HomeMy WebLinkAboutCAG2023-006 - Change Order - #1 - Active Construction Inc. - S. 240th Street and Russell Road TIB Sidewalk Improvements - 10/03/2023 (3) Agreement Routing Form • For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. w A s H I H c T o N (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: > 9/20/23 0 L 0. Authorized to Sign: Date of Council Approval: 0' 0 Director or Designee ❑ Mayor 12/13/2022 Q Budget Account Number: Grant? 0 Yes ❑No R20122.64110.120 Budget? 0 Yes ❑No Type: N/A Vendor Name: Category: Active Construction, Inc. Contract Vendor Number: Sub-Category: C 2319336 Change Order#5 Project Name: S. 240th Street and Russell Road TIB Sidewalk Improvements E L C ProjectDetails:Grind and overlay exisitng HMA on Russell Road. C Agreement Amount: $6,189.76 Basis for Selection of Contractor: Bid E 0 1. Start Date: N/ATermination Date: 130 Working Days tm Q Local Business? ❑Yes ❑ No* *Ifineets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: ❑Yes 0 No CAG2023-006 Date Received by City Attorney: Comments: Im C 7 3 0 41 N •� L p� Date Routed to the Mayor's Office: iA Date Routed to the City Clerk's Office: dd«w22373 120 Visit Documents.KentWA.gov to obtain copies of all agreements • KEN T WAS Ill N G T.N CHANGE ORDER NO. # 5 NAME OF CONTRACTOR: Active Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBERS. 2401h Street and Russell Road TIB Sidewalk Improvements ORIGINAL CONTRACT DATE: December 28, 2022 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Grind and overlay existing HMA on Russell Road per revision #6. This work was tracked on force account sheet #3. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,943,943.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $25,574.54 (incl. applicable WSST) Current Contract Amount $1,969,517.54 (incl. Previous Change Orders) Current Change Order $6,189.76 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $1,975,707.30 CHANGE ORDER - 1 OF 3 Original Time for Completion 130 working days (insert date) Revised Time for Completion under 0 working days prior Change Orders (insert date) Days Required (±) for this Change Order 0 working days Revised Time for Completion 130 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: DigUAI1y signed by Ryan Suits DN O=US, @tytinbeactiveconstruclion.com, p Q Digitally signed by Chad Bieren Ryan Burks CN#Ftyan Surfs Chad B(G re n Date 2023.10.03 17:51 16-07'00' By: 08W'2023.09.28 10:19:29-07'W By: (signature) (signature) Print Name: Print Name: Chad Bieren, P.E. Its Its Public Works Director (title) (title) DATE: DATE: KP F EC I� CHANGE ORDER - 2 OF 3 ATTEST• APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department C[In this feld,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 File No. 200.2 KENT CHANGE ORDER WORKSHEET NO. 5 Construction Engineering Division - Public Works Project: So 240th and Russell Rd TIB Sidewalk Project No: 22-3004 Improvements Project Engineer: Drew Holcomb TIB-Aid No: #P-P-106(P06)-1 Capital Projects Jason Bryant Contractor: ACI M n r: Date: 9/13/2023 I. Proposed Change FGrind and overlay existing HMA on Russell Rd per Rev #6. This work was tracked as force account on FA #3 II. Reason and Background for Change During construction it was discovered ponding would occur within the existing roadway if a half street grind and overlay was not done to improve slopes. Revision #6 was issued to address grading challenges. Work was tracked as force account on sheet #3. III. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Total Est. Total Estimated Cost of No Item Description t Unit Unit Price Item II Grind and Overlay 1/2 Street - Russell Rd. 1 FA $6,189.76 $ 6,189.76 (Rev 6) $ - New Pay Items Total: $ 6,189.76 DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not applicable Sch Bid Item No. Item Description Qty Unit 7 Unit Price Cost of Item No. Delete Existing Pay Items Total: $ - Page 1 INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not applicable Sch Bid Item No. 7 Item Description Qty Unit Unit Price Cost of Item No. $ Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $6,189.76 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 130 Due This Change Order: 0 Previous Total: 130 Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 130 * This Change Order + Previous Total Capital Projects Manager: Date: Jason Br ty,nt Construction Engineering Date: 't Supervisor: J on Barry Construction Manager: � _- � Date: Eric Connor Page 2 FA Sheet No.: 3 DAILY REPORT OF FORCE ACCOUNT WORKED T Project Name: TIB Sidewalk Improvements Project No: 22-3003,22-3004 Item No.: 8021 Date: 6/8/2023 Description of Work: Grind HMA on Russel Rd Work by Subcontractor?: No Prime Contractor: ACI Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate Hrs OT Rate AMOUNT John A Foreman 3.5 95.31 $ 333.59 Eugene C Foreman 95.31 $ - Kevin M Laborer App 60% 48.25 $ - Cody P loperator 3.5 91.2 1 1 $ 319.20 Jim ITruck Driver 1 91.2 $ 91.20 Mattew Laborer 3 3.51 68.37 $ 239.30 SUBTOTAL-LABOR: $ 983.29 LABOR OVERHEAD&PROFIT @ 31% $ 304.82 LABOR TOTAL $ 1,288.11 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 437 Bomag 135 70.11 $ - 441 Chevy 3500 3.5 31.97 $ 111.90 456 420E Cat Backhoe 1.5 105.66 $ 158.49 489 Chevy Silverado I $ - 429 Dump Truck 1 78.081 3 406 85G Deere SUBTOTAL-EQUIPMENT $ 348.47 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 73.18 EQUIPMENT TOTAL $ 421.65 MATE RIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Ground Up Invoice#9316 1 ea $ 4,000.00 $ 4,000.00 Is Is - SUBTOTAL $ 4,000.00 OVERHEAD&PROFIT @ 12% $ 480.00 TOTAL $ 4,480.00 Verification of Hours Worked: TOTAL: $ 6,189.76 12%MARKUP (for prime when subcontract work) $ - Miranda Frasier Contractor's Representative Date SHEET TOTAL: $ 6,189.76 Owner's Representative Date J Pay Esti a ntered: Date: By: IV 133HS 33S OZ+L£ 'V1S 3NIl HD1VW II i 4 I ' a x N c?m I M z O -O _ o s . p {-,, fS » LL® II• jl • I W H ygjW� ..( mNa Ip •I �I 'I u VaH v a� Inui d S$w J s �Y pl I I v gn oll^°II ,S ro' in x xoi$^ FI li • oIN < I, I Io'^ I a mM Cli Cq d+m....r'J ��/ c� xwcoim'n I• I - '.g w °k a r ! I IP V B r/ Iwo oW= � x p�_ I " I g � Wo, w � I " r o w v Ea o a O M i0..9 a\ L �a i ° I N m l a a P N '�! J C9 c x I w I a La n °o IF I w lwz i w0 Z 0U' o iL 19 J ox w l I it I of s I I � & gI° ItH I I w w g 1 m= N <za ti _ f § z +^ I "• - I I < a , g I I I Fow I' ox` os I I I Wq 'I ° i �� ,.� I I —,—_---- z cc gOyQ Ilor v17 �— ` \° T M�M I I f I I ° I F I 1 —T I ®� ,C' z�o ZV 133HS 33S OZ+OV 'V1S 3NIl HO1VW x�,oe�e ��y$ ry I' h- \\� 3 om o IAI 11.06 1 v 0 0 o o a JdCLa i iL n - i I w ry rc o I II 'jai I jn �� _ N aa. [JFI_a I I W S 3 in 3 Y a Za p it IEl Q W J o d l 0 M M n inKZ i y'6�w CL Q� L2it — o w �Oz z I 11Z�1 °' ffII I� yam+ F Fi Im z SIG .> ii I f ow aE H q ��7711 rr 'WI II zI zui I xaJ o .� 3 � �" z ' �i � F of �w m w N I � M -_ II 1 I m ' rc t J[F-- 41 a� a Z �S�JI.. i m i. 11 3 �I I I I Z V ga. IN Z Z. � 1 3 a n m N 1 eI I %a# I I I Wu� a Tn II I II n B o o f� -- 11,% SXA Ile. n I MI x �axa I I r W 20 g I to g:E I I I,TI. "s I Ii Ij I - It + - I j - 176 zz w - x m «w px II 'i o a" - I OV 133HS 33S OZ+LE 'V1S 3NIl HO1VW is n C / � aaoa ao 0 o a o 8 zz a a a a K W~ c Td�a a S n a G cZ-i i5 F a > yV a m W J 8 o Or N o c 'a oYi oartT3 w m' x> �RFul a"✓. �Qr'G"7'�kaznW �a .^� a pp (J G W 3i�1 SVI YaI� ��t O2WSJ m m a nova n �In wzo� w� Oz' &zc azog R_ o �23 R �a 8 m m 3 � p z Vgo 80 8� x ` - ZZ 8 R 8 8 OFZZ x }} + +w +w as +a m? ���w z - zz o pU L ��5�� w� LL' I wNwYaN M =�Q� 1 'umu`iawmmum a 2 a m�'ox z ur"mgb ...r 3 0;aa a C4 w N i I W w U < � � g W T — . y _ --- I / J 0 '9 01 A + zo j ii i �o z i Z,, �m 5E S 2,6 -^ a z s ,PI �i 3� W ), I Wp m+ w++ m+ 1 Fr fiI 1 N a a N � 1 F \ '11 i 1 Wwi� WOK 1 II 1 \ ryWU] mfmw ! ' dl . I In � I Urn '^�<'➢ NO J 1 11, J ..-{ �� Wrc F W IF 6N M. { II 1 /n o+ Lt' 133HS 33S OZ+Op 'V1S 3NI-1 H31VW a PUBLIC WORKS DESIGN ENGINEERING Carla Maloney Design Engineering Manager 400 West Gowe Kent, WA 98032 K E i�T Fax: 253-856-6500 W A..I N n I O N PHONE: 253-856-5500 Date: June 7, 2023 To: Eric Connor, Construction Engineering Manager Cc: Jason Barry, Construction Supervisor Jason Bryant, Capital Project Manager , >� Carla Maloney, Design Engineering Manage From: Drew Holcomb, Project Engineer Mark Madfai, Engineering Supervisor/A M. Regarding: 240th Street and Russell Road TIB Sidewalk Improvements Project No. 22-3003 and 22-3004 Revision No. 6 Half street overlay of Russell Rd. This will involve planing and overlaying the existing pavement 2 . The west side of the road shall match existing and the contractor will create a crown in the middle of the lane and tie into the curb and gutter on the east. This revision is necessary for the following reasons: 1. The road is very flat and this will help to alleviate ponding. 2. If kept as designed, the ponding will be in the wheel path of a vehicle. 3. The roadway will be patchwork with multiple jogs in the new pavement. Attachments: Sheets 40-42 Drew Holcomb Project Engineer I City of Kent Public Works Department Chad Bieren, Public Works Director oil Lti 133HS 33S OZ+L£ 'V1S 3N11 H31VWS x y Wad < W-J mWyx '/, '-✓Tra Ib hl u Uam - -� o s� I I UWH ooWN ��>nM oQ�x � III li o FI II . Uly I5 II lip ( a mM x-1 s� as i N a° iP W w� s a Y I� o _/ vxi p a 1 `v I. I '� ( �- „ O M d v' ix i K Z w i m�www ]apt . RL -z _I . II KQQ h ma I. IxAl 8,6 IW U3, I I G o< fli <� I' r�J wffi I 1 �oW I oaS�I' 0 I m I J oo ag3 1 ! I w ` oww 0R JA �205 1 i I r JI ^xxQo — � =qqb6 N�K I I� I Z II I x x oil k �s�� � l Ilo ij I waan I i � ri i 1 w I - _ � s �ZV 133HS 33S OZ+04 'V1S 3Nil H31VW �+ � II• I I >t0 0 0 n a n n g+ j 11 ,6m e rvii 3 m - It p I i9 % I LL I � mM a ¢ I o Nqb 6 -- o z En l J 7 UJI s 1 o ._oo 0Wga �zG CL / W ( I !� I /�-o i n o`Ai"'n°non UJI IT di zw a o_ w :1 a oa ff I I lil3i° p ��-JU1 i zJ o 51 m o o _ M <x w a I I „ I I I v " 3 ii ioJI II w ° w I gs� cc LL i m Iy a�zo. o n FP a II°I LJ eY3^ < I � a �_ ii I I LLi go o ky a N � w r z'a 1 K s \ Moo I a I " OF .. < i m a i I �+ --- i I ,I n to $ osow x 9z N Y I i I Oti 133HS 33S OZ+L2 'V1S 3NIl H31VW NINE 8 M E C5 a b o j 0 a N ® Z s nd m N 0 i a' i o W d w Yd n a o g 3 mz� S o nn o w � q oz oz $ o $ $ a x g as a�,o $ o N n JJ UU (Q� F 1I-e vs QUz66 S m g 3at O o2W OZ �(�w SJm a mm o &z �� $i mi✓ �z $m rci o @2 Rzm it O O O O a a a klw - Y z tn U WIZa H. �� R �� rco rco Yw 1 \ WSJ p v Of 0. zo G y am yy g }} _ pN +N 0 C4 mo H ^y Z._�i ZCL ZOo o Z Q o O U 3 SOU MmH d3 S w 1sb��3�M w1�"� swum 3 ; ¢ Imo _ _ aaa222 §w00 \+ O 1Sx3 ,' 61 Rorer �3 mM / 0 o II" 1 <N ft. N H n N �'6 �q o II I z w aH I IIL I N N -o ,dm R.LL o4 II, m r2 it �o So wo mo x -JJ + " 91 I w.; _I �o I N w n I PI I m co$ z a w :g wa I / o L P U 9 z _w � o 11 I =�wzw Wore =oy oa5� II \� ry^�cwifN 041 fA ry z I I J w a \ .I� � 1 � Jar ell I w I" �N �a t: m 1 4 11 I N IF 3 50 II` K M �U - r I 11 I mo o - j1 ON wit N \ op L4 133HS 33S OZ+04 'V1S 3NI1 H31VW Bryant, Jason From: Holcomb, Drew Sent: Wednesday, June 7, 2023 2:58 PM To: Connor, Eric; Barry, Jason; Bryant, Jason; Krier, Rick Cc: Maloney, Carla; Madfai, Mark; Adams, Brunye Subject: TIB - Russell Rd. Revision 6 Attachments: Revision 6 - Russell overlay signed.pdf Hello Construction team, Thank you for bringing this pavement issues up and discussing in detail. Attached is the revision we discussed with the half street overlay on Russell. Drew Holcomb, P.E. Design Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 1 Cell 253-561-1587 dholcomb(&kentwa.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube Instaaram From: Holcomb, Drew Sent: Wednesday, May 24, 2023 3:37 PM To: Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarry@kentwa.gov> Cc: Maloney, Carla <CMaloney@kentwa.gov>; Madfai, Mark<MMadfai@kentwa.gov>; Fraumeni,Joe <JFraumeni@kentwa.gov>;Tomjack, Chase <CTomjack@kentwa.gov>; Warren, Cody<CMWarren@kentwa.gov>; Bryant,Jason <JBryant@kentwa.gov>; Krier, Rick<RKrier@kentwa.gov>; Adams, Brunye <BAdams@kentwa.gov>; Mollett,Toby<TMollett@kentwa.gov> Subject:TIB - Russell Rd. Revision 5 Hello Eric and Jason, Please see the attached signed plans for Revision 5 of TIB sidewalks. This revision raises the flowline and was necessary because the designed plans created a steep cross slope from the sawcut line to the flowline. Thank you to Brunye for hoping on this project despite it not being his project! Catch basin RIM and IE elevations unchanged. Fire Hydrant elevation provided. Saw cut from 37+77.26 to 37+78.70 was extended 1'. Luminaire schedule on sheet 48 elevations updated. Please let me know if you have any comments or questions. Drew Holcomb, P.E. Design Engineer III Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-5561 1 Cell 253-561-1587 dholcomb(akentwa.gov 1 CITY OF KENT, WASHINGTON KentWA.aov Facebook YouTube Instaaram 2 Bryant, Jason From: Bryant, Jason Sent: Wednesday, June 7, 2023 8:24 AM To: Barry, Jason Cc: Connor, Eric; Krier, Rick Subject: TIB Sidewalk- Revision Jason, We meet on site yesterday to discuss the paving limits on Russell Rd. It was agreed upon in the field that additional grinding is necessary. An additional 3' of HMA will need to be ground to avoid a quarter crown. Drew was on site and he is working on a Revision. If you have any question give Rick or I a call. Thank you, Jason Bryant, capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 JBryant(@KentWA.gov CITY OF KENT,WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 1 Ground Up Road Construction Inc, INVOICE �>r DBA M&M Road Recycle Date Invoice# PO Box 1690 06/08/2023 9316 Milton, WA 98354-1690 P: 253.891.1413 F. 253.891.1425 Email.susan@grndup.com Bill To Active Construction PO Box 430 Puyallup WA 98371 ContractlJob/PO# Project Description GrndUp Job# 22-044 S 240th St and Russell Rd-Kent 23-043pw DATE DESCRIPTION UNIT QUANTITY RATE AMOUNT 06/08/23 Mobilization I Per Occurrence LS 1.00 600.00 600.00 Milling Bituminous Asphalt Hourly 4.00 850.00 3,400.00 Minimum Shift Charge (0-4 hrs) 577 SY @ 2"Depth Sales Tax 0.00 (per Quote Total $4,000.00 Please remit to above address. Terms Retention $0.00 Please refer to our Quote for Terms&Condistions. Payments/Credits $0.00 Past due balances are subject to finance charges @ 30DY 1.0%monthly(exluces retention). Balance Due $4,0070