Loading...
HomeMy WebLinkAboutCAG2023-271 - Original - Specialized Pavement Marking, LLC - 2023 Paint Line Striping & RPM Replacement - 04/26/2023 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form DirAsst: • For Approvals,Signatures and Records Management Dir/Dep: KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional) W A S H I N G T O N Sheet forms. (Print on pink or cherry colored paper) Originator: Department: Karin Bayes for Joe Araucto Public Works Date Sent: Date Required: c 04/25/2023 05/02/2023 Q Authorized to Sign: Date of Council Approval: QMayor or Designee 4 4 2023 Budqet Account Number: Grant? Yes NoE] 11115530.7497 Budget? Yes E]No Type: N/A Vendor Name: Category. Specialized pavement Marking, LLC Contract Vendor Number: Sub-Category: Original 0 Project Name: 2023 Paint Line Striping & RPM Placement 3- Project Details: The project consists of installing paint striping over existing lane markings 0 P ] 9 P p 9 9r C painting existing traffic curbing, and installing replacement raised pavement *, markings on various City of Kent Streets C Basis for Selection of Contractor: Agreement $342,575.0 Bid Memo to Mayor must be iStart Date: within 10 days after notice toprooeed Termination Date: 40 Working days Q Local Business? Yes F—]No*If meets requirements per KCC 3.70.100,please complete'Vendor Purchose-Locol Exceptions"form on Cityspace. Business License Verification: El Yes In-Process❑Exempt(KCC 5.01.045) ElAuthorized Signer Verified Notice required prior to disclosure? Contract Number: F—]YesF—]No CAG2023-271 Comments: i 3 IM RW C C 3 0 cc a, a, cc Date Received:City Attorney: 4/25/23 Date Routed:Mayor's Office 4/26/23 City Clerk's Office 4/27/23 adccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20221201 CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011 . 1 BIDS ACCEPTED UNTIL March 21, 2023 11 :00 A.M. BID OPENING IMMEDIATELY FOLLOWING DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 CHAD BIEREN, P.E. PUBLIC WORKS DIRECTOR • KEN TT WA S H IN G T O N INDEX Section 1 Bidder's Package Section 2 Payment and Performance Bond and Contract Section 3 Table of Contents Section 4 Kent Special Provisions Section 5 Kent Standard Plans Section 6 Appendices Section 7 Traffic Control Plans Section 8 Prevailing Wage Rates BIDDER'S NAME Specialized Pavement Marking, LLC CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2023 Paint Line Striping & RPM Replacement Project Number: 23-3011 . 1 BIDS ACCEPTED UNTIL March 21, 2023 11:00 A.M. BID OPENING IMMEDIATELY FOLLOWING DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 CHAD BIEREN, P.E. PUBLIC WORKS DIRECTOR • KEN TT WASH IN GTO N ORDER OF CONTENTS Invitation to Bid Contractor Compliance Statement Declaration - City of Kent Non-Discrimination Policy Administrative Policy 1.2 - Inclusive Contracting Proposal Subcontractor List (over $1 million) - HVAC, Plumbing, and Electrical Subcontractor List (over $1 million) - Structural Steel Installation and Rebar Installation Contractor's Qualification Statement Statement that Bidder Has Not Been Disqualified Certification of Compliance with Wage Payment Statutes Proposal Signature Page Bid Bond Form Combined Declaration Form Non-Collusion, Minimum Wage Change Order Bidder's Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Kent Standard Plans Appendices Traffic Control Plans Prevailing Wage Rates INVITATION TO BID Notice is hereby given that the City of Kent, Washington, will receive sealed bids at the City Clerk's office through March 21, 2023, up to 11:00 a.m. as shown on the clock on the east wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must be properly marked and sealed in accordance with this "Invitation to Bid." Bids must be delivered and received at the City Clerk's office by the above-stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud immediately following 11:00 a.m. for the City of Kent project named as follows: 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011.1 The City Clerk will read the bids out loud from the Clerk's office. Individuals can stand in the lobby outside the Clerk's office during the bid opening to hear the bid results. The project consists of installing paint striping over existing lane markings, painting existing traffic curbing, and installing replacement raised pavement markings on various City of Kent Streets, all in accordance with Kent Special Provisions, and the WSDOT Standard Specifications. The Engineer's estimated range for this project is approximately $371,000 to $415,000. Bid documents may be obtained by contacting City of Kent Engineering Department, Karin Bayes at 425-856-5657. For technical questions, please call Joseph Araucto at 253-856-5664. Bids must be clearly marked "Bid" with the name of the project on the outside of the envelope, addressed to the City Clerk, 220 4th Avenue South, Kent, WA 98032- 5895. Only sealed bids will be accepted. No facsimiles or electronic submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file in the office of the City Engineer, City of Kent, Washington. Plans and specifications can also be downloaded at no charge at https://www.kentwa.-gov/pay-and-apply/bids-procurement-rf . Copies of the WSDOT Standard Specifications are available for perusal only. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. Note: The award of the contract will not occur until the City of Kent has reviewed all bids for responsiveness and responsibility determinations and the Kent City Council has formally awarded the contract. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. The City of Kent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. No bidder may withdraw his/her bid for a period of sixt (60) days after the day of bid opening. Dated this 6th day of March 2023. BY: Kimberl A. Komoto, City Clerk Published: Daily Journal of Commerce on March 7 and 14, 2023 Washington State Office of Minority and Women's Business Enterprise on March 7, 2023 1 'i i i CONTRACTOR COMPLIANCE STATEMENT (President's Executive Order #11246) Date March 17 , 2023 This statement relates to a proposed contract with the City of Kent named 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011.1 I am the undersigned bidder or prospective contractor. I represent that - 1. I X have, have not, participated in a previous contract or subcontract subject to the President's Executive Order #11246 (regarding equal employment opportunity) or a preceding similar Executive Order. Specialized Pavement Marking, LLC NAME OF BIDDER BY: I SIGNATUR /TITLE Mark Price, President 11095 SW Industrial Way, Suite A Tualatin, OR 97062 ADDRESS (Note to Bidders: The information required in this Compliance Statement is informational only) 2023 Paint Line Striping &RPM Replacement/Araucto 1 March 6, 2023 Project Number: 23-3011.1 DECLARATION CITY OF KENT NON-DISCRIMINATION POLICY The City of Kent (City) is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors, consultants, vendors, and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The City of Kent and its contractors are subject to and will comply with the following: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 C.F.R. Part 21 (entitled Non-discrimination In Federally-Assisted Programs Of The Department Of Transportation-Effectuation Of Title VI Of The Civil Rights Act Of 1964); • 28 C.F.R. section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the Civil Rights Act of 1964). • Ch. 49.60 RCW (Washington Law Against Discrimination) The preceding statutory and regulatory cites hereinafter are referred to as "the Acts and Regulations". The following statements specifically identify the requirements the City deems necessary for any contractor, subcontractor, or supplier on this specific Agreement to adhere to. An affirmation of all of the following is required for this Agreement to be valid and binding. If any contractor, subcontractor, or supplier willfully misrepresents themselves with regard to the directives outlined below, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement. The statements are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement I, the prime contractor, will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 2023 Paint Line Striping &RPM Replacement/Araucto 2 March 6, 2023 Project Number: 23-3011.1 5. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: A. Compliance with Regulations: The contractor, subcontractor, consultant, vendor, and supplier (hereinafter "Contractor") will comply with all Acts and the Regulations relative to non-discrimination, including those applicable to Federally-assisted programs of the U.S. Department of Transportation, State-assisted programs through the Washington State Department of Transportation, and generally under Washington's Law Against Discrimination, Ch. 49.60 RCW, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. B. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21. C. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to non-discrimination on the grounds of race, color, or national origin. D. Information and Reports: The contractor will provide all information and reports required by the Acts and Regulations and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined applicable to contractor's contract by the City or the Washington State Department of Transportation to be pertinent to ascertain compliance with such Acts and Regulations and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the City or the Washington State Department of Transportation, as appropriate, and will set forth what efforts it has made to obtain the information. E. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the non-discrimination provisions of this contract, the City will impose such contract sanctions as it or the Washington State Department of Transportation may determine to be appropriate, including, but not limited to: 2023 Paint Line Striping &RPM Replacement/Araucto 3 March 6, 2023 Project Number: 23-3011.1 a. withholding payments to the contractor under the contract until the contractor complies; and/or b. cancelling, terminating, or suspending a contract, in whole or in part. F. Incorporation of Provisions: The contractor will include the provisions of paragraphs (A) through (F) above in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts and Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the City or the Washington State Department of Transportation may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the City to enter into any litigation to protect the interests of the City. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. 6. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: i. Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. ii. The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); iii. Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); iv. Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; V. The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); vi. Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); vii. The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); 2023 Paint Line Striping &RPM Replacement/Araucto 4 March 6, 2023 Project Number: 23-3011.1 viii. Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; ix. The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); X. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures Non- discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; xi. Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of Limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); xii. Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). xiii. Washington Law Against Discrimination (Ch. 49.60 RCW) 7. The submission of the final invoice for this contract will constitute a reaffirmation that the preceding statements were complied with during the course of the contract's performance. By signing below, I agree to fulfill the five requirements referenced above. By: For: Specialized Pavement Marking, LLC Title: President Date: March 17 , 2023 2023 Paint Line Striping &RPM Replacement/Araucto 5 March 6, 2023 Project Number: 23-3011.1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: October 20, 2022 SUBJECT: INCLUSIVE CONTRACTING SUPERSEDES: January 1, 1998 APPROVED BY Dana Ralph, Mayor POLICY: Equal employment opportunity and non-discrimination in contracting requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants, and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Further, all contractors, subcontractors, consultants, suppliers, grantees, or subgrantees of the City, regardless of the value of the Agreement, are required to sign the City's Non-Discrimination Policy Declaration, prior to commencing performance. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to coordinate with the City's Title VI coordinator and perform the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 2023 Paint Line Striping &RPM Replacement/Araucto 6 March 6, 2023 Project Number: 23-3011.1 PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that Specialized Pavement Marking, LLC has examined the job site and construction details of the work as outlined on the plans and described in the specifications for the project named 2023 Paint Line Striping and RPM Replacement/Project Number: 23-3011.1 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions, marked with asterisk (*), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. EXAMPLE SCHEDULE I - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1006 2-03.5 100 Roadway Excavation, $14.00 $1,400.00 WSDOT CU YDS Including Haul Per CY Any bids not filled out properly may be considered non-responsive. 2023 Paint Line Striping &RPM Replacement/Araucto 7 March 6, 2023 Project Number: 23-3011.1 ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-09.7 1 Mobilization $ Moo 00 $ a 0 500.00 WSDOT LUMP SUM Per LS 1005 8-22.5 390,000 Painted Double Solid Line $ A $ -/0J;)-w,00 KSP LN FT Per LF 1010 8-22.5 580,000 Painted Single Solid Line $ . 10 $ 51,000.00 KSP LN FT Per LF 1015 8-22.5 130,000 Painted Skip Lane Line $ . 09 $ n) 100.00 KSP LN FT Per LF 1020 8-22.5 12,000 Painted Dotted Line $ , 10 $ 113.00.00 KSP LN FT Per LF 1025 8-22.5 100,000 Painted TWLTL Line $ .14 $ 1410o0.00 KSP LN FT Per, LF 1030 8-22.5 35,000 Painted Wide Lane Line $ . 24 $ '91400.00 WSDOT LN FT Per LF 1035 8-22.5 140,000 Painted Bike Lane Line $ . .Z.o1.. $ 30)TOO.00 KSP LN FT Per LF 1040 8-22.5 12,500 Painting Traffic Curb $ 1.05 $ i31 la.. 06 KSP LN FT Per LF 1045 8-09.5 100 Raised Pavement Marker $ 316",00 $ 6 9 -&10.00 WSDOT HUNDRED Type 1 Per HUND 2023 Paint Line Striping &RPM Replacement/Araucto 8 March 6, 2023 Project Number: 23-3011.1 ITEM SECTION APPROX. ITEM UNIT TOTAL NO NO. QUANTITY PRICE AMOUNT 1050 8-09.5 100 Raised Pavement Marker $ 395: D0 $391500.00 WSDOT HUNDRED Type 2 Per HUND 1055 8-22.5 100 RPM Lane Line Removal at $ 1•50 $ -450.to KSP LN FT Ramsay Way Per LF 1060 1-10.4(1) 1 Project Temporary Traffic $5►,.moo $ 51,150.00 KSP LUMP SUM Control Per LS 1065 1-07.15(1) 1 SPCC Plan $ g50.00 $ 960. Ov WSDOT LUMP SUM Per LS 1065 1-04.4(1) 1 Minor Changes $5,000.00* $5,000.00 WSDOT CALC Per CALC *Common price to all bidders Total $ 00 2023 Paint Line Striping &RPM Replacement/Araucto 9 March 6, 2023 Project Number: 23-3011.1 SUBCONTRACTOR LIST (Contracts over 1 million dollars) HVAC, PLUMBING AND ELECTRICAL Name of Bidder: Specialized Pavement Marking, LLC Project Name: 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011.1 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation, and air conditioning; plumbing; and electrical, or name itself for the work. Failure of the Bidder to submit, within one hour after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Heating, Ventilation, and Air Conditioning Subcontractor Name: N/A Plumbing Subcontractor Name: Electrical Subcontractor Name: March 17 , 2023 Signature of Bidder Date 2023 Paint Line Striping &RPM Replacement/Araucto 10 March 6, 2023 Project Number: 23-3011.1 SUBCONTRACTOR LIST (Contracts over 1 million dollars) STRUCTURAL STEEL INSTALLATION AND REBAR INSTALLATION Name of Bidder: Specialized Pavement Marking, LLC Project Name: 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011.1 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation and rebar installation. Failure of the Bidder to submit, within 48 hours after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcon22-3011.1tractors to perform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Structural Steel Installation Subcontractor Name: N/A Rebar Installation Subcontractor Name: March 17 , 2023 Signature of Bidder Date 2023 Paint Line Striping &RPM Replacement/Araucto 11 March 6, 2023 Project Number: 23-3011.1 CONTRACTOR'S QUALIFICATION STATEMENT (RCW 39.04.350) THE CITY WILL REVIEW THE CONTRACTOR'S RESPONSES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR IS RESPONSIBLE TO PERFORM THE CONTRACT WORK. THIS FORM INCLUDES CRITERIA ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSIDERED A RESPONSIBLE BIDDER AND QUALIFIED TO BE AWARDED THIS PUBLIC WORKS PROJECT AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CITY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT. THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY. Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner. Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid documents or three (3) business days prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeals will be received after the expiration of this 24 hour appeal period. The city may deliver this notice by hand delivery, email, facsimile, or regular mail. In the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S. Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city issues a final determination. Bidder acknowledges and understands that, as provided by RCW 39.04.350, no other appeal is allowed and no other remedy of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work. 2023 Paint Line Striping &RPM Replacement/Araucto 12 March 6, 2023 Project Number: 23-3011.1 If the bidder fails to request a modification within the time allowed or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND SIGN THIS FORM AS PART OF YOUR BID. FAILURE TO PROPERLY COMPLETE THIS FORM MAYALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON-RESPONSIVE AND THEREFORE VOID. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED BY: NAME: Mark Price, President ADDRESS: 11095 SW Industrial Way, Suite A Tualatin, OR 97062 PRINCIPAL OFFICE: Specialized Pavement Marking, LLC ADDRESS: 11095 SW Industrial Way, Suite A Tualatin, OR 97062 PHONE: 503-885-0420 FAX: 503-582-8629 STATUTORY REQUIREMENTS — Per state law a bidder must meet the following responsibility criteria 1. Required Responsibility Criteria 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18.27 RCW. Attached. 1.2 Provide your current state unified business identifier number. 602-001-003 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection. Attached. 1.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under 2023 Paint Line Striping &RPM Replacement/Araucto 13 March 6, 2023 Project Number: 23-3011.1 control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). Attached. 1.5 Provide a signed statement, signed under penalty of perjury by a person with authority to act and speak for your company, that within the three- year period immediately preceding the bid solicitation date, your company is not a "willful" violator as defined in RCW 49.48.082, of any provisions of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. Attached. 1.6 Provide proof that a designated person or persons with your company has either received training from the department of labor and industries or an approved training provider on the requirements related to public works and prevailing wages under chapter 39.04 RCW and 39.12 RCW or provide proof that your company has completed three or more public works projects and have had a valid business license in Washington for three or more years and are exempt from this training requirement. Attached. SUPPLEMENTAL CRITERIA — Established by the City to determine bidder responsibility 2. ORGANIZATION PLEASE SEE ATTACHMENTS 2.1 How many years has your organization been in business as a Contractor? 2.2 How many years has your organization been in business under its present business name? 2.2.1 Under what other or former names has your organization operated? 2.3 If your organization is a corporation, answer the following: N/A 2.3.1 Date of incorporation: 2.3.2 State of incorporation: 2.3.3 President's name: 2.3.4 Vice-president's name(s): 2.3.5 Secretary's name: 2.3.6 Treasurer's name: 2.4 If your organization is a partnership, answer the following: N/A 2.4.1 Date of organization: 2.4.2 Type of partnership (if applicable): 2.4.3 Name(s) of general partner(s): 2.5 If your organization is individually owned, answer the following: N/A 2.5.1 Date of organization: 2.5.2 Name of owner: 2023 Paint Line Striping &RPM Replacement/Araucto 14 March 6, 2023 Project Number: 23-3011.1 2.6 If the form of your organization is other than those listed above, describe it and name the principals: Limited Liability Company (LLC) Mark Price, President 3. LICENSING PLEASE SEE ATTACHMENT 3.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate license numbers, if applicable. 3.2 List jurisdictions in which your organization's partnership or trade name is filed. 4. EXPERIENCE PLEASE SEE ATTACHMENTS 4.1 List the categories of work that your organization normally performs with its own forces. 4.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 4.2.1 Has your organization ever failed to complete any work awarded to it? 4.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 4.2.3 Has your organization filed any lawsuits or requested arbitration with regard to construction contracts within the last five years? 4.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 4.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect or design engineer, contract amount, percent complete and scheduled completion date. 4.4.1 State total worth of work in progress and under contract: 4.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect or design engineer, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 4.5.1 State average annual amount of construction work performed during the past five years: 4.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 4.7 On a separate sheet, list your major equipment. 2023 Paint Line Striping &RPM Replacement/Araucto 15 March 6, 2023 Project Number: 23-3011.1 5. REFERENCES PLEASE SEE ATTACHMENT 5.1 Trade References: 5.2 Bank References: 5.3 Surety: 5.3.1 Name of bonding company: 5.3.2 Name and address of agent: 6. FINANCING 6.1 Financial Statement. After bid opening, the City may require the following financial information from any of the three apparent low bidders. If so required, the selected bidder(s) must respond with this financial information within 24 hours of the City's request for that information. The City's request for this information shall not be construed as an award or as an intent to award the contract. A bidder's failure or refusal to provide this information may result in rejection of that bidder's bid. 6.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.1.2 Name and address of firm preparing attached financial statement, and date thereof: 6.1.3 Is the attached financial statement for the identical organization named on page one? 6.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent- subsidiary). 6.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 2023 Paint Line Striping &RPM Replacement/Araucto 16 March 6, 2023 Project Number: 23-3011.1 7. SIGNATURE 7.1 Dated at this 17th day of March , 2023. Name of Organization: Specialized Pavement Marking, LLC By: Title: Mark Price, President 7.2 Mark Price , being duly sworn, deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and orn before me this 17th day of March , 2023. Notary Public: My Commission Expires: May 31, 2025 OFFICIAL STAMP CANDICE DAWN TAVERNIER NOTARY PUBLIC-OREGON COMMISSION NO. 1012457 MY COMMISSION EXPIRES MAY 31,2025 2023 Paint Line Striping &RPM Replacement/Araucto 17 March 6, 2023 Project Number: 23-3011.1 BIDDER RESPONSIBILITY CRITERIA Statement that Bidder Has Not Been Disqualified This statement is required by state law (RCW 39.04.350(1)(d)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (March 21, 2023), the bidder has not been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Specialized Pavement Marking, LLC Bidder's Business Name ZZ-l ! Signature of Authorized Official* Mark Price Printed Name President Title March 17 , 2023 Tualatin OR Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2023 Paint Line Striping &RPM Replacement/Araucto 18 March 6, 2023 Project Number: 23-3011.1 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (March 21, 2023), the bidder is not a "willful" violator, as defined in RCW 49,48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Specialized Pavement Marking, LLC Bidder's Business Name Signatu of Authorized Official* Mark Price Printed Name President Title March 17, 2023 Tualatin OR Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2023 Paint Line Striping &RPM Replacement/Araucto 19 March 6, 2023 Project Number: 23-3011.1 PROPOSAL SIGNATURE PAGE The City will issue multiple Notice to Proceed letters. A limited Notice to Proceed will be issued for the installation of raised pavement markers and the paint line striping of Group A Streets on the day of the preconstruction meeting. The City anticipates issuance of a separate Notice to Proceed for the performance of the remaining work on July 5, 2023. The undersigned bidder, if awarded to him/her, hereby proposes and agrees to start construction work on the Contract to complete all paint line striping on Group A Streets on or before ten (10) working days from the date of the Limited Notice to Proceed. Liquidated Damages may be assessed if the work is not completed within ten (10) working days. RPM installation may be completed by the end of the full Notice to Proceed time period. The Contractor also proposes and agrees to complete the Contract within forty (40) working days after issuance of the City's final Notice to Proceed. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening. The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5% of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. Receipt of Addendum No.'s to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal. By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE: March 17, 2023 Specialized Pavement Marking, LLC NAME OF BIDDER Signature of Authorized Representative Mark Price, President (Print Name and Title) 11095 SW Industrial Way, Suite A Address Tualatin, OR 97062 2023 Paint Line Striping &RPM Replacement/Araucto 20 March 6, 2023 Project Number: 23-3011.1 BID BOND FORM KNOW ALL MEN BY THESE PRESENTS: That we, Specialized Pavement Marking, LLC , as Principal, and Berkley Insurance Company , as Surety, are held and firmly bound unto the CITY OF KENT, as Obligee, in the penal sum of Five Percentot Total Amount Bid($5%T.A.B.) Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for 2023 Paint Line Striping and RPM Replacement/ Project Number: 23-3011.1 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS 21st DAY OF March 2023. Specialized Pavement Marking, Li.0 PRINCIPAL Berkley Insurance Company 1. TY Laura Lee Kneitz,Attorne in-Fact 20 Received return of deposit in the sum of $ 2023 Paint Line Striping &RPM Replacement/Araucto 21 March 6, 2023 Project Number: 23-3011.1 No.BI-303i-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Robert F. Bobo; Timothy Kelly; Florence McClellan; Kristin Darling; Aaron R Clark; Teresa D. Kelly; Craig C. Payne, or Laura Lee Kneitz of Lockton Companies, LLC of Houston, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings,with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S.Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and farther RESOLVED,that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF, the Company has caused these presents to-be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 30th day of January2023 umlvice Attest: Berk! Insurance CompPO any SFALco By By 3975 dermas Je alter qz"Aar Executive Vice President&Secretary Se c`e resident STATE OF CONNECTICUT) ) ss: COUNTY OF FAIRFIELD ) Sworn to before me, a Notary Public in the State of Connecticut,this 30th day of January 2023 ,by Ira.S.Lederman and Jeflirey M. Hafter who are sworn to me to be the Executive Vice President Secretary, and t Senior Vice President, respectively,of Berkley Insurance Company. MART AAYUNDB PUBIAc" CONNECTICUT MY OOMMISSION A HIL30,2024PIRE9 Otky Public,State of Connecticut CERTIFICATE 1,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded an authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of I ' RAN o ched,is in full force and effect as of this date. S,er "�'rt der my hand and seal of the Company,this 21 st day of March 2023 W SEAL m 3975 °Etnwa Vincent P.Forte CITY OF KENT COMBINED DECLARATION FORM: NON-COLLUSION, MINIMUM WAGE NON-COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. 2023 Paint Line Striping and RPM Replacement Project Number: 23-3011.1 NAME OF PROJECT Specialized Pavement Marking, LLC NAME OF BIDDER'S FIRM SIGNATURE OF AUTHORIZED REPRESENTATIVE OF BIDDER 2023 Paint Line Striping &RPM Replacement/Araucto 22 March 6, 2023 Project Number: 23-3011.1 This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. [Enter # 1, 2, 3, etc.] NAME OF CONTRACTOR: [Insert Company Name] ("Contractor") CONTRACT NAME & PROJECT NUMBER:[Insert Name of Original Contract & Project #, if applicable] ORIGINAL CONTRACT DATE: [Insert Date Original Contract was Signed] This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section 1 of the Contract is hereby modified to revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order - Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and date] 2. The contract amount and time for performance provisions of Section 1 of the Contract are also modified as follows: Original Contract Sum, $ (including applicable alternates and WSST) Net Change by Previous Change Orders $ (incl. applicable WSST) Current Contract Amount $ (incl. Previous Change Orders) Current Change Order $ Applicable WSST Tax on this Change $ Order Revised Contract Sum $ 2023 Paint Line Striping &RPM Replacement/Araucto 23 March 6, 2023 Project Number: 23-3011.1 Original Time for Completion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (±) for this Change Order working days Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: (signature) (signa ture) Print Name: Print Name: Chad Bieren, P.E. Its Its Public Works Director (title) (title) DATE: DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department 2023 Paint Line Striping &RPM Replacement/Araucto 24 March 6, 2023 Project Number: 23-3011.1 BIDDER'S CHECKLIST The following checklist is a guideline to help the Contractor make sure all forms are complete. The bidder's attention is especially called to the following forms. Failure to execute these forms as required may result in rejection of any bid. Bidder's Package should include the following: Bid Document Cover Sheet filled out with Bidder's Name ....................❑ Orderof Contents.................................................................................❑ Invitationto Bid...................................................................................❑ Contractor Compliance Statement........................................................❑ Date............................................................................................❑ Have/have not participated acknowledgment.............................❑ Signatureand address ................................................................❑ Declaration - City of Kent Non-Discrimination Policy...........................❑ Dateand signature .....................................................................❑ AdministrativePolicy ...........................................................................❑ Proposal...............................................................................................❑ First line of proposal - filled in ...................................................❑ Unit prices are correct ................................................................❑ Subcontractor List (contracts over$1M — HVAC, Plumbing, & Electrical)............❑ Subcontractors listed properly....................................................❑ Signature ....................................................................................❑ Subcontractor List (contracts over $1M — Structural Steel & Rebar Installation)..❑ Subcontractorslisted properly....................................................❑ Dateand signature .....................................................................❑ Contractor's Qualification Statement ...................................................❑ Completeand notarized ..............................................................❑ Statement that Bidder Has Not Been Disqualified ................................❑ Certification of Compliance with Wage Payment Statutes....................❑ ProposalSignature Page ......................................................................❑ All Addenda acknowledged .........................................................❑ Date, signature and address .......................................................❑ BidBond Form .....................................................................................❑ Signature, sealed and dated........................................................❑ Powerof Attorney.......................................................................❑ (Amount of bid bond shall equal 5% of the total bid amount) CombinedDeclaration Form.................................................................❑ Signature ....................................................................................❑ ChangeOrder Form..............................................................................❑ Bidder's Checklist ................................................................................❑ The following forms are to be executed after the Contract is awarded: A) CONTRACT This agreement is to be executed by the successful bidder. B) PAYMENT AND PERFORMANCE BOND To be executed by the successful bidder and its surety company. The following form is to be executed after the Contract is completed: A) CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT To be executed by the successful bidder AFTER COMPLETION of this contract. 2023 Paint Line Striping &RPM Replacement/Araucto 25 March 6, 2023 Project Number: 23-3011.1 I . � Department of Labor and Industries SPECIALIZED PAVEMENT MRKG LLC PO Box 44450 Olympia, WA 98504-4450 Reg: CC SPECIPM781139 UBL• 602-001-003 Registered as provided by Law as: Construction Contractor (CCO 1) - GENERAL 780 SPECIALIZED PAVEMENT MRKG LLC Effective Date: 11/19/2021 11095 SW INDUSTRIAL WAY Expiration Date: 11/19/2023 SUITE A TUALATIN OR 97062 3/17/23,2:28 PM SPECIALIZED PAVEMENT MRKG LLC lJLabor&Industries(https://Ini.wa.g2y) Contractors SPECIALIZED PAVEMENT MRKG LLC Owner or tradesperson 11095 SW INDUSTRIAL WAY ................................................................_... Principals SUITE A PRICE,MARK ALLAN,PARTNER/MEMBER TUALATIN,OR 97062 503-885-0420 EVERTON,ROBERT K,PARTNER/MEMBER Doing business as SPECIALIZED PAVEMENT MRKG LLC WA UBI No. Business type 602 001 003 Limited Liability Company Governing persons MARK A PRICE HOWARD DAHILL; License Verify the contractor's active registration/license/certification(depending on trade)and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. SPECIPM781B9 Effective—expiration 11/19/2021—11/19/2023 Bond ....._...... Swiss RE Corporate Solutions America $12,000.00 Insurance Corporation Bond account no. 2307260 Received by L&I Effective date 11/19/2021 09/28/2021 Expiration date Until Canceled Insurance Travelers Indemnity Company Th $2,000,000.00 Policy no, VT C 2 K C 03 K990 7061 N D23 Received by L&I Effective date 01/04/2023 01/01/2023 Expiration date 01/01/2024 Insurance history Savings ........._............ No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ............. .................._ https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=602001003&LIC=SPECIPM781 B9&SAW=false 1/2 3/17/23,2:28 PM SPECIALIZED PAVEMENT MRKG LLC No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts may be recorded by other agencies. License Violations I .......... No license violations during the previous 6 year period. I Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent Registered training agent.Check their eligible programs and occupations. Workers' Comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. L&I Account ID Account is current. 002,815-01 .........................._.. Doing business as SPECIALIZED PAVEMENT MARKING Estimated workers reported Quarter 4 of Year 2022"31 to 50 Workers" L&I account contact T2/LINDA ALGUIRE(360)902-4678-Email:POTH235@lni.wa.gov Public Works Requirements Verify the contractor is eligible to perform work on public works projects. Required Training—Effective July.1 2019 Exempt from this requirement. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid .. .......... No debarments have been issued against this contractor. Workplace Safety & Health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 08/06/2021 Violations Inspection no. 317964101 Location N 34th&Stone Seattle,WA 98103 Inspection results date 03/12/2021 No violations Inspection no. 317962291 Location 3102 B St Nw Auburn,WA 98001 https://secure.ini.wa.gov/verify/Detail.aspx?UB1=602001003&LIC=SPECIPM781 B9&SAW=false 2/2 ORE—I BUSINESS LICENSE STATE OF Limited Liability Company Unified Business ID #: 602001003 Business ID #: 001 Location: 0001 SPECIALIZED PAVEMENT MARKING, LLC Expires: Feb 29, 2024 UNEMPLOYMENT INSURANCE -ACTIVE INDUSTRIAL INSURANCE-ACTIVE 4 TAX REGISTRATION -ACTIVE CITY ENDORSEMENTS: FIFE GENERAL BUSINESS - NON-RESIDENT -ACTIVE KELSO GENERAL BUSINESS - NON-RESIDENT#13010369 -ACTIVE MOUNT VERNON GENERAL BUSINESS - NON-RESIDENT-ACTIVE BATTLE GROUND GENERAL BUSINESS - NON-RESIDENT-ACTIVE MUKILTEO GENERAL BUSINESS - NON-RESIDENT-ACTIVE 94 PUYALLUP GENERAL BUSINESS - NON-RESIDENT-ACTIVE 5- LAKEWOOD GENERAL BUSINESS - NON-RESIDENT-ACTIVE 91 BAINBRIDGE ISLAND GENERAL BUSINESS - NON-RESIDENT-ACTIVE CHEHALIS GENERAL BUSINESS - NON-RESIDENT-ACTIVE YELM GENERAL BUSINESS - NON-RESIDENT#13183-ACTIVE SHELTON GENERAL BUSINESS - NON-RESIDENT#0079270-ACTIVE KIRKLAND GENERAL BUSINESS - NON-RESIDENT#OBL-0004978 -ACTIVE RIDGEFIELD GENERAL BUSINESS - NON-RESIDENT (EXPIRES 9/30/2023) -ACTIVE BONNEY LAKE GENERAL BUSINESS - NON-RESIDENT-ACTIVE BUCKLEY GENERAL BUSINESS - NON-RESIDENT-ACTIVE This document lists the registrations,endorsements, and licenses authorized for the business named above.By accepting this document,the licensee certifies the information on the application was complete,true,and accurate to the best of his or her knowledge,and that business will be conducted in compliance with all applicable Washington state,county,and city regulations. Direclor,Department(A Reventie UB|�� 8828010030010001 �a»�sop«w�*mo�mw Expires: Feb 2024 . ` uws�p�oYwsmTimou�xmnE ' SPECIALIZED PAVEMENT � � nAnm|mo. uo m./wE 11000avv INDUSTRIAL WAY GTEA INDUSTRIAL INSURANCE-ACTIVE TUALAT|NORn7n82-9aOn TAX REGISTRATION xoT|vE FIFE GENERAL BUSINESS' NoN'Rsa|oeNT AoT|vs KELoo GENERAL BUSINESS NON-RESIDENT#eu1oose'ACTIVE MOUNT VERNON GENERAL oUn|NEss woN'REa|oswT AnT|vs BATTLE GROUND GENERAL BUSINESS'NON-RESIDENT' ACTIVE Mumcreo GENERAL BUSINESS BUSINESS LICENSE STATE OF WASHINGTON Unified Business ID #: 602001003 Limited Liability Company Business ID #: 001 Location: 0001 SPECIALIZED PAVEMENT MARKING, LLC Expires: Feb 29, 2024 CITY ENDORSEMENTS: CARNATION GENERAL BUSINESS - NON-RESIDENT-ACTIVE COVINGTON GENERAL BUSINESS - NON-RESIDENT-ACTIVE DUPONT GENERAL BUSINESS- NON-RESIDENT#5885 -ACTIVE DUVALL GENERAL BUSINESS - NON-RESIDENT-ACTIVE EATONVILLE GENERAL BUSINESS - NON-RESIDENT-ACTIVE NJ ENUMCLAW GENERAL BUSINESS - NON-RESIDENT#BUS2022-0238 (EXPIRES 7/31/2023)-ACTIVE GIG HARBOR GENERAL BUSINESS - NON-RESIDENT-ACTIVE ISSAQUAH GENERAL BUSINESS - NON-RESIDENT-ACTIVE LACEY GENERAL BUSINESS - NON-RESIDENT#211932 -ACTIVE LAKE STEVENS GENERAL BUSINESS - NON-RESIDENT-ACTIVE LONGVIEW GENERAL BUSINESS - NON-RESIDENT#735792 -ACTIVE MAPLE VALLEY GENERAL BUSINESS - NON-RESIDENT-ACTIVE MARYSVILLE GENERAL BUSINESS - NON-RESIDENT#042000N921 -ACTIVE MILTON GENERAL BUSINESS- NON-RESIDENT-ACTIVE NEWCASTLE GENERAL BUSINESS - NON-RESIDENT-ACTIVE NORTH BEND GENERAL BUSINESS - NON-RESIDENT#022044.0 -ACTIVE OLYMPIA GENERAL BUSINESS - NON-RESIDENT#28013 -ACTIVE PORT ORCHARD GENERAL BUSINESS - NON-RESIDENT-ACTIVE POULSBO GENERAL BUSINESS - NON-RESIDENT-ACTIVE SEDRO WOOLLEY GENERAL BUSINESS - NON-RESIDENT-ACTIVE This document lists the registrations,endorsements,and licenses authorized for the business namedabove.By accepting this document,the licensee certifies the information ontheapplication was complete,true,and accurate to the best of his or her knowledge,and that business will be conducted in compliance with all applicable Washington state,county,and city regulations. Direclor,DepartmentlAf Revenue STATE opWASHmGTo UB|�� 682OU10O3OU1 0001 Expires: Feb 2Q 2024 � . . SPECIALIZED PAVEMENT � UNEMPLOYMENT INSURANCE � mAnNwo. LLC m./wE 11neaovv INDUSTRIAL WAY 8TEx INDUSTRIAL INSURANCE-ACTIVE TUxLAT|N0R 97002e685 TAX REGISTRATION AcT|vs FIFE GENERAL BUSINESS- NON-RESIDENT'ACTIVE KELoo GENERAL BUSINESS NON-RESIDENT#a01oaso-ACTIVE MOUNT VERNON GENERAL oua|wsos moN'RE0oewT ACTIVE BATTLE GROUND GENERAL oUmNsaa NON-RESIDENT' xoT|vs MuK|cTco GENERAL BUSINESS' BUSINESS LICENSE STATE Of Issue Date: Mar 10, 2023 WASHINGTON Unified Business ID 602001003 Limited Liability Company Business ID 001 Location: 0001 SPECIALIZED PAVEMENT MARKING, LLC Expires: Feb 29, 2024 CITY ENDORSEMENTS: SULTAN GENERAL BUSINESS - NON-RESIDENT-ACTIVE TUMWATER GENERAL BUSINESS - NON-RESIDENT#R-015029 -ACTIVE WOODINVILLE GENERAL BUSINESS - NON-RESIDENT-ACTIVE VANCOUVER GENERAL BUSINESS - NON-RESIDENT-ACTIVE QUINCY GENERAL BUSINESS - NON-RESIDENT (EXPIRES 6/30/2023) -ACTIVE BLACK DIAMOND GENERAL BUSINESS - NON-RESIDENT (EXPIRES 1/31/2024) -ACTIVE SNOHOMISH GENERAL BUSINESS - NON-RESIDENT-ACTIVE TUKWILA GENERAL BUSINESS - NON-RESIDENT-ACTIVE BURLINGTON GENERAL BUSINESS - NON-RESIDENT (EXPIRES 5/31/2023) -ACTIVE FRIDAY HARBOR GENERAL BUSINESS - NON-RESIDENT-ACTIVE CASTLE ROCK GENERAL BUSINESS - NON-RESIDENT-ACTIVE SEATAC GENERAL BUSINESS - NON-RESIDENT-ACTIVE MERCER ISLAND GENERAL BUSINESS - NON-RESIDENT#220151 -ACTIVE FEDERAL WAY GENERAL BUSINESS - NON-RESIDENT#16-104772-00-BL-ACTIVE WENATCHEE GENERAL BUSINESS - NON-RESIDENT-ACTIVE LYNNWOOD GENERAL BUSINESS - NON-RESIDENT-ACTIVE MOUNTLAKE TERRACE GENERAL BUSINESS - NON-RESIDENT-ACTIVE CAMAS GENERAL BUSINESS - NON-RESIDENT-ACTIVE YAKIMA GENERAL BUSINESS - NON-RESIDENT#BL078135-ACTIVE BURIEN GENERAL BUSINESS - NON-RESIDENT-ACTIVE This docurnlent lists the registrations,endorsements, and licenses authorized for the business nainedabove.By accepting this document,the licensee certifiesthe information ontheapplication was complete,true,and accurate to the best of his or her knowledge,and that business will be conducted in compliance with all applicable Washington state,county,and city regulations. STATE orW«sxINorow UB|�� 602001003UU1 0001 Expires:� Fab20 2024 ' � ' ` = SPECIALIZED PAVEMENT UNEMPLOYMENT INSURANCE � MxRn|mo. Lu: ACTIVE 1109oGvv INDUSTRIAL WAY 8Ts« INDUSTRIAL INSURANCE AoT|vs TuALAT|w0n 97002'e085 TAX REGISTRATION AnT|vs FIFE GENERAL BUSINESS' NON-RESIDENT'ACTIVE nsLoo GENERAL BUSINESS NON-RESIDENT#13o1o309'ACTIVE MOUNT VERNON GENERAL BUSINESS Now'nEomsNT ACTIVE BATTLE GROUND GENERAL BUSINESS'NON-RESIDENT ACTIVE Mumcren GENERAL BUSINESS' � ����� e St z BUSINESS LICENSE 71, `) 9y 1Ntl9� i STATE OF 4I. Issue Date: Mar 10, 2023 ` WASHINGTON Limited Liability Company Unified Business ID #: 602001003 Business ID #: 001 k� Location: 0001 ' SPECIALIZED PAVEMENT MARKING, LLC Expires: Feb 29, 2024 Y t={! 11095 SW INDUSTRIAL WAY STE A +' TUALATIN OR 97062-9685 CITY ENDORSEMENTS: BINGEN GENERAL BUSINESS - NON-RESIDENT#2784 -ACTIVE REDMOND GENERAL BUSINESS - NON-RESIDENT#RED10-000267 -ACTIVE -N s� ABERDEEN GENERAL BUSINESS - NON-RESIDENT#216825-ACTIVE =; BREMERTON GENERAL BUSINESS - NON-RESIDENT#35188 -ACTIVE t' ARLINGTON GENERAL BUSINESS - NON-RESIDENT (EXPIRES 10/31/2023) -ACTIVE I� PACIFIC GENERAL BUSINESS- NON-RESIDENT#3409 -ACTIVE BOTHELL GENERAL BUSINESS - NON-RESIDENT#14304 -ACTIVE AUBURN GENERAL BUSINESS - NON-RESIDENT#BUS-27986 (EXPIRES 12/31/2023)-ACTIVE �41 {; LICENSING RESTRICTIONS: Aberdeen city license valid until canceled by either party. I) No person, or business, or those under their control, shall cause or allow the discharge of unauthorized pollutantsI (e.g. chemicals, oils, detergents, or wastewater) into a City of Redmond storm water drainage system, surface water I t° bodies or groundwater. 1 Not licensed to hire minors without a Minor Work Permit. tl 6; 4/�I REGISTERED TRADE NAMES: ti SPECIALIZED PAVEMENT MARKING, LLC >§ No i" 4,ii Fr This document lists the registrations,endorsements, and licenses authorized for the business named above.By accepting this document,the licensee certifies the information on the application (il was complete,true,and accurate to the best of his or her knowledge,and that business will be conducted in compliance with all applicable Washington state,county,and city regulations Director Dcpv IRItme•nt r uc 9 .azs�m�_re,,r.,,,cnn:..,.eo�:.:..rn. w ,u'� .n.:.w,'.+3w-.� -.m....eK-+:?.�-•u:aw.mow._ ,..wx- u�'�s-.z� -- �. STATE OF WASHINGTON UBI: 602001003 001 0001 Expires: Feb 29, 2024 SPECIALIZED PAVEMENT UNEMPLOYMENT INSURANCE- MARKING,LLC ACTIVE 11095 SW INDUSTRIAL WAY STE A INDUSTRIAL INSURANCE-ACTIVE TUALATIN OR 97062-9685 TAX REGISTRATION-ACTIVE FIFE GENERAL BUSINESS- NON-RESIDENT-ACTIVE KELSO GENERAL BUSINESS- NON-RESIDENT#B010369-ACTIVE MOUNT VERNON GENERAL BUSINESS-NON-RESIDENT- ACTIVE BATTLE GROUND GENERAL BUSINESS-NON-RESIDENT- ACTIVE MUKILTEO GENERAL BUSINESS- ' BUSINESS LICENSE STATE OF Limited Liability Company Unified Business ID 602001003 Business ID 001 Location: 0001 SPECIALIZED PAVEMENT MARKING, LLC Expires: Feb 29, 2024 This document lists the registrations, endorsements, and licenses authorized for the btisiness named above.By accepting this document,the licensee certifies the information on the application was complete,trtie,and accurate to the best of his or her knowledge,and that business will be Lcoliducted in compliance with all applicable Washington state,county,and city regtilations. Diret for,Depa—limen i R,-v�nm, U8|�� 8U2OO10030U1 8001 STATE o+WAa*INmrom Expires: Feb 2O. 2O24 SPECIALIZED PAVEMENT UNEMPLOYMENT INSURANCE � MxnmNo.Lu: ACTIVE 11nenSvv INDUSTRIAL WAY oTsA INDUSTRIAL INSURANCE'ACTIVE TUALAT|moR 97002-9085 TAX REGISTRATION ACTIVE FIFE GENERAL BUSINESS NON-RESIDENT'ACTIVE KELaooENEnAL Bua|NsSs NON-RESIDENT#un1o3*8'ACTIVE MOUNT VERNON GENERAL oUa|Neuo Nom'nEG0EwT ACTIVE BATTLE GROUND GENERAL BUSINESS'NON-RESIDENT' ACTIVE mumLTEo GENERAL BUSINESS _ 440W mmalkh, Wk .000M Aq Oregon Office: Washington Office: 11095 SW Industrial Way 175 Roy Rd SW, Bldg C Tualatin, OR 97062 Pacific,WA 98047 Ph: 503.885.0420 Ph:253.299.1200 Fax:503.582.8629 Fax: 253.299.1250 SPECIALIZED PAVEMENT MARKING March 17, 2023 City of Kent 220 4th Ave S Kent, WA 98032-5895 RE: Statutory Requirements 1.4 & 1.5—Signed Statement To Whom It May Concern: Specialized Pavement Marking, LLC has not in the past three (3)years been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Specialized Pavement Marking, LLC has not in the past three (3) year period immediately preceding the bid solicitation dated been a willful violator as defined in RCW 49.48.082, of any provisions of Chapters 49.46, 49.48 or 49.52 RCW as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement entered by a court of limited or general jurisdiction. Sincerely, Mark Price President OOW ommok, Wk Oregon Office: Washington Office: 11095 SW Industrial Way 175 Roy Rd SW, Bldg C Tualatin, OR 97062 Pacific,WA 98047 Ph: 503.885.0420 Ph:253.299.1200 Fax:503.582.8629 Fax:253.299.1250 SPECIALIZED PAVEMENT MARKING 2023 Paint Line Striping& RPM Replacement CITY OF KENT-PROJECT#23-3011.1 2.1 Specialized Pavement Marking, LLC. has been in business as a Contractor Since 1995. 2.2 Specialized Pavement Marking, LLC. has been under its present business name since 2021. 2.2.1 Former Business Name: Specialized Pavement Marking, Inc 2.3 N/A 2.4 N/A 2.5 N/A 2.6 Limited Liability Company(LLC)/ Mark Price, President 3.1 Specialized Pavement Marking, LLC is legally qualified to do business as a Specialty Contractor in the scop of installation of traffic pavement markings. We are licensed in the states of: Washington-SPECIPM781139, Oregon- 238621, California-854894, Hawaii-C-38253-0, Ida ho-PWC-C-14511-AAA-2 and Alaska-187979. 3.2 Our trade name is filed in all of the above referenced jurisdictions. 4 Experience: 4.1 Categories of Work: Pavement Marking/Striping and associated tasks, Stripe Removal, Rumble Strips, Curbing, and Traffic Control. 4.2.1 Ever failed to complete any work awarded to it? No. 4.2.2 Any Judgments, claims, arbitration proceedings or suits pending or outstanding? No. 4.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? No. 4.3 Within the last five years has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? No. 4.4 See Attached Sheet. 4.5 See Attached Sheet. 4.6 See Attached Sheet. 40w MEM116k 1w .000M Aq Oregon Office: Washington Office: 11095 SW Industrial Way 175 Roy Rd SW, Bldg C Tualatin, OR 97062 Pacific,WA 98047 Ph: 503.885.0420 Ph: 253.299.1200 Fax:503.582.8629 Fax:253.299.1250 SPECIALIZED PAVEMENT MARKING 4.7 See Attached Sheet. 5 References: 5.1 See Attached Sheet 5.2 See Attached Sheet 5.3.1 Name of Surety: Berkley Insurance Company 5.3.2 Name/Address of Agent: Lockton Companies, Aaron Clark—3657 Briarpark Dr, Suite 700, Houston,TX 77042 6 Financing 6.1—6.2 Will be provided after bid opening upon request. 3 / Zo Z 3 Mark Price, President Date iv00000000aoee000000000o d000000000000000 N 00 I� M(n V O) )n 0 (n N )n 0 (n M OD N LC) )n ) 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 _ N N 0) r 0) V O I� N 0) to CO I- CO CO 0) (n N N 0) r - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a o r E E o O U U e e a) N c c 0 0 t t a a � a v o o u c c U U x N z a O 0 0 U U y >EL z > o Q O O a ' j J a J J O J U U Q W y_fn _ _J Jr c L a) F toZ O ,O z d� z (o) cU c cz U o02 c � m d c W Z 0 0 S Y -G E 0 E y E O J j O c E o S c c�0 JF VU NVd UZUS c r�a' a .Y U o ca F o 0 a) n o a W a) c c 0 c w o a`� �F' as a a c N " c0 ��� cl_ W °Ne U ° �9(nLU 2Q �Z W o it o-o A Q o W N y U Z m N D y V c O Y U a U Z 2 c O K _2 E c c 2 o c 5 a) 2 � 0Ea2oF V1L �UW U m > m = 2 0E 0 o y Y o z o c Q E w z 3 w w U 0 0 o O w > s m O °o o 3 0 O c c ca o La M UO � a)12 0 _ a o o ¢ � oU o�°LL° cZUJLL cLL aci c cor m o � w o o y EYY -am } SUUImU2UNO ` O ��O o @0Y0 _ jUw4- a N y y._.LL o te a'O - y�U L � L L Z a) y E J M o o C� `° o c F- c c 3 } L cv' a) �' 3 N w c y I N } c 5 (D a)O E o} Q m E c m 3gyyo> Eg �� asFmmgas= asgt 3 ��Oa aF �' (nmmo .° o OLLaa 'Y(7U(7UUFJU(nY � aF � (n�yU OaY �QU�(4U WLL (n I- M N (0 O V W II- r r O O M 00 O (O I- r- I` CO O LO In to 00 N O )n Cl) (0 O C N (n U) N I� N 0) M W (n OD O M (O V I� O C V I� (n Cl (n V V 0) )n N 4) t` M O a 7 (0 W r 1� m O M V Cl 00 M f_ f0 V r M a1 Q) r W 7 M M O N 00 (n (O )n N r Q) )n O V O M (n N O V V N I, V I- C') 00 N M W C) 0 N M O O r- M 0) 0 co r V co (o I- co M � E O CO M I- M O 0) OD 00 I- O (O )S') N r (O (n V M M E O 0) V O (0 V N 0) a) (0 (n LO V N (n A) ¢ O (n )n (nN N NO) � � OON � 4� tn V V V V V V ¢ W 00 (n V M M M N N N N N N N (0 - �. )n N r r r r r C Y (? V 3 U Q ,d. x 2 v W Z ayi 0 °i o 0 Y rn c 0 sa w m U > o m Y U 0 2 Y`o Y n o L o W Urn n ~ 3 ac)O r) Z 3 } >z z d > o m _� E 4 a0U a Nam ¢ rn xt > N c OU af0) wcmn4 L M-a 12 ~O o E� o ,mow OQ w ao`� w QIL CO CO I- O C7 0 I- Q d N c Co W a' J > w 0 J a z0 Y j Q o in U m W ca `o Q OD U d N W LL m V Za LL� (n ~ a'ZQ � OF > OOQ O JI_ NJZS N�a' OU<}o L.. rn O LL Z 2 a o� Y F N(n o W X o C m lyl m d o Z Z F a Q OOa o(n�C�U �wUZ W U `oar (na - .cm� r` 0 W�(n (naoom(? gZ �� *zY , C) E LSoaga a00�°Fza wz00w 0Ywa.< w> o0D 8 o � 02ZQ oN(7UQz� lU-U E D;aXW,JWUZ - JQ � aa ¢ J(1J (N wz N .o W UUwz UZ >H mZ O 2O. m N�>d >~-p @ U Q [JJ Xa m c zp Q _�o W gz > Z cc W v> Z )n M) ew a' O CD Nw0 >w a (OU JOYN y Olm K�aw mQ(nW -(- aZa'o ,p m (V aJaL (nF"n (n (n WOzaOa W I-ZN y OW W Z C7mN W Fw W LLU a) O Q }(n U g Q(n K F J fn~ ~ m �- J p C Q J LL O W Q C J z w a Y ^2(� N OF Z �F Z=QO�OZ O2w �O2aQa a) ad- �� w LL W� J OzJ JQ(nV FZ L ~ � g m0 = a) C, O W > af- FwOQ > d a � a. a CZZ > QZ (n �.+ w N~ � ZZIn��� 2' a' � I.L � 0z0L}LJ y �- u (_MOyYa' � F 02Qa. >>a'o0' QaF� y 7 N )n (on d W O@(fj N M F O LL co N O O Z J C a)N VJ I�-ON N 10 N N O a' (n ` C) Ovw (nW� a)WW No � 0aOr�Oi �cnKOM � } 2 V nwSooJMooWQo WN W m c d _(nSLLfn fn(nQ N(n_ � Q W Q(n �-W_ J � O G. _� a NNUW NNyHNaZN O (n (n M M O M M M M M M M M M M M M M M M M V U N N N N N N N N N N N N N N M U V w N N N N N N N N N N N N N N N N N N N N N N y (,� N N N N N N N N N N N N N N M y y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d JJJ N N N N N N N N N N N N N N N N N N N N N N O` N N N N N N N N N N N N N N N M Q co MM \ m E d. NNMM N M N M W M f� N 7 m m E (O r-M M V W M N O d aO7 C C m @ C E m L O L E a m a O In y (n M (Vp V N M O 6 W 6 (,S 6 6 N O �6 O 06 O c0 66 O W NA M O N (0 0. r 0 0 0 04'1 OD O m )n r (n V r MO N 00 V 0 0 0 V N co (n V I� I` M V O I` I` (n V 0 V (0 I` V O w )n O h V uO 0 I- 1- (0 V Il- 0 0 to I- ID O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 41pw nmnfth�, wk '006M Aq Oregon Office: Washington Office: 11095 SW Industrial Way 175 Roy Rd SW, Bldg C Tualatin, OR 97062 Pacific,WA 98047 Ph: 503.885.0420 Ph: 253.299.1200 Fax:503.582.8629 Fax: 253.299.1250 SPECIALIZED PAVEMENT MARKING 4.6 Construction Experience of Key Individuals: individual's Name Present Position Years Experience Mark Price President 28 Henry Robinson Project Manager/Scheduling 21 Bob Everton CFO 27 Tyler Pierce General Manager, WA 28 Troy Benedict Field Superintendent 25 Rob Busse Field Superintendent 24 Opw "k 4 Oregon Office: Washington Office: 11095 SW Industrial Way 175 Roy Rd SW, Bldg C Tualatin,OR 97062 Pacific,WA 98047 Ph: 503.885.0420 Ph: 253.299.1200 Fax:503.582.8629 Fax:253.299.1250 SPECIALIZED PAVEMENT MARKING 4.7 Major Equipment Quantity Equipment Description 1 1999- Paint Striping Truck 1 2000- Paint Striping Truck 1 2004- Paint Striping Truck 1 2005-Paint Striping Truck 1 2001-Thermoplastic Striping Truck 1 2006-Thermoplastic Striping Truck 1 2003- MMA Striping Truck 1 2006- MMA Striping Truck 1 2019- MMA Striping Truck 1 2001- Epoxy Striping Truck 1 1999-Turboblast Shot Blaster 1 2006-Concord Hydroblaster 1 2002-Vac Trac Grinder 1 2003- Inlaid Milling Truck 1 2006-Wirtgen Milling Machine 1 2015-StripeHog Hydroblaster 1 1997- Freightliner Blastrac Shot Blaster/Abrasion Truck 21 Support Trucks (10)/ 1 Tons (11) 4 Sweepers PAYMENT AND PERFORMANCE BOND ' TO CITY OF KENT KENT Bond No. 0252657 KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Specialized Pavement Marking, LLC as Principal, and Berkley Insurance Company a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $ 342,575.00 * , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. Three Hundred Forty Two Thousand Five Hundred Seventy Five and 00/100 This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 2023 Paint Line Striping and RPM Replacement/Project Number: 23-3011.1 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority,of its governing body. 2023 Paint Line Striping&RPM Replacement/Araucto 26 March 6, 2023 Project Number: 23-3011.1 TWO WITNESSES: Specialized Pavement Marking, LLC PRINCIPAL (enter principal's name above) 6 By: i BY By: �C �Zw TITLE: Y I �illl/►'l DATE: �'� ( � a 2 DATE: f�i YY�GI I�/Iyv��� CORPORATE SEAL: PRINT NAME (l S`►�n�n0 , PRINT NAM `-l- ICl -Z DATE: Berkley Insurance Company SURETY CORPORATE SEAL. BY: Aaron P. Clark DATE: 4/13/2023 TITLE; Attorney-In-Fact ADDRESS: 475 Steamboat Road Greenwich, CT 06830 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that O�XYA- Ci11 Gi1� Who signed the said bond on behalf of the Principal Specialized Pavement Marking, LLC of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed; and attested for and in behalf of said Corporation by authority of its governing body, �! c SECRETARY OR ASS STANT SECRETARY 2023 Paint Line Striping &RPM Replace ment/Araucto 27 March 6, 2023 Project Number: 23-3011.1 No. BI-303g-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Robert Bobo; Timothy Kelly; Florence McClellan; Kristin Darling, Aaron A Clark; Dan W. Burton; Teresa D. Kelly; Craig C. Payne; or Laura Lee Kneitz of Lockton Companies, LLC of Houston, TX its true and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED,that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF,the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 28th day of March _--, 2022 ��c,uBANCF Attest: Berkl Insurance Company B By x y SEAL z� 1975 Y Ira ederman Je Executive Vice President&Secretary �SeNOfter resident STATE OF CONNECTICUT) ) ss: COUNTY OF FA.IRFIELD } Swom to before me, a Notary Public in the State of Connecticut,this 28th day of March 2022 ,by Irz S. Lederman and Jeffrey M. Hailer who are sworn to me to be the Executive Vice President Secretary, and Senior Vice President, respectively,of Berkley Insurance Company. "'"NOTARY PURL icy � CONNECTICUT MY COMMISSION EXPIRES � of I'llbhC,Mate Of COLLrIeCtlCtlt AFRIL.30,2024 CERTIFICATE I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and-that-t authority of the Arorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of �1BAN $ o ched,is in full force and effect as of this date. s'R` art %under my band and seal of the Company,this 13th day of April_, 2023 sill D z m 1975 \41AWfo` Vincent P.Forte CONTRACT THIS AGREEMENT is entered into between the CITY OF KENT, a Washington municipal corporation ("City"), and Specialized Pavement Marking LLC , organized under the laws of the State of Washington , located and doing business at 11095 SW Industrial Way,Suite A,Tualatin,OR 97062 ("Contractor"). WITNESS: In consideration of the terms and conditions contained in this Agreement and in the project documents, plans,'and specifications all of which are a part of this Agreement, the parties agree as follows: 1. The Contractor shall do all work and furnish all tools, materials, and equipment for: 2023 Paint Line Striping and RPM Replacement/Project Number: 23-3011.1 in accordance with and as described In the Contract and shall perform any alterations In or additions to the work provided under the Contract and every part thereof, The Contract shall Include all project specifications, provisions, and plans; the City's general and special conditions; the 2023 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("Standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2023 WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues Its Notice to Proceed and work shall be physically completed within forty (40) working days. The term of this Contract shall continue until all work has been completed, Final Acceptance has occurred, and all Contractor obligations have been fulfilled. 2, The City will issue multiple Notice to Proceed letters. A limited Notice to Proceed will be issued for the installation of raised pavement markers and paint line striping of Group A Streets on the day of the preconstruction meeting. The City anticipates issuance of a separate Notice to Proceed for the performance of the remaining Work on July 5, 2023. The Contractor agrees to complete all paint line striping on Group A Streets within ten (10) working days after issuance of Limited Notice to Proceed. Liquidated Damages may be assessed if the work is not completed within ten (10) working days. RPM installation may be completed by the end of the full Notice to Proceed time period. The Contractor also agrees to complete the Contract within forty (40) working days after issuance of the full City's Notice to Proceed. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for In the Contract, except where the specifications allocate that responsibility to the City. The total 2023 Paint Line striping&RPM Replacement/Araucto 28 March 6,2023 Project Number: 23-3011.1 contract amount for all Work performed under this Contract, including Washington State Sales Tax, is $ 342,575.00 2. The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and In the manner and upon the conditions provided for in the Contract. 3. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 4. It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. S. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, Injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this contract, except for Injuries and damages caused by the sole negligence of the City. The City's Inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this contract is subject to RCW 4.24,115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. 6. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit In the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the City. 2023 Paint Line striping&RPM Replacement/Araucto 29 March 6,2023 Project Number: 23-3011.1 7. The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amounts described in Exhibit A attached and incorporated by this reference. 8. Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19,122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19.122, including utilization of the "one call" locator service before commencing any excavation activities. 2023 Paint Line striping&RPM Replacement(Araucto 30 March 6, 2023 Project Number: 23-3011A CITY OF KENT B Y7 - DANA a H, MAYOR DATE: 04/26/2023 ATTEST: KIMBERLEYO.)<O MMOTO*, CLERK APPROVED AS TO FORM: OhkW DEPARTMENT CONTRACTOR BY: l PRINT NAME: Mark Price TITLE: PRESIDENT DATE: 4ni2023 2023 Paint Line Striping&RPM Replacement/Araucto 31 March 6, 2023 Project Nurriber: 23-3011.1 EXHIBIT A INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2023 Paint Line Striping & RPM Replacement/Araucto 32 March 6, 2023 Project Number: 23-3011.1 EXHIBIT A (Continued) 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Contractor's Insurance for Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 2023 Paint Line Striping & RPM Replacement/Araucto 33 March 6, 2023 Project Number: 23-3011.1 EXHIBIT A (Continued) F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 2023 Paint Line Striping & RPM Replacement/Araucto 34 March 6, 2023 Project Number: 23-3011.1 -4� CERTIFICATE OF LIABILITY INSURANCE DATE(M0 410 7/2 0 2 3 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on w. this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). d CONTACT V PRODUCER NAME: Aon Risk Insurance Services West, inc. PfiONE �acNo): (303) 758-9458 v Denver CO Office (A/C.No.Ext): (303) 758-7688 c 1900 16th Street, Suite 1000 E-MAIL = ADDRESS: Denver CO 80202 USA INSURER(S)AFFORDING COVERAGE NAIC# INSURED INSURERA: The Travelers indemnity Co. 25658 specialized Pavement Marking, LLC INSURERS: Travelers Property Cas Co of America 25674 175 Roy Road SW, Bldg c INSURERC: The Charter Oak Fire Insurance Company 25615 Pacific WA 98047 USA INSURERD: Arch Specialty Insurance Company 21199 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 570098961527 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, Limits shown are as requested INTR ADDL SUBR POLICY EFF POLICYEXP LIMITS TYPE OF INSURANCE INSD WVD POLICY NUMBER (MM/DOIYYYY) (MMIDD/YYYY) A X COMMERCIAL GENERAL LIABILITY Y vTC2Kco3K9907061ND23 01 Ol 2 22 3 01/01/2024 EACH OCCURRENCE $2,000,000 �i DAMAGETO RENTED $3D0 DOO CLAIMS-MADE I X OCCUR PREMISES(Ea occurrence) L� MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $2,000,000 r` GENERAL AGGREGATE $4,000,000 12 GEN'LAGGREGAT�E LIMITAPPLIES PER <0 POLICY X JECOT- ❑LOC PRODUCTS-COMP/OP AGG $4,000,000 -- o OTHER r N B AUTOMOBILE LIABILITY Y VTC27—CAP-3K990718-TIL-23 01/01/2023 01/01/2024 COMBINED SINGLE LIMIT $1,000,000. (Ea accident) JX ANY AUTO BODILY INJURY(Per person) ZOWNEDSCHEDULED BODILY INJURY(Per accident)AUTOS a)AUTOS ONLY PROPERTY DAMAGEHIREDAUTOS F NON-OWNED (Peraccldent) ONLY AUTOS ONLY d D Y UXP105098900 01/01/2023 01/01/2024 EACH OCCURRENCE $5,000,000 U X UMBRELLA LIAR X O C CUR AGGREGATE $5,000,000 EXCESS LIAR CLAIMS-MADE DED RETENTION C WORKERS COMPENSATION AND UB1W5734672325K Ol/O1/2023 Ol/O1/2024 X PER STATUTE ORH. EMPLOYERS'LIABILRY Y/N ANY PROPRIETOR/PARTNER/ E.L.EACH ACCIDENT $1,000,000 EXECUTIVE OFFICER/MEMBER N N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 IfESC RIPTION OF OPERATIONS below E.L.D E.L.DISEASE-POLICY LIMIT $1,000,000 B Business Auto Physical Damag VTI-BAP-3K99072A-TIL-23 01/01/2023 01/01/2024 Actual Cash Value Included Coverage DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES(ACORD 101,Addltlonal Remarks Schedule,may be attached If more space Is required) RE: 27266 -23-3011.1, 2023 Paint Line Striping and RPM Replacement. City of Kent is included as Additional Insured in rs accordance with the policy provisions of the General Liability, Automobile Liability and Umbrella Liability policies. A 30-day ■-. cancellation notice is given in favor of Certificate Holder. P r� CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION �— DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. srJ city of Kent AUTHORIZED REPRESENTATIVE 220 4th Avenue S. Kent WA 98032 USA r�n �%Z.S�J�tuctane�Jct�vrro %��ira _ ©1988-2015 ACORD CORPORATION.All rights reserved ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - AUTOMATIC STATUS IF REQUIRED BY WRITTEN CONTRACT (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART The following is added to SECTION II —WHO IS AN (a) The Additional Insured — Owners, Les- INSURED: sees or Contractors — Scheduled Person Any person or organization that: or Organization endorsement CG 20 10 07 04 or CG 20 10 04 13, the Additional a. You agree in a written contract or agreement to Insured — Owners, Lessees or Contrac- include as an additional insured on this Coverage tors — Completed Operations endorse- Part; and ment CG 20 37 07 04 or CG 20 3 7 04 13, b. Has not been added as an additional insured for or both of such endorsements with either the same project by attachment of an endorse- of those edition dates;or ment under this Coverage Part which includes (b) Either or both of the following: the Addi- such person or organization in the endorsement's tional Insured—Owners, Lessees or Con- schedule; tractors — Scheduled Person Or Organi- is an insured, but: zation endorsement CG 20 10, or the Ad- a. Only with respect to liability for "bodily injury" or ditional Insured — Owners, Lessees or "property damage" that occurs, or for "personal Contractors — Completed Operations en- injury" caused by an offense that is committed, dorsement CG 20 37, without an edition subsequent to the signing of that contract or date of such endorsement specified; agreement and while that part of the contract or the person or organization is an additional in- agreement is in effect; and sured only if the injury or damage is caused, b. Only as described in Paragraph (1), (2) or(3) be- in whole or in part, by acts or omissions of low,whichever applies: you or your subcontractor in the performance (1) If the written contract or agreement specifical- of"your work"to which the written contract or ly requires you to provide additional insured agreement applies;or coverage to that person or organization by (3) If neither Paragraph(1) nor(2) above applies: the use of: (a) The person or organization is an addi- (a) The Additional Insured — Owners, Les- tional insured only if, and to the extent sees or Contractors — (Form B) endorse- that, the injury or damage is caused by ment CG 20 10 11 85; or acts or omissions of you or your subcon- (b) Either or both of the following: the Addi- tractor in the performance of "your work" tional Insured—Owners, Lessees or Con- to which the written contract or agree- tractors — Scheduled Person Or Organi- ment applies; and zation endorsement CG 20 10 10 01, or (b) Such person or organization does not the Additional Insured —Owners, Lessees qualify as an additional insured with re- or Contractors — Completed Operations spect to the independent acts or omis- endorsement CG 20 37 10 01; sions of such person or organization. the person or organization is an additional in- The insurance provided to such additional insured is sured only if the injury or damage arises out subject to the following provisions: of"your work"to which the written contract or a. If the Limits of Insurance of this Coverage Part agreement applies; shown in the Declarations exceed the minimum (2) If the written contract or agreement specifical- limits required by the written contract or agree- ly requires you to provide additional insured ment, the insurance provided to the additional in- coverage to that person or organization by sured will be limited to such minimum required the use of: limits. For the purposes of determining whether CG D6 04 02 19 ©2017 The Travelers Indemnity Company.All rights reserved. Page 1 Of 2 COMMERCIAL GENERAL LIABILITY this limitation applies,the minimum limits required result in a claim. To the extent possible, such by the written contract or agreement will be con- notice should include: sidered to include the minimum limits of any Um- (a) How, when and where the "occurrence" brella or Excess liability coverage required for the or offense took place; additional insured by that written contract or (b) The names and addresses of any injured agreement. This provision will not increase the persons and witnesses; and limits of insurance described in Section III—Limits Of Insurance. (c) The nature and location of any injury or damage arising out of the "occurrence" or b. The insurance provided to such additional insured offense. does not apply to: 1 An "bodily injury", "property damage" or (2) If a claim is made or "suit" is brought against ( ) y y ry , p p y g the additional insured: "personal injury" arising out of the providing, or failure to provide, any professional archi- (a) Immediately record the specifics of the tectural, engineering or surveying services, claim or"suit"and the date received;and including: (b) Notify us as soon as practicable and see (a) The preparing, approving, or failing to to it that we receive written notice of the prepare or approve, maps, shop draw- claim or"suit"as soon as practicable. ings, opinions, reports, surveys, field or- (3) Immediately send us copies of all legal pa- ders or change orders, or the preparing, pers received in connection with the claim or approving, or failing to prepare or ap- "suit", cooperate with us in the investigation prove,drawings and specifications;and or settlement of the claim or defense against (b) Supervisory, inspection, architectural or the"suit", and otherwise comply with all policy engineering activities. conditions. (2) Any "bodily injury" or "property damage" (4) Tender the defense and indemnity of any caused by "your work" and included in the claim or "suit" to any provider of other insur- "products-completed operations hazard" un- ance which would cover such additional fin- less the written contract or agreement specifi- sured for a loss we cover. However, this con- cally requires you to provide such coverage dition does not affect whether the insurance for that additional insured during the policy provided to such additional insured is primary period. to other insurance available to such additional c. The additional insured must comply with the fol- insured which covers that person or organiza- lowing duties: tion as a named insured as described in Par- (1) Give us written notice as soon as practicable agraph 4., Other Insurance, of Section IV — of an "occurrence" or an offense which may Commercial General Liability Conditions. Page 2 of 2 ©2017 The Travelers Indemnity Company.All rights reserved. CG D6 04 02 19 COMMERCIAL GENERAL LIABILITY C. INCIDENTAL MEDICAL MALPRACTICE pharmaceuticals committed by, or with the 1. The following replaces Paragraph b. of the knowledge or consent of,the insured. definition of "occurrence" in the 5. The following is added to the DEFINITIONS DEFINITIONS Section: Section: b. An act or omission committed in providing "Incidental medical services"means: or failing to provide "incidental medical a. Medical, surgical, dental, laboratory, x-ray services", first aid or "Good Samaritan services to a person, unless you are in or nursing service or treatment, advice or the business or occupation of providing instruction, or the related furnishing of professional health care services. food or beverages;or 2. The following replaces the last paragraph of b. The furnishing or dispensing of drugs or Paragraph 2.a.(1) of SECTION II — WHO IS medical, dental, or surgical supplies or AN INSURED: appliances. Unless you are in the business or occupation 6. The following is added to Paragraph 4.b., of providing professional health care services, Excess Insurance, of SECTION IV — Paragraphs (1)(a), (b), (c) and (d) above do COMMERCIAL GENERAL LIABILITY not apply to "bodily injury" arising out of CONDITIONS: providing or failing to provide: This insurance is excess over any valid and (a) "Incidental medical services" by any of collectible other insurance, whether primary, your "employees" who is a nurse, nurse excess,contingent or on any other basis, that assistant, emergency medical technician is available to any of your "employees" for or paramedic; or "bodily injury" that arises out of providing or (b) First aid or"Good Samaritan services" by failing to provide "incidental medical services" any of your "employees" or "volunteer to any person to the extent not subject to workers", other than an employed or Paragraph 2.a.(1) of Section II — Who Is An volunteer doctor. Any such "employees" Insured. or "volunteer workers" providing or failing D. BLANKET WAIVER OF SUBROGATION to provide first aid or "Good Samaritan services" during their work hours for you The following is added to Paragraph 8., Transfer will be deemed to be acting within the Of Rights Of Recovery Against Others To Us, scope of their employment by you or of SECTION IV — COMMERCIAL GENERAL performing duties related to the conduct LIABILITY CONDITIONS: of your business. If the insured has agreed in a contract or 3. The following replaces the last sentence of agreement to waive that insured's right of Paragraph S. of SECTION III — LIMITS OF recovery against any person or organization, we INSURANCE: waive our right of recovery against such person or For the purposes of determining the organization, but only for payments we make applicable Each Occurrence Limit, all related because of: acts or omissions committed in providing or a. "Bodily injury" or "property damage" that failing to provide "incidental medical occurs; or services", first aid or "Good Samaritan services"to any one person will be deemed to b. "Personal and advertising injury" caused by an offense that is committed; be one"occurrence". 4. The following exclusion is added to subsequent to the execution of the contract or Paragraph 2., Exclusions, of SECTION I — agreement. COVERAGES — COVERAGE A — BODILY E. CONTRACTUAL LIABILITY—RAILROADS INJURY AND PROPERTY DAMAGE LIABILITY: 1. The following replaces Paragraph c. of the Sale Of Pharmaceuticals definition of "insured contract" in the "Bodily injury" or "property damage" arising DEFINITIONS Section: out of the violation of a penal statute or c. Any easement or license agreement; ordinance relating to the sale of Page 2 of 3 ©2017 The Travelers Indemnity Company.All rights reserved. CG D3 16 02 19 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. COMMERCIAL GENERAL LIABILITY c. Method Of Sharing a. The statements in the Declarations are If all of the other insurance permits contribution accurate and complete; by equal shares,we will follow this method also. b. Those statements are based upon Under this approach each insurer contributes representations you made to us;and equal amounts until it has paid its applicable c. We have issued this policy in reliance upon limit of insurance or none of the loss remains, your representations. whichever comes first. The unintentional omission of, or unintentional error If any of the other insurance does not permit in, any information provided by you which we relied contribution by equal shares, we will contribute upon in issuing this policy will not prejudice your by limits. Under this method, each insurer's rights under this insurance. However, this provision share is based on the ratio of its applicable limit does not affect our right to collect additional of insurance to the total applicable limits of premium or to exercise our rights of cancellation or insurance of all insurers. nonrenewal in accordance with applicable insurance d. Primary And Non-Contributory Insurance If laws or regulations. Required By Written Contract 7. Separation Of Insureds If you specifically agree in a written contract or Except with respect to the Limits of Insurance, and agreement that the insurance afforded to an any rights or duties specifically assigned in this insured under this Coverage Part must apply on Coverage Part to the first Named Insured, this a primary basis, or a primary and non- insurance applies: contributory basis, this insurance is primary to a. As if each Named Insured were the only other insurance that is available to such insured Named Insured;and which covers such insured as a named insured, and we will not share with that other insurance, b. Separately to each insured against whom claim provided that: is made or"suit" is brought. (1) The "bodily injury' or"property damage"for 8. Transfer Of Rights Of Recovery Against Others which coverage is sought occurs; and To Us (2) The "personal and advertising injury" for If the insured has rights to recover all or part of any which coverage is sought is caused by an payment we have made under this Coverage Part, offense that is committed; those rights are transferred to us.The insured must do nothing after loss to impair them.At our request, subsequent to the signing of that contract or the insured will bring "suit" or transfer those rights agreement by you. to us and help us enforce them. 5. Premium Audit 9. When We Do Not Renew a. We will compute all premiums for this Coverage If we decide not to renew this Coverage Part,we will Part in accordance with our rules and rates. mail or deliver to the first Named Insured shown in b. Premium shown in this Coverage Part as the Declarations written notice of the nonrenewal advance premium is a deposit premium only.At not less than 30 days before the expiration date. the close of each audit period we will compute If notice is mailed, proof of mailing will be sufficient the earned premium for that period and send proof of notice. notice to the first Named Insured.The due date for audit and retrospective premiums is the date SECTION V—DEFINITIONS shown as the due date on the bill. If the sum of 1. "Advertisement" means a notice that is broadcast or the advance and audit premiums paid for the published to the general public or specific market policy period is greater than the earned segments about your goods, products or services premium, we will return the excess to the first for the purpose of attracting customers or Named Insured. supporters. For the purposes of this definition: c. The first Named Insured must keep records of a. Notices that are published include material the information we need for premium placed on the Internet or on similar electronic computation, and send us copies at such times means of communication;and as we may request. b. Regarding websites, only that part of a website 6. Representations that is about your goods, products or services By accepting this policy,you agree: for the purposes of attracting customers or supporters is considered an advertisement. Page 16 of 21 ©2017 The Travelers Indemnity Company.All rights reserved. CG T1 00 02 19 Includes copyrighted material of Insurance Services Office,Inc.with its permission. POLICY NUMBER: vTC2x-Co-3K990706-IND-23 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED PERSON OR ORGANIZATION - NOTICE OF CANCELLATION PROVIDED BY US This endorsement modifies insurance provided under the following: ALL COVERAGE PARTS INCLUDED IN THIS POLICY SCHEDULE CANCELLATION: Number of Days Notice: 30 PERSON OR ORGANIZATION: Any person or organization to whom you have agreed in a written contract that notice of cancellation of this policy will be given, but only if: 1. You send us a written request to provide such notice, including the name and address of such person or organization, after the first Named Insured receives notice from us of the cancellation of this policy; and 2. We receive such written request at least 14 days before the beginning of the applicable number of days shown in this endorsement. ADDRESS: The address for that :person or organization included in such written request from you to us. PROVISIONS If we cancel this policy for any legally permitted reason other than nonpayment of premium, and a number of days is shown for Cancellation in the Schedule above, we will mail notice of cancellation to the person or organization shown in such Schedule. We will mail such notice to the address shown in the Schedule above at least the number of days shown for Cancellation in such Schedule before the effective date of cancellation. IL T4 05 05 19 ©2019 The Travelers Indemnity Company.All rights reserved. Page 1 of 1 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties,and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIRED AUTO PHYSICAL DAMAGE— LOSS OF B. BLANKET ADDITIONAL INSURED USE—INCREASED LIMIT C. EMPLOYEE HIRED AUTO 1. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES—INCREASED LIMIT D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY E. SUPPLEMENTARY PAYMENTS — INCREASED K. AIRBAGS LIMITS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR F. HIRED AUTO — LIMITED WORLDWIDE COV- LOSS ERAGE—INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE—GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS PROVISIONS A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that The following is added to Paragraph A.1., Who Is person or organization qualifies as an "insured" under the Who Is An Insured provision contained An Insured, of SECTION 11—COVERED AUTOS in Section II. LIABILITY COVERAGE: C. EMPLOYEE HIRED AUTO Any organization you newly acquire or form dur- ing the policy period over which you maintain 1. The following is added to Paragraph 50% or more ownership interest and that is not Who Is An Insured, of SECTION II — COV- separately insured for Business Auto Coverage. ERED AUTOS LIABILITY COVERAGE An "employee" of yours is an "insured" while Coverage under this provision is afforded only un- til the 180th day after you acquire or form the or- operating an "auto" hired or rented under a ganization or the end of the policy period, which- contract or agreement in an "employee's" ever is earlier. name, with your permission, while performing duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness. The following is added to Paragraph c. in A.1., 2. The following replaces Paragraph b. in B.5., Who Is An Insured, of SECTION 11 — COVERED Other Insurance, of SECTION IV — BUSI- AUTOS LIABILITY COVERAGE: NESS AUTO CONDITIONS: Any person or organization who is required under b. For Hired Auto Physical Damage Cover- a written contract or agreement between you and age, the following are deemed to be cov- that person or organization, that is signed and ered"autos"you own: executed by you before the "bodily injury" or (1) Any covered "auto" you lease, hire, "property damage" occurs and that is in effect rent or borrow; and during the policy period, to be named as an addi- (2) Any covered "auto" hired or rented by tional insured is an "insured" for Covered Autos your "employee" under a contract in Liability Coverage, but only for damages to which an "employee's" name, with your CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office,Inc.with its permission. COMMERCIAL AUTO permission, while performing duties (a) With respect to any claim made or "suit" related to the conduct of your busi- brought outside the United States of ness. America, the territories and possessions However, any "auto" that is leased, hired, of the United States of America, Puerto rented or borrowed with a driver is not a Rico and Canada: covered"auto". (i) You must arrange to defend the "in- D. EMPLOYEES AS INSURED sured" against, and investigate or set- tle any such claim or "suit" and keep The following is added to Paragraph A.1., Who Is us advised of all proceedings and ac- An Insured, of SECTION II —COVERED AUTOS tions. LIABILITY COVERAGE: Any "employee" of yours is an "insured" while us- (ii) Neither you nor any other involved "insured" will make any settlement ing a covered "auto" you don't own, hire or borrow without our consent. in your business or your personal affairs. E. SUPPLEMENTARY PAYMENTS — INCREASED (iii) in may, at our discretion, participate LIMITS in defending the "insured" against, or in the settlement of, any claim or 1. The following replaces Paragraph A.2.a.(2), "suit". of SECTION II — COVERED AUTOS LIABIL- ITY COVERAGE: (iv) We will reimburse the "insured" for sums that the "insured" legally must (2) Up to $3,000 for cost of bail bonds (in- pay as damages because of "bodily cluding bonds for related traffic law viola- injury" or "property damage" to which tions) required because of an "accident" this insurance applies, that the "in- we cover. We do not have to furnish sured" pays with our consent, but these bonds. only up to the limit described in Para- 2. The following replaces Paragraph A.2.a.(4), graph C., Limits Of Insurance, of Of SECTION II — COVERED AUTOS LIABIL- SECTION II — COVERED AUTOS LIABILITY COVERAGE. ITY COVERAGE: (4) All reasonable expenses incurred by the (v) We will reimburse the "insured" for "insured" at our request, including actual the reasonable expenses incurred loss of earnings up to $500 a day be- with our consent for your investiga- cause of time off from work. tion of such claims and your defense of the "insured" against any such F. HIRED AUTO — LIMITED WORLDWIDE COV- "suit", but only up to and included ERAGE—INDEMNITY BASIS within the limit described in Para- The following replaces Subparagraph (5) in Para- graph C., Limits Of Insurance, of graph B.7., Policy Period, Coverage Territory, SECTION II — COVERED AUTOS of SECTION IV — BUSINESS AUTO CONDI- LIABILITY COVERAGE, and not in TIONS: addition to such limit. Our duty to make such payments ends when we (5) Anywhere in the world, except any country or have used up the applicable limit of jurisdiction while any trade sanction, em- insurance in payments for damages, bargo, or similar regulation imposed by the settlements or defense expenses. United States of America applies to and pro- hibits the transaction of business with or (b) This insurance is excess over any valid within such country or jurisdiction, for Cov- and collectible other insurance available ered Autos Liability Coverage for any covered to the "insured" whether primary, excess, "auto" that you lease, hire, rent or borrow contingent or on any other basis. without a driver for a period of 30 days or less (c) This insurance is not a substitute for re- and that is not an "auto" you lease, hire, rent quired or compulsory insurance in any or borrow from any of your "employees", country outside the United States, its ter- partners (if you are a partnership), members ritories and possessions, Puerto Rico and (if you are a limited liability company) or Canada. members of their households. Page 2 of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office,Inc.with its permission. COMMERCIAL AUTO You agree to maintain all required or (2) In or on your covered"auto". compulsory insurance in any such coun- This coverage applies only in the event of a total try up to the minimum limits required by theft of your covered"auto". local law. Your failure to comply with compulsory insurance requirements will No deductibles apply to this Personal Property not invalidate the coverage afforded by coverage. this policy, but we will only be liable to the K. AIRBAGS same extent we would have been liable The following is added to Paragraph B.3., Exclu- had you complied with the compulsory in- sions, of SECTION III — PHYSICAL DAMAGE surance requirements. COVERAGE: (d) It is understood that we are not an admit- Exclusion 3.a. does not apply to "loss" to one or ted or authorized insurer outside the more airbags in a covered "auto" you own that in- United States of America, its territories flate due to a cause other than a cause of 'loss" and possessions, Puerto Rico and Can- set forth in Paragraphs A.1.b. and A.1.c., but ada. We assume no responsibility for the only: furnishing of certificates of insurance, or a. If that "auto" is a covered "auto" for Compre- for compliance in any way with the laws hensive Coverage under this policy; of other countries relating to insurance. b. The airbags are not covered under any war- G. WAIVER OF DEDUCTIBLE—GLASS ranty;and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III — PHYSICAL DAMAGE We will pay up to a maximum of $1,000 for any COVERAGE: one'loss". No deductible for a covered "auto" will apply to L. NOTICE AND KNOWLEDGE OF ACCIDENT OR glass damage if the glass is repaired rather than LOSS replaced. The following is added to Paragraph A.2.a., of H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF SECTION IV—BUSINESS AUTO CONDITIONS: USE—INCREASED LIMIT Your duty to give us or our authorized representa- The following replaces the last sentence of Para- tive prompt notice of the "accident" or 'loss" ap- graph A.4.b., Loss Of Use Expenses, of SEC- plies only when the "accident" or 'loss" is known TION III—PHYSICAL DAMAGE COVERAGE: to: However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of (b) A partner(if you are a partnership); $750 for any one"accident". (c) A member (if you are a limited liability com- I. PHYSICAL DAMAGE — TRANSPORTATION pany); EXPENSES—INCREASED LIMIT (d) An executive officer, director or insurance The following replaces the first sentence in Para- manager (if you are a corporation or other or- graph A.4.a., Transportation Expenses, of ganization); or SECTION III — PHYSICAL DAMAGE COVER- (e) Any "employee" authorized by you to give no- AGE: tice of the"accident"or"loss". We will pay up to $50 per day to a maximum of M. BLANKET WAIVER OF SUBROGATION $1,500 for temporary transportation expense in- The following replaces Paragraph A.S., Transfer curred by you because of the total theft of a cov- Of Rights Of Recovery Against Others To Us, ered"auto"of the private passenger type. of SECTION IV — BUSINESS AUTO CONDI- J. PERSONAL PROPERTY TIONS : The following is added to Paragraph A.4., Cover- S. Transfer Of Rights Of Recovery Against age Extensions, of SECTION III — PHYSICAL Others To Us DAMAGE COVERAGE: We waive any right of recovery we may have Personal Property against any person or organization to the ex- tent required of you by a written contract We will pay up to $400 for 'loss" to wearing ap- signed and executed prior to any "accident" parel and other personal property which is: or'loss", provided that the "accident" or 'loss" (1) Owned by an"insured";and arises out of operations contemplated by CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office,Inc.with its permission. COMMERCIAL AUTO such contract. The waiver applies only to the The unintentional omission of, or unintentional person or organization designated in such error in, any information given by you shall not contract. prejudice your rights under this insurance. How- N. UNINTENTIONAL ERRORS OR OMISSIONS ever this provision does not affect our right to col- The following is added to Paragraph B.2., Con- lect additional premium or exercise our right of cealment, Misrepresentation, Or Fraud, of cancellation or non-renewal. SECTION IV—BUSINESS AUTO CONDITIONS: Page 4 of 4 ©2015 The Travelers Indemnity Compa ny.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office,Inc.with its permission. COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY WITH OTHER INSURANCE - CONTRACTORS This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM PROVISIONS 2. The following is added to Paragraph B.S., Other 1. The following is added to Paragraph c. in A.1., Insurance of SECTION IV — BUSINESS AUTO Who Is An Insured, of SECTION 11 —COVERED CONDITIONS: AUTOS LIABILITY COVERAGE: Regardless of the provisions of paragraph a. and This includes any person or organization who you paragraph d. of this part S. Other Insurance, this are required under a written contract or insurance is primary to and non-contributory with agreement, that is signed by you before the applicable other insurance under which an "bodily injury" or "property damage" occurs and additional insured person or organization is a that is in effect during the policy period, to name named insured when a written contract or as an additional insured for Covered Autos agreement with you, that is signed by you before Liability Coverage, but only for damages to which the "bodily injury" or "property damage" occurs this insurance applies and only to the extent of and that is in effect during the policy period, that person's or organization's liability for the requires this insurance to be primary and non- conduct of another"insured". contributory. CA T4 99 02 16 ©2016 The Travelers Indemnity Company.All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office,Inc.with its permission. TRAVELERS, WORKERS COMPENSATION AND ONE TOWER SQUARE EMPLOYERS LIABILITY POLICY HARTFORD CT 061B3 ENDORSEMENT WC 00 03 13(00)- 001 POLICY NUMBER: UB-1W573467-23-25-K WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit any one not named in the Schedule. SCHEDULE DESIGNATED PERSON: DESIGNATED ORGANIZATION: ANY PERSON OR ORGANIZATION FOR WHICH THE INSURED HAS AGREED BY WRITTEN CONTRACT EXECUTED PRIOR TO LOSS TO FURNISH THIS WAIVER. DATE OF ISSUE: 01-24-22 STASSIGN: PAGE 1 OF POLICY NUMBER: VTC2J—CAP-3K990718—TIL-23 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED PERSON OR ORGANIZATION - NOTICE OF CANCELLATION PROVIDED BY US This endorsement modifies insurance provided under the following: ALL COVERAGE PARTS INCLUDED IN THIS POLICY SCHEDULE CANCELLATION: Number of Days Notice: 30 PERSON OR ORGANIZATION: ANY PERSON OR ORGANIZATION TO WHOM YOU HAVE AGREED IN A WRITTEN CONTRACT THAT NOTICE OF CANCELLATION OF THIS POLICY WILL BE GIVEN, BUT ONLY IF: 1. YOU SEND US A WRITTEN REQUEST TO PROVIDE SUCH NOTICE, INCLUDING THE NAME AND ADDRESS OF SUCH PERSON OR ORGANIZATION, AFTER THE FIRST NAMED INSURED RECEIVES NOTICE FROM US OF THE CANCELLATION OF THIS POLICY; AND 2. WE RECEIVE SUCH WRITTEN REQUEST AT LEAST 14 DAYS BEFORE THE BEGINNING OF THE APPLICABLE NUMBER OF DAYS SHOWN IN THIS ENDORSEMENT. ADDRESS: THE ADDRESS FOR THAT PERSON OR ORGANIZATION INCLUDED IN SUCH WRITTEN REQUEST FROM YOU TO US. PROVISIONS If we cancel this policy for any legally permitted reason other than nonpayment of premium, and a number of days is shown for Cancellation in the Schedule above, we will mail notice of cancellation to the person or organization shown in such Schedule. We will mail such notice to the address shown in the Schedule above at least the number of days shown for Cancellation in such Schedule before the effective date of cancellation. IL T4 05 05 19 0 2019 The Travelers Indemnity Company.All rights reserved. Page 1 of 1 QPL Search Information for Database Record No. 238931 SPM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Walla Home Spec No: 00855.00 BI# 1100, 1110 QPL Home Product Name: 3-M 290 SERIES Product Name 2: Do fresh search Category: PAVEMENT MARKER, TYPE IAR Category 2: REFLECTORIZED, RAISEDABRASIVE RESISTANT Product Number: 1632 Type of List: A Effective date: 32212 Manufacturer: 3-M COMPANY TSSD 800/553-1380 Manuf.2: LOGAN MATSON 312/545-0920 Remarks: SIZE 4"X 3.5"X 0.6" NOMINALUSE EPDXY ADHESIVEUSE FLEX BIT ADHESIVE Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 III C. e Information for Database Record No. 238898 SPM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Walla Home Spec No: 00855.00 BI# 1100, 1110 QPL Home Product Name: CRAFCO FLEXIBLE BIT ADHESIVE Product Name 2: FORMULA#34270 Do fresh search Category: MARKER ADHESIVE- BITUMIN Category 2: FLEXIBLE Product Number: 2853 Type of List: Q Effective date: 60905 Manufacturer: CRAFCO INC. 800/528-8242 Manuf.2: GREG SHARP 503/284-4330 Remarks: PERMANENT APPLICATIONS ONLY.TEST BY LOT.USE JACKETED DOUBLE BOILER W/AGITATION Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 P S m, h Information for Database Record No. 238946 SPM#15985 Construction OR213 at MP 15.71 Home Spec No: 00860.00 (Toliver Rd) Walla BI# 1120 QPL Home Product Name: ENNIS ORW-21-M-4 Product Name 2: 983711 Do fresh search Category: LONGITUDINAL PAINT Category 2: WATERBORNE Product Number: 2735 Type of List: A Effective date: 121202 Manufacturer: ENNIS PAINT 800/331-8118 Manuf.2: Remarks: TEST DECK 73000029-01 Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 QPL Search Information for Database Record No. 238947 SPM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Walla Home Spec No: 00860.00 BI# 1120 QPL Home Product Name: ENNIS ORY-21-M-1 Product Name 2: 983712 Do fresh search Category: LONGITUDINAL PAINT Category 2: WATERBORNE Product Number: 2360 Type of List: A Effective date: 111600 Manufacturer: ENNIS PAINT 800/331-8118 Manuf. 2: Remarks: YELLOW WATERBORNE TRAFFIC PNT.TEST DECK 73000042-99 Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 QPL • h Information for Database Record No. 238891 SPM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Walla Home Spec No: 00850.00 BI# 1120 OPL Home Product Name: SWARCO (AASHTO TYPE 1 M247) Product Name 2: Do fresh search Category: REFLECTIVE ELEMENTS Category 2: FOR PAVEMENT MARKINGS Product Number: 5060 Type of List: A Effective date: 72017 Manufacturer: SWARCO INDUSTRIES 931/388-5900 Manuf.2: MARK COLOMBO: 314/729-7197MFG: 254/562- 9879TECH: 314/729-7197 Remarks: AASHTO M247-TYPE 1.COATED FOR PAINT AND THERMOPLASTIC Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301.3871 it 1-1 " i. .: 3 a v . Information for Database Record No. 239142 S1PM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Walla Home Spec No: 00865.00 BI# 1130 QPL Horne Product Name: AQUALITE-WHITE (884411) Product Name 2: Do fresh search Category: METHOD A EXTRUDED Category 2: SURFACEPROFILEDTHERMOPLASTIC Product Number: 1348 Type of List: Q Effective date: 90910 Manufacturer: ENNIS PAINT 800/331-8118 Manuf.2: Remarks: THERMOPLASTIC LINE WITH BUMPSBEADS: SWARCO 3130 Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 Information for Database Record No. 239143 Construction SPM#15985 Home Spec No: 00865.00 OR213 at MP 15.71 Product Name: AQUALITE-YELLOW (885301) (Toliver Rd) Molalla QPL Home BI# 1130 Product Name 2: Do fresh search Category: METHOD A EXTRUDED Category 2: SURFACEPROFILEDTHERMOPLASTIC Product Number: 3081 Type of List: Q Effective date: 101410 Manufacturer: ENNIS PAINT 800/331-8118 Manuf.2: Remarks: TESTED ON ROUTE 22 8/17/04#14BEADS: SWARCO 3130 Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 , Search Information for Database Record No. 238895 SPM#15985 Construction OR213 at MP 15.71 Home Spec No: 00850.00 (Toliver Rd) Walla OPL Home Product Name: SWARCO 3130 BLEND BI# 1130 Product Name 2: Do fresh search Category: REFLECTIVE ELEMENTS Category 2: FOR PAVEMENT MARKINGSTHERMOPLASTIC Product Number: 3893 Type of List: A Effective date: 101410 Manufacturer: SWARCO INDUSTRIES 931/388-5900 Manuf. 2: MARK COLOMBO: 314/729-7197MFG: 254/562- 9879TECH: 314/729-7197 Remarks: DESIGNED WITH A COATING THATIS GOOD WITH THERMOPLASTICMARKINGS. Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 rZ 3= h G sty Information for Database Record No. 239218 SPM#15985 OR213 at MP 15.71 Construction (Toliver Rd) Molalla Home Spec No: 00867.00 BI# 1140,1150,1160; Product Name: ALTA ALL-SEASON SERIES 100-PT Bike Symbols, Bar, QPL Herne Yield Triangles Product Name 2: Cho fresh search Category: TRANSVERSE MARKINGS Category 2: TYPE B STANDARDTYPE B-HS HIGH SKIDPREFORMED THERMO 125 MILS Product Number: 4432 Type of List: Q Effective date: 80211 Manufacturer: ALTA TRAFFIC SOLUTIONS INC Man uf. 2: 503/482-7500 Remarks: HEAT PAVEMENT PRIOR TO INSTALLINTEGRAL BEADS SWARCO 3130SURFACE APPLIED SWARCO 3130DROP ON BEAD SWARCO 3130 Version 1.0.4 April 23,2015 Content maintained by Mike Dunning I For programming,contact ODOT Computer Support Oregon Department of Transportation 355 Capitol St.NE Salem OR 97301-3871 KENT SPECIAL PROVISIONS TABLE OF CONTENTS PAGE DIVISION 1 GENERAL REQUIREMENTS ...................................... 1-1 Description of Work..........................................................1-1 1-01 Definitions and Terms.......................................................1-1 1-02 Bid Procedures and Conditions ...........................................1-2 1-03 Award and Execution of Contract........................................1-5 1-04 Scope of the Work ...........................................................1-6 1-05 Control of Work ...............................................................1-7 1-06 Control of Material ...........................................................1-10 1-07 Legal Relations and Responsibilities to the Public ..................1-13 1-08 Prosecution and Progress ..................................................1-17 1-09 Measurement and Payment ...............................................1-21 1-10 Temporary Traffic Control .................................................1-22 DIVISION 8 MISCELLANEOUS CONSTRUCTION .......................... 8-1 8-09 Raised Pavement Markers .................................................8-1 8-22 Pavement Marking ...........................................................8-2 KENT STANDARD PLANS .................................................................. A-1 APPENDICES.................................................................................... A-2 TRAFFIC CONTROL PLANS ............................................................... A-3 PREVAILING WAGE RATES............................................................... A-4 2023 Paint Line Striping & RPM Replacement/Araucto March 6, 2023 Project Number: 23-3011.1 KENT SPECIAL PROVISIONS The Kent Special Provisions ("Kent Special Provisions" or "KSP") modify and supersede any conflicting provisions of the 2023 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations ("WSDOT Standard Specifications"). Otherwise, all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. DIVISION 1 - GENERAL REQUIREMENTS DIVISION 1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: DESCRIPTION OF WORK This Contract provides for the installation of paint striping over existing lane markings, and installing replacement raised pavement markings on various City of Kent Streets, all in accordance with these Kent Special Provisions, and the WSDOT Standard Specifications. Appendix A includes the following: 1. Location Maps and Appendix A of 2023 RPM Replacement Project Locations 2. Location Map and List of 2023 Paint Line Striping Group A Streets 3. Location Maps and Appendix B of 2023 Paint Line Striping - Citywide 1-01 DEFINITIONS AND TERMS SECTION 1-01.1 IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a "Section," for example, "in accordance with Section 1-01," the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account HR Hour M GAL Thousand gallons NIC Not In Contract 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 1 March 6, 2023 Project Number: 23-3011.1 SF Square Feet SECTION 1-01.3, "CONTRACT"DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1. What work will be done, and by when; 2. Who provides labor and materials; and 3. How Contractors will be paid. The Contract includes the Contract (agreement) Form, Bidder's completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1. Standard Plans (M21-01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the "National Electrical Code." Responsibility for obtaining these publications rests with the Contractor. SECTION 1-01.3, "DEFINITIONS"IS SUPPLEMENTED BY ADDING THE FOLLOWING DEFINITION: Incidental Work The terms "incidental to the project," "incidental to the involved bid item(s)," etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1-04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID PROCEDURES AND CONDITIONS SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING: 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 2 March 6, 2023 Project Number: 23-3011.1 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City's review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the contract to the next lowest bidder that the City, in its sole judgment, determines is also responsible and able to perform the contract work (the "lowest responsive and responsible bidder"). SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a "Bid Proposal" for the advertised project by downloading at no charge at https://www.kentwa.aov/pay-and-apply/bids-procurement-rfps; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder's or the City's technology. SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder's sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BYADDING THE FOLLOWING TO THE LAST PARAGRAPH: 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 3 March 6, 2023 Project Number: 23-3011.1 Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS. SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier's check, or a proposal bond (Surety bond). Any proposal bond shall be on the City's bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the "Invitation to Bid." Bids must be received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1. The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 4 March 6, 2023 Project Number: 23-3011.1 are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 1(a) WITH THE FOLLOWING; 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. SECTION 1-02.14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING; 1-02.14 Disqualification of Bidders 3. The bidder is not qualified for the work or to the full extent of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION; 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BY REPLACING "45 CALENDAR DAYS" WITH "60 CALENDAR DAYS"RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions. SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 5 March 6, 2023 Project Number: 23-3011.1 any, shall be timely filed in the King County Superior Court, located in Kent, Washington. 1-04 SCOPE OF THE WORK SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1(2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the proposal form, the entire cost of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, "KENT SPECIAL PROVISIONS, KENT STANDARD PLANS"FOLLOWING THE WORDS, "CONTRACT PROVISIONS"IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH. SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1. Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 6 March 6, 2023 Project Number: 23-3011.1 Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1-04.5. The Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING; 1-04.6 Variation in Estimated Quantities Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 3. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1-05.8, the requirements of KSP Section 1-05.8 will prevail. SECTION 1-05.7 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.7 Removal of Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor's failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 7 March 6, 2023 Project Number: 23-3011.1 unauthorized work corrected immediately, have the rejected work removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City's rights provided by this section nor shall the exercise of this right diminish the City's right to pursue any other remedy available under law with respect to the Contractor's failure to perform the work as required. SECTION 1-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW SUBSECTION; 1-05.9 Equipment 1-05.9(1) Operational Testing It is the intent of the City to have at the Physical Completion Date a complete and operable system. Therefore, when the work involves the installation of machinery or other mechanical equipment, street lighting, electrical distribution of signal systems, building or other similar work, it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the Physical Completion Date. Whenever items of work are listed in the contract provisions for operational testing, they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. In the event the contract does not specify testing time periods, the default testing time period shall be twenty-one (21) calendar days. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment that prove faulty or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 8 March 6, 2023 Project Number: 23-3011.1 The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing shall be included in the various contract bid item prices unless specifically set forth otherwise in the contract. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the Contract. SECTION 1-05.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees In addition to any other warranty or guarantee provided for at law or in the parties' contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer's effort to establish a list of corrective work then known and discovered. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH; 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2022 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05.13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor's qualifications or prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 9 March 6, 2023 Project Number: 23-3011.1 SECTION 1-05.14 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Other Contracts Or Other Work It is anticipated that the following work adjacent to or within the limits of this project will be performed by others during the course of this project and will require coordination of the work: None SECTION 1-05IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-05.16 Water and Power The Contractor shall make necessary arrangements and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY. 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany each submittal with a letter of transmittal containing the following information: 1. Contractor's name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1, 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1A, 113, 1C, etc.). 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 10 March 6, 2023 Project Number: 23-3011.1 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. 5. Bid item(s) where product will be used. 1-06.7(2) Schedule of Submittals The Contractor shall create and submit three (3) copies of a schedule of submittals showing the date by which each submittal required for product review or product information will be made. The schedule can be modified, deducted, or added to by the City. The schedule shall be available at the preconstruction conference (see 1-08.0 of the Kent Special Provisions). The schedule of submittals must be accepted prior to the City making the first progress payment. The schedule shall identify the items that will be included in each submittal by listing the item or group of items and the Specification Section and paragraph number and bid item under which they are specified. The schedule shall indicate whether the submittal is required for product review of proposed equivalents, shop drawings, product data or samples or required for product information only. The Contractor shall allow a minimum of 21 days for the Engineer's review of each submittal or resubmittal. All submittals shall be in accordance with the approved schedule of submittals. Submittals shall be made early enough to allow adequate time for manufacturing, delivery, labor issues, additional review due to inadequate or incomplete submittals, and any other reasonably foreseeable delay. 1-06.7(3) Shop Drawings, Product Data, and Samples The Contractor shall submit the following for the Engineer's review: 1. Shop Drawings: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 2. Product Data: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 3. Samples: Submit three labeled samples or three sets of samples of manufacturer's full range of colors and finishes unless otherwise directed. One approved sample will be returned to the Contractor. Content of submittals: 1. Each submittal shall include all of the items required for a complete assembly or system. 2. Submittals shall contain all of the physical, technical and performance data required to demonstrate conclusively that the items comply with the requirements of the Contract. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 11 March 6, 2023 Project Number: 23-3011.1 3. Each submittal shall verify that the physical characteristics of items submitted, including size, configurations, clearances, mounting points, utility connection points and service access points, are suitable for the space provided and are compatible with other interrelated items. 4. The Contractor shall label each Product Data submittal, Shop Drawing or Sample with the bid item number and, if a lump sum bid item, provide a reference to the applicable KSP paragraph. The Contractor shall highlight or mark every page of every copy of all Product Data submittals to show the specific items being submitted and all options included, or choices offered. The City encourages a creative approach to complete a timely, economical, and quality project. Submittals that contain deviations from the requirements of the Contract shall be accompanied by a separate letter explaining the deviations. The Contractor's letter shall: 1. Cite the specific Contract requirement including the Specification Section bid item number and paragraph number for which approval of a deviation is sought. 2. Describe the proposed alternate material, item or construction, explain its advantages, and explain how the proposed alternate meets or exceeds the Contract requirements. 3. State the reduction in Contract Price, if any, which is offered to the City. The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed deviation with or without cause. The Engineer will stamp and mark each submittal prior to returning it to the Contractor. The stamps will indicate one of the following: 1. "APPROVED AS SUBMITTED" - Accepted subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. 2. "APPROVED AS NOTED" - Accepted subject to minor corrections that shall be made by the Contractor and subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. No resubmission is required. 3. "AMEND AND RESUBMIT" - Rejected because of major inconsistencies, errors or insufficient information that shall be resolved or corrected by the Contractor prior to subsequent re- submittal. An amended resubmission is required. Re-submittals that contain changes that were not requested by the Engineer on the previous submittal shall note all changes and be accompanied by a letter explaining the changes. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 12 March 6, 2023 Project Number: 23-3011.1 1-06.7(4) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.2 State Taxes 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1-07.2(1) in the proposal bid items. 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1-07.2(2) in the proposal bid items. SECTION 1-07.4(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.4(2) COVID-19 Job Site Requirements The Contractor shall comply with all COVID-19 workplace health and safety measures established by the state Department of Labor & Industries or otherwise imposed by the Governor, the state Department of Health, or the Local Health Officer of Seattle-King County Public Health, or subsequent modifications to such health and safety measures as those authorities may issue, including providing all needed personal protective equipment. SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.6 Permits and Licenses The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH: 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 13 March 6, 2023 Project Number: 23-3011.1 A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH; 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. 1-07.13 Contractor's Responsibility for Work SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) Repair of Damage SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION: 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 1- 07.14 and Section 5 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH: 1-07.15 Temporary Water Pollution Prevention 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan When the proposal form includes multiple bid schedules and the "SPCC Plan" bid item is present in only one bid schedule, the lump sum payment item for the "SPCC Plan" in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 14 March 6, 2023 Project Number: 23-3011.1 SECTION 1-07.17IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH; 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07.17 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the Contractor, the Contractor/excavator is responsible to determine the precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.17(4) Payment All costs to comply with subsection 1-07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor's failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 15 March 6, 2023 Project Number: 23-3011.1 The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. Lumen Comcast Tanaiya Anderson Aaron Cantrel 253-313-8961 206-510-4222 (cell) TanaivaAnderson@lumen.com Aaron Cantrel@comcast.com Puget Sound Energy Gas Puget Sound Energy Power Glenn Helton Gary Bradley 253-395-6926 253-234-6302 425-559-4647 (cell) Gary.Bradlev@Dse.com Glenn.Helton@pse.com Verizon Brad Landis 425-201-0901 425-766-1740 (cell) SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1- 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 16 March 6, 2023 Project Number: 23-3011.1 SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 1-08 PROSECUTION AND PROGRESS SECTION 1-08 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 1-08.0 Preconstruction and Preconstruction Conference The Engineer will furnish the Contractor with up to ten (10) copies of the plans and specifications. Additional documents may be purchased from the City at the price specified by the City or in the Invitation to Bid. Prior to undertaking each part of the work, the Contractor shall carefully study and compare the Contract and check and verify all pertinent figures shown and all applicable field measurements. The Contractor shall promptly report in writing to the Engineer any conflict, error or discrepancy that the Contractor discovers. After the Contract has been executed, but prior to the Contractor beginning the work, a preconstruction conference will be held with the Contractor, the Engineer and any other interested parties that the City determines to invite. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule. 2. To establish a working understanding among the various parties associated or affected by the work. 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc. 4. To verify normal working hours for the work. 5. To review safety standards and traffic control. 6. To discuss any other related items that may be pertinent to the work. The Contractor shall prepare and submit for approval, at or prior to the preconstruction conference the following: 1. A price breakdown of all lump sum items. 2. A preliminary construction schedule. 3. A list of material sources for approval, if applicable. 4. Schedule of submittals. (See 1-06.6(2)) 5. Temporary Erosion/Sedimentation Control Plan (TESCP) for approval. 6. Traffic Control Plan (TCP) for approval. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 17 March 6, 2023 Project Number: 23-3011.1 7. Request to sublet, for approval by the Engineer, of all subcontractors. SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The City will issue multiple Notice to Proceed letters. A limited Notice to Proceed will be issued for the installation of raised pavement markers and paint line striping of Group A Streets on the day of the preconstruction meeting. The City anticipates issuance of a separate Notice to Proceed for the performance of the remaining Work on July 5, 2023. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. Except in the case of emergency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one-hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City's noise control regulations or the city receives complaints from the public or adjoining 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 18 March 6, 2023 Project Number: 23-3011.1 property owners regarding noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours but may be subject to other conditions established by the City or Engineer. These conditions may include but are not limited to the following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. The Contractor shall coordinate its work around scheduled events that will likely impact its Work. The Contractor shall have no claim for damages or delays for work schedule conflicts. The following are known events that could impact the work: 1. Kent Cornucopia Days: July 14-16, 2023 1-08.4(A) Reimbursement for Overtime Work of City Employees Following is a non-exclusive list of work that may require Contractor reimbursement for overtime of City employees. The City will bill the Contractor at the OVERTIME RATE in order for locate crews to complete other work. If the locate request is for nights, weekend, holidays or at other times when locate crews are not normally working, all locate work and expenses, including travel, minimum call out times, and/or Holiday premiums will be borne by the Contractor. 1. Locate work required to re-establish marks for City-owned underground facilities that were not maintained or recorded by the Contractor in accordance with RCW 19.122.030. 2. Work required by City personnel or independent testing laboratories to re-test project materials, utility pressure or vacuum tests, camera surveys or water purity tests as the result of initial test failure on the part of the Contractor. 1-08.4(6) General The City allocates its resources to a contract based on the total time allowed in the contract. The City will accept a progress schedule indicating an early physical completion date but cannot guarantee the City resources will be available to meet the accelerated schedule. No additional compensation will be allowed if the Contractor is not able to meet its accelerated schedule due to the unavailability of City resources or for other reasons beyond the City's control. Unless previously approved by the Engineer, the original and all supplemental progress schedules shall not conflict with any time and order-of-work requirements in the contract. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 19 March 6, 2023 Project Number: 23-3011.1 If the Engineer deems that the original or any necessary supplemental progress schedule does not provide adequate information, the City may withhold progress payments until a schedule containing needed information has been submitted by the Contractor and approved by the Engineer. The Engineer's acceptance of any schedule shall not transfer any of the Contractor's responsibilities to the City. The Contractor alone shall remain responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the times specified in the contract. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1-04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor's written notice to protest. In any event, no protest will be allowed later than the date of the Contractor's signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 20 March 6, 2023 Project Number: 23-3011.1 The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1- 09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.9 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION; 1-09.9(2) City's Right to Withhold Certain Amounts In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1. The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 5. Engineering and inspection fees beyond Completion Date. 6. Cost of City personnel to re-establish locate marks for City-owned facilities that were not maintained by the Contractor in accordance with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re-doing failed, water, other utility tests. SECTION 1-09.11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.11(3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor's failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 21 March 6, 2023 Project Number: 23-3011.1 It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to the Contractor's right to seek an appeal of the City's decision. The City's decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor's right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. 1-10 TEMPORARY TRAFFIC CONTROL SECTION 1-10.2(1) IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-10.2(1) General The TCS shall be certified as a work site traffic control supervisor by one of the following: Evergreen Safety Council 401 Pontius Avenue North Seattle, WA 98109 1-800-521-0778 or 206-382-4090 The Northwest Laborers-Employers Training Trust 27055 Ohio Avenue Kingston, WA 98346 360-297-3035 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 Training Dept. Toll Free (877) 642-4637 or (540) 368-1701 1-10.3(3) Traffic Control Devices SECTION 1-10.3 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 22 March 6, 2023 Project Number: 23-3011.1 1-10.3(3)L Temporary Traffic Control Devices When the bid proposal includes an item for "Temporary Traffic Control Devices," the work required for this item shall be furnishing barricades, flashers, cones, traffic safety drums, and other temporary traffic control devices, unless the contract provides for furnishing a specific temporary traffic control device under another item. The item "Temporary Traffic Control Devices" includes: 1. Initial delivery to the project site (or temporary storage) in good repair and in clean usable condition, 2. Repair or replacement when they are damaged and they are still needed on the project, and 3. Removal from the project site when they are no longer on the project. SECTION 1-10.4(1) IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-10.4(1) Lump Sum Bid for Project (No Unit Items) The proposal contains the item "Project Temporary Traffic Control," lump sum. The provisions of Section 1-10.4(1) shall apply. 2023 Paint Line Striping & RPM Replacement/Araucto 1 - 23 March 6, 2023 Project Number: 23-3011.1 DIVISION 8 - MISCELLANEOUS CONSTRUCTION 8-09 RAISED PAVEMENT MARKERS SECTION 8-09.1 IS DELETED AND REPLACED WITH THE FOLLOWING; 8-09.1 Description This work shall consist of furnishing and installing new raised pavement markers (RPM) to replace damaged and missing RPMs upon the roadway surface in accordance with applicable Kent Standard Plans and/or WSDOT Standard Plans at locations shown on 2023 RPM Refresh Location map or as directed by the Engineer. The color of pavement markers shall conform to the color of the marking for which they supplement, substitute for, or serve as a positioning guide for. Unless otherwise noted, new raised pavement markers shall be installed in strict conformance to Kent Standard Plans 6-73M and 6-74M. The 2023 RPM Replacement Location map referenced table show more than what can be completed under this contract. It also indicates the locations RPM installation must be coordinated with paving and other activities. The Contractor shall approach this project as follows: The Contractor shall reserve quantities of Type 1 and 2 RPM for streets that are scheduled to be re-paved. Installation of these RPM will be completed following completion of paving activities. These locations are noted as "Coordinate with City paving project" in the Appendix. The Contractor shall complete the installation of new Type 2 RPM upon street(s) requiring Type 2YY and/or Type 2W, with the lowest location index number first before proceeding with the same activity upon street with the next lowest location index number. The Contractor shall immediately cease installation of Type 2 RPM when the total installed amount equals the contract quantity for Type 2 RPM, or as directed by the Engineer. The Contractor shall complete replacement of all damaged and missing Type 1 RPMs upon street(s) requiring Type 1Y and/or Type 1W, with the lowest location index number first before proceeding with the same activity upon street with the next lowest location index number. The Contractor shall immediately cease installation of Type 1 RPM when the total installed amount equals the contract quantity for Type 1 RPM or as directed by the Engineer. SECTION 8-09.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION; 2023 Paint Line Striping & RPM Replacement/Araucto 8 - 1 March 6, 2023 Project Number: 23-3011.1 8-09.3(8) Reporting For each week that RPM Work is performed, the Contractor shall submit a report summarizing the accomplished work. The report shall be in adequate detail to determine the number of RPM, color and type, installed on each location described on the location map. The report shall be submitted to the Engineer by the end of the week following the RPM Work or some other mutually agreed upon submittal time. The Contractor shall sign each report certifying that material was installed and the linear footage installed are based on actual measurements in accordance with the specifications. At the end of the Contract, the Contractor shall provide the total amount of RPM installed for each type and color. SECTION 8-09.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-09.3(2) Surface Preparation In removing raised pavement markers and plastic traffic buttons, the Contractor shall: 1. Haul broken-up pieces of raised pavement markers, plastic traffic buttons and all waste material to an off-project site, unless otherwise directed by the Engineer, or permitted by the Kent Special Provisions. 2. Remove all sand, or other waste materials deposited on the pavement, or within the City's stormwater management system, as a result of the removal process selected by the Contractor. 3. Install temporary lane markings at their sole expense, unless the street is going to be remarked, or overlaid immediately after the completed removal of raised pavement markers and/or plastic traffic buttons. 4. Take suitable care so as not to damage the underlying pavement surface more than necessary, clean all underlying pavement, including the complete removal of all remaining adhesive, and fill any surface voids caused by the removal work. 8-22 PAVEMENT MARKING THE LAST SENTENCE OF THE SECOND PARAGRAPH OF SECTION 8-22.1 IS REVISED AS FOLLOWS: 8-22.1 Description Except for "R" in the railroad crossing symbol, traffic pavement marking letters and numerals shall be 8-feet high per WSDOT Standard Plan M- 80.10-01 and M-80.20-00 for high-speed application (regardless of the posted speed limit of the street). The "R" in the railroad crossing symbol shall be as shown on Kent Standard Plan 6-78. Layout of ONLY and arrows in the left turn pockets shall be as shown in the Kent Standard Plan 6-81. 2023 Paint Line Striping &RPM Replacement/Araucto 8 - 2 March 6, 2023 Project Number: 23-3011.1 SECTION 8-22.2 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.2 Materials Paint striping and curb painting shall be installed using Low VOC (volatile organic compound) solvent-based paint meeting the requirements of Section 9-34. 8-22.3(3) Marking Application SECTION 8-22.3(3)B IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(3)B Line Patterns Double Solid Yellow Center Line - Two solid yellow lines, each 4 inches wide, separated by a 4-inch space. Single Solid Yellow Center Line - One solid yellow line, 4 inches wide, to delineate adjacent curb, barrier, etc. at select locations. Skip Center Line - A broken yellow line 4 inches wide. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. Skip center stripe may be used as centerline delineation on select two way highways and streets. Two Way Left Turn Line (TWLTL) - A solid yellow line, 4 inches wide, with a broken yellow line 4 inches wide, separated by a 4-inch space. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. The solid line shall be installed to the right of the broken line relative to the direction of travel and for each direction of travel. Skip Lane Line - A broken white line 4 inches wide to delineate adjacent lanes traveling in the same direction. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. Gore / Wide Line - A solid white line 8 inches wide used for delineation at ramp connections, to separate left and right turning movements from through movements, to separate high Occupancy Vehicle (HOV) lanes from general purpose lanes, for traffic islands, hash marks, chevrons, and other applications. Wide Dotted Line - A broken white or yellow line, 8 inches wide, matching color with its associated solid or broken line. The dotted pattern shall be based on an 8-foot unit consisting of a 2-foot line and a 6-foot gap. Dotted Line - A broken white or yellow line, 4 inches wide, matching color with its associated solid or broken line, an extension of an edge line, lane line, or centerline used at exit ramps, intersections, horizontal curves, multiple turn lanes, and other locations where the direction of 2023 Paint Line Striping &RPM Replacement/Araucto 8 - 3 March 6, 2023 Project Number: 23-3011.1 travel for through traffic is unclear. The dotted pattern shall be based on a 6-foot unit consisting of a 2-foot line and a 4-foot gap. Edge Line / Solid Lane Line - A single solid white line 4 inches wide used for road edge and lane delineation, bike lane delineation, adjacent lanes traveling in the same direction or bus pull-outs. Bike Lane Line - A solid white line 8 inches wide that is used to delineate a bike lane adjacent general purpose lanes. Dotted Bike Lane Line - A dotted white line 8 inches wide with the dotted pattern based on an 8-foot unit consisting of a 2-foot line and a 6-foot gap. Bike Lane Dotted Line is used to discontinue a Bike Lane Line in advance of right-turns at major intersections or corresponding with transit stops. Curb Painting — Existing traffic curbing shall be painted with one full coat of paint. The paint can be applied by brush or spray on all side of curbing visible to vehicular traffic. The Contractor shall install glass traffic paint beads sprinkled in the wet paint at the rate of 12 pounds per 100 linear feet of curbing. The beads shall conform to the requirements of Section 9-34.4. 8-22.3 Construction Requirements 8-22.3(1) Preliminary Spotting THE FIRST SENTENCE OF SECTION 8-22.3(1) IS REVISED AS FOLLOWS; The Engineer will provide necessary begin/end control points for work sections where begin/end points cannot be readily discerned per existing permanent markings and/or newly installed permanent markings. A list of intersections where newly installed permanent markings are likely to be encountered, and therefore excluded from this Contract, can be provided before work commences. THE THIRD SENTENCE IS REVISED AS FOLLOWS: Approval by the Engineer is required before marking begins unless other mutually agreed upon inspection and approval process is proposed and approved. SECTION 8-22.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(2) Preparation of Roadway Surfaces Traffic curbing surfaces shall be dry, and within the proper temperature range prior to painting. 2023 Paint Line Striping & RPM Replacement/Araucto 8 - 4 March 6, 2023 Project Number: 23-3011.1 SECTION 8-22.3(3) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(3) Marking Application The Contractor is responsible for providing traffic control and traffic control devices as necessary to direct vehicular traffic away from freshly painted traffic stripes until such time as the marking paint has completely dried. Failure to ensure reasonable protection for the undried paint stripes will result in the Engineer's decision to adjust the method of payment for damaged paint stripes. The Engineer's decision regarding the means of payment adjustment for vehicle damaged paint stripes is final in this matter. THE FIRST SENTENCE OF THE FOURTH PARAGRAPH OF SECTION 8-22.3(3)E IS REVISED AS FOLLOWS: 8-22.3(3)E Installation One coat application of paint will be required to complete all paint markings installed over existing paint markings. Two applications of paint will be required to complete all paint markings installed on new surface-treated roadways, on re-channelized street or when centerline markings are revised to double yellow centerline, or as noted in the Appendix A. Vehicle and pedestrian tracking of newly applied striping shall be removed per section 8-22.3(6), and the affected portion of marking reinstalled by the end of the next working day. THE FIRST PARAGRAPH OF SECTION 8-22.3(3)F IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.3(3)F Application Thickness Marking Material Application I I HMA PCC BST Groove Depth Paint - one coat I spray 15 15 15 SECTION 8-22.3(4) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(4) Tolerances for Lines Length of Line: The longitudinal accumulative error within a 40-foot length of dotted line shall not exceed plus or minus 1 inch. The dotted line segment shall not be less than 2 feet. The gap spacing specified for skip/broken and dotted lines in Section 8-22.3(B) of Kent Special Provisions are anticipated to be the shortest gaps that exists. Regardless of the specified gap spacing, the Contractor shall paint over skip/broken and dotted paint lines to reasonably match the existing pattern. SECTION 8-22.3(6) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(6) Removal of Pavement Markings Only hydroblasting equipment will be allowed for the removal of painted or plastic pavement markings as called for in Appendix A. Vacuum shrouded equipment, or other equally effective means, shall be used to 2023 Paint Line Striping &RPM Replacement/Araucto 8 - 5 March 6, 2023 Project Number: 23-3011.1 contain and collect all pavement marking debris and excess water. Collected water and debris shall be disposed of off the project site in accordance with Department of Ecology or other federal, state or local regulations. The removal of raised pavement markers shall be incidental to the removal of the associated marking. SECTION 8-22.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 8-22.3(7) Reporting For each week that Work is performed, the Contractor shall submit a report summarizing the accomplished work. The report shall be in the same format and detail as Appendix A, for each street section painted, showing the total installed linear footage for each line pattern and color. The report shall be submitted to the Engineer by the end of the week following the Work or some other mutually agreed upon submittal time. The Contractor shall sign each report certifying that material was installed and the linear footage installed are based on actual measurements in accordance with the specifications. At the end of the Contract, the Contractor shall provide the total amount of paint in gallons used for each color and the total amount of beads in pounds used to perform the Work. SECTION 8-22.4 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.4 Measurement "Painted Double Solid Line" "Painted Single Solid Line" "Painted Skip Lane Line" "Painted Dotted Line" "Painted TWLTL Line" The measurement for the above items will be based on a marking system capable of simultaneous application of three 4-inch lines with two 4-inch spaces. No deduction will be made for the unmarked area when the marking includes a broken line such as center line, dotted extension line, center line with no-pass line, lane line, reversible lane line, or two-way left-turn center line. No additional measurement will be made when more than one line can be installed on a single pass such as center line with no-pass line, double center line, double lane line, reversible lane line, or two-way left-turn center line "Painted Wide Lane Line" "Painted Bike Lane Line" The measurement for the above items will be based on the total length of each painted line installed. No deduction will be made for the unmarked area when the marking includes a broken line such as, wide broken lane line, drop lane line, or wide dotted lane line. The measurement for double wide lane line will be based on the total length of each wide lane line installed. 2023 Paint Line Striping &RPM Replacement/Araucto 8 - 6 March 6, 2023 Project Number: 23-3011.1 The measurement for "Painting Traffic Curb" will be based on the total length of painted curb. No additional measurement will be made for curbing painted on both sides of the curbing. No specific measurement will be made for placing preliminary spotting. Cost for placing preliminary spotting shall be considered incidental to the various items of the Contract. SECTION 8-22.5 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.5 Payment "Painted Double Solid Line," per linear foot "Painted Single Solid Line," per linear foot "Painted Skip Lane Line," per linear foot "Painted Dotted Line," per linear foot "Painted TWLTL Line," per linear foot "Painted Bike Lane Line," per linear foot "Painting Traffic Curb," per linear foot 2023 Paint Line Striping &RPM Replacement/Araucto 8 - 7 March 6, 2023 Project Number: 23-3011.1 KE NT STANDARD PLANS The following Kent Standard Plans supplement all other plans, which have been prepared for this project and are considered to be a part of the project plans. STREET 6-73 Typical RPM Lane Markings 6-74 Typical Lane Markings 2023 Paint Line Striping & RPM Replacement/Araucto A - 1 March 6, 2023 Project Number: 23-3011.1 42' 12' 30' 3' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 00000 00000 00000 VARIES (300' MAX.) 5' TWO WAY LEFT TURN LANE 2.5' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o g 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TYPE 1Y RPM 4"GAP 0 0 0 0 0 21 TYPE 2YY RPM TRAFFIC DIRECTION TWO WAY LEFT TURN LINES TRAFFIC DIRECTION TRAFFIC DIRECTION 21' TYPE 2W OR Y RPM 0000000a0000000��44" TYPE IWORYRPM 00 � 000000000 21' TYPE 1Y RPM GAP I I TYPE 2YYRPM 8888888 8 8888 8 8 8 8 8 8 8- NO GAP TRAFFIC DIRECTION DOUBLE YELLOW CENTER LINE WIDE LINE TRAFFIC DIRECTION TRAFFIC DIRECTION 42' 42' 12' 30' 12' 30' f Qo00 00000 0 0 0 0 00 TYPE 1W RPM TYPE 2W RPM TYPE 1W RPM TYPE 2W RPM TRAFFIC DIRECTION TRAFFIC DIRECTION LANE LINE SKIP CENTER LINE TYPE 2Y RPM 6' 21' 8 — TYPE 1Y RPM- 3 1 �� a a a a s s o� o00oo8o o8000000 00000000000 TYPE IWRPM 0000000000000000000000 0 0 0 0 0 0 000 0 0 0 0 0 00 0 0 0 0 00 TYPE 2W RPM 18"-RPM'S EQUALLY SPACED 11 TRAFFIC DIRECTION BARRIER LINE DOTTED WIDE LINE 42' 12' 15' � F �a s� es ea 0 0 0 0 0 0 0 0 0 0 0 0 �o 0 0 0 0 0 0 0 0 '� TYPE 1W RPM TYPE 2W RPM TRAFFIC DIRECTION TYPE 2W RPM TYPE 1W RPM DROP LANE LINE EDGE LINE NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE NOTE: �� WAY ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT ��OF WASNI�� THE CITY OF KENT.A COPY MAY BE OBTAINED UPON REQUEST. 1. THIS DETAIL TO BE USED ONLY WHEN 4� Gi CITY OF KENT ENGINEERING DEPARTMENT DEVELOPMENT PROJECTS ARE j� ;� O REQUIRED TO MATCH EXISTING RPM =\ LANE MARKINGS. KENT TYPICAL RPM LANE W—HI"GTG" MARKINGS 2. RAISED PAVEMENT MARKERS(RPM'S) 29 SHALL BE INSTALLED PER WSDOT �L � DESIGNED COK SCALE NONE STANDARD FAN STANDARD SPECIFICATIONS 8-09, �SSIONAL DDRAWNCHECKED COK DATE 2/2020 9-02.1(8),9 26.2 AND 9 21. APPROVED ENGINEER 6-73 30' 10' 1' TRAFFIC DIRECTION O D O D O D O O 4"GAP VARIES (300'MAX.) 2.5' TWO WAY LEFT TURN LANE D o D o D o D o D TRAFFIC DIRECTION TWO WAY LEFT TURN LINES TRAFFIC DIRECTION TRAFFIC DIRECTION 20' 8"WHITE LINE D D TYPE 2W RPM TYPE 2YY RPM a D 4"GAP 4"GAP t 20' 4"YELLOW LINE TRAFFIC DIRECTION TRAFFIC DIRECTION DOUBLE YELLOW CENTER LINE WIDE LINE TRAFFIC DIRECTION TRAFFIC DIRECTION 11' 30' 11' 30' IS 1' 1, o �o TYPE 2W RPM D =TYoPE 2Y RPM 4"WHITE LINE 4 YELLOW LINE TRAFFIC DIRECTION TRAFFIC DIRECTION LANE LINE SKIP CENTER LINE 6' 8' D D 0 D13 Ali—TYPE 2W RPM 4"WHITE OR YELLOW LINE 4"GAP 8"WHITE LINE EDGE LINE DOTTED WIDE LINE TRAFFIC DIRECTION 3' 9' 21'(TYP) 18"YELLOW BARRIER 1„ LINE 1„ TYPE 2W RPM�B� BD $�� 8"WHITE LINE DROP LANE LINE 18"-TYPE 2Y RPM'S EQUALLY SPACED TRAFFIC DIRECTION NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE ENGINEER BARRIER LINE ��FREY AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT THE CITY OF ��OF Wk, �f KENT.A COPY MAY BE OBTAINED UPON REQUEST. NOTE: aa�� CITY OF KENT ENGINEERING DEPARTMENT 1. SEE SECTION 6.123 FOR PLASTIC MATERIAL SPECIFICATIONS. • /w%1 :7` KENT TYPICAL LANE MARKINGS 2. RAISED PAVEMENT MARKERS(RPM'S) �,p 38296 �� WASHINGTON SHALL BE INSTALLED PER WSDOT I 8TER� �w DESIGNED COK SCALE NONE STANDARD PLAN STANDARD SPECIFICATIONS 8-09, DRAWN COK ��"sIpNAL E CHECKED COK DATE 04/zozz ^1 7 9-02.1(8),9-26.2 AND 9-21. crn eNciN�+ APPROVED APPENDICES This section includes the following which have been prepared for this project and are considered to be a part of the project plans: • Ramsay Way Loading Zone Centerline Relocation Sketch • SE 224 St Channelization (104 to 105 Ave SE) Sketch • Group A Streets Paint Line Striping Map • Appendix A - Group A Streets Information Table • RPM Refresh Location Map • 2023 Paint Line Refresh and Curb Painting Mapbook - Citywide • 2023 Paint Line Refresh and Curb Painting Wall Map - Citywide • Appendix B - Painting Locations and Estimated Quantities 2023 Paint Line Striping & RPM/Araucto A - 2 March 6, 2023 Project Number: 23-3011.1 Ramsay Way Loading Zone N W Temperance St Y_ Remove 75' feet of double-yellow centerline south of crosswalk. w� Replace with Type 1 and 2 RPMS per 6.73 in new alignment, 16' from east Face of Curb. &P 16' NB lane to FOC. Ln N!` fA � 1 i ! 4i 1, 1�•4 / 1 ti REFERENCE RPM REFRESH LOCATION ID #3 SE 224 St Channelization (104 to 105 Ave SE) 250'of white edge line 70'of double-yellow centerlineLU N 1 J 4 - W U) zz251 7 Q p 1 (D SE 224 St N t` o w v Q 22415 500'of white edge line CITY OF KENT 2023 Paint Line Striping Group A Streets - �' Legend Group A Streets 123 Location Inde�diA L �l , 'Q Fj 3 \: L IV t z � P t `© J nV ,:,S/ri�-- , '�_ I � 2; I {., ,� .�.--+ •9 � � -.i [� _._. ---- �. _ �1 L' r t LU sf l Document Pa[h.P.\Public\Opera[ions151ree[s\Pavement Marking Protects\2023 Protecis12023 Pain[antl RPM1Pain[antl RPM Protects 2023.ap t'' APPENDIX A-GROUP A STREETS —Pa. aeenaana eaemala Q—dkea e o..ane ar 9e VIn arreeq kidd ne ine 9e pin arsmf wo Iuy an oeanlptlen Pa9elel Yelw S ealb swodid. lew S Intl Lk. LkdIfik mIddgUne aaYb m1p Skip IV 1so aAva ass(I<emxan9ley Roadt-ss zasm a Sz5 21d 610 15 2. E SMITH ST ntal Ave N-bYate AveN 7,12 - nt ypI RPM lines 229 E SMITH ST MAve H-Jespn AveN 7,12 2900 mover Type 1 RPM fines 232 E CANYON DR —it Ave N-9E Ave3 S ES00 1., Nint Typ.I RPM 1- 1. E CANYON DR <Ave S-101 Ave 6E 14,S 6200 2140 Nint Typ.I RPM lines 519 REITH RDS 2Ave S-52535t/HAynS 11,1 3— S. MILITARY RDS S26S St-326E. 11 1290 2550 599 MILITARY RDS S 264 St S Reat,Rd 11 2— 155 2820 591MILITARY RDS .4 St SR 516(Kem—s Moines Roatl) 5 2060 16 5000 P.-tdk ereapn--mentM.Nnk Proje2n1z923 Proj-23 Pemtena RPMwemt Line Lo t-Lis end Naea.xlax 2-023 324 PM ' T' -���� G.. - CITY OF KENT 2023 RPM Refresh Locations Legend s Location Index(see table below for details) y - � � 1w,2w 2rr,2w SY,IW,2Y1;2W IY,IW,2W,2W(Coordinate work with other work activities) 2VY _2W,2W(Coordinate work with other work activities) _ T - L -- e� � a .�a.olA�eee SE k L e�N��lm�re� rp p o- v� — r I 3 °77�. O 4-i— 3 xa w v wsmNn Streetmwlemperence5treet mwa a,new uneoort Iamneeu,same Mz : w me,st A 5mwa,Na�m A k �baa w rk.aryp wa,pm 5 .A.s w,ame,s—l— :,av wm:,ea—Pamm�rw �N.pe1NPM SE Nem xane eV rtoed 3311 A.enoesEro Kemc NLmn A 5 1-dAvenue SE SE-1:streetto SE-1,Place fwknereworkw[fr a,,W.,,-,ea —11 w SE22h re mxE—hRream,L �.` ��� O - J m� J y�p g 1 zz Lwin Avanue Se z etn trees iosez ,nstreet nzu w r nes erst hntorere.lsnr¢rypel nvMz eore�p<,�3=t=SLre—d—p1. „ 16 mmo ��d�,ea,�ardE wtK-I..SEI11 tKAmpe d 1 15 132nd Arenue SE 1o1M15treetto z&1RnaaM1 of SE 2[BtM1 q ' aokw asps :edA»epa5Ete3ooR oem street .1d1azpd Avep�eSE 17 M u,—S -dm.rkapdkde nonx Emance 7i4- oez Mo nez 1 i 6 ` o 3 \ 4 E E.oNStre oSE:�Kstre .^ _�.M' Y _ mAve1— sEzzm Place to SE 2-h _ �iN t�- tb � frr ---- ,.. --- _ Date:212212023 i'. I Document PatM1:P:\Public\Operations\Streets\Pavement Marking Projects12023 Projects12023 Paint antl RPM\Paint antl RPM Projects 2023.aprx 1 2 3 4 5 7 8 10 6 9 OWNTOWN - 19 y' 15 CLARK 11 .... .._ ____ 12 13 14 16 SPRINGS _ - 18 _ I 0 0.5 1 1.5 2 PAINT LINE REFRESH AND CURB PAINTING INDEX MAP �� KENT Produced by Joseph Arauclo P:1PubliclOpemtionsl5treetslPavement Marking Projects12023 Pmjectsl2023 Paint and RPMIPaint and RPM Projects 2023.aprz Panted:Felxuary 2023 176 St S 176 St Q Midland or S177St 1 $ Saxon Dr e1�s, 81 St S178St S 178 St N \50 PIS ¢' ¢' Triland Dr m I N 5, 1s St m I > S 180 St S 179 St �o 1 c 1 + SI Raw Lane Dr S 181 St S 181 St N p\d, N ! S 180 St \ laort -- � ■ S 181 St a _ \ N 5181 PI R Q a ¢ $ _ s 182 St S 182 sI I � egale Park D Dr t/ \��\\ II 381 s, S 182 PI 329 I a t 183 St ¢ (n I� �eg, ■W , m 3 R"asltla S 184 St $ S 184 PI 1 184 St 84 St 8 Av 185 St A S 186 St s 186 roraany 328 S 186 S 187 St S 188 St 'ram^__ N S 188 St St N 'eeAi 189 St d �� %`�� / S Glacier 51 St ! a' s/ay s\89 / / 327 N ¢ _ pi � y — w N ¢' N ¢' �� m �' �S 190 St I a ��\. 5 IQ,5t 16 I Q ¢ S194 St Q 193 St f9 s_tsa St • �••�••�•���� 17� sz P, stsa St 326 .r --tn-- I �/� S 194 St I � ,sa Pi I ! I 14 16 • �! ^pp N I N N S198 St m •� ♦\\ N '�Wrrj� ¢ `�\ p V M / .. r• �_S.200 St, \ s 199 PI Q 200 St S 200 SI a 201 S �•`;i / 11 I , 1 ISt S 203 St / I ■ / I S 204 St /� S 204 St / N S 204 St / I / I co ¢' � xy asp ♦ l N I _ _ a I 208 St �z p a m. .ter/ ry�n\\\ 278 \ S 208 St I 209 St O \ 209 s[ 210 St Go zn sr 211 St I I szzv`. z1,Pi I _S 212 St t N 269 21as; h 296 N 1, ery s m to �y a' 2,a a ?g �` ¢' < 7 P \ cc 277 cc N $z 521G PI 215 st ^ N M N N a6b mg�d a0 N / A I. 0�J I N N S216 St 0 e RiveN\�' S 216 St g '•• OQ items Q88 \ I IJ S216 St I y■ • z\t at \, 21e Rr d N . I N ! w w 2v PI S a /s@ p�etR �� \\\ 218 St 521751 �a / I 276 -- a ' 219 sr 4 Q" Cr N I ■ ho ?8j s zzssry I I �_�. ■ N ry z ° . I c S 220 St ■_r.l a alal 4 $522d0 7_I PAGE 6 DOWN 321 2023 Paint Line Refresh and Curb Painting 0 600 1,000 1,600 2,0Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 1 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 n Midland Dr C Q / I SW 3f 7 / N Saxon Dr I SW41 St SW 41 St Triland Dr m/ U I S 180 St \ \ X\ t 330 i SW 43_St����-� 8ega,e Park D Dr \ \ I 1s1 St I \\ \1 a 329 455 Ctj I J.yP S182 St - $182 St p`D y 3 I Revery or - 1 S 45 PI 454 s 164 s1 � 1 / roraelvd 328 See%p ?r 460 1 alY(O.O / N 453 185 P1 0 / 1 S 186 PI 1 S 188 St N Q S 187 St 1 00�—`�` 1 S Glacier St v S 188 St � / _-�`••����` 327 I 452 1 4 rn �•f`\^ 7� s 190 st I a a �•; S on St I $190 st ��', S 190$t 1 1 1 N 6 1 I 6^a 1 �'/ m G S1s3 at I $192 St 1m S55 St 17 326 s 192 St S 194 st 451 19sw 14 I a S 196 St"' i 2 I � m N a I a' S 196 St Q5 Q I N S 198 St m r = I 198 St a' S198 s. /- M m P W S 199 PI aas 9 Q y S200 St I _a yam. 3 <' � S 200 St N m ¢' S 202 St S 202 St v a S 202 St PlS2 o I N 466 N a^ Go I o N N 03 PI Q a r! S zoa St a 488 - - 2 \ 456 1 N i 204 p� rye T N I S 206 St S 206 SIT .zos Pi m d 8 I N 2W PI S 465 20s P1 278 m w th —5-207-P.I d S 208 St I s 207 Ct $208 St �q� S 2p8St 209 s, I } s S 2 209 S[ 1 487 209 St 21ost N S 210 St ¢' zn St I I 211 PI o N C`S in a e o S 212 St m m rn I rn N I s a' Q S213 PI 8 277 S2i3 Si ssp WPy N N N '4 PI a N _ U ffi - rn tV N S 216 St I Q fO w $ I----'--- S216 St I S216 St [g °� � 216 St 1 I N I s 217 St `5276 St 216 P1 a I 218 St I a7 � s I N ¢' $219 St I276 218 St S 218 St Q I > > N N m rn V Q Q S220 St rV N I N N 21s Pi 321 s22ost PAGE 7 DOWN `22oL. 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,0Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING - T TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 2OF19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 vc�t745t 1 SW 39 St & SE s Ftq s 3g 4 176 St �O w c SW41 St SW 41 SI w y $ w Q 4 a 'SE 178 PI SE 179 St o` sl 179 PI SE 179 St SE 180 St 91 ¢' 180 St a' SE 180 PI w ��0 180 PI o SE 1815 v SE St St w Qa �1S2 st SE 182 St � a S45R mo , m te3Pt 5E<83 183 PI 1Lu S p y 3G w Ja S184 St //n� ^ f 184 PI Q ���.. co , (n %E 194 Ln SE 186 St SE 186 St 3E 1fi5 PI 48p P a' a' Q SE 186 St F a 186 PI 1 r s 50 st 187 a ,� - SE 186 PI sle7st ' ta7 PI Q w 1 SE 188 S1 tee sl p0 SE tsa st SE S.5 J ^Q LL 188 PI 1 Ct y� 9� 1895[ SE 18" 9 ct'1i• m S 190 St ■ H - - 18 189 PI a E 139 Ln N SFts9 PI w SE 190 St _ o� Ct fg Z8l 8.. , SE 190 St o F w SE 190 PI 190R o 190 P1 A�a u-' uneP males Pl SE t9l st a 190 PI - � SE 190 Ln n 3 s rsz st ' s ss st s 1 s2 st t93 P/ SE 193 Tq� 31 s m i194Sf a ' v 194 St SE 193P C N ' 5194'h N 1 % SE 7A st - 94 y Q ^SE 1&Stl r Q T1 ' A 14 PI y $ SFRB St n ' r Dof ' D SE 198 SL SE 196 S[ SE 196 St SFI9s PI m N s 198 st � N m y 30 SE 198 st W 4 w G Q SE 199 St t98 Ct M- in y N N IjA! 3� SE 1w st ^ 199 ct c 1� e a' a' ¢ 't o SE 200 St s 200 SI ,� (sE zoo SI m ' SE 201 St w N SE 21 Q < N 201 a o w d ? 'a,PI� Gt SI 202 St �. t ly W S N w S 202 sE�02 202St c a o 29 ejJP' 03 PI Q Q S 203 St SE 203 St o � a v o <se 203 PI � �sE 204 St' I T 204 P, ryp5 111 f A4 Plw SE 204 SI a 204 PI St J�, 5 SI 2055t d ^PS206 SI>` PIo 20�aN M SE 205 St 205 St N 20511 1 tP I w Il SE gas st 206St� rrm 7 G 465 J Q Q 206 PI `SE 207 St �SE206 PI_ 2$ D 5E[uti st'' 2075[ P! —5.20�PI Il _ 20]S[ S 208 st M ��M S?08 St + s S 208 St 2095t r m¢' 2095t 474 g�zosplo ff 2p9Ln 2osPl T6 SE209 PI w SE 210 Q 0Q 09 tl S 210 PI w 210 PI Qn' 473 0 0 ¢' SE 211 St ,p SE 210 PI 210P SE 2v 8 211 c 'Tred SE m 711 PI m SE 212$1 w SE 212 St a s a 27 SSE 212St SE 212 PI Q 212 108 s213 P1 $273 St1 9s m p16'o Q 213 C1 W 2135$ 9�SE 213 Sf W `t 21'g S�y,,352 Ct h 213 PI SE 273 PI s <N SE 214 St (n W N W 2,$PI m ptagv < a72 _ a> SSE 2145t Q' > Q 2145t a<y Q d YJ S y SE 214,PI - _ _ Q 214 PI 16 Si V SE 215 St �Mt< fg 2165t SE 216 St SE 2165t 21fi St M^ E 216 215 St S St hMS 218 PI 0. - vwi wy _ $E 217$t 21fi Ln ry 2^6C9 16��y M �76 St �a SE 217 St U9�' 107 sE 217 St mNFL S28S1 S218 St SF2tea SE 2785t ' 26 ¢` RN zj SE 2 SE 217 PI 2�1951 1Bpl Q d w ' _ SE 218 PI 218P H 219PI 130 g 219 PI - 6 e SE 218 PI y s T a' 106 S220 Av 4 sF �10 SE 219 PI 219 Ct aLn ,,, N PAGE 8 DOW 220 SE219PI 105 5 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,0Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) OT 3OF19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 4 5 E SE 175 Ln \ mF SE 176 St " SE 176 St \ w w Q Q Q 41, Q Q w a -SE 178 PI ' rn w O ^ V O� `180 st 179 PI SE 179 St SE SE 180 St 178 PI P� a' 180$I a> SE 180 PI � SE 180 St a 180 PI `��� ^ ti•• ^SE 170� 1 ^�161 5l w `• U t st SE 181 5, S' W SE IS,St 9` • ,180 PI SE 182 St m ^dry ,• SE 182 St SE SE 18'1 PI 183 N SE 182 PI 03P1 Q A • v 183E o Lu < •,✓ SE 183 S1 N 184 PI N SE 184 St m SE 78451 j ISE 1S11 L, p 184 PI SE 186 Sl SE 185 R en SE 184 SE 184 PI 185 St SE 186 St Q ¢'a ¢' SE 166 St ¢' 185 PI 3' g' t86 PI 3 O ♦ 185q SE/ 188 St ^ h n _ 0 7&St ( ^ SE 186 PI \7�q SE 186 PI 186 St '6'PI SE 187 St > w Q sE toe SI , o a w SE 188 St 188 P/ p� SE 7 S St 187'PI 8� m 66' Bg sa ^SE 188 ,� SE 188 Wy 't 189 SI LLSE 189 Ct�e m ' E 188 PI te9 St % a - S 1 SE 189 Ln t Q LL SE 19051 189 PI o N FFt99 PI 189 PI 169P gqG 189 PI `SE 1�' C! 3' SE 189 PI w SE 190 PI o 190 PI ,��a � 8nk Pnvale SE 191 st 190 PI t90 PI to p 99 P 3E tse In , N =�1915 Q a st,Fl� 3 sE 1s1 Ip 191 PI SE 192 S: t93q sE193]�. m SE 192 St 31 SE 193 St {II1 193 St VWi SE 1.R C y-( (W ♦ y w 194 ^SE 1S43t1 I Ill W W SI Q ` Q ll N 181 PI N ♦ Q Q N 194 s1 D N ^ V SE 195 St SE1 fist SF193Fl m ', ¢"e E 196 St t� I 6 ♦ 1965, 198 Ct W h 1 . r J m w 1e]PI G 197 PI , y m 30 QQ SE 198 St W ¢> a Q 198 St `� _ SE 198 St SE 199 SI 198 Cl N 198 PI P SE 198 PI ♦ i� C 198 Sf SE 199 SI 189 Ct �% 199 S1 9t E 1d1jp\ a SE 29051 m aj, w L -7 SE 200 St SE—s< � SE 200 St^ $ 20151 8 w V♦�� E 'w PI 26 SE ZOI SE 201 St 201 Ct 201 SI C j c Gt ^ SE 201 St 'tv" 3� 29 w zM SE201 PI ' : 5E 202 Ct e zoz Ln^ !K ¢'�.. • N SE 202 St ' SE 202 r-7; SE 203 St131 qs� :E203 PI � SE 203 PI , SE 204 St f I2 o SSE 204 04 St 204 PI E W SE 203 PI sE zoo si OQ V`y a 2055t „ep 123 20451 q, SE 204 PI y Q 208 Sty ,� m P,QN m sE zos sl q zos si ut `� 3E 26651 ^ ^ 7 Nm � m�ry i6 PI_ 2$ SE niti SY''D N aS/ SE 206 PI y 286 PI L3kq .� — _ E sE z07 s< 2m.Pl Q' 20]81 t m 204 •\ ' 4b oN 207 PI V 207 P1 ' \ 5 zln a n � 57 SE 208 St r` 8 n �` m9.m zos Pl m 76 zos sc 2001 zos ape 203. PI W SE 210 St S �ry 210 CFI SE 2.C1 0 9Sej d ` 21p S1 Q 210 Ct ^ SE210 SE 210 PI 210 PI C'II Ir N2115( _ m '• / E 211 St ^ T N210 PI "¢> U0 '�1II 1r SE 211 St it O 211 j¢ Q` c d S E� 211 PIS Iry N 211 PI 2,11 C I S E t 27 SSE 212St 108 SE 212 PI Q 2t2G1 ?� 212 PI 212 PI SE St 202 SE 212 PI \ Q 213 CI W 213`'t$ `3E 21351 5�213 t2�3 SSt SE 213 St 21351 /(n SE 214 S1 (n " 213 St Q� SE 21451 w _ _ - Q Q> 214 St 21 214 PI EL bQ 214$t C Z 1r SE2 �_ =� j __ _ • I Itvp 214 PI 216 St SE 215 St Mtn ^ 21551 d ¢ 215% 215 SI ¢ 0 5�,�14 SE 2t6 s[ SE 216 St SE 217 St 216 Ln w 1teCF ect�� SE 216 St �01 SE 216 St 3 ^ SE 21]S[ 11 m y z1]St ti�21:ISIJ 26 07 1 1 sE 217 St >azlra 218RQ J / 21]PI �. SE 21]P/SE21Bp SE 217 PI 50 y.SE 211 PI i 200 W \ Q SE 218 PI^ - SE 218 PI 210 Pi ' 6 �� , c gyp' � 218 PI /~ <n stg o z2o st ��� 106 SE 219 PI m21 Ct 2 229 sl SSE 218.PI M t11 \ 22 Ir SE219PI 105 9 PAGE 9 DOWN r 7 N 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,000 Ft Legend � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 4 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 J L I.L Jt m S212$t \U, ¢' S213 PI W y s 214 St � N ' " 296 y ?8g Q N > S215R / N N N N %5p^o 55a1$o S 21 SSt 1'• 5 R ary 0 Q y y l �S bpQ :216 P 2as $2„ a' 1 z TS q �� zlep Ftd N' y y N Q c 216 P1a a w 5219 st s219 St 1 M a' I s $220 St P, S_220 St $ 6/22 $t 1 ! do Zg s} s 22o et y ry q � ho F zzop 1 s2z2St $221$t s 223 st S 223 St a' 222 PI y1� s< 222st r a3 3 E S 224 St 1 Zg5 - S226St w ■ �,,v S 226 St _ 99 S227 PI 1 fl' 1 221 PI ' • a y S 229 St >< ' S 228 St d 230 St q q • �t y q 231 sri2Bd w 2g4 �1 no� e Rd J w Veterans Dr m°' z3xs oe I I 593 ,tig1 // i 232.Sf y z33 st ,Qq � $232$, ■ y P■ �. I � S� 232' d 1 1 y • �� 1A��'��,n S 234 St ¢ ■ p y \ N S 234 St �- y �S 234 St N '. 5258 St V' LLJ y S 236 St I q S 0 q y,199 2sBsre_` � 9°j el S 240 St a 591 0 S 240$t 241& � � Q 2425t S 242 S[ m Q 2 Q Q N S 242 St Q d m ¢43 P, 516 S 243 St a q S 243 St S 244 St S 244 St 269 V S 244 St S 244 PI IS z44 St 245 C,-- S 245 PI ¢' 245 Ct S 245 PI m S 246 st Q IJ 247 st 'ON 4' S 246 PI � �m U7 I j x4i a ,� Q 590 �Y aIn 4 S 248 St s zae st S 248 St L a a' .zas Pl m S 249,S C a� N u•585 o to a v a� 2 aP S 249 St 2p6 P1 �^ 5251 PI S 251 St y a 250 at 30 25a PI ea > q q — q 5 h 250 PI Q S 250 PI < N V 25f S[ $251$t d M S 251 St $252 St S 251 PI 251 \�s 257 PI 252 S[ y zs2 St Ct 8 252 PI 253 254 St 61 Q 252 PI Qs 252 PI 45Av S 253 St ■ m_ a q- 253 PI i• q S q m 252 PI 3 252 Pi < 2� N y y Sj x5351 n 0� 4 G z541 t l� a _ 589 a 253 P1 p P 3 S Q < M a 254 PI x54 St 154,y� Q 255 PI (� ^ S 257 St S 256 St S 258 st S 255 St zss 584 _ s 256 ct �s�9 2%P1 q zss Pl �S�A 4J w tt 251 PI N q q M2 tr 3 Q N Q 257 SYq r 8 I---I � 525i St � I a PAGE 11 DOWN --� , 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,000 Ft Legend � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 5 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 J�I�Jt PAGE 1 UP I+ s 21z t u, 289 I M y 296 sr y m > ha' 14w ? ,�' & a 52155t cc 2215at P I i° st .21— N !^ N N I '� 0 Rivarv�a S 1e St I _—____ S 216 St rz16R 268 \ r'- S216St I s■ a �' ! m • h 2171.a. /Ss 2�gt�a tD� `\ 2185t S217 St of ■ < a zta�' � � S219 St 27.6 I cr 8220 St N N I ■ ,yo ?81 'sy s zzo sr I --\� PI 1 1 1/ \ S220St N? Q 221 P1 N�,q N! I N a Bea Q22i P ¢'1 N M Pt sa Q < el < 1 222 PI ryw zzz st ____ __ I tisf @ 3 ,1 c 321 .......... 22 / - - I S 224 St _- �-- o i S2245t I M S 286 St rn I 225 P1 I a I lz.y as / a S 226 PI 227 PI I \ ■ Nf v I m� I � I S 228 St N �a J 285 \\ 304 a "' S 228 St 284 eterans Dr o� I I 593 g`I. !� ! ZZS St j I !! S/� 5231 St � I $23z st 600 rn 1n T �f� 1 \\ �3 5232$\ 92322335�+252.5 2' 23951 6' m ni Q cc 30> ,'2.PI R 'S W - S234 P/ c 52345t S F PI3 y N S23Q 5t I V r� \N2 tJt P 306 5f5 �q j I 181 n r 5x385[ 1 �,,((�� 1 a —St y St �. I W mI' g - r S236 St I (' 'a ��J �P 23a P1 J' m 237S1 S239 PI 9gl ��P 2 _ ' I NI/ 237 PI CdkeS/us M S23 N a239 st 23e PIS N N g W Morton St N N Sry3 I 9L N Emp� y 257 N1 60SS N E V 59..1 2aiSSt 1g 7 ^ 261 z4oal JameaPl James 242 SI ' - r 1 Q d .243 P� m 516 WSamst I T !/ -- m P I James Ln Z I S 243 St A 2 s zaa st �- 1 28 0 @t@ o I 245 CI \\ 5 Z tf\ \ 1O Q 246 Ct \ N 2a7 St N s•e \\ `�' W Meeker St 207 F \409� 24/Gt 590 �f. j SDI" I S 248 St va / ��eeFe<- 263 - e s zae st N N 585 I < 5 249 St z4a Pt ` ai / -- \ S 248 PI --..�,\�g2a9 st 9 �m Z wS ° 302 a' e g h ��i'' •t l _ yy zsost m � y ti at SR 516 N 250 PI Q $250 PI a 6+' NI \^O / •�� N $ry��$t S, St a 251 sl 251 P �s ti\— • --_— I Q s 251 PI 251 `'�FC � ��■••'`a 1 251 PI zsz St v_ zsz sl ct 1 _ ;/ ,e°e!/ 341 I �c ' 252 PI m PI 2. )A, ■ � 5251,, • I N 252 PI 9 252 PI •i PI , 271 I C S 253Sf h 25331 a a W 'I 15 253Witelmen d 589 4 253 PI !Q ' 6 D I M 4 25q PI 254 St v 5254 Sf ,/rIs 253 PI 11 • 267aw F N S 255 St 2.PI 9 .�, S 256 St 584 2.01 �� 2%PI r • z55tst� 340 I 16.........• \ / • I y N 257 Styrd2g 8257 st �. 1jeTRil`' I m a a 9 IPAGE 12 DOWN 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,000 Ft Legend � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING -T AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 6 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 s212st PAGE 2 UP mon I I .gar sz�s N r, ¢' Q S213 PI sAJ a,, o m 277 I w �4 PI11- arg4r `a N N Q c4 N St S 216 I Q I------- S216 St I S216 St F$ ztsst I I a I S217 St I Q `S216 St 216 PI a 218 Sl I M I N j 5 219$t 276 N.1 St M S 218 St w Q S 220$t N N I r Eh d N 219 PI m $22u St a zzoc4n I I 221 PI n r S222 SY Y - I S222 St sz;2s y-_--- ; ---- �321 /m I S 224 St I S 223 PI a s za,,n I I M S 226 St I S 224 Sf N I 224 St 5 224 St a ¢ I 322 S 226 PI 227 PI s 225 PI 484 z ao I _ W I 31 IS,2,28.St � 2za st266 3404 m a 22as< I I z 5843 N s 9 j 1 t264 Q' _ S 231 St I Q Q z3o PI I sr g yc 9.GI sz3z sl 600 vi Z Q 5232 St 3.1 Q> Q Q Novak Ln �� 485 S 233 St m ~ Y/ 3 I N I nCtS m LE, N I S 234 St I m w Q Q t I 181 N sue,Pi CIDrn za2 sNl 236 a n II^� d a v LLI 236 st con"" st 236 PI S 235 PI z 823a PI S - St N m & z3a PI, m IS ti3z st 1°< ¢ 444 �@ S2,1 N S9 W Morton St N 9 n e:a '�rrevpr ¢'n S 23T_P S236PI N 257 / WCOUdy st QOQ � z o 5239 S239 s1 4 t Z George Sl < Q¢ Z 5239$t a 443 d 601 � S 239 PI � N E < L. � � _ $ � m S 239 PI dames vSt to M M _ m 239 PI 3 24oa N _ ct N I z 392 0_ 5 240 St 145 L a wxem sa coda,St z szas P1149 al S241SI E q a w sam st I _ IN N• a 148 144 ¢' z I James Ln z z Ramsay z V V ear sl .2 2 s 242 s[ ¢' z 4q wJao L a' a N29 PMoan an st a N eTemParenaa sc 8 L� m z4z ct Smith St o a Esmrtn slm - H " S 147 a I �� 390 366 430 421�> esm�msl�^ 446 zaa st 143 _ s 244 PI Z I a 1y v N 208 o � i a 410 447 262 "' W Meeker St 207 F 409� m W i.eker:lo 38�4�' "' 431N 42:N pj ` ti 142 sz4 � a w co S83t ias89 365 432 cnwN y F� z \�� ��3 146 I 373 388 a S423j2q kw \` waoara sl s zas Pl 26 N 404 a 382 372v`�364 433 sir Ke rmmast P��� C 141 sza: 7itus� ES,�JS 434 -p d' _ 403 r m N 363 ggY s Dean Dean s char,,Hilla S24a PI m, I t�N 1 G1 M ��� ��\u s2a9 Si v_ �m z N15aar St p81 M a$87 M mrh �£ c EMadyn SI •ts �,160 �,� S249Pt N SR 516 2 _ 378 380 37041� yaSt wv 111 st 377 Wil'p St.o;gb M '� 8 5'a EGa,b. nst _ 385 � �> d saaula st \\ •N 4ti;.�... O I I m 379 N I > IE saante_g1�s �\ 516 JI • q°a I 341 I RachaelPl w-srowst N a' auaaanst I I S 251 PI / 271 II 8 Q .o Ctearlew Y c E Chicaga St ry�9 r I s zsz st !�5253 SI 1 1 i A W;termen stl s 6 IY Chicaga St 0 ELa...I St '1r9 2b3 PI I' ! 267 N I Overlook at a'I I I Carter St Qr E Hemlock St — ¢ 'di \ 375 369N -Manor si s zsslslt 340 x E E Walnut St Walnut ♦ w 'fie?R8`� a PAGE 13 DOWN Isa Maple st 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,0Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING T TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) OT 7OF19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 PAGE Ep N 2„ EI / Vn' d NSE 211PI6 2 ' SE 212 81 s •gPl s���s 473 N G p $ =SE 212SI ryLn SE 212 PI Q 2+2 S p� O P o 213 St .27 Q y w 21g $213 PI S2�3 St1 95 Ct `0P 213 PI $E 213 PI A�6' h 2,3 ct 2135 O� 9�SE 213 st 108 W SE2+3'rt2 N SE 214 St W �4 PI m Zrggv Q (n Q m SE 214 St �Q Il Q Il Q _ ^ SE 21 to 4,PI O 21a PI SE 21y ^ v 16 St zls St SE 216 SI V SE 215St N SE 216 St 216St M" SE 216 S[ N S 21fi PI d - N SE 217 St 215 ?16 St _ - - SE 217 St 2+ 6' .,I�,1f g cl a '� o`V g SE 218 st yF' 107 1 1 SE 217 S1 >- $218 St S 218 St SE Se218 s f 26 h _ 2j8A 3E 21,951 sE 21ap SE 217 PI 5 > a a w SE 218 PI 2,a Pl d 219PI 130 219 PI_ s s SE 218 PI E m P a 106 ¢>22a Av Q SE 22o St SF22p Sto 0 22031 >—�� SE 219 PI 2,8 Ct z2o Ln S220 PI D \22o PIS 7 SE 219 PI 221 PI N. ams22zst -129 0 220 PI N - 22o pv zzo CI y - 128 J SE 220 PI a 2m P g - S 222 St s SE 222 S 'E 221S7 (� N S st 22z St zzl yEp - S 1 O ' t d• SE 222 � 105 PI I SE 222 Ct 222 PI V S 223 PI SE 223 St ,e A s 127 G oe o A (1C 223 Ln Q - - ^ SE 224 S[ a-•'�v � s � � �� SE? 109 SE 223 PID, 1Q 224 Sf S zzo st m 126 225 s,`r 92a PI SE 224 P1z2a PI/ 'zzo PI SE 22S SE 225Fy z25 s1 SE 225 St S 225 P1 Sr S 226 St ?3 ¢ SE 225 S, 2zs st 104 484 y zzz�m f 'nq zn 125 zzo PI N N 22zsv a aN uai 2- 226 StS226 St 2St 124 26 u 227 S1 < a a SE 227 PI 3401 m S 228 S(M 3 m a 22e st n 123 o zz7 sl a' 5� d 104 51143 @ ' - '@q s zzae zze a z28 a M SE 228 St 22a sl o f SE 227 PI 2 103 o a 226 PI 2za% SE 2280 n m S Q+ a' >' 122 c' 22 z2» zz9 s 102 �Q PS 230$( yF' a ry�2` •yes St SE 2?j PI z3o PI 1 12 z3o PI a oe Py c s 2 St 5 ye 238 51 >'v�SE 230 PI `ten 230 PI - SE 2315t Mo O,IQ 2315, 3+ 101 le S 232 St z32 St SE 232 St SE 232 S[' 237`'+ a> SE 231 py 465 \ ,G w SE 232 PI '� u 232 M y D V� 120 °Oo > e a' a ,a, w 100 _ T 9dcts W 2335tp Vr I.,1 G 233 R 233 PI ^ ".ppi q SI 233 CI!IF O 233 PIV N 5234 PI ¢> ¢ 21 Q om SE 2342St3 PI 99 V S 23w _ C _ oy y 234 d Pl 235 St N >� N rvA 234•PI.96 ^ T 235 PI S 235 o SE 234 PI M a SE235 Sl o 235 St I` //��� 236 PI S 235 PI a 235 PI �35PI SS 236 Sl M1 ¢ p y se 119 SE 23651 y 97 1 493 a Q^ P 236 PIN s 23fi _ _ a SE 236 PI ¢+ 23fi PI SE 23 n d 4a Q S•'237 St N _ o '� F 23fi PI Q> a SE 237 St c I SE 23fi st 2 PI 444 p&2aYnr n S 237 P S 236 St o 0 23J.S1' y� St SE 237 St n23704 4 O Z a 238 St 2� 96 237 PIS s zJSt Tit. sE zae ait 48 ' 1k 2�PI 49< sE 239 S, > mS 239 PI SI _� 233 SE 240 St 9I c z g 3s PI Q a s 240 St 145 40 P caaar se z N S 241 st N t 49 57 a6 PI - _ za0 PI S 240 P,149 2 m - a 148 Q 144 Ir 2 S 242 St f �` f" z P P Q s 242 PI 2 PI SE 241 PI f 242 St E r mPeraa�a s, E Q m zaz a 94 491 I`/_��_1I SE,2a3 St Nrr m N m O h N S 243 St 116 P''r 4'd'E M r N Q Nllt„st� N� _ N "6� s 147 143 " o `N' a �zaz�l QI P w s—sr 244 St _ f m v M S 244 PI � - sE 2aa m b st m ' 244 Gt f $E 244 Sl 447 142 szaSPl 114sP1 _ o e' co 5423124 o \\\ ti-1-sl 146 S 246 PI 113`246 PI (�I I 983 245 Pit rwi, a.� 141 - r �` 7 a' 2a7 P1 490 E 434 P dij fO 'D 165 } wr Eoaaa ceaa s< cram ein 1\ J'o2Z 167 n P * E Macl n St V 1 �� m a SE 248 St`� r�' A25 Y �\ 160 hi y gz4161 °t 248 m ¢' SE 248 C,t a w a 2,2 >N EGuiberson Sl \\ 8 O 2d0 "515 c N Q SE249S• 269 PIy Z5 N Seattle St \\ 516 249 Pr l st 1p3� SE 250 St o �� 249 Ct Q N >12.cl _ _ s o i Q f > > E Seattle 6t� \ I SE 250 PI " m s+ F _ z5o PI y0 P1 II st �g Y o \ c I I o— a' z'`0 c' Is yu o z51 a' SE 251 St t CleaMew f > E Chicago St z51 A �j1e St I 252$t z51 P1 p\ _ 252 PI o chlca90 51 rq \ \,� - w , w 252 PI y52 M16 ELaurel Sl 4• \ ry�j \ 253PI d 4 oS a 252 PI y - W N7 \ ry W 253 PI Q 253$l - 2 Carlar St m E Nembck St - 'y PI N SE 253 PI w� - U K c = Q -w on •254 St 2yq St W Caster PI w E Eileen w v ,• \ SE 254 PI 254 PI > N SE 254 PI N n -Mari -St n \ S W Q _ 5+}�I E at\ �G 234 235. Q 173 -1 ¢ 26a E Walnut St Walnut m SEE256 St 255 PI o 11356 a 237 255,e1 \\ 595 a _ s \ zss PI 25s88 _zss PI SE 2, Mapi, PAGE 14 DOWN 257$, $Ez57$t 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,OFt Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 8OF19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 it N 21,1 EI J ESE211Ln W 211%_ I ai PAGE 4 UP ' AQ / S 213 St y SE 272 St SE 212 PI 6 1�20 n• •212 PI 212 PI 1 ,t o 27 ¢' t M1P1 TOT SE 212 P1 a 213 Ct W rs`'t$ `SE 2135t SE214St 1Q$ W m21g S£2155t 2°3C 5, SE 213 St j 8 1R (n 213 a 213 S,i F ti` SE 21451¢' 4 _ - Q 6 51 2145t 214 H r5s 214St 214 PI >"i55 1 t 21, v �_ j _- Q - n • I t cc f 2n16St SE215St � ,n f 2155t Q 215Pt 215St ln4 a SE,�14WY 1 I SE zts St SE 216 St x16 Ln SE 217 St U y16G 'Cl//J SE 218 St- 26$')1 $E 216$t ry 6 ' d N SE 21]S1 2t m 211Sf 21]St n T6 SE 218 St Q0 107 SE 217St w 217 PI 21iC G R a N SE 217 P, 5E2fep Sr 217 PI a .119\ y SE 217PI W • \ Q SE 218 PI s SE 218 PI _ E 106 - 1 `SE 218 PI. Q - SE 219 PI '21 IF 1 0 9Ct moo N St o229 PI�20 Sf ? SE 219 PI SE 219 PI _ M 11 220 220 Ct q $t U d - A 1 �' SE 220 PI $ a zxs PI SE2�1 T5 C S yg 221p - $ NAv _ Sell. PI 1 ¢> 1 �2)SE 222 PI SE 222 St 11 1\ f SE 222 Ct 222 INv 223 Dr U` Ne 199 • yoc 223Ln SE 223 St M SE 223 PI - $E�3 Dr hAv 26 W yes% do2z3c sE 1 •e7.4 PI SEE 224 PIP, f 224 PI - SE 22y. �S 225 PI $E 224$7 225 st 01 SE 225 S[ _ S/ ,5c �, �„ s SE 224 St y _ 3C2 Ye m v� m G 2zs% sE 225 st ',z 22s s< 104 `tea N 9ss ° 225 PI 226 st=SEst m �+ 226 St c SE 22s 19$QSE 226 S, _p04se 227 PI 2z3C4 SE 227stsSE 227 PI 52 p m 1 \ 226 St ¢> 223 PI z23P1 103 :26. SE 227% ,W71 _ \ SE 228 St - sEz28P1 � 9 229 s1 102 SF � SE 2280 a ••` \ PepQ o,t Qy E S o> t ��/'�P5 v19U S t 2 SE 2t I SE2a051 e�, m 2� Q\ 197 230SI 231)Pt � 231 st W ct 2 30 St E 232 St - �101 y .1 ` SE ,y\\\\ _ 231 St , N 2s�5 SE 231 PI 4 SE 2329 Q ,py9 �FZ31 WY SE 231 St 19 -P ' P 5 2 s, . I— v S s N 100 ,'+ �' 23s1 Q SE 233$I SF ^'�3,� 232% 6 32 •Tt 2 ' C`�3 ••1 '�9 z33% a sl 233 CI 233 St c b zs3 P1 v T m 194 0. SE < a \ 00 SE z34 St '99 SE 234 S[w ' 2a4 EI P, _ " -234.8t °' SE 234 at 'c \ O r W 234•P.I-98 a • 1H N 1� N m 234 st 5 S N zas st w¢cQ 2396 Qw/%m Q' _ N_ \ \ IQL T 36 2 93 a 97 493 SE236St 235 St t SE 235 St V 2.PI � PI 2fi n 192 SE 237 St ( 5[ E 236 2369\ E 236 R SE 23PI SE 237 St 237 C, g I 2385f 96237 SE-237-PI SE23;, 49T48 S N $ Q 23g 31 $23P9 IW71 238 PI N ("1--191 w m 133 PI 233 Ln SE0. \ \f 239 �i Q 2 F l Si st a 9I z3s Pill & 1nm st 9 N � O 240% f � 49 - _ - 51 24O% m _ za0 PI 497 • SE 24'0 St SE 247 PI a m � `�47 � �� Lm 94 w 24 2 st 491 � 11 a a' SE 2qr 2•cfl 190 1 \ m s, 2m Pi SE243�St _ w I 2° I z4z st yW 1 I 2 a w 2aa st I alp _ M M M o alp � a �24®I 243 PI I / F, Sty �f• 243 SE 24Vt - O SE 244St - �Cl n( P 93 s 43:yy 189 245sc 245 PIf 490 246 st / / 1 \l ( RI 1D 165 247 St \ t / / 1 \ c. 167 _ SE248St /� \\ \ \ \ i / t \ \ OI V 248 PI w P SE 247 PI 188 `� ¢> SE 248 Ct m \ 1 o' N 49 248 PI Q c Q SE 249 s7� 249 PIN h 2 S 7 iE 250 St o �� 249 Ct 6 N F-t-Ct - ; w rA 187 Q _ g— xs9 c SE 25 St 'tiy o `', Sg26 SE257 S $ 25t P, '25\ Q SE 251 pi Sr 252 St 252 PI 251•PI w 252 PI 252P, N 187 SE 251R \\ \\ L\�1 251 PI d w os a pip y - SE 252 PI SE 252 St W _ SE252 St 8' zsz Pl !� 252E c m zsa% 253 St 253 St !'n m ZJ 253% w SE 253 PI 253 Ct , 6: > W -w �254SI 3545,N Ct _ W N F3 Q _ ¢ 1 SE 254 PI 254 p SE 254 PI 514 w 254 so 1 5 ry 55t Nm Nt<` PI L �263 PI Q 254R .255s °s 186 SE 25581 m m A 173 255 PIIF 1' PASS '3 255,e a a > 258% $$ _ SE Z56 St_ n 255 PI 185 N - 5� = ry 255 PI N M 255 PI W o 256 F PI 256 PI PI 184 25)S[ '255 PI 331J 256 PI- 2573f �sEzs7sl 513-PAGE 15 DOWN 256 W � _-- 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,000 Ft Legend � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING ^'-NT AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 9OF19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 SE 212 S1 y 1 i2l 1�1 202 SE 212 PI 14P1 1 / J"U f sE,0 WY • 1 CO 1 I Q �eSi01 SE 216 St I SE 2165t 1 t w 217 P/ W \ '\ 2.00 1 I SE 218 Sr SSE 271, Q • tl M LE2211 St V 1 1 199 1 1 n �'431Av t • \ fw/1 222 St ¢' �zzat` �q 1 a' a' SE 224 SI e��4 SE 224 St SE 224 St SE 2: m PI _ N 199 SE 22fi& L 4f a • \ Ir q n SE \ SE—s< 1 1 SE 227 St F \ SE ZZ)PI 1. SE 228 St SE 228 P` ••` \\ 5�,� Q\ 197 198 �230st �\ SE zzs el SE 231 St ¢' w •\ n sF2dl WY SE 231 St ;\\ S Q qst ♦ \ `� a SE 231 St 195 z32% E: f \ SE232 5t SE 232 S1 4 1 \ SE 232 PI 232 St w m 194d $ SE 233 St v \V $ N r m 5f _ m•.\ \\ 6 234 St SE 234 St Q' a z3a sl m 193 " I `SE•234•PI SE 235 SI \ SE 235 St 234 PI 192 1 A SE 235 St \ w SE 235 pl 43 � SE 238 PI; \\ SE 238 St 4 SE 23Fi St SE 237 St m \ 1 SE 232P1 •� \\ U '< 23T Ct N • \ w a' • a> 191 S _ " 2W P1 23 Ln \V/ z3e M • \ W W St p s�Q ` \ CO 497' Ly SE 240 St \ s SE 242 y \\ Q N 199 42 s W I I^ — \ a' m 1 I 2 \Of. 243 PI I 64' 5�29 e N� 243 p 5 (\�j� Sl 2455\ / ry �188 zafia 246St Im SE_247 St_ w 247PI s `'' LN \\ \ / \t \ SE 241 S\ / • > _ 249 Sy P248 PI F �\ ��—�—\ 1 , /� // 1 ..�..�•.�f � 187 SEA SE 251 \♦ / I 1 (n / 1 SE 251q Sf \ \ 1 I\ Q •� SE 251S1 A25.2 SE 251 St 187 \ I 251 PI\SSE 252 St 2u PI z5z q 1 IL •_••.••.. N W a \ \ /� 504 a 1 SP253 PI Q 254PI 25451 9�F ` h /1 4 w Q 254 St 185 SE 2555f 185 t7 255 PI {} I N 255 PI / 10BP Q Q r N PAGE 16 DOWN SE 184"1 25]St 255 PI - 35 ^ 256 PI_ 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2�000 iFt Legend Ft � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING ^'-NT AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 10 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 r s zso s1 rn PAG E 5 U P ryo9�p 585 zso ar �. a a a' e ins 3251 pl S 251 250 at 251 PI Q.v Sl y (0 P 250 PI ¢ Q y _ y h s zso PI ELL251 St $251$t Qi N �� S251 St V 251 PI 4'sM ^ S 251 PI S 252 St 251 PI 252 at 302 252 St Gt S 252 PI < 252 PI QS 252 PI 45 av S 253 St • 253 St m 6 sz 253 PI i• m h ro zP y 252;,3 zsa s1 < y s 2535z y 1,sa st 21S (� a 589 a zsa Pl o 54 y Q Q(\/l n a I G S54 St 25 52�'sr Q 255 PI 4 PI S a p n S 256 St 5 M '9 P 5j9 iC, ae S 256 Sl S 257 St �- S 256 St S 25 St 255 !n 256 PI N - 255 Ct 258 PI t- �S2Ar 251 St y a II( ry 258 PI n 259 CI y 259 St 2595t 269(p CD2.11 \ P\ 5 S 260 S 260 Ln S 260 Sl S 260 St \ t` q S 261 PI S 261 S[ \ Q" S261 PI a S261S S 262 PI �m fig \`0� � S 262$[ , _•. I S263Po �O ¢' Q pv S26 n rn ro S 263 5l9 Q S 264 PI yom rset Ln 26.5 km cl ryamplon W /`� 5 26fi PI 0 � Q o S121fof0 ARrse!! 587 a Hampton Wy�q a ^\ a 2✓a` bndge Ct n O 99 S 268 St `a S 268 St S 258 PI z _ N m se P1 carraby Q 269 a 2696[ n m ¢ 2695t o "'Y f N SI Q Q:270dr O ¢ d - y S 270 St 586 s 270 SI M s 270 St _ S 272 St R 5212 SI IL o S 273 St N S 272 St N LU yI Gres woof Ra S`Srdf�d 521a'PI t t2 P1m 521,9, III �g Rd j 52745 Q ' rnj 1&274.RI. S 276 St y Qy • y,y15 PI h �� 9 S 276 SI p 2 ry16 a 4 �46 P �s S Star N LdJ a 9 N LP S Star Lake R, S 277 PI `n a' T a h Q\ s y ` <n w h '9S rQ 279p, - ■ S 280 St S 279 S ■ opl ��C\ , S280 St S281P 2e�IV, I < , ¢ N 281 St 2-8-2�St m 282 St S 282 St , S 282 St ' II a ♦ S 282 Sr p1 262 ■ p ry 283 S, ' 283 St 2$St (T` ■ S 284 PI S 284 Sl ■ Q 1 Y 284 PI S 28 S 284 PI �-- ■ 5 285 St • S ■ 6 St ` a'1 28 ' S 285 PI Q S 285 PI v S 285 PI y 5286 SG rn S 287 St �, r„ h S 286 ■ Q' N a ¢ S 287 St a S 288 St S 288 PI Iq S 289 5 289 Sr PI S 288 PI Q m d � • i Q d f�--^--- S 290 St '� - rq °' 289 PI v S 28' 9 PI a - w rypP S 290 Sl S 290 St. < y S 290 St d S 290 PI y S 291 S1 < S2915I v .6 v S 291 St , y 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 Z,aFt Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING ^■-NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 11 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 e N N 585 e� r PAGE 6 UP -'"' •`° 62°9S' N 2 W_ aD 590250St a' fat ` ♦'' jI\^ S2g9PI SR 516 — N 25p PI ¢ St $250 PI Q e K my '�O /•� N Sry51 5251 SI 251 PI - n 251 SI �.. ry .. • > _ _ I Q 5 ell PI 251 M\19ey �J���IY. I t 251 PI 252 St Y —302 zsz a ct �ltl t qs�/•� P 341 I Ra< ' 252 PI w QS 252 PI 45 Av �_ ./ ! S25t r N cNi 252 PI 9 252 PI 1 i P' % S 253 IS 253$i I , 1 N� A 4h,E 4 253 PI Q Y Y n n d 589 254 sl s2sa ,�S 253 PI It 1 267 N 1 c sl ; n 254 PI S - 5P S 255 St 2S5 PI ro 9 .r, <" S 256 St Y I ' I a I 1 I 255 Ct (�� 255 PI N I . • I S 2$St$.� I N N 257 Stm �!'3>g I--_I a 52575t £ ! `•1 dS, Y I 9 I , 255'PI 1 � SBB 26081 S 260 S( 1 I \ l \ S261 St ♦ S 261 St Q-a S261 PI s261`'� �'�_-� '1 t 1 s zsz sty yaa ' ' 1 s zsz st s z6z St pv 5263 ,A N 1 1 - � S 263 St 2 1 P mereet Ln K �� •����•So Cl 1l­04on t uSvatto�. m \'�ursel� �_ U) Ct Hampton Wy 4¢ - �\ a 2� Cambntl9a Cl o n O �— 167 ,I� CanlemaiY Me _ _ I S 268 St m m c wl 269 51 M - N x.9 51 Q Camaby y� ` S 269 St 594 m ¢'270 33 s 270 SI D ° s 19 2719 � ¢N N <� vA� PI N a Q s N s C� m s - V e 272 St 9 IL S 272 St _ P° „^, s 272 St M LU S 2T3�� 8 273_PI_ 1 Q 627.4.6I_ a 1 d yZT5P1 4� ci� LL a N s_Star L. a e� S Star Lake Ra s zn PI s 277 St w QS 279 pt o S 279 St S 278 3 80 St S 280 St P7 2 N T Q m 281 Sl R j S 282 St S 282 St hP,� 1 k] N 1 N Q S 284 PI S28 285 PI 4 PI. r......... .••."..•.......... 1 N � ¢' ; N S 285 St i S 285 St S N N C D N (• 528681 a �N S287 St ` 40 S 287 St a N N S 288 St U 4 S He R a S 289 PI S 288 at I N 289 PI S 289 PI 289 PI 290 St S 290 S% < Q N `> e S 290 SI a S 290 PI ¢' N N 11 St ¢' 9291 St v - 291 PI - S 291 St 292 St�nr? S 292 St 37 st.NW- �■ 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,OFt Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 12 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 i�■■�� 'o' qP /NSaar St st °rl `% a vo _ PAGE 7 UP �1 wrm7 N EMa 403 11" s SR 516 _ M M363 a g n a 160 q3 v \I\II W St W E Guiberson St ■ Est wwllrsst 377 m m R < '¢' \\ ____ a �' °' 3asI a E 5aattlTs, 516 -•����`d I I 379 w I h > ESeama_gtJ J 341 I Rachaal PI %.crow st rn a' Pus:ell St g < yea is I„I _ ry�9 1 5251 E ChlCago St Q N o S 252 St S 253 SI 1 1 Q Waterman 8tl Q N Mono St CM1licego St N E L.—I St R \ �IS 253 PI 1 ! 267 y E Hemlock sl 1I rn 111 I o�ebook st n 375 ? I 1 Carter st 0 1 1 a I • 1 1 369N -Mario stir% 3EFilbart e \\ . I 1°S255Ist� I E E AI � ` EWaI,i St Y Walnul �\ �^ageTRBs ' II 0 s v\ Q I 1 Q U h 258 Maple St �\ I I � � S259st S 261 St S 262 St S 262 SI 26jst Amer L. ■ �' \``` i S262PI (D IL _ ♦ I J X 1 Q 1 I 253 PI 0o to 1 - 1 367 I 21 s 266 st n 1 357 i 1 s z69 St ` 339 N I D I 2 C7 I a N IF S 272 St r I > rn �- r" ' w y � T N I I d 1 277 St I —-����� .��_ S_27.7 S St I z a I S 280 Sl T I L I z • I rn� a r— I ' I ■ ■ a5s`NE i i ■ S 285 St i S 285 S[ L_ 1 I Z n I T s 287 St � I 4 BPINW 1 I 40 St NE I I z N 37__St,NW 37 Sit NE 0 ( 2023 Paint Line Refresh and Curb Painting o SOU t,t,0o ,,Sot, Z,t,Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 13 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 wry �" E Maclyn St ti �1. - u _i 160 .y3� a 246PI PAGE 8 UP �._ 246PI Q :o :o w SE 248 Ct 2 >Q 3 EGuifieraon Sl \� c p.,� N W Q SE z4s S• _\I L 5` seanle sr \ 249 PI 5\ �1O.5e'515 a 249 ct N % 516 SE 250 S[ N12m Ct — y E Seatlle_8t�5 \ I SE 250 PI II cl SE 251 St ryy0Pl st S Gtee�'"t E Chioago St LSL O 25f Ct m 1Q\ @ j 252 St I N 252 St 252 PI 25f•PI W 6,tp\ pL� CMra90 SI 41 E Laufel St $ \ �j \ 2�% h N 252 PI r/1 252 P 2 253 PI SE 253 PI W 253$1 S 2 254 St Celfer Sf y E Hemlock SI — 4 6 \ Q 233 PI W U _ IY y¢ � w 25�5t W a Caner Pl 5 Q \ 1 W N —MariooS� $�E Filhen w n a \ C SE 254 PI 25a PI Q SE 254 PI E �6 234 g'�P 255 Q _ E wamm sl wamm '\ 5ss st 235-10 173 2ss PI a 11356 '237 255.PI a \ sE 2� \ - 3T7 PI W258MaPIeslPI \ y ¢ 9 258 PI w 259 256 PI 2588. a ^ I� � � 7Q � �I SE 260 St 2aaM1st¢ > 259 PI m � 2r \ ``I5 266 PI 547 - �. SE 260 PI rimer hn �` I 'o0 261s < 262 548 Z61 q M1 S 262 PI N s, SE 264 St 83 553m' z6z PI n a 263 PI SE 264 SI 3 264 St SE 264 PI £ 367 /� I zss PI W w 265 St 26p Q 55 PI ' I 'sw St H SE 266 St 266 p SE 267 St — _ lil 66PI 3 266 Ct o > � 267 PI 68 St —268,Sr vwi I� > I p. N 266 S O 549 < 4 NilSt 268 St 1 Q D I SSE 2`69�5't % — �9� x 269 PI n Inn ; SE 270 PI of st SS270 sf 7p7 270 st - am - `r (' E 270 SI W I m y g 82 = L0 r I f SEf272 St' N SE 271 St Nm L, w 171 I _ 272 PI w SE 2]2 PI E Q SE 272 PI Ur TI N I Q E 2]3 y V 1 �Ist < E - a ^ SE 273 PI 276 CI y N 214 Sf 5�2175�- -_-- = SE274WY f Q z]55 f f va: 75 SI S277St -- ;/�\�\ �550 sEz7s5 a$<) \' SE 27]St ¢�' N277 S` SE 276 Q p7 0 I �� T I I SE 277R SE 279 St �/ -- - --- r -----------�. SE 280 St- - ---�. SE281 St y —I Q Q :\ C\E ` 1 W ¢ SE 282 St I=\= ass\ Q ' i � Q 2835t Q SE 284 St SE286St SE 286 St 4 • Q Q ,� SE 287 St N SE 288 St 40 S[NE Q 266 PI\ SE 289 St ` W Q SE 290 st SE 290 PI z ; SE 290 PI `'2 ) 37 St NE— T 9 SE 295 St _ 2023 Paint Line Refresh and Curb Painting i 500 1,000 1,500 2,OFt Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 14 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 SE 247 PI 188 P O o 246PI N Q SE246Ct PAGE 9 UP y69 5} 248 PI Q N Q SE 249 y} J 249 PI W h - �' \ c 249 q w a ��'"""''' r ry iE 250 St �N Q N yL0 cl - t w 187 /� F 1 z— a xsB et slsa SE 25,/S1 � PI SE F 257 \ 1 S zst% m h1 Q SE 251 PI o n 252 St z51.P1 2p� (V SE 251 P, \ 1\ -t! 251 PI 252 PI 7 y 252% w 252 PI 1y c- SE 252 PI SE 252 St 187 SE 252 St ��l \\ \ I ! W$� 253% m 253 St S 253 St W W n h 252 F 253% 8E 259 PI �7 253 Ct 253�25a st m z54 st w d1 rn ?� SE 254 PI 2S1% N SE 254 PI 514 '!< $ `8f 253 PI Q 254 PI tPm _2s5 st x5^- ' 186 a 6 255 PI ; 11356 237 255.BI se z5s sT N w 256% 256 St R 255 PI 195 N f255 P1� N 255 PI N 25 PI 258 PI m N 257 S1 $E 257 SI 256 PI 25)3t 'xr�6 PI 33S 258 PI 15511 Q3 St s a' 259-PI - 3S9 E 256 Ct`I a dz6% F H 52225593 184 sE2Ct N; 2)% & 253 w 257 27 SE 257 PI PI 25512 Sr 258 St za EzSt 291 �P' 255 1 59 St 25931 S- It y 5P s 59P PI S 51 SE 260 PI647 a , 280 St E 2 Ln 8 P PI I < 3 SE 260 St St 87 m 51 Ci 26 5Q9 SE 261 St 1 5 '$ 548 N e C 2 508 m261 PI 261 St �N 5ozs1 SE 264 St 83 \ N x6xc� zs2 cl - v F m ¢ t o ¢ 8 72g 183 sE262s1 ¢ y 262 PI 9 7' N 4 `M 846 26451 z6z P1 N m2635t SE 2G 'L SE 264 PI 264 Sf 2635 5O7 SE 284 St uJ '263 P < ¢ S S 265 St � •� ^Q 506 265 C! a fi55 182 PI $E 2 65 PI . 264 F SE 264 �z�t 2 264 PI 265 St `= w266 St 506 265 PI w ¢ s 3E268 n St SE 266 St -f'2-6-6�P 266 SI a 7 (n 16a I \ a M 266$t c 9 Q 267 PI `268 St I , 515 e zss PI Ip 549 < ¢ 268 St 288 St j 267 PI ` St 268 at SE 268 St 4 �1 8E 9�St D f 7- 270 St 9y) zws H 181 X SE270 at lr� d 270 m r, P 545 - a - SE 270$I 3F 270 St O n M ? z ry 2jos 249 I n,st MSE za t0 r - SE 271 w Nm m t a 516 .i( �g 250 v�i - H 6 m oi0i N m w N 8 272 St 27.25t N N SE 271 PI N '^ LU V TI ]3 rn 8E 272 PI S � ? 4 SE 272 PI �.7z PI 336 2]38t S Q i]4 Ct'7 y N 27I St SE 273 PI / �,( ry135� ¢ 18O SE 273 SI 273 Ct o a ' W a' a' f a m SE 274 se SE 274 Y _ 273 w 274 St a� \ \ `� '�+ SE 274 71A5 h ¢ 274% 534 .I 275 51 c Q ry 274 PI - 7 N ryz^SyP� i \�n 57 m 6t 275 PI-SS SE 276 St 179 ¢ S2276 P1 278 St 275 PI E v 277St 276 PI � 63 _ 178 S[ PI t a _ N _ / SE 277 R sE 277 st PI H _ , s TT\ I 518 sE 276 P zn PI 276 aN "' SE 27e St F�esy 536sE 276 9 --- ,y� 6 p '0r NI N y 279 CA _ vgq 1-76 SE 279 P1 tW ----•-----. sE 280 St I' - y --- 519 sE 280 St s 175 se zso St _ `A7st SE 280 ct 26a PI a 537 SE281 St zwp w v $ y 520 I W < SE 282 St I 0 - - M SE 282 St �oe2g2 ¢ 281 PI - —SE 2828[m h IE� ¢ a' •ems+ �538 sE zaz PI 283 St SE 282 St SE 284 St W SE 284 St SE 283 q SE 284 St Q SE 285 St M 539 LU SE 286 SI SE 286 St SE 286 PI 174 W SE 265% � w w w 540 SE 287 St N Q y rn SE266p a Q N�2.St 66 SE 288 St 541 266 PI\ SE 288 PI SE 289 S1 SE 288 St SE 290$f SE 290 PI �� SE 2819 SE 290 PI ybry xsl 6ry l e 3E!295 S1 I PAGE 17 DOWN 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,0Ft Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING NT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T 15 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 247 PI �Z{a9�s 24'8 �P1 I \ \ \I W 187 4 SE25oS SE 257 SE 251R 251 PI\\S/ \ \ I I' Q ♦� SE251St SE 251 S1\ I / • 25 \ , � S 187 ir W u SE 25251 C 252 PI \\ I \ 252 P t/ •�•��••�•! _ zs3s1 z3 \\\ter / 504 ! a 252PI � _ _ I a f a Pl 253 PI 4 254 PI 254 SB L�� Z� /) w1 'Q 2548 y3 186 185 o f i I a zssPl , zssPl s� Q N ,g 255 PIS N B PIPI,, 257 St 2�PI 335 zse PI SE 256 St .4;la —523 \\ 184 BE.1 CI y 25]Ct�Q Q ' I SE 257 PI — '--St SE 258 S1 SE 258 q 258 SI ?�% ' 258 PI ' i N 255 25 3p q w 59 PI I — SE 260 Ln is1.81 � SE 260 St SE 260 St m 261 St �Nm 5E 261 St \` 0 � zst PI SE 261 S[ �-E 263 PI183A262 St 26 2IS46�PISE 263 StE3 PI SE 263 SI 182 26M1 St SE 2s4 Sf26g Sr SE 264 St ���� r SE 264 St 264 P1 265 St \ SE 264 PI SE 264 St 16631 2fi6 Sr SER6651 �-' v 265 Cty a m N ' Q W 266 St� r rn zss PI y s 525 a ' 2fi6 S m m 267 PI ' G 1U� 268 sl 3E 288 St s 267 St SE N O ^D^ 181 `W' h _ G) a 278 st m$ F$2� `, 269 St w a 270 St m M m �5 U1 f 9 S aMj b� 1 N0 I a rn' N n1 sr S SE 2, 270 Pr a r' 250 - ,� 6 m S N m .-. N � N SE 271 PI- 'O N 2�P N ' L� io -n v 336 516 & 338 `�Kent ....I...Rd SE 273 St III z7a sr a 6 8 , 180 2i6G m W 273 Ct 527 SE 273 PI y SE 274 St < w dj SE 274 St 273 St 4 p5 N SF 2 274 PI Y SE 27,1 /4 St 21 S Q + 3} w a' n 2� 534 < a �274 Ln 'St a' 27=PI \a SE 275 PI o 179 275 PI BSI SE 275 PI 5I 7 G. 276 St 535 276 PI v SE 276 PI BE z7s wy 6 PI `� t�9 1 0 e 178 2 532 n 147 a o 1 529 zn Pl ' G m 'c+ SE 278 St SFze� 536EzraSlc < 278 St �' tP �P a' SE 278 St 77 278 PI G 2l9 176 SE 27s PI W 3 SE 278 PI 279 PI 175 SE 280 5t t530 f zap Pt SE 286 Ct 280 PI a 537 .- v�279 PI _ u SE280 St SF279 PI - za1 st v 5312 ♦♦ 1 ma aMi 2a1 PI mi& 531 ..� •♦`• sE 282 st '° g538 sE zaz PI �ti°° •� SE 282 St _ - w SE 282 PI 5 ♦♦ , W e � i `♦ � QSE 283p SE 284 St 4 '•♦, ♦� �, t M 539 ,� n 174 SE 211P1 •• ♦♦�• N F2t Q � y a ¢ t �.. b.' • `'0 07 SE 287 Sb ♦�• 541 /Ri 6aQ' a SE 288 St sEzeast 2885 cFOr� lr Q aka ti�°�' 290 St --� I SE 291 PI SE,292 St 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2�000 iFt Legend Ft � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING ^'-NT AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) 16 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 o Ze6P Pze6--r= w"` 'I Ge��� PAGE 15 UP os Zss 7 St S lL 266 PI SE 266 St 288 P 2e6 sl a' zee Ct ¢> M 266 St $ > N 287 PI 288 St I I 515 2 PI 1.1 J 266 PI 8•Sf ¢ - p 549 Q 268 St 266 SL Suers N n m 67 "m 2w St > f�St 268 St SE 268 St g 545 a' ¢ 553 �sE s2 s°gst w 7 288% SE 270 PI SEao st 'pTtr) 181 270 St a r7 nn a a a, S 82249 I z7f PI '° wm 1 516 250 v�i - a m S 272 St SE 271 St W - ,� 3 N E 272 PI w > SE 272 PI 272 s_t 272•St,< Q S 273 SE 272 PI s ¢ 272 PI 336 IL S J/'st Q S a Il Q Q a N SE 273 St 273 SI S SE 273 PI c Jzl4'CI" y 274 St SE 273 PI / �•f �35� 1$0 2T \ \ yt3U SE 274 SL 273 271 Sti SE 274 WY ¢ ¢ z7s St T4 St _ °� \ \ SE 274 r_--______ 275 SI $ Q NI N� \'274 PI ^ ---550 y SE 276 St f 577P\--r-\--�- SE 2]5 S Ct N SE 276 276 PI 179 Q 275 PI SE 277 277 St n SE 276 PI o 276 St 216st S N � m n� `��° !r znct. s rp�178 Q i SE 277 R 9 - SE 277 PI 277 PI - 1 ¢ SE 278 St SE 279 St l I --1 t 9 518 sE 27s% N �n day 1 1�7 2aq sE z7s PI 1.76 I �� —-—-—-_ 5E 2880 SI 519 SE 280 St _ 175 SE 280 St X —st SE 280 CA 280 iSE 281 St 520 YG - a' z6¢ w SE 282 St I SE 282 St ^28= ^ za PI a ¢ 2 ¢' SE 282 SI � 283 St 4 BSI I S SE 284 St 10 SE 284 St > SE 286 St N M LU SE 288 St SE 236 St SE 286 PI 174 W w � SE 287 SI a' m ' SE 288 St _M m zea al� SE 288 St� $ SE 289 St � \` sE 288 PI Q SE 290 St SE 290 PI r7 SE 290 PI SE 29, SE 290 PI M1 _ �9�ti ZSl e SE 295 SI SE 295 St SE2�)y� j 3 - SE 296 Wy W SE 29851 co l _ a 29]CI LLl SE 298 PI �e N 1 SE 299 St Q SE 299 PI W N OI I/] I SE 300 Wy > ^. \ SE 301 S[ t\ SE 301 PII \ _ SE.2 SI A a 303 C( W2 PIN y SE 304 St \ & w _ ;i a SE 304 St i 2023 Paint Line Refresh and Curb Painting i 50U 1,000 1,500 2,QFt Legend PAINT LINE REFRESH CURB PAINTING _ COORDINATE PAINTING WITH PAVING 123 Map Key(see Appendix Afor details) w^s NT TT AND ROAD ACTIVITIES BRIDGES-17 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 \\ 1 ` 1 ., 1 1lil 1 /f � 1 r �I SE 264 St SE 264 St �t — ..................................... SE 265 St SFZ66S h� N 2s'ti� SE KEN.-KANGL•EyRO zs� � Im `gY RD _ 269 St w N,�'PNG • Q 271�PI03 L_...._.._.._.._.._.._.._.._.._.._.._.._.._ I to � ,♦� N 1 Z �..�'. ♦••�..�..1 Q • o ♦ I 1 SE 276 St 0 ♦` 1 ■ N. I n D 1 9E�S, I 1 SE 286 St 1>t 1 ........ 1 v 2023 Paint Line Refresh and Curb Painting 0 500 1,000 1,500 2,OFt Legend PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING KENT TT AND ROAD ACTIVITIES 123 Map Key(see Appendix Afor details) °T CLARK SPRINGS-18 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 321 S 228 St 322 ' r> "rNi 484 rNi In I 266 3401= s 22A o I I z 5843 a I 264 I a S 231 St I L C I I Z 2 st 600 rn Z Q a' a s, m I Q Novak Ln 485 23 3 3 St 00 �I I �¢' I to a I co n I S 234 St I Q > I I rn D r I 181 CL I m '36 St Concord S 236 PI I St W Cole St 236 PI S 235 PI 237 St S�0 Z Z oo�` Cis N W J a O > > Q238 St 38 PI N to ,Sg St a �,va y 444 tote 3a9 co l7 W Morton St `�3" `� r N J'P/ N S 238 PI on 257 / z W Cloudy St I "r Z Z a z 3l'mO r N Q S 239 St d 1 > George;St a Q m _ 601 o S 239 PI N E M O 443 " v o aJ = I JamesPl a James St `�' 240 d z 392 E E Gt v W Cn Kent St.St Cedar St Z N co 10 Z W Sam St I N Z a oe I James n W Jamea Ln ¢ z Ramsay ¢ z Pioneer St o n 3 a a IL Iz FLm L O Mcmillan St O N E Temperance St 'f8 N rc 10 N Z C - ro N N m O N 00 3 Z W Smlth St N E Smith sto N N s o c ¢ T- 390 N � E Smith St ^ 446 I T 366 430 421 ^o N $ �_`°, Z 410 e� z I to 208 I a' W Harrison St a> o a St T E I N 431 42; 447 `�' W Meeker Sf'' 207 '409� ao W Ni-z r_o_38�4�0 ' N sr�A< 1v389 365 432 cow - 3 388 s423y24 0 o5w �N wen. o� 382 a �y y Puo. > 404 �_. 372a $64 433 s' Ke Tacomast f�5 N� C a ¢ L W Tititsl� E 434 -pa t S 248 PI w y 403 N T mo 363 WY E Dean Cherry Hill i cc Saar a378 M S 249 St z �^ 0j3 , m y AZy C4 6D ean St ac� E Maclyn St �N S 2-P\ SR 516 _ 380 370 c' a t St W Willis St 377 WII W Sf W M M �_ a > ¢ E Guiberson St —__ U) N am) by a a Seattle St a s I t t I 379 385 I a m ,� N m Q' D ESeattle St v O 6� 341 I w•Grow St m ¢> Russell St g Y 0 > Rachael PI I S 251'PI / ■ 271 I Q 8 _� ctearview a a > E Chicago St I I • ' y j r � > o m` S 253 St 1 r � Jp W1 terman St to a o` Chicago St w E Laurel St 1 t a a Morton SF I > C S 253 PI II; ' 267 Cl) E Hemlock S[ m I > � `r' .; Overlook St 375 ¢ I I Carter St U C 1 ■ I Carter PI w N 1 ■ ' I 369 —Marion-St E Filbert S 2552StI ■ I - U) t�l / 40� ' I Q rn E Walnut: � � • I N in a' w *94-r R85, 4 I c 34p I \I a U r 258 I i u CID a n PI w S 261 St �41 68� —" I/ `�` \ ■ S 262 St S 262 St 267 St Alder L•n 339 367,4 2023 Paint Line Refresh and Curb Painting ° 500 ''°°° 11S00 Ft Legend � PAINT LINE REFRESH CURB PAINTING COORDINATE PAINTING WITH PAVING ^'-NT AND ROAD ACTIVITIES 123 Map Key(see Appendix A for details) DOWNTOWN-19 OF 19 Produced by Joseph Araucto P:\Public\Operations\Streets\Pavement Marking Projects\2023 Projects\2023 Paint and RPM\Paint and RPM Projects 2023.aprx Printed:February 2023 1 ' OMAN CL �' mom,ME L , HE sm was Wmr �■ ��® � � �!� Illy,; �L, � _ � � _. '�,�, �-�'� . ; � ® ��r'E� ` ■ ,� � �a III APPENDIX B 2o23 as �.>na..m.lm wa..ns.. .9.oi., l.p 11«1 rv.m, ten..o. a v.ga.� 'llp g rm.., �v.�iw.�� .n v�,Yg..i- s �am .w. S. -S. 2 S196 ST own S S,IEg.-SR te1IW VNIky-y 1,2 188r 9 S., 90 Szos tm 3 S 196 sr SP1811wvaay rv.v-fz.a A..s z P.11.ryv.l RPM 11— a S 196 sr 72.d A,.s swn A..s z 31so 13go uzz o,.,ryv.l vvm rm.. 5 $198 ST lOhA S-E Vdl Hwy 2 1.1 300 2320 S. 14 Avs 19e si-s 1ws1 1 sas 23 15 S1%Sr 519.51-wM-S 1.2 2820 11 e.AV s19.si-s—E, 1 1115 1. S 190 sr 66A.s w..ry Iu Hry z 31 1g S 190 sr WW-. ry y-rz A..s z lggg M .a.. i..u.... ®w.e H, 20 BUS Sr al v.11ey H"12 Av.S 2 960 u 1.AV BE E232 St BE fee St e 21. 355 23 SENSON Rry BE Ef23 St BE f2.St S 25 1.AV BE BE 222 St BE fzo al a — - 2S AVSE BE zo3 St BE zo.St 3 t295 290 0 5. 3o 1.AV BE BE zoo St BE 1.St 3 610 210 355 31 AvsE BE 1%SI-SE 192 St 3 .5 lo. 32 33 BE 232Sr -A sE-eml.ndd— a 75 v ct'Y.EIIIBN VAN u.lemanr x BE—sr A.BE 105A BE a 3g v in.re mm.rere�emb.,.q.m•..m pyew 3r sE—Sr 1.-sE-105-sE a 1. v ctlNI11BN w.u.Mman rcpi.cemml--t 39 BE f2.Sr 1.-sE-105-sE a 90 ao BE 222 aL -sE-110-sE a 110 g vm.nu.loa.au...lse..i.w.�..bm 9v,.i.-.u�2gz3 v,.i.-.u�2gz3 v.mi.m RPM-1 im.i..ma,im.m rvm...a.. znv_.33.1a P. APPENDIX B zo23 Pe ms�6•xm.m Gay.na so-«1Neme it I.L.�ne"oe a " v9ae� 6 r.Im. �vliw.l� .n P;n• ".saxa s •x�"• aim semi c Nao w. vmxe 7 SE 2a1 ST Aye SE-IDS PI SE 3 1t0 47 SE a6 1.AV SE IF2ao St SE 236 PI a 1130 a5 5o111AVSE E2a0 St SE 232 Si a doto 11 1 llAV SE E2a0 SI-w.x-.IIn. a .5 15 53 SE tab ST 1.Aye 3E-116 Aye SE 3,4 z1o5 SSE SO d685 56 SE 1.ST 116A SE-1za Aye$E a 2d3o 5— El 1.AV Ss SE206 Si SE 209 Si a 315 as PS.—r6v.1 RPM li... eo Szlz Sr IS ASS-12-S 2 sas —5 .5 - 13a1 IV,A" RPM I- 65 Szlz S* ea As s--Ramae 2 630 3 — 11 S. leas zoo 66 S 212 sr zRema.-16z F. 191 PIS 2,3 6e5 1 n ua 13 SE Zoe ST 116A SE-1za Aye$E a 705 1 22 .35 SE Ave -.si city Mmlb R—Crcek Trell �5 sx6 Sr »e� a 16xa lw 296a sxaaciyumxsa"x:.y �6lIVISE SE Zoe St-SE 210 PI a 415 IVIwer RPM In. 76 SE 22a ST MI Ave SE-1zi Aye$E a z51s 62 1 lRAV SE 114A SE-SE2 SI 14,15 17 1660 66 GREEN RIVER RNS City Llmib-Cly Llmlb td 1n5 3550 e] 116AV SE SE516(--K,.y RUMS SE 259 PI 15 1— ze a3 1 1SAV SE SE 2a6 St SE 2aa St a 1z65 zero as 1 1SAV SE $E 2a0 Si-SE 236$I a 7. dos 4. 9B1 1SAV SE $E 236 Si-SE 236$I a 6ao 50 1315 AfthIngres-1— eke 2.14 P.-bLc\OPeraums\StreNe�P t aPrgx6�SMl23 Prgec6�1023 Pai"1 a"tl RPM 1 Llne LaaOm Liel SM N.m.Ne. zYU/z023 3 .18 PM APPENDIX B zpzs Pa m.mx.xm.lm ca."xn.. so-«1x.m. win•"o. a " v.9.j.� llp n Pei... �v.�ld iws.P,I. .n Emy. ��i".Sara E •x�"• ee�i c xao w vmx. it SAV SE E—SI-SE z33 PI 9 3. TIS 71all S - 1 1SAV SE 1EISS PI-SEe PI 9 1. nos tw 116AV SE E—PI-SE.5 St 9 — 1- - 1 1SAV SE 1Ezzs St SE 119 PI 9 Bps SSS — IDT 1 1SAV SE 1E118 PI-SE 116 PI 9 415 11 — tto SE ST 1.Aix SE-too Aye SE S — 111 SE—Sr 105A SE 1wA SE a 711 7. xm«c.I d -ii..s<.SE zaa Sl (Iw SE).xemx 113 1.AV SE SE zas Pl-SE zas Pl S - 114 1.AV SE SE zas Pl-SE 2aa Ct S .5 118 1.AV SE SE zap St zas St S —5 2530 12t 1.AV SE Sz31 St SE 19 PI S az0 STB 123 1.AV SE SE 22 lE 1151 S .5 Sep 1. 1.AV SE SE—SI-SE—PI S 13p 175 128 1.AV SE SE.5 PI-SE—SI S .5 Sp0 129 1.AV SE S10 PI-SE zzo St S Ss 9s 131 SE zaa ST 1.Aix SE-tot PI SE S 1A — 1. SE zaa ST 1PI SE-toe Aux SE S 1A Se3e1a P.m�xuolca.raim.lso-.a.wme.em 9 Pryern�m33 Pryers 23 Palm am 11—L'in.�a.tim gut am em...a.. znazoz3 3 .1B PM APPENDIX B zoz3 Pa m.ma..m.tm oa..nn.. so-« . S Pei..,11p �v.�iId ws.P,�. .n Emy. �i..s �am Ewex.� o� E�.t. � '—I— IN.. R.w .w. x. -I. to se za.sr Aix SE-tosA 1 S tzao zazo 137 SE 1. SE za.Sr 1 o-sE-ttsAix SE S .1 toss tdo SE za.Sr 114RSE-116 Aux SE S 350 - 2t tdt AVS E—SI-S-Pi S 380 Hs tds Avs 2I.PI-S z.z St S rW — 146 AV 1EMSt-S-St S t28o — US SI AV zaz St-S 2.1 St S — Sos tds AV S&t St-SE Al$t S zss sts tm S zsz sr SIR 516(KenPK.rgi.y 1—)-se Pis s zm tso .Avs $R 516(Km1-N. ,,I—)-SE gas St S Sxs 21 6lo �s - SzaS sr —..-s a 1- 90 2235 ]SS v k— ma..a k,,rep.irxwk. 1Sr SE 20 Sr 1 top SE-tts Ave SE S. tsso Shoo ass do SE 20 Sr 1 la-SE-tzo Aye SE s Soo taco trt SE 20 Sr M SE-tzd Aye$E s tzss zsto tis l.AVSE SE2..-SE20. td,a -o Saoo trs lS2AVSE SE-1-SE—Pi 15.1 tss .20 tis lS2AVSE $En St-SE nS St 15.1 .1 zzss t79 lS2AVSE SE—SI-SE—St 15.1 so tso tto tw 132.ss SEna sr sR sts(--K. .yRma( ts,t aao eta Se.etd P.m�suotoa.�im.tso-.a.wme.em gPr.po 23 Pr.prn�zazs Palm am Ratmram L,..yaotim L.am em...a.. zn .S 3 .ts P. APPENDIX B zpzs as .,a anx axmam oaanxna. so-« a w�non oa a re . my.�wa�, s vasae) v. d n �axme e�x.`,Nna n ioId � iw a ov�mxe �m e�n�s tat zAv se ESte(1-1K Kim R-)SE zss Si s,, tnp z zw sa zzw me,type,RPM ones ,ez AVSE E—St-SE—al ,s — 1— w RPM ones ,es 1.AVSE IE—SI-SE 266 St ,s a5o , 6a6 .5 resrA..I— ,ST 1.AV SE E2.PI-SE—St ,Sx ,S5 1.5 188 AVSE IE2,R St SE za6 St S .5 ,Eo MAVSE IEzaa St SE 2ao St S S6o 360 1.5 tat 132.sE SE—sr SE zx Pi a tses twa r kmmaam ck, K,m pqx 1E3 AVSE E266 St SE 2.St S z66 6zo ,Es lS2AVSE IE266 St SE 261 war S 6zo — ,xe lS2AVSE SE 261 war-SE zap$l S 166 — 1. lS2AVSE SE zee El SEzza St S no 1T 2dEo E,—chevron nd lnclu0.N zo, lS2AVSE SE 216 St SE 211 war S,a 260 ,po — zpz SE3,3 ST SE3,C war-SE noR a xw spw — lS2AVSE SE 210 St SE 206$, a m W6 ,T „zs „p sod lS2AVSE SE zo6 St SE Lgrerwngs war • 166 - Sop ,o. zps SEIAKE vomrvcs 132—sE Ems,cy umm a sss 1310 zos IN—RIPON$T m Mn N aT A N i,,E 4W zos IN m-ST an -N w® Mn-N T,,E aa6 ztp w sm-sr S4 A N wasn'ln"A N 11,at uap ztt IN MEEKER ST SR 11e(Ke1-manes R.)-le RE 6 116 So 810 zt2 IN MEEKER ST re RE-...,RE 6 zas 6660 ,Eds zu W MEEKER ST Aws wsnxpon A.nry 6,i,t zsop v .rem aam—oinP— ge5d,d P.mnxus,Oae,ai�sso-eMswaemeni pPrga. 23 Pryenn�pzs Palm am RPM—1 Fine�aatim gut am Nmes.Ns. znazpzs s.,SPm APPENDIX B zoz3 LWd, .n..nd..m.lm GavN6a so-«1 N.me L-1.n De a n a ldnygl� Dv.iw., s xtl a ° eeMi eev.9.� n m. ld yw e „w . e -I. na MEEKER ST Awry Ral�..a AwN 7,19 1m v Irerernm G.�azdn.Pnw.a 222 MEEKER ST Ave N-S Kennpeck Aux 7,19 az0 zzS SMITH ST .maI A..N s1.M A..ry 7,12 1m 0�.,Tyv.1 RPM ran.. 2A SMITH ST A..N 3..dn A..N 7,12 — Ell—Tyv.1 RPM ran.. z3o ESMITHST -N-Ec..ya,D, T,19 lsoo Tao 1.1,4. RPM In, z31 E DAH ON DR E smdn id S.mmdArn ry 7,8,19 — Ell—Tyv.1 RPM ran.. - E—YON OR tdzs P.11 w.r RPM IIne. z33 ECANYON OR Aye S-101-EE 14,5 6200 114 w.r RPM IIne. SE 2711 z35 SR 516 AND SE 256 ST HTERSECTON 14,a 963 - SE 2.ST 131A sE-1dz Aye ME t6 4 H rAin1— .9 ER519 WEST LEG OF INTERSECTION WITH 132 AVE 151 2 z50 SE KENT KANGLEY RO 131A sE-13T Aye ME 15.1 .5 115 tze - EE KENT KANGLEY RO A sE-15z Wq SE 16 9T0 1360 i 32 253 SEKENT KANGLEY RD HUMy SE-16S PI SE 16 1. 96 173 255 S236 sT Aye S-wnl end P,T,t .5 z5T WASHINGTONAVN w m—st-.-s 7,19 170 435 156 111 IT -P-711I T PO 259 W.LAMES ST .Li."Aro N-e.AWs 6,7,1 28&1 Y c ire vnd,cilypmna prq.M zet IN—ES ET Lmce.Me E.-H—P.N.M En0eice 6 ills 1- Y C.adirelevdPs IkP�N'%d Do rola.Inl Pl.elblinee. z. 3.14 szze si-.wm enaarne. T 1- z6T AWrEVRDs . tW-P-.wmenda6ne. 13.7.19 zso 13zo WiP —ER RDs W Meeke,si-n-end a rne. 6 310 sszo ae1dtd Pw.5u.10p.ra�.n.lse.M.w..<nbni 9P,.p.0 23 P,.i-0z3 P..d RPM 1 I...LOoma,Lin.m N—A.. znaz0z3 3.1SPM APPENDIX B 2625 P>r ma and axmalm Gaa.xfia II xr i. . ;�Ya.wnlL. s ldso-1Nan. G. a . vga=) 'llp ,91 I.w x g = EZx.I"• = e' Nao Md. Md. vmxa zn szle sT Ass-66 AKs 1,z 11so — S10 ST Ass-12-S T afio xu — S S 216 SI-S 212 St 2 1235 sm 236 Avs S 212 SI-S 20d St 2 -1 afix0 261 FRAGER RNS S 212 SI-S 20d St 1 2865 28d mma Gr-Rrvemew BlMS 66 3d5 288 k-d-BLV➢S 9PIS-41 PIS 5 1 1130 263 -RVI-B—S PIS-S21R St 5,d 2000 M kE 1—BLV➢s S212 SI-521d St 1 555 1150 2. S2165T I---BIM S-d2 AueS 1 1S5 2. S2166T Ircrvlcv BlM S-FDS Ad 1 675 675 2. FRAGER RNS S216 SI--and dli..a 6.1 716 1- .2 S2d3 ST eAb RE-43-3 12,6 S 1220 2aaa0 303 RLISS—RDR S226 SI-5212 St 6,1 600 1200 305 S2265T Sd Aye S-ea AwS 6 2.5 S06 IA—IF—D IF S226 SI-S 232 PI 6 t6 395 1. Se7dtd P.NubLc\Operaume\sbede�Pamiml 9Prgx6.23 Prgx6 23 PSId RPM1 1 Llna Laatim Lief aM Ndm.dea 3YU/3033 3 .16 PM APPENDIX B zoz3 Pa ms>ne>xmN.a OuvNlla so-«1N.w. o r>Ilor, �vlld iw.l� .x v,Yg>.nl�i.>saxa swex.� emu" ennne w vmx. 3w 7-E.1-w na Pl S-w.e>ie>6.E 6 3630 313 ETE—oR M�IS,Rd-3a ASS s,6 zoeo slrgi.:am yaiw,r�reen s.n.Ia.mnarnsab aianxr 316 Szze S* Ayes-6e A..s 6.7 316 236o sz 3zo Avs A.e N-- z SAM 1 3zo A,Avs A.e N-eaAveS z 1 wer.nnleT,,l I RPM>uN�ns 321 Avs S zze si szza sr 7 P.1ws-17y 1RPM r,na. 3z2 lS AV A la SI-s zlz St 7,2 3000 .5 1— 3z3 Sz13 ST Ayes-se PiS 7 — v cawk—vnu Oly a.InS a,Se 3z1 Szze 3T SSAyes-no wwS R,-IW—) z ax 13ao Sze AV S-SI-s 1.Si z 260 65n n Sze AV S1ee SI-s fez St z 300 330 S 1e1 sr W vau.z Ilk,-S 1e0s z seo 333 PA AV eaA.es-ne Ares 2,3 3nao 1 RK 33n 1.AV SE SE 2.St-1.Aye$E 1S znoo n000 115 — 1 S5 AV SE SR 516(xenl-K ,,Rwa)-SE zrz sl 11 En 337 SEno PL SIR516(KkIt-rgis Rsa)--enda1 . 16 ss 33e 1.1SE SR 516(Kent-K.rgley Rwa)-SE—PI 16 125 34 W AV S 262 s-Fr Rd S,'S 27. -o .1 WASHINGTON AV —Ra-S-sl 13,7.R — z000 3xs W JAMES sr a.N."AS N-Rac Hem CMu 7,1E 3Se3 P.1—1Trs.1 RPM.Na tins .1 IN—ES ST ..—.—S-d-N 7,1S 7. 1 no m PI,11 wet 7,Pl 1 RPM>klp In. - IN—ES ST 4 Aye N-Oe 1-N 7,19 2a a rzo aao Y PNM-7-1 RPM.kpiIn. Se 1114 P.wwu.lGa.���.1Sn.M.wa.<nr.m gPrgsre 23 Prgsre�zaz3 Painlam RPM-1 inn.io.aaa,iHt am N—A.. znazoz3 3 .1a vM APPENDIX B 2o23 Pa m>md>bm>Im Ma>.nn» so-«I Nan,> v9a>) n r>Ilor,llpId �I.— .n Pr>y, T.>s SI-Skiam Ewex.> emu" E.' wre> >w. I. -I. 66 381 CENTRAL AVS T31u So-E—S1 3,19 1. 390 e80 So 3ez szee sT IreIA—t—S 13 zedo 1e5 See szee$T IreIA--IJPRRo­ 13 zoo ldoo 389 AVS S z59 s1-W WIIIIa Si I 3,1,1 P 2359 — Y Cwdln>R VAN MuIo Zm>Pq.t 3n1 AV WSea Si.W IIW>St 3,19 .5 3zd 1 AV w—sl-.mb and.— 7,19 1. 3n IAVS w wulq sl-w s.sl 7.19 21R Sze IAVS W—St-E T.I.sl 7,19 3eo 3eo2 AV w wulq sl-w s.sl 7,19 zao 3e3 2 AV weaves.-w M>m . 7,19 175 385 RIDGES AVs ERussgl sl-E WIIII>St 3,19 doo — RAI—AVS WIII—E—st 3,19 255 38e RAI—AVS E It.St-EGwre Si 3,19 355 39z RAI—AVN I—t-E—St 3,19 .5 Ptllaer RPM a 3. 1—T Aye S-2-S 3,19 2. Soo SSS WIWsST 2 Aye S-1-S 3,19 2eo z2o ge1114 P.-bLc\Oaeraeme\BbeNalPamiml .Prgx6.23 Prgx612823 P-1 antl RPM 1 Llna Laatim Lief aM Nam.dea 1YtN3p33 3.18 PM APPENDIX B zo23� mama a.matm.am99aa .9.oi.m, so-«t Nan,a I It.L.mn..oa a ' va9aja� II rel..,ld �vliwsaal� .n E""y'i' `^s °'„^ Ewex.� `I^ E .mi Cvvr°w,�nAB� Narea w -S. P. 399 W—ST A.�s--S 3,19 zso — IN A $T —s-SA.aS 7.19 zdo 4. 1.S Tas St-W G—St 7,19 ass ,H5 IN—E ST -S-2-S 7,19 280 401 IN—E ST -S-5-S 3,19 260 — 6AVN W Hk—St-w—Si 3,19 — 411 W HARRISON ST 2-4— 7,IS — E-US$T Mm RE S-KmreEmk-S T,19 4. 415 E nTus ST m.abmk A.S-cmirel AK 7,19 ns 417 E nTUS ST aSma A..s IA..s 7,19 30 too v m G—zm.P14..i 418 IN TITUS ST -S-2-S 3,19 250 - KIENNEBECKAVN E—SI-E—St 3,19 2. d23 KIENNEBECKAVS Ek—,St-EGa.esl 3,19 180 dzd KIENNEBECKAVS E—SI-E Tima Si 3,19 125 d28 E WAR.ST m..be.k A.N-SmRAveN 3,19 335 az9 STATEAVN Imeer Sl-E 3—Pt 3,19 4. 431 STATEAVN E—SI-E 1A—SI 3,19 235 4. STATEAVS Ek—,St-EGa.esl 3,19 1. 433 STATEAlE Gay.sl ETW.81 7,19 1&i na Type I RPM II... 1114 P.-bL.\OP.raum—t 9Prg-23 Prq-033 P.I.t..RP—.Lln.La.Om U.A,A!N—.d.. 3YU.3 3.18PM APPENDIX B z9zs Pa one..x.xmatm GavNsa .. ,...9m..,teMt .9.oi.w, so-«INe.e L.�n..De a • v.9ej.� 9 I=Id D-v.ilwa. .n E;,;Yg..niDi..s wextl e�,„0.. Du� eMeui cane w vmx. it ass Ss-sr 1.MA�s-t Ares is ras use v coo,nmMernu Lalrrza.e F�,t ass zs9 sr AroS sAr.S is — 1w9 v i..M ram Gr�.lm..v.ya<1 S 2% — EGEORGE ST N-SteleA N 7,19 2a0 aas WOODFORD AV F—St-E Fkg,st 7,19 3rs — wOOOFORD AVN EG—sl-mN mE✓— 7,19 ns HS ESIMITHST E OSR,D,-PAatl ArnN 7,19 335 — aas ESMITHST A—Aye N-S NO$1 7.8 20W 4140 .7 LVOfID AV E CSR,D,-E-Uh& r — a.s S1.FT so Ayes-wear e.E aiirea 2 ills ast Avs 1196$l-s 1%s1 z 4000 1. azs we,r.IMe MLw In. aszW AV I tso$l-s tee$t z sus .1 ass WAVS Stee sl-s tea St z ess tzas zs ass WAVS Sno s1-s ae9 St z 1s00 aye as00 FT Ayes-weMe.Edmaa 2 so ass al AV s2oo$I-s 1%st z ats ss ast S1.FT z t25s zw aw s1w FT e.x d9re. 2 ties ass Rs AV sew Pi-szoz$I s ezo two aer AVs Ssos st-Taxa Ras s rats zero 1Wta P.m.xuelsa.�.e...1s..M.w..< t 9P,geM. 23 P,qx 023 PS.t Sm Rvnr 1 L..L.omm L.N..x Na.AW znaz9zs 3 ate vM APPENDIX B z9z3 Pa n�mx.xmdm MaMmspp so-«t Neon. I I.�nnn o. a n v9ae� II rdI NkbI lre .n En n.s �axa Er�,„an. E�ere a are w vmxe are AVSE z13 st-szw Pl 3 s3s 930 aze 1.1 SE REz13 PI-SE 116$t S.3 Tso v cmdi—.nm cinawln9 pnrpd. dig SE z10 ST 3MSE-tOS PI SE S 5S5 1130 480 SE z10 ST 1.MSE-108 Aux SE a 830 e0 1.1 des 1 zze st-s z35 RI 3,19 1— zeoo de] 1.s S 212 St S20851 2 380 3120 19 Y eMM vnm Cik, vied.Pamurer Type 1 RPM I. Q. 1.s S 206 St S202s 2 235 INS 1 IS Y iremenm cin wnx Mg- - -VS I lo,st-MM1mtl dune, z 1985 1. Y cawxi--cln Wn9 prgpd. x90 1211.SE SE2xe St SE 2Ce St 9 1885 1 IS 2145 PSIma Type I RPM hoes d91 OAV SE Ezdd St-SE—St 9 t 5 lio z090 492 MAV SE SE IQ St SE z30$t 9 1415 lio 1.5 4. SE I.ST 1 1R-SE-1z0 Aye ME 9 1115 1- 49T 1.AV SE SE IQ St-SE IN$1 10 - 499 SE 140 ST M sE-13z Aye ME 9 510 nt 21 3300 500 SE IQ ST Aix SE-1d0 Aye ME 910 tzeo 3 11 IN 4835 wer RPM In. .1 SE2<0 ST m SE 148A 8E 10 W. 50e0 225 Y .remrnm cin Pang Pgxt .I SE zd9 ST SE IQ St-SE zdd St 10 St0 13do Y c—h—w0k On—,Prgpd 505 dAV SE SIR518(Kmt-KergleyRmii-SE 281 Ct 15 535 70 eID PSImo-Type I RPM hose 508 1.AV SE SE zed Ct-sE-st 15 4. 4. 508 1.AV SE SE.3 St-SE.1 ST 15 520 — wer RPM llnpa .9 1.AV SE SE 281 ST-sE 160 PI 15 115 3. wer RPM llnpa 510 1..SE SE280 PI SE 239 St 15 BTO NO ma Typal RPM lines zdtd P.-bl ,0 aumelSo-eMewme t 9 Prgxe4Ml23 Prgeent2023 Paint S.RP—.Llne Laatim Lies aM N—A.. 2YUrz023 3 .18 PM APPENDIX B znz3 Pa .,a aan axmama oaanofiaa .. ,...omaa,mw axs(Ii., o so-«txaa�a it w�noa oa a � vgaja� n llp caner, �v.�iwsaa,�. .n E.rey. �iea s �axa e�•„0"a o� E� � .w�°m xare. mId vmxa a 7 1 d -E EISS PI SEzsfi$t is 260 sty 1 St.SE IR 516(KenFKmgley I—)SE St 1s,1 tsar 155 1111 1RPMiln- 11T lS4AVSE E—St-SE—PI 15,1 ttoo 2230 stS l.AV SE E—PI-SE—PI ts,t 325 to Sao szo l.AV SE IEZSS St-SEz $t 15.17 13oo 333 env SE SEves Inn city L'imire(past SE 380 Sp 15,17 zaaa 33ae sz3 1.AV SE Ezsa Sl-SEMSt 16 ttas — 528 11WYSE IEz6/St-SR ste(KanFKergieyawtl) tS ssds to 3660 s2T 152AV SE IRst6(KanFK I,y I—)SE zt5 St tS to. 15 tsso 1. 129 152AV SE SE—SI-SE—St t6 Szs to 665 — AV SE 152A $E-SP 516(Kem-KmgleI—) t6 — 3to0 - sad AV SE SR 516(—Kmg1eyR )SE zts PI tS ttto 1 zzzo s3s AV SE SE ns Pi-SE zt6 Pi 16 NO — 53T AV SE SE—St-SE—St 16 1335 S3 sae AV SE SE 265 Pi-SEZ St t6 azs .2 SE—ST 1.-SE-116 Aye SE 15,1 2o3o 10 zzzo Y ClxawmrAm SCMd ZmeFl®xa,lnamllaxen Prgal. .1 SE—ST 1.-SE-126 Pi SE is Tao k— saa Tnv SE xet6(Ksm-Kmgisy R—S SE z�Si is fie 11114 P.-xuetoaaraianstSo-lswaemsni aPrq-23 Pry-023 Palm am nat 1 y'ine yaotim yut am rvmss.ns. znazoz3 3 .ta Pm APPENDIX B m23 Pa m.ml.fimdm GavNes so-«1N.�.. it S rm.., �v.Iitw�IM .n n.s �axa E�•x�"• aim e�e�i w -I. sds dAv se Rs16)Kmt-K.rMl.yaml)-SE-PI A,1 32s 518 SE 26d ST 1-SE---din. tI 21O sn 1AV SE R510(Kmi-K.rgl.yamal-SE 264 St td 6m em sag1.AV SE E—St-SE—St td 2850 5320 SSt SE 260 ST 5151104A SE 11OS Aye SE I em.an Rd- td 2 1]e PIIIova aI®fia.nlreaarea.afi.o� III AW SE 552 SE 2]2 ST 1.-SE-1.Aye SE td 1230 69 1S 2de0 15 F,s31.AV SE SE z6dTH ST TO SE—ST 14 — aez as TSr.t RPM Iin.. 553 -AVSE SE 26pTH ST TO SE—KANGLEY RD td deg 1255 45 Y Carli--R--.Print—T-IRPMllns 555 SE 26d ST 1.-SE--SE td .5 45 — 5& S252 ST Ifia H,S-25-S 5 535 S50 5]S SREITH RO -1-1-1 11 1390 6S 581 SWITH RO L.k.I —RlS-SR 516(Kmt-DS Mdre. 6 td55 Rro! 5e4 AkEWNWICKRDS S25d St saint City Limits 12,E — ]]00 see MILITARY ROS 2]2 St WSSt tt 18]0 3t 1969 5SS MILITARY ROS I.St R.IIF TM 11 2d30 155 WII) 589 3SAVS sRdn Rd-S I.St 1115 2965 16 5d50 591 MILITARY RDS sdd St-SR 516(K.MAS Mdn..I—) 5 2060 16 5000 583 MILITARY RDS SIRINS H—D.Mdns Rml)-Vseres D' S 2 14m Y iremvn eYPmn9 Pi4xt 1. 11 AV I sn St-Inkrvrbm Trell Crc.—Ik 13 3350 1-5 600 AVS S 236 PI TO 8228 St 6,7,1 450 5m0 ISO Y iroM v.M RPM—P.II as Ty lRPM fins 891 ed AV —St N S 2.PI 6,7,19 Y Ca.h--RPM—P.Int— RPM llns O55 IN—dy IH A N--A N 7,19 2. 2do lim SE 2.ST WEST LEG OF INTERSECTION WITH 116 WP d .15 ud td P.-bLs\OPera.ms\S.easlPe t WIk.gPrgs6 23Prq-023 Paint-R—d Lln.La.em Liet.M Nasals. 1YtNm33 3.18PM TRAFFIC CONTROL PLANS 2023 Paint Line Striping &RPM/Araucto A - 3 March 6, 2023 Project Number: 23-3011.1 LEGEND SIGN LOCATION (TEMPORARY MOUNT) WORK VEHICLE ■ TEMPORARY TRAFFIC CONTROL DEVICE (CONES) 0 ARROW BOARD DISTANCE (FLASHING CAUTION) ROAD TYPE BETWEEN SIGNS A B URBAN PROTECTIVE/SHADOW 200 FT 200 FT 25/30 MPH h VEHICLE URBAN STREETS RESIDENTIAL & 350 FT 350 FT Pp,s PORTABLE CHANGEABLE BUSINESS DISTRICTS 35/40 MPH MESSAGE SIGN uj a RURAL ROADS & Qf URBAN ARTERIALS 500 FT 500 FT Y 45/55 MPH 3 MINIMUM TAPER LENGTH =L (FEET) PROTECTIVE/SHADOW LANE WIDTH POSTED SPEED (MPH) VEHICLE (FT) 25 30 35 40 45 10 105 150 205 270 450 • • 11 115 165 225 295 495 12 125 180 245 320 540 • • ARROW BOARD (FLASHING CAUTION) GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF KENT SPECIFICATIONS. 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES. 3. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE. Q 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON ORANGE UNLESS OTHERWISE SPECIFIED. USE SIGN SHAPE AND 6. CHANNELIZATION DEVICES (IF NEEDED) ARE LEGEND APPROPRIATE TO STANDARD TRAFFIC CONES. THE TYPE OF WORK 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF PROJECT. CHANNELIZATION DEVICE SPACING (FEET) i TAPER TANGENT 10 10 2023 Paint Line Striping and RPM Replacement KENT WIINXIMOTON CITY OF KENT SCALE NTS EXHIBIT ENGINEERING DEPARTMENT DATE MAR 2016 MOBILE CHANNELIZATION DEVICE LEGEND SPACING (FEET) I SIGN LOCATION TAPER TANGENT (TEMPORARY MOUNT) 10 10 ■ TEMPORARY TRAFFIC DISTANCE CONTROL DEVICE (CONES) ROAD TYPE BETWEEN SIGNS A IB C ARROW BOARD URBAN (FLASHING CAUTION) 25/30 MPH 200 FT 200 FT L URBAN STREETS 1 PROTECTIVE/WORK RESIDENTIAL & 350 FT 350 FT h VEHICLE BUSINESS DISTRICTS 35/40 MPH Pp,s PORTABLE CHANGEABLE RURAL ROADS & MESSAGE SIGN URBAN ARTERIALS 500 FT 500 FT 45/55 MPH ui a Y MINIMUM TAPER LENGTH =L (FEET) 3 LANE WIDTH POSTED SPEED (MPH) (FT) 25 30 35 40 45 10 105 150 205 270 450 WORK VEHICLE 11 115 165 225 295 495 12 125 180 245 320 540 • • ARROW BOARD 0 (FLASHING CAUTION) GENERAL NOTES: I I IW20-1 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF KENT SPECIFICATIONS.2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES.3. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE. 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON ORANAGE UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES (IF NEEDED) ARE STANDARD TRAFFIC CONES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF PROJECT. 4 2023 Paint Line Striping and RPM Replacement KENT WIINXINOTON CITY OF KENT SCALE NTs EXHIBIT ENGINEERING DEPARTMENT DATE MAR 2016 SHORT LEGEND SIGN LOCATION (TEMPORARY MOUNT) WORK VEHICLE ■ TEMPORARY TRAFFIC CONTROL DEVICE (CONES) 0 ARROW BOARD DISTANCE (FLASHING CAUTION) ROAD TYPE BETWEEN SIGNS A B URBAN PROTECTIVE/SHADOW 200 FT 200 FT 25/30 MPH h VEHICLE URBAN STREETS RESIDENTIAL & 350 FT 350 FT Pp,s PORTABLE CHANGEABLE BUSINESS DISTRICTS 35/40 MPH MESSAGE SIGN a RURAL ROADS & URBAN ARTERIALS 500 FT 500 FT Y 45/55 MPH 3 MINIMUM TAPER LENGTH =L (FEET) PROTECTIVE/SHADOW LANE WIDTH POSTED SPEED (MPH) VEHICLE (FT) 25 30 35 40 45 10 105 150 205 270 450 • • 11 115 165 225 295 495 12 125 180 245 320 540 • • ARROW BOARD (FLASHING CAUTION) GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF KENT SPECIFICATIONS. 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES. 3. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE. Q 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON ORANGE UNLESS OTHERWISE SPECIFIED. USE SIGN SHAPE AND 6. CHANNELIZATION DEVICES (IF NEEDED) ARE LEGEND APPROPRIATE TO STANDARD TRAFFIC CONES. THE TYPE OF WORK 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF PROJECT. CHANNELIZATION DEVICE SPACING (FEET) i TAPER TANGENT 10 10 2023 Paint/RPM Project KENT WIINXIMOTON CITY OF KENT SCALE NTS EXHIBIT ENGINEERING DEPARTMENT DATE MAR 2016 MOBILE PREVAILING WAGE RATES 2023 Paint Line Striping &RPM/Araucto A - 4 March 6, 2023 Project Number: 23-3011.1 3/6/23,2:38 PM about:blank State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 03/21/2023 County Trade Job Classification Wage Holiday Overtime Note *Risk Class King Asbestos Abatement Workers Journey Level $56.80 5D 1 H View King Boilermakers Journey Level $74.29 5N 1C View King Brick Mason Journey Level $66.32 7E 1 N View King Brick Mason Pointer-Caulker-Cleaner $66.32 7E 1 N View King Building Service Employees Janitor $28.23 5S 2F View King Building Service Employees Traveling Waxer/Shampooer $28.68 5S 2F View King Building Service Employees Window Cleaner (Non-Scaffold) $32.18 5S 2F View King Building Service Employees Window Cleaner (Scaffold) $33.18 5S 2F View King Cabinet Makers In Shop) Journey Level $22.74 1 View King Carpenters Acoustical Worker $71.53 15J 4C View King Carpenters Bridge, Dock And Wharf $71.53 15J 4C View Carpenters King Carpenters Floor Layer Et Floor Finisher $71.53 15J 4C View King Carpenters Journey Level $71.53 15J 4C View King Carpenters Scaffold Erector $71.53 15J 4C View King Cement Masons Application of all Composition $70.09 15J 41J View Mastic King Cement Masons Application of all Epoxy $69.59 15J 41J View Material King Cement Masons Application of all Plastic $70.09 15J 4U View Material King Cement Masons Application of Sealing $69.59 15J 41J View Compound King Cement Masons Application of Underlayment $70.09 15J 41J View King Cement Masons Building General $69.59 15J 4U View King Cement Masons Composition or Kalman Floors $70.09 15J 41J View King Cement Masons Concrete Paving $69.59 15J 41J View King Cement Masons Curb Et Gutter Machine $70.09 15J 41J View King Cement Masons Curb Ft Gutter, Sidewalks $69.59 15J 41J View King Cement Masons Curing Concrete $69.59 15J 4U View King Cement Masons Finish Colored Concrete $70.09 15J 4U View about:blank 1/18 3/6/23,2:38 PM about:blank King Cement Masons Floor Grinding $70.09 15J 4U View King Cement Masons Floor Grinding/Polisher $69.59 15J 41-1 View King Cement Masons Green Concrete Saw, self- $70.09 15J 4U View powered King Cement Masons Grouting of all Plates $69.59 15J 41.1 View King Cement Masons Grouting of all Tilt-up Panels $69.59 15J 41-1 View King Cement Masons Gunite Nozzleman $70.09 15J 4U View King Cement Masons Hand Powered Grinder $70.09 15J 41.1 View King Cement Masons Journey Level $69.59 15J 4U View King Cement Masons Patching Concrete $69.59 15J 4U View King Cement Masons Pneumatic Power Tools $70.09 15J 41-1 View King Cement Masons Power Chipping Et Brushing $70.09 15J 4U View King Cement Masons Sand Blasting Architectural $70.09 15J 41.1 View Finish King Cement Masons Screed Et Rodding Machine $70.09 15J 41-1 View King Cement Masons Spackling or Skim Coat $69.59 15J 4U View Concrete King Cement Masons Troweling Machine Operator $70.09 15J 41.1 View King Cement Masons Troweling Machine Operator on $70.09 15J 4U View Colored Slabs King Cement Masons Tunnel Workers $70.09 15J 4U View King Divers Et Tenders Bell/Vehicle or Submersible $126.05 15J 4C View Operator (Not Under Pressure) King Divers Et Tenders Dive Supervisor/Master $89.94 15J 4C View King Divers Et Tenders Diver $126.05 15J 4C 8V View King Divers Et Tenders Diver On Standby $84.94 15J 4C View King Divers Et Tenders Diver Tender $77.16 15J 4C View King Divers Et Tenders Hyperbaric Worker - $89.09 15J 4C View Compressed Air Worker 0-30.00 PSI King Divers Et Tenders Hyperbaric Worker - $94.09 15J 4C View Compressed Air Worker 30.01 - 44.00 PSI King Divers Et Tenders Hyperbaric Worker - $107.09 15J 4C View Compressed Air Worker 44.01 - ' 54.00 PSI King Divers Et Tenders Hyperbaric Worker - $103.09 15J 4C View Compressed Air Worker 54.01 - 60.00 PSI King Divers Et Tenders Hyperbaric Worker - $105.59 15J 4C View Compressed Air Worker 60.01 - 64.00 PSI King Divers Et Tenders Hyperbaric Worker - $110.59 15J 4C View Compressed Air Worker 64.01 - 68.00 PSI King Divers Et Tenders Hyperbaric Worker - $112.59 15J 4C View Compressed Air Worker 68.01 - 70.00 PSI King Divers Et Tenders Hyperbaric Worker - $114.59 15J 4C View Compressed Air Worker 70.01 - 72.00 PSI about:blank 2/18 3/6123,2:38 PM about:blank King Divers Et Tenders Hyperbaric Worker - $116.59 15J 4C View Compressed Air Worker 72.01 74.00 PSI King Divers Et Tenders Manifold Operator $77.16 15J 4C View King Divers Et Tenders Manifold Operator Mixed Gas $82.16 15J 4C View King Divers Et Tenders Remote Operated Vehicle $77.16 15J 4C View Operator/Technician King Divers Et Tenders Remote Operated Vehicle $71.98 15J 4C View Tender King Dredge Workers Assistant Engineer $76.56 5D 3F View King Dredge Workers Assistant Mate (Deckhand) $75.97 5D 3F View King Dredge Workers Boatmen $76.56 5D 3F View King Dredge Workers Engineer Welder $78.03 5D 3F View King Dredge Workers Leverman, Hydraulic $79.59 5D 3F View King Dredge Workers Mates $76.56 5D 3F View King Dredge Workers Oiler $75.97 5D 3F View King Drywall Applicator Journey Level $71.53 15J 4C View King Drywall Tapers Journey Level $70.61 5P 1 E View King Electrical Fixture Maintenance Journey Level $37.19 5L 1 E View Workers King Electricians - Inside Cable Splicer $102.90 7C 4E View King Electricians - Inside Cable Splicer (tunnel) $110.61 7C 4E View King Electricians - Inside Certified Welder $99.38 7C 4E View King Electricians - Inside Certified Welder (tunnel) $106.75 7C 4E View King Electricians - Inside Construction Stock Person $49.28 7C 4E View King Electricians - Inside Journey Level $95.88 7C 4E View King Electricians - Inside Journey Level (tunnel) $102.90 7C 4E View King Electricians - Motor Shop Journey Level $48.68 5A 1 B View King Electricians - Powerline Cable Splicer $93.00 5A 4D View Construction King Electricians - Powerline Certified Line Welder $85.42 5A 4D View Construction King Electricians - Powerline Groundperson $55.27 5A 4D View Construction King Electricians - Powerline Heavy Line Equipment $85.42 5A 4D View Construction Operator King Electricians - Powerline Journey Level Lineperson $85.42 5A 4D View Construction King Electricians - Powerline Line Equipment Operator $73.35 5A 4D View Construction King Electricians - Powerline Meter Installer $55.27 5A 4D 8W View Construction King Electricians - Powerline Pole Sprayer $85.42 5A 4D View Construction King Electricians - Powerline Powderperson $63.50 5A 4D View Construction King Electronic Technicians Journey Level $62.13 7E 1 E View King Elevator Constructors Mechanic $107.49 7D 4A View King Elevator Constructors Mechanic In Charge $116.13 7D 4A View about:blank 3/18 3/6/23,2:38 PM about:blank King Fabricated Precast Concrete All Classifications - In-Factory $21.34 5B 1 R View Products Work Only King Fence Erectors Fence Erector $48.14 15J 4V 8Y View King Fence Erectors Fence Laborer $48.14 15J 4V 8Y View King Flaggers Journey Level $48.14 15J 4V 8Y View King Glaziers Journey Level $75.91 7L 1Y View King Heat Et Frost Insulators And Journey Level $84.84 15H 11C View Asbestos Workers King Heating Equipment Mechanics Journey Level $94.11 7F 1 E View King Hod Carriers Et Mason Tenders Journey Level $59.85 15J 4V 8Y View King Industrial Power Vacuum Journey Level $15.74 1 View Cleaner King Inland Boatmen Boat Operator $61.41 5B 1 K View King Inland Boatmen Cook $56.48 5B 1 K View King Inland Boatmen Deckhand $57.48 5B 1 K View King Inland Boatmen Deckhand Engineer $58.81 5B 1 K View King Inland Boatmen Launch Operator $58.89 5B 1 K View King Inland Boatmen Mate $57.31 5B 1 K View King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 View Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $15.74 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 View Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $71.53 15J 4C View King Ironworkers Journeyman $83.79 7N 10 View King Laborers Air, Gas Or Electric Vibrating $56.80 15J 4V 8Y View Screed King Laborers Airtrac Drill Operator $58.56 15J 4V 8Y View King Laborers Ballast Regular Machine $56.80 15J 4V 8Y View King Laborers Batch Weighman $48.14 15J 4V 8Y View King Laborers Brick Pavers $56.80 15J 4V 8Y View King Laborers Brush Cutter $56.80 15J 4V 8Y View King Laborers Brush Hog Feeder $56.80 15J 4V 8Y View King Laborers Burner $56.80 15J 4V 8Y View King Laborers Caisson Worker $58.56 15J 4V 8Y View King Laborers Carpenter Tender $56.80 15J 4V 8Y View King Laborers Cement Dumper-paving $57.84 15J 4V 8Y View King Laborers Cement Finisher Tender $56.80 15J 4V 8Y View King Laborers Change House Or Dry Shack $56.80 15J 4V 8Y View about:blank 4/18 3/6/23,2:38 PM about:blank King Laborers Chipping Gun (30 Lbs. And $57.84 15J 4V 8Y View Over) King Laborers Chipping Gun (Under 30 Lbs.) $56.80 15J 4V 8Y View King Laborers Choker Setter $56.80 15J 4V 8Y View King Laborers Chuck Tender $56.80 15J 4V 8Y View King Laborers Clary Power Spreader $57.84 15J 4V 8Y View King Laborers Clean-up Laborer $56.80 15J 4V 8Y View King Laborers Concrete Dumper/Chute $57.84 15J 4V 8Y View Operator King Laborers Concrete Form Stripper $56.80 15J 4V 8Y View King Laborers Concrete Placement Crew $57.84 15J 4V 8Y View King Laborers Concrete Saw Operator/Core $57.84 15J 4V 8Y View Driller King Laborers Crusher Feeder $48.14 15J 4V 8Y View King Laborers Curing Laborer $56.80 15J 4V 8Y View King Laborers Demolition: Wrecking Et Moving $56.80 15J 4V 8Y View (Incl. Charred Material) King Laborers Ditch Digger $56.80 15J 4V 8Y View King Laborers Diver $58.56 15J 4V 8Y View King Laborers Drill Operator (Hydraulic, $57.84 15J 4V 8Y View Diamond) King Laborers Dry Stack Walls $56.80 15J 4V 8Y View King Laborers Dump Person $56.80 15J 4V 8Y View King Laborers Epoxy Technician $56.80 15J 4V 8Y View King Laborers Erosion Control Worker $56.80 15J 4V 8Y View King Laborers Faller Et Bucker Chain Saw $57.84 15J 4V 8Y View King Laborers Fine Graders $56.80 15J 4V 8Y View King Laborers Firewatch $48.14 15J 4V 8Y View King Laborers Form Setter $57.84 15J 4V 8Y View King Laborers Gabian Basket Builders $56.80 15J 4V 8Y View King Laborers General Laborer $56.80 15J 4V 8Y View King Laborers Grade Checker Et Transit Person $59.85 15J 4V 8Y View King Laborers Grinders $56.80 15J 4V 8Y View King Laborers Grout Machine Tender $56.80 15J 4V 8Y View King Laborers Groutmen (Pressure) Including $57.84 15J 4V 8Y View Post Tension Beams King Laborers Guardrail Erector $56.80 15J 4V 8Y View King Laborers Hazardous Waste Worker (Level $58.56 15J 4V 8Y View A) King Laborers Hazardous Waste Worker (Level $57.84 15J 4V 8Y View B) King Laborers Hazardous Waste Worker (Level $56.80 15J 4V 8Y View C) King Laborers High Scaler $58.56 15J 4V 8Y View King Laborers Jackhammer $57.84 15J 4V 8Y View King Laborers Laserbeam Operator $57.84 15J 4V 8Y View King Laborers Maintenance Person $56.80 15J 4V 8Y View King Laborers Manhole Builder-Mudman $57.84 15J 4V 8Y View about:blank 5/18 3/6/23,2:38 PM about:blank King Laborers Material Yard Person $56.80 15J 4V 8Y View King Laborers Mold Abatement Worker $56.80 15J 4V 8Y View King Laborers Motorman-Dinky Locomotive $59.95 15J 4V 8Y View King Laborers nozzleman (concrete pump, $59.85 15J 4V 8Y View green cutter when using combination of high pressure air Et water on concrete Et rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster) King Laborers Pavement Breaker $57.84 15J 4V 8Y View King Laborers Pilot Car $48.14 15J 4V 8Y View King Laborers Pipe Layer (Lead) $59.85 15J 4V 8Y View King Laborers Pipe Layer/Tailor $57.84 15J 4V 8Y View King Laborers Pipe Pot Tender $57.84 15J 4V 8Y View King Laborers Pipe Reliner $57.84 15J 4V 8Y View King Laborers Pipe Wrapper $57.84 15J 4V 8Y View King Laborers Pot Tender $56.80 15J 4V 8Y View King Laborers Powderman $58.56 15J 4V 8Y View King Laborers Powderman's Helper $56.80 15J 4V 8Y View King Laborers Power Jacks $57.84 15J 4V 8Y View King Laborers Railroad Spike Puller - Power $57.84 15J 4V 8Y View King Laborers Raker -Asphalt $59.85 15J 4V 8Y View King Laborers Re-timberman $58.56 15J 4V 8Y View King Laborers Remote Equipment Operator $57.84 15J 4V 8Y View King Laborers Rigger/Signal Person $57.84 15J 4V 8Y View King Laborers Rip Rap Person $56.80 15J 4V 8Y View King Laborers Rivet Buster $57.84 15J 4V 8Y View King Laborers Rodder $57.84 15J 4V 8Y View King Laborers Scaffold Erector $56.80 15J 4V 8Y View King Laborers Scale Person $56.80 15J 4V 8Y View King Laborers Sloper (Over 20") $57.84 15J 4V 8Y View King Laborers Sloper Sprayer $56.80 15J 4V 8Y View King Laborers Spreader (Concrete) $57.84 15J 4V 8Y View King Laborers Stake Hopper $56.80 15J 4V 8Y View King Laborers Stock Piler $56.80 15J 4V 8Y View King Laborers Swinging Stage/Boatswain $48.14 15J 4V 8Y View Chair King Laborers Tamper Et Similar Electric, Air $57.84 15J 4V 8Y View Et Gas Operated Tools King Laborers Tamper (Multiple Et Self- $57.84 15J 4V 8Y View propelled) King Laborers Timber Person - Sewer (Lagger, $57.84 15J 4V 8Y View Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $56.80 15J 4V 8Y View King Laborers Topper $56.80 15J 4V 8Y View King Laborers Track Laborer $56.80 15J 4V 8Y View King Laborers Track Liner (Power) $57.84 15J 4V 8Y View King Laborers Traffic Control Laborer $51.48 15J 4V 9C View about:blank 6/18 3/6/23,2:38 PM about:blank King Laborers Traffic Control Supervisor $54.55 15J 4V 9C View King Laborers Truck Spotter $56.80 15J 4V 8Y View King Laborers Tugger Operator $57.84 15J 4V 8Y View King Laborers Tunnel Work-Compressed Air $158.87 15J 4V 9B View Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $163.90 15J 4V 9B View Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $167.58 15J 4V 9B View Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $173.28 15J 4V 9B View Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $175.40 15J 4V 9B View Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $180.50 15J 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $182.40 15J 4V 9B View Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $184.40 15J 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $186.40 15J 4V 9B View Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $59.95 15J 4V 8Y View Tender King Laborers Tunnel Work-Miner $59.95 15J 4V 8Y View King Laborers Vibrator $57.84 15J 4V 8Y View King Laborers Vinyl Seamer $56.80 15J 4V 8Y View King Laborers Watchman $43.76 15J 4V 8Y View King Laborers Welder $57.84 15J 4V 8Y View King Laborers Well Point Laborer $57.84 15J 4V 8Y View King Laborers Window Washer/Cleaner $43.76 15J 4V 8Y View King Laborers - Underground Sewer General Laborer Et Topman $56.80 15J 4V 8Y View Et Water King Laborers - Underground Sewer Pipe Layer $57.84 15J 4V 8Y View Et Water King Landscape Construction Landscape $43.76 15J 4V 8Y View Construction/Landscaping Or Planting Laborers King Landscape Construction Landscape Operator $78.80 15J 11G 8X View King Landscape Maintenance Groundskeeper $17.87 1 View King Lathers Journey Level $71.53 15J 4C View King Marble Setters Journey Level $66.32 7E 1 N View King Metal Fabrication In Shop), Fitter/Certified Welder $42.17 151 11 E View King Metal Fabrication In Shop), General Laborer $30.07 151 11 E View King Metal Fabrication In Shop), Mechanic $43.63 151 11 E View King Metal Fabrication In Shop) Welder/Burner $39.28 151 11E View King Millwright Journey Level $73.08 15J 4C View King Modular Buildings Cabinet Assembly $15.74 1 View King Modular Buildings Electrician $15.74 1 View King Modular Buildings Equipment Maintenance $15.74 1 View King Modular Buildings Plumber $15.74 1 View about:blank 7/18 3/6/23,2:38 PM about:blank King Modular Buildings Production Worker $15.74 1 View King Modular Buildings Tool Maintenance $15.74 1 View King Modular Buildings Utility Person $15.74 1 View King Modular Buildings Welder $15.74 1 View King Painters Journey Level $49.46 6Z 11J View King Pile Driver Crew Tender $77.16 15J 4C View King Pile Driver Journey Level $71.98 15J 4C View King Plasterers Journey Level $67.49 7Q 1 R View King Plasterers Nozzleman $71.49 7Q 1 R View King Playground Et Park Equipment Journey Level $15.74 1 View Installers King Plumbers Et Pipefitters Journey Level $96.69 6Z 1G View King Power Equipment Operators Asphalt Plant Operators $80.12 15J 11G 8X View King Power Equipment Operators Assistant Engineer $75.35 15J 11G 8X View King Power Equipment Operators Barrier Machine (zipper) $79.41 15J 11G 8X View King Power Equipment Operators Batch Plant Operator: concrete $79.41 15J 11G 8X View King Power Equipment Operators Boat Operator $80.33 7A 11 H 8X View King Power Equipment Operators Bobcat $75.35 15J 11G 8X View King Power Equipment Operators Brokk - Remote Demolition $75.35 15J 11G 8X View Equipment King Power Equipment Operators Brooms $75.35 15J 11G 8X View King Power Equipment Operators Bump Cutter $79.41 15J 11G 8X View King Power Equipment Operators Cableways $80.12 15J 11G 8X View King Power Equipment Operators Chipper $79.41 15J 11G 8X View King Power Equipment Operators Compressor $75.35 15J 11G 8X View King Power Equipment Operators Concrete Finish Machine - $75.35 15J 11G 8X View Laser Screed King Power Equipment Operators Concrete Pump - Mounted Or $78.80 15J 11G 8X View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators Concrete Pump: Truck Mount $80.12 15J 11G 8X View With Boom Attachment Over 42 M King Power Equipment Operators Concrete Pump: Truck Mount $79.41 15J 11G 8X View With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $78.80 15J 11G 8X View King Power Equipment Operators Cranes Friction: 200 tons and $82.76 7A 11 H 8X View over King Power Equipment Operators Cranes, A-frame: 10 tons and $75.55 7A 11 H 8X View under King Power Equipment Operators Cranes: 100 tons through 199 $81.12 7A 11 H 8X View tons, or 150' of boom (including jib with attachments) King Power Equipment Operators Cranes: 20 tons through 44 $79.62 7A 11 H 8X View tons with attachments King Power Equipment Operators Cranes: 200 tons- 299 tons, or $81.97 7A 11 H 8X View 250' of boom including jib with attachments about:blank 8/18 3/6123,2:38 PM about:blank King Power Equipment Operators Cranes: 300 tons and over or $82.76 7A 11H 8X View 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 tons through 99 $80.33 7A 11H 8X View tons, under 150' of boom(including jib with attachments) King Power Equipment Operators Cranes: Friction cranes through $81.97 7A 11H 8X View 199 tons King Power Equipment Operators Cranes: through 19 tons with $79.00 7A 11H 8X View attachments, a-frame over 10 tons King Power Equipment Operators Crusher $79.41 15J 11G 8X View King Power Equipment Operators Deck Engineer/Deck Winches $79.41 15J 11G 8X View (power) King Power Equipment Operators Derricks, On Building Work $80.12 15J 11G 8X View King Power Equipment Operators Dozers D-9 Et Under $78.80 15J 11G 8X View King Power Equipment Operators Drill Oilers: Auger Type, Truck $78.80 15J 11G 8X View Or Crane Mount King Power Equipment Operators Drilling Machine $80.92 15J 11G 8X View King Power Equipment Operators Elevator and man-lift: $75.35 15J 11G 8X View permanent and shaft type King Power Equipment Operators Finishing Machine, Bidwell And $79.41 15J 11G 8X View Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 lbs and over with $78.80 15J 11G 8X View attachments King Power Equipment Operators Forklifts: under 3000 lbs. with $75.35 15J 11G 8X View attachments King Power Equipment Operators Grade Engineer: Using Blue $79.41 15J 11G 8X View Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/Stakeman $75.35 15J 11G 8X View King Power Equipment Operators Guardrail Punch $79.41 15J 11G 8X View King Power Equipment Operators Hard Tail End Dump $80.12 15J 11G 8X View Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $79.41 15J 11G 8X View Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/Directional Drill $78.80 15J 11G 8X View Locator King Power Equipment Operators Horizontal/Directional Drill $79.41 15J 11G 8X View Operator King Power Equipment Operators Hydralifts/Boom Trucks Over $79.00 7A 11H 8X View 10 Tons King Power Equipment Operators Hydralifts/boom trucks: 10 $75.55 7A 11H 8X View tons and under King Power Equipment Operators Leverman $81.75 15J 11G 8X View King Power Equipment Operators Loader, Overhead, 6 Yards. But $80.12 15J 11G 8X View Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $79.41 15J 11G 8X View Yards King Power Equipment Operators Loaders, Plant Feed $79.41 15J 11G 8X View about:blank 9/18 3/6/23,2:38 PM about:blank King Power Equipment Operators Loaders: Elevating Type Belt $78.80 15J 11G 8X View King Power Equipment Operators Locomotives, All $79.41 15J 11G 8X View King Power Equipment Operators Material Transfer Device $79.41 15J 11G 8X View King Power Equipment Operators Mechanics: All (Leadmen - $80.92 15J 11G 8X View $0.50 per hour over mechanic) King Power Equipment Operators Motor Patrol Graders $80.12 15J 11G 8X View King Power Equipment Operators Mucking Machine, Mole, Tunnel $80.12 15J 11G 8X View Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $75.35 15J 11G 8X View Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (Elevators and $78.80 15J 11G 8X View Manlifts), Air Tuggers, Strato King Power Equipment Operators Overhead, bridge type Crane: $79.62 7A 11 H 8X View 20 tons through 44 tons King Power Equipment Operators Overhead, bridge type: 100 $81.12 7A 11 H 8X View tons and over King Power Equipment Operators Overhead, bridge type: 45 tons $80.33 7A 11 H 8X View through 99 tons King Power Equipment Operators Pavement Breaker $75.35 15J 11G 8X View King Power Equipment Operators Pile Driver (other Than Crane $79.41 15J 11G 8X View Mount) King Power Equipment Operators Plant Oiler -Asphalt, Crusher $78.80 15J 11G 8X View King Power Equipment Operators Posthole Digger, Mechanical $75.35 15J 11G 8X View King Power Equipment Operators Power Plant $75.35 15J 11G 8X View King Power Equipment Operators Pumps - Water $75.35 15J 11G 8X View King Power Equipment Operators Quad 9, Hd 41, D10And Over $80.12 15J 11G 8X View King Power Equipment Operators Quick Tower: no cab, under $79.41 15J 11G 8X View 100 feet in height base to boom King Power Equipment Operators Remote Control Operator On $80.12 15J 11G 8X View Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger and Bellman $75.55 7A 11 H 8X View King Power Equipment Operators Rigger/Signal Person, $79.00 7A 11 H. 8X View Bellman(Certified) King Power Equipment Operators Rollagon $80.12 15J 11G 8X View King Power Equipment Operators Roller, Other Than Plant Mix $75.35 15J 11G 8X View King Power Equipment Operators Roller, Plant Mix Or Multi-lift $78.80 15J 11G 8X View Materials King Power Equipment Operators Roto-mill, Roto-grinder $79.41 15J 11G 8X View King Power Equipment Operators Saws - Concrete $78.80 15J 11G 8X View King Power Equipment Operators Scraper, Self Propelled Under $79.41 15J 11G 8X View 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $78.80 15J 11G 8X View King Power Equipment Operators Scrapers, Self-propelled: 45 $80.12 15J 11G 8X View Yards And Over King Power Equipment Operators Service Engineers: Equipment $78.80 15J 11G 8X View King Power Equipment Operators Shotcrete/Gunite Equipment $75.35 15J 11G 8X View about:blank 10/18 3/6123,2:38 PM about:blank King Power Equipment Operators Shovel, Excavator, Backhoe, $78.80 15J 11G 8X View Tractors Under 15 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoe: $80.12 15J 11G 8X View Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $79.41 15J 11G 8X View Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $80.92 15J 11G 8X View Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $81.75 15J 11G 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $80.12 15J 11G 8X View King Power Equipment Operators Spreader, Topsider Et $80.12 15J 11G 8X View Screedman King Power Equipment Operators Subgrader Trimmer $79.41 15J 11G 8X View King Power Equipment Operators Tower Bucket Elevators $78.80 15J 11G 8X View King Power Equipment Operators Tower Crane: over 175' through $81.97 7A 11 H 8X View 250' in height, base to boom King Power Equipment Operators Tower crane: up to 175' in $81.12 7A 11 H 8X View height base to boom King Power Equipment Operators Tower Cranes: over 250' in $82.76 7A 11 H 8X View height from base to boom King Power Equipment Operators Transporters, All Track Or Truck $80.12 15J 11G 8X View Type King Power Equipment Operators Trenching Machines $78.80 15J 11G 8X View King Power Equipment Operators Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View tons and over King Power Equipment Operators Truck crane oiler/driver: under $79.00 7A 11 H 8X View 100 tons King Power Equipment Operators Truck Mount Portable Conveyor $79.41 15J 11G 8X View King Power Equipment Operators Vac Truck (Vactor Guzzler, $79.41 15J 11G 8X View Hydro Excavator) King Power Equipment Operators Welder $80.12 15J 11G 8X View King Power Equipment Operators Wheel Tractors, Farman Type $75.35 15J 11G 8X View King Power Equipment Operators Yo Yo Pay Dozer $79.41 15J 11G 8X View King Power Equipment Operators- Asphalt Plant Operators $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Boat Operator $80.33 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Bobcat $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $75.35 15J 11G 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $75.35 15J 11G 8X View Underground Sewer Et Water about:blank 11/18 3/6123,2:38 PM about:blank King Power Equipment Operators- Bump Cutter $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cableways $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Chipper $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Compressor $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - $75.35 15J 11G 8X View Underground Sewer Et Water Laser Screed King Power Equipment Operators- Concrete Pump - Mounted Or $78.80 15J 11G 8X View Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators- Concrete Pump: Truck Mount $80.12 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Pump: Truck Mount $79.41 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes Friction: 200 tons and $82.76 7A 11 H 8X View Underground Sewer Et Water over King Power Equipment Operators- Cranes, A-frame: 10 tons and $75.55 7A 11 H 8X View Underground Sewer Et Water under King Power Equipment Operators- Cranes: 100 tons through 199 $81.12 7A 11 H 8X View Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) King Power Equipment Operators- Cranes: 20 tons through 44 $79.62 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 20 tons through 44 $79.62 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $81.97 7A 11 H 8X View Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $82.76 7A 11 H 8X View Underground Sewer Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 tons through 99 $80.33 7A 11 H 8X View Underground Sewer Et Water tons, under 150' of boom(including jib with attachments) King Power Equipment Operators- Cranes: Friction cranes through $81.97 7A 11 H 8X View Underground Sewer Et Water 199 tons King Power Equipment Operators- Cranes: through 19 tons with $79.00 7A 11 H 8X View Underground Sewer Et Water attachments, a-frame over 10 tons King Power Equipment Operators- Crusher $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches $79.41 15J 11G 8X View Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $80.12 15J 11G 8X View Underground Sewer Et Water about:blank 12/18 3/6123,2:38 PM about:blank King Power Equipment Operators- Dozers D-9 Et Under $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $78.80 15J 11G 8X View Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $80.92 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Elevator and man-lift: $75.35 15J 11G 8X View Underground Sewer Et Water permanent and shaft type King Power Equipment Operators- Finishing Machine, Bidwell And $79.41 15J 11G 8X View Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 lbs and over with $78.80 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Forklifts: under 3000 lbs. with $75.35 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Grade Engineer: Using Blue $79.41 15J 11G 8X View Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/Stakeman $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $80.12 15J 11G 8X View Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $79.41 15J 11G 8X View Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/Directional Drill $78.80 15J 11G 8X View Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/Directional Drill $79.41 15J 11G 8X View Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom trucks: 10 $75.55 7A 11H 8X View Underground Sewer Et Water tons and under King Power Equipment Operators- Hydralifts/boom trucks: over $79.00 7A 11H 8X View Underground Sewer Et Water 10 tons King Power Equipment Operators- Leverman $81.75 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But $80.12 15J 11G 8X View Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $79.41 15J 11G 8X View Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics: All (Leadmen - $80.92 15J 11G 8X View Underground Sewer Et Water $0.50 per hour over mechanic) King Power Equipment Operators- Motor Patrol Graders $80.12 15J 11G 8X View Underground Sewer Et Water about:blank 13/18 3/6123,2:38 PM about:blank King Power Equipment Operators- Mucking Machine, Mole, Tunnel $80.12 15J 11G 8X View Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $75.35 15J 11G 8X View Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (Elevators and $78.80 15J 11G 8X View Underground Sewer Et Water Manlifts), Air Tuggers, Strato King Power Equipment Operators- Overhead, bridge type Crane: $79.62 7A 11 H 8X View Underground Sewer Et Water 20 tons through 44 tons King Power Equipment Operators- Overhead, bridge type: 100 $81.12 7A 11 H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Overhead, bridge type: 45 tons $80.33 7A 11 H 8X View Underground Sewer Et Water through 99 tons King Power Equipment Operators- Pavement Breaker $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $79.41 15J 11G 8X View Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler -Asphalt, Crusher $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10And Over $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Quick Tower: no cab, under $79.41 15J 11G 8X View Underground Sewer Et Water 100 feet in height base to boom King Power Equipment Operators- Remote Control Operator On $80.12 15J 11G 8X View Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bellman $75.55 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, $79.00 7A 11 H 8X View Underground Sewer Et Water Bellman(Certified) King Power Equipment Operators- Rollagon $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $78.80 15J 11G 8X View Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $79.41 15J 11G 8X View Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $78.80 15J 11G 8X View Underground Sewer Et Water about:blank 14/18 3/6123,2:38 PM about:blank King Power Equipment Operators- Scrapers, Self-propelled: 45 $80.12 15J 11G 8X View Underground Sewer Et Water Yards And Over King Power Equipment Operators- Shotcrete/Gunite Equipment $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, $78.80 15J 11G 8X View Underground Sewer Et Water Tractors Under 15 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoe: $80.12 15J 11G 8X View Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $79.41 15J 11G 8X View Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $80.92 15J 11G 8X View Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $81.75 15J 11G 8X View Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $80.12 15J 11G 8X View Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Crane: over 175' through $81.97 7A 11H 8X View Underground Sewer Et Water 250' in height, base to boom King Power Equipment Operators- Tower crane: up to 175' in $81.12 7A 11H 8X View Underground Sewer Et Water height base to boom King Power Equipment Operators- Tower Cranes: over 250' in $82.76 7A 11H 8X View Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or Truck $80.12 15J 11G 8X View Underground Sewer Et Water Type King Power Equipment Operators- Trenching Machines $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Truck crane oiler/driver: under $79.00 7A 11H 8X View Underground Sewer Et Water 100 tons King Power Equipment Operators- Truck Mount Portable Conveyor $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Vac Truck (Vactor Guzzler, $79.41 15J 11G 8X View Underground Sewer Et Water Hydro Excavator) King Power Equipment Operators- Welder $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $79.41 15J 11G 8X View Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $57.22 5A 4A View Trimmers about:blank 15/18 3/6123,2:38 PM about:blank King Power Line Clearance Tree Spray Person $54.32 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $57.22 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer $51.18 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $38.99 5A 4A View Trimmers King Refrigeration Et Air Conditioning Journey Level $92.51 6Z 1G View Mechanics King Residential Brick Mason Journey Level $66.32 7E 1 N View King Residential Carpenters Journey Level $36.44 1 View King Residential Cement Masons Journey Level $46.64 1 View King Residential Drywall Applicators Journey Level $71.53 15J 4C View King Residential Drvwall Tapers Journey Level $36.36 1 View King Residential Electricians Journey Level $48.80 1 View King Residential Glaziers Journey Level $28.93 1 View King Residential Insulation Journey Level $28.18 1 View Applicators King Residential Laborers Journey Level $29.73 1 View King Residential Marble Setters Journey Level $27.38 1 View King Residential Painters Journey Level $23.47 1 View King Residential Plumbers Et Journey Level $96.69 6Z 1G View Pipefitters King Residential Refrigeration Et Air Journey Level $92.51 6Z 1G View Conditioning Mechanics King Residential Sheet Metal Journey Level $94.11 7F 1 E View Workers King Residential Soft Floor Lavers Journey Level $55.76 5A 3J View King Residential Sprinkler Fitters Journey Level $58.26 5C 211 View .(Fire Protection), King Residential Stone Masons Journey Level $66.32 7E 1 N View King Residential Terrazzo Workers Journey Level $60.36 7E 1 N View King Residential Terrazzo/Tile Journey Level $24.39 1 View Finishers King Residential Tile Setters Journey Level $21.04 1 View King Roofers Journey Level $60.95 5A 3H View King Roofers Using Irritable Bituminous $63.95 5A 3H View Materials King Sheet Metal Workers Journey Level (Field or Shop) $94.11 7F 1 E View King Shipbuilding Et Ship Repair New Construction Boilermaker $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Carpenter $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Crane $41.83 7V 1 View Operator King Shipbuilding Et Ship Repair New Construction Electrician $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Heat Et Frost $84.84 15H 11C View Insulator King Shipbuilding Et Ship Repair New Construction Laborer $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Machinist $41.83 7V 1 View about:blank 16/18 3/6123,2:38 PM about:blank King Shipbuilding Et Ship Repair New Construction Operating $41.83 7V 1 View Engineer King Shipbuilding Et Ship Repair New Construction Painter $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Pipefitter $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Rigger $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Sheet Metal $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction Shipfitter $41.83 7V 1 View King Shipbuilding Et Ship Repair New Construction $41.83 7V 1 View Warehouse/Teamster King Shipbuilding Et Ship Repair New Construction Welder / $41.83 7V 1 View Burner King Shipbuilding Et Ship Repair Ship Repair Boilermaker $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Carpenter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Crane Operator $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Electrician $50.42 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Heat Et Frost $84.84 15H 11C View Insulator King Shipbuilding Et Ship Repair Ship Repair Laborer $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Machinist $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Operating Engineer $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Painter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Pipefitter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Rigger $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Sheet Metal $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Shipwright $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Warehouse / $45.06 7Y 4K View Teamster King Sign Makers Et Installers Journey Level $55.78 0 1 View .(Electrical) King Sign Makers Et Installers (Non- Journey Level $35.73 0 1 View Electrical), King Soft Floor Lavers Journey Level $62.39 15J 4C View King Solar Controls For Windows Journey Level $15.74 1 View King Sprinkler Fitters (Fire Journey Level $92.49 5C 1X View Protection), King Stage Rigging Mechanics (Non Journey Level $15.74 1 View Structural) King Stone Masons Journey Level $66.32 7E 1 N View King Street And Parking Lot Sweeper Journey Level $19.09 1 View Workers King Surveyors Assistant Construction Site $79.00 7A 11 H 8X View Surveyor King Surveyors Chainman $75.55 7A 11 H 8X View King Surveyors Construction Site Surveyor $80.33 7A 11 H 8X View King Surveyors Drone Operator (when used in $75.55 7A 11 H 8X View conjunction with survey work only) King Surveyors Ground Penetrating Radar $75.55 7A 11 H 8X View Operator King Telecommunication Technicians Journey Level $62.13 7E 1 E View about:blank 17/18 3/6123,2:38 PM about:blank King Telephone Line Construction - Cable Splicer $39.15 5A 2B View Outside King Telephone Line Construction - Hole Digger/Ground Person $26.29 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator $32.72 5A 2B View Outside (Light) King Telephone Line Construction - Telephone Lineperson $37.00 5A 2B View Outside King Terrazzo Workers Journey Level $60.36 7E 1 N View King Tile Setters Journey Level $60.36 7E 1N View King Tile, Marble Et Terrazzo Finisher $51.19 7E 1N View Finishers King Traffic Control Stripers Journey Level $51.90 7A 1 K View King Truck Drivers Asphalt Mix Over 16 Yards $72.45 15J 11M 8L View King Truck Drivers Asphalt Mix To 16 Yards $71.61 15J 11M 8L View King Truck Drivers Dump Truck $71.61 15J 11M 8L View King Truck Drivers Dump Truck Et Trailer $72.45 15J 11M 8L View King Truck Drivers Other Trucks $72.45 15J 11M 8L View King Truck Drivers - Ready Mix Transit Mix $72.45 15J 11M 8L View King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 View Installers King Well Drillers Et Irrigation Pump Oiler $15.74 1 View Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 View Installers about:blank 18/18