HomeMy WebLinkAboutCAG2022-341 - Change Order - #7 - SCI Infrastructure, LLC - 76th Avenue South: North Segment - 08/03/2023 Agreement Routing Form
For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H I N G T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required:
> 8/30/2023 N/A
0
I-
G. Authorized to Sign: Date of Council Approval:
I' 0 Director or Designee ❑ Mayor 08/02/2022
a
Budget Account Number: Grant? 0 Yes ❑No
R90125.64110.120
Budget? 0 Yes ❑No Type: Federal
Vendor Name: Category:
SCI Infrastructure, LLC. Contract
Vendor Number: Sub-Category:
170264 Change Order#7
0
Project Name: 76th Avenue South - North Segment
E
i.
C Project Details:Creates abid item to provide compensation for extra de-watering and other
work associated with installation of MH 7.
c
a,
E Agreement Amount: $9,778.18 Basis for Selection of Contractor: Bid
40
i Start Date: N/A Termination Date: 103 Working Days
a Local Business? ❑Yes ❑ No*
*If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce.
Notice required prior to disclosure? Contract Number:
❑Yes 0 No CAG2022-341
Date Received by City Attorney: Comments:
I1
C
7
3 0
ai V1
a1
fa
p� Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
ad«W22373 , zo Visit Documents.KentWA.gov to obtain copies of all agreements
•
4000'*
�FKNT
WASHINGTON
CHANGE ORDER NO. #7
NAME OF CONTRACTOR: SCI Infrastructure, LLC ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 76th Avenue South - North Segment
�I
ORIGINAL CONTRACT DATE: August 23, 2022
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
This change order creates a bid item to provide compensation for extra
dewatering and other work associated with the installation of MH 7
2. The contract amount and time for p pr
ovisions rovisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $4,165,504.10
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $99,059.31
(incl. applicable WSST)
Current Contract Amount $4,264,563.41
(incl. Previous Change Orders)
I
Current Change Order $9,778.18
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $4,274,341.59
CHANGE ORDER - 1 OF 3
Original Time for Completion 75 working days
(insert date)
Revised Time for Completion under 27 working days
prior Change Orders
(insert date)
Days Required (t) for this Change Order 01 working days
Revised Time for Completion 103 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the j
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
I
I
i
IN WITNESS, the parties below have executed this Agreement, which will become
effective on the last date written below.
CONTRACTOR: CITY OF KENT:
Digitally signed by Chad
Bieren
Chad B I e re I n� Date:2023.08.03
By:
By: 18:46:44-07'00'
(si at Ire) (signature)
PriKI eevL,& Print Name: Chad Bieren, P.E.
16 CpN-i P- -t M�-i, V;P .. Its Public Works Director
(title) (title)
DATE: 07 -2 4—7- DATE:
EC
KP
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
k�;U ZOVA
Kent City Clerk Kent Law Department
i
i
I
C[tn this flew,you may enter the electronic fllepath where the contract has been saved]
I
i
CHANGE ORDER - 3 OF 3
File No. 200.2
KENT
CHANGE ORDER WORKSHEET NO. 7
Construction Engineering Division - Public Works
Project: 76th Avenue South - North Segment Project No: 21-3012
Project Engineer: Mark Madfai Fed-Aid No: STPUL-1075(004)
Capital Projects Cameron Bloomer (KBA, Inc.) Contractor: SCI Infrastructure
Manager:
Date: 6/27/2023
I. Proposed Change
This change order creates a bid item to provide compensation for extra dewatering and other work
associated with the installation of MH 7.
II. Reason and Background for Change
New storm manhole MH7 is shown being installed over an existing 20 RCP storm line. The existing
storm line was surcharged with water which must be removed to complete the work. The bid
documents do not inform the contractor of this condition. To accomplish this, inflatable plugs were
installed into the existing 20" storm pipe up and downstream of the location of MH 7. The downstream
plug was installed on 1/11, excavation was performed on 1/12 (bid item work), and the upstream plug
and dewatering work performed on 1/13. Dewatering included cutting into the existing pipe, letting the
pressurized water drain, and removing oversaturated soil from the excavation. Time and material
efforts on 1/11 (FA8) and 1/13 (FA9) were tracked in the field.
III. Method of Payment
NEW PAY ITEMS 0 Notapplicable
Sch. Total Est. Total Estimated Cost of
No Item Description Qty Unit Unit Price Item
IV MH 7 Dewatering 1 LS $9,778.18 $ 9,778.18
New Pay Items Total: $ 9,778.18
DELETE EXISTING PAY ITEMS) per 1-09.5 o Notapplicable
Page 1
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$
Delete Existing Pay Items Total: $
INCREASE/DECREASE TO EXISTING PAY ITEMS) o Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$
Increase / Decrease to Existing Pay Items Total: $
*TOTAL ESTIMATED COST OF CHANGE ORDER: $9,778.18
*Total of the Cost of Item Columns
IV. WORKING DAYS 0--
Original Contract: 75 Due This Change Order: 1 Previous Total: 0 ��..
107-
Explanation/Justification for Additional Working Days:
MH 7 installation was a critical path activity on the schedule and extra work totaled approximatly 1 crew day.
*TOTAL WORKING DAYS: — 10
*This Change Order + Previous Total
Date: 2023.07.12 6/27/2023
Capital Projects Manager: �� 64bf-",007:19:47-07'00' Date:
Cameron Bloomer (KBA, Inc)
Construction Engineering Date:
Supervisor: 7/11/23
,r
for Jason Barry
Construction Manager: 5 f %,,,,�,. Date: 7/11/23
Eric Connor
Page 2
DAILY REPORT OF FORCE ACCOUNT WORKED
A
CONTRACTOR SCI Infrastructure DATE 1/11/2023
SUBCONTRACTOR PAY EST#
Project No.:21-3012 ITEM# 4300
Federal Aid No.:STPUL 1075(004)
FA# 8
DESCRIPTION OF WORK Extra Dewatering Effort to install MH 7.Install plug inside existing storm
PERFORMED:MH Contractor 31859
FA#
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG HRS REG RATE OT HRS OT RATE AMOUNT
Shane Elmendorf(2023) Pipe Layer 2.00 $ 67.81 $ 92.70 $135.62
Andrew Pace(2023) Operator 2.00 $ 89.44 $ 119.80 $178.88
Jake Raudenbush(2023) 10perator Foreman 2.00 $ 93.52 $ 125.88 $187.04
$ - $ _ $0.00
_ $ _ $ - $0.00
LABOR SUBTOTAL $501.54
29%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $145.45
Per WSDOT Spec 1-09.6,add an additional 2%for Contractor Sick Leave $10.03
TOTAL LABOR $657.02
EQUIPMENT
EQUIPMENT TYPE EQUIPMENT SIZE I REG HRSI EG RATE STDBY HRS STDBY RATE AMOUNT
325-202 Pipe Truck(Jan 2023) 01 2 $ 51.59 $ 8.91 $103.18
335-141 Dodge 2500 P/U(Jan 2023) 01 2 $ 36.67 $ 4.67 $73.34
Test Plug/Ball Per Day 1 2 $ 173.00 $ - $346.00
EQUIPMENT SUBTOTAL $522.52
21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $109.73
TOTAL EQUIPMENT $632.25
MATERIALS and/or SERVICES
VENDOR&INVOICE# MATERIAL SUB TOTAL TAX AMOUNT
$O.00 $0.00
$0.00 $0.00
$0.00 $0.00
MATERIALS SUBTOTAL INCLUDING TAX $0.00
21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $0.00
TOTAL MATERIALS $0.00
SUBCONTRACTOR INVOICED WORK
VENDOR&INVOICE# WORK DESCRIPTION AMOUNT
$0.00
$0.00
SUBCONTRACTOR INV SUBTOTAL $0.00
Tax on Material(if applicable) $0.00
TOTAL SUBCONTRACTOR INV WORK $0.00
AMOUNT
PRIME Subtotal of Labor,Equipment,&Material Work $1,289.27
SUBCONTRACTOR Subtotal of Labor,Equipment,Material,&Subcontractor Invoiced Work $0.00
Markups on work performed by Subcontractor:up to$25,000=12%,$25,000-$100,000=10%Greater than$100,000=7% 0
Subcontractor Mark-up $0.00
TOTAL COST $1,289.27
❑ If checked,this work is in dispute.By signing this form,parties are agreeing to the time and
effort needed to accomplish the task. Entitlement to be determined at a later date.
Owner's Representative Contractor's Representative
Form Date 7/2020
SCI Infrastructure, L L C Daily Cost Record
031859
Project: 76th Ave S-N Segment Job#2210 Date: 01/11/23 Weather:
Description:
Install test pluq inside existing stonn MH in southbound lane on west side of 76th:pluq installation is to allow
MH7 connection.
HOURS
DETAIL COST RECORD CODE S.T. O.T. D.T. Total RATE EXTENSION
Andrew Pace OP 2 2 89.44 178.88
Andrew Pace OP OT 0 0.00
Shane Elmendorf PL 2 2 67.81 135.62
Shane Elmendorf PL OT 0 0.00
Jason L ons OP 1 0 0.00
Jason Lyons OP OT 0 0.00
Ken Brumley OF 0 0.00
Ken Brumley OF OT 0 0.00
Rob Braun TM 0 0.00
Rob Braun TM OT 0 0.00
Jake Raudenbush FM 2 2 93.52 187.04
cif Jake Raudenbush kLA1
0 0.00
O Ton Engstrom 0 0.00
m Ton Engstrom 0 0.00
Kai Simao 0 0.00
0 0.00
Kai Simao 501.54
Sub-Total
0.00
Travel Time 155.48
Labor Markup
657.02
Total Labor Costs
0) 200-159 240 Excavator 0 187.14 0.00
110-152 320 Loader 0 51..50 0.00
O 200-156 320 Excavator 0 159 0.00
O DumpTruck&Trailer 0 109.43 0.00
F- 8x20 Box Vda 0 297.32 0.00
7-c Skiff 0 235.62 0.00
Pipe Truck 325-202 2 2 51.94 103.88
F 3"Submersible Pump 0 11.75 0.00
z 310-047 Water Truck 0 33.66 0.00
w 330-080 Service/Mechanic Truck 0 31.86 0.00
:E Pickup Truck 335-141 2 21 36.67 73.34
a- 202-112 Yanmar Mini-Excavator 01 59.21 0.00
D Sub-Total 177.22
0 Equipment Markup 37.22 44
w Total E ui ment&Tools Costs 214.44
L25Eest
36'Plus ea 2 No
OAO
plugair lines and gauge e 2 0.00
0.00
w 0.00
=
F- Sub-Total 0.00
O ISale Tax if applicable) 0.00
0.00
Marku
Other Costs 0.00
Contractor's Representative Sub-Total 871.45
Sales Tax on Rented Equipment
Sub-Total 871.45
Subcontractor's Representative
Ins& B&O
Owner's Representative.
No. Sheet 1 of 1 TOTAL 871.451
Daily Cost Record
2821 SOUTH 154th ST SEATTLE,WA 98188 (206)242-0833 FAX:(206)242-0792 I
Project (n tti V r y� Job# (�O Date —�(— Z Weather L.�✓r7v
Description(must be complete) �^S
� h
HOURS RATE EXTENSION
DETAIL COST RECORD CODE T. TOTAL
tY
O
m —
Sub-Total
Labor Taxes&Fringe Benefits
Travel Time
Labor Markup
i
Total Labor Costs
_j
O
0 a V
06
z
w
0-
5 Sub-Total
W Equipment Markup -
Total Equipment Costs
Q
CG
LU
F-
2 Sub-Total
Sales Tax(if applicable)
Material Markup
Total Material Costs
LW3:
Total Other Costs
Sub-Total
Bond Insurance Taxes
Miscellaneous Costs
TjSubc
Contractor's Representative Sub-Total
Overhead
actor's Representative
wner's Representative Sub-Total
Sales Tax
No. Sheet of TOTAL —
DAILY REPORT OF FORCE ACCOUNT WORKED
ar CONTRACTOR SC Infrastructure DATE 1/13/2023
SUBCONTRACTOR PAY EST#
Project No.:21-3012 ITEM# 4300
Federal Aid No.:STPUL 1075(004)
Dewatering storm system to allow for install of MH7.Work included dewatering excavation, FA# 9
DESCRIPTION OF WORK use saw to cut into existing 20"RCP near MH7,which connects to private pond,to relieve
PERFORMED:system pressure which flooded excavation further,install plug and clean excavation of Contractor 31 860
oversaturated materal I FA#
LABOR
WORKER'S NAME WORKER'S OCCUPATION REG HRS REG RATE OT HRS OT RATE AMOUNT
Shane Elmendorf(2023) Pipe Layer 7.00 $ 67.81 $ 92.70 $474.67
Andrew Pace(2023) Operator 7.00 $ 89.44 $ 119.80 $626.08
Kai Simao(2023) Laborer 7.00 $ 66.60 $ 90.89 $466.20
Jason Lyons(2023) Operator 7.00 $ 89.44 $ 119.80 $626.08
Jake Raudenbush(2023) Operator Foreman 7.00 $ 93,52 $ 125.88 $654.64
Tony Engstrom(2023) Teamster 7.00 $ 84.72 $ 112,28 $593.04
$ $ $0.00
LABOR SUBTOTAL $3,440.71
29%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $997.81
Per WSDOT Spec 1-09.6,add an additional 2%for Contractor Sick Leave $68.81
TOTAL LABOR $4,507.33
EQUIPMENT
EQUIPMENT TYPE EQUIPMENT SIZE REG HRS REG RATE STDBY HRS STDBY RATE AMOUNT
200-159 240 Excavator(Jan 2023) Komatsu PC240LC-10 2013 7 $ 159.00 $ - $1,113.00
110-152 320 Loader(Jan 2023) 0 7 $ 87.14 $ 35.76 $609.98
325-202 Pipe Truck(Jan 2023) 0 7 $ 51.59 $ 8.91 $361.13
335-141 Dodge 2500 P/U(Jan 2023) 0 7 $ 36.67 $ 4.67 $256.69
300-080 On Highway Rear Dump w/Trail 0 7 $ 109.43 $ 14.64 $766.01
605-8 Waker Generator 25KW(Jan 202 01 7 $ 15.24 $ 1.49 $106.68
3"Electric Submersible Pump(Jan 2023) 01 7 $ 11.01 $ 5,51 $77.07
$0.00
EQUIPMENT SUBTOTAL $3,290.56
21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $691.02
TOTAL EQUIPMENT $3,11IF58
MATERIALS and/or SERVICES
VENDOR&INVOICE# MATERIAL SUB TOTAL TAX AMOUNT
$0,00 $0.00
$0.00 $0.00
$0.00 $0.00
MATERIALS SUBTOTAL INCLUDING TAX $0.00
21%OVERHEAD AND PROFIT,BONDING,INSURANCE AND TAX $0.00
TOTAL MATERIALS $0.00
SUBCONTRACTOR INVOICED WORK
VENDOR&INVOICE# WORK DESCRIPTION AMOUNT
$0.00
$0.00
SUBCONTRACTOR INV SUBTOTAL $0.00
Tax on Material(if applicable) $0.00
TOTAL SUBCONTRACTOR INV WORK $0.00
AMOUNT
PRIME Subtotal of Labor,Equipment,&Material Work $8,488.91
SUBCONTRACTOR Subtotal of Labor,Equipment,Material,&Subcontractor Invoiced Work $0.00
Markups on work performed by Subcontractor:up to$25,000=12%,$25,0004100,000=10%Greater than$100,000=7% 0
Subcontractor Mark-up $0.00
TOTAL COST $8,488.91
ElIf checked,this work is in dispute.By signing this form,parties are agreeing to the time and effort needed to
accomplish the task.Entitlement to be determined at a later date.
Owner's Representative Contractor's Representative
Form Date 712020
SCI Infrastructure, L L C Daily Cost Record
031860
l
Project: 76th Ave S-N Segment Job#2210 Date: 01/13/23 Weather:
Description:
Dewateting storm mainline to allow MH7 connection.
HOURS
DETAIL COST RECORD CODE S.T. O.T.I D.T. Total RATE EXTENSION
Andrew Pace OP 7 7 89.44 626.08
Andrew Pace OP OT 0 0.00
Shane Elmendorf PL 7 7 67.81 474.67
Shane Elmendorf PL OT 0 0.00
Jason Lyons OP 7 7 89A4 626.08
Jason Lyons OP OT 0 0.00
Ken Brumley OF 0 0.00
Ken Brumley OF OT 0 0.00
Rob Braun TM 1 0 0.00
Rob Braun TM OT 0 0.00
Jake Raudenbush FM 7 7 93.52 654.64
w Jake Raudenbush FM OT 0 0.00
O Tony Engstrom TM 7 7 84.72 593.04
m Tonv En strom TM OT 0 0.00
c Kai Simao LA 7 7 66.60 466.20
0 0.00
LA OT
� Kai Simao 440.71
0.71
Sub-Total 3
Travel Time 1 06 .00
Labor Markup
62
Total Labor Costs 4 507.33
cn 200-159 240 Excavator 7 7 159.00 1,113.00
-1 110-162 320 Loader 7 7 87.14 609.98
O 200-166 320 Excavator 0 161.50 0.00
O Dump Truck&Trailer 7 7 109.43 766.01
t- 8x20 Box dav 0 297.32 0.00
25 KW Generator 7 7 15.24 106.68
Pipe Truck 325-202 7 7 51.94 363.58
►- 3"Submersible Pump 7 7 11.75 82.25
z 310-047 Water Truck 0 33.66 0.00
w 330-080 Service/Mechanic Truck 0 31.86 0.00
n Pickup Truck 335-141 7 7 36.67 256.69
m 202-112 Yanmar Mini-Excavator 01 59.21 0.00
Sub-Total 3 298.19
a Equipment Markup692.62
w Total Equipment&Tools Costs 3 990.81
0 0.00
0 0.00
0 0.00
w 0 0.00
S
f- Sub-Total 0.00
O Sale Tax if applicable) 0.00
0.00
Markup
0.00
Other Costs
Contractor's Representative Sub-Total 8,498.14
Sales Tax on Rented Equipment
Sub-Total 81498.14
Subcontractor's Representative
Ins&B&O
Owner's Representative
No. Sheet 1 of 1 ITOTAL 8 498.14
I
Daily Cost Record
2821 SOUTH 154th ST • SEATTLE,WA 98188 • (206)242-0633 FAX:(206)242-0792 )
Project 2(,'�7 4.e X 91,1 Job# Z l(0 Date weather
Description(must be complete) ���,�{�y., �� r� /KyL 10 Qlelviv
HOURS RATE EXTENSION
CODE
DETAIL COST RECORD S.T. O.T. D.T. TOTAL
I
c.Ne: r L
to
K i:ti }mo)tinM
rr
O
m
g --
Sub-Total
'Labor Taxes&Fringe Benefits
Travel Time
Labor Markup
Total Labor Costs
Zo o --- /57 o ^-K
1 v-
o
t— +5
U.1 t) s r t
C L j u
5 Sub-Total
w Equipment Markup
Total Equipment Costs
J
Q --
Q'
M Sub-Total
Sales Tax(if applicable)
Material Markup
Total Material Costs
W - —
8 --
Total Other Costs
Sub-Total
--
Bond Insurance Taxes
Miscellaneous Costs
Contractor's Representative Sub-Total
Overhead
ubcon ad or'�Reprreslnt!tllvee
er' Sub-Total
Sales Tax
No. Sheet of TOTAL ---