HomeMy WebLinkAboutCAG2023-217 - Change Order - #5 - ICON Materials - 2023 Asphalt Overlays - 01/08/2024 Agreement Routing Form
• For Approvals,Signatures and Records Management
This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
KEN T
WASHINGTON (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required:
> 1/8/2024 N/A
0
I-
Q. Authorized to Sign: Date of Council Approval:
0 Director or Designee ❑ Mayor 4/7/2023
Q
Budget Account Number: Grant? ❑Yes 0 No
R20124.64110.120
Budget? 0 Yes ❑ No Type: N/A
Vendor Name: Category:
ICON Materials Contract
Vendor Number: Sub-Category:
34467 Change Order#5
JProject Name: 2023 Asphalt Overlays
E
� Project Details:This change order provides complete payment for all labor, tools, materials
*, and equipment necessary for the installation of raised pavement markers
c
Agreement Amount: $10,357.76 Basis for Selection of Contractor:
E Bid
m
i Start Date: N/A Termination Date: 136 Working Days
Q Local Business? ❑Yes ❑ No*
*If meets requirements per KCC 3.10.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Notice required prior to disclosure? Contract Number:
❑Yes 0 No CAG2023-217
Date Received by City Attorney: Comments:
Im
C
a+
3 0
a,
a,
cc
ph Date Routed to the Mayor's Office:
V1
Date Routed to the City Clerk's Office: 61 `l
aa«W22373 , z0 Visit Documents.KentWA.gov 4 obtJ copies of all agreements
��•
,KcNT
WASHINGTON
CHANGE ORDER NO. 5
NAME OF CONTRACTOR: ICON Materials ("contractor")
CONTRACT NAME & PROJECT NUMBER: 2023 Asphalt Overlays
ORIGINAL CONTRACT DATE: April 7, 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
This change order provides complete payment for:
all labor, tools, materials, and equipment necessary for the installation
of raised pavement markers.
Add bid item to SCH I-Raised Pav Markers 8.5 HND $896 $7,616
Add bid item to SCH II-Raised Pay. Markers 3.06 HND $896 $2,741.76
Total change order $10,357.76
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,872,117.50
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $108,112.83
(inch applicable WSST)
Current Contract Amount $2,980,230.33
(incl. Previous Change Orders)
Current Change Order $10,357.76
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $2,990,588.09
CHANGE ORDER - 1 OF 3
Original Time for Completion 130 working days
(insert date)
Revised Time for Completion under 136 working days
prior Change Orders
(insert date)
Days Required (f) for this Change 00 working days
Order
Revised Time for Completion 136 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
,,J pn Digitally signed by Chad 8ieren
Chad �IerGl 1 Date:2024.01.08
By. �y/f_ _ ��G�Jy� By: 08:56:56-08'00'
��1L2 (signature) (signature)
Print Name: TyierTownsend Print Name: Chad Bieren, P.E.
Its Project Manager Its Public Works Director
(title) (title)
DATE: 01/03/2024 DATE:
AF EC
KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Mel;,". MCA 01.1 a 4 4
Kent City Clerk Kent Law Department
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
KENT
w,.III.oT..
CHANGE ORDER WORKSHEET NO. 5
Construction Engineering Division - Public Works
Project: 2023 Asphalt Overlay Project No: 23-3001.1
Project Engineer: Alex Murillo Fed-Aid No: n/a
Capital Projects Brian Shields Contractor: ICON Materials
Mana
Date: 12/20/2023
I. Proposed Change
This change order provides complete payment for:
all labor, tools, materials, and equipment necessary for the installation of Raised Pavment Markers.
Add bid item to Schedule I - Raised Pavement Markers 8.5 HND $896 $7,616.00
Add bid item to Schedule II- Raised Pavement Markers 3.06 HND $896 $2,741.76
Total change to contract: 10 357.76
II. Reason and Background for Change
This contract did not include a bid item for the installation with Raised Pavement Markings. The markings are
required as part of the City of Kent's channelization standard and were installed during construction in
multiple locations. Price was negotiated with the contractor and amounts to $10,357.76. Approval was
obtained by Deputy Director of Public Works on Dec 19,2023.
III. Method of Payment
NEW PAY ITEMS ❑Not applicable
Sch. Total Est. Total Estimated Cost of
No
Item Description t Unit Unit Price Item
I Raised Pavement Markers 8.5 HND $896.00 $ 7,616.00
Raised Pavement Markers 3.06 HND $896.00 $ 2,741.76
New Pay Items Total: $ 10,357.76
DELETE EXISTING PAY ITEM(S) per 1-09.5 OO Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
N o.
$ - - _-
$
Page 1
Delete Existing Pay Items Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) Q Nofapplicable
Soh No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item
$
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $10,357.76 -�
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 130 FDue This Change Order: 3 Previous Total: 130
Explanation/Justification for Additional Working Days:
*TOTAL WORKING DAYS: 133
* This Change Order+ Previous Total
Capital Projects Manager: i Date:
i2 -28 •Z-o23
Brian Shields
Construction Engineering Date:
Supervisor: I l
J on Barry
Construction Manager: Date: Z 2
rEric Connor
Page 2
Shields, Brian
From: Connor, Eric
Sent: Wednesday, December 20, 2023 6:32 AM
To: Shields, Brian
Cc: Barry,Jason
Subject: FW: [EXT] 23 Overlays - RPMS
Eric Connor, Construction Engineering Manager
Phone 253-856-SS33 I Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent:Tuesday, December 19, 2023 3:49 PM
To: Connor, Eric<EConnor@kentwa.gov>
Cc: Barry,Jason <JBarry@kentwa.gov>; Bieren,Chad<CBieren@kentwa.gov>
Subject: RE: [EXT] 23 Overlays- RPMS
Eric-
Thank you for discussing the RPMs you described below. Please proceed with the change as noted below.
Thank you,
Kelly
Kelly Peterson, AICP, Deputy Director-Engineering
Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5547 - Cell 253-740-8066
Kpeterson(@KentWA.gov
CITY OF KENT, WASHINGTON
KentWA.aov Facebook i.,vi(',i_n YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Connor, Eric<EConnor@kentwa.gov_>
Sent:Tuesday, December 19, 2023 8:33 AM
To: Peterson, Kelly<KPeterson@kentwa.gov>
Cc: Barry,Jason<JBarrv@kentwa.gov>
Subject: FW: [EXT] 23 Overlays- RPMS
Good Morning Kelly,
i
The plans and specifications on our 2023 Overlay project require the installation of Raised
Pavement Markings (RPM's) at multiple locations per our Standards. Unfortunately, a pay item
was not included. The contractor installed the RPM'S during the channelization activities but
pricing was not established.
The contractor is requesting a unit price of $896 per hundred RPM'S for a quantity of 11.56
hundred. Are you okay with proceeding with a change order in the amount of $10,357.76 in
order to compensate the contractor for this work?
Please let me know if you have any questions or need any additional information.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From:Shields, Brian<BShields kentwa.gov>
Sent:Tuesday, December 19, 2023 7:59 AM
To: Connor, Eric<EConnor kentwa.gov>; Barry,Jason<JBarrv@kentwa.gov>
Subject: RE: [EXTj 23 Overlays- RPMS
They were installed at all striping locations. The specifications did not indicate them as incidental
to any other channelization activities and they had a pay description specifically for RPMS, with
no proposal bid item.
The quantity looks to be about what I expect when I consider the striping quantity. I am waiting
for Jamies back up to compare to the tickets from SPM/Icon.
Brian Shields, Capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6510
bshields(d)KentWA.gov
CITY OF KENT, WASHINGTON
KentWA.aov Facebook YOUTube
From: Connor, Eric<EConnor@kentwa.gov>
Sent: Friday, December 15, 2023 10:50 AM
2
To:Shields, Brian <BShields kentwa.gov>; Barry,Jason<JBarrv@kentwa.gov>
Subject: RE: [EXT] 23 Overlays- RPMS
Where were they installed, and do you concur with the quantity? Do you have backup?
Eric Connor, construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From:Shields, Brian<BShields@kentwa.gov>
Sent: Friday, December 15, 2023 10:28 AM
To: Barry,Jason<JBarry@kentwa.gov_>
Cc:Connor, Eric<EConnor kentwa.gov>
Subject: FW: [EXT] 23 Overlays- RPMS
Jason,
RPMS were left out of the 2023 Overlay proposal form. 1,156 RPMS were necessary to be
installed. I negotiated the cost originally proposed by SPM/Icon from $1,288 per hundred down
to $896 per hundred.
I am seeking approval to created a CO request worksheet in the amount of $10.354.76
$10,357.76 (ec 12/19/23).
11.56 HND * $896 = $10,354.76 $10,357.76 (ec, 12/19/23)
Other costs (traffic control, etc) were covered by existing bid items; this work was performed in
conjunction with other channelization activities.
Let me know if you have any questions. Thanks!
Brian Shields, capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6510
bshields0KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.aov Facebook YouTube
From:Townsend,Tyler(ICON Materials) <tyler.townsend @ icon mate rials.com_>
Sent: Friday, December 15, 2023 10:14 AM
To:Shields, Brian <BShields@kentwa.gov>
Cc: Krier, Rick<RKrier kentwa.gov>
Subject: RE: [EXT] 23 Overlays- RPMS
3
EXTERNAL EMAIL
Hi Brian,
This does look correct to me.
Thank you,
Tyler Townsend
Project Manager
(253)293 4391
From: Shields, Brian<BShields kentwa.gov>
Sent: Friday, December 15, 2023 10:10 AM
To:Townsend,Tyler(ICON Materials) <tyler.townsend Aconmaterials.com>
Cc: Krier, Rick<RKrier kentwa.gov>
Subject: [EXT] 23 Overlays-RPMS
CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you are expecting
this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish
button.
Tyler,
Sending this email to confirm the price of $896 per hundred RPMs installed on this year's
project.
11.56 hundred installed @ $896/HND = $10,357.76.
Does this look correct to you?
Brian Shields, Capita/Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-s56-6510
bshields(@KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.QOV Facebook YouTube
ATTENTION:Ce courriel vient de 1'exterieur de 1'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pieces jointer,a moins
que vous ne connaissiez 1'expediteur du courriel et savez que le contenu est securitaire.Si vous pensez qu'il s'agit d'un courriel
d'hame�onnage ou malveillant,veuillez cliquer sur le bouton Signaler une tentative d'hamegonnage.
4
Field Notes
Job# 27288 23-0115-2023 ASPHALT OVERLAYS-KENT
Work to T I
m
tractor en w na es NO
Contact Name Inspector's Name
Olfice Phone ns sPhone
jobPhone °
cell ne Yvarranry Reps Name
sF
a n wTan Re a Phone
>» on Eli
unyx
1�oLtD w
1040 REMOVAL OF RPM's AND PAINTED OR THERMOPLASTIC 1 IS
__ _.(_5t.-.
1615 PLASTIC CROSSWALK LINE 1900 'Sp
1625 PtAsnc STOP LINE 160 LF
1630 PLASTIC TRAFFIC ARROW 6 EA
1670 PLASTIC DOUBLE YELLOW CENTERLINE 4800 LF
1675 pRomm PLASTIC DOUBLE YELLOW CENTERLINE 2000 0 LF
1680 WHITE PLASTIC EDGE LINE 9000 LF
1685 PROFILED PLASTIC EDGE LINE 3700 LF
1690 PLASTIC WHITE WIDE LINE 600 LF
LS II-B dr O ROAbWO
2210 NT CONCRETE EXTRUDED CURB PAINTED%111TE 1200 LF
2560 RAFFIC PYLON 14 EA
2581 PAINTED SKIP LANE LINE 800 LF
2585 WHITE EDGE LINE PAINT STRIPE 2400 LF,
2586 ANTI-RACING RUBLE STRIPS 8 EA
2605 PROFILED PLASTIC SKIP LANE LINE "' 1100 LF
2610 PLASTIC WHITE WIDE LINE 300 LF
2615 PROFILED PLASTIC TWLT LINE 600 LF
2630 PLASTIC TRAFFIC ARROW 4 EA
2635 TYPE 5 PLASTIC TRAFFIC ARROW 1 EA
2640 PLASTIC BIKE LANE LINE 500 LF
2655 PLA511C BIKE LANE SYMBOL WITH ARROW 1 EA
2675 PROFILED DOUBLE YELLOW CENTERLINE 1400 LF
2680 'WHITS PLASTIC EDGE LINE 'rC 1600 LF
t4vN
Contract City KENT
Contract County KING
Work City(if different)
Work County(if diff)
TAX TYPE
TAX CODE
HOLD
BILL
FINAL BILL B
4 If(^
1 �
Field Notes
Job# 27288 23-0115-2023 ASPHALT OVERLAY&KENT
or to
JASO
N
ontractor Verifiedw/buivdix Yes No
Contact Name Ins
rectors Name
Office s e
Phone o t er
oon
ne �m Re Name
C.
L hone
Specification arrant Phone
*AM
1040 REMOVAL Or,RPM's AND PAINTED OR THERMOPLASTIC 1
1615 PLAMCCROSSWALK LINE 1900 SF
1625 PLASTIC 51 OP LINE 160 LT
1630 PLASTIC TRAFFIC ARROW 6 EA
1670 PLASTIC DOUBLE YELLOW CENTERLINE 48W LF
1675 PROFIt1'D III ASfICDOUBLE YELLOW CENTERLINE 2000 LF
1680 WHIT,,PLASTIC EDGE LINE 9000 LF
1685 PROF11 0 PLASTIC EDGE LINE 3700 LF
1690 PLASTIC WHTE WIDE LINE 600 JQLF
4.
2210 CEMENT CONCRETE EXTRUDED CURB PAINTED WHITE 12DO LF
2560 TRAFFIC PYLON 14 EA
2581 PAINTEV SKIP LANE LINH 800 LF
2585 %%.'1111 F I:IX:E LINE PAINT STRIPE 9400 LF
2586 AN I-RACING RUBLE STRIPS 8 EA
2605 PROFILED PLASTIC SKIP LANE LINE 1100 LF
2610 PLASTIC WHITE WIDE LINE 300 LF
2615 YROFILED PLASTIC TWLT LINE 600 LF
2630 PLASTIC TRAFFIC ARROW 4 EA
2635 TYPE 5 PLASTIC TRAFFIC ARROW 1 '
2640 PLASTIC BIKE LANE LINE 500 LF
EA
2655 PLASTIC BIKE LANE SYMBOL WITH ARROW 1 LF
2675 PROILED DOUBLE YELLOW CENTERLINE 1400 IF
2680 WHITE PLASTIC EDGE LINE 16W LF
Sol
COl AM)ED TYPE 2 RPMS 3 HUN
Contract C KENT
Contract County KING JAM
York Ci If different
Work Co if dIM
TAX TYPE
TAX CODE Line Width 17=
HOLD
BILL
FINAL BILL
Field Notes
Job#2n88 23.mi5-2023 ASPHALT OVERLAYS-KENT
Work to
ontractor w to r es No
Intact Name ImpmWes
s
ce one
er
rrwm
0 one
Phoneceu arrant
spedfication arrant $From
1040 RFMOVAL OF RPM's AND PAINTED ORTHERMOPLASTTC 1 1S
1615 PLASTIC CROSSWALK LINE 1900 SF
1625 PLASTIC STOP LINE 160 LF
1630 PLASTIC TRAFFIC ARROW 6 BA
1670 PLASTIC DOUBLE YELLOW CENTERLINE 4800 LF
1675 Ptt()FiL SL)PLASTIC DOUBLE YELLOW CENTERLME 2� LF
1680 WI 111 E PLASTIC EDGE LINE 9000 Ty
1685 PR0)191_10PL.ASTICEDGR LINE 3700 LF
1690 1 PLASTIC WHITE WIDE LINE 600 4b
2210 CEML'N1'CIONCWt I XfRUUhD CURB PAINTED WHITE 1200 I-f
2560 TRAFFIC NYLON 14 BA
2581 PAINTED SKIP LANE LINE 800 LF
2585 WHIIkVMrLINEPAINT'STRIPE 2400 LF
2586 ANTI-RACING RUBLE STRIPS 8 EA
2605 PKC)rILED PLASTIC SKIP LANE LINE 1100 ------ LF
2610 PLAS1"1C WHITE WIDE LINE 300 LF
2615 PROFILED PLASTIC TWLT LINE 600
2630 PLASTIC TRAFFIC ARROW 4 EA
2635 TYPES PLASTICTRAFFIC ARROW 1 EA
2640 PLASTIC BIKE LANE LINE 800 LF
2655 PLASTIC BIKE LANE SYMBOL WITH ARROW 1 BA
2675 FRMILED DOUBLE YELLOW CENTERLINE 1400 LF
2680 WHITE PLASTIC EDGE LINE 1600 LF
Col ADDUI)TYPE 2 RPMS 3 HUN '
Contract city KENT
Contract County KING
work Ci iE different
Work Count (if diff)
TAX TYPE
TAX CODE
HOLD 1, C
vvidth
BILL
FI
NAL BILLL Cycle .,�
Field Notes
job# 27288 23.0115-2023 ASPHALT OVERLAYS-KENT
Work Dits
Caan ete Y
C ontr"tor V W O
tact Name Inspectoes aa►e
office hone uwpecwrsrmne
t er
o Pone
Warrantys ame
Cell Phone tion Warranty ftfs Fhone
t•BEat.lII21'if1►5IF
1040 RI`MOV,1L OF RPM's AND PAINTED OR THERMOPLASTIC 1 LS
1615 PLAS17CCR06SWALKUNE 2900 SF
1625 PLASTIC STOP LINE 160 LF
1630 PLASTIC TRAFFIC ARROW 6 EA
1670 PLASTIC DOUBLE YELLOW CENTERLINE 4800 LF
1675 PROFILED PLASTIC DOUBLE YELLOW CBNTERUNE 2000 LF
1680 WHITE PLASTIC EDGE LINE 90M LF
1685 PROFILEDPLASTICEDGE LINE 3700 IF
1690 PLASTIC WHITE WIDE LINE 600 LF
SCHEr
AJI.E If-B&O ROADWORK
2210 CEMENT CONCRETE EXTRUDED CURB PAINTED WHITE 1200 LF
2560 TRAFFIC PYLON 14 EA
2581 PAINTED SKIP LANE LINE B00 LF
2%5 WHITS EDGE LINE PAINT STRIPE 2400 LF
2586 ANTI-RACING RUBLE STRIPS 8 EA
260.5 PROFILED PLASTIC SW LANE LINE 1100 �
2610 PLASnC WHITE WIDE LINE 300 LF
'2615 PROFILED PLASTIC TWLTLINE 600 LF
2630 PLASTICTRAFFIC ARROW 4 EA
2635 TYPE 5 PLASTIC TRAFFIC ARROW 1 EA
2640 PLASTIC BIKE LANE LINE ` LF
2655 PLASTIC BIKE LANE SYMBOL WITH ARROW 1 EA
2675 PROFILED DOUBLE YELLOW CENTERLINE 1400 LF
2680 WHITE PLASTIC EDGE LINE 1600 LF
C01 ADDED TYPE 2 RPMS 3 "4R� HUN
CO2040 REMOVAL OF RPMS PAINTSIl,THERMO MARKINGS I IS
__ ContraM City KENT
Contract County KING e
ork City(if different)
Work Coun (if diff)
TAX TYPE
TAX CODE
HOLD @
BILL
FINAL BILL B
Field Notes
job#27288 23.0115-2)23 ASPHALT OVERLAYS-KENT
FM
13CON MGM W or Yes NO
C(Mntractor
tact Name $ erne
Office e na
0Phone armn t
one Warranty PIK=
Specifica
1040 REMOV AL OF RPM'9 AND PAINTED OR THERMOPLASTIC 1 is
1615 PLASTIC CROSSWALK LINE 1900 SF
1625 C STOP LINE 160 LF
1630 PLASTIC TRAFFIC ARROW 6 EA
1670 PLASTIC DOUBLE YELLOW CENTERLINE 4800 LF
1675 PROFILED PLASTIC DOUBLE YELLOW CENTERLINE 20M LF
1680 WHITE PLASTIC EDGE LINE 9000 LF
1685 ROr,11II)PLASTICEDGE LINE 37W LF
1690 PLASMIC WHITE WIDE LINE 600 LF
R 1ti?
2210 M04T CONCRETE EXTRUDED CURB Pr1llvWD,WHITE 1Y00 IY
2560 IFIC PYLON 14 EA
2WI Am,Ito SKIP LANE LINE 2 400 LF
LF
2585 HI II,L tX;E LINE PAINT STRIPE
2586 ANTI-RALING RUBLE STRIPS 8 EA
2605 OFILED PLASTIC SKIP LANE LINE 1100 LF
2610 IC WHITE WIDE LINE 300 LF
2615 OFILEDPLASTICTWLTLINE 600 LF
2630 PLASfICTRAFFIC ARROW 4 HA
2635 5 PLASTIC TRAFFIC ARROW 1 BA
2640 PLASTIC BIKE LANE LINE 500 LF
2655 PLASTIC BIKE LANE SYMBOL WITH ARROW 1 RA
2675 PRO"L.ED DOUBU YELLOW r-WMRIINE 1400 11z
2680 WHITE PLASTIC EDGE LINE 1600 LF
CD1 At>PIA)TYPE 2RPM5 3 HUN t
CO2040 RE W. A'AL OF RPM S,PAINTBR,THERMOMARKINGS 1
I�
Contract City
Comract County KING LAW Wdfh
work City(if dlffetrent)
Work Count (if dif�
TAX TYPE
TAX CODE
HOLD LinIt
WMIt
BILL