HomeMy WebLinkAboutCAG2020-418 - Change Order - #10 - T. Bailey, Inc. - West Hill Reservoir Construct New 5.0 Million Gallon - 04/10/2023 Agreement Routing Form INSFor Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. W A S H I N O T O N (Print on pink or cherry colored paper) Originator: Department: S.Anderson PW Engineering Date Sent: Date Required: > 4/24/2023 N/A 0 CL Authorized to Sign: Date of Council Approval: C' 0 Director or Designee ❑Mayor 12/8/2020 a Budget Account Number: Grant? ❑Yes El No W20054.64110.330 Budget? El Yes ❑No Type: N/A Vendor Name: Category: T. Bailey, Inc. Contract Vendor Number: Sub-Category: c 294554 Change Order#10 0 Project Name: West Hill Reservoir E L C Project Details:Provide and install gravity block wall as directed adjacent the site perimeter C fence. Work to be paid 1 LS in the amount of$31,242.80 C 40 Agreement Amount: $34,398.32 Basis for Selection of Contractor: E Bid 41 Start Date: 12/23/2020 Termination Date: 407 Working Days v� Q Local Business? ❑Yes El No* *Ifineets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions'form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes iD No CAG2020-418 Date Received by City Attorney: Comments: p1 C 30 a, N o°'c pti Date Routed to the Mayor's Office: 'vf Date Routed to the City Clerk's Office: ad«W22373, z0 Visit Documents.KentWA.gov to obtain copies of all agreements • KENT WA9 HINOTON CHANGE ORDER NO. 10 NAME OF CONTRACTOR: T. Bailey, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: West Hill Reservoir ORIGINAL CONTRACT DATE: December 23, 2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide and install gravity block wall as directed adjacent the site perimeter fence. Work to be paid 1 LS in the amount of $31,242.80. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $8,493,470.72 (including applicable alternates and WSST) Net Change by Previous Change Orders $354,541.35 (incl. applicable WSST) Current Contract Amount $8,848,012.07 (incl. Previous Change Orders) Current Change Order $31,242.80 Applicable WSST Tax on this Change $3,155.52 Order Revised Contract Sum $8,882,410.39 CHANGE ORDER - 1 OF 3 Original Time for Completion 350 working days (insert date) Revised Time for Completion under 50 working days prior Change Orders (insert date) Days Required (f) for this Change Order 7 working days Revised Time for Completion 407 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: Chad Bieren Chad Bieren 2023.04.10 By: —' By: 17:10:10-07'00' signature) (signature) Print Nam 0 �, Print Name: Chad Bieren, P.E. Its C r Its Public Works Director (title) (title) DATE: �I I�� DATE: AF EC KP CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] i i I i I I CHANGE ORDER - 3 OF 3 File No. 200.2 KENT Was ��... CHANGE ORDER WORKSHEET NO. 10 Construction Engineering Division - Public Works Project: West Hill Reservoir Project No: 19-3027.1 Project Engineer: RH2/Drew Holcomb Fed-Aid No: N/A Capital Projects Phil McConnell Contractor: T Bailey Inc Manaa r• Date: 3/3/2023 I. Proposed Change Provide and install gravity block wall as directed adjacent the site perimeter fence. Work to be paid 1 LS in the amount of $31,242.80. II. Reason and Background for Change A gravity block wall is required to properly complete site grading. Site area is extremely restricted and proper sloping of the ground could not be achieved without vertical steps. Once this was discovered and understood, discussions were had with the Contractor to define overall limits and wall height, and negotiate a lump sum cost. This addition will elevate fence height which will improving overall security, it will prevent soil erosion over new sidewalk, as well as provide a more uniform fence installation improving aesthetics for the neighborhood. III. Method of Payment NEW PAY ITEMS ❑ Not applicable Sch. Total Est. Total Estimated Cost of No Item Description t Unit Unit Price Item Provide and install a gravity block wall 1 LS $31,242.80 $ 31,242.80 New Pay Items Total: $ 31,242.80 DELETE EXISTING PAY ITEMS) per 1-09.5 ❑� Notapplicable Sch No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item Page 1 Delete Existing Pay Items Total: $ - INCREASE/DECREASE TO EXISTING PAY ITEM(S) D Notapplicable Soh No. Bid Item No. Item Description Qty Unit Unit Price Cost of Item $ - Increase / Decrease to Existing Pay Items Total: $ - *TOTAL ESTIMATED COST OF CHANGE ORDER: $31,242.80 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 350 Due This Change Order: Previous Total: 400 Explanation/Justification for Additional Working Days: The design change impacted the critical path creating additional work days *TOTAL WORKING DAYS: y21 A !G21 V"- * This Change Order + Previous Total 1 Capital Projects Manager: v� Date: 3 2-C?Z P it McConne Construction Engineering Date: - 3 Supervisor: _ son Barry Construction Manager: � Date: -3 3A Eric Conno— Page 2 \ \ \ § _ _ 'IT 04 Q / 7 7G04 m q 0 % %® d » g � � e _m _ / \ \ § 2 m I � \ 2 0 . � z } SG� \ G a B. /\ \ N N B. = § § ] CO k \ z b � ) � o § } I � I / / f O u) \ \ 0 = $ 2 0L _ a . ea /j z OLo @ � a -i c } i { 0 2 � 3 / co c CC) = 0 k \ \ CLk k C \ / 2 } % I (L . � 2 G \ \ \ j /// o z t \ R @ 2 o E W ' OR 1\ r- o � ) § � � � � � 2 e = - z \ o uiƒ - o Cl) _ > � \ 2. � a a § ; _ 2 _0 ■ ( 2 I cn R \ \ e s 2 �k m LZU �\ ) }! _02 \ /» k { > 000 = § ® � § § §\ \ / § o � ul ± mm = u o | � C CNW NQI?THWEST CASCADE INC. POST OFFICE BOX 73399,PUYALLUP,WASHINGTON 98373!TOLL FREE 800-562-4442 Action Request Date: 2/8/2023 To: Chris Parker Project Manager T.Bailey,Inc. 9628 S.March Point Rd. Anacortes,WA 98221 (360)630-5831 From: Chris Quesenbury RE: CMU Block Wall West Hill Reservoir NWC#4299 Action Request#21 Chris, The purpose of this Action Request is provide T.Bailey with a forward price to construct a CMU block wall per conceptual drawing provided by the City of Kent along the south and southeast face of the new West Hill Reservoir. NWC proposes to perform the subgrade prep,placement of a 4-inch compacted CSTC leveling course,465 square feet of split face straight CMU block wall installation, and backfill with free draining material as depicted on the attached plan page for a lump sum price of$27,948.00. Specific conditions and Exclusions are as follows:no engineering,drawings, survey,block doweling/epoxy,wall drain system, and a maximum block wall height of 36-inches.Wall area in excess of 465 square feet will be tracked and billed out accordingly. Please provide NWC with timely response to this Action Request so that we may coordinate any submittals, and material procurement in a timely manner with the overall project schedule and sequencing. If you would like to discuss this matter in snore detail, I can be reached at 253-255- 7728. Respectful, f t Chris Quesenbury j Elev 448 4 W SS7 r' 1 l LINE IN / r i• 3'PVC CASING N_`,4i_87.7 92 E 1280,746 85.INSTAi:L --------------------- u r I ) I .� // (t)-6`0I+15'BEND(RJxRJ) I I APPROX 60 LF of 6 DI RJ PIPF At*4A I+ APPROX 22 LF of 6"DI RJ PIPE Proposed CM U Wali ; i N:141II1T 92 G 1280084.69,fNSTA--- I -: A!/ (1) 6 D145'BEND(RJIRJ) APPROX 33 LF of 6'DI RJ PIPE SEE DWG N I FOR CONTIK I ,I 111' N:141854,42E',128_0661.f5,INS71[.L l� (tj-6°DI 0 SEND(f@kRJ) ( APPROX 16 LF of W DI RJ PIPE SEE DWG NO.M101 FOR CONTINUATION + N;141784 60E:1280761 61 IN5'fQl.l,: (1).18"DI22.5"VE�RTICALBE D(FLxlt) —� II x APPROX 8 LF of 16 DI RJ PIPE ---� j Yy N 141718.64F 128076157 IdSIALL: APPROX 12 i F of 16 DI RJ PI } \ (1) i6 D122>°VERTICAI.BIND(R W Jj t N:141782.29 E:1280661 12,INSTAL[._: N W7882D 128066112,JNSTAIl__ (1)-16"D122.5°VEf271CA1 BEND(R 1xRJ} (1}•16"DI 22.5"VEfi f IGAL BEND(RJxRJ) APPROX 6 LF of 16'DI RJ PIPE APPROX 8 Lr of 16"DI RJ PIPE L{� ` SEE DWG NO.M10i FOR CONTINUATION N ( N N I, i6'DI RJ PiPE — N 14177185E 1 112 INSTAt.; 0 16°D)RJ PIPE APPROX 7 LF of I DI RJ PIPE (1 x 16°DI TEE(RJxF.) 16'GATE VALVE FL 5,5 N,141771.80 F:128074489 STALL: AREA "A„ -�C � � � � '" -C, (3) u,�GATEvv FLxRJ) , -4- � CA PROPOSED UTILITY PLAN 1 ' EC.22,T 1"v 10' �+,R.4t:.;W.M. ➢ESIGNED, JND CHECKED, CLP KENT PROJECT NO. SCALE, BAR IS 94E INCH ON .� 19-3027,1 HORIZ. I"10'_ ORIGINAL DRAWING pRAVW Jt-0D PROJECT ENGR.�Lp CONST,MGM ,NCVIEW VERT 1•=10' ADJUST SCALES PUb)1, ACCORDINGLY REVISION APPROVED r� — CITY ENGINEER DATE. I1/ i2020 0' 1 KENT Enj 9Y OATE _ lr >y McConnell, Phil From: Connor, Eric Sent: Thursday, February 16, 2023 10:52 AM To: McConnell, Phil Cc: Barry,Jason Subject: Fwd: West Hill Reservoir - Added Block Wall Get Outlook for iOS From: Peterson, Kelly<KPeterson@kentwa.gov> Sent:Thursday, February 16, 2023 10:50:59 AM To: Connor, Eric<EConnor@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov> Subject: RE: West Hill Reservoir-Added Block Wall Eric- Chad and I discussed this issue. Please proceed. Thank you, Kelly Kelly Peterson, AICP, Deputy Director-Engineering Public Works department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 Kpeterson@KentWA.gov CITY OF KENT, WASHINGTON KentWA.gov Fecebook - g YouTube PLEASE CONSIDER THE ENVUROWLNIF BUORE PRINTING THIS E-MAIL From: Connor, Eric<EConnor@kentwa.gov> Sent:Thursday, February 16, 2023 7:23 AM To: Peterson, Kelly<KPeterson@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject: FW: West Hill Reservoir-Added Block Wall Good Morning Kelly, Did you get an opportunity to take a look at this? Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON 1 ?'i"2 saE Cf3tdtiS S Ct'3"1dC Yid`,»': s@'? : 3'i'EiEFORE!?';YNTING THIS E-14AIL. From: Connor, Eric Sent:Tuesday, February 14, 2023 3:27 PM To: Peterson, Kelly<KPeterson@kentwa.gov> Cc: Barry,Jason <JBarry@kentwa.gov> Subject:West Hill Reservoir-Added Block Wall Good Afternoon Kelly, It was determined in the field that the West Hill Reservoir site will need a short retaining wall (N3') added to account for a grade break between hard surfaces and vaults on the southern portion of the site. The proposed wall length is approximately 150' long and will be approximately 465 square feet of split face CMU blocks. This general contractor markup, the contractor's proposal to complete the construction of this added site feature is $31,301.76. Are you okay with proceeding with a change order that will add this work to our contract? Please let me know if you have questions or need any additional information. Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON :e5 o-s 0r1 ec,FT vEFORE PRINTING TH- <. From: Bauer, Sean <SBauer@kentwa.gov> Sent:Thursday, February 9, 2023 3:30 PM To: McConnell, Phil <PMcConnell@kentwa.gov> Cc: Brock, David <DBrocic@kentwa.Rov>; Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarry@kentwa.Rov>; Holcomb, Drew<DHolcomb kentwa.gov>; Araucto,Joseph <JAraucto@kentwa.Rov> Subject: RE: Kent West Hill change Thanks Phil, I'm good with the proposal and agree with the need. Please run it by Kevin for his concurrence. See you next week. Sean M. Bauer, water& Sewer Utility Manager Water Section I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5610 1 Cell 253-740-7089 sbauerCa>Ke tWA.gov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube N ''ho E+::-ONSWER THE ;-?:,.'FDRE€14TING'F.HIs E-MAIL 2 From: McConnell, Phil <PMcConnell@kentwa.gov> Sent:Thursday, February 9, 2023 8:23 AM To: Bauer, Sean <SBauer@kentwa.gov> Cc: Brock, David <DBrock@kentwa.gov>; Connor, Eric<EConnor@kentwa.gov>; Barry,Jason <JBarry kentwa.gov>; Holcomb, Drew<DHolcomb@kentwa.gov>; Araucto,Joseph <JAraucto@kentwa.gov> Subject: FW: Kent West Hill change Sean and All, Please review and comment on the attached proposal from T Bailey's subcontractors price to install a gravity block wall. I've asked if this included a cap block. They excluded epoxy, caps need some type of adhesive. This proposal is for +/- 150 LF of wall. They didn't break out the 85 plus feet that is required along the sidewalk. That number alone is +/-$16,768.80. All of these numbers will need the 12% subcontractor markup. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 1 Cell 253-261-5685 pmcconnell KentWA.gov CITY OF KENT, WASHINGTON KentWA.aov Facebook YoesT be From: Chris Parker<cparker@tbailey.com> Sent:Thursday, February 9, 2023 7:46 AM To: McConnell, Phil <PMcConnell kentwa.gov> Subject: FW: Kent West Hill change EXTERNAL I Phil See below, 27K without mark up, not a bad price in my opinion. Any concerns before I right up? Thanks, Chris Parker SENIOR CONSTRUCTION MANAGER T BAILEY, INC. (360)293-0682 DIRECT (206)310-7454 CELL (360)293-3893 FAX CPARKER(D_1 BAILEY.00M ww w.TBAILEY.COM 3 From:Chris Quesenbury [mailto•ChrisQuesenburv@nwcascade.com] Sent: Wednesday, February 8, 2023 4:55 PM To:Chris Parker<cparker@tbailey.com>; Paddy Worthington <PaddyWorthington@nwcascade.com> Cc: Bonnie Wardlaw<bwardlaw@tbailey.com>;Justin Rawls<irawls@tbailey.com> Subject: RE: Kent West Hill change Chris, Attached please find NWC's forward price for the CMU black wall at the West Hill Reservoir per the City of Kent's conceptual drawing and plan. Give us a call if you would like to discuss. Chris Que.senbLWV EstimatoriProject Manager Northwest Cascade Inc. Direct 253-848-2371 ext.4445 Cell 253-255-7728 Fax 253-848-254.5 I1.0, Box 73399,1'uya)1up3 M/A 98373 i'/'k z�sc ca!ttirrrr!'a''nrne:;tri>;er,reii-re-nr irsY;a�f;7rLs rrrzrrL Confidential and Privileged.Information:This message and any altaclmients are intended for the addressee only and are privileged and confidential, if you are not the addressee.then please DO NOT read,copy.distribute or use the message or the attachments. If you have received this message in error,please notify the sender innnediately and delete it.Thank you. From: Chris Parker<cparker@tbailey.com> Sent: Wednesday, February 8, 2023 10:17 AM To: Chris Quesenbury<ChrisQuesenburv@nwcascade_.com>; Paddy Worthington <PaddyWorthington@nwcascade.com> Cc: Bonnie Wardlaw<bwardlaw@tbailey.com>;Justin Rawls<irawis@tbailey.com> Subject: FW: Kent West Hill change Chris See below addressing outstanding questions. Thanks, Chris Parker SENIOR CONSTRUCTION MANAGER T BAILEY, INC. (360)293-0682 DIRECT (206)310-7454 CELL (360)293-3893 FAX CPARKE R((a�TFSAI LEYCMIA www.THAILEY.C:OM From: McConnell, Phil [mailto:PMcConnell@kentwa.gov] Sent: Wednesday, February 8, 2023 9:36 AM To: Chris Parker<cparker@tbailey.com> Cc: Barry,Jason <JBarry@kentwa.gov>; Holcomb, Drew<DHolcomb@kentwa.gov> Subject: RE: Kent West Hill change Chris, He answers to NWC's question are in red below. I've attached a drawing of the approx. location. If they want more I can reach out to my Engineer. 4 Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 1 Cell 253-261-5685 pmcconnell@KentWA.gov CITY OF KENT,WASHINGTON KentWA.aov Faceboolc YouTube From: Chris Parker<cparker@tbailey.com> Sent: Monday, February 6, 2023 3:34 PM To: McConnell, Phil <PMcConnell@kentwa.gov> Subject: Fwd: Kent West Hill change EXTERNAL EMAIL Phil Chris Q had some questions, see below Thanks Chris Parker 206-310-7454 Begin forwarded message: From: Chris Quesenbury<ChrisQuesenbury@nwcascade.com> Date: February 6, 2023 at 3:13:53 PM PST To: Chris Parker<cparker@tbailev.com>, Paddy Worthington <PaddyWorthington nwcascade.com> Cc: Bonnie Wardlaw<bward►aw@tbailey.com> Subject: RE: Kent West Hill change Chris, A few questions regarding wall: 1. Does the City have at least preliminary or conceptual drawing they can provide?Attached 2. Will wall have a drain line? No drain piping, Attempt to place free draining material against the blocks 3. Does the 30" overall height include bury depth and leveling rock course, or is this the exposed face? The overall height will be 36 inches There will need to b +/-4 inches of compacted CSTC. 4. Does the City have particular block style/face in mind? Split face straight 5. Does the City want the blocks epoxy dowelled together? Dowels will not required Chris Quesenbury Estimator/Project Manager Northwest Cascade Inc. 5 Direct 253-848-2371 ext. 4445 Cell 253-255-7728 Fax 253-848-2545 P.O. Box 73399, Puyallup, WA 98373 P Please consider the environment before printing this email. Confidential and Privileged Information: This message and any attachments are intended for the addressee only and are privileged and confidential. If you are not the addressee,then please DO NOT read, copy, distribute or use the message or the attachments. If you have received this message in error, please notify the sender immediately and delete it. Thank you. -----Original Message----- From: Chris Parker<cparker@tbailey.com> Sent: Monday, February 6, 2023 1:29 PM To: Chris Quesenbury<ChrisQuesenbury@nwcascade.com>; Paddy Worthington <PaddyWorthinRton@nwcascade.com> Cc: Bonnie Wardlaw<bwardlaw@tbailey.com> Subject: Kent West Hill change Chris The City of Kent would like a block wall priced out. It was my understanding Paddy was on site last week and NW Cascade would be interested in building. Wall will be located on the south side of Reservoir and extend from the flow control structure past CB 13.The wall will have a straight run length of 85' (just north of new sidewalk) with both ends having a dog leg. The leg to the west will be 10' and the leg to the east 55'. Each end will taper down. Height of wall 30"to include a cap block. Color would be gray. If interested could you get us a price as soon as possible please.Think this would be on the front end of the site grading activities. Any questions please call. Thanks Chris Parker 206-310-7454 6 McConnell, Phil From: Swinford, Kevin Sent: Monday, February 13, 2023 5:53 AM To: McConnell, Phil Cc: Ralph, Shawn Subject: CO 11 Swindord Approval Hello Phil Based on our conversation and your recommendation we proceed with this change I concure. Kevin R. Swinford, Utility Site Process and Control Manager Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Main 253-856-56001 Cell 253-740-6590 kswinford@KentWA.gov CITY OF KENT, WASHINGTON KentWA.aov Face-book YouTube In �� From: McConnell, Phil <PMcConnell@kentwa.gov> Sent:Thursday, February 9, 2023 7:18 PM To: Swinford, Kevin <KSwinford@kentwa.gov> Subject: FW: Kent West Hill Block Wall CO#11 Kevin, Please review, comment and or approve the proposed change order for a retaining wall along the south and east portion of the Reservoir. It will create a level level for the fence. It will create and more aesthetically pleasing and possibly secure site. Any questions give me a call. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 1 Cell 253-261-5685 pmcconnell KentWA.gov CITY OF KENT,WASHINGTON KentWA.Qov Facebook _ You`rulae From: Bonnie Wardlaw<bwardlaw tbailey.com> Sent:Thursday, February 9, 2023 11:15 AM To: McConnell, Phil <PMcConnell@kentwa.gov> Cc:Justin Rawls<irawls tbailey.com>; Chris Parker<cparker@tbailey.com>; Ron Parker<rparker tbailey com> Subject: RE: Kent West Hill Block Wall CO#11 1 EXTERNAL ENTAIL Attached please find our change order pricing for the added block wall per the email trail below. Please let us know if you would like us to proceed with this work or if any additional clarifications are needed. Thank you, Bonnie Wardlaw CONTRACTS MANAGER/PROJECT ASSISTANT CONSTRUCTION GROUP T BAILEY, INC. (360)630-5804 DIRECT (360)420-5309 CELL (360)293-3893 FAX L3UVFa)2�� W@DIAIMY:CPM a,iLw.TBAILEY.COM From: Chris Parker<cparker@tbailey.com> Sent: Wednesday, February 8, 2023 10:17 AM To: Chris Quesenbury<ChrisQuesenburv@nwcascade.com>; Paddy Worthington <PaddyWorthington@nwcascade.com> Cc: Bonnie Wardlaw<bwardlaw@tbailey.com>; Justin Rawls<irawls@tbailey.com> Subject: FW: Kent West Hill change Chris See below addressing outstanding questions. Thanks, Chris Parker SENIOR CONSTRUCTION MANAGER T ]BAILEY, INC. (360)293-0682 DIRECT (206)310-7454 CELL (360)293-3893 FAX CPARKE R�_TBAI LEY_CC)M www.Tf3AILEY.COM From: McConnell, Phil [mailto:PMcConnell@kentwa.Rov] Sent: Wednesday, February 8, 2023 9:36 AM To: Chris Parker<cparker tbailey.com> Cc: Barry,Jason <JBarry kentwa.gov>; Holcomb, Drew<DHolcomb@kentwa.Rov> Subject: RE: Kent West Hill change Chris, He answers to NWC's question are in red below. I've attached a drawing of the approx. location. If they want more I can reach out to my Engineer. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 2 Phone 253-856-5542 1 Cell 253-261-5685 2mcconnell2KentWA.gov CITY OF KENT, WASHINGTON KentWA.aov F cebook YouTube PUE.;'_;C NSLx3 stTFfE €.,...E;4t 's. sh} BZ-1F 3PE PRINTING THI:b"U-M AIL From: Chris Parker<cparker&tbailey.com> Sent: Monday, February 6, 2023 3:34 PM To: McConnell, Phil <PMcConnell@kentwa.gov> Subject: Fwd: Kent West Hill change EXTERNAL EMAIL Phil Chris Q had some questions, see below Thanks Chris Parker 206-310-7454 Begin forwarded message: From: Chris Quesenbury<ChrisQuesenbury@nwcascade.com> Date: February 6, 2023 at 3:13:53 PM PST To: Chris Parker<cparker@tbailey.com>, Paddy Worthington <PaddyWorthington(LDnwcascade.com> Cc: Bonnie Wardlaw<bwardlaw@tbailey.com> Subject: RE: Kent West Hill change Chris, A few questions regarding wall: 1. Does the City have at least preliminary or conceptual drawing they can provide. Attached 2. Will wall have a drain line? No drain piping, Attempt to place free draining material against the blocks 3. Does the 30" overall height include bury depth and leveling rock course, or is this the exposed face? The overall height will be 36 inches There will need to b +/-4 inches of compacted CSTC. 4. Does the City have particular block style/face in mind?Split face straight 5. Does the City want the blocks epoxy dowelled together? Dowels will not required Chris Quesenbury Estimator/Project Manager Northwest Cascade Inc. Direct 253-848-2371 ext. 4445 Cell 253-255-7728 Fax 253-848-2545 P.O. Box 73399, Puyallup, WA 98373 3 P Please consider the environment before printing this email. Confidential and Privileged Information: This message and any attachments are intended for the addressee only and are privileged and confidential. If you are not the addressee,then please DO NOT read, copy, distribute or use the message or the attachments. If you have received this message in error, please notify the sender immediately and delete it.Thank you. -----Original Message----- From: Chris Parker<cparl<er@tbailey.com> Sent: Monday, February 6, 2023 1:29 PM To: Chris Quesenbury<ChrisQuesenburV@nwcascade.com>; Paddy Worthington <PaddyWorthinRton nwcascade.com> Cc: Bonnie Wardlaw<bwardlaw tbailey.com> Subject: Kent West Hill change Chris The City of Kent would like a block wall priced out. It was my understanding Paddy was on site last week and NW Cascade would be interested in building. Wall will be located on the south side of Reservoir and extend from the flow control structure past CB 13. The wall will have a straight run length of 85' (just north of new sidewalk) with both ends having a dog leg.The leg to the west will be 10' and the leg to the east 55'. Each end will taper down. Height of wall 30" to include a cap block. Color would be gray. If interested could you get us a price as soon as possible please.Think this would be on the front end of the site grading activities. Any questions please call. Thanks Chris Parker 206-310-7454 4