HomeMy WebLinkAboutCAG2023-097 - Amendment - #1 - Controlled Power, Inc. - City of Kent Facilities PLC Upgrade - 07/03/2023 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: �W
dw
Agreement Routing Form
• For Approvals,Signatures and Records Management
KE N T This form combines&replaces the Request for Mayor's Signature and Contract Cover
WASHINGTON Sheet forms.
Originator: Department:
Leah Bryant for Will Moore Parks, Recreation & Community Services
Date Sent: Date Required:
> 07/03/2023 ASAP
0
CL Authorized to Sign: Date of Council Approval:
QDirector or Designee NA
Budget Account Number: G ra n t?1:1 Ye s F71No
F20101.64850.9419
Budget?W]YesEl No Type: N/A
Vendor Name: Category:
Controlled Power, Inc. Contract
Vendor Number: Sub-Category:
= 39722 Amendment
a0 City of Kent Facilities PLC Upgrade
Project Name: Y pg
1.1. Project Details:As described in attached Exhibit A, incorporated herein, this
0
= amendment is to cover the cost of material changes.
c
40
E Agreement Amount: $4 036.76 Basis for Selection of Contractor: Other
`Memo to Mayor must be attached
Start Date: February 2023 Termination Date: 12/31/2023
Im
Q Local Business?F--]YeslzNo* If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspace.
Business License Verification:YesEl In-ProcessEl Exempt(KCC 5.01.045)
Notice required prior to disclosure? Contract Number:
FTesONo CAG2023-97
Comments:
im Contract number CAG2023-097
c
a�
H
•� i
N 3
f0
C
Im
V1
Date Routed to the City Clerk's Office: 7/5/23
,c«w»373__,0 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20210513
•
KENT
WASHINGTON
AMENDMENT NO. #1
NAME OF CONSULTANT OR VENDOR: Controlled Power, Inc
CONTRACT NAME & PROJECT NUMBER: City of Kent Facilities PLC Upgrade
ORIGINAL AGREEMENT DATE: 2/17/2023
This Amendment is made between the City and the above-referenced Consultant or Vendor
and amends the original Agreement and all prior Amendments. All other provisions of the original
Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force
and effect. For valuable consideration and by mutual consent of the parties, Consultant or
Vendor's work is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, the Consultant or Vendor shall:
As described in attached Exhibit A, incorporated herein, this
amendment is to cover the cost of material changes.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are modified as follows:
Original Contract Sum, $$73,829.76
including applicable WSST
Net Change by Previous Amendments $0
including applicable WSST
Current Contract Amount $$73,829.76
including all previous amendments
Current Amendment Sum $$3,666.00
Applicable WSST Tax on this $$370.27
Amendment
Revised Contract Sum $$77,866.02
AMENDMENT - 1 OF 2
Original Time for Completion 12/31/2023
(insert date)
Revised Time for Completion under 12/31/2023
prior Amendments
(insert date)
Add'I Days Required (f) for this 0 calendar days
Amendment
Revised Time for Completion 12/31/2023
(insert date)
The Consultant or Vendor accepts all requirements of this Amendment by signing below, by
its signature waives any protest or claim it may have regarding this Amendment, and
acknowledges and accepts that this Amendment constitutes full payment and final settlement of
all claims of any kind or nature arising from or connected with any work either covered or affected
by this Amendment, including, without limitation, claims related to contract time, contract
acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise
provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and
warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if any), and
this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed,
and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be
deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective on the last date written below.
CONSULTANT/VENDOR: CITY OF KENT:
Dayl�( PylMer wdCG moyr"-
David Wilder(Jul 3,202313:36 PDT) By:Will Moore(Jul 3,202313:55 PDT)
7 i ature) 7 (signature)
Print Name: David Alder Print Name: Will Moore
ItsVP Sales/Marketing Its Facilities Superintendent
DATE:
J u 13,2023 DATE
(title) Jul 3,2023 (title)
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
AMENDMENT - 2 OF 2
Exhibit A
Controlled Power, Inc.
17909 Bothell Everett Hwy.S.E., Suite 102
Bothell, Washington 98012
ILA' 414V
{425)485-1778 FAX(425)485-0658
01
JULY 3,2023
CITY OF KENT FACILITIES
400 WEST GOWE ST
KENT,WA 98032
ATTN: RANDY KRATZER
QUOTE: 7313-C
FOB: CITY OF KENT FACILITIES KENT, WA
DELIVERY: 8- 10 WEEKS AFTER ACCEPTANCE OF ORDER AT THE FACTORY FOR THE NEW MATERIAL
NOTED BELOW AND DEPENDENT ON FACTORY INVENTORY AND COVID PRODUCTION
DELAYS
CITY OF KENT FACILITIES(JOB#4594)
RX31 PLC UPGRADE
ITEM#1—MASTER SECTION AND WILL CONTAIN THE FOLLOWING:
• (1) IC695CHS012 RX31 12 SLOT UNIVERSAL BASE
• (1) IC695CPE305 CPE305 SINGLE SLOT CPU, 1.1GHZ PROCESSOR, 5 MEG MEMORY, 1 RS-232
PORT, 1 ETHERNET PORT AND USB MASTER PORT
• (1) IC695PSD140 RX31 24VDC,40 WATT MULTIPURPOSE POWER SUPPLY
• (1) IC695PNCO01 PROFINET CONTROLLER
• (1) IC694MDL655 INPUT MODULE 24VDC, 32 POINTS
• (3) IC694MDL740 OUTPUT MODULE 12/24VDC, 0.5A, 16 POINTS
• (1) IC694ALG221 INPUT MODULE,ANALOG 4 POINT CURRENT
• (1) IC755CSS10CDA 10" COLOR QP+WITH VIEW AND CONTROL
• (1) IC693CBKO02 CABLE KIT FOR HIGH DENSITY 1/0 MODULES
• (2) IC693ACC337 TBQC BASE
• (1) ME100MBP001 MACHINE EDITION V10.0 PROFESSIONAL DEVELOPMENT SUITE 700 POINTS
• (1) NEW LICENSE WITH SOFTWARE LICENSE
ITEM#2—ENG/GEN#1,#2 AND EACH SECTION WILL CONTAIN THE FOLLOWING:
• (1) IC69SCHS007 RX31 7 SLOT UNIVERSAL BASE
• (1) IC695PSDO40 PAC SYSTEMS RX31 POWER SUPPLY 24VDC, HIGH CAPACITY,40 WATT
0 (1) IG69.3r,91=301 RACK EXPANSION CABLE,E 1/0 EXPANSION 2 METERS (CABLES NO LONGER
REQUIRED)
• (1) IC695PNS001 PROFINET SCANNER
• (1) IC693ACC307 1/0 BUS TERMINATOR PLUS FOR GEN#1 AND GEN #2
• (1) IC694MDL655 INPUT MODULE 24VDC, 32 POINTS
• (3) IC694MDL740 OUTPUT MODULE 12/24VDC, 0.5A, 16 POINTS
• (1) IC693CBKO02 CABLE KIT FOR HIGH DENSITY 1/0 MODULES
0 (2) IC693ACC337 TBQC BASE
Controlled Power, Inc.
17909 Bothell Everett Hwy.S.E., Suite 102
Bothell, Washington 98012
ILA' �: {425J 485-1778 FAX l425]485-0656
CPI WILL UPDATE THE EXISTING DRAWINGS, DEVELOP THE NEW PROGRAM FOR THE RX31 PLC SYSTEM
AND FULLY TEST AT OUR FACILITY BEFORE ARRIVING AT THE JOB SITE.
YOUR TOTAL COST FOR MATERIAL AND ENGINEERING: $51,523.00
DUE TO THE MATERIAL CHANGES NOTED ABOVE,THERE IS A PRICE INCREASE OF$3,666.00
NOTE:PROPOSAL VALID THROUGH 7/31/2023.
ITEM #3—FIELD SERVICE TO INSTALL AND COMMISSION THE NEW RX31 PLC SYSTEM ONSITE
WEEKDAY RATE PER DAY: $3,600.00(10 HOUR DAY MAX)
(1 CPI ENGINEER AND 1 CPI TECHNICIAN)
WEEKEND/HOLIDAY RATE PER DAY: $4,200.00(10 HOUR DAY MAX)
(1 CPI ENGINEER AND 1 CPI TECHNICIAN)
THE FIELD SERVICES ARE DEPENDENT UPON CITY OF KENT FACILITIES REQUIREMENTS FOR SCHEDULING
SYSTEM OUTAGES SO THAT CPI CAN REMOVE THE EXISTING PLC EQUIPMENT AND REINSTALL THE NEW
RX31 PLC AND TEST THE COMPLETE SYSTEM. IF SCHEDULE IS DURING THE EVENING HOURS OR EARLY
MORNING,THE WEEKEND/HOLIDAY RATE PER DAY WILL APPLY.CPI ESTIMATES APPROXIMATELY(5) FULL
DAYS BUT WILL ONLY BILL FOR THE ACTUAL DAYS USED.
IF YOU HAVE ANY FURTHER QUESTIONS CONCERNING THIS QUOTE, PLEASE FEEL FREE TO CONTACT ME
AT ANY TIME.
SINCERELY,
f I
11A,
DAVID WILDER
VP/SALES& MARKETING
E-MAIL: dwilder@controlledpowerinc.com
DW/M RA
Signature• M6l%5Sq MGCo!'YY7%GK
Melissa McCormick(Jul 5,2023 07:27 PDT)
Email: cityclerk@kentwa.gov
FAC-07032023-Controlled Power Inc-PLC
Upgrade
Final Audit Report 2023-07-05
Created: 2023-07-03
By: Leah Bryant(Ibryant@kentwa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAQGKiPng3tvOFWsCZHAcNyCLYegmV96UK
"FAC-07032023-Controlled Power Inc-PLC Upgrade" History
Document created by Leah Bryant(Ibryant@kentwa.gov)
2023-07-03-8:29:27 PM GMT
Document emailed to dwilder@controlledpowerinc.com for signature
2023-07-03-8:32:25 PM GMT
Email viewed by dwilder@controlledpowerinc.com
2023-07-03-8:33:00 PM GMT
Signer dwilder@controlledpowerinc.com entered name at signing as David Wilder
2023-07-03-8:36:38 PM GMT
Document e-signed by David Wilder(dwilder@controlledpowerinc.com)
Signature Date:2023-07-03-8:36:40 PM GMT-Time Source:server
Document emailed to wmoore@kentwa.gov for signature
2023-07-03-8:36:42 PM GMT
Email viewed by wmoore@kentwa.gov
2023-07-03-8:54:36 PM GMT
d4 Signer wmoore@kentwa.gov entered name at signing as Will Moore
2023-07-03-8:55:15 PM GMT
Document e-signed by Will Moore (wmoore@kentwa.gov)
Signature Date:2023-07-03-8:55:17 PM GMT-Time Source:server
Document emailed to Kim Komoto (kkomoto@kentwa.gov)for signature
2023-07-03-8:55:18 PM GMT
Powered by
Adobe
` ENT Acrobat Sign
Email viewed by Kim Komoto (kkomoto@kentwa.gov)
2023-07-03-11:13:55 PM GMT
dp Document e-signed by Kim Komoto (kkomoto@kentwa.gov)
Signature Date:2023-07-03-11:14:07 PM GMT-Time Source:server
Document emailed to cityclerk@kentwa.gov for signature
2023-07-03-11:14:08 PM GMT
Email viewed by cityclerk@kentwa.gov
2023-07-05-2:20:06 PM GMT
dp Signer cityclerk@kentwa.gov entered name at signing as Melissa McCormick
2023-07-05-2:27:01 PM GMT
d4 Document e-signed by Melissa McCormick (cityclerk@kentwa.gov)
Signature Date:2023-07-05-2:27:03 PM GMT-Time Source:server
Agreement completed.
2023-07-05-2:27:03 PM GMT
Powered by
Adobe
�� KENT Acrobat Sign