HomeMy WebLinkAboutCAG2023-323 - Original - WA State Dept of Transportation (WSDOT) - East Valley Highway Preservation Federal Aid Project Prospectus - 06/01/2023 FOR CITY OF KENT OFFICIAL USE ONLY
Sup/Mgr:
Agreement Routing Form DirAsst:
• For Approvals,Signatures and Records Management Dir/Dep:
KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional)
WASHINGTON Sheet forms. (Print on pink or cherry colored paper)
Originator: Department:
Karin Bayes for Drew Holcomb Public Works
Date Sent: Date Required:
c 05/31/2023 6/5/2023
QAuthorized to Sign: Date of Council Approval:
Q ❑✓ Mayor or Designee 2 21 23
Budclet Account Number: Grant? Yes ✓ NoF_]
20-3015
Budget? Yes E]No Type: N/A
Vendor Name: Category:
wsDOT Application
Vendor Number: Sub-Category:
33085 Original
0
Project Name: East Valley Highway Preservation
OProject Details: Grind and replace failing pavement sections, overlay the full width of the roadway, upgrade curb ramps
and traffic signals to meet ADA standards.The project will include replacement of existing ACP with
C cement concrete for the intersection approach legs for the northbound and southbound lanes at S 212th
4 Street.
C _ _
Basis for Selection of Contractor:
(11.111 Agreement $3,036,500 Other
i Memo to Mayor must be attached
A- Start Date: Jude 2023 Termination Date: Unknown
lm
a Local Business? Yes F]No*If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace.
Business License Verification: ❑Yes In-Process F1 Exempt(KCC 5.01.045) FlAuthorized Signer Verified
Notice required prior to disclosure?ad Contract Number:
Yes❑No CAG2023-323
Comments_
H This document was already routed and signed by the Mayor. Drew made some edits, it is being
i resent to be resigned, the version attached here is correct and replaces the previously sent version.
7
a+
= Reviewed again by Law 6/1/2023. OK for
in C �� Mayor to sign corrected version.
3 �
a,
a
Date Received:City Attorney: 5/19/23 Date Routed:Mayor's Office 5/22/23 'ty Clerk's Office 5/26/23
adccW22373_7_20 Visit Documents.KentWA.gov to obtain copies of all agreements
rev.20221201
UPAM
Washington State Local Agency Federal Aid
Department of Transportation Project Prospectus
Prefix Route ( ) Date 5/18/23
Federal Aid DUNS Number 020253613
Project Number
Local Agency r WSDOT 1 Federal Employer 91-6001254
Project Number 20-3015 ` Use Only J Tax ID Number
Agency CAAgency Federal Program Title
City of Kent Yes ❑No ❑✓ 20.205 [:]Other
Project Title Start Latitude N 47.411527 Start Longitude W-122.227975
East Valley Highway Preservation End Latitude N 47.426212 End Longitude W-122.228052
Project Termini From-To Nearest City Name Project Zip Code(+4)
S 212th St. S 196th St. Kent 98032-5895
Begin Mile Post End Mile Post Length of Project Award Type
1 mile ❑✓ Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
0615 17 KING
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 47 8 80389
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. 0 0 0
R/W 0 0 0
Const. $3,036,500 $1,636,500 $1,400,000 6 2023
Total $3,036,500 $1,636,500 $1,400,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
58 feet 5
Five lane road with existing asphalt concrete pavement.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
Grind and replace failing pavement sections, overlay the full width of the roadway,upgrade curb ramps and
traffic signals to meet ADA standards. The project will include replacement of existing ACP with cement
concrete for the intersection approach legs for the northbound and southbound lanes at S 212th Street.
Local Agency Contact Person Title Phone
Drew Holcomb Design Engineer 2535611587
Mailing Address City State Zip Code
220 4th Ave. S Kent WA 98032
By
Project Prospectus Approving Authority
Title Public Works Director Date
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Agency Project Title Date
City of Kent East Valley Highway Preservation 5/18/23
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑3-R 58 feet 5
❑✓ Reconstruction ✓❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking ❑Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
[✓ Principal Arterial ❑ Principal Arterial
Federal ✓Z Urban ❑ Minor Arterial ❑ Urban ❑ Minor Arterial
❑Collector ❑Collector
Functional ❑Rural ❑Major Collector ❑ Rural ❑Major Collector
Classification ❑ NHS ❑ Minor Collector ❑ NHS ❑ Minor Collector
❑ Local Access ❑ Local Access
Terrain ❑✓ Flat [:] Roll [:] Mountain ❑ Flat ❑ Roll ❑ Mountain
Posted Speed 40
Design Speed N/A
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
City of Kent % 100
Construction Will Be Performed By Contract Agency
Private contractor 100 % %
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑Class I II - Environmental Assessment(EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
DOT Form 140-101 Page 2
Revised 01/2022 Previous Editions Obsolete
Agency Project Title Date
City of Kent East Valley Highway Preservation 5/18/23
Right of Way
0✓ No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑ No utility work required ❑ No railroad work required
❑AII utility work will be completed prior to the start El All railroad work will be completed prior to the start of
of the construction contract the construction contract
[✓ All utility work will be completed in coordination ❑✓ All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
This project includes non-eligible sewer main replacement. ADA and road geometry require storm line work.
No other utility work is anticipated. The overlay will pave up to the concrete railroad panels. This is a spur
track, railroad flaggers will be hired.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project?❑Yes ✓❑ No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
e 06/01/2023 By
D �
at 'lay Md!!d.. p.son
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete