HomeMy WebLinkAboutCAG2023-006 - Change Order - #8 - Active Construction Inc. - S. 240th Street and Russell Road TIB Sidewalk Improvements - 11/07/2023 Agreement Routing Form
• For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
WASHINGTON (Print on pink or cherry colored paper)
Originator: Department:
S.Anderson PW Engineering
Date Sent: Date Required:
j 11/7/23
0
L
aAuthorized to Sign: Date of Council Approval:
Q 0 Director or Designee ❑Mayor 12/13/2022
Budget Account Number: Grant? 0 Yes ❑No
R20122.64110.120
Budget? 0 Yes ❑No Type: N/A
Vendor Name: Category:
Active Construction, Inc. Contract
Vendor Number: Sub-Category:
C 2319336 Change Order#8
Project Name: S. 240th Street and Russell Road TIB Sidewalk Improvements
E
Project Details:Underground power was unlocated resulting in additional equipment and
C manpower to install new CB at sta. 36+02.
C
E Agreement Amount: $1543213 Basis for Selection of Contractor:
� , . Bid
Go
Start Date: N/A Termination Date: 130 Working Days
ch
a Local Business? ❑Yes ❑No*
*If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Notice required prior to disclosure? Contract Number:
❑Yes 0 No CAG2023-006
Date Received by City Attorney: Comments:
, 0
V1
•> i
!0
ph Date Routed to the Mayor's Office:
Vf
Date Routed to the City Clerk's Office: r l i ZJ
adaW22373 1 z0 Visit Documents.KentWA.gov to obtain copies of all agreements
•
KENT
W A S H I N G T G N
CHANGE ORDER NO. # 8
NAME OF CONTRACTOR: Active Construction, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:S. 24011 Street and Russell Road TIB Sidewalk
Improvements
ORIGINAL CONTRACT DATE: December 28, 2022
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Underground power was unlocated resulting in additional equipment and
manpower to install the new CB @ sta 36+02. This work was tracked as
force account on sheets 12 and 13.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $1,943,943.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $54,611.28
(incl. applicable WSST)
Current Contract Amount $1,998,554.28
(incl. Previous Change Orders)
Current Change Order $15,432.13
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $2,013,986.41
I
I
CHANGE ORDER - 1 OF 3
Original Time for Completion 130 working days
(insert date)
Revised Time for Completion under 0 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 working days
Revised Time for Completion 130 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
DgR4ty epnetl by Ryan Rake
Ryan Burk$R;.us, Digitally signed by Chad Bieren
r�nbQ+ctiveconslruc�I.n.com.CR=Ryan Chad Bieren Date:2023.1,.07
OHWM20 _11-W 1].01Y3-0-
By: By: 10:48:30-08'00'
(signature) (signature)
Print Name: Print Name: Chad Bieren, P.E.
Its Its Public Works Director
(title) (title)
DATE: DATE:
CF for A
EC KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
` KENT
V!A$HIHG*ON
CHANGE ORDER WORKSHEET NO. 8
Construction Engineering Division - Public Works
Project: 0 240th and Russell Rd TIB Sidewalk Project No: 22-3004
Improvements
Project Engineer: Drew Holcomb TIB-Aid No: #P-P-106(P06)-1
Capital Projects Jason Bryant Contractor: ACI
Manaa r•
Date: 10/31/2023
I. Proposed Change
Underground power was unlocated resulting in additional equipment and man power to install the new
CB @ sta 36+02. This work was tracked as force account on sheets 12 and 13.
II. Reason and Background for Change
During installation of the new storm CB @ Sta 36+02 Crews discovered an unlocated power line. Crews
used a vactor truck to expose the line. The new CB was adjusted to meet the field conditions as well as
changed to a concrete inlet. This work was tracked as force account on sheets 12 and 13.
III. Method of Payment
NEW PAY ITEMS El Not applicable
Sch. 7Item Description Total Est. Unit Unit Price Total Estimated Cost of
No Item
1 Unlocated power conflict 1 FA $15,432.13 $ 15,432.13
$
New Pay Items Total: $ 15,432.13
DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not applicable
Sch Bid Item No. 71tem Description Qty Unit Unit Price Cost of Item
No.
Page 1
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEMS) ❑ Notapplicable
Sch Bid Item No. 71tem Description Qty Unit Unit Price Cost of Item
No.
$
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $15,432.13
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 1307 Due This Change Order: 0 Previous Total: 130
Explanation/Justification for Additional Working Days:
*TOTAL WORKING DAYS: 130
* This Change Order + Previous Total
Capital Projects Manager: Date:
Jaso Bry
Construction Engineering Date:
Supervisor: ,✓ 11 z z3
Jason Barry
Construction Manager: Date: 1
Eric Connor
l
Page 2
FA Sheet No.: 12
DAILY REPORT OF
FORCE ACCOUNT WORKED �_ T
Project Name: TIB Sidewalk Improvements Project No: 22-3003,22-3004
Item No.: 8017 Date: 4/25/2023-4/26/2023
Description of Work: Unlocated power @ sta 36+05
Work by Subcontractor?: No
Prime Contractor: ACI Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
John A Foreman 11 95.31 $ 1,048.41
Corey Truck Driver 6 91.2 $ 547.20
Jim S Laborer 11 69.58 $ 765.38
Cody P loperator 11 91.21 $ 1.003.20
Lavorato Truck Driver 11 91.21 1 $ 1,003.20
Wyatt Laborer 3 68.37 $
SUBTOTAL-LABOR: $ 4.367.39
LABOR OVERHEAD&PROFIT @ 31% $ 1.353.89
LABOR TOTAL $ 5,721.28
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
141 Dump Truck 11 96.81 $ 1,064.91
441 Chevy 3500 11 31.97 $ 351.67
Backhoe 1.5 105.66 $ 158.49
152 Trailer 6 11.25 $ 67.50
492 Dump Truck 61 78.08 $ 468.48
506 85G Deere 2.51 10Z751 $ 256.88
SUBTOTAL-EQUIPMENT $ 2,367.93
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 497.27
EQUIPMENT TOTAL $ 2,865.20
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Trenchman Safety#848440 1 ea $ 2,439.25 $ 2,439.25
CNI Locates 1 ea $ 510.00 $ 510.00
Is
SUBTOTAL $ 2,949.25
OVERHEAD&PROFIT @ 21% $ 619.34
TOTAL $ 3,568.59
Verification of Hours Worked: TOTAL: $ 12,155.07
12%MARKUP (for prime when
subcontract work) $
Miranda Frasier 10/25/2023
Contractor's Representative Date SHEET TOTAL: $ 12,155.07
Owner's Representative Date
Pay Est(ate red:
Date:
By:
1)0�- '�-D
Trenchman Trench an Shoring Invoice 848440
INVOICE DATE 05/03/2023
Trench safety PO Box 8734 DUE DATE 05/03/2023
ECE'HED SALESPERSON Brian Garlinghouse
Lacey, WA 98509-8734 briang@trenchmansafety.com
MAY 0 3 2023 (360)490-8453 RENTAL 1315
ACI
SHIP TO BILL TO(#564251)
Active Construction,Inc.
24244 Russell Rd 5110 River Road E.
Kent,WA 98032 Tacoma,WA 98443
s (253)248-1091
CUST 22-044/240th St. CONTACT Bill Ward BiIIW@activeconstruction.com,Ap@activeconstruction.com
!SHIP UT Will Call DROP SW No
DESCRIPTION QTY F LED RATE DISC } NEC FJET
1# ProRS 2 P (THQ)[#256995]Pro Tec — — 0.00 li 0.00 0.00
MODULAR BOX 8':
MODULAR BOX 8' I
Rent Qty: 1
Start:04/24/2023,End:
j I 05/02/2023(Called Off) j
Duration:1 Week(s)2 Day(s)
j I
2 Comer Rail 8' (THQ)Corner Rail 8'1 W:75 0.00 — 0.00 0.00 0.00 i
Rent Qty:4
I :
Start:04/24/2023,End:
05/02/2023(Called Off)
Duration: 1 Week(s)2 Day(s)
3 Panel 2'X 8' (THQ)Panel 2'X 8'1 W: 120 — 0.00 1,056.00 1 11,056.00 1.056.00
Rent Qty:8
Start:04/24/2023,End:
j 05/02/2023(Called Off)
Duration:1 Week(s)2 Day(s)
4 Finnform 4x8 (THQ)Finnform 4x8 — 0.00 — 78.62 ; 78.62 78.62
Rent Qty:2
Start:04/24/2023,End: j
05/02/2023(Called Off)
Duration:1 Week(s)2 Day(s)
i � I
5 160"-96"Adjustable Spreaders (THQ)60"-96"Adjustable — 0.00 — 0.00 0.00 0.00
Spreaders
Rent Qty:4
Start:04/24/2023,End:
05/02/2023(Called Off)
Duration:1 Week(s)2 Day(s)
6 ProRS 257007 (THQ)[#257007)Pro-Tec 0,00 0.00 0.00
MODULAR BOX 10':
MODULAR BOX 10'
Rent Qty: 1
Start:04/24/2023,End:
05/02/2023(Called Off)
Duration:1 Week(s)2 Day(s)
7 Comer Rail 8' (THQ)Corner Rail 8'1 W:75 0.00 0.00 0.00 0.00
GENERATED 5/03/2023 AT 3:00:51 PM BY Brian Garlinghouse l INVOICE CREATED 05/02/2023 1 Of 2
§ v �
# PART DESCRIPTION QTY B/O FILLED RATE DISC NET EXT
Rent Qty:4
Start:04/24/2023,End
05/0212023(Called Off)
Duration:1 Week(s)2 Day(s)
8 Panel 2'X 10' (THQ)Panel 2'X 10'1 W:132 0.00 1,056.00 1,056.00 1,056.00
Rent Qty:8
Start:04/24/2023,End:
05/02/2023(Called Off)
Duration: 1 Week(s)2 Day(s)
9 Adjustable Spreader 4 hole Blue 22"-34" (THO)Blue Adjustable 0.00 0.00 0.00 0.00
Spreader 22"-34"
Rent Qty.4
Start:04/24/2023,End:
05/02/2023(Called Off)
Duration:1 Week(s)2 Day(s)
10 Mod Lifting Lugs (THQ)Mod Lifting Lugs 0.00 0.00 0.00 0.00
Rent Qty:4
Start:04/24/2023,End:
05102/2023(Called Off)
Duration:1 Week(s)2 Day(s)
11 DELV (THQ)Delivery to address; 1.00 0.00 1.00 0.00 0.00 0.00
24244 Russell Rd
Kent WA 98032
12 TAX (THQ)1700-King(3.60%) 1.00 78.86 78.86 78.86
13 TAX (THQ)Washington State Tax 1.00 142.39 14239 142.39
(6.50%)
14 TAX (THQ)Wa State Heavy 1.00 27.38 27.38 27.38
Equipment(1.25%)
PAYMENT DETAILS AMT
Account
COMMENTS SUBTOTAL 2,190.1621,
Ordered by Bill -TAXABLE SUBTOTAL, 2,190.621
TAX 248.63
Customer PU 4/20, Rental Starts 4/24/23 TOTAL 2,439-.25�
Customer DO 5/2
PAYMENTS 0.06:
�
No lift slings needed BALANCE DUE 2,439.2
W mod
8x10 mod
ACCEPTANCE: DATE:
All sales are as is,the Competent Person on job shall determine the condition of the equipment prior to use.Items returned within 30 days of purchase with original invoice are subject to a
30%restocking fee.Special order items are only returnable with factory"ok",plus a 30%restocking fee and return freight.Special order items not picked up after 30 days will be placed
back in inventory,a 30%restocking fee and inbound shipping are charged.No returns on electrical parts.
2 of 2
TED 510312023 AT 3:00:51 Pm By Binan GaringhouSe I INVOICE CREATED 05/02/2023
" INVOICE #46641
-}j- SERVICE DATE Apr 21, 2023
MAY 10 2023 INVOICE DATE Apr 21, 2023
LOCATES-1,1 DUE Upon receipt
und.�,�d
G
Wiry Detection
Impecdon 5 nso 40 $510.00
PO Box AMOUNT DUE
BONNEY LAKE,WA"391
C-N-1 Locates Ltd.
Active Construction Inc. SERVICE ADDRESS
PO Box 430 2440 Russell Rd S zo
Puyallup, WA 98371 Kent, WA 98032 10
CONTACT US U
(253) 248-1091 P.O. Box 7740
ap@activeconstruction.com Bonney Lake, WA 98391
(253) 862-5204
adminC@cnilocates.com
Service completed by: Brandon Boudreau
INVOICE
METALLIC LINE DETECTION- 1.0 $110.00 $110.00
UTILITIES WITH NO BREAK IN ELECTRICAL CONTINUITY: Utilizing radio frequency
electromagnetic transmitters and receivers to tone and locate Electrical, Phone, Gas,
TV, Sewer, Water and Storm Lines. (2-HR MINIMUM)
PURCHASE ORDER-22-044 1.0 $0.00
JOB DESCRIPTION-Brandon 1.0 $0 00
Technician met with Eugene on site for locate. Customer requests locates at two (2)
separate entrances at apartment complex. Customer installing new drainage in area.
Located telephone and power electromagnetically throughout work area. Provided
several electromagnetic depth assessments on locates. Used GPR cart throughout work
area to provide depth assessments on publicly marked utilities throughout. Multiple
passive scans throughout work areas, marking no new clear or continuous signals.
Public locates on water, gas, power and communication lines throughout work area prior
to private locate. Went over all locates with Eugene on site.
P G R SUBSURFACE
UR ACE UTILITY SCANNING - 2.0
200.$ 00 $400.00
C-N-I Locates Ltd. UBI #602133975 http://www.cnilocates.com 1 of 3
(GPR) GEOPHYSICAL METHOD THAT USES RADAR PULSES TO IMAGE THE
SUBSURFACE: GPR can
be a powerful tool for mapping the location and depth of metallic, non-metallic utilities
and detecting the reflected signals from subsurface structures. (2-HR MINIMUM)
Total $510.00
C-N-1 Locates, Ltd will accept all credit cards with a 3%transaction fee for invoices above $1000.00.
Payment for services is due no later than 30 days after billing. Sums remaining owing after 30 days from billing shall
bear interest of 1.5% per month. If it becomes necessary to take any action to collect the amount due, client will be
liable for all costs of collection, including attorney's fees and costs of suit which is 40%of the invoice amount, collection
agency fees, etc.
The scope of C-N-I Locates, Ltd., service is limited to those specifically requested by client. Client understands that
underground utility locates are performed per client's instructions with information (i.e. maps, records, points of origin or
termination for utility access) provided by client and relied upon C-N-1 Locates, Ltd.
C-N-I Locates, Ltd., it's employees and technicians have no prior knowledge of existing utilities on clients site and as
such cannot guarantee that all underground utilities in the requested area will be designated. C-N-1 Locates Ltd, shall
not be liable for damages of any kind which may arise due to existence of underground utilities not located or mis-
located and client agrees to hold C-N-I Locates, Ltd. Harmless from any such damages.
If conditions and/or circumstances are encountered at the job site which are concealed physical conditions, or unknown
physical conditions of an unusual nature, which differ materially from that which is visually ascertained, customer
agrees to accept responsibility for such conditions and those circumstances outside the control of contractor and
further agrees to pay for any labor or materials, including repair to damaged equipment of contractor caused by such
conditions and/or circumstances.
It is the intent of this provision to make the customer responsible for all (1) unforeseen and concealed conditions, and
(2) for that which contractor cannot control. Accordingly, customer further agrees to hold contractor harmless and shall
indemnify and defend contractor and all its agents and employees from and against all claims, damages, losses and
expenses, including but not limited to attorney fees, consequential damages, arising out or as a result from the
performance of contractors work involving, affecting, or relating to such unforeseen or concealed conditions regardless
of whether such damages are caused in part by contractor.
Client is responsible for contacting the local one-call center to request public utility locates and for all actions required
for compliance with RCW 19.122, ET. Seq. Any liability of C-N-I Locates, Ltd. Shall be limited to an amount not more
than the total amount billed by C-N-1 Locates, Ltd. For its services for this request.
if utilized-Ground Penetrating Radar (GPR) subsurface utility scanning is not without its limitations, its effectiveness is
site specific and varies greatly from place-to-place. The most significant performance limitation of GPR is in high-
conductivity materials such as clay soils and soils that are salt contaminated. Performance is also limited by signal
scattering in heterogeneous conditions (E.G. Rocky Soils) and responds differently to changes in soil type, density,
water, content, as well as many other buried objects; making unique identification of the desired target difficult.
GPR Structural and Concrete Imaging depth of exploration is dependent upon the electrical properties of material(s)
2of3
C-N-I Locates Ltd. UBI 4602133975
http. www.cnilocates.com
inspected and interpretations are opinions based on judgments made from those acquired radar signals and/or other
data. GPR cannot distinguish the difference between a single rebar, conduit or post tension cable. It can only detect the
center and approximate depth of target. Also, while scanning in congested areas, with upper and lower rebar mat's,
conduits and post-tension cables... A 3-D scan to aid in viewing various elements is recommended along with a radio
frequency (RF), electromagnetic (EM) and 60 cycle scan (power must be running through these lines) is performed to
detect any utilities as a secondary precaution.
At all times during the term of this agreement, and for a period of three (3) years following any termination of expiration
thereof, contractor and client agree that they shall not, directly or indirectly, for themselves or on behalf of any person or
entity solicit or contact any employees or customer of each other for the purpose of inducing them to terminate their
employment or contractual agreements with either of them or to become employees or independent contractors of
either of them or such person or entity.
We want to thank you for trusting C-N-I Locates Underground Utility Detection & Inspection Services with your recent
service needs. We would like to follow up to make sure that you received exceptional service during this visit, as well as
to make sure all your questions or concerns were addressed to your satisfaction.
We value all our customer's feedback and would like to ask if you would please write a review regarding your
experience. Your comments help others know what to expect when they are looking for the services we offer. Please
give us your feedback by visiting: https://g.page/r/CTOtmv5oD4v4EAI/review
C-N-1 Locates Ltd. UBI #602133975 http://www.cnilocates.corn 3 of 3
FA Sheet No.: 13
DAILY REPORT OF
FORCE ACCOUNT WORKED �_ T
Project Name: TIB Sidewalk Improvements Project No: 22-3003,22-3004
Item No.: 8017 Date: 4/25/2023-4/26/2023
Description of Work: Unlocated power @ sta 36+05 vactor truck trench
Work by Subcontractor?: NO
Prime Contractor: ACI Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
John A IForeman 95.31 $
Corey Truck Driver 91.2 $
Jim S Laborer 69.58 $
Cody P Operator 91.2 $
Lavorato Truck Driver 91.2 $
Wyatt Laborer 3 68.37 $
SUBTOTAL-LABOR: $
LABOR OVERHEAD&PROFIT @ 31% $
LABOR TOTAL $
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs I Hourly Rate Hrs Standby Rate AMOUNT
141 Dump Truck 96.81 $
441 Chevy 3500 31.97 $
Backhoe 105.66 $
152 Trailer 11.25 $
492 Dump Truck 78.08 $
506 85G Deere 102.75 $
SUBTOTAL-EQUIPMENT $
EQUIPMENT OVERHEAD&PROFIT @ 21% $
EQUIPMENT TOTAL $
MATERIALS/SERVICES/RENTALS
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
ECO Street Services#5394 1 ea $ 2,925.95 $ 2,925.95
$
$
$
SUBTOTAL $ 2,925.95
OVERHEAD&PROFIT @ 12% $ 351.11
TOTAL $ 3,277.06
Verification of Hours Worked: TOTAL: $ 3,277.06
12%MARKUP (for prime when
subcontract work) $ -
Miranda Frasier 10/25/2023
Contractor's Representative Date SHEET TOTAL: $ 3,277.06
Owner's Representative Dat,/ �f ?
Pay ima a Entered:
Date:
By:
ECO Street Services,LLC.
14505 Aqua Drive Kp N �r _
Gig Harbor,WA 98329
253-549-9223
shammon99@gmail.com Street Services, LLC
www.ecostreetservices.com 253.549.9223
�a www.ecostreetservices.com
BILL TO SHIP TO INVOICE# 5394
ACI#22-044 Kent ACI#22-044 Kent DATE 04/30/2023
Kent, WA DUE DATE 06/29/2023
["SATE ACTIVITY OTY RATE AMOUNT
04/25/2023 Services 6.50 225.00 1,462.50
VAC Truck Services on Project
#22-044 at Hogan Park and
Russell in Kent,WA
04/26/2023 Services 5.50 225.00 1,237.50
VAC Truck Services on Project
#22-044 at Hogan Park and
Russell in Kent,WA
04/26/2023 Services 1 225.95 225.95
Pass through charges for Dump
Fees
ECO Street Services, LLC SUBTOTAL 2,925.95
TAX 0.00
TOTAL 2,925.95
BALANCE DUE $2,925.95
THANK YOU FOR YOUR BUSINESSM
Bryant, Jason
From: Krier, Rick
Sent: Monday, April 24, 2023 7:52 AM
To: Barry, Jason; Holcomb, Drew
Cc: Bryant, Jason
Subject: RE: Power conflict is completed
Good Morning Team: ACI is planning on Pot Holing today after saw cutting is completed. I will send the information as
soon as I have it.
Thanks Rick K
From: Barry,Jason<JBarry@kentwa.gov>
Sent: Monday, April 24, 2023 7:30 AM
To: Holcomb, Drew<DHolcomb@kentwa.gov>
Cc: Bryant,Jason <JBryant@kentwa.gov>; Krier, Rick<RKrier@kentwa.gov>
Subject: FW: Power conflict
Hi Drew,
Just an FYI... should know more after potholing.
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
400 Phone 253-856-5546 1 Cell 253-797-8462
IN rr_ iibarry�KentWA.00v
7.10Waei..wai�bx
www.KentWA.4ov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Krier, Rick<RKrier@kentwa.gov>
Sent: Friday, April 21, 2023 11:52 AM
To: Barry,Jason <JBarry@kentwa.gov>
Subject: Power conflict
1
r
s
+
"" ;
Jason I think we are going to have a problem in this area 36+00 CB#2A looks like it lands on a power line. I'll
have the pot hole on Monday to confirm.
3