HomeMy WebLinkAboutCAG2021-372 - Amendment - WSDOT - Grant Funds for City Safety Road Diets Program - 07/06/2023 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr:
Agreement Routing Form DirAsst:
• For Approvals,Signatures and Records Management Dir/Dep:
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional)
WASHINGTON Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Karin Bayes for Drew Holcomb Public Works
Date Sent: Date Required:
c 06/28/2023 7/3/2023
QAuthorized to Sign: Date of Council Approval:
Q �✓ Mayor or Designee 3/2/2021
Budget Account Number: Grant? Yes NoF-]
21-3003
Budget? Yes E]No Type: N/A
Vendor Name: Category:
WSDOT Other
Vendor Number: Sub-Category:
Amendment
0
Project Name: City Safety Road Diets
3- Project Details:
0 See attached
c
c
Basis for Selection of Contractor:
� Agreement 1,234,200 Other
4J *Memo to Mayor must be attached
Start Date: July 2023 Termination Date: unknown
lm
a Local Business? Yes F]No*If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Business License Verification: ❑Yes In-Process F1 Exempt(KCC 5.01.045) Authorized Signer Verified
Notice required prior to disclosure? Contract Number:
Yes❑No CAG2021-372
JIL
Comments:
-.&
H Council originally authorized the acceptance of $735,000 on 3/21/2021 (motion
attached). Project costs increased substantially in the last two years and WSDOT
offered additional funding of $499,200 in mid-June of this year to cover this increase.
C PW is requesting to proceed with mayor signature as required by WSDOT to begin
Nadvertising. This will ensure that construction can begin this year and that the project
3 0 can be covered by these grant funds. An item will be brought to Committee of the
d Whole on July 18th to request ratification of the acceptance of these funds.
a
Date Received:City Attorney: 6/28/23 Date Routed:Mayor's Offic�7/6/23 'ty Clerk's Office 7/6/23
adccW22373_7_20 Visit Documents.KentWA.gov to obtain copies of all agreements
� rev.20221201
AM Washington State Local Agency Federal Aid
Department of Transportation Project Prospectus
Prefix Route ( ) Date 6/12/23
Federal Aid HSIP-OOOS(604) DUNS Number 020253613
Project Number
Local Agency ( WSDOT 1 Federal Employer 91-6001254
Project Number 21-3003 ` Use Only I Tax ID Number
Agency CAAgency Federal Program Title
City of Kent []✓ Yes ❑No ❑✓ 20.205 [:]Other
Project Title Start latitude N See attached Start Longitude W See attached
City Safety Road Diets End Latitude N See attached End Longitude W See attached
Project Termini From-To Nearest City Name Project Zip Code(+4)
See attached 1 Kent 98032-5895
Begin Mile Post End Mile Post Length of Project Award Type
[✓
N/A N/A N/A Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
N/A N/A N/A 0615 17 KING
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 33 9 80389
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. $160,000 $160,000 Oct - 2021
R/V1l
Const. $1,074,200 $1,074,200 July 2023
Total $1,234,200 1$1,234,200
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
See attached See attached
See attached
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
See attached
Local Agency Contact Person Title Phone
Drew Holcomb Project Engineer 2535611587
Mailing Address City State Zip Code
220 Fourth Ave. S. Kent WA 98032
Project Prospectus Approving Authority
Title Public Works Director Date (, at Pa.
Page 1
DOT Form 140-101 Previous Editions Obsolete
Revised 01/2022
Agency Project Title Date
City of Kent City Safety Road Diets 6/12/23
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑3-R See attached See attached
❑ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking 0✓ Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑✓ Principal Arterial
Federal ❑✓ Urban Minor Arterial ❑✓ Urban ❑Minor Arterial
❑Collector ❑Collector
Functional Rural ❑Major Collector ❑ Rural ❑Major Collector
Classification NHS ❑ Minor Collector ❑ NHS ❑Minor Collector
❑ Local Access ❑ Local Access
Terrain Flat [—] Roll [:] Mountain W1 Flat ❑ Roll [:] Mountain
Posted Speed
Design Speed
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent % 100
Construction Will Be Performed By Contract Agency
Contractor 100 % %
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
DOT Form 140-101 Page 2
Revised 01/2022 Previous Editions Obsolete
Agency Project Title Date
City of Kent City Safety Road Diets 6/12/23
Right of Way
No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑✓ No utility work required W No railroad work required
❑All utility work will be completed prior to the start ❑All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑All utility work will be completed in coordination ❑All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑Yes ❑✓ No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date 07/06/2023 By
Mayori�:hairpei on
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete
PUBLIC WORKS
Chad Bieren, P.E.
Director
• 400 West Gowe Street
KENT
WASHINGTON Kent, WA 98032
Fax: 253-856-6500
PHONE: 253-856-5500
Date: June 13, 2023
City Safety Road Diets Prospectus
This project has three separate locations where the existing roads will be
converted to a three lane roadway with bike lanes.
Project locations
1. S 260th St -S 259th PI from Pacific Hwy to Military Rd. S
2. Meeker-Lincoln-Smith from Washington Ave. (SR 181) to 4th Ave. N
3. 4th Ave N from S. 228th St to W James St.
Location 1 - S 260th St -S 259th PI
Start Latitude N 47022'7.39" End Latitude N 47022'11.69"
Start Longitude W 122018'12.60" End Longitude W 122017'13.69"
Project Termini From - To
Pacific Hwy S (SR 99) - Military Rd. S
Length of Project: 3000 feet
Description of Existing Facility
Road width: 45' feet Number of Lanes: 2
Approximately 900 feet east of Pacific Hwy and 260th St intersection the two
way left turn lane (TWLTL) ends and the road is a two lane road all the way to
Military Rd.
Description of Proposed Work
This project will restripe the road into a three lane road with bike lanes. One
travel lane and one bike lane in each direction with a TWLTL down the center.
Type of Proposed Work
Other
Road width: 45' feet Number of Lanes: 2
0
m
d
v
Y
0 Mayor Dana Ralph
City of Kent Public Works
Geometric Design Data
Posted Speed
Description Through Route Crossroad
Federal Functional Urban Minor Arterial Urban Principal Arterial
Classification
Terrain Rolling Rollin
Posted Speed 35
Design Speed 35
Existing ADT 12,595 2018
Design Year
Design Hourly
Volume DHV
Location 2 - Meeker-Lincoln-Smith from Washington Ave. (SR
181) to 4th Ave. N
Start Latitude N 47122'52.88" End Latitude 47022'58.93"
Start Longitude W 122014'49.90" End Longitude W 122014'15.06"
Project Termini From — To
Washington Ave. (SR 181) to 4th Ave. N
Length of Project: 2800 feet
Description of Existing Facility
Road width: 39-55-39 feet Number of Lanes: 4-5-4
This road is continuous but is best described as three segments, all of which
have different road names but are the same road. Meeker St from Washington
Ave to 167, is 39 feet wide and has four lanes. Lincoln Street from 167 to
Madison Ave is 55 feet wide and has four lanes with a TWLTL. Smith St. from
Madison Ave to 4t" Ave is 39 feet wide and has four lanes.
Description of Proposed Work
This project will restripe the road into a three lane road with bike lanes. One
travel lane and one bike lane in each direction with a TWLTL down the center.
Where the road is wider a buffer space may allow for some vertical elements to
improve separation for the bike lane.
Type of Proposed Work
Other
Road width: 39-55-39 feet Number of Lanes: 4-5-4
Geometric Design Data
Posted Speed
Description Through Route Crossroad
Federal Functional Urban Minor Arterial Urban Principal Arterial
Classification
Terrain Flat Flat
Posted Speed 30
Design Speed 30
Existing ADT 18,025 2018
Design Year
Design Hourly
Volume DHV
Location 3 - 4th Ave N from S. 228th St to W James St.
Start Latitude N 47023'50.86" End Latitude 47023'12.44"
Start Longitude W 122014'19.47" End Longitude W 122014'14.39"
Project Termini From — To
S. 228th St to W James St.
Length of Project: 4000 feet
Description of Existing Facility
Road width: 66-48-57 feet Number of Lanes: 4
After the turn lane at the intersection of 228th St, 4th Ave has a short 370 foot
long median and then transitions to a 48 foot wide four lane road. After the
intersection of Cloudy St. the road remains 4 lanes at 57 feet wide until the
intersection of James St. where a turn lane is incorporated.
Description of Proposed Work
This project will restripe the road into a three lane road with bike lanes. One
travel lane and one bike lane in each direction with a TWLTL down the center.
Where the road is wider a buffer space may allow for some vertical elements to
improve separation for the bike lane.
Type of Proposed Work
Other
Road width: 66-48-57 feet Number of Lanes: 4
Geometric Design Data
Posted Speed
Description Through Route Crossroad
Federal Functional Urban Minor Arterial Urban Minor Arterial
Classification
Terrain Flat Flat
Posted Speed 35-30
Design Speed 35-30
Existing ADT 15,264 2018
Desi n Year
Design Hourly
Volume DHV
8.G
AOL
4eNo��
KENT
DATE: March 2, 2021
TO: Kent City Council
SUBJECT: Highway Safety Improvement Program — City Safety Road
Diets Grant - Authorize
MOTION: Authorize the Mayor to accept grant funds from the Washington
State Department of Transportation for the Highway Safety Improvement
Program - City Safety Road Diets program, in the amount of $735,000
dollars, amend the budget, authorize the expenditure of the grant funds
accordingly, authorize the expenditure of up to $75,000 dollars in local
matching funds from the B&O fund, and authorize the Mayor to sign all
necessary documents, subject to final terms and conditions acceptable to
the City Attorney and Public Works Director.
SUMMARY: The Washington State Department of Transportation (WSDOT) sends
out a call for safety projects every two years, with funds available through the
Highway Safety Improvement Program (HSIP). In March of 2020, the City applied
to WSDOT for City Safety funds through the HSIP. Accompanying these applications
was the City's Local Road Safety Plan, an engineering document that includes
analysis of traffic accident data. WSDOT selected from the projects and
countermeasures identified in the Local Road Safety Plan and has chosen to award
two City Safety projects to the City of Kent: (1) City Safety Road Diets, and (2)
108th Avenue S.E. / S.E. 264th Street Compact Roundabout per award letters
dated December 23, 2020.
The City Safety Road Diets Project would re-stripe existing 4-lane and wide 2-lane
roadways to 3-lanes plus bike lanes on three corridors where bike lanes are planned
as part of the Transportation Master Plan. Those three corridors are:
• 4th Avenue North (South 228th Street to West James Street)
• West Meeker Street - Lincoln Avenue North - East Smith Street (Washington
Avenue North to 4th Avenue North)
• South 260th Street - South 259th Place (Pacific Highway South to Military Road
South)
The three projects are estimated to total $750,000 and a 10% local match is
required for all phases; however, the 10% match may be waived for the
construction phase if construction funds are obligated by April 30, 2023. The
preliminary project schedule assumes that construction will be completed by
Packet Pg. 107
8.G
December of 2022 and every effort will be made to ensure this schedule is met.
While the total City match may be up to $75,000, the resulting local match is only
expected to be $15,000 for the Preliminary Engineering/Design phase. Staff
proposes that the required match funds be paid from the B&O fund.
BUDGET IMPACT: Minimum budget impact is $15,000 to match federal funding for
project design. If obligation of construction funds occurs after April 30, 2023, then
a $75,000 match would be required. Local matching dollars would come from the
B&O Tax fund.
SUPPORTS STRATEGIC PLAN GOAL:
Evolving Infrastructure - Connecting people and places through strategic investments in physical
and technological infrastructure.
Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and
inviting parks and recreation.
ATTACHMENTS:
1. HSIP Grant Awards Map (PDF)
02/23/21 Committee of the Whole RECOMMENDED TO
COUNCIL BY CONSENSUS
RESULT: RECOMMENDED TO COUNCIL BY CONSENSUS
Next: 3/2/2021 7:00 PM