 15DO60567 01500•Auburn s&G Date: 1131/2024 Time: 7:33:19AM 4040 Kersey Way SE Vehicle: ROD213 I Auburn,WA98092 Driver. Customer: 60455 Order: RODART2301.20Z3 AGG VOL PRICE(fO813.1.2023 Oust.NNW: Rodarte Construction Disp 0: Pounds Tons Job: 2305 orts Gross 62,760 31.36 Address&InvtruEti P.O.: KENT Tare 31,300 15.65 Net 31,460 15.73 Weighmaster: Crystal Swartz pmd Loads I&I_Qty T C gl Qty 14Q& 1910 COLD MIX 1 15.73 15.73 Ton Thank you for your business! Waaar6:MO1W0.tRIrlTIrrLL1nl/ErAURES La�E1:Ir0 J76 DECiEn.xo.Ly.orrirr warrvr�e.•auv^!a�:A:r-:w.h1t+1•nn w.0 knrnMw•k•ry w,.lnv t�l�iamm,in-,xrrcwtn-+. • ICON Materials CUSTOMER COPY Ticket: 1SOM67 OHM-Aubuirn S&G Date: 1/31/2024 4040 Kersey Way SE Time: 7:33:19AM I Aubum,WA98092 Vehicle: R00213 Driver, Customer 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1,2023 Cust.Name: Rodarte Cortstruction Disp 0: Pounds Tons Job: 2305 Address&hEstructions: Gross 62,760 31.39 P.O.: KENT lare 31,3DO 15.6S Net 31,460 15.73 Weighmaster: Crystal Swartz Product Loads Total City Ticket UOM 1910 COLD MIX 1 15.73 15.73 Ton Thank you for your business!