HomeMy WebLinkAboutCAG2023-217 - Change Order - #1 - ICON Materials - 2023 Asphalt Overlays - 07/25/2023 Agreement Routing Form
• For Approvals,Signatures and Records Management
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A S H I N G T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required:
> 7/25/2023 N/A
0
L.
aAuthorized to Sign: Date of Council Approval:
cc0 Director or Designee ❑Mayor 4/7/2023
Budget Account Number: Grant? ❑Yes El No
R20124.64110.120
Budget? 0 Yes ❑ No Type: N/A
Vendor Name: Category:
ICON Materials Contract
Vendor Number: Sub-Category:
C 34467 Change Order#1
wProject Name: 2023 Asphalt Overlays
E
`2 Project Details:Tree removal and stump grinding 1 LS $8,031.02
c
40
c
Go Agreement Amount: $8,031.02 Basis for Selection of Contractor: Bid
E
40
Start Date: N/A Termination Date: 130 Working Days
Im
Q Local Business? ❑Yes ❑ No*
*If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Notice required prior to disclosure? Contract Number:
❑Yes I7 No CAG2023-217
Date Received by City Attorney: Comments:
p1
C
I=
•� i
IQ
p� Date Routed to the Mayor's Office: 7 2-V
V1
Date Routed to the City Clerk's Office:
adaW22373 , z0 Visit Documents.KentWA.gov to obtain copies of all agreements
•
KEN
W A S H I N G T O N
CHANGE ORDER NO. 1
NAME OF CONTRACTOR: ICON Materials ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 2023 Asphalt Overlays
ORIGINAL CONTRACT DATE: April 7, 2023
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Tree Removal and Stump Grinding 1 LS $8,031.02
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $2,872,117.50
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $2,872,117.50
(incl. Previous Change Orders)
Current Change Order $8,031.02
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $2,880,148.52
CHANGE ORDER - 1 OF 3
Original Time for Completion 130 working days
(insert date)
Revised Time for Completion under 00 working days
prior Change Orders
(insert date)
Days Required (±) for this Change Order 00 working days
Revised Time for Completion 130 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
p rQ Yt Digitally signed by Chad Bieren
B By Chad B I e 1 G 1 1 Date:2023.07.25 10:37:39-07'00'
y: ure) (signature)
(signature)
Print Name:-Tyler Townsend Print Name: Chad Bieren, P.E.
Its Project Manager Its Public Works Director
(title) (title)
DATE: 07/12/2023 DATE:
AF EC
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent bty Clerk Kent Law Department
C[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
KEN T
WAS.1iNOTON
CHANGE ORDER WORKSHEET NO. 1
Construction Engineering Division - Public Works
Project: 2023 Asphalt Overlay Project No: 23-3001.1
Project Engineer: Alex Murillo Fed-Aid No: n/a
Capital Projects
Manager: Brian Shields/Rick Krier Contractor: ICON Materials
Date: 7/11/2023
I. Proposed Change
This change order provides complete payment for:
Tree Removal and Stump Grinding 1 LS $8,031.02
II. Reason and Background for Change
As part of the 2023 Asphalt Overlay project, in constructing an ADA curb ramp at the NE corner of SE
228th PI and 103rd Ave SE, it was necessary that the contractor cut through the major roots of three
established cedar trees to perform the work. City of Kent arborist (Scott Schroeder) looked at the roots
after they were cut and concluded that the health of the trees were at risk. After discussions with the
home owner at 10304 SE 228th PI (Susan Lee), she agreed to the trees being removed. Icon proposed
a price of $8,031.02 to perform the work. Approval was received from Kelly Peterson on 6-13-23.
III. Method of Payment
NEW PAY ITEMS ❑ Notapplicable
Schh. Item Description Total Est. Unit Unit Price Total Estimated Cost of
Item
I Tree Removal and Stump Grinding 1 LS $8,031.02 $ 8,031.02
New Pay Items Total: $ 8,031.02
DELETE EXISTING PAY ITEMS) per 1-09.5 F,_/l Notapplicable
Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item
No.
$ -
Page 1
$-
Delete Existing Pay Items Total: $
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑� Notapplicable
Soh No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item
$
Increase / Decrease to Existing Pay Items Total: $
*TOTAL ESTIMATED COST OF CHANGE ORDER: $8,031.02
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract: 130 Due This Change Order: 0-7 Previous Total: 130
Explanation/]ustification for Additional Working Days:
*TOTAL WORKING DAYS: 130
* This Change Order + Previous Total
Capital Projects Manager: Date: 64 za Ll
Brian Shields
Construction Engineering Date:
Supervisor:
Jason Barry
Construction Manager: � Date:
Eric Connor
Page 2
ICON MATERIALS
EXTRA WORK ORDER
1�
1508 VALENTINE AVE CONFIDENTIAL INFORMATION
' PACIFIC,WA 98047 FOR INTENDED RECIPIENT ONLY
(206) 575-3200 Office • (206) 575-3207 Fax DO NO'F DISCLOSE
ICON Job# ICON Foreman Anthony Eichelberger ICON EWO#
Owner City of Kent Contractor Ref#
--- — -- -
2023
Project Name 2023 Asphalt Overlays Date 6/6/
DESCRIPTION OF EXTRA WORK PERFORMED
Tree and stump removal on 228th and 103rd.Flagging and sweeping will be charged under Bid Items.
LABOR
Regular Hours Worked Overtime Hours Worked
Quantity Classification Quantity Unit Rate Quantity Unit Rate Total
1 Mid-Level-General Equip. 2 HR $ 80.11 HR $ 1C&19 $ 160.22
HR $ - HR $ $
HR $ HR $ $
HR $ HR $ $
HR $ HR $ $
HR $ HR $ $
HR $ HR $ $
HR 1 $ HR $ $
Total: $ 160.22
MATERAA4&WTALS
Material Description Quantity Unit Cost Tax% Cost Total
Total: $
EQUIPMENT
Regular Hours Worked Hours on Standby
Equipment Description(Make/ModelNear) EQ# Quantity Unit Rate Quantity Unit Rate Total
Ford F550 2006 51.0072 2 HR $ 22.09 HR $ - 5 44,18
Cat 305E 2013 31.0042 2 HR $ 25.65 HR $ 8.88 $ 51.30
HR $ - HR $ $
HR $ HRF-_ $ $
HR $ HR $ - $
Total:
SUBCONTRACTORS
Name Service Quantity Unit Cost Total
J.M.Knelleken Company Tree Removal 1 LS $ 5,000.00 $ 5,000.00
The Davey Tree Expert Company Stump grinding 1 LS $ 1,680.00 $ 1,680.00
Buckley Recyclers Dump Fee 1 LS $ 200.00 $ 200.00
Total: $ 6,880.00
I hereby certify that this Extra Work Order represents the true and correct quantities of work r TOTAL COSTS AND MARKUPS
performed during this period and that prevailing wages have been paid to all laborers,workers or
mechanics on this project in accordance with the Statement of Intent on file with the District. LABOR $ 160.22 31.00% $ 209.89
MATERIAL&RENTALS $ - 21.00% $ -
Owner/Contractor EQUIPMENT $ 95.48 21.00% $ 115.5
SUBCONTRACTOR $ 6,880.00 12.00% $ 7,705.60
BOND MARKUP $ 8,031.02 0.00% $ -
ICON MATERIALS Total:
Shields, Brian
From: Barry, Jason
Sent: Tuesday, June 13, 2023 2:31 PM
To: Shields, Brian
Cc: Connor, Eric
Subject: FW: 23-3001.1 06-06-23 Tree Removal Proposal (2023 Overlay)
FYI...
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent:Tuesday,June 13, 2023 2:07 PM
To:Connor, Eric<EConnor@kentwa.gov>
Cc: Barry,Jason <JBarry@kentwa.gov>; Bieren, Chad<CBieren@kentwa.gov>
Subject: RE: 23-3001.106-06-23 Tree Removal Proposal (2023 Overlay)
Eric-
Please proceed with removing the trees.
Thank you,
Kelly
Kelly Peterson, AICP, Deputy Director-Engineering
Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5547 - Cell 253-740-8066
KDeterson(�b KentWA.aov
CITY OF KENT, WASHINGTON
KentWA.gov Facebook ;sw+' ;: YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E—MAIL
From:Connor, Eric<EConnor@kentwa.gov>
Sent: Friday,June 9, 2023 8:45 AM
To: Peterson, Kelly<KPeterson@kentwa.gov>
Cc: Barry,Jason <JBarry@kentwa.gov>
Subject: FW: 23-3001.106-06-23 Tree Removal Proposal (2023 Overlay)
Good Morning Kelly,
Are you okay with removing 3 cedar trees on 228th for $8,031. The roots were unavoidable is
completed the contract's required flatwork repairs in their vicinity.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
1
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Barry,Jason<JBarrv@kentwa.gov>
Sent:Thursday,June 8, 2023 12:50 PM
To:Shields, Brian <BShieIds@kentwa.gov_>; Connor, Eric<EConnor@kentwa.gov>
Subject: FW: 23-3001.1 06-06-23 Tree Removal Proposal
Here's some pictures. Prices look fair to me.
Thanks,
Jason
Jason Barry, Capital Projects Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
f�CNT ra ibarry@KentWA.yov
W"•"4wO`�» www.KentWA.aov `i116
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
From: Shields, Brian<BShields@kentwa.gov>
Sent:Thursday,June 8, 2023 12:08 PM
To: Barry,Jason<JBarrv@kentwa.l;ov>
Cc:Connor, Eric<EConnor kentwa.gov>
Subject: FW: 23-3001.1 06-06-23 Tree Removal Proposal
Jason,
Bumping this one. I know those emails stack up QUICK! Q
Brian Shields, Capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 I Desk 253-856-6510
bshields(@KentWA.gov
CITY OF KENT, WASHINGTON
KentWA.ciov Facebook YouTube
From:Shields, Brian
Sent:Tuesday,June 6, 2023 2:05 PM
To: Barry,Jason<JBarrv@kentwa.gov>
Cc: Connor, Eric<EConnor@kentwa.gov>
Subject: FW: 23-3001.106-06-23 Tree Removal Proposal
Jason,
Icon got us the quote for the three cedar trees' removal and stump grinding on 228th for the
2023 Overlays.
2
As a reminder, this is the location where the anchor roots of several established cedar trees
were cut as necessary to construct the ADA ramp per plan. Due to the location of gas and
power, pulling the stumps put those utilities at risk; Icon included the cost of stump grinding in
their quote.
Scott Schroeder came to the site and believes the trees will not survive if left in place. They are
in close proximity to the resident's home. (approx. 20' from the house).
Talking with the property owner who planted these trees 40 years ago, she is also hoping to
plant something back there. I spoke with Alex Murillo when this was first discovered and he
agreed with this plan.
I am seeking authorization to down these trees, since their anchor roots have been removed and
work with the resident to determine what is appropriate to plant in their place.
Let me know if you have any questions. Thanks!
Brian Shields, Capita/Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6530
bshields(@KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.aov Facebook : YouTube
From:Townsend,Tyler(ICON Materials)<tyler.townsend iconmaterials.com>
Sent:Tuesday,June 6, 2023 1:53 PM
To:Shields, Brian<BShields@kentwa.gov>; Krier, Rick<RKrier@kentwa.l;ov>
Cc: Knelleken, Matt(ICON Materials)<matt.knelleken@iconmaterials.com>
Subject: 23-3001.106-06-23 Tree Removal Proposal
EXTERNAL EMAIL
Brian and Rick,
Please see the attached proposal for the tree removal.
Thank you,
Tyler Townsend
Project Manager