Loading...
HomeMy WebLinkAboutCAG2023-217 - Original - #4 - ICON Materials - 2023 Asphalt Overlays - 01/04/2024 Agreement Routing Form • For Approvals,Signatures and Records Management SiIIiiIIIMKEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: > 1/8/2024 N/A 0 L 0. Authorized to Sign: Date of Council Approval: C" 0 Director or Designee ❑Mayor 4/7/2023 a Budget Account Number: Grant? ❑Yes 0 No R20124.64110.120 Budget? 0 Yes ❑ No Type: N/A Vendor Name: Category: ICON Materials Contract Vendor Number: Sub-Category: c 34467 Change Order#4 0 Z Project Name: 2023 Asphalt Overlays E w = Project Details:This change order provides complete payment for all labor, tools, materials and equipment necessary for addl. road repairs on S. 277th ST to be paid under sch 11. 0 E Agreement Amount: $31,026.00 Basis for Selection of Contractor: Bid 41 i Start Date: N/A Termination Date: 136 Working Days a Local Business? ❑Yes ❑ No* *If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: ❑Yes 0 No CAG2023-217 Date Received by City Attorney: Comments: 01 C 3 cc a H •� L a, oc M Date Routed to the Mayor's Office: in Date Routed to the City Clerk's Office: adccW22313 1 20 Visit Documents.KentWA.gov t obtain c pies of all agreements KE •N T WAS H I N G T O N CHANGE ORDER NO. 4 NAME OF CONTRACTOR: ICON Materials ("Contractor") CONTRACT NAME & PROJECT NUMBER: 2023 Asphalt Overlays ORIGINAL CONTRACT DATE: April 7, 2023 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled 'Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change order provides complete payment for: all labor, tools, materials, and equipment necessary for additional road repairs on S. 277th St. to be paid under sch II: pricing as referenced in ICON Materials "Kent Added Work 277th" COP. Add new bid item S 277th Repairs Mobilization 1 LS$ 5,000.00 $5,000 Add 80 CY to bid item 2060: 80 CY $59.00 $4,720 Add 95 TON to bid item 2080: 95 TON $52.00 $4,940 Add 55 TON to bid item 2095: 55 TON $140.00 $7,700 Add 250 SY to bid item 2110: 250 SY $11.00 $2,750 Add 72 HR to bid item 2505: 64 HR $69.00 $4,416 Add 18 HR to bid item 2510: 20 HR $75.00 $1,500 Total change to contract $31 026 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,872,117.50 (including applicable alternates and WSST) Net Change by Previous Change Orders $77,086.83 (incl. applicable WSST) Current Contract Amount $2,949,204.33 (incl. Previous Change Orders) Current Change Order $31,026.00 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $2,980,230.33 CHANGE ORDER - 1 OF 3 Original Time for Completion 130 working days (insert date) Revised Time for Completion under 133 working days prior Change Orders (insert date) Days Required (f) for this Change 03 working days Order Revised Time for Completion 136 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: p pn Digitally signed by Chad Bieren B . ��� By: Chad B I G re 1 1 Date:2024.01.04 17:32:16-08'00' Y (signature) (signature) Print Name: Tyler Townsend Print Name: Chad Bieren, P.E. Its Project Manager Its Public Works Director (title) (title) DATE: 01/03/2024 DATE: KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) M 414 MX4441," 04. & 4 Kent City Clerk Kent Law Department C[In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 File No. 200.2 • KENT CHANGE ORDER WORKSHEET NO. 4 Construction Engineering Division - Public Works Project: 2023 Asphalt Overlay Project No: 23-3001.1 Project Engineer: Alex Murillo Fed-Aid No: n/a Capital Projects Brian Shields Contractor: ICON Materials Manaa r• Date: 12/20/2023 I. Proposed Change This change order provides complete payment for: all labor, tools, materials, and equipment necessary for additional road repairs on S. 277th St. to be paid under schedule II; pricing as referenced in Icon Materials' "Kent Added Work 277th" COP. Add new bid item S 277th Repairs Mobilization 1 LS $ 5,000.00 $5,000 Add 80 CY to bid item 2060 80 CY $ 59.00 $4,720 Add 95 TON to bid item 2080 95 TON $ 52.00 $4,940 Add 55 TON to bid item 2095 55 TON $ 140.00 $7,700 Add 250 SY to bid item 2110 250 SY $ 11.00 $2,750 Add 72 HR to bid item 2505 64 HR $ 69.00 $4,416 Add 18 HR to bid item 2510 20 HR $ 75.00 $1,500 Total change to contract $31 026 II. Reason and Background for Change Additional pavement repairs are needed on S 277th St in preparation for the upcoming chip sealing project (anticipated for Spring/Summer 2024). Public Works managmeent determined a change order for this project would be the best way of addressing the roadway repairs. Pricing as referenced in Icon Materials' "Kent Added Work 277th.pdf" COP. III. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Item Description Total Est. Unit Unit Price Total Estimated Cost of No Item II S 277th St Repairs Mobilization 1 LS $5,000.00 $ 5,000.00 New Pay Items Total: $ 5,000.00 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑✓ Notapplicable Page 1 Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ - Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑� Notapplicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. 7 II 2060 Roadway Excavation 80 CY $ 59.00 $ 4,720.00 II 2080 Crushed Surfacing Top 95 TON $ 52.00 $ 4,940.00 Course II 2095 HMA Class 222" PG 58V- 55 TON $ 140.00 $ 7,700.00 II 2110 Planing Bituminous 250 SY $ 11.00 $ 2,750.00 Pavement II 2510 Traffic Control Supervisor 20 HR $ 75.00 $ 1,500.00 II 2505 Traffic Control Laborer 64 HR $ 69.00 $ 4,416.00 Increase / Decrease to Existing Pay Items Total: $ 26,026.00 *TOTAL ESTIMATED COST OF CHANGE ORDER: $31,026.00 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 130 7 Due This Change Order: 3 7 Previous Total: 130 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 133 * This Change Order + Previous Total Capital Projects Manager: Date: �Z.2$-2oZ3 Brian Shields Construction Engineering Date: Supervisor: , Z z Jas4 Barry Construction Manager: i � yl� Date: Z 2 Eric Connor Page 2 Shields, Brian From: Barry,Jason Sent: Thursday, December 21, 2023 1:48 PM To: Shields, Brian Cc: Connor, Eric Subject: FW: 2023 Overlay - Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project From: Peterson, Kelly<KPeterson@kentwa.gov> Sent:Wednesday, December 20, 2023 2:03 PM To: Connor, Eric<EConnor@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Eric- Thank you. Please proceed with the work. Kelly From: Connor, Eric<EConnor@kentwa.gov> Sent: Wednesday, December 20, 2023 1:03 PM To: Peterson, Kelly<KPeterson@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject: Fwd: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Kelly, Are you okay with us proceeding with a change order as proposed below? Thank you, Eric Get Outlook for iOS From: Shields, Brian <BShields@kentwa.gov> Sent: Wednesday, December 20, 2023 11:23:16 AM To:Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Eric, After talking with Matt at Icon, we updated the COP by adding planing and we discussed and agreed on TC estimates. Based on what we saw this summer, I anticipate we won't be doing much (if any) full depth repair, and most of this is top down milling to get into good asphalt base. The updated total I am seeking approval for is #31,026.00 1 Add new bid item S 277th Repairs Mobilization 1 LS $5,00( Add 80 CY to bid item 2060 Roadway Excavation 80 CY $ 5( Add 95 TON to bid item 2080 Crushed Surfacing Top Course 95 TON $ 5: Add 55 TON to bid item 2095 HMA Class 1/2" 55 TON $ 14( Add 250 SY to bid item 2110 Planing bituminous pavement 250 SY $ 1: Add 72 HR to bid item 2505 Traffic Control Laborer 64 HR $ 6`- Add 18 HR to bid item 2510 Traffic Control Supervisor 20 HR $ 7.` Total change to contract Icon has availability Thursday and Friday of next week. I asked him to pencil us in, pending approvals. Let me know if you have any questions. Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields(cbKentWA.gov CITY OF KENT, WASHINGTON KentWA.aov Facebook YouTube From: Connor, Eric<EConnor@kentwa.gov> Sent: Wednesday, December 20, 2023 11:13 AM To:Shields, Brian <BShields@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Would you mind putting in the BI descriptions so there are no questions when I forward for approval? Eric Connor, construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From:Shields, Brian <BShields@kentwa.gov> Sent:Wednesday, December 20, 2023 11:05 AM To: Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Eric, After talking with Matt at Icon, we updated the COP by adding planing and we discussed and agreed on TC estimates. Based on what we saw this summer, I anticipate we won't be doing much (if any) full depth repair, and most of this is top down milling to get into good asphalt base. The updated total I am seeking approval for is #31,026.00 2 Add new bid item S 277th Repairs Mobilization 1 LS $ 5,000.00 $5,000 Add 80 CY to bid item 2060 80 CY $ 59.00 $4,720 Add 95 TON to bid item 2080 95 TON $ 52.00 $4,940 Add 55 TON to bid item 2095 55 TON $ 140.00 $7,700 Add 250 SY to bid item 2110 250 SY $ 11.00 $2,750 Add 72 HR to bid item 2505 64 HR $ 69.00 $4,416 Add 18 HR to bid item 2510 20 HR $ 75.00 $1,500 Total change to contract $31,026 Icon has availability Thursday and Friday of next week. I asked him to pencil us in, pending approvals. Let me know if you have any questions. Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields(@KentWA.gov CITY OF KENT,WASHINGTON KentWA.4ov Facebook YouTube From: Connor, Eric<EConnor@kentwa.gov> Sent: Wednesday, December 20, 2023 10:59 AM To:Shields, Brian <BShields@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project I'm sure they are shut down, but we probably won't see 50 degrees and dry again until February. Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT,WASHINGTON PLEASE CONSIIDFR THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Shields, Brian<BShields@kentwa.gov> Sent: Wednesday, December 20, 2023 10:57 AM To: Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Should clarify... I asked about doing it next week and he hasn't responded yet. Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshieldsCcbKentWA.gov CITY OF KENT, WASHINGTON KentWA.4ov Facebook YouTube 3 From:Shields, Brian Sent:Wednesday, December 20, 2023 10:56 AM To: Connor, Eric<EConnor@kentwa.gov_>; Barry,Jason <JBarrV kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project I asked Matt. He's also going to add milling to the proposal; I talked with him about his actual plan of attack after you swung by my cube. Brian Shields, Capital Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields KentWA.gov CITY OF KENT,WASHINGTON KentWA.aov Facebook YouTube From: Connor, Eric<EConnor kentwa.gov> Sent:Wednesday, December 20, 2023 10:45 AM To:Shields, Brian <BShields@kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Any chance they can do it next week? The weather looks very favorable Wed-Fri. From:Shields, Brian<BShields@kentwa.gov> Sent: Wednesday, December 20, 2023 10:13 AM To: Barry,Jason<JBarrv@kentwa.gov> Cc: Connor, Eric<EConnor kentwa.gov> Subject: RE: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Good morning, Attached is Icon's proposal for the dig out areas. Their quantities are based on full depth subgrade repairs. I spoke with them regarding traffic control and they anticipate 2 days of work with 1 TCS and 4 TCL. I calculated flagging totals based on 9 hour days to build in contingency; if we proceed with a change order, I will add the reflected quantities and pay on what is actually used. I am seeking approval to create a change order worksheet for $28,678 for the purpose of performing the pavement repairs on S 277th as laid out by Bill/Brent in the field. Add new bid item S 277th Repairs Mobilization 1 LS $5,000 $5,000 Add 80 CY to bid item 2060 80 CY $59.00 $4,720 Add 95 TON to bid item 2080 95 TON $52.00 $4,940 Add 55 TON to bid item 2095 55 TON $140 $7,700 Add 72 HR to bid item 2505 72 HR $69.00 $4,968 Add 18 HR to bid item 2510 18 HR $75.00 $1,350 Total change to contract $28,671 4 Let me know if you have any questions. Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshieldsCu)KentWA.aov CITY OF KENT,WASHINGTON KentWA.4ov Facebook YouTube From: Connor, Eric<EConnor@kentwa.gov> Sent: Monday, December 4, 2023 10:05 AM To: Peterson, Kelly<KPeterson kentwa.gov> Cc: Barry,Jason <JBarrv@kentwa.gov>; Maloney, Carla <CMalonev@kentwa.gov> Subject: 2023 Overlay- Proposed S 277th Asphalt Repairs for upcoming Chip Seal Project Good Morning Kelly, Attached is draft plan sheets with 3 areas on S 277th that need to be repaired prior to next year's (2024) chip seal project. 2 areas were previously identified for repair, plus a V has been identified and marked on these plan sheets. Assuming unit prices from the 2023 Overlay project plus added lump sum values for Mobilization and Traffic Control Devices, I estimate the cost to the contract for completing the repair of these 3 areas could be roughly $92,000. With your concurrence, we will proceed with scoping out the work with the contractor and our stakeholders. Hard pricing will be established and memorialized via a change order on the 2023 Overlay project prior to proceeding with the work. Please let me know if you have any questions or need any additional information at this time. Thank you, Eric Eric Connor, construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT,WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Holcomb, Drew<DHolcomb@kentwa.gov> Sent: Monday, December 4, 2023 9:10 AM To:Shields, Brian <BShields@kentwa.gov> Cc:Araucto,Joseph <JAraucto@kentwa.gov>; Hawkes, Derek<DHawkes kentwa.gov>; Hallock,Toby <THallock@kentwa.gov>; Ghanim, Mazin <MGhanim kentwa.gov>; Barry,Jason <JBarrv@kentwa.gov>; Connor, Eric <EConnor@kentwa.gov>; Murillo, Alex<AMurillo@kentwa.gov>; Maloney, Carla <CMalonev kentwa.gov>; Carroll, Ryan <RCarroll@kentwa.gov> Subject: RE: 277th dig outs for 2024 chip seal Hello Brian, 5 Attached are the dig out areas that need to be done prior to the 2024 Chip Seal project (which is being managed by Joe and Ryan). My understanding is that this work will be included in the 2023 Overlay project. Please work with Joe for any additional areas that need to be repaired on 277th prior to chip seal. Thank you, Drew Holcomb, P.E. Design Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 1 Cell 253-561-1587 dholcombCa)kentwa.4ov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube Instaaram From: Holcomb, Drew Sent: Wednesday, November 29, 2023 8:26 AM To: Peterson, Kelly<KPeterson kentwa.gov> Cc:Araucto,Joseph <JAraucto@kentwa.gov>; Hawkes, Derek<DHawkes@kentwa.gov> Subject: 277th dig outs- 2024 chip seal vs pavement preservation Hi Kelly, After our chi seal budget meeting yesterday Derek and I spoke with Joe regarding the dig out work which needs to be completed ahead of chip seal on 277th St. Joe indicated that this work is not optimal to be completed by in house staff because of the scale of traffic control required. However, we all agreed that this work would be better bundled with the Chip seal project because then the chip seal contractor is in charge of the schedule and not waiting on another project to finish. Joe added this is common on WSDOT chip seal projects which he looked up. Can we proceed to hand off the dig outs to Joe/Ryan to add to their chip seal project? Drew Holcomb, P.E. Design Engineerlll Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 1 Cell 253-561-1587 dholcombCa)kentwa.aov CITY OF KENT, WASHINGTON KentWA.cio Facebook YouTube Instaciram 6 Shields, Brian From: Knelleken, Matt (ICON Materials) <matt.knelleken@ icon materials.com> Sent: Wednesday, December 20, 2023 10:57 AM To: Shields, Brian Subject: RE: [EXT] RE: 277th Pavement Repairs Attachments: Kent Added Work 277th.pdf EXTERNAL EMAIL Hi Brian, Here is an updated work order for you. Thank you, ICON MATERIALS A CRH COMPANY Matt Knelleken Construction Superintendent/Estimator ICON Materials A CRH COMPANY 1508 Valentine Ave SE Pacific, WA 98047 O +1 (206)574 3942 C +1 (253)261 5273 E matt knel leken(a-)_icon materials.corn www.iconmaterials.com From: Shields, Brian<BShields@kentwa.gov> Sent: Wednesday, December 20, 2023 8:37 AM To: Knelleken, Matt(ICON Materials) <matt.knelleken@iconmaterials.com> Cc:Townsend,Tyler(ICON Materials) <tyler.townsend@iconmaterials.com>; Barry,Jason <JBarry@kentwa.gov> Subject: [EXT] RE: 277th Pavement Repairs CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you are expecting this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish button. Matt, How long do you anticipate the work taking and what size traffic control crew? Brian Shields, Capita/Projects Manager 1 Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields(@KentWA.aov CITY OF KENT,WASHINGTON KentWA.go Facebook YouTube From: Knelleken, Matt (ICON Materials) <matt.knelleken iconmaterials.com> Sent:Tuesday, December 19, 2023 3:28 PM To: Shields, Brian <BShields@kentwa.gov> Cc:Townsend,Tyler(ICON Materials) <tyler.townsend P icon materials.com> Subject: 277th Pavement Repairs EXTERNAL EMAIL Hi Brian, Attached is our estimated quantities and Mob for doing the 9 added pavement repairs. Let me know if you have any questions. Thank you, ICON ftATERIALS A CRH COMPANY Matt Knelleken Construction Superintendent/Estimator ICON Materials A CRH COMPANY 1508 Valentine Ave SE Pacific, WA 98047 O +1 (206)574 3942 C +1 (253)261 5273 E matt.knelleken6a7 icon materials.com http://secure- web cisco com/lZWxniZ7BIKMo7oKswHFOS9pR96eVHQAJRODoR6vzzFmQV7zpO3OOtJiH8mxOx6EOFAier1v ZCK XgdVXUeiRhmg3AgiOgHtlrkEK29Eo5nirgig 9gdl3hLCnOtSpyCEwxsvJt4wH1kDbGvGRbt6wsm6G8U8dMYnsPNk uu4vroyQ13VMLvWTth1i4-cQAo7v6lli-rtzt H7J5Y7KVegW-CxsvxuFv - 2 83vQiWlau4dX56o321KgKwmkhXR8YIEC5xKEIDCIJKon733FHoOsy2o3HE83Ei5lzQNNa z4R9Y18B81MDdxOPVD BIKivT/http%3A%2F%2Fwww.iconmaterials.com ATTENTION:Ce courriel vient de 1'exterieur de 1'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pieces jointes, a moins que vous ne connaissiez 1'expediteur du courriel et savez que le contenu est securitaire.Si vous pensez qu'il s'agit d'un courriel d'hamegonnage ou malveillant,veuillez cliquer sur le bouton Signaler une tentative d'hamegonnage 2 ICON MATERIALS 1.1 1508 VALENTINE AVE ADDITIONAL PACIFIC,WA 98047 (206) 575-3200 Office • (206) 575-3207 Fax WORK PRICING Project Name : 2023 Asphalt Overlays-City of Kent ICON Job# 523305 Contractor ICON Materials Request# _ 002 Attention Brian Shields Date 12/19/2023 ICON MATERIALS respectfully submitts this Additional Pricing Form which contains a quotation for a change in the contract sum or the contract time in response to proposed modifications to the contract documents based on: ® Forward Priced Proposal 0 EWO Work to be Performed EWO Work already Performed Explanation of Change(s) Added Pavement Repair Sections on S277th St at 9 locations *Please see attachments for additional in ormation* ITEM ITEM DESCRIPTION I ESTIMATED QUANTITY UNIT 11 UNIT PRICE TOTAL PRICE 2060 Roadway Excavation 80 CY $ 59.00 $ 4,720.00 2080 CSTC 95 TON $ 52.00 $ 4,940.00 2095 HMA Class 1/2" PG 58V-22 55 TON $ 140.00 $ 7,700.00 2000 Mobilization 1 EACH $ 5,000.00 $ 5,000.00 2110 Planing Bituminous Pavement 250 SY $ 11.00 $ 2,750.00 2510 Traffic Control Supervisor 20 HR $ 75.00 $ 1,200.00 2505 Traffic Control Labor 64 HR $ 69.00 $ 4,416.00 TOTAL General Contractor ICON Materials $ 30,726.00 Signature: Signature: ICON is requesting your review,acceptance and Change Order issuance so it may apply for payment during the proper billing cycle.