HomeMy WebLinkAboutCAG2023-387 - Change Order - #1 - Evergreen Asphalt & Concrete Construction, Inc. - Court/Corrections Sealcoating and Re-striping - 08/28/2023 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr:
WM
Agreement Routing Form Dir. Assist:
• For Approvals,Signatures and Records Management
KE N T This form combines&replaces the Request for Mayor's Signature and Contract Cover
WASHINcroN Sheet forms. Dir/Dep Dir:
Originator: Department:
Leah Bryant for Nate Harper Parks, Recreation & Community Services
Date Sent: Date Required:
c 08/28/2023 9/4/2023
CL Authorized to Sign: Date of Council Approval:
QDirector or Designee NA
Budget Account Number: Grant? Yes ZNo
F00508.64110.5825
Budget?[Z]YesEl No Type: N/A
Vendor Name: Category:
Evergreen Asphalt&Concrete Construction, Inc Contract
Vendor Number: Sub-Category:
= 213355 Change Order
0
Project Name: FAC23-21 Court /Corrections sealcoating and re-striping
E
Project Details:Change Order is for added striping, 3 additional signs, and
� 9
c additional needed mobilization.
g $2119.43 Other
Agreement Amount: Basis for Selection of Contractor:
*Memo to Mayor must be attached
Start Date: August 2023 Termination Date: 12/31/2023
Q Local Business?F--]YesFv(-]No* If meets req uiremen ts per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace.
Business License Verification:ElYes In-Process Exempt(KCC 5.01.045)
Notice required prior to disclosure? Contract Number:
F—]Yes7No CAG2023-387
Comments:
a1
_
3
4)
H
•� i
N 3
f0
_
V1
Date Routed to the City Clerk's Office: Aug 29, 2023
ac«W»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20210513
•
KEN T
WASHINGTON
CHANGE ORDER NO. 1
NAME OF CONTRACTOR: Evergreen Asphalt & Concrete Construction, Inc ("Contractor")
CONTRACT NAME & PROJECT NUMBER: FAC23-21 Court /Corrections sealcoating and re-striping
ORIGINAL CONTRACT DATE: 7/6/2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Change Order is for added striping, 3 additional signs, and additional
needed mobilization.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $39,658.02
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0
(incl. applicable WSST)
Current Contract Amount $39,658.02
(incl. Previous Change Orders)
Current Change Order $1,925.00
Applicable WSST Tax on this Change $194.43
Order
Revised Contract Sum $$41,777.45
CHANGE ORDER - 1 OF 3
Original Time for Completion 12/31/2023
(insert date)
Revised Time for Completion under 12/31/2023
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 calendar days
Revised Time for Completion 12/31/2023
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
sIWA,-1140#rty�v MU Moose
By: Shane Gilbertson(Aug 28,2023 14:16 PDT) By:Will Moore(Aug 28,2023 11:15 PDT)
Print Name: Shane Gilbertson Print Name: Will Moore
Iteresident Its: Facilities Superintendent
DATE:Aug28,2023 DATE: Aug 28, 2023
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
k�;U gum�
Kent City Clerk Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
r J1% Exhibit A
Evergreen Asphalt and Concrete Inc.
PO Box 1567
Kent,WA 98035
253 670-9072
Project Manager: Nate Harper
Owner: City of Kent Facilities
Project: Municipal Court
COP# 1
Date 8/28/2023
Base Bid
uantit Description Rate Sub Total Total
1 Contract Amount NA $36,020.00
1 Tax $0.10 $3,638.02
39658.02
Previous CO NA
COP#1
2 RESERVE Signage $275.00 $550.00
1 NO PARKING area $100.00 $100.00
1 Additional MOB $1,275.00 $1,275.00 1925.00
1 Sales Tax $0.10 194.43
Sub Total
Total COP 2119.43
REV Contract Total $41,777.45
Signature• M0li55a MGCo�'�YIIGK
Melissa McCormick(Aug 29,202307:11 PDT)
Email: cityclerk@kentwa.gov
FAC23-21 -Evergreen Asp halt-Court_Correction
s C01
Final Audit Report 2023-08-29
Created: 2023-08-28
By: Leah Bryant(Ibryant@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAARYTByNILLEo3jIKJ90IyWEgfJw-zKgIN
"FAC23-21 -Evergreen Asphalt-Court—Corrections COV History
Document created by Leah Bryant(Ibryant@kentwa.gov)
2023-08-28-6:01:31 PM GMT
Document emailed to wmoore@kentwa.gov for signature
2023-08-28-6:04:02 PM GMT
Email viewed by wmoore@kentwa.gov
2023-08-28-6:15:26 PM GMT
Signer wmoore@kentwa.gov entered name at signing as Will Moore
2023-08-28-6:15:49 PM GMT
Document e-signed by Will Moore (wmoore@kentwa.gov)
Signature Date:2023-08-28-6:15:51 PM GMT-Time Source:server
Document emailed to evergreen.shane@comcast.net for signature
2023-08-28-6:15:52 PM GMT
Email viewed by evergreen.shane@comcast.net
2023-08-28-9:16:11 PM GMT
d4 Signer evergreen.shane@comcast.net entered name at signing as Shane Gilbertson
2023-08-28-9:16:38 PM GMT
Document e-signed by Shane Gilbertson (evergreen.shane@comcast.net)
Signature Date:2023-08-28-9:16:40 PM GMT-Time Source:server
Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature
2023-08-28-9:16:42 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign
Email viewed by Kim Komoto (kkomoto@kentwa.gov)
2023-08-28-9:18:29 PM GMT
dp Document e-signed by Kim Komoto (kkomoto@kentwa.gov)
Signature Date:2023-08-28-9:18:37 PM GMT-Time Source:server
Document emailed to cityclerk@kentwa.gov for signature
2023-08-28-9:18:38 PM GMT
Email viewed by cityclerk@kentwa.gov
2023-08-29-2:06:15 PM GMT
dp Signer cityclerk@kentwa.gov entered name at signing as Melissa McCormick
2023-08-29-2:11:22 PM GMT
d4 Document e-signed by Melissa McCormick (cityclerk@kentwa.gov)
Signature Date:2023-08-29-2:11:24 PM GMT-Time Source:server
Agreement completed.
2023-08-29-2:11:24 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign