HomeMy WebLinkAboutCAG2024-076 - Original - WSDOT - S. 218th St./98th Ave S from 94th Pl S to 99th Pl S - 02/21/2024 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr:
Agreement Routing Form DirAsst:
• For Approvals,Signatures and Records Management Dir/Dep:
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (Optional)
WASHINGTON Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Karin Bayes/Mark Madfai Public Works
Date Sent: Date Required:
c 02/15/2024 2/22/2024
Q Mayor or Designee to Sign. Date of Council Approval:
Q Interlocal Agreement Uploaded to Website 7/6/2021
Budget Account Number: Grant? Yes ✓ NoE]
R90110
Budget?❑✓ YesE]No Type: Federal
Vendor Name: Category:
WSDOT Grant: Non-Real Property
Vendor Number: Sub-Category:
Original
0
Project Name: S. 218th St./98th Ave S from 94th PI S to 99th PI S
3- Project Details: The project will widen S. 218th Street/98th Ave S to three lanes and includes paving , concrete
0- curbs, gutters, sidewalks, 5-foot paved shoulders, street lighting, storm drainage, landscaping,
iC utilities and channilization.
*, The Prospectus is required in order to obligate federal funds for construction.
IC _
Basis for Selection of Contractor:
Agreement Amount: $4,915,680 Other
E Memo to Mayor must be attached i
11— Start Date: February, 2024 Termination Date: Unknown
lm
a Local Business? Yes F]No*If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Business License Verification: ❑Yes In-Process F1 Exempt(KCC 5.01.045) FlAuthorized Signer Verified
Notice required prior to disclosure? Contract Number:
Yes❑No CAG2024-076
Comments:
IM
C C
a,
a
Date Received:City Attorney:2/15/24 Date Routed:Mayor's Office 2/20/24 City Clerk's Office 2/22/24
adccW22373_7_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20221201
Adm
T7Washington State Local A enc Federal Aid
Department of Transportation g y
_ Project Prospectus_
Prefix Route ( ) Date 2/5/2024
Federal Aid DUNS Number 020253613
Project Number
LocalAgency 17-3010 r WSDO y 1 Federal Employer 91-6001254
Project Number ` Use Only 1 Tax ID Number
Agency CAAgency Federal Program Title
City of Kent 0✓ Yes ❑No ❑✓ 20.205 [:]Other
Project Title Start Latitude N47.406802 Start Longitude W-122.214615
S 218th St/98th Ave S - 94th PI S. to S.216th St. End Latitude N47.408653 End Longitude W-122.208885
Project Termini From-To Nearest City Name Project Zip Code(+4)
94th PI S S 216th St Kent 98032-5895
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A 2000 feet ❑✓ Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
N/A N/A N/A 0615 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region❑ 47th 8th 80389
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. 1,200,000 1,200,000 1 2022
R/W 700,000 700,000 3 2022
Const. 10,370400 5,454800 4,915,700 2 2024
Total 12,270,400 7,354800 4,915,700
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
22 2
Currently a two lane roadway with limited sidewalks
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
The project will widen S. 218th Street/98th Ave S to three lanes and includes paving, concrete curbs,gutters,
sidewalks, 5-foot paved shoulders, street lighting, storm drainage, landscaping,utilities and channilization.
Local Agency Contact Person Title Phone
Mark Madfai Design Engineering Supervisor 253-856-5521
Mailing Address City State Zip Code
220 4th Ave. S Kent WA 98032
By
Project Prospectus - — --- — Approving Authority
Title Public Works Director Date 7 ay/
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
[Ag�ancy Project Title Date
Kent S 218th St/98th Ave S - 94th PI S. to 5.216th 2/5/2024
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑3-R 40 3
❑✓ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking ❑Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑ Principal Arterial
Federal ❑ Minor Arterial ❑ Minor Arterial
[✓� Urban ❑Collector ✓� Urban El collector
Functional ❑ Rural ❑ Rural
❑✓ Major Collector ❑ Major Collector
Classification NHS ❑ Minor Collector ❑ NHS Minor Collector
❑ Local Access ❑ Local Access
Terrain ❑ Flat ❑ Roll [:] Mountain ❑ Flat ❑ Roll ❑ Mountain
Posted Speed 25 mph 25 mph
Design Speed 25 mph
Existing ADT 4500 VPD
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent ova 100 ova
Construction Will Be Performed By Contract Agency
Contractor 100 ova
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 [y Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
No major environmental impacts.
DOT Form 140-101 Page 2
Revised 01/2022 Previous Editions Obsolete
Agency Project Title Date
City of Kent S 218th St/98th Ave S - 94th PI S. to S.216th 2/5/2024
Right of Way
❑ No Right of Way Needed n✓ Right of Way Needed
*All construction required by the ❑✓ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑ No utility work required ❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑All utility work will be completed in coordination ❑All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project
Existing overhead power and communication lines will be undergrounded. Communications lines and gas
relocations will be completed in advance of the construction project. PSE power undergrounding will be
peformed by the City's contractor.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?❑Yes [v No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
--Dqrtd��
Date By
02/21/2024 Mayor/Chairpers�—n —
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete
2/15/24, 1:50 PM South 218th Street/98th Avenue South from 94th Place South to South 216th Street-PSRC Grant Acceptance-Authorize-City...
City of Kent ,U, Approved
Washington 6, 2021 j,00
pM
KE O T Action Item
27SO
South 218th Street/98th Avenue South from 94th Place South to South 216th Street -
PSRC Grant Acceptance - Authorize
Information
Department: Public Works Department Sponsors:
Category: Grant/Donation
Attachments
Printout
218th Award Letter
Budget Impact
BUDGET IMPACT: This adds $4,915,680 of federal grant funding to the construction budget for
this project and the City's match is estimated at $3,444,320, which will come from transportation
impact fees, Local Improvement District #363 proceeds and B&O.
Motion
MOTION: I move authorize the Mayor to accept federal funds in the amount of
$4,915,680 for the South 218th Street/98th Avenue South from 94th Place South to
South 216th Street Improvements and direct staff to establish a budget for the funds.
Summary
SUMMARY: This project will widen South 218th Street/98th Avenue South from 94th Place
South to South 216th Street to three lanes and includes paving, concrete curbs, gutters,
sidewalks, street lighting, storm drainage, landscaping, utilities, and channelization.
This project will extend the recently completed improvements of phase II of the South 224th
Street corridor up the hill by approximately 3000 feet.
The City competed for grant funds for construction through the Puget Sound Regional Council
Meeting History
Committee Committee of the Whole - Regular
Jun 22, 2021 4:00 PM Video of the Meeting
Whole
Design Engineering Manager, Mark Madfai reviewed the South 218th Street/98th Avenue South from 94th Place South to 216th
Street PSRC grant.
RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS
https://kentwa.igm2.com/Citizens/Detail-LegiFile.aspx?MeetinglD=4625&MediaPosition=&ID=2750&CssClass=&Print=Yes 1/2
2/15/24, 1:50 PM South 218th Street/98th Avenue South from 94th Place South to South 216th Street—PSRC Grant Acceptance—Authorize-City...
City
Jul 6, 2021 7:00 PM Video Council City Council Regular Meeting
Meeting
RESULT: APPROVED [UNANIMOUS]
MOVER: Toni Troutner, Council President
SECONDER: Les Thomas, Councilmember
AYES: Toni Troutner, Bill Boyce, Brenda Fincher, Satwinder Kaur, Marli Larimer, Les Thomas, Zandria Michaud