HomeMy WebLinkAboutCAG2023-292 - Change Order - #2 - Scarsella Bros., Inc. - 2023 Watermain Replacement - 01/11/2024 Agreement Routing Form
N
For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
WASHINGTON (Print on pink or cherry colored paper)
Originator: Department:
S.Anderson PW Engineering
Date Sent: Date Required:
> 1/10/2024
0
CL Authorized to Sign: Date of Council Approval:
C' 0 Director or Designee 0 Mayor 4/18/2023
Q
Budget Account Number: Grant? 0 Yes ❑No
W20108.64110.330
Budget? 0 Yes ❑ No Type: N/A
Vendor Name: Category:
Scarsella Bros., Inc. Contract
Vendor Number: Sub-Category:
C 34547 Change Order#2
0
Project Name: 2023 Watermain Replacement
E
L
0 Dig up two 16"valves connected to the City of Kent's 16"Ameron watermain in the intersections of 84th Avenue South&
Project Details:South 212th Street and 84th Avenue South&South 208th Street to attempt replacement of non-working bypass valves
with new City of Kent provided 16"butterfly valves.All work tracked and quantified on force account sheets 2 through 5.
i1+
C
W
E Agreement Amount: $88,904.15 Basis for Selection of Contractor: Bid
N
i Start Date: N/A Termination Date: 85 Working Days
Q Local Business? ❑Yes ❑No*
*I f meets requirements per KCC 3.70.7 00,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Notice required prior to disclosure? Contract Number:
❑Yes IZI No CAG2023-292
Date Received by City Attorney: Comments:
C
3
30
a,
a
p� Date Routed to the Mayor's Office:
V1
Date Routed to the City Clerk's Office:
,daW22373 120 Visit Documents.KentWA.gov to obtain copies of all agreements
1 4 000,0*0 0 •
KENT
WAS H I N G T O N
CHANGE ORDER NO. #2
NAME OF CONTRACTOR: Scarsella Bros., Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 2023 Watermain Replacement
ORIGINAL CONTRACT DATE: May 5, 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Dig up two 16" valves connected to the City of Kent s 16 Ameron
watermain in the intersections of 84th Avenue South & South 212th
Street and 84th Avenue South & South 208th Street to attempt
replacement of non-working bypass valves with new City of Kent
provided 16" butterfly valves. All work tracked and quantified on force
account sheets 2 through 5.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,346,673.84
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $4,726.25
(incl. applicable WSST)
Current Contract Amount $1,341,947.59
(incl. Previous Change Orders)
Current Change Order $80,748.55
Applicable WSST Tax on this Change $8,155.60
Order
Revised Contract Sum $1,430,851.74
CHANGE ORDER - 1 OF 3
Original Time for Completion 80 working days
(insert date)
Revised Time for Completion under 80 working days
prior Change Orders
(insert date) _
Days Required (f) for this Change Order 5 working days
Revised Time for Completion 85 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
7
- ✓ [� p p„ Digitally signed by Chad Bieren
Chad B I rG 1 1 Date:2024.01,11 11:52:53-08'00'
By. / By. _ —
Fsly ure) (signature)
Print Name: ZLjFX A!,� Print Name: Chad Bieren,_P.E.
Its� 7�_ LAC',_- Its Public Works Director
(titlze) (title)
DATE: I �V,ZQ 't DATE:
Al- EC - - -
CHANGE ORDER - 2 OF 3
ATTEST- APPROVED AS TO FORM:
(applicable if Mayor's signature required)
M&4,W- M,GCM4*.�C4 P4. IC44
Kent Law Department
Kent City Clerk
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
'''► File No. 200.2
T
CHANGE ORDER WORKSHEET NO. 2
Construction Engineering Division - Public Works
Project: 2023 Watermain Replacement Project No: 22-3002
Project Engineer: Almaroof Abdulnaser Fed-Aid No: N/A
Capital Projects .Josh Harris Contractor: Scarsella Brothers
Manager:
Date: 12/5/2023
I. Proposed Change
Dig up two 16" valves connected to the City of Kent's 16" Ameron watermain in the intersections of 84th Ave S & S
212th St and 84th Ave S & S 208th St, to attempt replacement of non working bypass valves with new City of Kent
provided 16 inch butterfly valves. All work tracked and quantified through Force Account, see sheets 2 thru 5.
H. Reason and Background for Change
The Water department asked during the 2023 Watermain Replacement Project precon if Scarsella would be interested
in attempting to replace two 16" bypass valves as a change order to the project. The bypasses on these valves have
been broken for a number of years, preventing the Water Department from isolating these areas for watermain
shutdowns. It was understood that the City had the replacement parts but was not equiped to take on the full
replacement. Scarsella agreed to the work, but only if work could be tracked on time and materials as there was
potential for unknowns that could not be priced effectively ahead of time. The City agreed. During execution of the
work it was determined existing valve removal would not be possible without cutting out portions of the old Ameron
pipe which would create a much longer shutdown, involving additional parts and specialty subcontractor in order to
complete. Understanding this, the Water Department made the decision to just have the valve bypasses removed which
was able to accomplish the original objective until a time when a more extensive project can be planned and organized
to replace the existing main and valves.
III. Method of Payment
NEW PAY ITEMS ❑Notapplicable
Sch. Total Est. Total Estimated Cost of
No Item Description t Unit Unit Price Item
II Valve Repair at 212th & 208th on 84th Ave S 1 FA $80,748.55 $ 80,748.55
New Pay Items Total: $ 80,748.55
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑✓ Not applicable
Sch
No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item
$ -
$ _
Page 1
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑✓ Not applicable
Sch Bid Item No. Item Description -7 Qty Unit Unit Price Cost of Item
No.
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $80,748.55
*Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 80 Due This Change Order: 5 Previous Total: 80
Explanation/Justification for Additional Working Days:
This work was not part of the original contracted days and took an additional 5 working days to complete since the project could
only be done on a night shift.
*TOTAL WORKING DAYS: 85
*This Change Order+ Previous Total
Capital Projects Manager: t ' Date: ��
Josh Harris
Construction Engineering Date:
Supervisor:
\f,4— —10--
Jaln Barry
Construction Manager: n� �' Date: 2
Er c Connor
Page 2
FA Sheet No.: 2
DAILY REPORT OF
FORCE ACCOUNT WORKED
Project Name: 2023 Watermain Replacement Project No: 22-3002
Item No.: Date: Monday 8/28/2023
Description of Work: 212th&208th Valve Replacement.Vactor and excavate around 16"valve in
the intersection of S 208th St and 84th Ave S
Work by Subcontractor?: NO
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Jay Krier 113.14 Foreman 8 95.69 $ 765.52
Dave Jacobs 226.47 Foreman 8 91.6 $ 732.80
Ty Williams 113.28 Pipe Layer 8 69.53 $ 556.24
Yorbin Martinez 113.18 Apprentic Laborer 8 60.94 $ 487.52
Abraham Feuchster 226.79 Vactor Operator 8 89.83 $ 718.64
Rober Lovell 332.81 Truck Driver 8 81.51 $ 652.08
Tania Lobben 113.02 TCS 8 63.33 $ 506.64
Bambi Gannon 113.02 TCS 8 63.33 $ 506.64
Hannah Ortega 113.01 Flagger 8 55.83 $ 446.64
Sara Watson 113.01 Flagger 81 55.83 $ 446.64
Seth Lucas 226.39 Operator 81 90.66 $ 725.28
Philip Norie a 113.08 Laborer 81 65.96 $ 527.68
SUBTOTAL-LABOR: $ 7,072.32
LABOR OVERHEAD&PROFIT @ 31% $ 2,192.42
LABOR TOTAL $ 9,264.74
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
2-299 Ford F-250 Pickup 8 27.21 $ 217.68
17-275 John Deer 50G 8 64.76 $ 518.08
3-122 Ford F-450 Tool Truck 8 36.04 $ 288.32
9-106 Dump Truck 8 105.59 $ 844.72
4-109 Vactor Truck 81 122.72 $ 981.76
2-352 TCS Pickup 81 25.44 $ 203.52
2-210 F-150 81 20.23 $ 161.84
SUBTOTAL-EQUIPMENT $ 3,215.92
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 675.34
EQUIPMENT TOTAL $ 3,891.26
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Hertz Rentals Inv#33987438-003,34002882-001,33994592-001.
33987438-001 1 LS $ 6,835.77 $ 6,835.77 *�
Icon Materials Aggregates Inv#3660625 1 LS $ 964.15 $ 964.15
Sunstate Equiptment Inv#11923895-001 1 LS $ 826.96 $ 826.96
Seattles Finest Security and Traffic Control Inv#28435 1 LS $ 7,227.00 $ 7,227.00
Del-Mar Concrete and Coring Inv#41418 1 LS $ 700.00 $ 700.00
SUBTOTAL $ 16,553.88
OVERHEAD&PROFIT @ 21% $ 3,476.31
TOTAL $ 20,030.19
Verification of Hours Worked: TOTAL: $ 33,186.19
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 33,186.19
Owner's Representative Date
Pay Estimate Entered:
Date:
By:
FINAL INVOICE
erc/')en talsr INVOICE N INV ICE DATE
33987438-003 09/14/2023
27500 Riverview Center Blvd INVOICE AMOUNT CURRENCY
Suite 100 USD
Bonita Springs,FL 34134 $ 4766.92
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
ACH PAYMENT
Beneficiary's Bank: L44217127869
ells Fargo
BILL TO: RTN/ABA#: 1000248
Acct#:
Beneficiary's Name: erc Rentals
CHECK PAYMENT ONLINE PAYMENT
SCARSELLA BROTHERS INCORPORATE , HERC RENTALS INC. /CONTROL
PO BOX 68697 P.O. Box 936257 By He RM&
SEATTLE,WA 98168-0697 Atlanta, GA 31193
PAY BY PHONE UESTIONST877-953-8778
AMOUNT EMCI.OSED:
To ensure accurate and timely posting,detach and send top portion with your payment ____.J--_ _-_-_
PO# RE UOTE # CUSTOMER#_.�...__..� SALES REP
SHOP--85 EXC 55330866 6677366 CODY DIETRICH
ORDERED BY I DELIVERED D BY SIGNED BY CLOSED BY
JERRY SOUTHWORTH R ALLEN WET SIGNATURE ISMAIL DIRIE
JOB# SITE
MAIN SHOP
TY EQUIPMENT# HRS MINIMUM HOUR DAY WEEK 4 WEEK AMOUNT
1 MINI-EXCAVATOR 14000-19000 LBS DSL CAB 8/715.00 3,19.17 715.00 1790.00 3779.00 3779.00
IC#.800414300 CAT/Class:2401710
Make:VOLVO Model:ECR88D Ser#:VCEOOE88EO0218068
Hours Free: 8 40 160
HP,OUT: 154.200 HR IN: 202.800 TOTAL: 48.600
FREE: 160.000 EXCESS: 0 HRS CHG: 23.619 (fin lot 47.24
WA EQUIPMENT RENTAL TAX 2217999990 N/C
1 BACKHOE BUCKET TRENCH 36IN QC 8/
IC#:800399869 CAT/Class: 2904170
Make:TAG Model:3632Q2 Ser#:4002581 N/C
WA EQUIPMENT RENTAL TAX 2217999990
1 BACKHOE BUCKET SMOOTH 48IN QC 8/55.00 9.17 55.00 130.00 380.00 380.00
IC#:248560013 CAT/Class:2904205
Make:CP Model:48031D Ser#: 256682
WA EQUIPMENT RENTAL TAX 2217999990 1790 ()a f 4f 4.75
SALES ITEMS: +130
QTY ITEMS ---------- UNIT PRICE AMOUNT
9.5 REFUEL 1920 EA 12.99 123.41
3741000001 - REFUEL SERVICE FEE- REVENU + 10.1 Sales Tax @ 193.92
2113.92
+ 47.24 1,11 o
4.75 51.11 je
ev°y 123.41
1�ancY m ---------------
E
y' 2289.32 Total G0C9G OOO.Zk9f
THIS INVOICE IS SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTArGSWE M NT
-- On finalustment Total
SHIP TO, RENTED FROM: RENTAL CHARGES 4159. 4159.00
SHOP HERC RENTALS 722 OTHER CHARGES 51. 51.99
19440 84TH AVE S 4403 20TH STREET EAST FUEL CHARGES 123. 123A1
KENT,WA 98032 FIFE,WA 98424 TAXABLE CHARGES 4282.41 4282.41
PH: 253-922-3852 TAX 432.52 l ?4 432.52
TOTAL CHARGES 4766.92 4766.92
RENTAL DAYS/HOURS: 17/3.72
INVOICE FROM: 8/28/23 8:31
INVOICE TO: 9 14 23 12:13
RENTAL START DATE: 8/28/23 8:30 LATE CHARGES MAY APPLY _
CUSTOMER#:6677366 RES/QUOTE#:55330866 INVOICE#:33987438-003 INVOICE DATE:09/14/2023
Page I of 1
FINAL INVOICE
,ercPen taisr°' INVOICE NO. INVOICE DATE
33994592-001 09/05/2023
/.500 Riverview Center Blvd INVOICE AMOUNT CURRENCY
suite 100
Bonita Springs,FL 34134 $ 1705.14 USD
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
ACH PAYMENT
Beneficiary's Bank: Wells Fargo
BILL TO: RTN/ABA#: 121000248
Acct#: 4217127869
Beneficiary's Name: Herc Rentals
CHECK PAYMENT ONLINE PAYMENT
SCARSELLA BROTHERS INCORPORATE HERC RENTALS INC. /CONTROL
PO BOX 68697 P.O, Box 936257 By H-P.MaM,
SEATTLE,WA 98168-0697 Atlanta, GA 31193
w f .Rer ,s.com
PAY BY PHONE/QUESTIONS: 877-953-8778
AMOUNT ENCLO5Ep:
To ensure accurate and timely posting,detach and send top portion with your payment
PO # RE5/ UOTE# I CUSTOMER # SALES REP
55340209 6677366 1 CHRISTOPHER HERTZ
ORDERED BY DELIVERED BY SIGNED BY CLOSED SY
JAY KRIER HERC WET SIGNATURE TREVOR GRIFFIS
JOB # SITE
2-SHOP-SHOP
TY EQUIPMENT# HRS MINIMUM HOUR DAY WEEK 4 WEEK AMOUNT
1 PUMP SUBMERSIBLE HV 5HP 3PH 3IN ELEC 8/ 100.00 16,67 100.00 293.00 876.00 100.00
IC#:800350373 CAT/Class: 8092020
Make: TSURUMI Model: KTV2-37 Ser#: 21698607007
WA EQUIPMENT RENTAL TAX 2217999990 1.25
1 PUMP SUBMERSIBLE HV 5HP 3PH 3IN ELEC 8/ 100.00 16,67 100.00 293.00 876,00 100,00
IC#: 800350376 CAT/Class:8092020
Make:TSURUMI Model: KTV2-37 Ser#: 21698607004
WA EQUIPMENT RENTAL TAX 2217999990 1.25
1 20KW GENERATOR DSL 8/276.00 46.00 276.00 683.00 1490.00 276,00
IC#: 800383613 CAT/Class: 5011020
Make: MULTIQUIP Model: DCA25SSIU4F Ser#: 7160922
LICENSE: WA 98944AH
Hours Free: 8 40 160
HR OUT: 504,500 HR IN: 510,000 TOTAL: 5.500
FREE: 8.000 EXCESS: 0 FIRS CHG: 34,500
WA EQUIPMENT RENTAL TAX 2217999990 3.45
1 20KW GENERATOR DSL 8/276.00 46,00 276.00 683,00 1490.00 276.00
IC#: 800388669 CAT/Class: 5011020
Make: MULTIQUIP Model: DCA25SSIU4F Ser#: 7160968
LICENSE: WA 31207AJ
Hours Free: 8 40 160
HR OUT: 850.000 HR IN: 856,700 TOTAL: 6.700
FREE: 8.000 EXCESS: 0 HRS CHG: 34,500
WA EQUIPMENT RENTAL TAX 2217999990 3.45
2 PUMP CONTROL PANEL MANUAL 8/ 15.00 2.50 15.00 30,00 90.00 30.00
9203620
WA EQUIPMENT RENTAL TAX 2217999990 .38
2 RUBBER SUCTION HOSE CAM CPLNG 3X20 8/ 10.00 1,67 10.00 25,00 75,00 20.00
9206406
WA EQUIPMENT RENTAL TAX 2217999990 .25
4 PVC DISCHARGE HOSE CAM CPLNG 3X50 8/24.00 4,00 24.00 45.00 135.00 96.00
9207306
WA EQUIPMENT RENTAL TAX 2217999990 1.20
2 EXT CORD 14/4X50 480V TWST LK 8/ 22.00 3.67 22.00 50,00 100.00 44.00
WATERPROOF
0030080
WA EQUIPMENT RENTAL TAX 2217999990 .55
SALES ITEMS:
QTY ITEMS UNIT PRICE AMOUNT
12 PREVENT MAINT$1.00 EA 1.00 12.00
3770000001 - PREVENTATIVE MAINTENANCE
CUSTOMER#:6677366 RE5/QUOTE#:55340209 INVOICE#:33994592-001 INVOICE DATE:09/05/2023
Page 1 of 2
FINAL INVOICE
lamPen E.a s" INVOICE NO. INVOICE DATE
33994592-001 09/05/2023
,500 Riverview Center Blvd INVOICE AMOUNT CURRENCY
.suite 100
Bonita Springs,FL 34134 $ 1705.14 USD
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
PO# RES UOTE # CUSTOMER # SALES REP
55340209 6677366 CHRISTOPHER HERTZ
ORDERED BY DELIVERED BY SIGNED BY CLOSED BY
JAY KRIER HERC WET SIGNATURE TREVOR GRIFFIS
308 # SITE
2 -SHOP-SHOP
TY EQUIPMENT# 1HRS/MINIMUMl HOUR I DAY I WEEK 1 4 WEEK I AMOUNT
SALES ITEMS:
QTY ITEMS UNIT PRICE AMOUNT
1 TRANS SRVC SURCHARGE 46.25 46.25
3710000001 -TRANS SERVICE SURCHARGE
1 TRANS SRVC SURCHARGE 46.25 46.25
3710000001 -TRANS SERVICE SURCHARGE
pOMer0'Y
o ensure accurate payment processing, please flu e a remittance with your payment.
f paying by ACH/Wire, send remittance to HercTimeChecks@hercrentals.com.
Credit Card Payments and E-Checks: Please log into your Pro Control NextGen account. To enroll please visit
ww.HercRentals.com
s your COI on file with Herc expired or about to be? Please send updated COI electronically to HerCCOI@hercrentais.com.
t. a a33aoa.no, 4 oao.001 tat 11. 13
1 SW,,50
ec eol a t -T 1G. I" v
THIS INVOICE IS SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT
Ori final Adjustment Total
RENTED FROM: RENTAL CHARGES 942.00 �942,00
SHOP HERC RENTALS S73 OTHER CHARGES 116.28 116.28
19440 84TH AVE S 1261 BOUSLOG RD DELIVERY/PICK UP 500.00 500.00
KENT, WA 98032 BURLINGTON,WA 98233 TAXABLE CHARGES 1.454.00 1454.00
PH: 360-707-2753 TAX 146.86 146.86
TOTAL CHARGES 1705.14 1705.14
RENTAL HOURS: 22.88
INVOICE FROM: 8/30/23 13:01
INVOICE TO: 8 31/23 12:53
RENTAL START DATE: 8/30/23 13:00 LATE CHARGES MAY APPLY
CUSTOMER#:6677366 RES/QUOTE#:55340209 INVOICE 4:33994592-001 INVOICE DATE:09/05/2023
Page 2 of 2
/a j�} y�{ FINAL INVOICE
,,er!�e t C d/S M INVOICE NO. INVOICE DATE
34002882-001 09/05/2023
,1600 Riverview Center Blvd INVOICE.AMOUNT CURRENCY
Suite 100
Bonita Springs,FL 34134 $ 1307.63 USD
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
ACH PAYMENT
Beneficiary's Bank: Wells Fargo
BILL TO: RTN/ABA#: 121000248
Acct#: 4217127869
Beneficiary's Name: Herc Rentals
CHECK PAYMENT ONLINE PAYMENT
SCARSELLA BROTHERS INCORPORATE HERC RENTALS INC. CONTROL
PO BOX 68697 P.O. Box 936257 By Nerc Re stale
SEATTLE,WA 98168-0697 Atlanta, GA 31193
n_kd.L�s etC.
PAY BY PHONE/QUESTIONS: 877-953-8778
AMOUNT ENCLOSER:
To ensure accurate and timely posting,detach and send top portion with your payment _
PO RES/ UOTE# CUSTOMER# SALES REP
DD ROLLER 6677366 CODY DIETRICH
ORDERED BY DELIVERED BY SIGNED BY CLOSED BY
NELSON CASEY SCOTT OUST CARE CENTRAL RE'ONLY EASTON DRESSEL
JOB# SITE
MAIN SHOP
TY EQUIPMENT 4 HRS MINIMUM HOUR DAY WEEK 4 WEEK AMOUNT
1 ROLLER RIDE-ON SMOOTH 471N DBL 3 TON 8/450.00 75,00 450.00 1100.00 2850.00 450.00
DSL
IC#. 800407300 CAT/Class: 1502860
Make.VOLVO Model: DD25B Ser#: VCEOD25BHOS271293
Hours Free: 8 40 160
HR OUT: 27,900 HR IN: 29.700 TOTAL: 1.800
FREE: 8.000 EXCESS: 0 HRS CHG: 56.250
WA EQUIPMENT RENTAL TAX 2217999990 5.63
1 TRAILER TILT 10000 LB 4/ 120.00 30.00 180.00 500.00 895.00 180.00
IC#. 800099926 CAT/Class:6101770
Make: FELLING Model: FT-10IT-I-G Ser#: 5FTEN232XH2O00741
LICENSE: WA 5351ZQ
VEHICLE LICENSING FEE 3790000001 1.50 per day 1,50
WA EQUIPMENT RENTAL TAX 2217999990 2,25
1 RATCHET LOAD BINDER F/3/8-1/2 CHAIN 8/ N/C
9134122 N/C
VEHICLE LICENSING FEE 3790000001 1.50 per day
WA EQUIPMENT RENTAL TAX 2217999990 N/C
1 TIE DOWN BINDER CHAIN G7 3/8 10-16 8/ N/C
9134106
VEHICLE LICENSING FEE 3790000001 1.50 per day N/C
WA EQUIPMENT RENTAL TAX 2217999990 N/C
SALES ITEMS:
QTY ITEMS UNIT PRICE AMOUNT
2.7 REFUEL EA 12.99 35.07
3741000001 - REFUEL SERVICE FEE-REVENU
1 TRANS SRVC SURCHARGE 36.08 36.08
3710000001 -TRANS SERVICE SURCHARGE
1 TRANS SRVC SURCHARGE 45.33 45.33
3710000001 -TRANS SERVICE SURCHARGE
o ensure accurate payment processing, please include a remittance with your payment.
If paying by ACH/Wire,send remittance to HercTimeChecks@hercrentals.com.
Credit Card Payments and E-Checks: Please log into your Pro Control NextGen account. To enroll please visit
www.HercRentals.com
s your COI on file with Herc expired or about to be? Please send updated COI electronically to HerCCOI@hercrentals.com.
CUSTOMER#:6677366 RES/QUOTE#: INVOICE 4:34002882-001 INVOICE DATE:09/05/2023
Page 1 of 2
FINAL INVOICE
W��+[�,r/ \e/ !y� a/S M INVOICE NO. INVOICE RATE
34002882-001 09/05/2023
,500 Riverview Center Blvd INVOICE AMOUNT CURRENCY
guile 100
Bonita Springs,FL 34134 $ 1307.63 USD
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
� (-A
PO # RESI UOTE# CUSTOMER # SALES REP
DD ROLLER 6677366 CODY DIETRICH
ORDERED BY DELIVERED BY SIGNED BY CLOSED BY
NELSON CASEY SCOTT OUST CARE/CENTRAL RES ONLY EASTON DRESSEL
JOB# SITE
MAIN SHOP
TY E UIPMENT# HRS MINIMUM HOUR DAY WEEK 4 WEEK AMOUNT
E 1 RI-"
Nancy pDOmeroy (1d
q�OCG,00t(a1 `7.
It 8- 98
Cc p Q t -ko tits 10-to
THIS INVOICE IS SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT
Origina{ Ad'ustment Total
,SHIP= RENTED FROM: RENTAL CHARGES 630.00 630,00
SHOP HERC RENTALS 717 OTHER CHARGES 90.79 90.79
19440 84TH AVE S 22868 PACIFIC HIGHWAY SOUT FUEL CHARGES 35,07 35.07
KENT,WA 98032 DES MOINES,WA 98198 DELIVERY/PICK UP 440.00 440.00
PH: 253-796-5070 TAXABLE CHARGES 1106,57 1106,57
TAX 111.77 111.77
RENTAL HOURS: =�77 TOTAL CHARGES 1307.63 1307.63
INVOICE FROM: 8/31/23 INVOICE T0: 9 Ol 73
RENTAL START DATE: 8/31/23 14:00 LATE CHARGES MAYAPPLY
CUSTOMER#:6677366 RES/QUOTE#: INVOICE#:34002882-001 INVOICE DATE:09/05/2023
Page 2 of 2
RENTAL INVOICE
r��/ \G���/�r" INVOICE NU, �f:CUR
OICE BATE
j 438-001 /05/2023
d�Riverview Center Blvd
fIfNVOICIE:AMOUNTRENCY
100 $ 1533.68 USD
Bonita Springs,FL 34134 TERMS
CUSTOMER NO.
For correspondence only(no payments) 6677366 Due Upon Receipt
ACH PAYMENT
Beneficiary's Bank: Wells Fargo
BILL TO: RTN/ABA#: 121000248
Acct#: 4217127869
Beneficiary's Name: Herc Rentals
CHECK PAYMENT ONLINE PAYMENT
HERC RENTALS INC. /CO�T�gL
SCARSELLA BROTHERS INCORPORATE P.O. Box 936257 By Herc Rentals
PO BOX 68697 Atlanta,GA 31193
SEATTLE,WA 98158-0697 > "rR�ntats c4'T�
PAY BY PHONE UESTIONS:877-953 8778
�AFM�O-UNTENCLOSED:
To ensure accurate and timely posting,detach and send top portion with your payment
CUSTOMER#_ SALES REP
PO # RES UOTE# 6677366 _ CODY DIETRICH
SHgP--85 EXC 55330866 CLOSED BY
DELIVERED BY SIGNED Tt
ORCERED BY, R,ALLEN WET SIGNATURE EASTCiN DRESSEL
�_^�•JERIiY SCIUTHWORTH JOB# StTE
MAIN SHOP
rY E UIPMENT# HRS MINIMUM HOUR DAY WEEK 4 WEEK AMOUNT
1 LIGHT TOWER VERT MAST LED TRAILER 8/ 185.00 30.83 185,00 475.00 935.00
IC#: 800400209 CAT/Class: 5101055
Make: GENERAC Model: G4-ECO2 Ser#: 3013162295
LICENSE: WA 74876PJ 8 40 160
Hours Free:
HR OUT: 679.800 HR IN: 702.900 TOTAL: 23.100
FREE: 48.000 EXCESS: 0 HRS CHG: 11.875 5.94
WA EQUIPMENT RENTAL TAX 221.7999990 475.00
1 LIGHT TOWER VERT MAST LED TRAILER 8/ 185.00 30.83 185.00 475.00 935.00
IC#. 800400227 CAT/Class: 5101.055
Make: GENERAC Model: G4-ECO2 Ser#: 3013162291
LICENSE: WA 79184AJ 8 40 160
Hours Free:
HR OUT: 494A00 HR IN: 521.500 TOTAL: 27.400
FREE: 48.000 EXCESS: 0 HRS CHG: 11.875 5.94
WA EQUIPMENT RENTAL TAX 2217999990
SALES ITEMS: UNIT PRICE AMOUNT
QTY ITEMS 34.23 34.23
1 TRANS SRVC SURCHARGE
3710000001-TRANS SERVICE SURCHARGE 0.00
TRANS SRVC SURCHARGE
3710000001-TRANS SERVICE SURCHARGE 34.23 34.23
1 TRANS SRVC SURCHARGE
371nnnnnnl -TRANS SERVICE SURCHARGE
o ensure accurate payment processing,please include a remittance with your payrflunt.
If paying by ACHtWire,send remittance to HercTimeChecks@hererentals.Com.
redit Card Payments and E-Checks: Please log into your Pro Control NextGen account. To enroll please visit
ww.HercRentals.com
s your COI on file with Herc expired or about to be'? Please send updated COI electronically to HercG01@hercrenta(s.com.
RES/QUOTE#:55330866 INVOICE#: 33987438-001 INVOICE DATE:09/05/2023
CUSTOMER#:6677365 Page 1 of 2
I
r,., RENTAL INVOICE
ercPen tale INVOICE NO. INVOICE DATE
33987438-001 09/05/2023
doo Riverview Center Blvd INVOICE AMOUNT CURRENCY
,,cite 100
Bonita Springs,FL 34134 $ 1533.68 USD
For correspondence only(no payments) CUSTOMER NO. TERMS
6677366 Due Upon Receipt
PO # RESint # CUSTOMER # i SALES REP
SHOP--85 EXC 55330866 6677366 CODY DIET'RICH
ORDERED BY DELIVERED BY SIGNED BY CLOSED BY
JERRY SOUTHWORTH R ALLEN WET SIGNATURE EASTON DRESSEL
JOB # SITE
MAIN SHOP
TY EQUIPMENT it 1-IRS MINIMUM HOUR DAY I WEEK 4 WEEK AMOUNT
ENTERED
By- Nancy Pomeroy
t• o a3300; q poU.00 t rates JI. 8
138$• �
C-f l7cS" k0.1
THIS INVOICE I5 SUBJECT TO THE TERMS AND CONDITIONS OF THE RENTAL AGREEMENT
Ori inal Ad ustment Total
TO: RENTEO FROM. RENTAL CHARGES_ — 950.00 950.00
SHOP HERC RENTALS 722 OTHER CHARGES 80.34 80.34
19440 84TH AVE S 4403 20TH STREET EAST DELIVERY/PICK UP 370.00 370.00
KENT,WA 98032 FIFE,WA 98424 TAXABLE CHARGES 1320.00 1320.00
PH: 253-922-3852 TAX 133.34 133.34
TOTAL CHARGES 1533.68 1533.68
RENTAL DAYS/HOURS 6/21.50 -
INVOICE FROM: 8/28/23 8:31
INVOICE TO: 9 04 23 7:00
RENTAL START DATE: 8/28/23 8:30 LATE CHARGES MAY APPLY
CUSTOMER#:6677366 RES/QUOTE 4:55330866 INVOICE#: 33987438-001 INVOICE DATE:09/05/2023
Page 2 of 2
BRANCH LOCATION PLEASE REMIT TO: CONTRACT TYPE: RENTAL RETURN
P.O. BOX 208439 INVOICE# 11923895-001
TRSEA PO# 2023 WATERMAIN REPI_.
SUNSIM 2 0 6-6 2 4-14 2 2 Dallas, TX 75320-8439 JOB# 2023 WATERMAIN REPL.
Equipment to. AFTER HR#:(253)294.3192
JOB NAME: 2023 WATERMAIN REPL..
CUSTOMER# 161634 PHONE#253-872-7173 _ ORDERED BY: JAY KRIER/SIERRAC/14
DATE/TIME OUT: 8/28123 7:00 AM
SCARSELLA BROS INC DATE/TIME IN: 9105/23 3:00 PM
PO BOX 68697
SEATTLE, WA 98168-0697
CONTACT: JAY KRIER 253-954-6754 TERRITORY:6 8 " PROCESSED BY: SIERRAC
DRIVER LICENSE: LICENSE PLATE: RETURN LOC: 708
JOB ADDRESS: 10400 SE 226TH ST KENT WA 98031
DEL. INSTRUCTIONS:
RENTAL RATES ARE FOR EACH ITEM AND DO NOT INCLUDE FUEL OR DELIVERY PAGE: 1
ITEM EQUIPMENT DESCRIPTION RATES EXTENDED
QTY EQUIP. # DAY WEEK 4 WEEK PRICE
1 SHORING-48" RELEASE TOOL 15.00 30.00 65.00 45.00
1 SHORING-PUMP CAN--PLASTIC 25.00 60.00 145.00 85.00
8 SHORING-KIT SHORE 1.5'-88 22.50 54.00 130.50 612.00
SALES ITEMS:
Qty Item number Unit Price
1 WAPPT EA 9.275 11CJ q� 9.Lt3
WA SB 5628 HEAVY EQUIPMENT RENTAL TAX
pameraY
BY=��nay aa3300;.0of 7000,00(ic1=
SUB TOTAL: 7 51 .28
CUSTOMER PROTECTION PLAN: ** N/A *
This contract has custom rates applied.
TAX: 7 5 . 6 8
TOTAL AMOUNT DUE: 826. 96
RENT CONTINUES UNTIL YOU CALL 1 206-624-1422 TO HAVE EQUIPMENT PICKED UP
CUSTOMER SIGNATURE PRINT CUSTOMER'S FU NAME DE3,IVERLA)BY DATE
7ERM5:NET 30 Uf ISSUANCE OF INVOICE(INVOICE DATE}.SERVICE CHARGES AT THE LESSER RATE OF 1.5%PER MONTH OR THE MAXIMUM RATE
PERMITTED BY LAW ON PAST DUE ACCOUNTS.
ASERVICEICLEANING CHARGE MAY RESULT DUE TO EQUIPMENT BEING RETURNED DAMAGED OR IN NEED OF EXCESSIVE CLEANING.
THE ENVIRONMENTAL FEE IS NOT REGULATED NOR COLLECTED BY OR FOR ANY GOVERNMENTAL AGENCY.
UNLAWFUL FAILURE TO RETURN RENTED PROPERTY MAY BE A FELONY, FINES,CRIMINAL PROSECUTION,ANDIOR IMPRISONMENT COULD RESULT.
BY SIGNING E I AGREE TO TERMS ON FRONT AND BACK OF THIS CONTRACT,I ALSO ACKNOWLEDGE RECEIVING INSTRUCTIONS AS TO THE SAFE
PROPER USE OFT HE EQUIPMENT,IN ADDITION, AGREE TO RECEIVE ELECTRONIC COMMUNICATIONS FROM SUNSTATE EQUIPMENT INCLU DING PHONEND
CALLS,EMAILS AND TEXT MESSAGES.TO READ MORE ABOUT THE TERMS OF USE REGARDING THESE COMMUNICATIONS,PLEASE VISIT
W W W.SUNSTATEEQUIP.COM/TERMSOFUSE.
{�EYI$e'd 09120
Customer No: 60467
Invoice No: 3660625
jl Inv Date: 08131/23
Page: Page 1 of 1
1508valenfineAveSE Customer Job: 233022
Pacific,WA 98047
A P\ &fiA �r�
Scarsella Brothers,Inc. ICON Materials
PO Box 68697 1508 Valentine Ave SE
Seattle WA 98168-0697 Pacific,WA 98047
206-575-3200
u M r Vl 2 M
M D
accounting@scarsellabros=m S )L
Delivered To: KENT 8Y: EIizabeth B o r d a
,2 qu QTY UM
3i5a)g-1 , Unit Price Matl Total Tax Total
Date CGode- Mate at De I
Plant:01500 Auburn S&G 62-81 TON 14.50 910.75 0.00 910,75
08/31/23 2379-1114--V CRUSHED ROCK 62.81 EA 0.50 31.41 0.00 31.41
08131/23 487000-Environmental Surcharge 62.81 EA 0,35 21.99 0.00 21�99
08/31123 467750-Fuel Surcharge-Ton
Total Invoice: 188A3 964.15 0.00 964.15
Ticket number(s)shipped from plant 01500-Auburn S&G
'150036920 *150036968
We Appreciate You and Your Business!
Now Portal Wobsito as of Sept.2021-https.,IlmycE?,7tralpromix.myamatportal,comI Questions?Accounts Receivable Department
Contact 509-536-3042-
Finance Charges will be applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount
Invoice Amount: 964.15
Amount Paid:
Customer Name: Scarsella Brothers,Inc.
Customer No: 60467 If you have any questions about your invoice please call 206-575-3200
Invoice#; 3660625
Date: 08/31/23 Remit Payment To: ICON Materials
Customer Job: 233022 PO Box 742421
Los Angeles,CA 90074
Due Date: 09/30/23
Please provide year email address b.r..if you...1d like W start receiving Y—in-rc.q
via email `U),
SEATME`S FINEST` 9%
Invoice
Office: 253-853-6608 Date Invoice#
PNW`S FINEST CEL: 253-225-1035
FAX: 253-858-8813
9/5/2023 28435
PO Box 209 apevans(aseafinest.com
West Glacier,MT 59936
Bill To
Scarsella Bros
PO Box 68697
Seattle, WA 98168
P/W/O # Terms Job# Job Site
233002 Due on receipt 2023 Waterline Improvements 84 Ave S/S 212 St-Kent
Date Officer Item Hours Rate Total Amount
8/28/2023 Giles Night Traffic Con... 5.5 1 1 1.00 610.50
8/28/2023 Shumate Night Traffic Con... 5.5 111.00 610.50
8/29/2023 Holdam Night Traffic Con... 5.5 1 1 1.00 610.50
8/29/2023 Houseberg Night Traffic Con... 5.5 111.00 610.50
8/30/2023 Estes Premium Rate 10 145.00 1,450.00
8/30/2023 Wong Premium Rate 10 145.00 1,450.00
8/31/2023 Ellis Premium Rate 6.5 145.00 942.50
8/31/2023 Estes Premium Rate 6.5 145.00 942.50
Thank you for your business. Total
$7.227.00
Payments/Credits SO 00
Balance Due $7,227.00
,L-MAR CONCRETE
4_,UTTING & CORING Invoice
152 100th St. S.
Tacoma, WA 98444
Ph # (253) 537-0109
FAX # (253) 535-0507
D . z' DATE JOB NO.
Ot 6A 97 CONTACT PERSON
U16(? JOB LOCATION
'RMS: NET 30 DAYS, UNLESS OTHERWISE NOTED.
T
F' DESCRtPTtON AMOUNT
10—
,AVFL
t. o.) 3 30od. do I ql)00'00
A FINANCE CHARGE OF 1.5% ON THE UNPAID PREVIOUS BALANCE WILL BE
COMPUTED AT THE END OF EACH MONTH. IF CUSTOMER DEFAULTS OR IF SUIT
IS BROUGHT TO COLLECT ANY OF THE PRINCIPAL OR INTEREST DUE OR OWIN(3r' A'4
UNDER THIS BILL, DEL-MAR MAY CHARGE CUSTOMER REASONABLE ATTORNEY
FEES AND COLLECTION COSTS.
FA Sheet No.: 3
DAILY REPORT OF
FORCE ACCOUNT WORKED `•�Eri r
Project Name: 2023 Watermain Replacement Project No: 22-3002
Item No.: Date: Tuesday 8/29/2023
Description of Work: 212th&208th Valve Replacement.Vactor and excavate around 16"valve
in the intersection of S 212th St&84th Ave S
Work by Subcontractor?: NO
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Jay Krier 113.14 Foreman 8 95.69 1 129.38 $ 894.90
Dave Jacobs 226.47 Foreman 8 91.6 1 123.28 $ 856.08
Ty Williams 113.28 Pipe Layer 8 69.53 1 95.81 $ 652.05
Yorbin Martinez 113.18 Apprentic Laborer 8 60.94 1 83.02 $ 570.54
Abraham Feuchster 226,79 Vactor Operator 8 89.83 $ 718.64
Rober Lovell 332.81 Truck Driver 8 81.51 $ 652.08
Tania Lobben 113.02 TCS 8 63,33 $ 506.64
Bambi Gannon 113.02 TCS 8 63.33 $ 506.64
Hannah Ortega 113.01 Flagger 8 55.83 $ 446.64
Sara Watson 113.01 Flagger 1 8 55.83 $ 446.64
Seth Lucas 226.39 Operator 1 81 90.66 1 121.89 $ 847.17
Philip Norie a 113,08 Laborer 1 81 65.96 $ 527.68
SUBTOTAL-LABOR: $ 7,625.70
LABOR OVERHEAD&PROFIT @ 31% $ 2,363.97
LABOR TOTAL $ 9,989.67
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
2-299 Ford F-250 Pickup 8 33.63 $ 269.04
17-275 John Deer50G 8 64.76 $ 518.08
3-122 Ford F-450 Tool Truck 8 36.04 $ 288.32
9-106 Dump Truck 8 105.59 $ 844.72
4-109 Vactor Truck 8 122.72 $ 981.76
2-352 TCS Pickup 8 25.44 $ 203.52
2-210 F-150 8 20.23 $ 161.84
SUBTOTAL-EQUIPMENT $ 3,267.28
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 686.13
EQUIPMENT TOTAL $ 3,953.41
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT
Is
SUBTOTAL $
OVERHEAD&PROFIT @ 21% $
TOTAL $
Verification of Hours Worked: TOTAL: $ 13,943.08
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 13,943.08
Owner's Representative Date
Pay Estimate Entered:
Date:
By:
Project 2023 Watermain Replacement Project# 22-3002
Date 8/29/2023 0 Workable Day Of the Week Tuesday
Weather:AM Overcast
Weather: PM Rain
Contractor Scarsella Bros. Inc. Submit Representative Jay Krier
Location and Type of Work
Contractor's Active Men and Equipment
•Dump truck-#106 W/Volvo 88 Excavator and tilt deck trailer driven by Bob Lovell
-Dump truck#107 Solo driven by Seth Lucas (operator)
•F-450#3-122 W/DEERE 50 mini ex/hoe pack/tilt deck driven by Dave Jacobs (operator)
•F-250#2-23 W/double drum roller/tilt deck Ty Williams (pipelayer)
•F-250 Jay Krier(Foreman)
•F-150#2-210 Bambie Gannon (Flagger)
*Chevy Colorado#2-352 Tanya Lobin (TCS)
•Isuzu sign truck#3-78 Philip Noriega (flagger/Laborer)
•F-650 W/arrow board
-Arrow board x 5
•Light plant x
•Flagger—Hannah Ortega
•Flagger- Sarah Watson
•Laborer- Yorbin Martinez
Abraham Feuchster-vactor truck
Contractor's Inactive Equipment
Diary
Scarsella began @ 8pm setting up the traffic control per the approved plan. UPO's arrived @ 815pm. @815 PM Reggie from
King County Metro arrived and informed PM that he was not notified of the lane closures. PM explained that the buses will be
escorted through to make the left turns. Reggie agreed. Scarsella removed the asphalt and began excavating for the valve on
212th and 84th. During excavation Crews encountered two unknow 4" pipes on the north side of the hole.. The pipes were
empty and damaged so they were removed. Crews continued excavating and found a 1' and 2' unknow utility crossing over
the valve. Crews began using the vactor truck to complete the excavation. Crews found large chunks of concrete resting on
top of the existing water main.The valve was exposed and Crews discovered the 4 bolts that hold the bypass on are studs that
will need to be removed. Crews were successful in removing the four studs. Additional shoring was placed and steel plates
were placed @ 1pm. Cold mix was placed and crews began picking up traffic @ 2am.
FA Sheet No.: 4
DAILY REPORT OF
FORCE ACCOUNT WORKED
Project Name: 2023 Watermain Replacement Project No: 22-3002
Item No.: Date: Wednesday 8/30/2023
Description of Work: 212th&208th Valve Replacement.Shut down watermain.Cut out b ass's
on 16"valve and blindflan e openings.Backfill with 5/8 gravel.
Work by Subcontractor?: NO
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Jay Krier 113.14 Foreman 8 95.69 3 129.38 $ 1,153.66
Kent Howard 226.45 Operator 8 91.6 2 123.28 $ 979.36
Casey Nelson 226.45 Operator 8 91.6 2 123.28 $ 979.36
Dave Jacobs 226.47 Foreman 8 91.6 3 123.28 $ 1,102.64
T Williams 113.28 Pipe Layer 8 69.53 3 95.81 $ 843.67
Yorbin Martinez 113.18 Apprentic Laborer 8 60.94 3 83.02 $ 736.58
Abraham Feuchster 226.79 Vactor Operator 7 89.83 4 120.65 $ 1,111.41
Rober Lovell 332.81 Truck Driver 8 81.511 2 108.86 $ 869.80
Tania Lobben 113.02 TCS 8 63.331 2.5 86.57 $ 723.07
Bambi Gannon 113.02 TCS 8 63.33 2.5 86.57 $ 723.07
Hannah Ortega 113.01 Flagger 8 55.83 2.5 75.4 $ 635.14
Sara Watson 113.01 Flagger 8 55.83 2.5 75.4 $ 635.14
Seth Lucas 226.39 Operator 8 90.66 3 121.89 $ 1,090.95
Philip Norie a 113.08 Laborer 8 65.96 2.5 90.49 $ 753.91
SUBTOTAL-LABOR: $ 12,337.76
LABOR OVERHEAD&PROFIT @ 31% $ 3,824.71
LABOR TOTAL $ 16,162.47
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
2-299 Ford F-250 Pickup 8 33.63 $ 269.04
17-275 John Deer 50G 8 64.76 $ 518.08
3-122 Ford F-450 Tool Truck 8 36.04 $ 288.32
9-106 Dump Truck 8 105.59 $ 844.72
4-109 Vactor Truck 8 122.72 $ 981.76
2-352 TCS Pickup 8 25.44 $ 203.52
2-258 F-150 8 20.23 $ 161.84
2-327 F-350 10 33.31 $ 333.10
2-210 F-150 8 20.23 $ 161.84
SUBTOTAL-EQUIPMENT $ 3,762.22
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 790.07
EQUIPMENT TOTAL $ 4,552.29
MATE RIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
SUBTOTAL $
OVERHEAD&PROFIT @ 21% $
TOTAL $ -
Verification of Hours Worked: TOTAL: $ 20,714.76
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 20,714.76
Owners Representative Date
Pay Estimate Entered:
D ate:
By:
Project 2023 Watermain Replacement Project# 22-3002
Date 8/30/2023 V Workable Day Of the Week Wednesda
Weather:Aft
Weather: PM
Contractor Scarsella Bros. Inc. Submit representative Jay Krier
Location and Type of Work
Contractor's Active Men and Equipment
•Dump truck-#106 W/Volvo 88 Excavator and tilt deck trailer driven by Bob Lovell
*Dump truck#107 Solo driven by Seth Lucas (operator)
•F-450#3-122 W/DEERE 50 mini ex/hoe pack/tilt deck driven by Dave Jacobs (operator)
•F-250#2-23 W/double drum roller/tilt deck Ty Williams (pipelayer)
•F-250 Jay Krier(Foreman)
•F-150#2-210 Bambie Gannon (Flagger)
-Chevy Colorado #2-352 Tanya Lobin (TCS)
•lsuzu sign truck#3-78 Philip Noriega (flagger/Laborer)
•F-650 W/arrow board
*Arrow board x 5
*Light plant x 2
•Flagger—Hannah Ortega
•Flagger- Sarah Watson
•Laborer- Yorbin Martinez
Abraham Feuchster-Vactor Truck
Kent Howard
Casey Neslon
Contractor's inactive Equipment
Diary
Crews started to set up traffic control for both 208th and 212th sections at 8pm.The water department showed up and
turned the main off by 11pm. Scarsella crews cut the bypass valves off the old 16 valves to drain the water out of the main.
Crews spent a couple hours getting the old bolts out of the flanges on the 16" valves. Scarsella was unable to break the valves
out from the flanges without risking breaking the ameron pipe so at the guidance of the water department we decided to
stop. Scarsella sealed the flanges back up with new bolts and caps the bypass flanges so that the valves will function. We put
steal plates over the holes and opened the road up at 6am.
FA Sheet No.: 5
DAILY REPORT OF
Oil 10.
FORCE ACCOUNT WORKED /KEN-r
Project Name: 2023 Watermain Replacement Project No: 22-3002
Item No.: Date: Thursday 8/31/2023
Description of Work: 212th&208th Valve Replacement. Compact excavated areas and hot mix
patch work areas on S 208th st and S 212th St.
Work by Subcontractor?: No
Prime Contractor: Scarsella Bros Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs I OT Rate AMOUNT
Jay Krier 113.14 Foreman 8 95.69 0.51 129.38 $ 830.21
Dave Jacobs 226.47 Foreman 8 91.6 0.5 123.28 $ 794.44
Ty Williams 113.28 Pipe Layer 8 69.53 0.5 95.81 $ 604.15
Yorbin Martinez 113.18 Apprentic Laborer 8 60.94 0.5 83.02 $ 529.03
Rober Lovell 332.81 Truck Driver 8 81.51 $ 652.08
Tania Lobben 113.02 TCS 8 63.33 0.5 86.57 $ 549.93
Bambi Gannon 113.02 TCS 8 63.33 0.51 86.57 $ 549.93
Hannah Ortega 113.01 Flagger 8 55.83 0.5 75.4 $ 484.34
Sara Watson 113.011 Flagger 8 55.83 0.5 75.4 $ 484.34
Seth Lucas I 226.39 Operator 81 90.66 0.5 121.891 $ 786.23
Philip Norie a 113.081 Laborer 81 65.96 0.5 90.49 $ 572.93
SUBTOTAL-LABOR: $ 6.837.61
LABOR OVERHEAD&PROFIT @ 31% $ 2,119.66
LABOR TOTAL $ 8,957.27
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
2-299 Ford F-250 Pickup 8 33.63 $ 269.04
17-275 John Deer 50G 8 64.76 $ 518.08
3-122 Ford F-450 Tool Truck 8 36.04 $ 288.32
9-106 Dump Truck 8 105.59 $ 844.72
2-352 TCS Pickup 81 25.441 $ 203.52
2-210 F-150 1 81 20.23 $ 161,84
SUBTOTAL-EQUIPMENT $ 2,285.52
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 479.96
EQUIPMENT TOTAL $ 2,765.48
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT
Icon Asphalt Inv#60467 1 Tn $ 976.67 $ 976.67
$
SUBTOTAL $ 976.67
OVERHEAD&PROFIT @ 21% $ 205.10
TOTAL $ 1,181.77
Verification of Hours Worked: TOTAL: $ 12,904.52
12%MARKUP (for prime when
subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 12,904.52
Owner's Representative Date
Pay Estimate Entered:
Date:
By:
Project 2023 Watermain Replacement Project# 22-3002
Date 8/31/2023 V Workable Clay Of the Week Thursday
Weather:AM overcast
Weather: PM overcast
Contractor Scarsella Bros. Inc. Submit Representative Jay Krier
Location and Type of Work
Contractor's Active [glen and Equipment
-Dump truck-#106 W/Volvo 88 Excavator and tilt deck trailer driven by Bob Lovell
-Dump truck#107 Solo driven by Seth Lucas (operator)
•F-450#3-122 W/DEERE 50 mini ex/hoe pack/tilt deck driven by Dave Jacobs (operator)
•F-250#2-23 W/double drum roller/tilt deck Ty Williams (pipelayer)
•F-250 Jay Krier(Foreman)
•F-150#2-210 Bambie Gannon (Flagger)
*Chevy Colorado #2-352 Tanya Lobin (TCS)
•lsuzu sign truck#3-78 Philip Noriega (flagger/Laborer)
•F-650 W/arrow board
*Arrow board x 5
*Light plant x 2
•UPO— Roy Ellis
•UPO—Andy Estes
•Flagger—Hannah Ortega
•Flagger- Sarah Watson
•Laborer- Yorbin Martinez
*Dirt Squeezer- Jamie Hicks
Contractor's Inactive Equipment
Diary
At 7:30PM traffic control was near completion. Crews began compaacting and asphalting the intersection of S 212th St & 84th
Ave S before moving to the intersection of S 208th St & 84th Ave S. At around 2:10 AM Scarcella had completed their final lift
at 208th and east valley. Scarsella had to wait for asphalt to cool before removing the ramaining traffic control to open the
road back up.
Customer No: 60467
r7 F I Invoice No: 3660672
—, j 0
V L-- LAI Inv Date: 08/31123
Page: Page I of I
SEP 0-5 20-1
1508 Valentine Ave SE
Pacific,WA 98047
�0 ODI SCARSELLA BROS, INC,
Scarsella Brothers,Inc. ICON Materials
PO Box 68697 1508 Valentine Ave SE
Seattle WA 98168-0697 Pacific,WA 98047
206-575-3200
accouriting@s(;arsellabros.com
SEP 2 7
Delivered To: 84th&212th Kent By: Elizabeth,Borda
4 -3
b 7 CITY Um Unit Price Matt Total Tax Total
Date Mode - Material DescriP
Plant:04504 Seattle Asphalt 12.08 TON 80.50 972.44 0100 972.44
08131123 12144230-11Z-PG 581-1-22(64-22) 12.08 TON 0.35 4.23 0.00 4.23
08131123 467750-Fuel Surcharge-Ton
Total Invoice: 24.116 976.67 0.00 976.67
Ticket number(s)shipped from plant 04504-Seattle Asphalt
*45438662
We Appreciate You and Your Business!New Portal Website as of Sept.2021-hUpsa/mycentra/premix.myamatpartal.com/Questions?Accounts Receivable Department
Contact 509-5,36-3042.
Finance- .. Charges.will be..applied to any late invoices at a rate of 1.5%per month per credit agreement or the State's Lawful Amount
Invoice Amount: 976.67
Amount Paid:
Customer Name: Srarsella Brothers,Inc.
Customer No: 60467 If you have any questions about your invoice please call 206-575-3200
invoice#: 3660672
Date: 08/31/23 Remit Payment To: ICON Materials
PO Box 742421
Los Angeles,CA 90074
Due Date: 09/30/23
pl..s.provide your email-010--t--I-w it you would Ilk.I.M.1t 4 ;c
Harris, Josh
From: Barry, Jason
Sent: Tuesday, August 22, 2023 12:17 PM
To: Harris, Josh
Subject: FW: 2023 WM 16" Valve Replacement
FYI...
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent:Tuesday, August 22, 2023 12:10 PM
To: Connor, Eric<EConnor@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov>
Cc: Barry, Jason <JBarry@kentwa.gov>; Bauer, Sean<SBauer@kentwa.gov>
Subject: RE: 2023 WM 16" Valve Replacement
Thank you for keeping us in the loop Eric.
Kelly
From: Connor, Eric<EConnor@kentwa.gov>
Sent:Tuesday, August 22, 2023 11:37 AM
To: Peterson, Kelly<KPeterson@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov>
Cc: Barry,Jason <JBarry@kentwa.gov>; Bauer, Sean<SBauer@Ientwa.gov>
Subject: RE: 2023 WM 16"Valve Replacement
Chad / Kelly,
It has been a while, but this work is scheduled to being on Monday, August 28 at night. They
are anticipating 4 nights to complete the work.
Please let me know if you have any questions or concerns.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT, WASHINGTON
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent:Thursday,June 29, 2023 3:49 PM
To: Connor, Eric<EConnor@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov>
Subject: RE: 2023 WM 16" Valve Replacement
Thank you for discussing this issue, please proceed with the replacement of the water valves
using T&M.
1
Thank you,
Kelly
Kelly Petermon, AJCP, Deputy
Public Works Department
220 Fourth Avenue South, Kent' VVA98032
Phone253-856-5547 [aU253-740-8066
CITY OFKEmT, WASHzMGT0N
8&elt8A.gov Face&ogk yoy0uUbe
PLEASE cCzmmooEurwm umFOms PRINTING rxmyE-MAIL
From: Connor, Eric »
Sent:Thursday,June 29, 2023 1:58 PM
To: Peterson, Kelly >; 8ieren, Chad
Subject: FVV: 2U23VVMl6" Valve Replacement
Any thoughts OOthis?
Eric Connor, construction Engineering Manager
pxone2so-ms6-ssn3 | ce|| os3-797-m6ga
CITY OFmemT, VvASuzmmnOm
pLc^�uuomszu'ER rnssmvzknnm*mRoUnwapmxwrzwonusc'w^z�
From: Harris,Josh < >
Sent: Wednesday,June Z8' Z02312:24PM
To: Connor, Eric x »; Barry,Jason < >
Cc: Bryant,Jason < >
Subject: Re: 2023VVM 16"Va|ve Replacement
Sean is willing to move forward with Scame||asestimate.
Get Outlook for USFrom: Connor, Eric >
Sent: Wednesday,June %8, 28231O:42:4OAM
To: Harris,Josh ; Barry,Jason >
Cu: Bryant,Jason
Subject: RE: ZO23VVM16" Valve Replacement
Thank you, Josh. Yes, let's get an idea what S8an'S expectations for the cost of this are. l will
talk with Kelly about it when he is dVa||db|e.
Eric Connor, Construction Engineering Manager
phoneas3-856-sss3 | ce|| 2so-797-m693
CITY OrmEwT, VvmmHzmmrOm
p�c�o^.cowe,o''nn,�uwvzm�m,�umrmcrowspn�m,zm�r,00" ,^^z�
From: Harris,Josh
Sent:Wednesday,June 28, JO239:33AM
To: Barry,Jason >; Connor, Eric
Cc: Bryant,Jason<JBrVant!2kentwa.go >
Subject: Re: 2023 WM 16"Valve Replacement
Eric,
Do you want me to have a conversation with Sean about this?
From: Barry,Jason <JBarrV@ken,t,wa.gov>
Sent: Tuesday,June 27, 2023 9:26 AM
To: Connor, Eric<EConnor@kentwa.go >
Cc: Bryant,Jason <JBryant@kentwa.gov>; Harris, Josh <JHarris@kentwa.go >
Subject: FW: 2023 WM 16" Valve Replacement
Eric,
Attached is Scarsella's rough estimate of costs for cutting in the two valves on EVH. This
estimate figures one 10 hour shift to expose and prep each location (say Monday & Tuesday),
one shift to install valves at both locations (Wednesday) and one shift to backfill and get
everything patched (Thursday), and then a worst case one shift (Friday) if something goes
wrong. The estimate is likely high, so I'd propose doing work on FA and pay actual costs with
mark-ups with a follow on CO at the end of install.
Let us know what you think.
Thanks,
Jason
Jason Barry, capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 I Cell 253-797-8462
KENT 91 Ib—a—rry-@KQntWA99v_
www.KentWA.gov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
3
From: Harris,Josh <JHarris@kentwa.gov>
Sent:Tuesday,June 27, 2023 9:10 AM
To: Barry,Jason <JBarry@kentwa.gov>
Subject: Fwd: 16" Valve Replacement
Get Outlook for iOS
From: Ben Blanchard <Ben.B SCARSELLABROS.COM>
Sent: Monday,June 26, 2023 1:44:20 PM
To: Bryant,Jason <JBryant@kentwa.gov>; Harris,Josh<JHarris@kentwa.gov>
Cc: Casey Nelson <casey.n@SCARSELLABROS.COM>
Subject: 16" Valve Replacement
IEXTERNAL EMAIL I
Jason and Josh, here is a rough estimate. I plugged in more flagging than we may need and assumed one cut in per night.
Depending on the TCP we may be able to adjust the flaggers. The only thing I don't have is if there is a fee to open the
asphalt plant, which I should get today or tomorrow. Let me know what you think.Thanks
Ben
Ben Blanchard
Scarsella Bros., Inc.
O: 253.872.7173 1 G: 206.775.5409 ( E: Ben B(a)scarsellabros.com
PO Box 68697 Seattle, Washington 98165
4
Project 2023VVatermain Replacement Project 22-3002
Date 8/28/2023 VVVorkabUe Day Of the Week Monday
Weather:AK8Sunny
Weather: PM Cloudy
Contractor 3cameUa Bros. Inc. Submit Representative ]ayKrier
Location and Type ofWork
'
Contractor's Active Men and Equipment
-Dump truck #106VV/Vo|vo OQ Excavator and tilt deck trailer driven by Bob Lovell
*Dump truck#l07 Solo driven by Seth Lucas (operator)
*F-450#3-122 W/DEERE 50 mini ex/hoe pack/tilt deck driven by Dave Jacobs (operator)
°F'250#2-23 VV/duub|odrum ro||er/ti|tdeck Ty Williams (pipe|ayer)
°F'258 Jay Krier(Fo/eman)
°F'150#2'2lUBanobie Gannon (F|ugOer)
-Chevy Colorado #Z'3SI Tanya Lobin (TCS)
°|suzu sign truck#3'78 Philip NurieBa /8a88e[/Laborer)
°F'6SOVV/arrnwboard
-Arrow board xS
°LiQht plant x 2
°F|agQe/—Hannah Ortega
°F|agger Sarah Watson
*Laborer YnrbinK4arbnez
AbrahumFeuchste/-VactorTruck
Contractor's Inactive Equipment
Diary
Crews started setting up traffic control at8pm ut208th and 84th st. Once traffic control was complete they saw cut around
the water valve at both 208th and 212th st. Crews pulled asphalt and began excavation around the water valve. Crews
encounterd a 4" unmarked white conduit. After excavating further we found the Marked fiber just below the watermain.
Crews finished excavation and started pulling traffic control at about 130am.