HomeMy WebLinkAboutCAG2023-595 - Change Order - #2 - Larson Berger Companies Construction, LLC - FAC23-27 City of Kent Courtroom Refurbishment - 01/24/2024 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr:
WM
Agreement Routing Form Dir. Assist:
P"p'�
• For Approvals,Signatures and Records Management
KEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover
WASHINGTON Sheet forms. Dir/Dep Dir:
Originator: Department:
Leah Bryant for Nate Harper Parks, Recreation & Community Services
Date Sent: Date Required:
> 01/24/2024 1/31/2024
0
Q Authorized to Sign: Date of Council Approval:
QWIDirector or Designee 11/7/2023
Budqet Account Number: Grant? Yes ZNo
F00056.64110.9412
Budget?W]YesElNo Type: N/A
Vendor Name: Category:
Larson Berger Companies-Construction,LLC,DBA LBC Contract
Construction
Vendor Number: Sub-Category:
= 2536711 Change Order
0 Project Name: City of Kent Courtroom Refurbishment FAC23-27
O Project Details:
As described in Exhibit A,change order to add:
1' (5)Lawyers Tables:Expandable tables with removable leaf and apron,PS Walnut Veneer Countertop and Apron,Solid PS
= Walnut Legs glued up for width.
40 (3)Non-Expandable Tables:PS Walnut Veneer Countertop and Apron,Solid PS Walnut Legs glued up for width.
(D Agreement Amount: $48 348.21 Basis for Selection of Contractor: Bid
*Memo to Mayor must be attached
i Start Date: November 2023 Termination Date: 8/31/2024
Q Local Business?1:1 Yes 91No* If meets requirements per KCC3.70.700,please complete'Vendor Purchase-Local Exceptions"form onCityspace.
Business License Verification:0 Yes In-Process Exempt(KCC 5.01.045)
Notice required prior to disclosure? Contract Number:
E]YesZNo CAG2023-595
Comments:
p1
C
3
3 0
1A
•� i
N
,7
a1
N
Date Routed to the City Clerk's Office: 1/25/24
,dccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20210513
•
KENT
CHANGE ORDER NO. 2
NAME OF CONTRACTOR:Larson Berger Companies - Construction, LLC, DBA LBC Construction
("Contractor")
CONTRACT NAME & PROJECT NUMBER: City of Kent Courtroom Refurbishment FAC23-27
ORIGINAL CONTRACT DATE: 11/28/2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
As described in Exhibit A, change order to add:
(5) Lawyers Tables: Expandable tables with removable leaf and apron, PS Walnut Veneer
Countertop and Apron, Solid PS Walnut Legs glued up for width.
(3) Non-Expandable Tables: PS Walnut Veneer Countertop and Apron, Solid PS Walnut Legs glued
up for width.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $678,216.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $13,476.82
(incl. applicable WSST)
Current Contract Amount $691,692.82
(incl. Previous Change Orders)
Current Change Order $43,913.00
Applicable WSST Tax on this Change $4,435.21
Order
Revised Contract Sum $740,041.04
CHANGE ORDER - 1 OF 3
Original Time for Completion 8/31/2024
(insert date)
Revised Time for Completion under NA
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 calendar days
Revised Time for Completion 8/31/2024
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
� e��
B�/� By:Juli arascondola(Jan 25,202409:07 PST)
Print Name: Nathan Larson Print Name: Julie Parascondola
Its Vice President Its: Director-Parks
DATE:Jan 25,2024 DATE: J an 25, 2024
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
Exhibit A
Change Order Proposal
Kent Municipal Court Refirbishment
To: City of Kent Date: 1/18/2024
400 West Gowe Project No.: 24-01
Kent,WA 98032 Change Proposal No.: 003
Attn: Nathen Harper REV: 0
CO Title: Lawyer Tables
Detail Proposed Item
CSI Description (L/M/E/S) Qty Unit Rate Cost
SCOPE
Casework Lawyer Tables S 1 LS $38,390.00 $ 38,390.00
SUBTOTAL $ 38,390.00
FEE&OVERHEAD
GC Markup(Self-Perform) 1 1 LS 15% $ -
GC Markup(Sub-Contractor) 1 LS 10% 1 $ 3,839.00
SUBTOTAL $ 42,229.00
TAXES&INSURANCE
Liability Insurance 1 LS 0.550% $ 232.26
Builders Risk Insurance 1 LS 0.200% $ 84.46
State&Local B&O tax 1 LS 0.571% $ 241.13
Payment&Performance Bond 1 LS 2.667% $ 1,126.25
SUBTOTAL $ 43,913.09
WSST
as ing on State Sales I ax 1 1 1 LS 1 0.00% $ -
TOTAL CHANGE: Subject to terms and conditions of main contract. TOTAL $ 43,913.09
Contractor LBC Construction Architec DLR Group 0 er City of Kent
Signed:ltl�at6e� B� Signe - Signed:
Title: Vice President Titl . rincipal in Firm Title: 74pital Project M na er
Date: 1/18/2024 Date: 1/24/2024 Date: 1/24/24
003
Kent Municipal Court Refirbishment
ASSUMPTIONS&EXCLUSIONS
Please reference the attached quote from CSW for the scope of work for the lawyer tables. Supply and delivery times are
not confirmed until approved submittals have been received by CSW. Schedule impact can not be addressed at this time.
003
CUSTOM ••
SOURCE 00
L�rr t��Olf7lvORKINC ri•
••
To:LBC Construction
324 170th PI NE
Bellevue,WA 98008
Office:2067477748
Project:7150 City of Kent Courtroom Refurbishment
COP#: 1
Date: 1/11/2024
Re:Added Lawyers Tables
CITY Deduct$ Cost Each$ Total Add$
Added Lawyers Tables(5)Expandable Tables with Removable Leaf and Apron-PS Walnut Veneer
Countertop and Apron,Solid PS Walnut Legs Glued up for Width.(3)Non Expandable Tables-PS
Walnut Veneer Countertop and Apron,Solid PS Walnut Legs Glued up for Width
5 Expandable Tables $ 4,838.00 $ 24,190
3 Non Expandable Tables $ 3,049.00 $ 9,147
$
This Change Order Proposal("COP")is presented to the party named above as an offer to amend the Subtotal $ 33,337
existing contract between it and Custom Source Woodworking,Inc("CSW"). By signing below,the Deduct -
party named above accepts said offer with respect to the costs and items herein,agrees to pay the I % Freight
Grand Total to CSW upon invoice and without delay,and hereby agrees that this COP is made part Yes $ 0.15 OH&P $ 5,00t
and piece of the contract between the parties. All other provisions of the contract remain in full force o $ sales Tax $ -
and effect. Work shall not begin until CSW receives a signed copy of this COP. Yes insurance $ 52
Signature Printed Name Grand Total $ 3F- 8,390
Date
Signature:wwia A M signature:r Penn + signature: Km Komato
m�un .rs,rsn
Email: wmoore@kentwa.gov Email: parkscontracts@kentwa.gov Email: cityclerk@kentwa.gov
FAC23-27-Courtroom Renovation -LBC CO2
Final Audit Report 2024-01-25
Created: 2024-01-24
By: Leah Bryant(Ibryant@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAa5a6VraZvNN09j7Q2SVvSf7FcTGcYyHj
"FAC23-27-Courtroom Renovation -LBC CO2" History
Document created by Leah Bryant (Ibryant@kentwa.gov)
2024-01-24- 11:14:53 PM GMT
�'► Document emailed to wmoore@kentwa.gov for signature
2024-01-24- 11:18:06 PM GMT
Email viewed by wmoore@kentwa.gov
2024-01-24- 11:30:17 PM GMT
do Signer wmoore@kentwa.gov entered name at signing as Will Moore
2024-01-24- 11:31:09 PM GMT
60 Document e-signed by Will Moore (wmoore@kentwa.gov)
Signature Date:2024-01-24-11:31:11 PM GMT-Time Source:server
C'► Document emailed to Nathan Larson (nathan@larsonbergercc.com)for signature
2024-01-24- 11:31:12 PM GMT
Email viewed by Nathan Larson (nathan@larsonbergercc.com)
2024-01-25-3:37:29 PM GMT
6Q Document e-signed by Nathan Larson (nathan@larsonbergercc.com)
Signature Date:2024-01-25-3:37:48 PM GMT-Time Source:server
C` Document emailed to parkscontracts@kentwa.gov for signature
2024-01-25-3:38:25 PM GMT
Email viewed by parkscontracts@kentwa.gov
2024-01-25-4:06:28 PM GMT
p Signer parkscontracts@kentwa.gov entered name at signing as Phung Huynh
2024-01-25-4:07:08 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign
y0 Document e-signed by Phung Huynh (parkscontracts@kentwa.gov)
Signature Date:2024-01-25-4:07:10 PM GMT-Time Source:server
C' Document emailed to Julie Parascondola Qparascondola@kentwa.gov) for signature
2024-01-25-4:07:12 PM GMT
15 Email viewed by Julie Parascondola Oparascondola@kentwa.gov)
2024-01-25-5:06:53 PM GMT
0"0 Document e-signed by Julie Parascondola Qparascondola@kentwa.gov)
Signature Date:2024-01-25-5:07:28 PM GMT-Time Source:server
'► Document emailed to Kim Komoto (kkomoto@kentwa.gov) for signature
2024-01-25-5:07:30 PM GMT
Email viewed by Kim Komoto (kkomoto@kentwa.gov)
2024-01-25-6:11:38 PM GMT
bo Document e-signed by Kim Komoto (kkomoto@kentwa.gov)
Signature Date:2024-01-25-6:11:48 PM GMT-Time Source:server
C' Document emailed to cityclerk@kentwa.gov for signature
2024-01-25-6:11:49 PM GMT
Email viewed by cityclerk@kentwa.gov
2024-01-25- 10:54:07 PM GMT
a Signer cityclerk@kentwa.gov entered name at signing as Kim Komoto
2024-01-25- 10:57:39 PM GMT
IUp Document e-signed by Kim Komoto (cityclerk@kentwa.gov)
Signature Date:2024-01-25-10:57:41 PM GMT-Time Source:server
® Agreement completed.
2024-01-25- 10:57:41 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign