Loading...
HomeMy WebLinkAboutCAG2023-447 - Change Order - #3 - Strickland & Sons Excavation LLC - 108th Ave SE & SE 264th St Compact Roundabout - 02/28/2024 Agreement Routing Form • For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASH 1 N G T O N (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: 3/6/2024 N/A 0 L IL Authorized to Sign: Date of Council Approval: Q El Director or Designee ❑Mayor 8/24/2023 Budget Account Number: Grant? El Yes ❑No R20098.64110.1200 Budget? El Yes ❑No Type: Federal Vendor Name: Category: Strickland & Sons Contract Vendor Number: Sub-Category: C 2536287 Change Order#3 0 Project Name: 108th & SE 264th Compact Roundabout fu L = Project Details:This CO replaces pre-cast mountable curb with cast-in-place mountable curb,replaces the HMA in the roundabout and aprons with stamped concrete and deletes the MMA finish from the roundabout.This Cchange order also adds and removes bid items to provide compensation for the changes. 41 E Agreement Amount:$8,771.40 Basis for Selection of Contractor: Bid all 11- Start Date. N/A Termination Date: 87 Working Days a Local Business? ❑Yes ❑No* *If meets requirements per KCC 3.70.1Oq please complete'Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: ❑Yes El No CAG2023-447 Date Received by City Attorney: Comments: ch C 3 3 � a, L ld hDate Routed to the Mayor's Office: Vf Date Routed to the City Clerk's Office: a MM173-i-m Visit Documents.KentWA.gov to obtain copies of all agreements KEN T W n 5 H i N G T O n CHANGE ORDER NO. 3 NAME OF CONTRACTOR: Strickland & Sons ("Contractor") CONTRACT NAME & PROJECT NUMBER: 108th & 264th Compact Roundabout ORIGINAL CONTRACT DATE: August 24, 2023 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change order replaces pre-cast mountable curb with cast-in-place mountable curb, replaces the HMA in the roundabout and aprons with stamped concrete and deletes the MMA finish from the roundabout. This change order also adds and removes bid items to provide compensation for the changes. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,184,513.74 (including applicable alternates and WSST) Net Change by Previous Change Orders $55,335.44 (incl. applicable WSST) Current Contract Amount $1,239,849.18 (incl. Previous Change Orders) Current Change Order $8,771.40 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $1,248,620.58 CHANGE ORDER - 1 OF 3 Original Time for Completion 75 working days (insert date) Revised Time for Completion under-A working days prior Change Orders /2 (insert date) Days Required (f) for this Change Order Xl working days [Revised Time for Completion 87 working days sert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRA OR: CITY OF KENT: Digitally signed by Chad Bieren By: Chad Bieren Date:2024.02.28 By: 16:55:51-08'00' ign ure) (signature) Print Name. Print Name: Chad Bieren, P.E. Its._ , ic- Its Public Works Director (title)DATE: 02. /3, 2_,62�! DATE: (title) AF EC KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) nt Ci y Clerk Kent Law Department qIn this field,you may enter the electronic filepath where the contract has been saved) CHANGE ORDER - 3 OF 3 File No. 200.2 KENT W-1-T.. CHANGE ORDER WORKSHEET NO. 03 Construction Engineering Division - Public Works Project: 108th & 264th Compact Roundabout Project No: 21-3004 Project Engineer: Thomas Leyrer Fed-Aid No: HISP-1129(001) Capital Projects Sean Flint, KBA, Inc. Contractor: Strickland & Sons Manager: Date: 1/30/2024 I. Proposed Change This change order replaces pre-cast mountable curb with cast-in-place mountable curb, replaces the HMA in the roundabout and aprons with stamped concrete and deletes the MMA finish from the roundabout. This change order also adds and removes bid items to provide compensation for these changes. II. Reason and Background for Change The plans call for pre-cast mountable curb at the round-about and splitter islands. Pre-cast sections are first grouted into place, and the grout needs time to set before HMA pavement can be placed to lock them in before they can be exposed to vehicle traffic. The HMA paving is weather dependent. The Contractor proposed installing cast in place mountable curb and stamped concrete in the roundabout as the curb could be poured one day and concrete in the island/roundabout poured the next day, both of which are less weather dependent that the HMA. This allows sections of the roadway to be opened to traffic sooner. Because cast in place curb is a single unit without grout seams, it is generally considered a superior product that requires less future maintence. III. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Item Description Total Est. Unit Unit Price Total Estimated Cost of No Qty Item I Stamped Concrete Pavement @ Roundabout, 9" 55 SY $503.13 $ 27,672.15 Thick Reinforced Stamped Concrete Pavement @ Spitter Islands, 69 SY $316.25 $ 21,821.25 I 9" Thick Reinforced I Cast In Place Mountable Curb, Type 1 240 LF $46.00 $ 11,040.00 I Cast In Place Mountable Curb, Type 2 330 LF $39.10 $ 12,903.00 New Pay Items Total: $ 73,436.40 Page 1 DELETE EXISTING PAY ITEMS) per 1-09.5 C Not applicable -7 Sc id Item No Item Description Qty Unit Unit Price Cost of Item No. B I HMA Class 1/2", PG 58V-22 for -45 Ton $331.00 1100 Islands and Truck Aprons $ (14,895.00) I Curb 2 - Precast Sloped Mountable -570 LF $56.00 1206 Curb $ (31,920.00) MMA or Island and Truc Apron V 5124 Coloring -1050 SF $17.00 $ (17,850.00) Delete Existing Pay Items Total: $ (64,665.00) INCREASE/DECREASE TO EXISTING PAY ITEMS) O Not applicable Sch id Item No7 Item Description Qty Unit Unit Price Cost of Item No. 7 $ - Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $8,771.40 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 75 Due This Change Order: 0 Previous Total: 87 Explanation/Justification for Additional Working Days: No additional working days will results due to this change. *TOTAL WORKING DAYS: 87 *This Change Order+ Previous Total Capital Projects Manager: Date: 02/05/2024 Sean Flint (KBA, Inc) Construction Engineering Date: 2/6/24 Supervisor: Jason Barry Construction Manager: � Date: 2/6/24 Eric Connor Page 2 From: Peterson.Kelly To: Connor.Eric Cc: Barry,Jason;Bieren,Chad Subject: RE: 108th 264th RAB COWS 3 CIP quantities Date: Monday,February 5,2024 3:07:49 PM Attachments: imaae002.ono imaae006.mo imaoe009.pna Eric- Chad and I talked about this issue and agree to proceed as noted. Thank you, Kelly Kelly Peterson, AICP, Deputy Director-Engineering Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 Koeterson(cbKentWA.gov CITY OF KENT,WASHINGTON KentWA.9ov Facebookr YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Connor, Eric<EConnor@kentwa.gov> Sent: Monday, February 5, 2024 2:04 PM To: Peterson, Kelly<KPeterson@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject: FW: 108th 264th RAB COWS 3 CIP quantities Good Afternoon Kelly, Did you get a chance to discuss this with Chad? Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT,WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Connor, Eric Sent: Friday, February 2, 2024 11:27 AM To: Peterson, Kelly<KPeterson(d)kentwa.gov> Cc: Barry,Jason <JBarryPkentwa.gov> Subject: FW: 108th 264th RAB COWS 3 CIP quantities Kelly, The attached CO Worksheet No. 3 is for the changes to the islands and truck aprons on our 108th/264th Roundabout project. In this change, the HMA inside the islands will be revised to stamped/colored concrete, and the curbing will be changed to cast-in-place instead of precast. The net add for this project revision as detailed our on CO WS No. 3 is $8,771.40. Are you okay with submitting the change order worksheet and beginning the process to prepare and execute Change Order No. 3? Please let me know if you have questions or need any additional information. Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT,WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Barry,Jason <JBarry(@kentwa.gov> Sent: Friday, February 2, 2024 11:01 AM To: Connor, Eric<EConnor(@kentwa.gov> Subject: FW: 108th 264th RAB CO 3 CIP quantities Hi Eric, Attached is CO3 work sheet and corrected quantities for review and approval. The previous version Cameron sent over had issues with estimated quantities. These quantities also include rounded up values to make sure we don't exceed quantity in field measurements. Thanks, Jason Jason Barry, Capital Projects Supervisor Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5546 1 Cell 253-797-8462 K ENT ibarry(cbKentWA.gov w.2-61se www.KentWA.gov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E- MAIL From: Sean Flint<sflintPkbacm.com> Sent:Tuesday,January 30, 2024 12:02 PM To: Barry,Jason <JBarryPkentwa.g_ov>;Jason Cundey<JCundey(@kbacm.com> Cc: Cameron Bloomer<cbloomerl@kbacm.com> Subject: Re: 108th 264th RAB CIP quantities EXTERNAL EMAIL Jason, Here is the worksheet.Also attached is an updated callout sheet identifying the curb and paving per the change order. Sean Flint (425)365-3469 KBA, Inc. Construction Management Specialists "Professionalism And Integrity Direct Our Actions" From: Barry,Jason <JBarr)�(@kentwa.gov> Sent:Tuesday,January 30, 2024 11:30 AM To: Sean Flint<sflintPkbacm.com>;Jason Cundey<JCundeyPkbacm.com> Cc: Cameron Bloomer<cbloomer(@kbacm.com> Subject: RE: 108th 264th RAB CIP quantities Sean, Can you revise the quantities on the CO worksheet and get back to me. I have not had time to do it. Thanks, Jason Jason Barry, Capital Projects Supervisor Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5546 1 Cell 253-797-8462 -� FMAarry KentWA.aov O w:.6 -a=o• www.KentWA.gov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E- MAIL From:Sean Flint<sflintPkbacm.com> Sent:Thursday,January 25, 2024 2:58 PM To: Barry,Jason <JBarry(@kentwa.gov>;Jason Cundey<JCundeyC@kbacm.com> Cc: Cameron Bloomer<cbloomer(@kbacm.com> Subject: 108th 264th RAB CIP quantities EXTERNAL EMAIL Good Afternoon, I reviewed the attached takeoff and updated it with the actual quantities for the curbs placed to date. My recommendation would be to take the estimated quantities and add 5% contingency for the change order. So far,the field measured quantities all came in slightly lower than the Bluebeam takeoff. Sean Flint (425)365-3469 KBA, Inc. Construction Management Specialists "Professionalism And Integrity Direct Our Actions" Bid Item Item CITY Unit Unit Price Total Action 1100 HMA Class 1/2" PG V-22 for Islands and Truck Aprons 45 Ton $ (331.00) $ (14,895.00) Delete Stamped Concrete Paved for Roundabout 9"W/#4 Rebar Mat on 12" Center 50 SY $ 503.13 $ 25,156.50 Add Nosing WSDOT Splitter Islands Stamped Concrete for Islands assumed 9" Depth w/#4 Rebar Mat on 12" Center 63 SY $ 316.25 $ 19,923.75 Add 1206 Curb 2 Precast Mountable Curb 570 LF $ (56.00) $ (31,920.00) Delete Cast In Place Mountable Curb Replacing Bid Item 1206 375 LF $ 39.10 $ 14,662.50 Add RAB Curb Type 1 For Roundabout Only 90 LF $ 46.00 $ 4,140.00 Add 1207 Curb 3 Precast Mountable Dual Face 5124 MMA for Island and Truck Apron existing bid item and 1050 SF $ (17.00) $ (17,850.00) Delete no change to • quantity. does not effect final price of $-782.25 CRB change SIDEWALK BUFFER STRIP CURB Q OUTSIDE CURB Q LANEO LANE CURB Q SPLInER ISLAND CURB Q LANE LANE CURB BUFFER STRIP Q SIDEWALK 6'-D"MIN. 1O 3'-D"MIN. 2 TRUCK APRON 1 2 2 2 1 3'-0"MIN. B-0"MIN. •-\° km \\\\C\LACEMENT�11 °\\\\ (TYP-) °SEE CONTRACT PLANS FOR TREATMENT SECTION O CENTRAL ISLANDQ CURB 3 SIDEWALK Q BUFFER STRIP CURB CIRCULATING ROADWAY Q 1Q CURB TRUCK APRON SEE CONTRACT PLANS FOR 6 (r'MIN. / _ •1 TREATMENT ° �IURR'P�LACEMENT SEE CONTRACT PLANS FOR PAVING AND SURFACING(TYP.) w°o SECTION O z (ROUNDABOUT CONFIGURATION WILL VARY NOTE LL DEPENDING ON CONTRACT PLANS) 1. Construct curb joints at cement concrete pavement transverse joint m locations.If all adjacent pavement is HMA,see Standard Plan F-30.10 for Curb Expansion and Contraction Joint Spacing. 2. Region Traffic engineer approval is needed to install a truck apron FACE OF CURB -__ ! J SPUTTER ISLAND lower than 3". 1e" la. nn CURB RAMP(TYP.) i MATCH ROADWAY i SIDEWALK(TYP.) 1/2"(IN)R. 4 12 SLOPE FACE OF LEGEND (TYP.) CURB CURB 2-OUTSIDE <.r 0 Width varies—See Contract Plans. I (SEE NOTE 2) I R 9" OR RIGHT SIDE w v SEE CONTRACT PLANS FOR 4• w TREATMENT(TYP.) i _� p O Match adjacent pavement thickness but 4 n O ROUNDABOUT not less than 6 inches. 6 ill"R.. ° BUFFER TRUCK APRON 26" Q CURB 3- ROUNDABOUT SPUTTER ISLAND CENTRAL ISLAND B;? CURB 1 NOSING CURB ec1DR ROUNDABOUT TRUCK APRON SECTION C B �O�y�y o1�WA s9iy� �9� CEMENT CONCRETE CURB 6 GUTTER (SINGLE SLOPE CURB) OUTSIDE u' DETAIL TRUCK APRON (SEE CONTRACT PLANS FOR R) SPUTTER ISLAND 1 37361 3/8"(IN)PREMOLDED JOINT FILLER 12"(IN)R. 1r2"(IN)R. A o;0 9F�!STe (OPTIONAL) (TYP.) FACE OF CURB 12"(IN)R. 4"(IN)R. 9 ONAL 12"(IN)R. FACE OF CURB ' to BUFFER MATCH ROADWAY Mar 25 2022 SLOPE mP') MATCH ROADWAY .. w SLOPE vro - aa ROUNDABOUT CEMENT °v yr TOP OF TRUCK a • w -- - -- CONCRETE CURBS oa' APRON O °- ° I ,12"R.�° 4�R "°. ' •.4��R... •. _ _ _ SIDEWALK STANDARD PLAN F-10.18-03 g• ° g" 16" °e" 1 16. 9" OPTIONAL SHEET 1 OF 1 SHEET CONSTRUCTION CURB 2 CURB 3 JOINT PARTIAL PLAN APPROVED FOR PUBLICATION (OUTSIDE,RIGHT SIDE OR SPUTTER ISLAND) ROUNDABOUT CENTRAL ISLAND Mar 28,2022 ROUNDABOUT CEMENT CONCRETE Ma.k Gaines lMil l9.lG13 m9$FGi CEMENT CONCRETE CURB STAtE aESION ENa1NEER CURB AND GUTTER (SINGLE SLOPE CURB) W.W.9t.n smn D.panmamorT—wortaeon (SINGLE SLOPE CURB) -" NE, NW, SE AND SW 1/4 SEC. 29, T 22N, R 5E, W.M. CURVE TABLE CURVE PC/PCC/PRC LENGTH RADIUS OLLIA PT/PCC/PRC CI 18+83.68.-17.92 L 38.37 400.00 5'29'46' 19+21.92,-20.90 L C9 18+28.81,5.68 R 1&73 289.00 3-42'48" 18+47.53.6.32 R CIO 18+78.35,0.59 R 48.91 171.00 lnS21" 19+27.01,6.63 R C14 18+85.74.-4.39 L 2.32 1.50 88'4830" 18+87.21,-5.89 L C15 18+87.21,-5.89 L 36.19 60tOO 3'26'59" 19+23.34,-7.73 L Ct6 18+87.19,-1.92 L 36.33 159.00 13'05'25" 19+23.32,-4.87 L C17 18+85.74,-3.42 L 2.31 1.50 88'07'21" 18+87.19,-1.92 L � f 85860-0017 CITY OF KENT \ \ i i WETLAND BOUNDARY ` --START 1295 13_ 1205 STA.19+41.97,\23.95'L\ STA.t9+2 29.33'L 1300 1295 - EXISTING R/W_ __ _ __ _-_ -_-__-_-__-_- 211 1211 _. 1215 °o�oocrn°Ooo. - - STA.19+12 fl 21.79'L 1095 - 1205 TA.19+32.11,-22.32LCI - 1205 Curb 2 - > N ✓ 1206 j y i _ - o - gloom " C14 / 1n R/W Q ° C17 D --18+= 1O8TH AVENUE SE _� 1206 B 1205 STA.19+44.42.5.82'R 1206 Stamved Concrete Of I 1207 1205 STA.19+4.42,5.57'R I O Spinner Islands 6"no I C9 Reinforcement N m noD stza m - ao or I M m I � N 1213 1211 fl82 N TA.18+98.32.18.81'R 18+94.22,16.16'R '- TA.18+80. 7.00'R 1298 - -- - - __- -_________________________________________ ____----______----_____:c___-�_-__emu. EXISTING R/W 1292205-9212 p 1 GIRI RIZAL+YAMUNA KHANAL +GANGA KHANAL 4(u(23 City of Kent 17�9 ROADWAY PUN1O8TH AVENUE SE 108TH AVENUE SE AND SE 264TH STRE w°° Public Works Divisinent STA 18+00 TO STA 19+46 COMPACT ROUNDABOUTBY on¢ 'a��-- o• KENT Engineering Division C:\Ge°ign\21-3p04 HSIP Comppct RnmJ°b,xd\Bbeei Filer1\21-3009 RpOe Pip,Awg 4/1e/2023<:B6 P4 NE, NW, SE AND SW 1/4 SEC. 29, T 22N, R 5E, W.M. MATCH LINE STA 9+50, SEE SHEET 14 � �- 185860-0017j � R� '--- _.. ._.....-- "CURVE TABLE CITY OF KENT - � 1205 I 292205-9113 -1 f BAO DINH NGUYEN F1.1'22 PC/PCC/PRCV58. RADIUS DELTA PT/PCC/PRC I�~ ENO 1295 STA. + 19 44.65.E 19+21.92,-20.90 400.00 7-17'23" 19+71.87.-30.46 L I \ S• 7g8q 4 6 19+71,87.-30.46 20.00 42'38'02" 19+83.66.-38.97 L D 1300 13.01 .. I I r 20+18.03,-31.89 20.00 53'1 1'01' 20+29.84, 17.50 L 5 D 190+5&00,-35.85'L� / / 06 _ i --_- _- 20+29.94,-17.50 65.00 39-24'22" 20+73.52,-12.81 L / I121 129 _ _.i, C3 ° I 19+27.01,6.63 60.00 49'37'47' 19+76.06.18.08 R °° 100 5 _ 19+....18.. 30.00 .12.451 19+99.16,24.06 R ' . C C13 19+99.16,24.06 500.00 6'40'03" 20+57.04,18.39 R ---J 1205 CIO CIO 19+50.99,-10.62 L 11.30 601.00 1V440" 19+62.19.-12.16 L 211 1215Stamped Concrete 1205 ® C19 19+89.19,-12.10 L 2.81 1.50 107'23'34" 19+63.89,-10.44 L 1205 Splitter Islands 6"Depth i C20 19+63.89.-10.44 L 2.67 31.00 4'S5'33" 19+83.59,-7.80 L �---I' 1215 ;� not Reinforced I C2 C21 19+83.59,-7.80 L 2.55 1.50 97'48'30" 19+81.78,-8.43 L RAB Curb Type 2 % - _ C22 19+61.78,-6.43 L 10.92 76.00 814'D2" 19+50.97,-7.91 L � � 121E �' C23 9+82.54,0.82 R 4.71 1.50 180'00'00" 9+62.90,-218 L ° 059 �6D0000aoc`i C24 9+60.45,0.57 R 4.71 1.50 180,00,00" 9+80.81,-2.41 L > 1100 512 ° M1 / C25 20+24.17,3.42 R 3.73 2.00 106'62'37" 20+20.09,6.00 R 120 o 1210 1208 C26 20+24.17,3.42 R 4.58 31.00 8'27'59" 20+25.17,-1.05 L CIO ° C7 1100 5124 .D.1 C27 20+25.17,-1.05 L 3.46 2.00 99-03.52" 20+27.75,-2.66 L 110 124 / i 1100 5124 = C28 20+27.78,-2.88 L 14.68 101.00 8'19'49" 20+42.03.0.72 R C Till=-nn' Stamped Concrete Island C29 9 20+42.03,0.72 R 3.53 2.50 80'S1'18' 20+4113.3.18 R t "depth Doweling ° STA. 4 ,-12.W C • 5 54.28•-11.12 L- z C30 20+41.63,6.00 R 3.93 2.50 90'OVOO" 20+44.13,3.50 R 1 1M TALL NEW - 1208 W / 26 UMENT 12 0 a N C31 20+54.17,3.48 R 2.37 1.50 BO'20.29" 20+55.68,1.88 R fN C C27 C28 D C37 20+54.17.4.48 R 2.36 1.50 90'00000" 20+55.67.5.98 R ' , I R/W rL ° RAB Curb Type 1 A`ENU SE , 1100 51 0 0 1205 6 O STA.19+94.51 -5.WL ° o C 0 CENTER OF R NDASOUT 7o0 1100 512 C11 1100 5124 12 2 1 A _ RAB Curb Type N� m .� k 1206 -1 1211 1213 1215 _ `+°• - 1205 STA.20+54.04,18.52' W F1 2051 STA.20+44.03,19.07' - _ 1205 \ - II • /.1205 X 121 70 non.v oodaoo 1217 1100 5124 61 1148 -- _ - _r____-_-_��� ' - -. EXISTING R/W`\ _ START 1285 ( Y4� I� 1 S• STA.20+56.80.30.50• q, ��/ t0• i START 1260 r 292205-9212 I m 1100 TA.20+01.83.39.79'R GIRI RIZAL+YAMUNA KHANAL 2 9 220 5-8101 +GANDA KHANAL I ^ I !'/ / / GURMEET S CIL 0M 4�n�Z3 SHEET _ _ rcsac°�_a�acE°: �_�a wmxm N° uuF: 1" 6• °,��°„E",�,�, City of Kent -T11-�--'-KENT Public Works Department ROADWAY PUN - 108TH AVENUE SE 108TH AVENUE SE AND SE 264TH STRE P STA 19+46 TO STA 20+60 COMPACT ROUNDABOUT FlIF NO 12 of 2e ND. NEv7voN Dr Dn1E °:� Engineering Division r•'p0"0ee1^"i°'r -� -.. art N,°nFca°"� Raind°ba°t\Soul Filae\2i-3004 NOW PI°n°w9�/10/202J 401 P4 NE, NW, SE AND SW 1/4 SEC. 29, T 22N, R 5E, W.M. CURVE TABLE FCURVE PC/PCC/PRC r29.21 RADIUS DELTA PT/PCC/PRC ~------- I I 20+73.52.-12.81 L 150.00 1314'06' 21+07.04.-17.00 L 292205-9113 292205-9249BAO DINN NCUYEN MANOG&BANDANA TRIPATHI 20+57.74,2.00 R 78.00 14'39'33' 20+77.49,-0.41 L 20+77.49,-0.41 L149.00 117J'53' 2t+08.32,-4.79 L 21+05.32,-4.79 L 2.50 142'40'22' 21+08.07.-0.39 L 20+93.30.5.52 R25.00 37V7'05' 21+08.07,-0.39 L -1-------------- � C38 20+76.11,6.00 R 299.00 81T{4' 20+93.30.5.52 R 1 I I I I EXISTING R/W 1205 1298 STA.21+32.88,-24.00'L _�_--rr EXISTING R/W ___-_1II- __- - I I I TA.20+76.89.-24.00'L m � I I STA.20+91.36,-23.00'L 1080 1095 I I 7000 8005 STA.21+12.74.-22.53'L Ep I 1206 1149 in 10' 1145 °! 1145 �' 1205 1095 1205 ,09b I � 1140 N t 6 Stamped Concrete I 1210 1205 Splitter Island 6" w I 1100 5.24 r+ not Reinforced I 2 N 1205 °- -- Curb Type 2 ° ° ° ° 1100 5124 C33 C34 1250 INSTALL NEW MONUMENT R/W V. 1 212 STA.22+09.87,3.31' 1205 C32 ---- - — 1O8TH AVENUE SE 22�00 C35 206 —� '212 21 .13.89R ---f -M — C) N t? STA.21+28.22,15.68'R 1205 STA.21+13.50.17.79' 'R TA.20+83.00,20.50'R i2g6 1095 C .� O1140 TA.20+77.33.20.00'R END 1280 m 11 A.20+80.00,30.40'R 77� ____________ o- _-- _- - ___ ___-___-__________-_-________--_-_____ _-_EXISTING STING R/W -- -_-� .-. o o R/W EXI START/END 1280 1285 I / I �p9 LEj TA.20+76.60.30.50'R I I I I q9 i I I j I I 292205-9083 292205-9101 1 I 1 I ROSEIINE ROSNER CURMEET S GIL I I 1 / SHEET °EG�Di�9L°1O°0`JIIL-"°'*`"°`°'" "„�P,_7• s °" \.� Works Kent ROADWAY PLAN — 1 O8TH AVENUE SE 1 O8TH AVENUE SE AND SE 284TH STRE x rsvo0N Public Works Department �,,,�, ,,N, --�— �- STA 20+80 TO STA 22+50 COMPACT ROUNDABOUT FlLE N0.1J or ze ND. REMSION Br DA, °,.ate,°"" ° KENT Engineering Division r-� G!\Oeelgn\21-J004 HSIP CanPect Rwntl°bout\Sneal Fllee\21-3004 RoaO PI°n.4wg 12/6/2023023 2:M PM