HomeMy WebLinkAboutCAG2023-574 - Change Order - #1 - Evergreen Technologies, Inc. - Access Control and Cameras for Shops - 12/13/2023 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr:
Agreement Routing Form
• For Approvals,Signatures and Records Management
KE N T This form combines&replaces the Request for Mayor's Signature and Contract Cover
WASHINGTON Sheet forms.
Originator: Department:
Leah Bryant for Will Moore Parks, Recreation & Community Services
Date Sent: Date Required:
> 12/12/2023 12/18/2023
0
CL Authorized to Sign: Date of Council Approval:
Q Director or Designee 10/17/2023
Budget Account Number: Grant? Yes WINo
F00901. 64110. 9419
Budget?w]YesEl No Type: N/A
Vendor Name: Category:
Evergreen Technologies, Inc. Contract
Vendor Number: Sub-Category:
= 192984 Change Order
0 FAC23- 28 Access Control and Cameras for Shops
Project Name: p
1.1. Project Details:As described in attached Exhibit A,Option #1, incorporated herein,
0
= Changing to a different camera type.
c
40
40 Agreement Amount: $8 026.75 Basis for Selection of Contractor: Other
`Memo to Mayor must be attached
Start Date: 11/9/2023 Termination Date: 2/29/2024
Im
Q Local Business?F--]YeslzNo* If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace.
Business License Verification:YesEl In-ProcessEl Exempt(KCC 5.01.045)
Notice required prior to disclosure? Contract Number:
FTesQNo CAG2023-574
Comments:
CA
G
3
4)
H
•� i
N 3
f0
C
V1
Date Routed to the City Clerk's Office: 1/22/24
,c«w»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20210513
•
KEN T
WASHINGTON
CHANGE ORDER NO. #1
NAME OF CONTRACTOR: EVERGREEN TECHNOLOGIES, INC. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: FAC23- 28 Access Control and Cameras for Shops
ORIGINAL CONTRACT DATE: 11/9/2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
As described in attached Exhibit A,Option #1, incorporated herein,
Changing to a different camera type.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $153,936.32
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0
(incl. applicable WSST)
Current Contract Amount $153,936.32
(incl. Previous Change Orders)
Current Change Order $7,290.42
Applicable WSST Tax on this Change $736.33
Order
Revised Contract Sum $161,963.07
CHANGE ORDER - 1 OF 3
Original Time for Completion 2/29/2024
(insert date)
Revised Time for Completion under 2/29/2024
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 calendar days
Revised Time for Completion 2/29/2024
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Adaov u 4 GUI GG U001-e
By :Adam Nolting(Dec 13,2023 7:56 PST) By:Will Moore(Dec 12,202315:00 PST)
Print Name:Adam Nolting Print Name: Will Moore
Its Adam Nolting Its: Facilities Superintendent
DATE: Dec 13,2023 DATE: Dec 12,2023
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
ec� 64
Kent City Clerk Kent Law Department
CHANGE ORDER - 3 OF 3
Exhibit A
EVERGREEN
TECHNOLOGIES INC.
Communication Consulting and Contracting
December 7, 2023
City of Kent- Shops Verkada Upgrade Camera swap CO 01
5821 S 240th St.
Kent, WA 98032.
Attn: Will Moore
P: 206-445-3761
E: WMoore(a)-kentwa.gov
Scope of Work—
• Provide a 30% discount off MSRP on all Verkada hardware and software licenses.
• Remove and return the following for a credit from Verkada:
o (6) pole mounts acc-mnt-9
o (14) CF81 E fisheye cameras
o (14) angle mounts ACC-MNT-7
o (13) camera licenses 5 year
• Purchase, Provide and install the following:
o (7) POE plus plus injectors
o (7) CH52 Multi sensor cameras
o (7) Multi sensor camera licenses
o (3) Corner mount acc-mnt-corner-1
o (7) Large arm mounts
o (7) Pendant caps ACC-MNT-8
o (3) Pole mounts ACC-MNT-Pole-1
o (1) CD52E dome camera (currently installed at front reception door, Sent out as a trial)
• All work to be completed on normal day shift hours.
• All networking and POE equipment to be existing or customer provided. Any networking port
configurations to be completed by customer IT group.
List of Materials and Services Below:
Date: 12/7/2023
Manf. Option #1 Total
Part Parts and
Manf. Number Item Description Qty. Unit Labor
ACC-POE- Verkada
Verkada 60W PoE++ 802.3bt-2018) Injector, Gi E 7 ea 730.10 Material
CH52-1TBE- CH52-E Outdoor Multisensor Camera, 1TB,
Verkada HW 30 Days 7 ea 17,635.10 Total:
Verkada LIC-CH52-5Y 5-Year CH52 Multisensor Camera License 7 ea 13,225.10 $34,930.00
ACC-M NT-
Verkada CORNER-1 Corner Mount 3 ea 417.90
ACC-M NT-
Verkada XLARM-1 Large Arm Mount PTZ 7 ea 779.10
Verkada ACC-MNT-8 Pendant Cap Mount 7 ea 338.10
ACC-M NT-
Verkada POLE-1 Pole Mount 3 ea 438.90
CD52-256E- CD52-E Outdoor Dome Camera, 256GB, 30
Verkada HW Days Max 1 ea 979.30
Verkada S&H Shipping and Handling 1 ea 386.40
product returns of software, mounts and Verkada Return
Verkada Verkada cameras 1 ea -28,388.58 Credit: (28,388.58)
Evergreen
Evergreen Tech Tech labor/extend lift rental 1 ea 749.00
Project Total: $ 7,290.42
(Price does not include Washington State Sales Tax)
3623 East Marginal Way S,Seattle,WA 98134•T(206)774-1400•F(206)774-1401
EVERGREEN
TECHNOLOGIES INC.
Communication Consulting and Contracting
Scope of Work— eliminate 1 multi sensor Alternate #1
o Same as above but completely remove 1 multi sensor, multi sensor license and mounts for 1
camera. *If on a pole the number would decrease as I could also remove a pole mount.* Can
also remove the front entry dome camera at reception for further savings if you'd prefer to return
that trial cam to Verkada.
List of Materials and Services Below:
Date: 121712023
Manf. Total
Part Parts and
Manf. Number Item Description Qty. Unit Labor
Verkada
Verkada ACC-POE-60W PoE++ 802.3bt-2018 Injector, Gi E 6 ea 625.80 Material
CH52-E Outdoor Multisensor Camera,
Verkada CH52-1TBE-HW 1TB, 30 Days 6 ea 15,115.80 Total:
5-Year CH52 Multisensor Camera
Verkada LIC-CH52-5Y License 6 ea 11,335.80 $30,257.50
ACC-M NT-
Verkada CORNER-1 Corner Mount 3 ea 417.90
ACC-M NT-
Verkada XLARM-1 Large Arm Mount PTZ 6 ea 667.80
Verkada ACC-MNT-8 Pendant Cap Mount 6 ea 289.80
ACC-MNT-POL E-
Verkada 1 Pole Mount 3 ea 438.90
CD52-E Outdoor Dome Camera, 256GB,
Verkada CD52-256E-HW 30 Days Max 1 ea 979.30
Verkada Shipping and Handling 1 ea 386.40
product returns of software, mounts and Verkada Return
Verkada Verkada cameras 1 ea -28,388.58 Credit: (28,388.58)
Evergreen
Tech Evergreen Tech labor/extend lift rental 1 ea 650.00
Project Total: $ 2,518.92
(Price does not include Washington State Sales Tax)
Thank you,
Adam Nolting
Project Manager
Evergreen Technologies, Inc.
(206) 900-2560
anoltinq(aevergreentec.com
3623 East Marginal Way S,Seattle,WA 98134•T(206)774-1400•F(206)774-1401
Signature• M0li55a MGCo�'�YIIGK
Melissa McCormick(Jan 22,202408:00 PST)
Email: cityclerk@kentwa.gov
FAC23-28 Evergreen Technologies-Change
Order 1
Final Audit Report 2024-01-22
Created: 2023-12-12
By: Leah Bryant(Ibryant@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA_F3Jy4BwvljmhsWaMdPYGja5xQz-6B71
"FAC23-28 Evergreen Technologies-Change Order 1 " History
Document created by Leah Bryant(Ibryant@kentwa.gov)
2023-12-12-10:31:33 PM GMT
Document emailed to wmoore@kentwa.gov for signature
2023-12-12-10:33:36 PM GMT
Email viewed by wmoore@kentwa.gov
2023-12-12-10:57:54 PM GMT
Signer wmoore@kentwa.gov entered name at signing as Will Moore
2023-12-12-11:00:01 PM GMT
Document e-signed by Will Moore (wmoore@kentwa.gov)
Signature Date:2023-12-12-11:00:03 PM GMT-Time Source:server
Document emailed to anolting@evergreentec.com for signature
2023-12-12-11:00:05 PM GMT
Email viewed by anolting@evergreentec.com
2023-12-13-3:55:37 PM GMT
d4 Signer anolting@evergreentec.com entered name at signing as Adam Nolting
2023-12-13-3:56:02 PM GMT
Document e-signed by Adam Nolting (anolting@evergreentec.com)
Signature Date:2023-12-13-3:56:04 PM GMT-Time Source:server
Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature
2023-12-13-3:56:06 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign
Email viewed by Kim Komoto (kkomoto@kentwa.gov)
2024-01-20-10:54:02 PM GMT
dp Document e-signed by Kim Komoto (kkomoto@kentwa.gov)
Signature Date:2024-01-20-10:54:33 PM GMT-Time Source:server
Document emailed to cityclerk@kentwa.gov for signature
2024-01-20-10:54:35 PM GMT
Email viewed by cityclerk@kentwa.gov
2024-01-22-3:56:07 PM GMT
dp Signer cityclerk@kentwa.gov entered name at signing as Melissa McCormick
2024-01-22-4:00:11 PM GMT
d4 Document e-signed by Melissa McCormick (cityclerk@kentwa.gov)
Signature Date:2024-01-22-4:00:13 PM GMT-Time Source:server
Agreement completed.
2024-01-22-4:00:13 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign