HomeMy WebLinkAboutCAG2023-369 - Change Order - #2 - Rodarte Construction, Inc. - Washington Avenue South Stormwater Pump Station: Project Number 19-3031 - 03/04/2024 Agreement Routing Form
• For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H I N G T G N (Print on pink or cherry colored paper)
Originator: Department:
S.Anderson PW Engineering
Date Sent: Date Required:
> 3/5/2024 N/A
O
L.
Q Authorized to Sign: Date of Council Approval:
a El Director or Designee ❑Mayor 6/06/2023
Q
Budget Account Number: Grant? ❑Yes I]No
D20119.64110.120
Budget? 0 Yes ❑No Type: N/A
Vendor Name: Category:
Rodarte Construction, Inc. Contract
Vendor Number: Sub-Category:
c Change Order#2
Project Name: Washington Avenue South Stormwater Pump Station
E
L
� Project Details:Remove and dispose of the existing unknown buried roadway on
}, Washington Avenue.
c
O Agreement Amount: $11,510.93 Basis for Selection of Contractor: Bid
G
� Start Date: N/A Termination Date: 330 Working Days
Q
Local Business? ❑Yes ❑ No*
*Ifineets requirements per KCC 3.70.700,please complete"Vendor Purchase-Local Exceptions'form on Cityspoce.
Notice required prior to disclosure? Contract Number: CAG 2 0 2 3-3 6 9
❑Yes El No eA6 e2a-e%
Date Received by City Attorney: Comments:
Im
C
O
3 �
a,
•� a,
41
p� Date Routed to the Mayor's Office:
V1
y Date Routed to the City Clerk's Office:
adaW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements
•
KENT
WASHINGTON
CHANGE ORDER NO. #2
NAME OF CONTRACTOR: Rodarte Construction, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Washington Avenue South Stormwater Pump Station
ORIGINAL CONTRACT DATE: June 21, 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Remove and dispose of the existing unknown buried roadway on
Washington Avenue. This work was tracked on force account #16.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $4,063,673.19
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $52,730.77
(incl. applicable WSST)
Current Contract Amount $4,116,403.96
(incl. Previous Change Orders)
Current Change Order $10,454.98
Applicable WSST Tax on this Change $1,055.95
Order
Revised Contract Sum $4,127,914.89
CHANGE ORDER - 1 OF 3
Original Time for Completion 330 working days
(insert date)
Revised Time for Completion under 0 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 working days
Revised Time for Completion 330 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Q rp Digitally signed by Chad Bieren
By: `/\�le! By: Chad BIGI Gn Date:2024.03.0414:19:3408'00'
(signature) (signature)
Print Name: D 'N. V Print Name: Chad Bieren P.E.
Its ( 44 bk 'r Its Public Works Director
title) (title)
DATE:��4.�f� 14 DATE:
AF EC
KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayors signature required)
K t City Clerk Kent Law Department
1
C[In this held,you may enter the clectrnNc filepath a hem the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
•
KENT
W-1-T-
CHANGE ORDER WORKSHEET NO. 2
Construction Engineering Division - Public Works
Project: Washington Ave Pump Station Project No: 19-3031
Project Engineer: Stephen Lincoln TIB-Aid No:
Capital Projects Jason Bryant Contractor: Rodarte
Manager:
Date: 10/31/2023
I. Proposed Change
Remove and dispose of the existing unknown buried roadway on Washington Ave. This work was
tracked on force account #16.
II. Reason and Background for Change
During the excavation for the installation of the new 48" storm system across Washington Ave crews
discovered an existing buried roadway. The existing roadway was 5' deep and was 14" thick. It was
necessary to remove the old roadway to install the storm. Crews sawcut, removed and hualed off the
existing materials. This work was tracked on force account sheet # 16.
III. Method of Payment
NEW PAY ITEMS ❑ Not applicable
SNh. Item Description Total Est. Unit Unit Price Total Estimated Cost of
o Otv
Item
1 Remove Unknown Buried Roadway 1 FA $10,454.98 $ 10,454.98
$ -
New Pay Items Total: $ 10,454.98
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Notapplicable
Soh No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item
$ -
Page 1
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEMS) ❑ Notapplicable
Sch Bid Item No. 7 Item Description Qty Unit Unit Price Cost of Item
No. 7
$ -
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $10,454.98
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 330 Due This Change Order: 0 Previous Total: 330
Explanation/Justification for Additional Working Days:
*TOTAL WORKING DAYS: 330
* This Change Order + Previous Total
Capital Projects Manager: Date:
Jas 71f,
ryae�
Construction Engineering
Date:
Supervisor: L=�4Z l6 Ly
] on Barry
Construction Manager:
Date:
Eric Connor
Page 2
FA Sheet No.: 16
DAILY REPORT OF
FORCE ACCOUNT WORKED �-T
Project Name: Washington Ave Pump Station Project No: 19-3031
Item No.: Change Order#2 Date: 1/8/2024
Description of Work: Remove unknown buried roadway
Work by Subcontractor?: no
Prime Contractor: Rodarte Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT
Payton Pipe Layer 69.47 $ -
Joel Laborer 8 68.25 $ 546.00
Jesus Laborer 8 6825 $ 546.00
Andy Operator 8 94.72 $ 757.76
LJ Foremen 98.23 $ -
Mark Operator 8 94.72 $ 757.76
Dan Operator 94.72 $ -
SUBTOTAL-LABOR: $ 2,607.52
LABOR OVERHEAD&PROFIT @ 31% $ 808.33
LABOR TOTAL $ 3,415.85
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
323 Cat 335 175.80 $ -
Hamm HD-12 roller 8 56.82 $ 454.56
346 Komatsu 228 8 124.39 1 $ 995.12
338 Komatsu Loader 8 83.01 $ 664.08
41 Ford Flatbed 24.06 $ -
2173 Dump Truck 84.42 $ -
SUBTOTAL-EQUIPMENT $ 2,113.76
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 443.89
EQUIPMENT TOTAL $ 2,557.65
MAT E R IALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Icon#3725180 1 ea $ 2,748.22 $ 2,748.22
Salinas Sawing and Sealing#37935 1 ea $ 955.48 $ 955.48
Is -
SUBTOTAL $ 3,703.70
OVERHEAD&PROFIT @ 21% $ 777.78
TOTAL $ 4,481.48
Verification of Hours Worked: TOTAL: $ 10,454.98
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date �p SHEET TOTAL: $ 10,454.98
Owner's Representative Date (� Z
Pay Es' a tered:
Date:
By:
FA Sheet No.: 16
DAILY REPORT OF
FORCE ACCOUNT WORKED �_ T
Project Name: Washington Ave Pump Station Project No: 19-3031
Item No.: 1355 Date: 1/8/2024
Description of Work: Remove unknown buried roadway
Work by Subcontractor?: no
Prime Contractor: Rodarte Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT
Payton Pipe Layer 69,47 S -
JOeI Laborer 8 68.25 S 546.00
Jesus Laborer 8 68.25 $ 546.00
Andy Operator 8 94.72 S 757.76
LJ lForemen 98.23 S
Mark Operator 8 94.72 S 757.76
Dan 10perator 1 94.72 $
SUBTOTAL-LABOR: S 2,607.52
LABOR OVERHEAD&PROFIT @ 31% S 808.33
LABOR TOTAL $ 3,415.85
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs I Hourly Rate Hrs Standby Rate AMOUNT
323 Cat 335 175.80 S
Hamm HD-12 roller 8 56.82 S 454.56
346 Komatsu 228 8 124.39 $ 995.12
338 Komatsu Loader 8 83.01 1 S 664.08
41 Ford Flatbed 24.06 $ -
2173 Dump Truck 84.42 S
SUBTOTAL-EQUIPMENT S 2,113.76
EQUIPMENT OVERHEAD&PROFIT @ 21% S 443.89
EQUIPMENT TOTAL S 2,557.65
MATERIALSISERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Icon#3725180 1 ea S 2,748.22 S 2,748.22
Salinas Sawing and Sealing#37935 1 ea S 955,48 S 955.48
S
S -
S -
SUBTOTAL S 3,703.70
OVERHEAD&PROFIT @ 21% S 777.78
TOTAL S 4,481.48
Verification of Hours Worked: TOTAL: $ 10,454.98
12%MARKUP (for prime when
n,1 subcontract work) $ -
Contractors Representative Date (—�� trt SHEET TOTAL: $ 10,454.98
Owner's Representative Date
Pay Estim e E red:
Date:
By:
Salinas Sawing & Sealing, Inc. Invoice
Mukilteo, WA 98275 Date Invoice#
1/8/2024 37935
Bill To Ship To
RODARTE CONSTRUCTION WASHINGTON AVE S STORMWATER
17 E. VALLEY HWY E PUMP STATION
AUBURN, WA 98092 CITY OF KENT
RODARTE JOB 2305-W
P.O. No. Terms Due Date Project Our Job No.
Net 30 2/7/2024 23-0290 Washington Ave... 23-0290
Item Description Quantity Rate Amount
300 Asphalt Demo-3" 48 0.60 28.80
600 Concrete Demo- 12" (15" TD) 48 8.16 391.68
825 Standby Time Per Hour 2 180.00 360.00
750 Slurry Vacuum Equip&Disposal 175.00 175.00
Work Completed 01/08/2024(W.O. 59769)
Office:(425)745-0706
Fax:(425)745-0628 Total $955.48
Customer No: 60455
Invoice No: 3725180
Inv Date: 01/08/24
Page: Page 1 of 1
1503 Valentine Ave SE Customer Job: 2305
Pacific,WA98047 Return Service Requested
7460000095 PRESORT PSPS001<> ICON Materials
(11�1t�'1lt�llll�lIlitt'I' 'I'I�l''�11�"'ll`il'�I�llllllllitll! 1508 Valentine Ave SE
RODARTE CONSTRUCTION Pacific, 98047
17 E VALLEY HWY E 206-575-323200
AUBURN WA 98092-5531
Delivered To: KENT
Date CEode - Material DescriE QTY UM Unit Price Matl Total Tax Total
Plant:04500 Auburn Asphalt
01/08/24 1910-COLD MIX 29.44 TON 93.00 2,737.92 0.00 2,737.92
01/08124 467750-Fuel Surcharge-Ton 29.44 EA 0.35 10.30 0.00 10.30
01/08/24 90147-Escalation Adjustment-HMA 29.44 EA 0.00 0.00 0.00 0.00
Total Invoice: 86,32 2,748.22 0.00 Z748.22
Ticket number(s)shipped from plant 04500-Auburn Asphalt
*150056935
We Appreciate You and Your Business!
New Portal Website as of Sept.2021-https://mycentralpremix,myamatportaLcom/Questions?Accounts Receivable Department
Contact 509-536-3042.
Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount
Invoice Amount: 2,748.22
Amount Paid:
Customer Name: RODARTE CONSTRUCTION
Customer No: 60455 If you have any questions about your invoice please call 206-575-3200
Invoice#: 3725180
Date: 01/8124 Remit Payment To: ICON Materials
Customer.lob: 2305 PO Box 742421
Los Angeles,CA 90074
Due Date: 02/07/24
Please provide your email address below it you would like to start receiving your lnrvolces via email
page 1 of 1
Fs OFFICE COPY Ticket: 150056935
ICON Materials Date: 1/8/2024
01S00-Auburn S&G
Time: 7:42:33AM
4040 Kersey Way SE
I Vehicle: RODARTE213
Auburn,WA98092
Customer., 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023
Cust.Name: Rodarte Construction Disp#: Pounds Tons
Address&Instructions: Job: 2305 Gross 102,500 51.25
KENT P.O.: Tare 43,620 21.81
Net 58,880 29.44
Weighmaster: Crystal Swartz
Prod uct Lggda Total QtX Ticket Qty UQM
1910 COLD MIX 1 29.44 29.44 Ton
Thank you for your business!
WARN IN G,HOT MIX ASPHALT(HMA}TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions.
K ICON Materials CUSTOMER COPY Ticket: 150056935
01500-Auburn S&G Date: 1/8/2024
4040 Kersey Way 5E Time: 7:42:33AM
IAuburn,WA 98092 Vehicle: RODARTE213
Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023
Cust.Name: Rodarte Construction Disp#: Pounds Tons
Address&Instructions: Job: 2305 Gross 102,500 5 i.25
KENT P.O.: Tare 43,620 21.81
Net 58,880 29,44
Weighmaster: Crystal Swartz
Product Loads Total Qjy Ticket UOM
1910 COLD MIX 1 29.44 29.44 Ton
Thank you for your business!
WARNING:HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES Use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions.
r s c CUSTOMER COPY Ticket: 150056935
ICON Materials
01500-Auburn S&G Date: 1/8/2024
4040 Kersey Way SE Time: 7:42:33AM
' Auburn,WA 98092 Vehicle: RODARTE213
Customer: 60455 Order: RODART2301-2023 AGG VOL PRICE(FOB)3.1.2023
Cust.Name: Rodarte Construction Disp#: Pounds Tons
Address&Instructions: Job: 2305 Gross 102,500 51.25
KENT P.O.: Tare 43,620 21.81
Net 58,880 29.44
Weighmaster: Crystal Swartz
Product Loads Total QN Ticket Qty UOM
1910 COLD MIX 1 29.44 29.44 Ton
Thank you for your business!
WARNING:HOT MIX ASPHALT(HMA)TEMPERATURES CAN EXCEED 330 DEGREES.Use appropriate protective equipment when working with HMA. See reverse side for warranty and shipment delivery conditions.
r _• � .!a is
��'�� � 'fir � ;a a Y, Z�. •• � t
s♦ -
,
-` 4 •- } �• i''+��, � yr. ��w a!'�«�.� � ��:rr _
a ..
a
,
sA"� . � � �" �r'�" '+--Mae _ •�
�''+ 'M.k�•+♦' •,a,��,� �.�.e: `-�S Y C �,�'"� ��+ �+_:t� -•r,� ^ .g.' �y 1'�"'L.a ra� -.. _
t
.w
+a aM.
to �t
k a x
E .; '"s•
x
e ,
c
r �
p � .
Y ,
�a
. e
✓hM .
.' ^fie+- h� t+.. �' -�•f"��-�..:r '+ -
' t e.
1 �
Y! p
,
r•
c:� � � � �' a •s �,a `�,.
g a
r