Loading...
HomeMy WebLinkAboutCAG2020-137 - Change Order - #13 - Active Construction, Inc. - Willis St & 4th Ave S Roundabout - 10/31/2023 Agreement Routing Form • For Approvals,Signatures and Records Management T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KEN W A S H I N G T O N (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: > 11/1/2023 N/A 0 L a. Authorized to Sign: Date of Council Approval: a' 0 Director or Designee ❑Mayor 5/15/2020 Q Budget Account Number: Grant? []Yes 0 No R90112.64110.120 Budget? 0 Yes ❑ No Type: N/A Vendor Name: Category: Active Construction, Inc Contract Vendor Number: Sub-Category: C 2319336 Change Order#13 0 Project Name: Willis Street and 4th Ave S. Roundabout E L .2 Project Details:Crosswalk widening 1 LS $18,908.96 and adding black DWS at pass C C through 1 LS $6,397.44 C Go Agreement Amount: $25,306.40 Basis for Selection of Contractor: E Bid W � Start Date: N/A Termination Date: N/A Ch Q Local Business? ❑Yes O No* *If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes 0 No CAG2020-137 Date Received by City Attorney: Comments: p1 C 3 � a, 1A •� L a p+, Date Routed to the Mayor's Office: N V1 Date Routed to the City Clerk's Office: adccW22373, Z0 Visit Documents.KentWA.gov to obtain copies of all agreements • KENT WASHINGTON CHANGE ORDER NO. 13 NAME OF CONTRACTOR: Active Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Willis Street and 4th Ave. S. Roundabout ORIGINAL CONTRACT DATE: Max 15, 2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change order provides complete payment for: Crosswalk widening 1 LS $18,908.96 Adding black DWS at pass throughs 1 LS $6,397.44. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $4,759,759.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $290,772.59 (incl. applicable WSST) Current Contract Amount $5,050,531.59 (incl. Previous Change Orders) Current Change Order $25,306.40 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $5,075,837.99 CHANGE ORDER - 1 OF 3 Original Time for Completion 100 working days (insert date) Revised Time for Completion under 100 working days prior Change Orders (insert date) Days Required (f) for this Change Order 00 working days Revised Time for Completion 100 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: Digitally signed by Chad Bieren Chad BIGp Ce1 r1 r Date:2023.10.31 By: By: 17:15:00-07'00' (signature) (signature) Print Name: -}:w% �.4Mo Print Name: Chad Bieren Its M Its Public Works Director (title) (title) DATE: (title) Z DATE: AF EC KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) 6tv Kent Cit Clerk Kent Law Department Y [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 File No. 200.2 KEN T Wp9 ��CHANGE ORDER WORKSHEET NO. 13 Construction Engineering Division - Public Works Project: Willis St & 4th Ave S Roundabout Project No: 18-3020 Project Engineer: Thomas Leyrer Fed-Aid No: Capital Projects Brian Shields Contractor: ACI Manager: Date: 6/27/2023 I. Proposed Change This change order provides complete payment for: Crosswalk widening 1 LS $18,908.96 Adding Black DWS at Pass Throughs 1 LS $6,397.44 II. Reason and Background for Change Designed crosswalk markings were not wide enough to span the entire throat of multiple curbramps throughout this project. WSDOT noted this on their final walk through and is requiring the markings to be widened to span the entire throat of the ramps. This change order pays for the scarifcation of the existing and reapplication of the crosswalk markings to the correct width. This change order also covers the costs of adding black surface applied detectable warning surfacing (DWS) to the wide gutterpan adjacent to the yellow DWS at the median passthrough ADA ramps to provide warning to users that they are about to enter the roadway. This was also required by WSDOT following their final walk Ithrminh III. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Total Est. Total Estimated Cost of No Item Description t Unit Unit Price Item V Crosswalk Widening 1 LS $18,908.96 $ 18,908.96 I Black DWS at Pass Throughs 1 LS $6,397.44 $ 6,397.44 New Pay Items Total: $ 25,306.40 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not applicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. — -- ------ — - Page 1 Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Notapplicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. $ $ Increase / Decrease to Existing Pay Items Total: $ *TOTAL ESTIMATED COST OF CHANGE ORDER: $25,306.40 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 100 Due This Change Order: 0 Previous Total 100 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 100 * This Change Order + Previous Total Capital Projects Manager: --- Date: V4, - 2--7-23 Brian Shields Construction Engineering Date: 9 Supervisor: E' 3 a A S70 B AO'( Construction Manager: Date: �g Eric Connor Page 2 ACTIVE CONSTRUCTION CHANGE ORDER/ADDITIONAL WORK SUMMARY ACI INC. A.C.I. A.C.I.PHASE Willis St.and 4th Ave.S Roundabout CODE PROJECT JOB#20-014 DATE WORK PERFORMED: TBD 2023 TBD DESCRIPTION OF WORK Provide Added Sidewalk Width Striping and Added Tilco Vanguard DWS LABOR CLASS/RATES MANPOWER HOURS @ TOTAL WORKING FOREMAN @ I 0,0 @ $94,46 $0.00 OPERATOR @ 1.0 A 00 0 @ $88.56 $0.00 Q $88.56 $0.00 OPERATOR @ 1.0 00.0 @ OPERATOR @ 1.0 Q 0.0 @ $88.56 $0,00 LABORER @ 1.0 Q 0.0 @ $68.59 $0.00 LABORER @ 1.0() 0.0 @ $68.59 $0,00 SUBTOTAL LABOR $0.00 EQUIPMENT DESCRIPTION/RATES EQUIP.NO. EQUIPMENT DESCRIPTION HOURS @ RATE TOTAL 497 Deere 500 Mini Excavator 0.0 @ $42.60 $0,00 263 SYD Dump Truck 0.0 @ $35.03 $0.00 294 CAT 420D Backhoe 0.0 @ $38,41 $0.00 505 Chevy Truck Foreman Truck 0.0 @ $34,09 $0.00 SUBTOTAL EQUIPMENT $0.00 MATERIAL COSTS DESCRIPTION UNIT RATE TOTAL Materials 1,00 LS @ $0.00 $0.00 SUBTOTAL MATERIALS $0.00 SERVICE COSTS DESCRIPTION UNIT @) RATE TOTAL SERVICE SUBTOTAL $0.00 SUB CONTRACTOR DESCRIPTION UNIT na, RATE TOTAL Specialized Pavement Marking 1.00 LS @ $16,883.00 $16,883,00 Tilco Vanguard 16.00 EA @ $357.00 $5,712.00 SUB CONTRACTOR SUBTOTAL S22,595.00 *Use Tax included in total price MARK-UP ON LABOR 31% $0.00 SUBTOTAL LABOR S0.00 MARK-UP ON EQUIPMENT 21% $0.00 SUBTOTAL EQUIPMENT $0.00 TAX ON MATERIALS(N/A ON WATER&SEWER) 0.00% $0.00 MARK-UP ON MATERIALS 21% $0.00 SUBTOTAL MATERIALS $0.00 MARK-UP ON SERVICE COST 21% $0.00 SUBTOTAL SERVICE COST $0.00 12%MARK-UP ON SUB-CONTRACTOR COST(>$25,000=10%) 12% $2,711.40 SUBTOTAL SUB-CONTRACTOR COST $25,306.40 TOTAL(no sales tax) $25,306.40 *Pricing subject to change beyond 60 days from Feb.15th,2023.Traffic control applicable to contract items/hourly. 4,4 SPECIALIZED PAVEMENr MAIZXI.41 175 Roy Rd SW Bldg C Pacific,WA 98047 Tel:253-299-1200*253-299-1250 Lic.#SPECIPM781 B9 PROPOSAL PROJECT: 22-0759 WILLIS ST ROUNDABOUT-SR 516 BID DATE: 12/30/2022 ITEM DESCRIPTION PLAN UNIT UNIT TOTAL # QTY BID BID 1 FULL CROSSWALK RE-STRIPE TO MEET ADA RAMPS 1.00 LS $ 16,883.00 5 16,883.00 Includes scuffing/prep existing bars prior. 2 PATCH CROSSWALKS TO MEET ADA RAMPS 1.00 LS $ 12,116.00 $ 12,116.00 PLEASE NOTIFY US RIGHT AWAY IF WE GOT THIS JOB SO WE CAN PROCESS AND CREATE A FILE Specialized Pavement Marking,LLC proposes to furnish all labor,equipment and materials necessary to complete referenced project Quote good for30 days from above date,after which time a price adjustment may be necessary. STIPULATIONS: 1.GENERAL CONTRACTOR TO PROVIDE TRAFFIC CONTROL&LAYOUT 2.PROPOSAL EXCLUDES BOND.BOND CAN BE PROVIDED AT 1.35%OF CONTRACT TOTAL 3.THIS PROPOSAL TO BE INCLUDED WITH CONTRACT DOCUMENTS. 4.PROPOSAL TO INCLUDE 1 MOBILIZATION.EACH ADDITIONAL MOBILIZATION TO BE$2000.00 For questions regarding this quote,please contact Jason Fingeron-(253)455-0637/Jason.Fingerson@SPMNW.com �� �Gti�1-PJLQ4�2 Page 1 of 1 APPROVED m, -buttons map/drwq ACTIVE cleaning other Proposal # Ph: 425 483 5700 20230051 CALL FIRST COflCfete in. plastic Email: i � -� J Emalled Plant - COt1CPete st� preSS WeSF- -----� _-®._.. i, BidRequests@TILCO.net Dorm@ cones sanding Guidestrip e SITE coast clear; sawcutting - VERBAL crackseal seal coat SkidGuard ` See our amazing products PREVAILINGcur EcoPath Proposal Date REVISED delve strisigpe DW 02/1512023 and services at: delivery P lTtNsl www,TILCO.net MULTIPLE all demo G,,�y sweeping P oa t, ,`5v Matters www.VanguardOnline.com equiprenta tr3fEiccontr _ vo".DisposaCone.com Winter Svcs grading <undergrour - - -- --_i ) EstltltatOr 18122 SR 9 SE,Suite F >lada retrofit . grind/remo,; wheelstops Bid Due Date Snohomish Wa,98296 asphalt hauVtruckir, wananty Jon Julnes(Cell 206 510 5700 ._w BIII To: Email:JimH@activeconstruction.com URL: Ship To: Email: Ph: (253)248-1091 Ext: Fax: (253)248-1093 Ph: Ext: Fax: Cell: (253)495-8286 Home: Cell: (253)606-1428 Home: Active Construction Kent Project C/o Jim Holland c/o Not yet provided P 0 Box 430 Puyallup WA 98371 Kent WA j Mobs Provided Addni Mobs Start Date Notice Req. Color/Special Notes: �As per: i $1,250.00 Yellow ,Drawings provided Quantity Item See new financingo ptions at:www.tilco.net/financing.htmi Our Proposal: Unit Pri Subtotal 16.00 EA Locations add BLACK detectable warnings between existing yellow DW's and to where just before the curb begins to rist $357.00 5,712.00 We will need to recieve payment in advance due to past billing experience 0.00 I H 2022...Celebrat!ng 46 years!! Bid Notes: Estimated Price Inspector: Brian Sheilds/253 293 4973 Subtotal(net incl.sales tax): it all began in 1977.Today we have products and services not*von dreamed of back then.....please take a minute and checkout our $5,712 a 00 websit*a: www.TILCO.net _ www.VanauardOnllne.com www.oisposacQne.com Please add sales tax if D e.co applicable Contrack Term aaW afar.rrluao�r�waad:n..mwd..,o,cwtse,r..wb,+wr.r+sadb asb eraaw.M +wwaE TRCOw+¢�r da.nr.wre��ww+r•Yrtida+maalne weMar'rM+r.�alvNMgrwn�rn+rn ra.++amW rM+tibnt.Yan'wo,up Nos aaaWraMW r+wawaaMW.MsNblMbay aberbwwMae.arrbb�p'4�(rca+nr,a arrrgtiaAaa Ar+ruld6naaMrr.Mwwess.r.r..n.wRtwede✓a+d ardwwww 6iiaaaaa.r!nxrr Tuts Yrtn Wia�.mwuya<•w.a ws,s,wwr.r.wrM+�b�r•rrw aaRYawprGpAaWbtYrMMrabbnaaRFrbiadwrrr+roada{rty161irtT10RMP�¢ad. annWN4�0 sWhY�dp{1aKdCYrY4bMQyYdEYM+dMYPat1/1AgPO Yx�}t.1 Mr +Nr'eW 4T0a+sieAMyraadidMaiMMOMW7drb V0�6uT.- baldwtlWhnlNRr,bow.aNrrw wrWbarrtlWar aa+aads aYreWMYMKM+b7r Wrr.W z, Mwme,6 aardadMNMMa.nibLf NaaaMtlrr+rorPoo"aa+aq 4a%b dayrMb~0"40AFdt9 Ylralr Kdaf W�1+M�«.M+r.6j Mt�M[I MOMrmxrnK 'rar.Ma,ifaad+Y•Mrt&ra+ran+M aq YrrWrrbRWi+ri(�7M r.WYMdabrNWrl aha,�a+fr aJrddr cnr4brNMw.1.Nf¢W atwtlawa+wdbMda+gM garb+ b*r+n adrddr ary rdad aarp. .0+00t lb,"WdMVM flaaw$*rot_V.. �.W.00d TH. a+f�sned fvlR�iibYY�rawa�n0 a,�wir Wrpaame7baYc�awMm W51.adr�alw ndrdrE�+ora�rmMMml�irar'iNOwwdrrndi.MMrrt YalaaM��rN.ww+lil�b eaWbrMMMWKaN.NdMWbOeadwMAlOa"a NdeM naW, sh,NlNrdhlroats+�lrtlial+MM'A4M oedl.dargnNroM�wai+rwrarsr.mis mowutR+9rrMNMpwagANMkr,MryM+1a11 rryrsaryd6rrwRbsdMarMMlbPaa+dtaYarr raYsr asoan btebar+.rppMbrrd dYkna+raMawra.ranrwarbeM/n+Dy+Oru'rMr�++r+�" rrrwWr n£ re►rwa«+Ywrw�arwnydbarppWwaaadblrra+adrmaa aq+errerramiwaoare.rburwrrrw.Yow,aewwa+rrw,ehix mwuumR ouYmAwsa�wYwaereaaandtnrrwnraaaraYr+a.w,Yrwrdw.wglna +snorrco�+ .�++rr rralGaaZ. .tN rn WRdatagrMaarar+M 9ardra+d++rr aaws+re Rr Nnaandbrr paralwartlMd[MMrY+pvra M7rOr rgR.aawmaroraa'arar4adrabrbawabaieasrn5afe,rMlr.heaawaod+pb4rYq bavRhMr+.aarrrJ:Tw+aaearl dwaa+dewarowrrar..�aardnxriYaaaanyurraleo.arwrasMaatvl+aao.YTaTH.w+vwbna.eaaiwadw4i+e+a>•++Mrs,w.,daiawao��w,�a�nawMar�+t++aw.enrrta+.br.wwwk�_Idraarn'..�TN4lnaryart,naalov, gay ainne+n bwlien lbbd N7fa+tWlasMaparNWY N aH *"ftbo LA.aMYW.*� M?M Na+Was`Ai5r f44.byfNltl(M+raM 4+"4W+aVaaaaRNaf MdPrlfiYl MaYM AA Tar�ld/. taMMd1.WaWrIfM.M as aan elL Mysudiactiviry wilna9Neany wu,aNreS.nPmeen Authorized Purchasers Signature required for scheduling Jon Julnes(Cell 206 510 5700) Shields, Brian From: Frantz, Randy <FrantzR@wsdot.wa.gov> Sent: Monday,June 27, 2022 6:44 AM To: Leyrer, Thomas Cc: Shields, Brian; Hawkes, Derek; Brown, Rob; Preston, Erik Subject: RE: [EXTERNAL] City of Kent -4th and Willis Roundabout EXTERNAL EMAIL Hi Thomas, The proposal is an acceptable solution. Thank you, Randy Frantz NWR WSDOT Assistant Manager Local Agency& Development Services 206-440-4715 From: Leyrer,Thomas<TLeyrer@kentwa.gov> Sent: Friday,June 24, 2022 2:42 PM To: Frantz, Randy<FrantzR@wsdot.wa.gov> Cc:Shields, Brian <BShieIds@kentwa.gov>; Hawkes, Derek<DHawkes@kentwa.gov>; Brown, Rob <RBrown@kentwa.gov>; Preston, Erik<EPreston@kentwa.gov> Subject: FW: [EXTERNAL] City of Kent-4th and Willis Roundabout Hi Randy, Would adding black DWS to the median pass-through gutter pans up to the "face of curb" of the mountable curbs be an acceptable solution to provide full width DWS? Please see attached sketch. Thank you, Thomas Thomas Leyrer, P.E. Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5562 tlevrer0kentwa.aov CITY OF KENT,WASHINGTON KentWA.Qov Facebook i;, YouTub Instagram From: Shields, Brian<BShields@kentwa.gov> Sent: Wednesday,June 15,2022 11:28 AM 1 To: Leyrer,Thomas<TLevrer@kentwa.gov> Cc: Barry,Jason<JBarrv@kentwa.gov_> Subject: FW: [EXTERNAL] City of Kent-4th and Willis Roundabout Thomas, See Randy's comments, below. I asked Rob Brown if he concurred with WSDOT's comments, and he does. We'll need to discuss fixing these. I'm looking to see if this is a built wrong or shown wrong situation. Regardless, I am working on it. More to come! Brian Shields, Senior Construction Inspector Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields(a)KentWA aov CITY OF KENT,WASHINGTON KentWA.aov Facebook YouTube From: Frantz, Randy<FrantzR@wsdot.wa.gov> Sent:Wednesday,June 15, 2022 9:01 AM To: Shields, Brian<BShields@kentwa.gov> Cc: Barry,Jason<JBarrv@kentwa.gov>; Connor, Eric<EConnor@kentwa.gov>; Mandery, Rus <ManderR@wsdot.wa.gov_>; Rahman,Sayma <RahmanS wsdot.wa.gov> Subject: RE: [EXTERNAL] City of Kent-4th and Willis Roundabout EXTERNAL EMAIL Brian, Below is the list of items discussed during final inspection: Utility in landing—needs MEF Cut-through island DWS not full width of opening few locations—needs be fixed (no good justification for MEF it) Crosswalk marking does not fully enclose the opening of the curb ramp in few locations—needs be fixed (no good justification for MEF it) See attached photos for list items. Please let me know if you have questions. Thanks, Randy Frantz NWR WSDOT Assistant Manager Local Agency& Development Services 206-440-4715 From:Shields, Brian<BShields@kentwa.gov> Sent:Tuesday,June 14, 2022 11:14 AM To: Frantz, Randy<FrantzR@wsdot.wa.gov_> Cc: Barry,Jason<JBarrv@kentwa.gov>; Connor, Eric<EConnor kentwa.gov_> Subject: [EXTERNAL] City of Kent-4th and Willis Roundabout 2 WARNING:This email originated from outside of WSDOT. Please use caution with links and attachments. Randy, Good Morning. Back on January 20th you met with Jason Bryant in my 4th and Willis Roundabout project. Jason said you had a few comments; I do not have a written copy of these. Do you happen to have a summary with your comments? Our team is hoping to get final buy off from WSDOT on this project. Would you like to meet again on site? Let me know what works best for you. Thank you, Brian Shields 253-293-4973 Get Outlook for iOS 3 From: Shields.Brian To: Jim Holland Cc: Barry.Jason Subject: FW: FW:willis 4th ave Roundabout Date: Wednesday,March 22,2023 3:34:00 PM Attachments: image001.Dna image002.Dng image003.Dng image004.igg imaae005.ioa image006.igg image007.igg image008.ioa Jim, I will work on getting this CO built/processed. Please reach out to your subcontractors and identify when they can get it on the schedule. I will double check with transportation; I am guessing night work is preferred for the in- traffic portions. Thanks! Brian Shields, capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshieldsCd)KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube From: Connor, Eric<EConnor@kentwa.gov> Sent:Wednesday, March 22, 2023 3:32 PM To:Shields, Brian <BShields@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject: FW: FW: willis 4th ave Roundabout Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT,WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Peterson, Kelly<KPeterson(@ kentwa.gov> Sent: Wednesday, March 22, 2023 2:35 PM To: Connor, Eric<EConnorl@kentwa.gov>; Bieren, Chad <CBierenl@kentwa.gov> Subject: RE: FW: Willis 4th ave Roundabout Eric- Thank you for the discussion with Chad and I. Please proceed. Thank you, Kelly Kelly Peterson, AICP, Deputy Director-Engineering Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 KDeterson(.@KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook fwittea YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Connor, Eric<EConnor(@kentwa.gov> Sent:Wednesday, March 22, 2023 11:13 AM To: Peterson, Kelly<KPeterson(@kentwa.g_o_v>; Bieren, Chad <CBierenl@kentwa.gov> Subject: FW: FW: willis 4th ave Roundabout For discussion... (last one) Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From:Shields, Brian <BShields@kentwa.gov> Sent:Tuesday, March 21, 2023 9:42 AM To: Barry,Jason <JBarryl@kentwa.gov> Cc: Connor, Eric<EConnor(@kentwa.gov> Subject: FW: FW: willis 4th ave Roundabout Jason, I am seeking authorization to proceed with creating a change order in the amount of $25,306.40 to remediate the ADA comments from WSDOT. This will be the final WSDOT item on the 4th & Willis roundabout, leaving only extended landscaping as remaining contract work. This change order will be payment for the added black surface applied DWS at the pass through islands (4x islands x 4x sections = 16 ea) that WSDOT has permitted as a fix for the DWS not covering the gutter pan. WSDOT asserted that since the gutter pan is wider than typical, it could be mistaken for pedestrian access to a visually impaired person. Additionally, this change order would compensate SPM for re-marking the crosswalks where the marks were put in per plan, but did not span the entire width of the DWS at almost all of the curb ramps. SPM would scuff the existing markings and re-stripe the entire cross walk areas. This will not only create a compliant channelization, but extend the life of the existing markings by several years. I have attached the quote from ACI, and also several images depicting the work to be done. Let me know if you have any questions or need additional information. Thank you! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-855-e510 bshields(dKentWA.gov CITY OF KENT,WASHINGTON KentWA.gov Facebook i ,rl3: t YouTube From:Jim Holland <IimHlcDactiveconstruction.com> Sent:Tuesday, March 7, 2023 2:36 PM To: Shields, Brian <BShields(@kentwa.gov> Cc: Barry,Jason <JBarryl@kentwa.gov>; Kevin Aalmo <kevina(@activeconstruction com>; Elizabeth Morris<elizabethc(@activeconstruction com> Subject: RE: FW: willis 4th ave Roundabout EXTERNAL EMAIL See attached per your request. Sorry for the delay on my part. Any questions please let us know. Thanks, -Jim ACI_Logo_Ful1_Long_Signature JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconstruction.com I jimhoactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: I�IPOIZ"I't\N"1'/CONI�IDL?N'1'[t�L: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipicnt(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Jim Holland Sent: Friday, March 3, 2023 10:53 AM To: Shields, Brian <BShields(@kentwa.gov> Cc: Barry,Jason <JBarryfkentwa.gov>; Kevin Aalmo <kevina(@activeconstruction.com>; Elizabeth Morris <elizabethc(@activeconstruction com> Subject: RE: FW: willis 4th ave Roundabout Good Morning Brian, This is on my to do list. I just got back from a quick getaway, so I haven't forgotten about you.Stay tuned. Thanks, -Jim 1AC l_Logo_F ul l_Long_S i gnature JIM HOLLAND Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconsti-uctiorl.com I iimhoactiveconstructi on.coin ACI is an Equal Opportunity Employer I FOLLOW US: IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Shields, Brian <BShieldsPkentwa.gov> Sent: Friday, March 3, 2023 10:49 AM To:Jim Holland<IimH(@a iv construction.com> Cc: Barry,Jason <JBarry(@kentwa.aov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizabethc(@activeconstruction com> Subject: RE: FW: Willis 4th ave Roundabout Checking in on this... Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-85e-es10 bshields(alKentWA.gov CITY OF KENT,WASHINGTON KentWA.aov Facebook Twitter YouTube From:Shields, Brian Sent:Wednesday, February 22, 2023 7:54 AM To:Jim Holland <JimH(@activeconstruction.com> Cc: Barry,Jason <JBarry(@kentwa.gov>; Kevin Aalmo<kevina(cDactiveconstruction.com>; Elizabeth Morris<elizabethc(cDactiveconstruction.com> Subject: RE: FW:Willis 4th ave Roundabout Jim, Can you put the work on a COP and send over so we can work on processing this? Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-85e-5510 bshields(aKentWA.aov CITY OF KENT, WASHINGTON KentWA.gov Facebook Twitter YouTube From:Jim Holland <IimHPactiveconstruction.com> Sent:Wednesday, February 15, 2023 1:09 PM To:Shields, Brian <BShieldsPkentwa.gov> Cc: Barry,Jason <JBarry(@kentwa.gov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizabethcPa tiveconstruction com> Subject: RE: FW:Willis 4th ave Roundabout EXTERNAL EMAIL Here is the raw pricing from Tilco Vanguard. Black DWS patched in concrete rolled curb to flow line. $357.00 per each X 16 each (pass thru ramps) =$5,712.00+ 12% mark-up.Traffic control and devices additional. We would of course need coordination with added striping and weather drying period. Any questions please let us know. Thanks, -Jim --------------------------- ACI_Logo_Ful l_Long_Signature JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 F: 253 248-1093 "GET ACTIVE" P.O. Box 430,Puyallup, WA 98371 www.activeconsti-uction.com I jimhoactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.'rhe information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Jim Holland Sent: Friday, February 10, 2023 1:31 PM To:Shields, Brian <BShields(@kentwa.gov> Cc: Barry,Jason<JBarry(@kentwa.aov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizabethc(@activeconstruction com> Subject: RE: FW: willis 4th ave Roundabout Good Afternoon Brian, Sorry for the delay as I was out of the office. I have a call into Tilco Vanguard concerning the quote. As soon as I get an update on the quote I will let you know. Thanks, -Jim AC I_Logo_Full_Long_Signature I JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 98371 www.activeconstruction.com I jimhaa activeconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: INIPOR'I'ANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Shields, Brian <BShields(@kentwa.gov> Sent:Tuesday, February 7, 2023 12:08 PM To:Jim Holland<JimH(@activeconstruction.com> Cc: Barry,Jason<J Barry(@kentwa.gov>; Kevin Aalmo<kevina(cDactiveconstruction.com>; Elizabeth Morris<elizabethc(@activeconstruction.com> Subject: RE: FW:willis 4th ave Roundabout Jim, Checking in on this. Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields0)KentWA.gov CITY OF KENT, WASHINGTON KentWA.aov Facebook Ij r ill.:..-a:, YouTube From:Shields, Brian Sent: Wednesday, February 1, 2023 9:36 AM To:Jim Holland <JimHPactiveconstruction com> Cc: Barry,Jason <JBarrx@kentwa.gov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizahethc(@activeconstruction.com> Subject: RE: FW: willis 4th ave Roundabout Yes, for the island pass through ramps, we need to add black vanguard extended from the existing yellow DWS to the flow line. The bottom picture you sent does not need any additional DWS. Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 2s3-85e-es10 bshields(cbKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube From:Jim Holland <JimHPactiveconstruction.com> Sent: Wednesday, February 1, 2023 7:55 AM To: Shields, Brian <BShieldsPkentwa.gov> Cc: Barry,Jason <JBarry(@kentwa.gov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizabethc(@activeconstruction.com> Subject: RE: FW: willis 4th ave Roundabout F ERNAL EMAIL To confirm for Tilco Vanguard it was decided we could have them add truncated domes to the edge of curb to flowline?Also some areas may need more truncated domes?See below. https://www.tiIco.net/ 01 IIMG-4185.JPG ---------- MG 4175.JPG IMG-4179.'J-P-d-'* 1,IMG 4181.JPG i I i I I What was the determination on this scenario? Is there truncated domes needs beyond the existing panel? ING_4179.JPG i i I I I I I i i I i i i I I I i Let us know. Thanks, -Jim CI_Logo_Ful l_Long_Signature JIM HOUAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 F: 253 248-1093 "GET ACTIVE" P.O. Box 430,Puyallup, WA 98371 www.activeconstruction.com I jimh _activeconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IMPORT"ANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the scnder by reply c-mail, and then destroy all copies of the message and its attachments,if any. From:Shields, Brian <BShields(d)kentwa.gov> Sent:Tuesday,January 31, 2023 4:02 PM To:Jim Holland<JimH(@activeconstruction.com> Cc: Barry,Jason <JBarry(@kentwa.gov>; Kevin Aalmo<kevina(@activeconstruction.com>; Elizabeth Morris<elizabe hcl@activeconstruction com> Subject: RE: FW: willis 4th ave Roundabout Any updates on this? Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-855-5510 bshields(aKentWA.gov CITY OF KENT,WASHINGTON KentWA.gov Facebook j ewitter YouTube From:Jim Holland <JimHCo)activeconstruction.com> Sent:Tuesday,January 10, 2023 9:33 AM To:Shields, Brian <BShieldsl@kentwa.gov> Cc: Barry,Jason <JBarryftentwa.gov>; Kevin Aalmo<kevinal@activeconstruction com>; Elizabeth Morris<elizabe hcl@activeconstruction com> Subject: RE: FW: willis 4th ave Roundabout EXTERNAL EMAIL See attached quote that came back right before the new year. We would need to set up traffic control for night time shift(s) with either way the city would decide to go. As discussed the full re- stripe is recommended for performance and aesthetic values. Please review. With the holidays I never heard back from Vanguard so I will get a status on that. Any question please let me know. Thanks, -Jim ACI_Logo_F lIl_Long_Signature N JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 "GET ACTIVE" P.O. Box 430,Puyallup, WA 983711 www.activeconstruction.com I iimhaactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Shields, Brian <BShields(@kentwa.gov> Sent:Tuesday,January 10, 2023 9:15 AM To:Jim Holland<IimH(@activeconstruction.com> Cc: Barry,Jason< Barryl@kentwa.gov> Subject: RE: FW: Willis 4th ave Roundabout Good morning Jim! Any word on this? Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-5510 bshields @KentWA.gov CITY OF KENT,WASHINGTON KentWA.gov Facebook Twitter YouTube From:Jim Holland <IimH(@activeconstruction.com> Sent: Wednesday, December 21, 2022 10:09 AM To:Shields, Brian <BShieldsl@kentwa.gov> Cc: Barry,Jason <JRarry(@kentwa gov> Subject: RE: FW: willis 4th ave Roundabout EXTERNAL EMA111: I have reached out for pricing. Stay tuned. Have a Merry Christmas and Happy New Year. Thanks, -Jim �ACI_Logo Full Long_Signature I 0 � JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 98371 1 www activeconstruction.com I iimhkactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IIPOR1'iAN"P/CONI�IDh;N"1'IiU.: This c-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipicnt(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From: Shields, Brian <BShieldsl@kentwa.gov> Sent:Tuesday, December 20, 2022 9:58 AM To:Jim Holland <IimHltactiveconstruction.com> Cc: Barry,Jason <JBarryl@kentwa.gov> Subject: RE: FW: willis 4th ave Roundabout Jim, Please provide price proposals for both options: 1. Just adding the "needed" pieces to the end 2. Doing a full refresh of the crosswalk markings Please include in both options the cost of the added vanguard systems black DWS to the gutter pan of the pass throughs. Let me know if you have ant questions. Thanks! Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-e510 bshields(aKentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook watLc�j- YouTube From:Jim Holland<JimHC@activeconstruction.com> Sent:Tuesday, November 29, 2022 8:56 AM To: Shields, Brian <BShieldsl@kentwa.gov> Subject: RE: FW: willis 4th ave Roundabout EXTERNAL EMAIL I circled back with Specialized Pavement Markings for pricing on the crosswalk striping.Jason with SPM said you were going to consult with your road department if they wanted to refresh (R&R) all crosswalk bars for quality and longevity reasons to the preferred length or if SPM were to just patching/adding to the crosswalk bars to meet the length.Jason with SPM mentioned that patching/adding would look terrible with existing bars showing signs of wear and that SPM could not use the torch down method with a flammable material butting up to it. Let us know when you have time. Congratulations on the engagement.Very cool! Thanks, -Jim ACI Logo_Full_Long_Signature a JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconstruction.com I iimh a activeconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Shields, Brian <BShields(@kentwa.gov> Sent:Thursday, November 3, 2022 12:58 PM To:Jim Holland<IimHC@activeconstruction.com> Cc: Elizabeth Morris<elizabeth (@activeconstruction.com>; Kevin Aalmo <kevina(@activeconstruction.com> Subject: Re: FW:willis 4th ave Roundabout We are opting not to go ahead with those arrows. Get Outlook for iOS From:Jim Holland<IimHPactiveconstruction.com> Sent:Thursday, November 3, 2022 12:44:42 PM To:Shields, Brian <BShields(@kentwa$ov> Cc: Elizabeth Morris<elizabe he(@activeconstruction.com>; Kevin Aalmo <kevina(@activeconstruction.com> Subject: RE: FW: willis 4th ave Roundabout EXTERNAL EMAIL Yes, Castaneda did fix the leak of the meter setter and lower the box. Did you find out about the round about"mid point arrows"?Then I will get final estimates to you. Let us know. Thanks, -Jim ACI_Logo_Full_Long_Signature JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconstruction.com I iimhoactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: I IPOIZI`�AN'1'/CONI�IDI;N"[IrU,: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intcndcd recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all topics of the message and its attachments,if any. From: Shields, Brian <BShieldsC@kentwa.gov> Sent:Thursday, November 3, 2022 11:27 AM To:Jim Holland<JimHPactiveconstruction.com> Cc: Elizabeth Morris<elizabethc(@activeconstruction com>; Kevin Aalmo <kevinaCcDactiveconstruction com> Subject: RE: FW: willis 4th ave Roundabout Jim, I'll put October with PE 13. Did Castaneda check out the leaking irrigation behind the meter setter?? Also, Kevin was going to lower the irrigation box. Any update on pricing for the ADA mitigation work? Brian Shields, Capita/Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields(abKentWA.aov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube From:Jim Holland<IimHPactiveconstruction.com> Sent:Thursday, November 3, 2022 11:20 AM To:Shields, Brian <BShields(@kentwa.gov> Cc: Elizabeth Morris<elizabethcPactiveconstruction.com>; Kevin Aalmo <kevina(@a tiveconstruction.com> Subject: FW: FW: willis 4th ave Roundabout EXTERNAL EMAIL We wanted to check in on the Pay Estimate#13.Also how should we handle the repairs that we completed in October so we can get Castaneda paid. Let us know. Thanks, -Jim --- - - -_o -- - - ACI_Logo_Full_Long_Signature i I I JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 98371 www.activeconstruction.com I iimh&,activeconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US:'. 1',\II'OR"1';\N'I'/CONF'IDEN'PIAI,: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From:Jim Holland Sent:Thursday,September 15, 2022 8:06 AM To: Shields, Brian <BShieldsna kentwa.gov> Cc: Elizabeth Morris<elizabe hc(@activeconstruction.com>; Kevin Aalmo ACI (kevinaCcDactiveconstruction.com) <keyinar@activeconstruction.com> Subject: FW: FW: willis 4th ave Roundabout Good Morning Brian, Please see attached quote for sprinkler head repairs from vehicle damage or vandalism. Let us know if we are approved to make the repairs so we are able to get the irrigation back online. We need to still meet up to discuss the crosswalk corrections.Also how is the status of the billing (attached)from last month? Let us know when you have time. Thanks, -Jim ACI Logo_Fulong_Signature — l_L � hI JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconstruction.com I jimbAactiveconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US: IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information.The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you arc not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From: Ismael Castaneda [mailto•icastanedalandsca iinng(@gmail com] Sent:Wednesday,September 14, 2022 4:10 PM To:Jim Holland<JimH(@activeconstruction.com> Subject: Re: FW: willis 4th ave Roundabout JIM Attached is the quote to replace the irrigation heads that were stolen Thank you Yesenia On Mon, Sep 12, 2022 at 10:48 AM Jim Holland <JimH c activeconstruction.com>wrote: Good Morning Teri, Would you send us an estimate so we can discuss with the City of Kent? Thanks, -Jim ACI_Logo_Ful l_Long_S ignature I 0 JIM HOLLAND I Project Manager/Estimator 0: 253 248-1091 1 M: 253 495-8286 1 F: 253 248-1093 1 "GET ACTIVE" P.O. Box 430, Puyallup, WA 983711 www.activeconstruction.com jimh activeconstruction.com ACI is an Equal Opportunity Employer I FOLLOW US:: i IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information. The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s)is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient,or if this message has been addressed to you in error, do not read,disclose, i reproduce,distribute,disseminate or otherwise use this transmission,rather,please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments,if any. From: Ismael Castaneda [mailto:iractanedalandsca iinngCcDgmail com] Sent:Tuesday, September 6, 2022 2:38 PM To:Jim Holland<IimH(@activeconstruction.com>; Elizabeth Morris <elizabethcPactiveconstruction.com> Subject:willis 4th ave Roundabout i Good afternoon Jim and Elizabeth We are having an issue at the Wills and 4th ave roundabout, Irrigation heads have been stolen for the copper inside them attached is some pictures our foreman took today. Thank you Teri CASTANEDA LANDSCAPING 1905 Bay Ave Aberdeen WA 98520 PH:(360)637-8225 FAX:(360)637-9629 CELL: 360-581-9678 icastanedalandsca iinngkgmail.com castanedalandscaping.com The information contained in this email, including any attachments, is confidential and may be privileged. It is intended only for the person or entity to which it is addressed and no waiver is intended by sending this email. If the reader is not the intended recipient,you are hereby notified I that any review, re-transmission,dissemination or other use of,or taking any action in reliance upon this information is strictly prohibited. If you have received this email in error, kindly notify the sender by reply email and delete the original message from any computer. Thank You. CASTANEDA LANDSCAPING 1905 Bay Ave Aberdeen WA 98520 PH:(360)637-8225 FAX:(360)637-9629 CELL: 360-581-9678 icactanedalandccapingkp gmail.com cactanedalandscaping.com The information contained in this email, including any attachments, is confidential and may be privileged. It is intended only for the person or entity to which it is addressed and no waiver is intended by sending this email. If the reader is not the intended recipient,you are hereby notified that any review,re-transmission, dissemination or other use of, or taking any action in reliance upon this information is strictly prohibited. If you have received this email in error,kindly notify the sender by reply email and delete the original message from any computer. Thank You. t i - � s A4c�� Ee FACE 4F CtW8 12m 12" to MATCH ROADWAY P U TRUCK APRON SLOPE 4 Ft.AY ` CURB 1 CEMENT CONCRETE ROUNDABOUT CURB GUTTER 2" NOT TO SCALE 1207 Grind gutter pan surface to accommodate thickness of DWS. Install Black DWS to face of curb of Curb 1. t 1���'..' ;+ 4 .r ��,ram, E'.�.,� `�� " f .,� ,� �r ,. �� ,i�,r .: ''`"' .. ra pit{� '', If:, .� M .. yr...a �'� _.,J I ♦®_ F f +f 'R �p.. .�. _ ' ... �...yaws. k r�_. � :� ., - .. .. .. � �.. `__"�'�K'w.+-,-..ems.....-..�. �.......�. �.�..s...w �._�... ��.. �t�- _.. Shields, Brian From: Frantz, Randy <FrantzR@wsdot.wa.gov> Sent: Monday,June 27,2022 6:44 AM To: Leyrer,Thomas Cc: Shields, Brian; Hawkes, Derek; Brown, Rob; Preston, Erik Subject: RE: [EXTERNAL] City of Kent -4th and Willis Roundabout EXTERNAL EMAIL Hi Thomas, The proposal is an acceptable solution. Thank you, Randy Frantz NWR WSDOT Assistant Manager Local Agency& Development Services 206-440-4715 From: Leyrer,Thomas<TLeyrer@kentwa.gov> Sent: Friday,June 24,2022 2:42 PM To: Frantz, Randy<FrantzR@wsdot.wa.gov> Cc:Shields, Brian<BShields@kentwa.gov>; Hawkes, Derek<DHawkes@kentwa.gov>; Brown, Rob <RBrown@kentwa.gov>; Preston, Erik<EPreston@kentwa.gov> Subject: FW: [EXTERNAL]City of Kent-4th and Willis Roundabout Hi Randy, Would adding black DWS to the median pass-through gutter pans up to the "face of curb" of the mountable curbs be an acceptable solution to provide full width DWS? Please see attached sketch. Thank you, Thomas Thomas Leyrer, P.E. Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5562 t1evrer6kentwa.aov CITY OF KENT,WASHINGTON KentWA.gov Facebook + ,,,i:3— YouTube Instagram From:Shields, Brian<BShields kentwa.gov> Sent:Wednesday,June 15,2022 11:28 AM � i To: Leyrer,Thomas<TLeyrer@kentwa.9ov> Cc: Barry,Jason<JBarry@kentwa.Kov> Subject:FW: [EXTERNAL] City of Kent-4th and Willis Roundabout Thomas, See Randy's comments, below. I asked Rob Brown if he concurred with WSDOT's comments, and he does. We'll need to discuss fixing these. I'm looking to see if this is a built wrong or shown wrong situation. Regardless, I am working on it. More to come! Brian Shields, senior Construction Inspector Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 hshieldsCa@KentWA.aov CITY OF KENT,WASHINGTON KentWA.aov Facebook YouTube From: Frantz, Randy<FrantzR@wsdot.wa.gov> Sent:Wednesday,June 15,2022 9:01 AM To:Shields, Brian<BShieIds@kentwa.kov> Cc: Barry,Jason<JBarrv@kentwa.gov>; Connor, Eric<EConnor@kentwa.sov>; Mandery, Rus <ManderR@wsdot.wa.sov>; Rahman,Sayma <RahmanS@wsdot.wa.gov> Subject: RE: [EXTERNAL]City of Kent-4th and Willis Roundabout EXTERNAL EMAIL Brian, Below is the list of items discussed during final inspection: Utility in landing—needs MEF Cut-through island DWS not full width of opening few locations—needs be fixed (no good justification for MEF it) Crosswalk marking does not fully enclose the opening of the curb ramp in few locations—needs be fixed (no good justification for MEF it) See attached photos for list items. Please let me know if you have questions. Thanks, Randy Frantz NWR WSDOT Assistant Manager Local Agency&Development Services 206-440-4715 From:Shields, Brian<BShields kentwa.eov> Sent:Tuesday,June 14, 2022 11:14 AM To: Frantz, Randy<FrantzR wsdot.wa.gov> Cc: Barry,Jason<J Barry@ kentwa.gov_>; Connor, Eric<EConnor@_kentwa-gov> Subject: [EXTERNAL]City of Kent-4th and Willis Roundabout 2 WARNING:This email originated from outside of WSDOT.Please use caution with links and attachments. Randy, Good Morning. Back on January 20th you met with Jason Bryant in my 4th and Willis Roundabout project. Jason said you had a few comments; I do not have a written copy of these. Do you happen to have a summary with your comments? Our team is hoping to get final buy off from WSDOT on this project. Would you like to meet again on site? Let me know what works best for you. Thank you, Brian Shields 253-293-4973 Get Outlook for iOS 3