HomeMy WebLinkAboutCAG2022-029 - Change Order - #8 - Long Painting Company - 6MG1 Reservoir Recoating & Vent Replacement - 04/26/2023 q� 4
Agreement Routing Form
llsvlc '• For Approvals,Signatures and Records Management
E1�-r This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
W A 9 H I N O T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Engineering
Date Sent: Date Required.
4/24/2023 5/1/2023
0
L
a Authorized to Sign: Date of Council Approval.
Q ❑Director or Designee El Mayor 1/24/2022
Budget Account Number: Grant? ❑Yes El No
W20091.64110.330
Budget? El Yes ❑ No Type: N/A
Vendor Name: Category:
Long Painting, Co- Contract
Vendor Number: Sub-Category:
c 1589103 Change Order#8
0
Project Name: 6MG1 Reservoir Recoating and Vent Replacement
E
L
0
Project Details:Pressure Washing
c
0
E Agreement Amount:$21,491.42 Basis for Selection of Contractor: Bid
4111
sStart Date: N/A Termination Date: 234 Working Days
Q
Local Business? ❑Yes []No*
*If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce.
Notice required prior to disclosure? Contract Number:
❑Yes El No CAG2022-029
Date Received by City Attorney: Comments:
v� D
Ira
o
alUll
KEPT LA
�a
Ch Date Routed to the Mayor's Office:
H
Date Routed to the City Clerk's Office:
aaaW22373-1_2U Visit Documents.KentWA.gov to obtain copies of all agreements
KENT
W A S H I N O T O N
CHANGE ORDER NO. 8
I
NAME OF CONTRACTOR: Long Painting Company ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 6MG1 Rese_rvotr Recoating and Vent Replacement
ORIGINAL CONTRACT DATE: Januar 24 2022
I
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable i
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Pressure Washing
Long Painting Company Pressure Washing (LPC-09-3 partial):
$19,519.91.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, 1 $3,022,229.32
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $348,374.21
(incl. applicable WSST)
Current Contract Amount $3,370,603.53
(incl. Previous Change Orders)
Current Change Order 19 51 i
g $ 9.9
Applicable WSST Tax on this Change $1,971.51
Order
Revised Contract Sum $3,392,094.95
CHANGE ORDER - 1 OF 3
Original Time for Completion 180 working days
(insert date)
Revised Time for Completion under 230 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 04 working days
Revised Time for Completion 234 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(signature) (signature)
Print me: AL tJd+��L-av-u16 Print Name: Dana Ralph _
Its rf-,es U C Its Mayor
� �(�e) (title)
DATE: lam/ Z!r ,p �9 DATE: 04/26/2023
v�
VIN
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable If Mayor's signature regulred)
- L� kIR4_ oxk
Kent City Clerk Kent Law Department
f
C[Sn this field,you may enter the electronic fllepath where the contract has been saved]
f
1
CHANGE ORDER- 3 OF 3
File No. 200.2
KENT
CHANGE ORDER WORKSHEET NO. S
Construction Engineering Division - Public Works
Project: 6MG1 Reservoir Recoating and Vent Project No: 20-3006
Replacement
Project Engineer: Gray & Osborne Fed-Aid No:
Capital Projects Brian Shields Contractor: Long Painting Company
Date: 3/27/2023
I. Proposed Change
Pressure washing
Long Painting Company pressure washing (LPC-09-3 partial): $19,519.91
II. Reason and Background for Change
A weather event damaged the resevoire containment for the 6MG1 Reservoir Recoating and Vent Replacement
project. As a result of the damaged containment, rain water made contact with most of the sand blasting media,
which caused it to harden and stick to the sides/top of the tank. Typically, the contractor is able to blow this
down with air. Air did not work since the media hardened, and LPC pressure washed the tank to clean the media
off. Another pressure washing event will be necessary to remove grime/debris caused by the contianment being
removed. This Change Order captures the initial cleaning of the media from the tank. Through a review of their
certified payroll, site observation, and negotiations with LPC Labor hours after markup totals $17,704.91 and
equipment rental after markup totals $1,815.00 for a total C08 cost of $19,519.91.
III. Method of Payment
NEW PAY ITEMS ❑Notapplicable
Sch. Item Description Total Est. Unit Unit Price 1
No i !2ty Total Estimated Cost of Item
I Pressure Washing Media off Tank 1 LS $19,519.91 $19,519.91
New Pay Items Total: $19,519.91
DELETE EXISTING PAY ITEMS) per 1-09.5 ❑� Not applicable
Sch Bid Item No. Item Descri
No. Ption Qty Unit Unit Price Cost of Item
$
Delete Existing Pay Items Total: $ -
Page 1
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑� Notapplicable
. p tion
No Bid Item No. Item Description Qty Unit Unit Price Cost of Item
I
$ -
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $19,519.91
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract:i 180 Due This Change Order:1 4 Previous Total: 230
Explanation/Justification for Additional Working Days:
'The work contained within this change order has an anticipated ten "working day duration.
4
*TOTAL WORKING DAYS: 234
*This Change Order + Previous Total
Capital Projects Manager: Date: G�� ,.2-
Brian Shields
Construction Engineering Date:
Supervisor: r ����yt.� -�
Jason Barry
Construction Manager: _ �. Date:
'Eric Conn r
Page 2
Shields, Brian
From: Connor, Eric
Sent: Wednesday, March 22, 2023 3:32 PM
To: Shields, Brian
Cc: Barry, Jason
Subject: FW: 6MG1 - Past Pressure Washing
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Peterson, Kelly<KPeterson@kentwa.gov>
Sent:Wednesday, March 22, 2023 2:55 PM
To:Connor, Eric<EConnor@kentwa.gov>; Bieren,Chad<CBieren@kentwa.gov>
Subject: RE:6MG1- Past Pressure Washing
Eric-
Thank you for the discussion with Chad and I. Please proceed.
Kelly
Kelly Peterson, AICP, Deputy Director-Engineering
Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5547 - Cell 253-740-8066
K efErsozj@KELOMA.go
CITY OF KENT, WASHINGTON
KentWA.aov Facebook YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From:Connor, Eric<EConnor@kentwa.gov>
Sent:Wednesday, March 22, 2023 11:05 AM
To: Peterson, Kelly<K Peterson Mentwa.eav>; Bieren, Chad <CBieren@kentwa.eov>
Subject: FW: 6MG1- Past Pressure Washing
For discussion...
i
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT,WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From:Shields, Brian<BShields@kentwa;gov>
Sent:Tuesday, March 21, 2023 11:34 AM
To: Barry,Jason<JBarrv@kentwa.gov>
Cc:Connor, Eric<EConnor@kentwa.gov>
Subject: FW:6MG1-Past Pressure Washing
Jason,
Below is my estimate that LPC agrees with for the cost of the pressure washing activities that
were a result of the weather events this last winter on the 6MG1 tank. I am seeking
authorization to process a change order in the amount of $19,519.91 to compensate LPC for this
extra work.
Let me know if you have any questions. Thanks!
Brian Shields, capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 1 Desk 253-856-6510
bShields@KentVVA. ov
CITY OF KENT,WASHINGTON
KentWA.aov YouTube
From:Charles Pham <charles 1 lon aintin .com>
Sent:Tuesday, March 21, 2023 11:29 AM
To:Shields, Brian<BShieIds 2 kentwa. ov>
Cc: Barry,Jason<JBarrv@kentwa.Rov>
Subject: RE: 6MG1-Past Pressure Washing
EXTERNAL EMAIL
Brian,
This looks correct.
2
__Ls ��_•_I_ u �` n r _u N1 r J
1r FA Sheet No-:
2 DAILY REPORT OF
3 FORCE ACCOUNT WORKED KZMT
4 Project Name: 61110116111 Project No. 20-3006
Item No.: Date:
B Description of Work: Pressure Washing estimate
7
8 Work by Subcnntraatorn no
8 Prime Contractor: Sub-Contractor:
10 LA9OA
11f STRAIGHT(Iru OVERIr61E DOLLAR
12 NANE CODE tr.CUP p1i0Il Hu Havrlr Rv Hrr OTA.t. AMOUNT
13 Willi—Or... Paints-Jaurn.y 4 96.41 ; 451.84
14 Tr W..h.Ik.ro.r Painter-Feroman 72 59.34 ; 4,272-48
Is Sniim P.an Paintor-Appr.ntia. 76 93.14 f 4,03;.64
16 IK..IM.Mullln Paintor-AP.r.ntia. ;0 50.91 f 4,072.0
17 Brian Valk Painter-Feroman 12 56.62 f 674.44
18 SUBTOTAL-LABOR: ; 43.515.20
18 LABOR OVERHEAD&PROFIT 031i ; 4,14 t-71
20 LABOR TOTAL s 1-1.7 all.91
21_ E EIIPMENT
22 EQUIPMENT OR ATTACHMENTS trPCRATED STAriDSY DOLLAR
Monthly
23 Egaiprn.nt0 E*uip m.nt0 arp tian Month rate Hr, SI.nlby Rat. AMOUNT
24 Prwruro um hor par EA month fx2) 2 754,00 f 1,544.0P
26 f -
26 s -
� s
2i s
29 SUBTOTAL-EQUIPMENT ; 1.SP0.06
EQUIPMENT OVERHEAD&PROFIT 1Lh 21i F 319-PD
31 1 EQUIPMEM7 TOTAL f
32 . MATERIALWSERVICE&!RENTALS
33 MAT ERIALSI SE Rt''IC E S P .r.•ily UMtr Unit Pria. DOLLARAMOUNT
34 f
3S s -
3i f
38 s
39 s
40 SUBTOTAL f
41 OVERHEAD St PROFIT 021i f
42 TOTAL >f
43 Verification of Hours Worked: TOTAL: ffi f9,fi19.91
12i MARKUP (For prim.uh-
44 rabaantraatuork) g
46 Oontraatar,Rop—ontatiuo Date SHEETTOTAL: $
48 Oun ,R.pr.r.ntatiu. Dat.
Brian Shields, Capita/Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cell 253-293-4973 j Desk 253-856-6510
bsh i eldsCa)KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.aov Facebook i,v„i,;:::, YouTube
4
FA Sheet No.: es1999
DAILY REPORT OF
FORCE ACCOUNT WORKED ��KENr
Project Name: 6MG1 Project No: 20-3006
Item No.: Date:
Description of Work: Pressure Washing estimate
Work by Subcontractor?: no
Prime Contractor: Sub-Contractor:
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
William Creson Painter-Journey 8 56.48 $ 451.84
Troy Wechselber er Painter-Foreman 72 59-34 $ 4,272.48
Snqim Peen Painter-Apprentice 76 53.14 $ 4.038.64
Keel McMullin Painter-Apprentice 80 50.91 $ 4.072.80
Brian Valek Painter-Foreman 121 56.62 $ 679.44
SUBTOTAL-LABOR: $ 13.516-20
LABOR OVERHEAD&PROFIT @ 31% $ 4,189.71
LABOR TOTAL $ 17,704.91
EQUNIMEW
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipmerit# Equipment Description Month Monthly rate Hrs Standby Rate AMOUNT
Pressure washer per EA month x2 2 750.00 $ 1,50000
$
$
SUBTOTAL-EQUIPMENT 5 1,500.00
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 315.00
EQUIPMENT TOTAL S 1,815.00
'6Ittl4°J'ERA L-StSE`10EIE hFTAL S
MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT
$
$
SUBTOTAL $
OVERHEAD&PROFIT @ 21% $
TOTAL $
Verification of Hours Worked: TOTAL: $ 19,519.91
12%MARKUP (for
prime when subcontract work) $ -
Contractor's Representative Date SHEET TOTAL: $ 19,519.91
Owner's Representative Date
Comments