Loading...
HomeMy WebLinkAboutCAG2022-007 - Supplement - Evergreen Technologies, Inc. - ShoWare Center Oven Cabling - 08/04/2023 FOR CITY OF KENT OFFICIAL USE ONLY �LS/JE Sup/Mgr: Agreement Routing Form DirAsst: 104 • For Approvals,Signatures and Records Management Dir/Dep: MC KEN T This form combines&replaces the Request for Mayor's Signature and Contract Cover (Optional) W ASH I NGTON Sheet forms. Originator: Department: Ikhra Mohamed IT Date Sent: Date Required: > 08/03/2023 08/09/2023 0 CLDirector or Designee to Sign. Date of Council Approval: Q Q Interlocal Agreement Uploaded to Website ❑✓ N/A Budget Account Number: Grant?:Yes:✓ No T00010.63520.1800 Budget?R]YesEl No Type: N/A Vendor Name: Category: Evergreen Technologies Contract Vendor Number: Sub-Category: 192984 Other 0 Project Name: Infrastructure Cabling E G Project Details:ShoWare Center cabling to connect ovens to network (one-time purchase under = Mayor-approved On-Call Services Contract with Evergreen Technologies, total +, amount not to exceed $100,000). C N Agreement Amount: $1 578.57 Basis for Selection of Contractor: Direct Negotiation N *Memo to Mayor must be attached Start Date: N/A Termination Date: N/A Q Local Business?F--]YesFv-]No* If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Business License Verification:Yes El In-Process Exempt(KCC 5.01.045) Notice required prior to disclosure? Contract Number: �Yes�✓ No CAG2022-007 Comments: 81 C ` 3 Mike Carringto Director a N ccc Date. 08/04/2023 �a in Date Routed to the City Clerk's Office: dd«V"d223-3_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20210513 EVERGREEN TECHNOLOGIES INC. Communication Consulting and Contracting August 3, 2023 Chris Beagle City of Kent 220 4th Ave. South Kent, WA 98032 SUBJECT: ShoWare Oven Cabling. SCOPE OF WORK: 1. Install 3 Cat.6 Cables to Kitchen Ovens. 2. Use SS faceplate and 45 deg angled jacks. 3. Provide 3- 12'Armored cat.6 patch cords 4.Work to be done during Regular Hours. INSTALL CAT.6 CABLE 3 45 DEG CAT.6 JACKS 3 SS FACEPLATE 1 TERMINATE EXISTING PATCH PANEL PORTS 3 ARMORED CAT.6 PATCH CORDS 3 TEST &LABEL CAT.6 CABLE 3 MISC MATERIALS 1 EVERGREEN TECHNOLOGIES PROJECT TOTAL: $1,433.76 The above price DOES NOT include Sales Tax, Bid Bonds or Performance Bonds. STANDARD ASSUMPTIONS AND CAVEATS(unless otherwise specified): 1) Evergreen Technologies requires a signed copy of this quotation before any work can begin. 2) This quotation is good for a period of thirty days. 3) City of Kent MSA will be followed.