Loading...
HomeMy WebLinkAboutCAG2023-180 - Original - Huizenga Enterprises, LLC - 2023 Crack Sealing - 03/22/2023 FOR CITY OF KENT OFFICIAL USE ONLY Sup/Mgr: Agreement Routing Form DirAsst: • For Approvals,Signatures and Records Management Dir/Dep: KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover (optional) W A S H I N G T O N Sheet forms. (Print on pink or cherry colored paper) Originator: Department: Karin Bayes for Joe Araucto Public Works Date Sent: Date Required: c 03/15/2023 3/22/2023 Q Authorized to Sign: Date of Council Approval: QQMayor or Designee 3 7 2023 Budqet Account Number: Grant? Yes NoE] AL 11115530.7496 Budget? Yes ONO Type: N/A Vendor Name: Category. Huizenga Enterprises, LLC Contract Vendor Number: Sub-Category: EL Original 0 Project Name: 2023 Crack Sealinq 3- Project Details: The project consists of installing approximately 22 tons of rubberized asphalt for O crack sealing asphalt roadway sections on various City of Kent Streets, all in C *, accordance with Kent Special Provisions, and the WSDOT Standard Specifications. C O Basis for Selection of Contractor: E AgreementAmount+ 186,455.88 Bid QJ *Memo to Mayor must be attached L Start Date: 10days after notice toproceed Termination Date: Within 26 days from start Q Local Business? Yes F—]No*If meets requirements per KCC 3.70.100,please complete'Vendor Purchose-Locol Exceptions"form on Cityspace. Business License Verification: ❑Yes In-Process❑Exempt(KCC 5.01.045) ❑Authorized Signer Verified Notice required prior to disclosure? Contract Number: F—]YesF—]No CAG2023-180 Comments: H 4J i 3 a-+ f0 a1 MEWC C N O '� 3 � a, cc Date Received:City Attorney: 3/15/23 Date Routed:Mayor's Office3/20/23 City Clerk's Office 3/23/23 Ll adccW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements rev.20221201 CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2023 Crack Sealing Project Numbers: 23-3001 .4 and 23-3011 . 3 BIDS ACCEPTED UNTIL February 22, 2023 11 :00 A.M. BID OPENING IMMEDIATELY FOLLOWING DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 CHAD BIEREN, P.E. PUBLIC WORKS DIRECTOR • KENT WASH IN G T O N INDEX Section 1 Bidder's Package Section 2 Payment and Performance Bond and Contract Section 3 Table of Contents Section 4 Kent Special Provisions Section 5 Crack Sealing Specifications Section 6 Location Maps, Site Description, and Quantity Estimates Section 7 Traffic Control Plans Section 8 Prevailing Wage Rates N'I�'-e r 'l BIDDER'S NAME4 V11 CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2023 Crack Sealing Project Numbers: 23-3001 .4 and 23-3011 .3 BIDS ACCEPTED UNTIL February 22, 2023 11:00 A.M. BID OPENING IMMEDIATELY FOLLOWING DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 CHAD BIEREN, P.E. PUBLIC WORKS DIRECTOR i KEN TT W AS H IN G T 0 N ORDER OF CONTENTS Invitation to Bid Contractor Compliance Statement Declaration - City of Kent Non-Discrimination Policy Administrative Policy 1.2 - Inclusive Contracting Proposal Subcontractor List (over $1 million) - HVAC, Plumbing, and Electrical Subcontractor List (over $1 million) - Structural Steel Installation and Rebar Installation Contractor's Qualification Statement Statement that Bidder Has Not Been Disqualified Certification of Compliance with Wage Payment Statutes Proposal Signature Page Bid Bond Form Combined Declaration Form Non-Collusion, Minimum Wage Change Order Bidder's Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Crack Sealing Specifications Location Maps, Site Description, and Quantity Estimates Traffic Control Plans Prevailing Wage Rates INVITATION TO BID Notice is hereby given that the City of Kent, Washington, will receive sealed bids at the City Clerk's office through February 22, 2023, up to 11:00 a.m. as shown on the clock on the east wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must be properly marked and sealed in accordance with this "Invitation to Bid." Bids must be delivered and received at. the City Clerk's office by the above-stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud immediately following 11:00 a.m. for the City of Kent project named as follows: 2023 Crack Sealing Project Numbers: 23-3001.4 and 23-3011.3 The City Clerk will read the bids out loud from the Clerk`s office. Individuals can stand in the lobby outside the Clerk's office during the bid opening to hear the bid results. The project consists of installing approximately 22 tons of rubberized asphalt for crack sealing asphalt roadway sections on various City of Kent Streets, all in accordance with Kent Special Provisions, and the WSDOT Standard Specifications. The City anticipates issuance of Notice to Proceed on or after July 11, 2023. The Engineer's estimated range for this project is approximately $230,000 to $260,000. Bid documents may be obtained by contacting City of Kent Engineering Department, Nancy Yoshitake at 253-856-5508. For technical questions, please call Joseph Araucto at 253-856-5664. Bids must be clearly marked ' Bid" with the name of the project on the outside of the envelope, addressed to the City Clerk, 220 4th Avenue South, Kent, WA 98032- 5895. Only sealed bids will be accepted. No facsimiles or electronic submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file in the office of the City Engineer, City of Kent, Washington. Plans and specifications can also be downloaded at no charge at blips. win w.ke_ntw� day-and-a��6 bode r®curpa�ent;dr . Copies of the WSDOT Standard Specifications are available for perusal only. A cashier's check, cash or surety bond in the amount of 5% of the bid must: be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. Note: The award of the contract will not occur until the City of Kent has reviewed all bids for responsiveness and responsibility determinations and the Kent City Council has formally awarded the contract. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. The City of Kent, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2O00d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening. Dated this 6t" day of February, 2023 BY: Kimberley omoto, City C Published: Daily Journal of Commerce on February 7 and 14, 2023 Washington State Office of Minority and Women's Business Enterprise on February 7, 2023 CONTRACTOR COMPLIANCE STATEMENT (President's Executive Order #11246) Date 2/21/2023 This statement relates to a proposed contract with the City of Kent named 2023 Crack Sealing Project Numbers: 23-3001.4 and 23-3011.3 I am the undersigned bidder or prospective contractor. I represent that - 1. I X have, have not, participated in a previous contract or subcontract subject to the President's Executive Order #11246 (regarding equal employment opportunity) or a preceding similar Executive Order. HUIZENGA ENTERPRISES LLC NAME OF BIDDER BY: SIGNATURE/TITLE RICHARD HUIZENGA, MANAGER PO BOX 31944 BELLINGHAM, WA. 98228 ADDRESS (Note to Bidders: The information required in this Compliance Statement is informational only) 2023 Crack Sealing/Araucto 1 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 DECLARATION CITY OF KENT NON-DISCRIMINATION POLICY The City of Kent (City) is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors, consultants, vendors, and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The City of Kent and its contractors are subject to and will comply with the following: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 C.F.R. Part 21 (entitled Non-discrimination In Federally Assisted Programs Of The Department Of Transportation-Effectuation Of Title VI Of The Civil Rights Act Of 1964); • 28 C.F.R. section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the Civil Rights Act of 1964). • Ch. 49.60 RCW (Washington Law Against Discrimination) The preceding statutory and regulatory cites hereinafter are referred to as "the Acts and Regulations". The following statements specifically identify the requirements the City deems necessary for any contractor, subcontractor, or supplier on this specific Agreement to adhere to. An affirmation of all of the following is required for this Agreement to be valid and binding. If any contractor, subcontractor, or supplier willfully misrepresents themselves with regard to the directives outlined below, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement. The statements are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement I, the prime contractor, will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 2023 Crack Sealing/Araucto 2 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 5. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: A. Compliance with Regulations: The contractor, subcontractor, consultant, vendor, and supplier (hereinafter "Contractor") will comply with all Acts and the Regulations relative to non-discrimination, including those applicable to Federally-assisted programs of the U.S. Department of Transportation, State-assisted programs through the Washington State Department of Transportation, and generally under Washington's Law Against Discrimination, Ch. 49.60 RCW, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. B. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21. C. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to non-discrimination on the grounds of race, color, or national origin. D. Information and Reports: The contractor will provide all information and reports required by the Acts and Regulations and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined applicable to contractor's contract by the City or the Washington State Department of Transportation to be pertinent to ascertain compliance with such Acts and Regulations and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the City or the Washington State Department of Transportation, as appropriate, and will set forth what efforts it has made to obtain the information. E. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the non-discrimination provisions of this contract, the City will impose such contract sanctions as it or the Washington State Department of Transportation may determine to be appropriate, including, but not limited to: 2023 Crack Sealing/Araucto 3 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 a. withholding payments to the contractor under the contract until the contractor complies; and/or b. cancelling, terminating, or suspending a contract, in whole or in pa rt. F. Incorporation of Provisions: The contractor will include the provisions of paragraphs (A) through (F) above in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts and Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the City or the Washington State Department of Transportation may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the City to enter into any litigation to protect the interests of the City. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. 6. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest agrees to comply with the following non- discrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: i. Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. ii. The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); iii. Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); iv. Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; V. The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); vi. Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); vii. The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid 2023 Crack Sealing/Araucto 4 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); viii. Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; ix. The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); X. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures Non- discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; xi. Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of Limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); xii. Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). xiii. Washington Law Against Discrimination (Ch. 49.60 RCW) 7. The submission of the final invoice for this contract will constitute a reaffirmation that the preceding statements were complied with during the course of the contract's performance. By signing below, I agree to fulfill the five requirements referenced above. By:, For: HUIZENGA ENTERPRISES LLC Title: MANAGER Date: 2/21/2023 2023 Crack Sealing/Araucto 5 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: October 20, 2022 SUBJECT: INCLUSIVE CONTRACTING SUPERSEDES: January 1, 1998 APPROVED BY Dana Ralph, Mayor POLICY: Equal employment opportunity and non-discrimination in contracting requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants, and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Further, all contractors, subcontractors, consultants, suppliers, grantees, or subgrantees of the City, regardless of the value of the Agreement, are required to sign the City's Non-Discrimination Policy Declaration, prior to commencing performance. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to coordinate with the City's Title VI coordinator and perform the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 2023 Crack Sealing/Araucto 6 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that HUIZENGA ENTERPRISES LLC has examined the job site and construction details of the work as outlined on the plans and described in the specifications for the project named 2023 Crack Sealing/Project Numbers: 23-3001.4 and 23-3011.3 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions, marked with asterisk (*), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. EXAMPLE SCHEDULE I - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1006 2-03.5 100 Roadway Excavation, $14.00 $1,400.00 WSDOT CU YDS Including Haul Per CY Any bids not filled out properly may be considered non-responsive. 2023 Crack Sealing/Araucto 7 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 SCHEDULE I - RESIDENTIAL (23-3001.4) ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-09.7 1 Mobilization - SCHEDULE I $18,000.00 $18,000.00 WSDOT LUMP SUM Per LS 1005 5-04.5 12 Crack Sealant for Crack $1,680.00 $20,160.00 �k KSP TONS Sealing Per TON 1010 1-10.5 350 Traffic Control Labor $1.00 $350.00 �k KSP HOURS Per HR 1015 1-10.5 140 Traffic Control Supervisor $1.00 $140.00 �k KSP HOURS Per HR 1020 1-10.5 1 Temporary Traffic Control $57,252.12 $57,252.12 KSP LUMP SUM Devices — Schedule I Per LS 1025 1-10.5 28 Portable Changeable Message $90.00 $2,520.00 �k KSP DAYS Sign (PCMS) Per DAY 1030 1-10.5 14 Sequential Arrow Sign (SAS) $40.00 $560.00 �k KSP DAYS Per DAY 1035 1-07.15(1) 1 SPCC Plan $50.00 $50.00 WSDOT LUMP SUM Per LS 1040 1-04.4(1) 1 Minor Changes - SCHEDULE I $1,500** $1,500 WSDOT CALC Per CALC "Common price to all bidders The description of this bid item is identical to a bid item(s) found in more than one schedule. * In accordance with the CONTRACT PROPOSAL - NOTE TO BIDDERS, it is required that bid items with identical bid item descriptions reflect the same unit price. SCHEDULE I Total $ 100,532.12 2023 Crack Sealing/Araucto 8 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 OV SCHEDULE II - B&O (23-3011.3) ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 2000 1-09.7 1 Mobilization — SCHEDULE II $16,000.00 $16,000.00 WSDOT LUMP SUM Per LS 2005 5-04.5 10 Crack Sealant for Crack $1,680.00 $16,800.00 �k KSP TONS Sealing Per TON 2010 1-10.5 300 Traffic Control Labor $1.00 $300.00 �K KSP HOURS Per HR 2015 1-10.5 120 Traffic Control Supervisor $1.00 $120.00 �k KSP HOURS Per HR 2020 1-10.5 1 Temporary Traffic Control $48,563.76 $48,563.76 KSP LUMP SUM Devices — Schedule II Per LS 2025 1-10.5 24 Portable Changeable Message $90.00 $2,160.00 �K KSP DAYS Sign (PCMS) Per DAY 2030 1-10.5 12 Sequential Arrow Sign (SAS) $40.00 $480.00 �k KSP DAYS Per DAY 2035 1-04.4(1) 1 Minor Changes — SCHEDULE $1,500** $1,500 WSDOT CALC II Per CALC **Common price to all bidders * The description of this bid item is identical to a bid item(s) found in more than one schedule. In accordance with the CONTRACT PROPOSAL - NOTE TO BIDDERS, it is required that bid items with identical bid item descriptions reflect the same unit price. SCHEDULE II: Total $85,923.76 2023 Crack Sealing/Araucto 9 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 BID SUMMARY Schedule I $100,532.12 Residential Schedule II $85,923.76 B&o TOTAL BID AMOUNT $186,455.88 2023 Crack Sealing/Araucto 10 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 SUBCONTRACTOR LIST (Contracts over 1 million dollars) HVAC, PLUMBING AND ELECTRICAL Name of Bidder: HUIZENGA ENTERPRISES LLC Project Name: 2023 Crack Sealing Project Numbers: 23-3001.4 and 23-3011.3 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation, and air conditioning; plumbing; and electrical, or name itself for the work. Failure of the Bidder to submit, within one hour after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Heating, Ventilation, and Air Conditioning Subcontractor Name: N/A Plumbing Subcontractor Name: N/A Electrical Subcontractor Name: N/A 2/21/2023 Signs ure of Bidder Date 2023 Crack Sealing/Araucto 11 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 SUBCONTRACTOR LIST (Contracts over 1 million dollars) STRUCTURAL STEEL INSTALLATION AND REBAR INSTALLATION Name of Bidder: HUIZENGA ENTERPRISES LLC Project Name: 2023 Crack Sealing Project Numbers: 23-3001.4 and 23-3011.3 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation and rebar installation. Failure of the Bidder to submit, within 48 hours after the published bid submittal time, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Structural Steel Installation Subcontractor Name: N/A Rebar Installation Subcontractor Name: N/A 2/21/2023 Signature of Bidder Date 2023 Crack Sealing/Araucto 12 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 CONTRACTOR'S QUALIFICATION STATEMENT (RCW 39.04.350) THE CITY WILL REVIEW THE CONTRACTOR'S RESPONSES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR IS RESPONSIBLE TO PERFORM THE CONTRACT WORK. THIS FORM INCLUDES CRITERIA ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSIDERED A RESPONSIBLE BIDDER AND QUALIFIED TO BE AWARDED THIS PUBLIC WORKS PROJECT AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CITY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT. THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY. Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner. Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid documents or three (3) business days prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeals will be received after the expiration of this 24 hour appeal period. The city may deliver this notice by hand delivery, email, facsimile, or regular mail. In the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S. Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city issues a final determination. Bidder acknowledges and understands that, as provided by RCW 39.04.350, no other appeal is allowed and no other remedy of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work. 2023 Crack Sealing/Araucto 13 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 V/ If the bidder fails to request a modification within the time allowed, or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND SIGN THIS FORM AS PART OF YOUR BID. FAILURE TO PROPERLY COMPLETE THIS FORM MAY ALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON-RESPONSIVE AND THEREFORE VOID. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED BY: Huizenga Enterprises LLC NAME: Richard Huizenga ADDRESS: PO BOX 31944 Bellingham, WA. 98228 PRINCIPAL OFFICE: Huizenga Enterprises LLC ADDRESS: 1090 E. Smith Rd. Bellingham, WA. 98226 PHONE: 360-303-8061 FAX: N/A STATUTORY REQUIREMENTS — Per state law a bidder must meet the following responsibility criteria 1. Required Responsibility Criteria 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18.27 RCW. 1.2 Provide your current state unified business identifier number. 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection. 1.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under 2023 Crack Sealing/Araucto 14 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). 1.5 Provide a signed statement, signed under penalty of perjury by a person with authority to act and speak for your company, that within the three- year period immediately preceding the bid solicitation date, your company is not a "willful" violator as defined in RCW 49.48.082, of any provisions of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. 1.6 Provide proof that a designated person or persons with your company has either received training from the department of labor and industries or an approved training provider on the requirements related to public works and prevailing wages under chapter 39.04 RCW and 39.12 RCW or provide proof that your company has completed three or more public works projects and have had a valid business license in Washington for three or more years and are exempt from this training requirement. SUPPLEMENTAL CRITERIA — Established by the City to determine bidder responsibility 2. ORGANIZATION 2.1 How many years has your organization been in business as a Contractor? 2.2 How many years has your organization been in business under its present business name? 2.2.1 Under what other or former names has your organization operated? 2.3 If your organization is a corporation, answer the following: 2.3.1 Date of incorporation: 2.3.2 State of incorporation: 2.3.3 President's name: 2.3.4 Vice-president's name(s): 2.3.5 Secretary's name: 2.3.6 Treasurer's name: 2.4 If your organization is a partnership, answer the following: 2.4.1 Date of organization: 2.4.2 Type of partnership (if applicable): 2.4.3 Name(s) of general partner(s): 2.5 If your organization is individually owned, answer the following: 2.5.1 Date of organization: 2.5.2 Name of owner: 2023 Crack Sealing/Araucto 15 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 2.6 If the form of your organization is other than those listed above, describe it and name the principals: 3. LICENSING 3.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate license numbers, if applicable. 3.2 List jurisdictions in which your organization's partnership or trade name is filed. 4. EXPERIENCE 4.1 List the categories of work that your organization normally performs with its own forces. 4.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 4.2.1 Has your organization ever failed to complete any work awarded to it? 4.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 4.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? 4.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 4.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect or design engineer, contract amount, percent complete and scheduled completion date. 4.4.1 State total worth of work in progress and under contract: 4.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect or design engineer, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 4.5.1 State average annual amount of construction work performed during the past five years: 4.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 4.7 On a separate sheet, list your major equipment. 2023 Crack Sealing/Araucto 16 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 S. REFERENCES 5.1 Trade References: 5.2 Bank References: 5.3 Surety: 5.3.1 Name of bonding company: 5.3.2 Name and address of agent: 6. FINANCING 6.1 Financial Statement. After bid opening, the City may require the following financial information from any of the three apparent low bidders. If so required, the selected bidder(s) must respond with this financial information within 24 hours of the City's request for that information. The City's request for this information shall not be construed as an award or as an intent to award the contract. A bidder's failure or refusal to provide this information may result in rejection of that bidder's bid. 6.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.1.2 Name and address of firm preparing attached financial statement, and date thereof: 6.1.3 Is the attached financial statement for the identical organization named on page one? 6.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent- subsidiary). 6.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 2023 Crack Sealing/Araucto 17 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 7. SIGNATURE w� 7.1 Dated at this )-a day of +ti - , 2023. Name of Organization: 0 V L? Q-v--V r1r-,— ,� c� L.C- By: rr Title: 7.2 IA,,i Z e��being duly sworn, deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. w I Subscribed and sworn before me this �'�' day of ` -CXar-va v4 , 2023. Notary Public: ENT EXPi'�F,�Z My Commission Expires: � 1 (o� a � el 16. v or \G ZPula%, COMM 2023 Crack Sealing/Araucto 18 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 Huizenga Enterprises, LLC. Contractor Qualification Statement Supplemental Criteria 1. Required Responsibility Criteria 1.1 Copy of L& I Certificate of Registration in Compliance: See Attachment 1.2 UBI#: 602 909 899 1.3 Proof of Applicable Industrial Insurance Coverage: See Attachment 1.4 Statement: - Huizenga Enterprises, LLC,the only company owned by the bidder, has never been disqualified from bidding on any public works contract. Signature: 1.5 Statement: - Huizenga Enterprises, LLC,the only company owned by the bidder, has not, within the three year period immediately preceding the bid solicitation date, your company is not a "willful'violator as defined in RCW 49.48.082,of any provisions of chapters 49.46,49.48,or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. 1.6 Proof of Training Exempt& Business License: See Attachment Signature: ► 2. Organization 2.1 How many years as a Contractor? 14 Years 2.2 How many years under present name? 14 Years 2.2.1 Under a different name? N/A 2.3 Corporate Information 2.3.1 Date of Incorporation: March 9,2009 2.3.2 State of Incorporation?: Washington 2.3.3 President: Richard Huizenga 2.4 Partnership Information: N/A 2.5 Individually Owned Information: N/A 2.6 N/A 3. Licensing 3.1 List of jurisdictions and trade categories: - Washington State-Contractor- Registration#HUIZEEL911JC 3.2 Trade Name Jurisdiction: - Washington State 4. Experience 4.1 Categories of Work Normally Performed: - Crack Sealing,Asphalt Patching,Asphalt Sealing,Asphalt Maintenance, Pavement Markings, Extruded Curbing, Concrete Services. 4.2 Claims and Suits 4.2.1 Failure to Complete Awarded Work? No 4.2.2 Judgements, Claims, Arbitration or Suits? No 4.2.3 Filed any Suits or Arbitration? No 4.3 Officer or Principal of Company failed to complete Construction Contract? No 4.4 List Major Construction Projects in Progress: - No current major projects in progress. 4.4.1 Total Contracts worth of Work in Progress: - Approximately$100,000 4.5 Major Projects completed in last 5 years: - 2018 City of Kenmore Crack Seal, City of Kenmore, Jenniferdon,425-398-9800,July 2018, $100,000-100% - 2018 City of Bellingham Crack Seal, City of Bellingham, Dan Larsen, 360-778-7830,September 2018, $162,492 - 100% - 2017 City of Bothell Crack Seal, City of Bothell, Jack Bartman,425-806-6800,July 2018, $316,635 - 100% - 2017 City of Sedro-Woolley Crack Seal, Sedro-Woolley, Mark Freiberger, 360-855-9933,June 2017,$68,681 - 100% 4.5.1 Average annual amount; past 5 years: 900k 4.6 Construction Experience and Present Commitments of Key Employees: - Richard Huizenga;Company Manager, Estimator, Project Manager for 12 years. - Zack Neeter;Superintendent/Supervisor for 9 years. - Joey Greco; Estimator, Project Manager, Superintendent/Supervisor for 8 years. 4.7 Major Equipment: - Crafco SS125, 3 Sealcoat tanks, Cat mini Excavator, Bobcat Skid Steer, New Holland Skid Steer,Asphalt Hot Box Trailer,Asphalt Hot box Truck, Roller, Hook/Dump Truck. 5. References 5.1 Trade References: - Windwood Enterprises,Curt Palmblad, 360-815-6295 - Lakeside Industries, Rich Owens, 360-398-1427 5.2 Bank References: - Peoples Bank, Scott Louia, 360-715-4200 5.3 Surety: 5.3.1 Name of Bonding Company: Integrity Surety 5.3.2 Name and Address of Agent: - Cameron Huntsucker 17544 Midvale Ave N,Suite#300 Seattle,WA 98133 6. Financing: (After Bid Opening) 1VasM1ing,on Stale Depanmmlol Aft `J Labor&Industries(https://lnima.g2v) Contractors HUIZENGA ENTERPRISES LLC Owner or tradesperson P O BOX 31944 Principals BELLINGHAM,WA 98228 HUIZENGA,RICHARD 360-303-8061 THEODORE,PARTNER/MEMBER WHATCOM County Doing business as HUIZENGA ENTERPRISES LLC WA UBI No. Business type 602 909 899 Limited Liability Company License Verify the contractor's active registration/license/certification(depending on trade)and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. HUIZEEL911JC Effective—expiration 04/03/2009—04/03/2025 Bond WESTERN SURETY COMPANY $12,000.00 Bond account no. 70694128 Received by L&I Effective date 04/03/2009 04/02/2009 Expiration date Until Canceled Insurance Ohio Security Ins Co $1,000,000.00 Policy no. BKS58752666 Received by L&I Effective date 03/11/2022 05/05/2018 Expiration date 05/05/2023 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period,but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent No active Washington registered apprentices exist for this business.Washington allows the use of apprentices registered with Oregon or Montana.Contact the UrPgr n r r,rea c'1 oho r L drat a or Hiiontana Department of Labor &Industry to verify if this business has apprentices. Workers' Comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. L&I Account ID Account is current. 028,663-01 Doing business as HUIZENGA ENTERPRISES LLC Estimated workers reported Quarter 4 of Year 2022"7 to 10 Workers" L&I account contact T4/TYRONE COLEMAN(360)902-4807-Email:COTI235@lni.wa.gov Public Works Requirements Verify the contractor is eligible to perform work on public works projects. Required Training—Effective July 1,2019 Exempt from this requirement. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have been issued against this contractor. Workplace Safety & Health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 02/22/2019 'io!eiirir s Inspection no. 317952206 Location Orleans adjacent to Whatcom Ed Bellingham,WA98226-8721 r ® DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 2/21/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Brad Neltlln Oltman Insurance Agency, Inc. PHONE 2417 Meridian Street, Suite 102 A/C No Eat):360-734-3960 FAX No:360 671 4590 Bellingham WA 98225 ADDRESS: brad@oltmaninsurance.com INSURER(S)AFFORDING COVERAGE NAIL# License#:30002 INSURERA:Ohio Security Insurance Co 24082 INSURED HUIZENT-01 INSURER B:The Ohio Casualty Insurance Co 24074 Huizenga Enterprises, LLC PO Box 31944 INSURER C Bellingham WA 98228 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:453455563 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADULTSUBR POLICY EFF POLICY EXP LTR IN D POLICYNUMBER MM/DDYYY MM/DD/YYYY LIMITS TYPE OF INSURANCE D /Y A X COMMERCIAL GENERAL LIABILITY Y Y BKS58752666 5/5/2022 5/5/2023 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES Ea occurrence) $1,000,000 MED EXP(Any one person) $15,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY[X]jE 1:1LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: A AUTOMOBILE LIABILITY Y Y BAS58752666 5/5/2022 5/5/2023 COMBINED SINGLE LIMIT $1,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ X AUTOS ONLY X AUTOS ONLY Per accident $ B X UMBRELLALIAB X OCCUR Y Y US058752666 5/5/2022 5/5/2023 EACH OCCURRENCE $4,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $4,000,000 DED I X I RETENTION$In nno $ A WORKERS COMPENSATION Y BKS58752666 5/5/2022 5/5/2023 STATUTE X ER H WA-STOP GAP AND EMPLOYERS'LIABILITY Y I N ANYPROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $2,000,000 A INLAND MARINE BKS58752666 5/5/2022 5/5/2023 SCHEDULED EQUIP. 776,275 RENTED EQUIP. 100,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) Project Numbers:23-3001.4 and 23-3011.3-2023 Crack Sealing See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Kent 220 4th Ave. S. AUTHORIZED REPRESENTATIVE Kent WA 980325895 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: HUIZENT-01 LOC#: AC")?" ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Oltman Insurance Agency,Inc. Huizenga Enterprises,LLC PO Box 31944 POLICY NUMBER Bellingham WA 98228 CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE City of Kent is listed as Additional Insured to the Automobile Liability with respects to the work performed by the Named Insured. Per Form: AC 85 01 06 18(attached) AC 85 01 06 18-Primary and Non-contributory(attached) AC 85 01 06 18-Waiver of Subrogation(attached) City of Kent is listed as Additional Insured to the General Liability with respects to the work performed by the Named Insured. Per Form: CG 88 10 04 13(attached) CG 88 10 04 13-Primary and Non-contributory(attached) CG 88 10 04 13-Waiver of Subrogation(attached) CG 88 70 12 08-Per Project Aggregate(attached) CG 85 83 04 13-Completed Operations(attached) ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD COMMERCIAL AUTO AC 85 01 06 18 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO COVERAGE ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the endorsement. If the policy to which this endorsement is attached also contains a Business Auto Coverage Enhancement Endorsement with a specific state named in the title, this endorsement does not apply to vehicles garaged in that specified state. COVERAGEINDEX SUBJECT PROVISION NUMBER ACCIDENTAL AIRBAG DEPLOYMENT 13 ADDITIONAL INSURED BY CONTRACT, AGREEMENT OR PERMIT 4 AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS 21 AMENDED FELLOW EMPLOYEE EXCLUSION 6 AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE 15 BODILY INJURY REDEFINED 25 EMPLOYEES AS INSUREDS (Including Employee Hired Auto) 3 EXTRA EXPENSE- BROADENED COVERAGE 11 GLASS REPAIR-WAIVER OF DEDUCTIBLE 17 HIRED AUTO COVERAGE TERRITORY 23 HIRED AUTO PHYSICAL DAMAGE (Including Employee Hired Auto) 7 LOAN / LEASE GAP (Coverage Not Available In New York) 16 NEWLY FORMED OR ACQUIRED SUBSIDIARIES 2 PARKED AUTO COLLISION COVERAGE(WAIVER OF DEDUCTIBLE) 18 PERSONAL EFFECTS COVERAGE 12 PHYSICAL DAMAGE -ADDITIONAL TRANSPORTATION EXPENSE COVERAGE 9 PHYSICAL DAMAGE DEDUCTIBLE -VEHICLE TRACKING SYSTEM 14 PRIMARY AND NON-CONTRIBUTORY -WRITTEN CONTRACT OR WRITTEN AGREEMENT 24 RENTAL REIMBURSEMENT 10 SUPPLEMENTARY PAYMENTS 5 TOWING AND LABOR 8 TRAILERS - INCREASED LOAD CAPACITY 1 TWO OR MORE DEDUCTIBLES 19 UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS 20 WAIVER OF TRANSFER OF RIGHTS OF RECOVERYAGAINST OTHERS TO US 22 SECTION I -COVERED AUTOS is amended as follows: 1. TRAILERS-INCREASED LOAD CAPACITY The following replaces Paragraph C.1. Certain Trailers, Mobile Equipment And Temporary Substitute Autos of SECTION I -COVERED AUTOS: "Trailers" with a load capacity of 3,000 pounds or less designed primarily for travel on public roads. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 1 of 7 03/09/2022 58752666 N0235131 EC Insured Copy SECTION II -LIABILITY COVERAGE is amended as follows: 2. NEWLY FORMED OR ACQUIRED SUBSIDIARIES SECTION II - LIABILITY COVERAGE, Paragraph A.1. - Who Is An Insured is amended to include the following as an "insured": d. Any legally incorporated subsidiary of which you own more than 50 percent interest during the policy period. Coverage is afforded only for 90 days from the date of acquisition or formation. However, "insured" does not include any organization that: (1) Is a partnership or joint venture; or (2) Is an "insured" under any other automobile policy except a policy written specifically to apply in excess of this policy; or (3) Has exhausted its Limit of Insurance or had its policy terminated under any other automobile policy. Coverage under this provision d. does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization. 3. EMPLOYEES AS INSUREDS SECTION II - LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured is amended to include the following as an "insured": e. Any "employee" of yours while using a covered "auto" you do not own, hire or borrow but only for acts within the scope of their employment by you. Insurance provided by this endorsement is excess over any other insurance available to any "employee". f. Any "employee" of yours while operating an "auto" hired or borrowed under a written contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business and within the scope of their employment. Insurance provided by this endorsement is excess over any other insurance available to the "employee". 4. ADDITIONAL INSURED BY CONTRACT, AGREEMENT OR PERMIT SECTION II - LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured is amended to include the following as an "insured": g. Any person or organization with respect to the operation, maintenance or use of a covered "auto", provided that you and such person or organization have agreed in a written contract, written agreement, or permit issued to you by governmental or public authority, to add such person, or organization, or governmental or public authority to this policy as an "insured". However, such person or organization is an "insured": (1) Only with respect to the operation, maintenance or use of a covered "auto"; (2) Only for "bodily injury" or "property damage" caused by an "accident" which takes place after you executed the written contract or written agreement, or the permit has been issued to you; and (3) Only for the duration of that contract, agreement or permit. The "insured" is required to submit a claim to any other insurer to which coverage could apply for defense and indemnity. Unless the "insured" has agreed in writing to primary noncontributory wording per enhancement number 24, this policy is excess over any other collectible insurance. 5. SUPPLEMENTARY PAYMENTS SECTION II - LIABILITY COVERAGE, Coverage Extensions, 2.a. Supplementary Payments, Paragraphs (2) and (4) are replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations ) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 2 of 7 03/09/2022 58752666 N0235131 EC Insured Copy ?, 6. AMENDED FELLOW EMPLOYEE EXCLUSION In those jurisdictions where, by law, fellow "employees" are not entitled to the protection afforded to the employer by the workers compensation exclusivity rule, or similar protection, the following provi- sion is added: SECTION II - LIABILITY, Exclusion B.5. Fellow Employee does not apply if the "bodily injury" results from the use of a covered "auto" you own or hire if you have workers compensation insurance in force for all of your "employees" at the time of "loss". This coverage is excess over any other collectible insurance. SECTION III -PHYSICAL DAMAGE COVERAGE is amended as follows: 7. HIRED AUTO PHYSICAL DAMAGE Paragraph A.4. Coverage Extensions of SECTION III - PHYSICAL DAMAGE COVERAGE, is amended by adding the following: If hired "autos" are covered "autos" for Liability Coverage, and if Comprehensive, Specified Causes of Loss or Collision coverage are provided under the Business Auto Coverage Form for any "auto" you own, then the Physical Damage coverages provided are extended to "autos": a. You hire, rent or borrow; or b. Your "employee" hires or rents under a written contract or agreement in that "employee's" name, but only if the damage occurs while the vehicle is being used in the conduct of your business, subject to the following limit and deductible: a. The most we will pay for "loss" in any one "accident" or "loss" is the smallest of: (1) $50,000; or (2) The actual cash value of the damaged or stolen property as of the time of the "loss"; or (3) The cost of repairing or replacing the damaged or stolen property with other property of like kind and quality, minus a deductible. b. The deductible will be equal to the largest deductible applicable to any owned "auto" for that coverage. c. Subject to the limit, deductible and excess provisions described in this provision, we will provide coverage equal to the broadest coverage applicable to any covered "auto" you own. d. Subject to a maximum of $1,000 per "accident", we will also cover the actual loss of use of the hired "auto" if it results from an "accident", you are legally liable and the lessor incurs an actual financial loss. e. This coverage extension does not apply to: (1) Any "auto" that is hired, rented or borrowed with a driver; or (2) Any "auto" that is hired, rented or borrowed from your "employee" or any member of your "employee's" household. Coverage provided under this extension is excess over any other collectible insurance available at the time of "loss". 8. TOWING AND LABOR SECTION III - PHYSICAL DAMAGE COVERAGE, Paragraph A.2. Towing, is amended by the addition of the following: We will pay towing and labor costs incurred, up to the limits shown below, each time a covered "auto" classified and rated as a private passenger type, "light truck" or "medium truck" is disabled: a. For private passenger type vehicles, we will pay up to $75 per disablement. b. For "light trucks", we will pay up to $75 per disablement. "Light trucks" are trucks that have a gross vehicle weight (GVW) of 10,000 pounds or less. c. For "medium trucks" , we will pay up to $150 per disablement. "Medium trucks" are trucks that have a gross vehicle weight (GVW) of 10,001 -20,000 pounds. However, the labor must be performed at the place of disablement. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 3 of 7 03/09/2022 58752666 N0235131 EC Insured Copy r 9. PHYSICAL DAMAGE -ADDITIONAL TRANSPORTATION EXPENSE COVERAGE Paragraph A.4.a. Coverage Extensions, Transportation Expenses of SECTION III - PHYSICAL DAMAGE COVERAGE, is amended to provide a limit of $50 per day and a maximum limit of $1,500. 10. RENTAL REIMBURSEMENT SECTION III -PHYSICAL DAMAGE COVERAGE, A. Coverage, is amended by adding the following: a. We will pay up to $75 per day for rental reimbursement expenses incurred by you for the rental of an "auto" because of "accident" or 'loss", to an "auto" for which we also pay a "loss" under Comprehensive, Specified Causes of Loss or Collision Coverages. We will pay only for those ex- penses incurred after the first 24 hours following the "accident" or 'loss" to the covered "auto." b. Rental Reimbursement requires the rental of a comparable or lessor vehicle, which in many cases may be substantially less than $75 per day, and will only be allowed for the period of time it should take to repair or replace the vehicle with reasonable speed and similar quality, up to a maximum of 30 days. c. We will also pay up to $500 for reasonable and necessary expenses incurred by you to remove and replace your tools and equipment from the covered "auto". This limit is excess over any other collectible insurance. d. This coverage does not apply unless you have a business necessity that other "autos" available for your use and operation cannot fill. e. If 'loss" results from the total theft of a covered "auto" of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided under Paragraph 4. Coverage Extension. f. No deductible applies to this coverage. g. The insurance provided under this extension is excess over any other collectible insurance. If this policy also provides Rental Reimbursement Coverage you purchased, the coverage provided by this Enhancement Endorsement is in addition to the coverage you purchased. For the purposes of this endorsement provision, materials and equipment do not include "personal effects" as defined in provision 12.13. 11. EXTRA EXPENSE -BROADENED COVERAGE Under SECTION III - PHYSICAL DAMAGE COVERAGE, A. Coverage, we will pay for the expense of returning a stolen covered "auto" to you. The maximum amount we will pay is $1,000. 12. PERSONAL EFFECTS COVERAGE A. SECTION III -PHYSICAL DAMAGE COVERAGE, A. Coverage, is amended by adding the following: If you have purchased Comprehensive Coverage on this policy for an "auto" you own and that "auto" is stolen, we will pay, without application of a deductible, up to $600 for "personal effects" stolen with the "auto." The insurance provided under this provision is excess over any other collectible insurance. B. SECTION V -DEFINITIONS is amended by adding the following: For the purposes of this provision, "personal effects" mean tangible property that is worn or carried by an "insured." "Personal effects" does not include tools, equipment, jewelry, money or securi- ties. 13. ACCIDENTAL AIRBAG DEPLOYMENT SECTION III -PHYSICAL DAMAGE COVERAGE, B. Exclusions is amended by adding the following: If you have purchased Comprehensive or Collision Coverage under this policy, the exclusion for 'loss" relating to mechanical breakdown does not apply to the accidental discharge of an airbag. Any insurance we provide shall be excess over any other collectible insurance or reimbursement by manufacturer's warranty. However, we agree to pay any deductible applicable to the other coverage or warranty. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 4 of,7 03/09/2022 58752666 N0235131 EC Insured Copy (-' 14. PHYSICAL DAMAGE DEDUCTIBLE -VEHICLE TRACKING SYSTEM SECTION III -PHYSICAL DAMAGE COVERAGE, D. Deductible, is amended by adding the following: Any Comprehensive Deductible shown in the Declarations will be reduced by 50% for any "loss" caused by theft if the vehicle is equipped with a vehicle tracking device such as a radio tracking device or a global position device and that device was the method of recovery of the vehicle. 15. AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE SECTION III - PHYSICAL DAMAGE COVERAGE, B. Exclusions, Paragraph a. of the exception to exclu- sions 4.c. and 4.d. is deleted and replaced with the following: Exclusions 4.c. and 4.d. do not apply to: a. Electronic equipment that receives or transmits audio, visual or data signals, whether or not de- signed solely for the reproduction of sound, if the equipment is: (1) Permanently installed in the covered "auto" at the time of the "loss" or removable from a housing unit that is permanently installed in the covered "auto"; and (2) Designed to be solely operated by use from the power from the "auto's" electrical system; and (3) Physical damage coverages are provided for the covered "auto". If the "loss" occurs solely to audio, visual or data electronic equipment or accessories used with this equipment, then our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by a$100 deductible. 16. LOAN / LEASE GAP COVERAGE (Not Applicable In New York) A. Paragraph C. Limit Of Insurance of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by adding the following: The most we will pay for a "total loss" to a covered "auto" owned by or leased to you in any one "accident" is the greater of the: 1. Balance due under the terms of the loan or lease to which the damaged covered "auto" is subject at the time of the "loss" less the amount of: a. Overdue payments and financial penalties associated with those payments as of the date of the "loss"; b. Financial penalties imposed under a lease due to high mileage, excessive use or abnormal wear and tear; c. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insur- ance purchased with the loan or lease; d. Transfer or rollover balances from previous loans or leases; e. Final payment due under a"Balloon Loan"; f. The dollar amount of any unrepaired damage which occurred prior to the "total loss" of a covered "auto"; g. Security deposits not refunded by a lessor; h. All refunds payable or paid to you as a result of the early termination of a lease agreement or as a result of the early termination of any warranty or extended service agreement on a covered "auto"; i. Any amount representing taxes; j. Loan or lease termination fees; or 2. The actual cash value of the damage or stolen property as of the time of the "loss". An adjustment for depreciation and physical condition will be made in determining the actual cash value at the time of the "loss". This adjustment is not applicable in Texas. B. Additional Conditions This coverage applies only to the original loan for which the covered "auto" that incurred the "loss" serves as collateral, or lease written on the covered "auto" that incurred the "loss". © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 5 of 7 03/09/2022 58752666 N0235131 EC Insured Copy / C. SECTION V -DEFINITIONS is changed by adding the following: As used in this endorsement provision, the following definitions apply: "Total loss" means a 'loss" in which the cost of repairs plus the salvage value exceeds the actual cash value. A "balloon loan" is one with periodic payments that are insufficient to repay the balance over the term of the loan, thereby requiring a large final payment. 17. GLASS REPAIR-WAIVER OF DEDUCTIBLE Paragraph D. Deductible of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: No deductible applies to glass damage if the glass is repaired rather than replaced. 18. PARKED AUTO COLLISION COVERAGE (WAIVER OF DEDUCTIBLE) Paragraph D. Deductible of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: The deductible does not apply to "loss" caused by collision to such covered "auto" of the private passenger type or light weight truck with a gross vehicle weight of 10,000 lbs. or less as defined by the manufacturer as maximum loaded weight the "auto" is designed to carry while it is: a. In the charge of an "insured"; b. Legally parked; and c. Unoccupied. The 'loss" must be reported to the police authorities within 24 hours of known damage. The total amount of the damage to the covered "auto" must exceed the deductible shown in the Declarations. This provision does not apply to any "loss" if the covered "auto" is in the charge of any person or organization engaged in the automobile business. 19. TWO OR MORE DEDUCTIBLES Under SECTION III - PHYSICAL DAMAGE COVERAGE, if two or more company policies or coverage forms apply to the same "accident", the following applies to Paragraph D. Deductible: a. If the applicable Business Auto deductible is the smaller (or smallest) deductible, it will be waived; or b. If the applicable Business Auto deductible is not the smaller (or smallest) deductible , it will be reduced by the amount of the smaller (or smallest) deductible; or c. If the "loss" involves two or more Business Auto coverage forms or policies, the smaller (or smallest) deductible will be waived. For the purpose of this endorsement, company means any company that is part of the Liberty Mutual Group. SECTION IV -BUSINESS AUTO CONDITIONS is amended as follows: 20. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS SECTION IV- BUSINESS AUTO CONDITIONS, Paragraph B.2. is amended by adding the following: If you unintentionally fail to disclose any hazards, exposures or material facts existing as of the incep- tion date or renewal date of the Business Auto Coverage Form, the coverage afforded by this policy will not be prejudiced. However, you must report the undisclosed hazard of exposure as soon as practicable after its discovery, and we have the right to collect additional premium for any such hazard or exposure. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 6 of 7 03/09/2022 58752666 N0235131 EC Insured Copy 21. AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT, OR LOSS SECTION IV - BUSINESS AUTO CONDITIONS, Paragraph A.2.a. is replaced in its entirety by the follow- ing: a. In the event of "accident", claim, "suit" or "loss", you must promptly notify us when it is known to: (1) You, if you are an individual; (2) A partner, if you are a partnership; (3) Member, if you are a limited liability company; (4) An executive officer or the "employee" designated by the Named Insured to give such notice, if you are a corporation. To the extent possible, notice to us should include: (a) How, when and where the "accident" or "loss" took place; (b) The "insureds" name and address; and (c) The names and addresses of any injured persons and witnesses. 22. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US SECTION IV - BUSINESS AUTO CONDITIONS, Paragraph A.5. Transfer Of Rights Of Recovery Against Others To Us, is amended by the addition of the following: If the person or organization has in a written agreement waived those rights before an "accident" or "loss", our rights are waived also. 23. HIRED AUTO COVERAGE TERRITORY SECTION IV - BUSINESS AUTO CONDITIONS, Paragraph B.7. Policy Period, Coverage Territory, is amended by the addition of the following: f. For "autos" hired 30 days or less, the coverage territory is anywhere in the world, provided that the "insured's" responsibility to pay for damages is determined in a "suit", on the merits, in the United States, the territories and possessions of the United States of America, Puerto Rico or Canada or in a settlement we agree to. This extension of coverage does not apply to an "auto" hired, leased, rented or borrowed with a driver. 24. PRIMARY AND NON-CONTRIBUTING IF REQUIRED BY WRITTEN CONTRACT OR WRITTEN AGREE- MENT The following is added to SECTION IV -BUSINESS AUTO CONDITIONS, General Conditions, B.5. Other Insurance and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in a written contract or written agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". SECTION V - DEFINITIONS is amended as follows: 25. BODILY INJURY REDEFINED Under SECTION V -DEFINITIONS, Definition C. is replaced by the following: "Bodily injury" means physical injury, sickness or disease sustained by a person, including mental anguish, mental injury, shock, fright or death resulting from any of these at any time. © 2017 Liberty Mutual Insurance AC 85 01 06 18 Includes copyrighted material of Insurance Services Office Inc.,with its Permission. Page 7 of 7 03/09/2022 58752666 N0235131 EC Insured Copy V COMMERCIAL GENERAL LIABILITY CG 88 10 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY EXTENSION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART INDEX SUBJECT PAGE NON-OWNED AIRCRAFT 2 NON-OWNED WATERCRAFT 2 PROPERTY DAMAGE LIABILITY -ELEVATORS 2 EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (Tenant's Property Damage) 2 MEDICAL PAYMENTS EXTENSION 3 EXTENSION OF SUPPLEMENTARY PAYMENTS -COVERAGES A AND B 3 ADDITIONAL INSUREDS -BY CONTRACT, AGREEMENT OR PERMIT 3 PRIMARY AND NON-CONTRIBUTORY- ADDITIONAL INSURED EXTENSION 5 ADDITIONAL INSUREDS -EXTENDED PROTECTION OF YOUR "LIMITS OF INSURANCE" 6 WHO IS AN INSURED -INCIDENTAL MEDICAL ERRORS/MALPRACTICE AND WHO IS AN INSURED -FELLOW EMPLOYEE EXTENSION -MANAGEMENT EMPLOYEES 6 NEWLY FORMED OR ADDITIONALLY ACQUIRED ENTITIES 7 FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES 7 KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT 7 LIBERALIZATION CLAUSE 7 BODILY INJURY REDEFINED 7 EXTENDED PROPERTY DAMAGE 8 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US - 8 WHEN REQUIRED IN A CONTRACT OR AGREEMENT WITH YOU © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 1 of 8 With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the endorsement. A. NON-OWNED AIRCRAFT Under Paragraph 2. Exclusions of Section I - Coverage A - Bodily Injury And Property Damage Liability, exclusion g. Aircraft, Auto Or Watercraft does not apply to an aircraft provided: 1. It is not owned by any insured; 2. It is hired, chartered or loaned with a trained paid crew; 3. The pilot in command holds a currently effective certificate, issued by the duly constituted authority of the United States of America or Canada, designating her or him a commercial or airline pilot; and 4. It is not being used to carry persons or property for a charge. However, the insurance afforded by this provision does not apply if there is available to the insured other valid and collectible insurance, whether primary, excess (other than insurance written to apply specifically in excess of this policy), contingent or on any other basis, that would also apply to the loss covered under this provision. B. NON-OWNED WATERCRAFT Under Paragraph 2. Exclusions of Section I -Coverage A-Bodily Injury And Property Damage Liability, Subparagraph (2) of exclusion g. Aircraft, Auto Or Watercraft is replaced by the following: This exclusion does not apply to: (2) A watercraft you do not own that is: (a) Less than 52 feet long; and (b) Not being used to carry persons or property for a charge. C. PROPERTY DAMAGE LIABILITY -ELEVATORS 1. Under Paragraph 2. Exclusions of Section I - Coverage A - Bodily Injury And Property Damage Liabil- ity, Subparagraphs (3), (4) and (6) of exclusion j. Damage To Property do not apply if such "property damage" results from the use of elevators. For the purpose of this provision, elevators do not include vehicle lifts. Vehicle lifts are lifts or hoists used in automobile service or repair operations. 2. The following is added to Section IV - Commercial General Liability Conditions, Condition 4. Other Insurance, Paragraph b. Excess Insurance: The insurance afforded by this provision of this endorsement is excess over any property insurance, whether primary, excess, contingent or on any other basis. D. EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (Tenant's Property Damage) If Damage To Premises Rented To You is not otherwise excluded from this Coverage Part: 1. Under Paragraph 2. Exclusions of Section I -Coverage A-Bodily Injury and Property Damage Liability: a. The fourth from the last paragraph of exclusion j. Damage To Property is replaced by the follow- ing: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire, lightning, explosion, smoke, or leakage from an automatic fire protection system) to: (i) Premises rented to you for a period of 7 or fewer consecutive days; or (ii) Contents that you rent or lease as part of a premises rental or lease agreement for a period of more than 7 days. Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" to contents of premises rented to you for a period of 7 or fewer consecutive days. A separate limit of insurance applies to this coverage as described in Section III - Limits of Insurance. © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 2 of 8 b. The last paragraph of subsection 2. Exclusions is replaced by the following: Exclusions c. through n. do not apply to damage by fire, lightning, explosion, smoke or leakage from automatic fire protection systems to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III -Limits Of Insurance. 2. Paragraph 6. under Section III -Limits Of Insurance is replaced by the following: 6. Subject to Paragraph 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to: a. Any one premise: (1) While rented to you; or (2) While rented to you or temporarily occupied by you with permission of the owner for damage by fire, lightning, explosion, smoke or leakage from automatic protection sys- tems; or b. Contents that you rent or lease as part of a premises rental or lease agreement. 3. As regards coverage provided by this provision D. EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (Tenant's Property Damage) -Paragraph 9.a. of Definitions is replaced with the following: 9.a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion, smoke, or leakage from automatic fire protection systems to premises while rented to you or temporarily occupied by you with the permission of the owner, or for damage to contents of such premises that are included in your premises rental or lease agreement, is not an "insured contract". E. MEDICAL PAYMENTS EXTENSION If Coverage C Medical Payments is not otherwise excluded, the Medical Payments provided by this policy are amended as follows: Under Paragraph 1. Insuring Agreement of Section I -Coverage C - Medical Payments, Subparagraph (b) of Paragraph a. is replaced by the following: (b) The expenses are incurred and reported within three years of the date of the accident; and F. EXTENSION OF SUPPLEMENTARY PAYMENTS -COVERAGES A AND B 1. Under Supplementary Payments -Coverages A and B, Paragraph 1.b. is replaced by the following: b. Up to $3,000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 2. Paragraph 1.d. is replaced by the following: ° d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit', including actual loss of earnings up to $500 a day because of time off from work. G. ADDITIONAL INSUREDS -BY CONTRACT, AGREEMENT OR PERMIT 1. Paragraph 2. under Section II -Who Is An Insured is amended to include as an insured any person or organization whom you have agreed to add as an additional insured in a written contract, written agreement or permit. Such person or organization is an additional insured but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused in whole or in part by: a. Your acts or omissions, or the acts or omissions of those acting on your behalf, in the performance of your on going operations for the additional insured that are the subject of the written contract or written agreement provided that the "bodily injury" or "property damage" occurs, or the "per- sonal and advertising injury" is committed, subsequent to the signing of such written contract or written agreement; or © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 3 of 8 b. Premises or facilities rented by you or used by you; or c. The maintenance, operation or use by you of equipment rented or leased to you by such person or organization; or d. Operations performed by you or on your behalf for which the state or political subdivision has issued a permit subject to the following additional provisions: (1) This insurance does not apply to "bodily injury", "property damage", or "personal and ad- vertising injury" arising out of the operations performed for the state or political subdivision; (2) This insurance does not apply to "bodily injury" or "property damage" included within the "completed operations hazard". (3) Insurance applies to premises you own, rent, or control but only with respect to the following hazards: (a) The existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoist away openings, sidewalk vaults, street banners, or decorations and similar expo- sures; or (b) The construction, erection, or removal of elevators; or (c) The ownership, maintenance, or use of any elevators covered by this insurance. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insur- ance afforded to such additional insured will not be broader than that which you are required by n the contract or agreement to provide for such additional insured. With respect to Paragraph 1.a. above, a person's or organization's status as an additional insured under this endorsement ends when: (1) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or (2) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. With respect to Paragraph 1.b. above, a person's or organization's status as an additional insured under this endorsement ends when their written contract or written agreement with you for such premises or facilities ends. With respects to Paragraph 1.c. above, this insurance does not apply to any "occurrence" which takes place after the equipment rental or lease agreement has expired or you have returned such equipment to the lessor. The insurance provided by this endorsement applies only if the written contract or written agreement is signed prior to the "bodily injury" or "property damage". We have no duty to defend an additional insured under this endorsement until we receive written notice of a "suit" by the additional insured as required in Paragraph b. of Condition 2. Duties In the Event Of Occurrence, Offense, Claim Or Suit under Section IV - Commercial General Liability Condi- tions. © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 4 of 8 r� 2. With respect to the insurance provided by this endorsement, the following are added to Paragraph 2. Exclusions under Section I -Coverage A-Bodily Injury And Property Damage Liability: This insurance does not apply to: a. "Bodily injury" or "property damage" arising from the sole negligence of the additional insured. b. "Bodily injury" or "property damage" that occurs prior to you commencing operations at the location where such "bodily injury" or "property damage" occurs. c. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the render- ing of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occur- rence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. d. "Bodily injury" or "property damage" occurring after: (1) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or (2) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. e. Any person or organization specifically designated as an additional insured for ongoing operations by a separate ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS endorsement is- sued by us and made a part of this policy. 3. With respect to the insurance afforded to these additional insureds, the following is added to Section III -Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; or b. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declaratio ns. H. PRIMARY AND NON-CONTRIBUTORY ADDITIONAL INSURED EXTENSION This provision applies to any person or organization who qualifies as an additional insured under any form or endorsement under this policy. Condition 4. Other Insurance of SECTION IV -COMMERCIAL GENERAL LIABILITY CONDITIONS is amend- ed as follows: a. The following is added to Paragraph a. Primary Insurance: If an additional insured's policy has an Other Insurance provision making its policy excess, and you have agreed in a written contract or written agreement to provide the additional insured coverage on a primary and noncontributory basis, this policy shall be primary and we will not seek contribution from the additional insured's policy for damages we cover. © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 5 of 8 b. The following is added to Paragraph b. Excess Insurance: When a written contract or written agreement, other than a premises lease, facilities rental contract or agreement, an equipment rental or lease contract or agreement, or permit issued by a state or political subdivision between you and an additional insured does not require this insurance to be primary or primary and non-contributory, this insurance is excess over any other insurance for which the addi- tional insured is designated as a Named Insured. Regardless of the written agreement between you and an additional insured, this insurance is excess over any other insurance whether primary, excess, contingent or on any other basis for which the additional insured has been added as an additional insured on other policies. I. ADDITIONAL INSUREDS -EXTENDED PROTECTION OF YOUR "LIMITS OF INSURANCE" This provision applies to any person or organization who qualifies as an additional insured under any form or endorsement under this policy. 1. The following is added to Condition 2. Duties In The Event Of Occurrence, Offense, Claim or Suit: An additional insured under this endorsement will as soon as practicable: a. Give written notice of an "occurrence" or an offense that may result in a claim or "suit" under this insurance to us; b. Tender the defense and indemnity of any claim or "suit" to all insurers whom also have insurance available to the additional insured; and c. Agree to make available any other insurance which the additional insured has for a loss we cover under this Coverage Part. d. We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a "suit" by the additional insured. 2. The limits of insurance applicable to the additional insured are those specified in a written contract or written agreement or the limits of insurance as stated in the Declarations of this policy and defined in Section III - Limits of Insurance of this policy, whichever are less. These limits are inclusive of and not in addition to the limits of insurance available under this policy. J. WHO IS AN INSURED -INCIDENTAL MEDICAL ERRORS/MALPRACTICE WHO IS AN INSURED -FELLOW EMPLOYEE EXTENSION -MANAGEMENT EMPLOYEES Paragraph 2.a.(1) of Section II -Who Is An Insured is replaced with the following: (1) "Bodily injury" or "personal and advertising injury": (a) To you, to your partners or members (if you are a partnership or joint venture), to your members (if you are a limited liability company), to a co-"employee" while in the course of his or her employ- ment or performing duties related to the conduct of your business, or to your other "volunteer workers" while performing duties related to the conduct of your business; (b) To the spouse, child, parent, brother or sister of that co-"employee" or "volunteer worker" as a consequence of Paragraph (1) (a) above; (c) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in Paragraphs (1) (a) or (b) above; or (d) Arising out of his or her providing or failing to provide professional health care services. However, if you are not in the business of providing professional health care services or providing profes- sional health care personnel to others, or if coverage for providing professional health care ser- vices is not otherwise excluded by separate endorsement, this provision (Paragraph (d))does not apply. Paragraphs (a) and (b) above do not apply to "bodily injury" or "personal and advertising injury" caused by an "employee" who is acting in a supervisory capacity for you. Supervisory capacity as used herein means the "employee's" job responsibilities assigned by you, includes the direct supervision of other "employ- ees" of yours. However, none of these "employees" are insureds for "bodily injury" or "personal and © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 6 of 8 advertising injury" arising out of their willful conduct, which is defined as the purposeful or willful intent to cause "bodily injury" or "personal and advertising injury", or caused in whole or in part by their intoxica- tion by liquor or controlled substances. The coverage provided by provision J. is excess over any other valid and collectable insurance available to your "employee". K. NEWLY FORMED OR ADDITIONALLY ACQUIRED ENTITIES Paragraph 3. of Section II -Who Is An Insured is replaced by the following: 3. Any organization you newly acquire or form and over which you maintain ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until the expiration of the policy period in which the entity was acquired or formed by you; b. Coverage A does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and c. Coverage B does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. d. Records and descriptions of operations must be maintained by the first Named Insured. No person or organization is an insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations or qualifies as an insured under this provision. L. FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES Under Section IV -Commercial General Liability Conditions, the following is added to Condition 6. Repre- sentations: Your failure to disclose all hazards or prior "occurrences" existing as of the inception date of the policy shall not prejudice the coverage afforded by this policy provided such failure to disclose all hazards or prior 'occurrences" is not intentional. M. KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT Under Section IV - Commercial General Liability Conditions, the following is added to Condition 2. Duties In The Event of Occurrence, Offense, Claim Or Suit: Knowledge of an 'occurrence", offense, claim or "suit' by an agent, servant or "employee" of any insured shall not in itself constitute knowledge of the insured unless an insured listed under Paragraph 1. of Section II -Who Is An Insured or a person who has been designated by them to receive reports of "occurrences", offenses, claims or "suits" shall have received such notice from the agent, servant or "employee". N. LIBERALIZATION CLAUSE If we revise this Commercial General Liability Extension Endorsement to provide more coverage without additional premium charge, your policy will automatically provide the coverage as of the day the revision is effective in your state. O. BODILY INJURY REDEFINED Under Section V -Definitions, Definition 3. is replaced by the following: 3. "Bodily Injury" means physical injury, sickness or disease sustained by a person. This includes mental anguish, mental injury, shock, fright or death that results from such physical injury, sick- ness or disease. © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission. Page 7 of 8 P. EXTENDED PROPERTY DAMAGE Exclusion a. of COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY is replaced by the following: a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. Q. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US - WHEN REQUIRED IN A CONTRACT OR AGREEMENT WITH YOU Under Section IV - Commercial General Liability Conditions, the following is added to Condition 8. Trans- fer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have against a person or organization because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the "products-completed operations hazard" provided: 1. You and that person or organization have agreed in writing in a contract or agreement that you waive such rights against that person or organization; and 2. The injury or damage occurs subsequent to the execution of the written contract or written agree- ment. © 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 8 of 8 COMMERCIAL GENERAL LIABILITY CG 88 70 12 08 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONSTRUCTION PROJECT(S) - GENERAL AGGREGATE LIMIT (PER PROJECT) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. For all sums which the insured becomes legally obligated to pay as damages caused by 'occurrences" under Section I - Coverage A - Bodily Injury And Property Damage Liability, and for all medical ex- penses caused by accidents under Section I - Coverage C Medical Payments, which can be attributed only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. A separate Construction Project General Aggregate Limit applies to each construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations . 2. The Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products-completed operations hazard", and for medical expenses under Cov- erage C regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Construction Project General Aggregate Limit for that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Construction Project General Aggregate Limit for any other construction project. 4. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Construction Project General Aggregate Limit. B. For all sums which the insured becomes legally obligated to pay as damages caused by 'occurrences" under Section I - Coverage A - Bodily Injury And Property Damage Liability, and for all medical ex- penses caused by accidents under Section I - Coverage C Medical Payments, which cannot be attrib- uted only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products-Completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Construction Project General Aggregate Limit. C. When coverage for liability arising out of the "products-completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products- completed operations hazard" will reduce the Products-Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Construction Project General Aggregate Limit. D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. The provisions of Section III - Limits Of Insurance not otherwise modified by this endorsement shall continue to apply. CG 88 70 12 08 Includes copyrighted material of ISO Properties,Inc.,with its permission. Page 1 of 1 COMMERCIAL GENERAL LIABILITY CG 85 83 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED CONTRACTORS - PRODUCTS/COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Paragraph 2. under Section II - Who Is An Insured is amended to include as an insured any person or organization whom you have agreed to add as an additional insured in a written contract or written agreement. Such person or organization is an additional insured but only with respect to liability for "bodily injury" or "property damage": 1. Caused by "your work" performed for that additional insured that is the subject of the written contract or written agreement; and 2. Included in the "products-completed operations hazard". However: a) The insurance afforded to such additional insured only applies to the extent permitted by law; and b) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured The insurance provided by this endorsement applies only if the written contract or written agreement is signed prior to the "bodily injury" or "property damage". We have no duty to defend an additional insured under this endorsement until we receive written notice of a "suit" by the additional insured as required in Paragraph b. of Condition 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit under Section IV -Commercial General Liability Conditions. B. With respect to the insurance provided by this endorsement, the following are added to Paragraph 2. Exclusions under Section I -Coverage A-Bodily Injury And Property Damage Liability: This insurance does not apply to: 1. 'Bodily injury" or "property damage" that occurs prior to you commencing operations at the ° location where such "bodily injury" or "property damage" occurs. 2. 'Bodily injury" or "property damage" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services including: a. The preparing, approving or failure to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawing and specifications; and b. Supervisory, inspection, architectural or engineering activities. © 2013 Liberty Mutual Insurance CG 85 83 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission . Page 1 of 2 C. With respect to the insurance afforded by this endorsement, exclusion I. Damage To Your Work of Paragraph 2. Exclusions under Section I - Coverage A - Bodily Injury And Property Damage Liability is replaced by the following: I. Damage To Your Work "Property damage" to "your work" arising out of it or any part of it and included in the "products- completed operations hazard". D. With respect to the insurance afforded to these additional insureds, the following is added to Section II - Limits of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declaration. whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declaratio ns. E. With respect to the insurance afforded by this endorsement, Section IV -Commercial General Liability Conditions is amended as follows: 1. The following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claims Or Suit: An additional insured under this endorsement will as soon as practicable: a. Give written notice of an "occurrence" or an offense that may result in a claim or "suit" under this insurance to us; b. Tender the defense and indemnity of any claim or "suit" to all insurers whom also have insurance available to the additional insured; and c. Agree to make available any other insurance which the additional insured has for a loss we cover under this Coverage Part. d. We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a"suit" by the additional insured. 2. Paragraph 4. of Section IV -Commercial General Liability Conditions is amended as follows: a. The following is added to Paragraph a. Primary Insurance: If an additional insured's policy has an Other Insurance provision making its policy excess, and you have agreed in a written contract or written agreement to provide the additional insured coverage on a primary and noncontributory basis, this policy shall be primary and we will not seek contribution from the additional insured's policy for damages we cover. b. The following is added to Paragraph b. Excess Insurance: When a written contract or written agreement, other than a premises lease, facilities rental contract or agreement, an equipment rental or lease contract or agreement, or permit issued by a state or political subdivision between you and an additional insured does not require this insurance to be primary or primary and non-contributory, this insurance is excess over any other insurance for which the additional insured is designated as a Named Insured. Regardless of the written agreement between you and an additional insured, this insur- ance is excess over any other insurance whether primary, excess, contingent or on any other basis for which the additional insured has been added as an additional insured on other policies. © 2013 Liberty Mutual Insurance CG 85 83 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission . Page 2 of 2 BIDDER RESPONSIBILITY CRITERIA Statement that Bidder Has Not Been Disqualified This statement is required by state law (RCW 39.04.350(1)(d)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (February 22, 2023), the bidder has not been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). HUIZENGA ENTERPRISES LLC Bidder's Business Name Signature of Authorized Official* RICHARD HUIZENGA Printed Name MANAGER Title 2/21/2023 BELLINGHAM WA Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2023 Crack Sealing/Araucto 19 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (February 22, 2023), the bidder is not a 'willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. HUIZENGA ENTERPRISES LLC Bidder's Business Name Signature of Authorized Offic aT" RICHARD HUIZENGA Printed Name MANAGER Title 2/21/2023 BELLINGHAM WA Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2023 Crack Sealing/Araucto 20 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 PROPOSAL SIGNATURE PAGE The undersigned bidder hereby proposes and agrees to start construction work on the Contract, if awarded to him/her, on or before ten (10) calendar days from the date of the Notice to Proceed, and agrees to complete the Contract within twenty-six (26) working days after issuance of the City's Notice to Proceed. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. The City anticipates issuance of the Notice to Proceed on the day of the preconstruction meeting. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening. The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5% of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. Receipt of Addendum No.'s , �' , /✓ /V to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal. By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE: 2/21/2023 HUIZENGA ENTERPRISES LLC NAME OF BI Signature of Authorized Representative RICHARD HUIZENGA, MANAGER (Print Name and Title) PO BOX 31944 Address BELLINGHAM, WA. 98228 2023 Crack Sealing/Araucto 21 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 BID BOND FORM KNOW ALL MEN BY THESE PRESENTS: That we, Huizenga Enterprises LLC , as Principal, and Philadelphia Indemnity Insurance Company as Surety, are held and firmly bound unto the CITY OF KENT, as Obligee, in the penal sum of 5% OF BID AMOUNT Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for 2023 Crack Sealing/Project Numbers: 23-3001.4 and 23-3011.3 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS 22nd DAY OF February 2023. PRINCIPAL Y44.....afaak §ttREp�+a Cameron Huntsucker,Attorney-ire-Fact ' 20 Received return of deposit in the sum of $ 2023 Crack Sealing/Araucto 22 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 . r PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Kara Skinner,Cameron Huntsucker,Sierra Maine,Mercedes Trokey-Moudy,and Jennifer Grenrood of Intearity Surety LLC its true and lawful Attorney-in-fact with full authority to execute on its behalf bonds,undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$50,000,000. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 14'h of November,2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company:(1)Appoint Attomey(s)in Fact and authorize the Attorney(s)in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto;and (2)to remove,at any time,any such Attorney-in-Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 5TH DAY OF MARCH,2021. Pg^v y Via, (Seal) """` UV 4JohAao.mb, President&CEO Philadelphia Indemnity Insurance Company On this 5'day of March,2021 before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. Notary Public: Commonwealth of Pennsylvania-Notary Seal Vanessa Mckenzie,Notary Public Montgomery County My commission expires November 3,2024 Commission number 1366394 Member,,Pennsylvar:a Association of Notaries residing at: Bala Cynwyd,PA My commission expires: November 3,2024 1,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do hereby certify that the foregoing resolution of the Board of Directors and the Power of Attorney issued pursuant thereto on the 5'day March,2021 are true and correct and are still in full force and effect.I do further certify that John Glomb, who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duty elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY. In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 22ndday of February 2023 y192 Edward Sayago,Corporate Secretary _4$ PHILADELPHIA INDEMNITY INSURANCE COMPANY CITY OF KENT COMBINED DECLARATION FORM: NON-COLLUSION, MINIMUM WAGE NON-COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. 2023 Crack Sealing Project Numbers: 23-3001.4 and 23-3011.3 NAME OF PROJECT HUIZENGA ENTERPRISES LLC NAME OF BIDDER'S FIRM SIGNATURE OF AUTHORIZED REPRESENTATIVE OF BIDDER 2023 Crack Sealing/Araucto 23 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. [Enter # 1, 2, 3, etc.] NAME OF CONTRACTOR: [Insert Company Name] ("Contractor") CONTRACT NAME & PROJECT NUMBER:rInsert Name of Original Contract & Project #, if applicable] ORIGINAL CONTRACT DATE: (Insert Date Original Contract was Signedl This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section 1 of the Contract is hereby modified to revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order - Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and date] 2. The contract amount and time for performance provisions of Section 1 of the Contract are also modified as follows: Original Contract Sum, $ (including applicable alternates and WSST) Net Change by Previous Change Orders $ (incl. applicable WSST) Current Contract Amount $ (incl. Previous Change Orders) Current Change Order $ Applicable WSST Tax on this Change $ Order Revised Contract Sum $ 2023 Crack Sealing/Araucto 24 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 6'" Original Time for Completion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (f) for this Change working days Order Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: (signature) (signature) Print Name: Print Name: Chad Bieren, P.E. Its Its Public Works Director (title) (title) DATE: DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department 2023 Crack Sealing/Araucto 25 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 Bond#PB11777500112 PAYMENT AND PERFORMANCE BOND KENT TO CITY OF KENT KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Huizenga Enterprises LLC as Principal, and Philadelphia Indemnity Insurance Company a Corporation organized and existing under the laws of the State of Pennsylvania,as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $ 186,455.88 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 2023 Crack Sealing/Project Numbers: 23-3001.4 and 23-3011.3 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or deve►oping in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. 2023 Crack Sealing/Araucto 27 February 6, 2023 Project Numbers: 23-3001.4 & 23-3011.3 TWO WITNESSES: Huizenga Enterprises LLC PRINCIPAL (enter principal's name above) BY: - 2 TITLE: DATE: _v ,.3 DATE: 3 I "Z3 CORPORATE SEAL: PRINT NAME DATE: Philadelphia Indemnity Insurance Company SURETY � RA "SEAL: BY: ameron L.Muntsucker 3/13/2023 = DATE: • 27 2i � a rrz�, I y TITLE: Attorney-in-Fact AS c/o c/o Integrity Surety LLC ti< ADDRESS: 17544 Midvale Ave N#300 Seattle WA 98133 (206)546-1397 cameron@integritysurety.com CERTIFICATE AS TO CORPORATE SEAL. hereby certify that I am the (Assistant) Secr�taryof the Corporation named as Principal in the within Bond; that Who signed the said bond on behalf of the Principal \A eti �' r of the said Corporation; that I know his signature thereto is genyline, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTANT SECRETARY Ilk q2. 4L SOS PPIv P ,••O� i •• 2101•• `�� 2023 Crack Sealing/Araucto 28 February 6, 2023 Project Numbers: 23-3001.4 & 23-3011.3 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Kara Skinner,Cameron Huntsucker,Sierra Maine,Mercedes Trokev-Moudv,and Jennifer Grenrood of Inteerity Surety LLC its true and lawful Attomey-in-fact with full authority to execute on its behalf bonds,undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$50,000,000. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 141 of November,2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company:(1)Appoint Attorney(s)in Fact and authorize the Attorney(s)in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto;and (2)to remove,at any time,any such Attorney-in-Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attomey or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 5TH DAY OF MARCH,2021. x{� d 7 * (Seal) Joh Glomb, President&CFO Philadelphia Indemnity Insurance Company On this 51 day of March,2021 before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. Notary Public: Commonweallh of Pennsylvania•Notary Seal Vanessa Mckenzie,Notary Public Montgomery County My commission expires November 3,2024 Commission number 1366394 Member,,Pannrylvar:m Aesoclatbn of Notarise residing at: Bala Cynwyd,PA My commission expires: November 3,2024 I,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do hereby certify that the foregoing resolution of the Board of Directors and the Power of Attorney issued pursuant thereto on the 5'day March,2021 are true and correct and are still in full force and effect.I do further certify that John Glomb, who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY. In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 1 3th day of March 2023 Edward Sayago,Corporate Secretary' k PHILADELPHIA INDEMNITY INSURANCE COMPANY g✓_ ni CONTRACT THIS AGREEMENT, is entered into between the CITY OF KENT, a Washington municipal corporation ("City"), andLc-�- organized under the laws of the State of Q off"^ , located and doing business at — f ( Pam" 3 ("Contractor"). WITNESS: In consideration of the terms and conditions contained in this Agreement and in the project documents, plans, and specifications all of which are a part of this Agreement, the parties agree as follows: 1. The Contractor shall do all work and furnish all tools, materials, and equipment for: 2023 Crack Sealing/Project Numbers: 23-3001.4 and 23-3011.3 in accordance with and as described in the Contract and shall perform any alterations in or additions to the work provided under the Contract and every part thereof. The Contract shall include all project specifications, provisions, and plans; the City's general and special conditions; the 2023 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("Standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2023 WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues its Notice to Proceed and work shall be physically completed within twenty-six (26) working days. The term of this Contract shall continue until all work has been completed, Final Acceptance has occurred, and all Contractor obligations have been fulfilled. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for in the Contract, except where the specifications allocate that responsibility to the City. The total contract amount for all Work performed under this Contract, including Washington State Sales Tax, is $186.455.88 2. The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and in the manner and upon the conditions provided for in the Contract. 3. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 2023 Crack Sealing/Araucto 29 February 6, 2023 Project Numbers: 23-3001.4&23-3011.3 4. It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. 5. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this contract, except for injuries and damages caused by the sole negligence of the City. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. 6. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit in the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the City. 7. The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amounts described in Exhibit A attached and incorporated by this reference. 8. Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19.122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19.122, including utilization of the "one call" locator service before commencing any excavation activities. 2023 Crack Sealing/Araucto 30 February 6, 2023 Project Numbers: 23-3001.4 & 23-3011.3 CITY OF KENT DANA RALPH, MAYOR DATE: 03/22/2023 ATTEST: &45 KIMBERLEYdFJkOMOTO, CITY CLERK AP ROVED AS TO FORM: A-t-r�' O�A KENT r AW DEPARTMENT CONTRACTOR PRINT NAME: TITLE: CAy1a5,e-= DATE: T�C�-Z��� 2023 Crack Sealing/Araucto 31 February 6, 2023 Project Numbers: 23-3001 A & 23-3011.3 EXHIBIT A INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2023 Crack Sealing/Araucto 32 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 EXHIBIT A (Continued) 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Contractor's Insurance for Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 2023 Crack Sealing/Araucto 33 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 EXHIBIT A (Continued) F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 2023 Crack Sealing/Araucto 34 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 KENT SPECIAL PROVISIONS TABLE OF CONTENTS PAGE DIVISION 1 GENERAL REQUIREMENTS ...................................... 1-1 1-01 Definitions and Terms.......................................................1-1 1-02 Bid Procedures and Conditions ...........................................1-2 1-03 Award and Execution of Contract........................................1-5 1-04 Scope of the Work ...........................................................1-5 1-05 Control of Work ...............................................................1-7 1-06 Control of Material ...........................................................1-10 1-07 Legal Relations and Responsibilities to the Public ..................1-12 1-08 Prosecution and Progress ..................................................1-16 1-09 Measurement and Payment ...............................................1-20 1-10 Temporary Traffic Control .................................................1-21 DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS ............... 5-1 5-04 Hot Mix Asphalt ...............................................................5-1 DIVISION 9 MATERIALS............................................................. 9-1 9-04 Joint and Crack Sealing Materials .......................................9-1 CRACK SEALING SPECIFICATIONS................................................... A-1 LOCATION MAPS, SITE DESCRIPTION, AND QUANTITY ESTIMATES A-2 TRAFFIC CONTROL PLANS ............................................................... A-3 PREVAILING WAGE RATES............................................................... A-4 2023 Crack Sealing/Araucto February 6, 2023 Project Numbers: 23-3011.3 KENT SPECIAL PROVISIONS The Kent Special Provisions ("Kent Special Provisions" or "KSP") modify and supersede any conflicting provisions of the 2023 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations ("WSDOT Standard Specifications"). Otherwise all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. DIVISION 1 - GENERAL REQUIREMENTS 1-01 DEFINITIONS AND TERMS SECTION 1-01.1 IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a "Section," for example, "in accordance with Section 1-01," the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account HR Hour M GAL Thousand gallons NIC Not In Contract SF Square Feet SECTION 1-01.3, "CONTRACT"DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1. What work will be done, and by when; 2. Who provides labor and materials; and 3. How Contractors will be paid. 2023 Crack Sealing/Araucto 1-1 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 The Contract includes the Contract (agreement) Form, Bidder's completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1. Standard Plans (M21-01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the "National Electrical Code." Responsibility for obtaining these publications rests with the Contractor. SECTION 1-01.3, "DEFINITIONS"IS SUPPLEMENTED BY ADDING THE FOLLOWING DEFINITION: Incidental Work The terms "incidental to the project," "incidental to the involved bid item(s)," etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1-04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID PROCEDURES AND CONDITIONS SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City's review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the contract to the next lowest bidder that the City, in its sole judgment, 2023 Crack Sealing/Araucto 1-2 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 determines is also responsible and able to perform the contract work (the "lowest responsive and responsible bidder"). SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a "Bid Proposal" for the advertised project by downloading at no charge at KentWA.gov/doing-business/bids-procurement; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder's or the City's technology. SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder's sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE LAST PARAGRAPH: Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS. SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier's check, or a proposal bond (Surety bond). Any proposal bond shall be on the City's bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized 2023 Crack Sealing/Araucto 1-3 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the "Invitation to Bid." Bids must be received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1. The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 1(a) WITH THE FOLLOWING: 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. SECTION 1-02.14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING: 2023 Crack Sealing/Araucto 1-4 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 1-02.14 Disqualification of Bidders 3. The bidder is not qualified for the work or to the full extent of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION: 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BY REPLACING "45 CALENDAR DAYS" WITH "60 CALENDAR DAYS"RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions. SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if any, shall be timely filed in the King County Superior Court, located in Kent, Washington. 1-04 SCOPE OF THE WORK SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1(2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the proposal form, the entire cost of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. 2023 Crack Sealing/Araucto 1-5 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, "KENT SPECIAL PROVISIONS, KENT STANDARD PLANS"FOLLOWING THE WORDS, "CONTRACT PROVISIONS"IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH. SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1. Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1-04.5. The Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.6 Variation in Estimated Quantities 2023 Crack Sealing/Araucto 1-6 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 2. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1-05.8, the requirements of KSP Section 1-05.8 will prevail. SECTION 1-05.7IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.7 Removal of Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer, or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor's failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. 2023 Crack Sealing/Araucto 1-7 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City's rights provided by this section nor shall the exercise of this right diminish the City's right to pursue any other remedy available under law with respect to the Contractor's failure to perform the work as required. SECTION 1-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW SUBSECTION: 1-05.9 Equipment 1-05.9(1) Operational Testing It is the intent of the City to have at the Physical Completion Date a complete and operable system. Therefore, when the work involves the installation of machinery or other mechanical equipment, street lighting, electrical distribution of signal systems, building or other similar work, it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the Physical Completion Date. Whenever items of work are listed in the contract provisions for operational testing, they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. In the event the contract does not specify testing time periods, the default testing time period shall be twenty-one (21) calendar days. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment that prove faulty or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing shall be included in the various contract bid item prices unless specifically set forth otherwise in the contract. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the Contract. SECTION 1-05.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees 2023 Crack Sealing/Araucto 1-8 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 In addition to any other warranty or guarantee provided for at law or in the parties' contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer's effort to establish a list of corrective work then known and discovered. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH: 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2023 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05.13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor's qualifications or prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. SECTION 1-05.14 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Other Contracts Or Other Work It is anticipated that the following work adjacent to or within the limits of this project will be performed by others during the course of this project and will require coordination of the work: None SECTION 1-05IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-05.16 Water and Power 2023 Crack Sealing/Araucto 1-9 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 The Contractor shall make necessary arrangements and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY. 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany each submittal with a letter of transmittal containing the following information: 1. Contractor's name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1, 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1A, 1B, 1C, etc.). 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. 5. Bid item(s) where product will be used. 1-06.7(2) Schedule of Submittals The Contractor shall create and submit three (3) copies of a schedule of submittals showing the date by which each submittal required for product review or product information will be made. The schedule can be modified, deducted, or added to by the City. The schedule shall be available at the preconstruction conference (see 1-08.0 of the Kent Special Provisions). The schedule of submittals must be accepted prior to the City making the first progress payment. The schedule shall identify the items that will be included in each submittal by listing the 2023 Crack Sealing/Araucto 1-10 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 item or group of items and the Specification Section and paragraph number and bid item under which they are specified. The schedule shall indicate whether the submittal is required for product review of proposed equivalents, shop drawings, product data or samples or required for product information only. The Contractor shall allow a minimum of 21 days for the Engineer's review of each submittal or resubmittal. All submittals shall be in accordance with the approved schedule of submittals. Submittals shall be made early enough to allow adequate time for manufacturing, delivery, labor issues, additional review due to inadequate or incomplete submittals, and any other reasonably foreseeable delay. 1-06.7(3) Shop Drawings, Product Data, and Samples The Contractor shall submit the following for the Engineer's review: 1. Shop Drawings: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 2. Product Data: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 3. Samples: Submit three labeled samples or three sets of samples of manufacturer's full range of colors and finishes unless otherwise directed. One approved sample will be returned to the Contractor. Content of submittals: 1. Each submittal shall include all of the items required for a complete assembly or system. 2. Submittals shall contain all of the physical, technical and performance data required to demonstrate conclusively that the items comply with the requirements of the Contract. 3. Each submittal shall verify that the physical characteristics of items submitted, including size, configurations, clearances, mounting points, utility connection points and service access points, are suitable for the space provided and are compatible with other interrelated items. 4. The Contractor shall label each Product Data submittal, Shop Drawing or Sample with the bid item number and, if a lump sum bid item, provide a reference to the applicable KSP paragraph. The Contractor shall highlight or mark every page of every copy of all Product Data submittals to show the specific items being submitted and all options included or choices offered. The City encourages a creative approach to complete a timely, economical, and quality project. Submittals that contain deviations from the requirements of the Contract shall be accompanied by a separate letter explaining the deviations. The Contractor's letter shall: 2023 Crack Sealing/Araucto 1-il February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 1. Cite the specific Contract requirement including the Specification Section bid item number and paragraph number for which approval of a deviation is sought. 2. Describe the proposed alternate material, item or construction, explain its advantages, and explain how the proposed alternate meets or exceeds the Contract requirements. 3. State the reduction in Contract Price, if any, which is offered to the City. The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed deviation with or without cause. The Engineer will stamp and mark each submittal prior to returning it to the Contractor. The stamps will indicate one of the following: 1. "APPROVED AS SUBMITTED" - Accepted subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. 2. "APPROVED AS NOTED" - Accepted subject to minor corrections that shall be made by the Contractor and subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. No resubmission is required. 3. "AMEND AND RESUBMIT" - Rejected because of major inconsistencies, errors or insufficient information that shall be resolved or corrected by the Contractor prior to subsequent re- submittal. An amended resubmission is required. Re-submittals that contain changes that were not requested by the Engineer on the previous submittal shall note all changes and be accompanied by a letter explaining the changes. 1-06.7(4) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.2 State Taxes 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1-07.2(1) in the proposal bid items. 2023 Crack Sealing/Araucto 1-12 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING; Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1-07.2(2) in the proposal bid items. SECTION 1-07.4(2) IS DELETED AND REPLACED WITH THE FOLLOWING; 1-07.4(2) COVID-19 Job Site Requirements The Contractor shall comply with all COVID-19 workplace health and safety measures established by the state Department of Labor & Industries or otherwise imposed by the Governor, the state Department of Health, or the Local Health Officer of Seattle-King County Public Health, or subsequent modifications to such health and safety measures as those authorities may issue, including providing all needed personal protective equipment. SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH; 1-07.6 Permits and Licenses The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH: A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH; 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. 2023 Crack Sealing/Araucto 1-13 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 1-07.13 Contractor's Responsibility for Work SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) Repair of Damage SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION; 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 1- 07.14 and Section 5 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH: 1-07.15 Temporary Water Pollution Prevention 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan When the proposal form includes multiple bid schedules and the "SPCC Plan" bid item is present in only one bid schedule, the lump sum payment item for the "SPCC Plan" in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. SECTION 1-07.17IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH; 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07.17IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the 2023 Crack Sealing/Araucto 1-14 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 Contractor, the Contractor/excavator is responsible to determine the precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.17(4) Payment All costs to comply with subsection 1-07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor's failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. Lumen Comcast Tanaiya Anderson Aaron Cantrell 253-313-8961 206-510-4222 (cell) TanaiyaAndersonMumen.com Aaron Cantrel@comcast.com Puget Sound Energy Gas Puget Sound Energy Power Glenn Helton Gary Bradley 253-395-6926 253-234-6302 425-559-4647 (cell) Gary.Bradley(@pse.com Glenn.Helton@pse.com Verizon Scott Christenson 425-636-6046 425-471-1079 (cell) 2023 Crack Sealing/Araucto 1-15 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1- 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 1-08 PROSECUTION AND PROGRESS SECTION 1-08 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 1-08.0 Preconstruction and Preconstruction Conference The Engineer will furnish the Contractor with up to ten (10) copies of the plans and specifications. Additional documents may be purchased from the City at the price specified by the City or in the Invitation to Bid. Prior to undertaking each part of the work, the Contractor shall 2023 Crack Sealing/Araucto 1-16 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 carefully study and compare the Contract and check and verify all pertinent figures shown and all applicable field measurements. The Contractor shall promptly report in writing to the Engineer any conflict, error or discrepancy that the Contractor discovers. After the Contract has been executed, but prior to the Contractor beginning the work, a preconstruction conference will be held with the Contractor, the Engineer and any other interested parties that the City determines to invite. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule. 2. To establish a working understanding among the various parties associated or affected by the work. 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc. 4. To verify normal working hours for the work. 5. To review safety standards and traffic control. 6. To discuss any other related items that may be pertinent to the work. The Contractor shall prepare and submit for approval, at or prior to the preconstruction conference the following: 1. A price breakdown of all lump sum items. 2. A preliminary construction schedule. 3. A list of material sources for approval, if applicable. 4. Schedule of submittals. (See 1-06.6(2)) 5. Temporary Erosion/Sedimentation Control Plan (TESCP) for approval. 6. Traffic Control Plan (TCP) for approval. 7. Request to sublet, for approval by the Engineer, of all subcontractors. SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The City anticipates issuance of Notice to Proceed on or after July 11, 2023. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. 2023 Crack Sealing/Araucto 1-17 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 Except in the case of emergency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one-hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City's noise control regulations or the city receives complaints from the public or adjoining property owners regarding noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours, but may be subject to other conditions established by the City or Engineer. These conditions may include, but are not limited to the following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. The Contractor shall coordinate its work around scheduled events that will likely impact its Work. The Contractor shall have no claim for damages or delays for work schedule conflicts. The following are known events that could impact the work: 1. None 1-08.4(A) Reimbursement for Overtime Work of City Employees Following is a non-exclusive list of work that may require Contractor reimbursement for overtime of City employees. The City will bill the Contractor at the OVERTIME RATE in order for locate crews to complete other work. If the locate request is for nights, weekend, holidays or at other times when locate crews are not normally working, all locate work and expenses, including travel, minimum call out times, and/or Holiday premiums will be borne by the Contractor. 2023 Crack Sealing/Araucto 1-18 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 1. Locate work required to re-establish marks for City-owned underground facilities that were not maintained or recorded by the Contractor in accordance with RCW 19.122.030. 2. Work required by City personnel or independent testing laboratories to re-test project materials, utility pressure or vacuum tests, camera surveys or water purity tests as the result of initial test failure on the part of the Contractor. 1-08.4(B) General The City allocates its resources to a contract based on the total time allowed in the contract. The City will accept a progress schedule indicating an early physical completion date but cannot guarantee the City resources will be available to meet the accelerated schedule. No additional compensation will be allowed if the Contractor is not able to meet its accelerated schedule due to the unavailability of City resources or for other reasons beyond the City's control. Unless previously approved by the Engineer, the original and all supplemental progress schedules shall not conflict with any time and order-of-work requirements in the contract. If the Engineer deems that the original or any necessary supplemental progress schedule does not provide adequate information, the City may withhold progress payments until a schedule containing needed information has been submitted by the Contractor and approved by the Engineer. The Engineer's acceptance of any schedule shall not transfer any of the Contractor's responsibilities to the City. The Contractor alone shall remain responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the times specified in the contract. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time 2023 Crack Sealing/Araucto 1-19 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1-04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor's written notice to protest. In any event, no protest will be allowed later than the date of the Contractor's signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension, and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1- 09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.9 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 1-09.9(2) City's Right to Withhold Certain Amounts In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1. The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 2023 Crack Sealing/Araucto 1-20 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 5. Engineering and inspection fees beyond Completion Date. 6. Cost of City personnel to re-establish locate marks for City-owned facilities that were not maintained by the Contractor in accordance with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re-doing failed, water, other utility tests. SECTION 1-09.11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.11(3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor's failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to the Contractor's right to seek an appeal of the City's decision. The City's decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor's right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. 1-10 TEMPORARY TRAFFIC CONTROL SECTION 1-10.2(1) IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-10.2(1) General 2023 Crack Sealing/Araucto 1-21 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 The TCS shall be certified as a work site traffic control supervisor by one of the following: Evergreen Safety Council 401 Pontius Avenue North Seattle, WA 98109 1-800-521-0778 or 206-382-4090 The Northwest Laborers-Employers Training Trust 27055 Ohio Avenue Kingston, WA 98346 360-297-3035 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 Training Dept. Toll Free (877) 642-4637 or (540) 368-1701 1-10.3(3) Traffic Control Devices SECTION 1-10.3 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION; 1-10.3(3)L Temporary Traffic Control Devices When the bid proposal includes an item for "Temporary Traffic Control Devices," the work required for this item shall be furnishing barricades, flashers, cones, traffic safety drums, and other temporary traffic control devices, unless the contract provides for furnishing a specific temporary traffic control device under another item. The item "Temporary Traffic Control Devices" includes: 1. Initial delivery to the project site (or temporary storage) in good repair and in clean usable condition, 2. Repair or replacement when they are damaged and they are still needed on the project, and 3. Removal from the project site when they are no longer on the project. SECTION 1-10.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-10.5 Payment Payment will be made in accordance with Section 1-04.1, for the following bid items when they are included in the Proposal: The unit contract price for "Traffic Control Labor" per hour shall be full pay for all costs for the labor provided for performing those construction operations described in Section 1-10.2(1)B, and Section 1-10.3(1) of the WSDOT Standard Specifications, and as authorized by the Engineer. The hours eligible for "Traffic Control Labor" shall be 2023 Crack Sealing/Araucto 1-22 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 limited to the hours the worker is actually performing the work as documented by traffic control forms provided by the Contractor's TCM, and verified by the City Inspector's records, and the Contractor's Certified Payroll Records submitted to the City Inspector on a weekly basis. The unit contract price for "Traffic Control Supervisor" per hour shall be full pay for each hour a person performs the Traffic Control Supervisor duties described in Section 1-10.2(1)B of the WSDOT Standard Specifications. Payment for traffic control labor performed by the Traffic Control Supervisor will be paid under the item for "Traffic Control Labor". The lump sum contract price for "Temporary Traffic Control Devices" shall be full pay for providing the work described in Section 1-10.3(3)L of the Kent Special Provisions. Progress payment for the lump sum item "Temporary Traffic Control Devices" will be made as follows: 1. When the initial temporary traffic control devices are set up, 50 percent of the amount bid for the item will be paid. 2. Payment for the remaining 50 percent of the amount bid for the item will be paid on a prorated basis in accordance with the total job progress as determined by progress payments. The unit contract price for "Portable Changeable Message Sign (PCMS)" per day shall be full pay for all costs for furnishing, transporting, initial installation within the project limits, maintaining and removing the PCMS, and associated work described in Section 1-10.3(3)C of the WSDOT Standard Specifications. Relocation of the PCMS within the project limits will be paid under the item "Traffic Control Labor." The unit contract price for "Sequential Arrow Sign (SAS)" per day shall be full pay for all costs for providing, maintaining and removing the SAS, and associated work and maintenance described in Section 1-10.3(3)B of the WSDOT Standard Specifications. The operator of this device will be paid under the item "Traffic Control Labor." When the proposal does not include a bid item for a specific bid item listed in the WSDOT Standard Specifications and/or the Kent Special Provisions, all costs for the work described for those traffic control bid items shall be included by the Contractor in the unit contract prices for the various other bid items contained within the proposal. The Contractor shall estimate these costs based on the Contractor's contemplated work procedures. When traffic control bid items are included in the bid proposal, payment is limited to the following work areas: 1. The entire construction area under contract and for a distance to include the initial warning signs for the beginning of the project and the END OF CONSTRUCTION sign. Any warning signs for side streets on the approved TCP are also included. If the project 2023 Crack Sealing/Araucto 1-23 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 consists of two or more sections, the limits will apply to each section individually. 2. A detour provided in the plans or approved by the City's Traffic Control Supervisor for by-passing all or any portion of the construction, irrespective of whether or not the termini of the detour are within the limits of the Contract. No payment will be made to the Contractor for traffic control items required in connection with the movement of equipment or the hauling of materials outside of the limits of 1 and 2 above, or for temporary road closures subject to the provisions of Section 1-07.23(1) of the WSDOT Standard Specifications. 2023 Crack Sealing/Araucto 1-24 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 5-04 HOT MIX ASPHALT SECTION 5-04.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 5-04.1 Description Streets may be removed from this project or additional streets may be added to this project as the City's project budget allows. SECTION 5-04.2 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 5-04.2 Materials The crack sealant materials shall be Roadsaver Low Tack and Detack by Crafco, Incorporated or approved equivalent. See Appendix A-1 for Crafco material specifications. 5-04.3 Construction Requirements SECTION 5-04.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 5-04.3(5)C Crack Sealing Where directed by the Engineer, at locations specified on the Site Description and Quantity Detail map located in Appendix A-2 of this Document, the Contractor shall perform crack sealing on existing asphalt concrete streets in accordance with the product manufacturer's installation instructions except where modified herein. The Site Description and Quantity Detail inserted in the map describes the street sections, the estimated Tack for Crack Sealing quantity for each street section, and the priority number. The Contractor shall preform crack sealing upon roadway(s) with the smallest priority number first before proceeding with the same activity upon roadway with the next lowest priority number. The Contractor shall immediately cease crack sealing when the total installed crack sealing quantity equal the total contract quantity for Crack Sealant for Crack Sealing for each Schedule. Crack sealing shall not be performed on pavement with severe alligator cracking. Severe alligator cracking is defined as a series of interconnecting cracks ranging from 3/8- inch to 1/2-inch in width in an asphalt pavement surface forming a pattern that resembles an alligator's hide. Individual pieces are severely spalled, appear loose, and may move under traffic. All cracks shall be cleaned, no more than ten (10) minutes prior to applying crack sealant by air blasting equipment capable of producing a pressure of 100 psi. Air blasting shall be performed using either an air lance or a hot air lance. The air blasting equipment shall be equipped with moisture and oil traps to assure the side walls of the crack are not 2023 Crack Sealing/Araucto 5 - 1 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 contaminated by the blowing operation. If the cracks contain vegetation, it shall be completely removed before crack sealing begins. The prepared cracks shall also be free of moisture, dust, loose aggregate, and other contaminates prior to the application of sealant. The Contractor shall be required to provide protective screening if the Engineer determines that cleaning and conditioning operations could cause damage to or interference with traffic in adjacent lanes. Sealant material shall not be placed if weather conditions are raining or wet. Should the Contractor place sealant and rain should fall before the sealant has properly cured, the Contractor shall remove and replace the wet/contaminated sealant with no extra compensation due from Owner. Sealing shall be placed in an overband (simple band-aid) configuration whereas the sealant is placed into and over the crack. Overbanding shall be controlled using a sealing disk, having a concave underside, to provide a smooth flush pavement surface with a minimum width of 2 inches, a maximum width of 3 inches, and a maximum band-aid sealant thickness of 1/8-inch. If, in the opinion of the Engineer, the Contractor's method of sealing results in an excessive amount of sealant, sealing shall be stopped, corrected, and the method changed. Contractor shall clean any excess overflow from the pavement surface. Sealant shall not be placed on or through pavement marking symbols, letters, stop lines, and crosswalk lines. Contractor shall apply Detack to sealant and allow sealant to cure sufficient time to prevent tracking prior to allowing traffic to travel on sealed area. Any damage by traffic to the treated pavement areas shall be repaired by the Contractor at no expense to the Owner. Any cracks or joints that do not remain completely filled after one week after installation shall be topped off with additional rubberized asphalt sealant material. Crack sealing operations shall not be permitted when pavement temperature is at or below 40 degrees Fahrenheit, or as directed by the Engineer. Sealant shall not be removed from their packaging until immediately before it is placed in the melter. All packaging shall be marked with manufacturer's information. On a daily basis, the Contractor shall provide a report to the Engineer with the following information: 1. Job number and street. 2. Crew Superintendent. 3. Date, air temperature (OF), AM and PM weather. 4. Amount of material in melter at the start of the day. 5. Number and weight of containers of material on site. 6. Amount of material in the melter at the end of the day. 2023 Crack Sealing/Araucto 5 - 2 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 7. Number and weight of containers of materials at the end of the day. 8. Beginning and ending locations for the day, including lane(s) and direction. 9. Traffic control used, including number of hours. 10. Volume of Detack used. Contractor shall sign each day's report certifying that material was heated pursuant to the manufacturer's recommendations. SECTION 5-04.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 5-04.4 Measurement "Crack Sealant for Crack Sealing" shall be measured by tonnage of material installed. The quantity of Crack Sealant necessary for this project is unknown. As such, the quantity entered in the Proposal is an estimate and intended to provide a common bid base and this bid item tonnage is subject to change. No additional measurement will be made for supplying and the installation of Detack. SECTION 5-04.5 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 5-04.5 Payment The unit contract price per ton for "Crack Sealant for Crack Sealing" shall be full pay for all costs of material, labor, tools, and equipment necessary for the application of the crack sealant and Detack. All costs associated with preparation, placing, blotting, spreading, temporary pavement markings, or any other material, tool, equipment, or labor shall be considered incidental to the unit contract price for "Crack Sealant for Crack Sealing." 2023 Crack Sealing/Araucto 5 - 3 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 DIVISION 9 - MATERIALS SECTION 9-04 IS DELETED IN ITS ENTIRETY. 9-04 JOINT AND CRACK SEALING MATERIALS 2023 Crack Sealing/Araucto 9 - 1 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 CRACK SEALING SPECIFICATIONS 2023 Crack Sealing/Araucto A - 1 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 C����. PRODUCT DATA SHEET INC ROADSAVER LOW AN ERGON S COMPANY PART NO.34543 420 N.Roosevelt Ave.•Chandler AZ 85226 JANUARY 2008 1-800-528-8242•(602)276-0406•FAX(480)961-0513 www.crafco.com READ BEFORE USING THIS PRODUCT GENERAL RoadSaver Low Tack is a single component,hot-applied petroleum based product which is used to fill cracks in both asphalt and portland cement concrete pavements in moderate to hot climates. RoadSaver Low Tack is supplied in solid form which when melted and properly applied forms a high stiffness,adhesive and flexible compound that resists cracking at winter temperatures and is highly resistant to flow or pick-up at extreme summer temperatures.RoadSaver Low Tack can be used in highway,street,airfield and parking lot pavements.It can be applied to pavement cracks using either pressure feed melter applicators or pour pots.At application temperature it is a free flowing,self-leveling product.RoadSaver Low Tack is specifically formulated to be a stiff,flow resistant,yet flexible product which is suited for use in areas subject to slow moving vehicle traffic where high resistance to pick-up or tracking is required. VOC=0 g/1. USAGE GUIDELINES RoadSaver Low Tack pavement temperature performance High Temperature Grade ff) limits are 82-16 for crack filling. Usage recommendations are shown in Crafco pavement �j temperature grade charts shown at the right.Refer to Crafco Product Selection Procedures to oC 58 64 70 76 8z determine sealant or filler use and pavement temperature grades. -4 � -10 -16 1 ■Suited for Use -22 . Recommended -28 Performance Limits 34 3 ao FI Not Recommended a -46 Pavement Temp for Filler Usage SPECIFICATION CONFORMANCE RoadSaver Low Tack meets the following requirements of ASTM D6690,Type I,"Joint and Crack Sealants,Hot-applied,for Concrete and Asphalt Pavements",(formerly ASTM D1190,AASHTO M173 and Federal Specification SS-S- 164). Specifications as follows: Test ASTM D6690,Type i Spec.Limits Cone Penetration 90 max. Softening Point 176F(80C)min. Asphalt Compatibility Pass Recommended Pour Temperature 380°F(193°C) Maximum Heating Temperature 400°F(204°C) Additional specifications when heated to the maximum heating temperature in accordance with ASTM D5167: Resilience,(ASTM D5329) 30%min. Softening Point(ASTM D36) 200°F(93°C)min. Ductility,77°F(25°C)(ASTM D113) 50 cm min. Flexibility,0°F(-1VC), 180 degree Pass 5 sec.,1/2"(12 mm)dia.(ASTM D3111) INSTALLATION The unit weight of RoadSaver Low Tack is 10.6 lbs.per gallon(1.27 kg/L)at 60F (15.5C). Prior to use,the user must read and follow Installation Instructions for Hot Applied RoadSaver, PolyFlex, Parking Lot and Asphalt Rubber Products to verify proper product selection, heating methods, pavement preparation procedures, application geometry, usage precautions and safety procedures. These instructions are provided with each pallet of sealant. PACKAGING Packaging consists of individual boxes of product which are palletized into shipping units. Boxes contain a non-adherent film which permits easy removal of the sealant. Each pallet contains 72 boxes which are stacked in six layers of 12 boxes per layer. The weight of product in each box does not exceed 40 lbs.(18kg)and pallet weights do not exceed 2,880 lbs.(1310kg). Pallets of product are weighed and product is sold by the net weight of product. Product boxes are manufactured from double wall kraft board producing a minimum bursting test certification of 350 psi(241 N/cm2)and using water resistant adhesives. Boxes use tape closure and do not contain any staples. Boxes are labeled with the product name,part number, lot number, specification conformance,application temperatures and safety instructions. Palletized units are protected from the weather using a three mil thick plastic bag,a weather and moisture resistant cap sheet and a minimum of two layers of six month u.v.protected stretch wrap. Pallets are labeled with the product part number,lot number and net weight. Installation Instructions are provided with each pallet in a weather resistant enclosure. WARRANTY CRAFCO, Inc. warrants that CRAFCO products meet applicable ASTM, AASHTO, Federal or State specifications at time of shipment. Techniques used for the preparation of the cracks and joints prior to sealing or filling are beyond our control as are the use and application of the products;therefore,Crafco shall not be responsible for improperly applied or misused products. Remedies against Crafco,Inc.,as agreed to by Crafco,are limited to replacing nonconforming product or refund(full or partial)of purchase price from Crafco,Inc. All claims for breach of this warranty must be made within three(3)months of the date of use or twelve(12)months from the date of delivery by Crafco,Inc.whichever is earlier. There shall be no other warranties expressed or implied. For optimum performance,follow Crafco recommendations for product installation. 02008,Crafco,Inc.,All Rights Reserved C orry SAFETY DATA SHEET INC AN ERGONO COMPANY 1. Identification Product identifier Crafco Roadsaver,Polyflex, Parking Lot,Asphalt Rubber, DF,Superflex,Matrix Binder, Loop Detector,Pavement Joint Adhesive,Polyfiber,Fiber Asphalt,Marker Adhesive, Quikstix,Asphalt Adhesive,PCF 100,High Slope,QWIKSEAL,QWIKDOT Other means of identification Not available. Recommended use Pavement Crack and Joint Sealing and Preservation Recommended restrictions None known. Manufacturer/Importer/Supplier/Distributor information Manufacturer Manufacturer: Crafco,Inc. Address: 6165 West Detroit St. Chandler,AZ 85226 USA Contact Name: Jim Chehovits Telephone: 602-276-0406 E-mail: jim.chehovits@crafco.com CHEMTREC: 800-424-9300(North America) + 1-703-527-3887 (International) 2. Hazard(s) identification Physical hazards Not classified. Health hazards Not classified. Environmental hazards Not classified. OSHA defined hazards Not classified. *Hazards not stated here are"Not classified", "Not applicable"or"Classification not possible". Label elements Hazard symbol None. Signal word Not applicable. Hazard statement Not applicable. Prevention Not applicable. Response Not applicable. Storage Not applicable. Disposal Not applicable. Hazard(s) not otherwise None known. classified (HNOC) Supplemental information None. 3. Composition/information on ingredients Mixtures Chemical name Common name and synonyms CAS number 0/0 ASPHALT 8052-42-4 20- 100 DISTILLATES(PETROLEUM), 64742-52-5 0-40 HYDROTREATED HEAVY NAPHTHENIC Other components below reportable levels 0-75 Composition comments *All concentrations are percent by weight unless ingredient is a gas. Gas concentrations are in percent by volume. 4. First-aid measures Inhalation If breathing is difficult, remove to fresh air and keep at rest in a position comfortable for breathing. Get medical attention, if needed. Call a physician if symptoms develop or persist. Skin contact In case of contact, immediately flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes.Thoroughly wash (or discard)clothing and shoes before reuse. Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector,Pavemen sos us 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 1/6 Eye contact Immediately flush eyes with plenty of water for at least 15 minutes. If a contact lens is present, DO NOT delay irrigation or attempt to remove the lens. Get medical attention if irritation develops and persists. Ingestion Rinse mouth. Do not induce vomiting. Do not use mouth-to-mouth method if victim ingested the substance. Call a POISON CENTER or doctor/physician if you feel unwell. Most important Not available. symptoms/effects,acute and delayed Indication of immediate In case of ingestion,the decision of whether or not to induce vomiting should be made by the medical attention and special attending physician. Certain pre-existing conditions may make workers particularly susceptible to treatment needed the effects of this chemical: asthma, allergies, impaired pulmonary function. General information If you feel unwell, seek medical advice(show the label where possible). Ensure that medical personnel are aware of the material(s) involved,and take precautions to protect themselves.Show this safety data sheet to the doctor in attendance. Discard any shoes or clothing items that cannot be decontaminated. S. Fire-fighting measures Suitable extinguishing media Water fog. Foam. Dry chemical powder. Carbon dioxide(CO2).Addition of water or foam to the fire may cause frothing. Unsuitable extinguishing Do not use a solid water stream as it may scatter and spread fire. media Specific hazards arising from Fire may produce irritating,corrosive and/or toxic gases. Development of hazardous combustion the chemical gases or vapours possible in the event of a fire.The following may develop: Acrolein. Special protective equipment Firefighters must use standard protective equipment including flame retardant coat, helmet with and precautions for face shield,gloves, rubber boots,and in enclosed spaces,SCBA. Firefighters should wear full firefighters protective clothing including self contained breathing apparatus. Structural firefighters protective clothing will only provide limited protection. Fire-fighting In case of fire and/or explosion do not breathe fumes. Firefighters must use standard protective equipment/instructions equipment including flame retardant coat, helmet with face shield,gloves, rubber boots,and in enclosed spaces,SCBA.ALWAYS stay away from tanks engulfed in flame. Fight fire from maximum distance or use unmanned hose holders or monitor nozzles. In the event of fire,cool tanks with water spray. By fire,toxic gases may be formed (COx, NOx). Keep run-off water out of sewers and water sources. Dike for water control. Specific methods In the event of fire and/or explosion do not breathe fumes. In the event of fire,cool tanks with water spray. Use water spray to cool unopened containers. 6. Accidental release measures Personal precautions, Keep unnecessary personnel away.Wear appropriate protective equipment and clothing during protective equipment and clean-up.Ventilate closed spaces before entering them. Do not touch or walk through spilled emergency procedures material. Methods and materials for ELIMINATE all ignition sources(no smoking,flares,sparks or flames in immediate area). Dike far containment and cleaning up ahead of spill for later disposal. Following product recovery,flush area with water. Never return spills in original containers for re-use. Environmental precautions Prevent further leakage or spillage if safe to do so. Runoff or release to sewer,waterway or ground is forbidden. 7. Handling and storage Precautions for safe handling The product is non-combustible. If heated, irritating vapors may be formed. Do not use in area without adequate ventilation.Wash hands thoroughly after handling. Wash hands after handling. Observe good industrial hygiene practices. Conditions for safe storage, Prevent electrostatic charge build-up by using common bonding and grounding techniques. Store in including any a well-ventilated place. Keep the container tightly closed and dry. Store in a closed container away incompatibilities from incompatible materials. Keep out of the reach of children. 8. Exposure controls/personal protection Occupational exposure limits US.OSHA Table Z-1 Limits for Air Contaminants(29 CFR 1910.1000) Components Type Value Form DISTILLATES PEL 5 mg/m3 Mist. (PETROLEUM), HYDROTREATED HEAVY NAPHTHENIC(CAS 64742-52-5) Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector, Pavemen sos us 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 2/6 US.ACGIH Threshold Limit Values Components Type Value Form ASPHALT(CAS 8052-42-4) TWA 0.5 mg/m3 Inhalable fraction. US.NIOSH: Pocket Guide to Chemical Hazards Components Type Value Form ASPHALT(CAS 8052-42-4) Ceiling 5 mg/m3 Fume. DISTILLATES STEL 10 mg/m3 Mist. (PETROLEUM), HYDROTREATED HEAVY NAPHTHENIC(CAS 64742-52-5) TWA 5 mg/m3 Mist. Biological limit values No biological exposure limits noted for the ingredient(s). Appropriate engineering Good general ventilation(typically 10 air changes per hour)should be used.Ventilation rates should controls be matched to conditions. If applicable, use process enclosures, local exhaust ventilation, or other engineering controls to maintain airborne levels below recommended exposure limits. If exposure limits have not been established, maintain airborne levels to an acceptable level. Ensure adequate ventilation,especially in confined areas. Individual protection measures,such as personal protective equipment Eye/face protection Wear safety glasses; chemical goggles(if splashing is possible).Wear chemical goggles; face shield (if handling molten material). Hand protection Chemical resistant gloves are recommended. If contact with forearms is likely wear gauntlet style gloves. Other Wear suitable protective clothing and eye/face protection. Use of an impervious apron is recommended. Skin protection Respiratory protection When workers are facing concentrations above the exposure limit they must use appropriate certified respirators. Thermal hazards During product use,there is a risk of thermal burns. General hygiene When using do not smoke.Avoid contact with eyes.Avoid contact with skin. Keep away from food considerations and drink. Handle in accordance with good industrial hygiene and safety practice. 9. Physical and chemical properties Appearance Solid. Physical state Solid. Form Solid. Color Black. Dark brown Odor Product is a black,semi-solid with a burnt tar odor. Odor threshold Not available. pH Not available. Melting point/freezing point 150- 250 IF(65.56- 121.11 IC)ASTM D36 Softening Point Initial boiling point and > 800 OF(> 426.67 °C) boiling range Flash point > 400.0 OF(> 204.4°C) Evaporation rate Not available. Flammability(solid,gas) Not available. Upper/lower flammability or explosive limits Flammability limit-lower Not available. (%) Flammability limit- Not available. upper(%) Explosive limit-lower Not available. (%) Explosive limit-upper Not available. (%) Vapor pressure Not available. Vapor density Not available. Relative density Not available. Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector, Pavemen sos us 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 3/6 Solubility(ies) Solubility(water) Not available. Partition coefficient Not available. (n-octanol/water) Auto-ignition temperature > 700 OF(> 371.11 °C) Decomposition temperature Not available. Viscosity Not available. Other information Density Not Available Percent volatile 0% Specific gravity 1 - 1.9 10. Stability and reactivity Reactivity Not available. Chemical stability Material is stable under normal conditions. Possibility of hazardous Hazardous polymerization does not occur. reactions Conditions to avoid Strong oxidizing agents. Incompatible materials Incompatible with oxidizing agents. Hazardous decomposition Upon decomposition, product emits acrid dense smoke with carbon dioxide, carbon monoxide,trace products oxides of nitrogen and sulfur,and water. 11. Toxicological information Information on likely routes of exposure Ingestion May cause gastrointestinal discomfort if swallowed. Do not induce vomiting. Vomiting may increase risk of product aspiration. Inhalation May be harmful if inhaled. However,this product does not currently meet the criteria for classification. Skin contact Frequent or prolonged contact may defat and dry the skin, leading to discomfort and dermatitis Eye contact May be irritating to eyes. Symptoms related to the Not available. physical,chemical and toxicological characteristics Information on toxicological effects Acute toxicity Not classified. Skin corrosion/irritation Not classified. May cause defatting of the skin, but is neither an irritant nor a sensitizer. Serious eye damage/eye Not classified. irritation Respiratory or skin sensitization Respiratory sensitization Not classified. Skin sensitization Not classified. Germ cell mutagenicity Non-mutagenic based on Modified Ames Assay. Carcinogenicity This product is not considered to be a carcinogen by IARC,ACGIH, NTP,or OSHA. US.OSHA Specifically Regulated Substances(29 CFR 1910.1001-1050) Not listed. Reproductive toxicity Contains no ingredient listed as toxic to reproduction Specific target organ toxicity Not classified. -single exposure Specific target organ toxicity Not classified. -repeated exposure Aspiration hazard Not classified. Chronic effects Prolonged or repeated contact may cause drying,cracking,or irritation of the skin. 12. Ecological information Ecotoxicity This product has no known eco-toxicological effects. Not expected to be harmful to aquatic organisms. Persistence and degradability Not available. Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector, Pavemen SDS US 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 4/6 Bioaccumulative potential Not available. Mobility in soil Not available. Other adverse effects Not available. 13. Disposal considerations Disposal instructions Dispose of contents/container in accordance with local/regional/national/international regulations. When this product as supplied is to be discarded as waste, it does not meet the definition of a RCRA waste under 40 CFR 261. Hazardous waste code Not applicable. Waste from residues/ Dispose of in accordance with local regulations. unused products Contaminated packaging Offer rinsed packaging material to local recycling facilities. 14. Transport information DOT Not regulated as dangerous goods. IATA Not regulated as dangerous goods. IMDG Not regulated as dangerous goods. Transport in bulk according to Not available. Annex II of MARPOL 73/78 and the IBC Code Further information If the product is shipped at temperatures below 212OF(1000C), it is not regulated for transport by ground,air or vessel. If shipped above 212 deg F: "UN3257, Elevated Temperature Liquid, n.o.s. (Asphalt mixture),9, PG III" 15. Regulatory information US federal regulations All components are on the U.S. EPA TSCA Inventory List. TSCA Section 12(b) Export Notification(40 CFR 707,Subpt. D) Not regulated. CERCLA Hazardous Substance List(40 CFR 302.4) Not listed. US.OSHA Specifically Regulated Substances(29 CFR 1910.1001-1050) Not listed. Superfund Amendments and Reauthorization Act of 1986(SARA) Hazard categories Immediate Hazard-No Delayed Hazard- No Fire Hazard- No Pressure Hazard- No Reactivity Hazard- No SARA 302 Extremely hazardous substance Not listed. SARA 311/312 No Hazardous chemical SARA 313 (TRI reporting) Not regulated. Other federal regulations Clean Air Act(CAA)Section 112 Hazardous Air Pollutants(HAPs)List Not regulated. Clean Air Act(CAA)Section 112(r)Accidental Release Prevention (40 CFR 68.130) Not regulated. Safe Drinking Water Act Not regulated. (SDWA) US state regulations WARNING:This product contains a chemical known to the State of California to cause cancer. US. Massachusetts RTK-Substance List Not regulated. US. New Jersey Worker and Community Right-to-Know Act Not regulated. Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector, Pavemen sos us 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 5/6 US. Pennsylvania RTK-Hazardous Substances Not regulated. US. Rhode Island RTK Not regulated. US.California Proposition 65 Not Listed. International Inventories Country(s)or region Inventory name On inventory(yes/no)* Australia Australian Inventory of Chemical Substances(AICS) Yes Canada Domestic Substances List(DSL) Yes Canada Non-Domestic Substances List(NDSL) No China Inventory of Existing Chemical Substances in China (IECSC) Yes Europe European Inventory of Existing Commercial Chemical Substances Yes (EINECS) Europe European List of Notified Chemical Substances(ELINCS) No Japan Inventory of Existing and New Chemical Substances(ENCS) Yes Korea Existing Chemicals List(ECL) Yes New Zealand New Zealand Inventory Yes Philippines Philippine Inventory of Chemicals and Chemical Substances Yes (PICCS) United States&Puerto Rico Toxic Substances Control Act(TSCA)Inventory Yes *A"Yes"indicates that all components of this product comply with the inventory requirements administered by the governing country(s) A"No"indicates that one or more components of the product are not listed or exempt from listing on the inventory administered by the governing country(s). 16. Other information, including date of preparation or last revision Issue date 11-25-2013 Revision date 08-18-2015 Version# 08 Further information HMIS®is a registered trade and service mark of the NPCA. References ACGIH EPA: AQUIRE database US. IARC Monographs on Occupational Exposures to Chemical Agents HSDB®-Hazardous Substances Data Bank IARC Monographs. Overall Evaluation of Carcinogenicity National Toxicology Program(NTP) Report on Carcinogens ACGIH Documentation of the Threshold Limit Values and Biological Exposure Indices Disclaimer The information in the sheet was written based on the best knowledge and experience currently available.The information provided in this Safety Data Sheet is correct to the best of our knowledge, information and belief at the date of its publication.The information given is designed only as a guidance for safe handling, use, processing,storage,transportation, disposal and release and is not to be considered a warranty or quality specification.The information relates only to the specific material designated and may not be valid for such material used in combination with any other materials or in any process, unless specified in the text. Revision Information Physical&Chemical Properties: Multiple Properties Toxicological information: Acute toxicity Toxicological information: Specific target organ toxicity-single exposure Toxicological information: Specific target organ toxicity-repeated exposure Toxicological information: Aspiration hazard Toxicological information: Respiratory sensitization Transport information: Further information Regulatory Information: Risk Phrases-Class. Material name: Crafco Roadsaver,Polyflex,Parking Lot,Asphalt Rubber, DF,Superflex, Matrix Binder,Loop Detector, Pavemen sos us 4988 Version#: 08 Revision date: 08-18-2015 Issue date: 11-25-2013 6/6 C���. INSTALLATION INSTRUCTIONS INC •T-APPLIED ROADSAVER,POLYFLEX, AN ERGON ra COMPANY LOT AND ASPHALT RUBBER PRODUCTS 420 N.Roosevelt Ave.•Chandler AZ 85226 1-800-528-8242•(602)276-0406•FAX(480)961-0513 JANUARY 2008 www.crafco.com READ BEFORE USING THIS PRODUCT GENERAL: These products are hot-applied, single component ASPHALT PAVEMENT CRACK SEALING: Crack sealing polymer/robber modified asphalts supplied in solid form used to seal or fill consists of installing extensible sealants into routed reservoirs in cracks or joints in asphalt concrete or Portland cement concrete pavements. working cracks in pavements in good condition. These products are not fuel resistant,and should not be used in fuel or oil spill prone areas.To use,product is removed from the package,heated in a melter Reservoir Culling_ Based on the 981/o LTPPBIND temperature e range and applied to the pavement Details on product specifications,climate and (difference from high to low), cracks are to be routed as follows: usage suitability,and product selection are contained in Product Data Sheets. Temperature Grade Range Reservoir Width Reservoir Depth MELTING AND APPLICATION: These products must be 80°C or less /2"(12 mm) 3/4"(19 mm) melted in jacketed double boiler metiers with effective agitation that 86°C 3/4"(19 mm) 3/4"(19 mm) meet requirements of Appendix Xl.l of ASTM D6690. Crafco 92°C 1 1/8"(28 mm) '/2"(12 mm) Supershot,EZ Series 2, and EZ Pour melters are recommended. Do 980 or greater 1 '/2"(38 mm) '/z"(12 mm) not use direct fired or air heated machines.Heat transfer oil should not exceed 525°F(274°C). The melter must be capable of safely heating Reservoir width should not exceed 1 t/2"(38 mm).Cutting should remove product to 400°F(204°C). CAUTION: Stop agitation when adding at least 1/8"(3 mm)from each side and produce vertical,intact surfaces product to prevent splashing. Product is heated to between the with no loosely bonded aggregate. The pavement should be sound minimum application temperature and the maximum heating enough to resist significant spatting during cutting.Final reservoir width temperature which are shown on product containers and Product Data should not exceed twice the cutter width or 1'/2"(38 mm)maximum. Sheets.These products are most effectively applied with pressure feed Installation and Finishing: After cleaning, sealant at the required wand systems.RoadSaver,PolyFlex and Parking Lot products can also temperature is installed in the reservoir.Sealant can be installed with up to be applied using gravity feed pour pots(Part No.40200 and 40201). a 3/8"(10 mm)underfill,flush fill,or with an overband cap that does not exceed 1/16"(1.5mm)above the pavement surface,and not greater than a APPLICATION LIFE:Application life when heated to application 2" (50 mm) width beyond crack edges, depending on project temperature is approximately 12 to 15 hours and may be extended by specifications. These configurations are achieved using appropriate wand adding fresh product as quantity in the melter decreases. Product shall tips,shoes or squeegees.To reduce surface tack,Crafco DeTack or other be agitated during installation. Product may be reheated once to approved material may be applied. application temperature,after initial heat up.When application life has been exceeded, RoadSaver and Parking Lot products will thicken, ASPHALT PAVEMENT CRACK FILLING: Crack filling consists become "stringy" and may then gel. If this occurs, product should of installing flexible,traffic resistant product into prepared,cleaned,non- immediately be removed from the melter and discarded. Asphalt working pavement cracks.Filler can be installed in routed or unmuted Rubber and PolyFlex products will soften when overheated or heated cracks or in surface overbands. for too long. Routed Reservoir—Routed reservoirs are recommended for longest life.Guidelines for determining reservoir use are: PAVEMENT TEMPERATURES: Apply product when pavement 1. Crack density should not exceed approximately 20%(linear feet temperature exceeds 40°F(4°C).Lower temperatures may result in reduced of cracks per square feet of pavement area). adhesion due to presence of moisture or ice If pavement temperature is 2. Pavement should be sound enough to resist significant spalling lower than 40°F(4°C), it may be warmed using a heat lance(Part No. during cutting(Final reservoir width should not exceed double the 45650)that puts no direct flame on the pavement If installing at lower cutter width,or 1'/2"(38 mm)maximum pavement temperature than 40°F (4°C), extreme care should be used to Reservoir Dimensions—Determined as follows: insure that cracks or joints are dry and free from ice and other contaminants. 1. The cut should remove at least 1/8"(3mm)from each side of the Product temperature should be maintained at the maximum heating crack and cut back to sound pavement. temperature. ff installing product at night,assure that dew is not forming on 2. Minimum width is'/2"(12 mm),maximum is 1'/2"(38 mm). the pavement surface. Applied product should be checked by qualified 3. Recommended cut depth is V(19 mm). personnel to assure that adhesion is adequate. 4. Reservoirs are then cleaned with compressed air. Cleaned Unrouted Cracks—Cracks may be cleaned and filled without TRAFFIC CONTROLS: Place tragic controls in accordance with Part 6, reservoirs,but longer life is achieved with reservoirs.Cleaning consists of Temporary Controls of the FHWA Manual on Uniform Traffic Control using high-pressure dry, clean compressed air, brushing, or vacuum devices(MUTCD)to protect the work site for the duration of the repairs. techniques to remove debris. Surface Overbands—Product can be applied in overbands after crack CRACK/JOINT CLEANING: For appropriate adhesion,cracks cleaning with compressed air. Overbands should not exceed 1116'(1.5 or joints must be thoroughly clean and dry immediately prior to product mm)high above the pavement surface and not extend greater than 2"(50 installation.After widening or debris removal,and just prior to product mm)beyond each crack edge. installation, final cleaning shall use high pressure 90 psi (620kpa) Filler Installation and Finishing— Same as sealant installation and minimum,dry,oil free compressed air to remove any remaining dust. finishing. Both sides of the crack or joint shall be cleaned. Surfaces should be PORTLAND CEMENT CONCRETE PAVEMENT JOINT inspected to assure adequate cleanliness and dryness. SEALING AND RESEALING: Joint sealing and resealing consist of C2008,Crafco,Inc.,All Rights Reserved installing extensible sealants into sawn and cleaned joint reservoirs in not adhere to asphalt or concrete pavements surfaces that are PCC pavements. contaminated with oil spills. Reservoir Sawing—New concrete should be cured for at least 7 days Crack Sealing or Filling in Pavements with Surface Treatments: prior to sawing the joint reservoir. Joint spacing should beat the design When crack sealing or filling pavements with chip seals, slurry seals, dimension, generally from approximately 12 to 20 ft. (3.7 to 6.2m). and open graded friction courses, routing should be deep enough to Joints shall be at least '/4" (6mm) wide, and should not exceed 1'/2" extend through the surface treatment layer into the underlying asphalt (38mm). For new pavements designed with narrow joints using the concrete. This anchors product into solid pavement for better bonding. initial narrow saw cut as the reservoir,spaced at 15 ft(5m)maximum, and when using low modulus type sealants,joint width may be as CLEAN OUT: If melters used require clean out,follow manufacturer's narrow as 1/8 inch(3mm).Contact Crafco for more details.Reservoir instructions. If solvent is used,insure i does not contaminate product because depth should allow a sealant depth to width ratio of 1:1 to 2:1,sufficient dilution and flash problems may occur. depth for backer rod,and the specified surface recess.Reservoirs shall be cut no deeper than required. When resealing, old sealant can be STORAGE: Pallets of product are protected with a weather resistant removed by knives,plows or sawing. Sawing shall slightly widen the covering. During storage,this covering must be intact to prevent boxes joint by 1/8 to inch(3-6mm)to remove all traces of old sealant and from getting wet ff wet,boxes may lose strength and crush.Rips in the produce clean, intact vertical surfaces. Maximum joint width is 1 '/2 pallet covering should be repaired to maintain packaging integrity. inch(38mm). Pallets should be stored on a dry, level surface with good drainage. Reservoir Cleaning—After sawing,joints shall be flushed with water to Pallets should not be stacked because crashing of bottom boxes may remove sawing slurry and allowed to dry.Just prior to installing sealant, occur. Product properties are not affected by packaging deterioration both joint surfaces shall be cleaned using sandblasting, brushing or other means to remove any remaining of sawing residue.Final cleaning SAFETY PRECAUTIONS: Since these products are heated to is then done with high-pressure(minimum 90 psi, 62N/cm2) clean, elevated temperatures, it is essential that operations be conducted dry , oil free compressed air the same day that sealant is installed. safely. All personnel need to be aware of hazards of using hot applied Moisture and oil traps are required on the compressor. Joints must be materials and safety precautions. Before use,the crew should read and inspected to assure cleanliness by rubbing a finger along each face to understand product use and safety information on the box and the spot dust or other contaminants.If found,recleaning should occur until product MSDS. User should check D.O.T. requirements for joints are completely clean and dry. The objective of sawing and transportation of product at elevated temperatures above 212°F cleaning is to provide vertical, intact,clean concrete bonding surfaces (100°C). free from all contaminants and are dry. HAZARDS ASSOCIATED WITH HOT-APPLIED Backer Rod—After cleaning,heat resistant backer rod(ASTM D5249, MATERIALS: Skin contact with hot materials causes bums. Over Type I)approx. 25%larger than the joint width shall be installed to the exposure to fumes may cause respiratory tract irritation, nausea, or required depth without damage or punctures. Punctures or damage to headaches. Precautions are to be taken to prevent contact with hot backer rod may cause sealant bubbling. material and to avoid inhalation of fumes for everyone in the vicinity. Sealant Installation—Concrete should be cured at least 7 days prior to Safety precautions should include: installing sealant. Sealant heated to required temperature is installed per 1. Protective clothing to prevent skin contact with hot material. project specifications.Typical installations include a recess up to'/4 inch 1. Care when adding product to melters to reduce splashing. (6mm), flush, or with a surface overband (maximum 1116' (1.5mm) 3. Careful operation of wands or pour pots that apply product above the surface,and 2"(50 mm)maximum beyond each joint edge). 4. Traffic and pedestrian control measures which meet or exceed MUTCD requirements to prevent access to work areas while INSTALLATION PRECAUTIONS: In certain situations, product is in a molten state. additional consideration needs to be given to product selection and 5. Avoidance of material fumes. application geometries. 6. Proper application configurations with a minimum amount of Parking lots and other areas subjected to slow moving traffic and material excess. pedestrians: Product used must be stiff enough at hot summer 7. Appropriate clean up of excessive applications or product spills. temperatures to resist pick up and should not be applied on top of the pavement surface. Product should have a high temperature grade at least ADDITIONAL INFORMATION: Additional information one step above the LTPPBIND grade for the climate.For even better pick- regarding these products is available by contacting your distributor or up resistance,increase by two grades. Crafco,Inc. This information includes: Pavement to receive an Overlay,Surface Treatment or Seal Coat: 1. Product Data Sheets Product will be subjected to overlay heat effects and carriers for surface 2. Material Safety Data Sheet, treatments and seal coats. If product is applied on top of the pavement, 3. Safety Manual and an overlay is then placed, bumps may occur during compaction. 4. Sealing Cracks and Joints in Parking and Pedestrian Areas Refer to"Bump Formation&Prevention in Asphalt Concrete Overlays 5. "Bump Formation& Prevention hi Asphalt Concrete Overlays Which Have Been Crack Sealed" (www.crafco.com) for more Which Have Been Crack Sealed" information.Solvents or other carriers in surface treatments may soften 6. Sealant Selection Guide product. Prior to placing a surface treatment or seal coat,a test strip should be placed to verify compatibility of the product and treatment. High Severity Cracked Areas: Highly cracked areas(fatigue cracks in wheel paths)should not be treated by covering cracks because pavement friction may be affected. These cracks can be filled if followed by a surface treatment or overlay to restore friction. Fuel or Oil Spill Areas:These products should not be used in fuel or oil spill areas due to softening of the sealant that may occur. Sealant will C2008,Crafco,Inc.,All Rights Reserved C11;lt ,11FW PRODUCT DATA SHEET INC AN ERGON 5 COMPANY PART NO.34681 420 N. Roosevelt Ave.•Chandler AZ 85226 JANUARY 2008 1-800-528-8242•(602)276-0406•FAX(480)961-0513 www.crafco.com READ BEFORE USING THIS PRODUCT GENERAL Crafco DETACK when applied to the surface of hot-melt pavement crack and joint sealants, immediately removes surface tack of the applied sealant to permit quicker opening to traffic. Use of DETACK is recommended in pavement areas such as parking lots, driveways, city streets, intersections,pedestrian areas,etc. where quick removal of sealant surface tackiness is desired. Also,DETACK assists with removing sealant tack when sealing during hotter months of the year, when applied sealant generally is softer and remains tacky for longer time periods after installation. Use of DETACK does not alter properties of the sealant. VOC=0 g/l. APPLICATION DETACK is supplied ready to use in 5 gallon(19L)plastic pails. To use,DETACK is poured into typical hand pump pressurized garden sprayers. The spray pattern should be adjusted to a medium fan. DETACK can be applied to the sealant immediately after sealant is placed, or at any time after sealant is placed when surface tack is present. Usage rate of DETACK is typically 1 gallon (3.8L)per 1000-2000 feet(305-610m)of sealed cracks. DETACK should be applied to cover the sealant surface with minimal excess of application onto the pavement surface. The use of this product in no way supersedes the warnings and instructions furnished with the sealant used. Follow Application Instructions on the product container prior to use. DETACK is a water based product and should not be exposed to freezing temperatures. CLEAN UP DETACK cleans with water. Flush the sprayer with water when finished with each application. SAFETY When used as directed,DETACK does not pose any health hazards. When handling DETACK,use appropriate precautions to avoid eye contact or ingestion. Impervious gloves and safety glasses should be worn during use. For eye contact,flush with water for 15 minutes and get immediate medical attention. For ingestion,drink large quantities of water. DO NOT induce vomiting. Get immediate medical attention. For skin contact, wash with soap and water. Wash hands after use prior to eating. 02008,Crafco,Inc.,All Rights Reserved C crvv SAFETY DATA SHEET RNVAI%OFINC AN ERGON G COMPANY 1. Identification Product identifier Detack Other means of identification Not available. Recommended use Applied to fresh road sealant to reduce tackiness. Recommended restrictions None known. Manufacturer/Importer/Supplier/Distributor information Manufacturer Manufacturer: Crafco,Inc. Address: 420 North Roosevelt Avenue Chandler,AZ 85226 USA Contact Name: Jim Chehovits Telephone: 602-276-0406 E-mail: jim.chehovits@crafco.com CH E MTREC: 800-424-9300 2. Hazard(s) identification Physical hazards Not classified. Health hazards Not classified. Environmental hazards Not classified. OSHA defined hazards Not classified. *Hazards not stated here are"Not classified", "Not applicable"or"Classification not possible". Label elements Hazard symbol None. Signal word Not available. Hazard statement Not available. Prevention Not available. Response Not available. Storage Not available. Disposal Not available. Hazard(s) not otherwise None known. classified (HNOC) Supplemental information Not applicable. 3. Composition/information on ingredients Mixtures Chemical name Common name and synonyms CAS number WATER 7732-18-5 70-90 TALL OIL, SODIUM SALT 65997-01-5 10-30 4. First-aid measures Inhalation If breathing is difficult, remove to fresh air and keep at rest in a position comfortable for breathing. Call a physician if symptoms develop or persist. Skin contact Wash contact areas with soap and water. If needed, seek medical attention. Eye contact Immediately flush eyes with plenty of water for at least 15 minutes. Remove contact lenses, if present and easy to do. Continue rinsing. Get medical attention if irritation develops and persists. Ingestion Rinse mouth. DO NOT induce vomiting. Get medical attention immediately. If ingestion of a large amount does occur,call a poison control center immediately. Most important Direct contact with eyes may cause temporary irritation. symptoms/effects,acute and delayed Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 1/6 Indication of immediate Treat symptomatically. medical attention and special treatment needed General information Ensure that medical personnel are aware of the material(s) involved, and take precautions to protect themselves. 5. Fire-fighting measures Suitable extinguishing media Foam. Dry chemical powder. Carbon dioxide(CO2). Unsuitable extinguishing Water. Do not use water jet as an extinguisher, as this will spread the fire. media Specific hazards arising from Not a fire hazard. the chemical Special protective equipment Firefighters must use standard protective equipment including flame retardant coat, helmet with and precautions for face shield,gloves, rubber boots,and in enclosed spaces, SCBA. Structural firefighters protective firefighters clothing will only provide limited protection. Fire-fighting ALWAYS stay away from tanks engulfed in flame. Fight fire from maximum distance or use equipment/instructions unmanned hose holders or monitor nozzles. Move containers from fire area if you can do so without risk. In the event of fire, cool tanks with water spray. Specific methods In the event of fire and/or explosion do not breathe fumes. In the event of fire, cool tanks with water spray. General fire hazards Will not burn 6. Accidental release measures Personal precautions, For personal protection,see section 8 of the SDS. protective equipment and emergency procedures Methods and materials for This product is miscible in water. containment and cleaning up Large Spills: Stop the flow of material, if this is without risk. Dike the spilled material,where this is possible. Cover with plastic sheet to prevent spreading.Absorb in vermiculite,dry sand or earth and place into containers. Prevent entry into waterways,sewer, basements or confined areas. Small Spills: Wipe up with absorbent material (e.g. cloth,fleece). Clean surface thoroughly to remove residual contamination. Never return spills to original containers for re-use. For waste disposal, see section 13 of the SDS. Absorb or cover with dry earth, sand or other non-combustible material and transfer to containers. Ventilate area and avoid breathing vapors or mist. For large spills, dike far ahead of liquid spill for later disposal. Do not release into sewers or waterways. Environmental precautions Avoid discharge into drains,water courses or onto the ground. 7. Handling and storage Precautions for safe handling Good personal hygiene is necessary.Wash hands and contaminated areas with water and soap before leaving the work site. Conditions for safe storage, Store in original tightly closed container. Store away from incompatible materials(see Section 10 of including any the SDS). Do not allow material to freeze. incompatibilities 8. Exposure controls/personal protection Occupational exposure limits No exposure limits noted for ingredient(s). Biological limit values No biological exposure limits noted for the ingredient(s). Appropriate engineering Provide adequate ventilation, including appropriate local extraction,to ensure that the defined controls occupational exposure limit is not exceeded. Individual protection measures,such as personal protective equipment Eye/face protection Safety glasses. Hand protection Chemical resistant gloves are recommended. If contact with forearms is likely wear gauntlet style gloves. Other Wear appropriate clothing to prevent any possibility of liquid contact and repeated or prolonged vapor contact. Respiratory protection No protection is ordinarily required under normal conditions of use and with adequate ventilation. Thermal hazards Not available. Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 2/6 General hygiene Always observe good personal hygiene measures,such as washing after handling the material and considerations before eating,drinking,and/or smoking. Routinely wash work clothing and protective equipment to remove contaminants. 9. Physical and chemical properties Appearance Not available. Physical state Liquid. Form Liquid. Color Brown. Odor Not available. Odor threshold Not available. PH 8-9 Melting point/freezing point Not available. Initial boiling point and 212 °F(100°C) boiling range Flash point Not applicable Evaporation rate Not available. Flammability(solid,gas) Not available. Upper/lower flammability or explosive limits Flammability limit- lower Not available. (%) Flammability limit- Not available. upper(%) Explosive limit-lower Not available. (%) Explosive limit-upper Not available. (%) Vapor pressure 0 hPa estimated Vapor density > 1 Relative density Not available. Solubility(ies) Solubility(water) Complete Partition coefficient Not available. (n-octanol/water) Auto-ignition temperature Not available. Decomposition temperature Not available. Viscosity Not available. Other information Percent volatile 85%estimated Specific gravity 1 10. Stability and reactivity Reactivity The product is stable and non-reactive under normal conditions of use,storage and transport. Chemical stability Stable under normal temperature conditions. Possibility of hazardous Hazardous polymerization does not occur. reactions Conditions to avoid Freezing. Incompatible materials Strong oxidizing agents. Hazardous decomposition None known. products 11. Toxicological information Information on likely routes of exposure Ingestion Expected to be a low ingestion hazard. Inhalation Prolonged inhalation may be harmful. Skin contact No adverse effects due to skin contact are expected. Eye contact Harmful in contact with eyes. Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 3/6 Symptoms related to the Direct contact with eyes may cause temporary irritation. physical,chemical and toxicological characteristics Information on toxicological effects Acute toxicity Not available. Skin corrosion/irritation Prolonged skin contact may cause temporary irritation. Serious eye damage/eye Harmful in contact with eyes. None known. irritation Respiratory or skin sensitization Respiratory sensitization Not available. Skin sensitization May cause skin disorders if contact is repeated or prolonged. Germ cell mutagenicity No data available to indicate product or any components present at greater than 0.1%are mutagenic or genotoxic. Carcinogenicity US.OSHA Specifically Regulated Substances(29 CFR 1910.1001-1050) Not listed. Reproductive toxicity Not classified. Specific target organ toxicity Not classified. -single exposure Specific target organ toxicity Not classified. -repeated exposure Aspiration hazard Not available. Chronic effects Prolonged or repeated contact with skin may cause redness, itching, irritation,eczema/chapping and oil acne. Further information This product has no known adverse effect on human health. 12. Ecological information Ecotoxicity Not expected to be harmful to aquatic organisms. Persistence and degradability No data is available on the degradability of this product. Bioaccumulative potential No data available. Mobility in soil No data available. Other adverse effects No other adverse environmental effects(e.g. ozone depletion, photochemical ozone creation potential,endocrine disruption,global warming potential)are expected from this component, 13. Disposal considerations Disposal instructions No components are identified as hazardous wastes. Local disposal regulations Dispose in accordance with all applicable regulations. Hazardous waste code Not applicable. Waste from residues/ Dispose of in accordance with local regulations. Empty containers or liners may retain some product unused products residues.This material and its container must be disposed of in a safe manner(see: Disposal instructions).Avoid discharge into water courses or onto the ground. Contaminated packaging Empty containers should be taken to an approved waste handling site for recycling or disposal. Since emptied containers may retain product residue,follow label warnings even after container is emptied. 14. Transport information DOT Not regulated as dangerous goods. IATA Not regulated as dangerous goods. IMDG Not regulated as dangerous goods. Transport in bulk according to Not available. Annex II of MARPOL 73/78 and the IBC Code 15. Regulatory information US federal regulations All components are on the U.S. EPA TSCA Inventory List. Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 4/6 TSCA Section 12(b)Export Notification(40 CFR 707,Subpt. D) Not regulated. CERCLA Hazardous Substance List(40 CFR 302.4) Not listed. US.OSHA Specifically Regulated Substances(29 CFR 1910.1001-1050) Not listed. Superfund Amendments and Reauthorization Act of 1986(SARA) Hazard categories Immediate Hazard - No Delayed Hazard-No Fire Hazard- No Pressure Hazard-No Reactivity Hazard- No SARA 302 Extremely hazardous substance Not listed. SARA 311/312 No Hazardous chemical SARA 313(TRI reporting) Not regulated. Other federal regulations Clean Air Act(CAA)Section 112 Hazardous Air Pollutants(HAPs) List Not regulated. Clean Air Act(CAA)Section 112(r)Accidental Release Prevention (40 CFR 68.130) Not regulated. Safe Drinking Water Act Not regulated. (SDWA) US state regulations US. Massachusetts RTK-Substance List Not regulated. US.New Jersey Worker and Community Right-to-Know Act Not regulated. US.Pennsylvania RTK-Hazardous Substances Not regulated. US. Rhode Island RTK Not regulated. US.California Proposition 65 Not Listed. International Inventories Country(s)or region Inventory name On inventory(yes/no)* Australia Australian Inventory of Chemical Substances(AICS) Yes Canada Domestic Substances List(DSL) Yes Canada Non-Domestic Substances List(NDSL) No China Inventory of Existing Chemical Substances in China (IECSC) Yes Europe European Inventory of Existing Commercial Chemical Substances Yes (EINECS) Europe European List of Notified Chemical Substances(ELINCS) No Japan Inventory of Existing and New Chemical Substances(ENCS) No Korea Existing Chemicals List(ECL) Yes New Zealand New Zealand Inventory Yes Philippines Philippine Inventory of Chemicals and Chemical Substances Yes (PICCS) United States&Puerto Rico Toxic Substances Control Act(TSCA)Inventory Yes *A"Yes"indicates that all components of this product comply with the inventory requirements administered by the governing country(s) A"No"indicates that one or more components of the product are not listed or exempt from listing on the inventory administered by the governing country(s). 16. Other information, including date of preparation or last revision Issue date 01-16-2015 Version # 01 Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 5/6 Further information HMIS® is a registered trade and service mark of the NPCA. References ACGIH EPA: AQUIRE database NLM: Hazardous Substances Data Base US. IARC Monographs on Occupational Exposures to Chemical Agents IARC Monographs. Overall Evaluation of Carcinogenicity National Toxicology Program(NTP) Report on Carcinogens ACGIH Documentation of the Threshold Limit Values and Biological Exposure Indices Disclaimer The information provided in this Safety Data Sheet is correct to the best of our knowledge, information and belief at the date of its publication.The information given is designed only as a guidance for safe handling, use, processing,storage,transportation,disposal and release and is not to be considered a warranty or quality specification.The information relates only to the specific material designated and may not be valid for such material used in combination with any other materials or in any process, unless specified in the text.The information in the sheet was written based on the best knowledge and experience currently available. Revision Information Product and Company Identification: Product and Company Identification Composition/Information on Ingredients: Ingredients Physical&Chemical Properties: Multiple Properties Regulatory Information: United States Material name: Detack sos us 4781 Version#: 01 Issue date: 01-16-2015 6/6 LOCATION MAPS, SITE DESCRIPTION, AND QUANTITY ESTIMATES 2023 Crack Sealing/Araucto A - 2 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 e 99 s I s :i CITY OF KENT ' 2023 Crack Sealing r . Overall Wall Map 1 1 � \ CSR-1 \ , Legend Crack Sealing Locations 64 Funding Source = V B&O ^/Residential , PROJECT LOCATON INDEX-SEE EXHIBIT FOR DETAILS , CSfv B_2 \ n . 516 - \. 1 1!1 � i C$R-4� � •la 1 � , 1 _.. _.: i ` ice-, • _ � 1 CSB-3 . st6 �._._�j - 1 �:. 1 21- R 1 1 Feet 0 1,250 2,500 5,000 RJ E 1. I s CSR-1 I A L 13 S 208 St CSR-2 J, CSB-1 77? 9 or- SJ 2-1 FT Legend Funding Source B&O ***4V Residential PROJECT LOCATION INDEX-SEE EXHIBIT B FOR DETAILS Page 1 of 4 2023 CRACK SEAL PROJECT LOCATIONS KEN Feet 0 1,250 2,500 5,000 T L F- y SB-2 D-1 C71 L SE-St 211 It L CSB-4 IE 2- El 13 516 If C IE 21111 If Legend Funding Source B&O In Z- Residential PROJECT LOCATION INDEX-SEE EXHIBIT B FOR DETAILS Page 2 of 4 2023 CRACK SEAL PROJECT LOCATIONS 10�. KEN ioneer st , � a Feetz , FP/ Q � 242 a 20 500 1,000 2 000 o E Temperance St Ell % ,m NI 1 S 243 St co U SI co a— E Smith St 244 St E Smith St — L I I S 244 PI — -_ Ward a' I ❑ -Z St U S 245 PI - GowSt o., Cyr Weiland St � S 246 PI_ 1 Oj 1Tacome St __ \� i��' ¢ S 247 Ct I � �a cagy m Cherry Hill -4Ay E Dean Dean St E Maclyn St �y Z s a m 8 x 6 Q � -E Guiberson St_ o Seattle St I 516 a rn s E Seattle St rn a' p� ¢' Russell St $ c tl! Q Y IQ Clearview Y E Chicago St I S 252 St o (Y S Chicago St Morton t E Laurel St O ^-� � 00, CS R-4 I U E Hemlock St LI 0 W � Carter PI 2 it E Filbert + , -Marion'St> I _ E \ Y � � > N E Walnut St _ —L Walnut J t6 Q m C 'e U Maple Sty 258 PI \ Co S 259 St i 10 Legend ' Funding Source L B&O Residential r J PROJECT LOCATION INDEX-SEE EXHIBIT B FOR DETAILS Page 3 of 4 N 2023 CRACK SEAL PROJECT LOCATIONS Feet 26, 6E261 St - 261 St 0 1,000 2,000 r 262 � \ Ca N b - � \�.c I263 SE4 263 Sl SE2 �St�6 teSt _ 10Pv2l°� I<<' Q c\ SE264PI ° m 264 SI p No 0 266� _�� ' a CSB-4 O 651° u I I 66m65 PI i a / �6 PII rv� SE 26fi ISt P❑ 286 P/ ~ R88 -W � a 266 St ' 4n— I'CiL 0 91 5 26fi PI V o \` 2635t D - y 26a 5t SE 266S�r 26fi fil q a =ems a 66PI iqm a SE 2T0 SE 270 PI Q st- 'p7 " RiO Stn 11 � -- 's 2T0 St O SE 270 St - (Pn� a 4 r; = „I PI jSE:272-Stz1z 1 II/ 2]2 PI Q IL z+ vl / p I SE 273 St SE 273 PI 0 a W 274 WY < 74 St SE E Q 21— ry \ SE 27a s CSB-3 -- a21I — 27551 ar �.1 ]sq PI I� \ \, SE 217 I / I \SE.277 PI N SE 2T/IN2i1 PI T� - (o E_27_9_St S � Ri o SE ww�-w �SE 28031 l/�/'`J' JJ 2PoSI SE 281 St Q w �o c a2 Wr X Q SE 2823t Q �^ SE 284 SI {� SE 284 St d —_� SE 288 31 SE 286 PI \ N SE 2S75t Q ! M SE 286 St A SE v SE 290 St I �`s— \I r PI 5E I �-� Jill 3� I sri I Legend ' Funding Source — Residential t! CSX-X=PROJECTLOCATION INDEX-SEE EXHIBIT B FOR DETAILS Page 4of4 N 2023 CRACK SEAL PROJECT LOCATIONS KEN T EXHIBIT B ESTIMATED QUANTITY BY LOCATION/AREA Estimated Ouantity By Location/Area FF Location ID Location Area Est. Crack Seal Tons Residential Funded 23-3001.4 CSR-1 IS 200th Street from Talbot Road S to 108 Ave SE 2.4 Near Panther Lake Elementary CSR-2 100th Ave SE from SE 208th Street to South end of 2 street SE 216th Street from 99th Ave S to 108th Ave SE Sun Meadows SE 282nd Street/ SE 282nd Way from 124th Ave SE CSR-3 to 132nd Ave SE 3.5 130th Ave SE from SE 282nd Way to SE 282nd Street Kent City Limit S North Scenic Hill Crest Ave S from E Chicago Street to End of Street (S) E Laurel Street from Crest Ave S to Reiten Road CSR-4 E Hemlock Street from Crest Ave S to Reiten Road 4.1 E Filbert Street from Crest Ave S to Ellis Place S Stoneburner Land S from E Walnut Street to E Filbert Street East Lane from E Walnut Street to E Filbert Street B&O Funded (23-3011.3 CSB-1 116th Ave SE from SE 231st Place to SE 208th Street 2.5 CSB-2 ISE 240th Street from 132nd Ave SE to 134th Ct SE 1 SE 272nd Street and 108th Ave SE CSB-3 SE 272nd Street from 105th Ave SE to 108th Ave SE 2.5 108th Ave SE from SE 280th Street to SE 272nd Street CSB-4 132nd Ave SE from SE 266th Street to SE 256th Street 4 P:\Public\Operations\Streets\Crack Seal Projects\2023 Crack Seal Projects\CrackSeal 2023 Project Listing and 1 OF 1 Estimates.xlsx TRAFFIC CONTROL PLANS 2023 Crack Sealing/Araucto A - 3 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 NO PARKING LEGEND PCMs rays SZ SIGN LOCATION TOW0 AWAY AREA (TEMPORARY MOUNT) WORK VEHICLE ■ TEMPORARY TRAFFIC CONTROL DEVICE (CONES) 0 ARROW BOARD DISTANCE (FLASHING CAUTION) ROAD TYPE BETWEEN SIGNS 4 A B URBAN PROTECTIVE/SHADOW 200 FT 200 FT 25/30 MPH h VEHICLE URBAN STREETS RESIDENTIAL & 350 FT 350 FT Pa,s PORTABLE CHANGEABLE BUSINESS DISTRICTS 35/40 MPH ® MESSAGE SIGN a RURAL ROADS & a ED TEMPORARY NO PARKING ZONES URBAN ARTERIALS 500 FT 500 FT Y (TYPE II BARRICADE) 45/55 MPH 3 MINIMUM TAPER LENGTH =L (FEET) PROTECTIVE/SHADOW LANE WIDTH POSTED SPEED (MPH) VEHICLE (FT) 25 30 35 40 45 10 105 150 205 270 450 0 • 11 115 165 225 295 495 12 125 180 1245 320 540 • • ARROW BOARD (FLASHING CAUTION) GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF KENT SPECIFICATIONS. 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES. 3. PROTECTIVE VEHICLE RECOMMENDED—MAY BE A WORK VEHICLE. EZ 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON ORANGE UNLESS OTHERWISE SPECIFIED. USE SIGN SHAPE AND 6. CHANNELIZATION DEVICES (IF NEEDED) ARE LEGEND APPROPRIATE TO STANDARD TRAFFIC CONES. THE TYPE of WORK 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF 9R TEMPORARY NO PARKING SIGNS SHALL BE P C M S IN PLACE 24 HRS IN ADVANCE TO RESTRICT ON STREET PARKING, AS NEEDED. CHANNELIZATION DEVICE SPACING (FEET) TAPER TANGENT 2023 CRACK SEALING 10 10 KENO PROJECT WIINXINOTON CITY OF KENT SCALE NTS EXHIBIT ENGINEERING DEPARTMENT DATE MAR 2016 MOBILE LEGEND NO PARKING Q SIGN LOCATION Rms 0 (TEMPORARY MOUNT) PcMs 0 TOW AWAY AREA ■ TEMPORARY TRAFFIC CONTROL DEVICE (CONES) 0 ARROW BOARD DISTANCE ROAD TYPE BETWEEN SIGNS • (FLASHING CAUTION) A B � URBAN ® PROTECTIVE/WORK 25/30 MPH 200 FT 200 FT VEHICLE URBAN STREETS RESIDENTIAL & 350 FT 350 FT Pcm PORTABLE CHANGEABLE BUSINESS DISTRICTS O 35/40 MPH MESSAGE SIGN a RURAL ROADS & a ® EMPORARY NO PARKING ZONES URBAN ARTERIALS 500 FT 500 FT Y (TYPE II BARRICADE) 45/55 MPH o 3 MINIMUM TAPER LENGTH =L (FEET) ® WORK VEHICLE LANE WIDTH POSTED SPEED (MPH) (FT) 25 30 35 40 45 10 105 150 205 270 450 0 • 11 115 165 225 295 495 12 125 180 1245 320 540 0 • ARROW BOARD (FLASHING CAUTION) GENERAL NOTES: A 1. ALL SIGNS AND SPACING SHALL CONFORM ®� LANE TO THE MUTCD AND CITY OF KENT sZ CLOSED SPECIFICATIONS. AHEAD 2. PRIORITY PASSAGE THROUGH WORK AREA B FOR EMERGENCY VEHICLES SHALL BE PROVIDED ROAD AT ALL TIMES. WORK 3. PROTECTIVE VEHICLE RECOMMENDED-MAY BE AHEAD A WORK VEHICLE. 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH W20-1 INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON ORANAGE UNLESS OTHERWISE SPECIFIED. CHANNELIZATION DEVICE 6. CHANNELIZATION DEVICES (IF NEEDED) ARE SPACING (FEET) STANDARD TRAFFIC CONES. TAPER TANGENT 7. ALL SPACING MAY BE ADJUSTED TO 10 10 ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF P C M S PROJECT. 9. TEMPORARY NO PARKING SIGNS SHALL BE IN PLACE 24 HRS IN ADVANCE TO RESTRICT ON STREET PARKING, AS NEEDED. 2023 CRACK SEALING KENT PROJECT WIINXINOTON CITY OF KENT SCALE NTB EXHIBIT ENGINEERING DEPARTMENT DATE MAR 2016 SHORT PREVAILING WAGE RATES 2023 Crack Sealing/Araucto A - 4 February 6, 2023 Project Numbers: 23-3001.4 &23-3011.3 2/6/23, 1:26 PM about:blank State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 2/6/2023 County Trade Job Classification Wage Holiday Overtime Note *Risk Class King Asbestos Abatement Workers Journey Level $56.80 5D 1 H View King Boilermakers Journey Level $72.54 5N 1C View King Brick Mason Journey Level $66.32 7E 1 N View King Brick Mason Pointer-Caulker-Cleaner $66.32 7E 1 N View King Building Service Employees Janitor $28.23 5S 2F View King Building Service Employees Traveling Waxer/Shampooer $28.68 5S 2F View King Building Service Employees Window Cleaner (Non-Scaffold) $32.18 5S 2F View King Building Service Employees Window Cleaner (Scaffold) $33.18 5S 2F View King Cabinet Makers In Shop) Journey Level $22.74 1 View King Carpenters Acoustical Worker $71.53 15J 4C View King Carpenters Bridge, Dock And Wharf $71.53 15J 4C View Carpenters King Carpenters Floor Layer Et Floor Finisher $71.53 15J 4C View King Carpenters Journey Level $71.53 15J 4C View King Carpenters Scaffold Erector $71.53 15J 4C View King Cement Masons Application of all Composition $70.09 15J 41J View Mastic King Cement Masons Application of all Epoxy $69.59 15J 41J View Material King Cement Masons Application of all Plastic $70.09 15J 4U View Material King Cement Masons Application of Sealing $69.59 15J 41J View Compound King Cement Masons Application of Underlayment $70.09 15J 41J View King Cement Masons Building General $69.59 15J 4U View King Cement Masons Composition or Kalman Floors $70.09 15J 41J View King Cement Masons Concrete Paving $69.59 15J 41J View King Cement Masons Curb Et Gutter Machine $70.09 15J 41J View King Cement Masons Curb Ft Gutter, Sidewalks $69.59 15J 41J View King Cement Masons Curing Concrete $69.59 15J 4U View King Cement Masons Finish Colored Concrete $70.09 15J 4U View about:blank 1/18 2/6/23, 1:26 PM about:blank King Cement Masons Floor Grinding $70.09 15J 4U View King Cement Masons Floor Grinding/Polisher $69.59 15J 41-1 View King Cement Masons Green Concrete Saw, self- $70.09 15J 4U View powered King Cement Masons Grouting of all Plates $69.59 15J 41.1 View King Cement Masons Grouting of all Tilt-up Panels $69.59 15J 41-1 View King Cement Masons Gunite Nozzleman $70.09 15J 4U View King Cement Masons Hand Powered Grinder $70.09 15J 41.1 View King Cement Masons Journey Level $69.59 15J 4U View King Cement Masons Patching Concrete $69.59 15J 4U View King Cement Masons Pneumatic Power Tools $70.09 15J 41-1 View King Cement Masons Power Chipping Et Brushing $70.09 15J 4U View King Cement Masons Sand Blasting Architectural $70.09 15J 41.1 View Finish King Cement Masons Screed Et Rodding Machine $70.09 15J 41-1 View King Cement Masons Spackling or Skim Coat $69.59 15J 4U View Concrete King Cement Masons Troweling Machine Operator $70.09 15J 41.1 View King Cement Masons Troweling Machine Operator on $70.09 15J 4U View Colored Slabs King Cement Masons Tunnel Workers $70.09 15J 4U View King Divers Et Tenders Bell/Vehicle or Submersible $126.05 15J 4C View Operator (Not Under Pressure) King Divers Et Tenders Dive Supervisor/Master $89.94 15J 4C View King Divers Et Tenders Diver $126.05 15J 4C 8V View King Divers Et Tenders Diver On Standby $84.94 15J 4C View King Divers Et Tenders Diver Tender $77.16 15J 4C View King Divers Et Tenders Hyperbaric Worker - $89.09 15J 4C View Compressed Air Worker 0-30.00 PSI King Divers Et Tenders Hyperbaric Worker - $94.09 15J 4C View Compressed Air Worker 30.01 - 44.00 PSI King Divers Et Tenders Hyperbaric Worker - $107.09 15J 4C View Compressed Air Worker 44.01 - ' 54.00 PSI King Divers Et Tenders Hyperbaric Worker - $103.09 15J 4C View Compressed Air Worker 54.01 - 60.00 PSI King Divers Et Tenders Hyperbaric Worker - $105.59 15J 4C View Compressed Air Worker 60.01 - 64.00 PSI King Divers Et Tenders Hyperbaric Worker - $110.59 15J 4C View Compressed Air Worker 64.01 - 68.00 PSI King Divers Et Tenders Hyperbaric Worker - $112.59 15J 4C View Compressed Air Worker 68.01 - 70.00 PSI King Divers Et Tenders Hyperbaric Worker - $114.59 15J 4C View Compressed Air Worker 70.01 - 72.00 PSI about:blank 2/18 2/6/23, 1:26 PM about:blank King Divers Et Tenders Hyperbaric Worker - $116.59 15J 4C View Compressed Air Worker 72.01 74.00 PSI King Divers Et Tenders Manifold Operator $77.16 15J 4C View King Divers Et Tenders Manifold Operator Mixed Gas $82.16 15J 4C View King Divers Et Tenders Remote Operated Vehicle $77.16 15J 4C View Operator/Technician King Divers Et Tenders Remote Operated Vehicle $71.98 15J 4C View Tender King Dredge Workers Assistant Engineer $76.56 5D 3F View King Dredge Workers Assistant Mate (Deckhand) $75.97 5D 3F View King Dredge Workers Boatmen $76.56 5D 3F View King Dredge Workers Engineer Welder $78.03 5D 3F View King Dredge Workers Leverman, Hydraulic $79.59 5D 3F View King Dredge Workers Mates $76.56 5D 3F View King Dredge Workers Oiler $75.97 5D 3F View King Drywall Applicator Journey Level $71.53 15J 4C View King Drywall Tapers Journey Level $70.61 5P 1 E View King Electrical Fixture Maintenance Journey Level $35.19 5L 1 E View Workers King Electricians - Inside Cable Splicer $99.36 7C 4E View King Electricians - Inside Cable Splicer (tunnel) $106.81 7C 4E View King Electricians - Inside Certified Welder $95.98 7C 4E View King Electricians - Inside Certified Welder (tunnel) $103.09 7C 4E View King Electricians - Inside Construction Stock Person $47.03 7C 4E View King Electricians - Inside Journey Level $92.59 7C 4E View King Electricians - Inside Journey Level (tunnel) $99.36 7C 4E View King Electricians - Motor Shop Journey Level $48.68 5A 1 B View King Electricians - Powerline Cable Splicer $88.89 5A 4D View Construction King Electricians - Powerline Certified Line Welder $81.65 5A 4D View Construction King Electricians - Powerline Groundperson $52.91 5A 4D View Construction King Electricians - Powerline Heavy Line Equipment $81.65 5A 4D View Construction Operator King Electricians - Powerline Journey Level Lineperson $81.65 5A 4D View Construction King Electricians - Powerline Line Equipment Operator $70.02 5A 4D View Construction King Electricians - Powerline Meter Installer $52.91 5A 4D 8W View Construction King Electricians - Powerline Pole Sprayer $81.65 5A 4D View Construction King Electricians - Powerline Powderperson $60.75 5A 4D View Construction King Electronic Technicians Journey Level $60.10 7E 1 E View King Elevator Constructors Mechanic $103.81 7D 4A View King Elevator Constructors Mechanic In Charge $112.09 7D 4A View about:blank 3/18 2/6/23, 1:26 PM about:blank King Fabricated Precast Concrete All Classifications - In-Factory $20.62 5B 1 R View Products Work Only King Fence Erectors Fence Erector $48.14 15J 4V 8Y View King Fence Erectors Fence Laborer $48.14 15J 4V 8Y View King Flaggers Journey Level $48.14 15J 4V 8Y View King Glaziers Journey Level $75.91 7L 1Y View King Heat Et Frost Insulators And Journey Level $84.58 15H 11C View Asbestos Workers King Heating Equipment Mechanics Journey Level $94.11 7F 1 E View King Hod Carriers Et Mason Tenders Journey Level $59.85 15J 4V 8Y View King Industrial Power Vacuum Journey Level $15.74 1 View Cleaner King Inland Boatmen Boat Operator $61.41 5B 1 K View King Inland Boatmen Cook $56.48 5B 1 K View King Inland Boatmen Deckhand $57.48 5B 1 K View King Inland Boatmen Deckhand Engineer $58.81 5B 1 K View King Inland Boatmen Launch Operator $58.89 5B 1 K View King Inland Boatmen Mate $57.31 5B 1 K View King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 View Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $15.74 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 View Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $71.53 15J 4C View King Ironworkers Journeyman $82.03 7N 10 View King Laborers Air, Gas Or Electric Vibrating $56.80 15J 4V 8Y View Screed King Laborers Airtrac Drill Operator $58.56 15J 4V 8Y View King Laborers Ballast Regular Machine $56.80 15J 4V 8Y View King Laborers Batch Weighman $48.14 15J 4V 8Y View King Laborers Brick Pavers $56.80 15J 4V 8Y View King Laborers Brush Cutter $56.80 15J 4V 8Y View King Laborers Brush Hog Feeder $56.80 15J 4V 8Y View King Laborers Burner $56.80 15J 4V 8Y View King Laborers Caisson Worker $58.56 15J 4V 8Y View King Laborers Carpenter Tender $56.80 15J 4V 8Y View King Laborers Cement Dumper-paving $57.84 15J 4V 8Y View King Laborers Cement Finisher Tender $56.80 15J 4V 8Y View King Laborers Change House Or Dry Shack $56.80 15J 4V 8Y View about:blank 4/18 2/6/23, 1:26 PM about:blank King Laborers Chipping Gun (30 Lbs. And $57.84 15J 4V 8Y View Over) King Laborers Chipping Gun (Under 30 Lbs.) $56.80 15J 4V 8Y View King Laborers Choker Setter $56.80 15J 4V 8Y View King Laborers Chuck Tender $56.80 15J 4V 8Y View King Laborers Clary Power Spreader $57.84 15J 4V 8Y View King Laborers Clean-up Laborer $56.80 15J 4V 8Y View King Laborers Concrete Dumper/Chute $57.84 15J 4V 8Y View Operator King Laborers Concrete Form Stripper $56.80 15J 4V 8Y View King Laborers Concrete Placement Crew $57.84 15J 4V 8Y View King Laborers Concrete Saw Operator/Core $57.84 15J 4V 8Y View Driller King Laborers Crusher Feeder $48.14 15J 4V 8Y View King Laborers Curing Laborer $56.80 15J 4V 8Y View King Laborers Demolition: Wrecking Et Moving $56.80 15J 4V 8Y View (Incl. Charred Material) King Laborers Ditch Digger $56.80 15J 4V 8Y View King Laborers Diver $58.56 15J 4V 8Y View King Laborers Drill Operator (Hydraulic, $57.84 15J 4V 8Y View Diamond) King Laborers Dry Stack Walls $56.80 15J 4V 8Y View King Laborers Dump Person $56.80 15J 4V 8Y View King Laborers Epoxy Technician $56.80 15J 4V 8Y View King Laborers Erosion Control Worker $56.80 15J 4V 8Y View King Laborers Faller Et Bucker Chain Saw $57.84 15J 4V 8Y View King Laborers Fine Graders $56.80 15J 4V 8Y View King Laborers Firewatch $48.14 15J 4V 8Y View King Laborers Form Setter $57.84 15J 4V 8Y View King Laborers Gabian Basket Builders $56.80 15J 4V 8Y View King Laborers General Laborer $56.80 15J 4V 8Y View King Laborers Grade Checker Et Transit Person $59.85 15J 4V 8Y View King Laborers Grinders $56.80 15J 4V 8Y View King Laborers Grout Machine Tender $56.80 15J 4V 8Y View King Laborers Groutmen (Pressure) Including $57.84 15J 4V 8Y View Post Tension Beams King Laborers Guardrail Erector $56.80 15J 4V 8Y View King Laborers Hazardous Waste Worker (Level $58.56 15J 4V 8Y View A) King Laborers Hazardous Waste Worker (Level $57.84 15J 4V 8Y View B) King Laborers Hazardous Waste Worker (Level $56.80 15J 4V 8Y View C) King Laborers High Scaler $58.56 15J 4V 8Y View King Laborers Jackhammer $57.84 15J 4V 8Y View King Laborers Laserbeam Operator $57.84 15J 4V 8Y View King Laborers Maintenance Person $56.80 15J 4V 8Y View King Laborers Manhole Builder-Mudman $57.84 15J 4V 8Y View about:blank 5/18 2/6/23, 1:26 PM about:blank King Laborers Material Yard Person $56.80 15J 4V 8Y View King Laborers Mold Abatement Worker $56.80 15J 4V 8Y View King Laborers Motorman-Dinky Locomotive $59.95 15J 4V 8Y View King Laborers nozzleman (concrete pump, $59.85 15J 4V 8Y View green cutter when using combination of high pressure air Et water on concrete Et rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster) King Laborers Pavement Breaker $57.84 15J 4V 8Y View King Laborers Pilot Car $48.14 15J 4V 8Y View King Laborers Pipe Layer (Lead) $59.85 15J 4V 8Y View King Laborers Pipe Layer/Tailor $57.84 15J 4V 8Y View King Laborers Pipe Pot Tender $57.84 15J 4V 8Y View King Laborers Pipe Reliner $57.84 15J 4V 8Y View King Laborers Pipe Wrapper $57.84 15J 4V 8Y View King Laborers Pot Tender $56.80 15J 4V 8Y View King Laborers Powderman $58.56 15J 4V 8Y View King Laborers Powderman's Helper $56.80 15J 4V 8Y View King Laborers Power Jacks $57.84 15J 4V 8Y View King Laborers Railroad Spike Puller - Power $57.84 15J 4V 8Y View King Laborers Raker -Asphalt $59.85 15J 4V 8Y View King Laborers Re-timberman $58.56 15J 4V 8Y View King Laborers Remote Equipment Operator $57.84 15J 4V 8Y View King Laborers Rigger/Signal Person $57.84 15J 4V 8Y View King Laborers Rip Rap Person $56.80 15J 4V 8Y View King Laborers Rivet Buster $57.84 15J 4V 8Y View King Laborers Rodder $57.84 15J 4V 8Y View King Laborers Scaffold Erector $56.80 15J 4V 8Y View King Laborers Scale Person $56.80 15J 4V 8Y View King Laborers Sloper (Over 20") $57.84 15J 4V 8Y View King Laborers Sloper Sprayer $56.80 15J 4V 8Y View King Laborers Spreader (Concrete) $57.84 15J 4V 8Y View King Laborers Stake Hopper $56.80 15J 4V 8Y View King Laborers Stock Piler $56.80 15J 4V 8Y View King Laborers Swinging Stage/Boatswain $48.14 15J 4V 8Y View Chair King Laborers Tamper Et Similar Electric, Air $57.84 15J 4V 8Y View Et Gas Operated Tools King Laborers Tamper (Multiple Et Self- $57.84 15J 4V 8Y View propelled) King Laborers Timber Person - Sewer (Lagger, $57.84 15J 4V 8Y View Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $56.80 15J 4V 8Y View King Laborers Topper $56.80 15J 4V 8Y View King Laborers Track Laborer $56.80 15J 4V 8Y View King Laborers Track Liner (Power) $57.84 15J 4V 8Y View King Laborers Traffic Control Laborer $51.48 15J 4V 9C View about:blank 6/18 2/6/23, 1:26 PM about:blank King Laborers Traffic Control Supervisor $54.55 15J 4V 9C View King Laborers Truck Spotter $56.80 15J 4V 8Y View King Laborers Tugger Operator $57.84 15J 4V 8Y View King Laborers Tunnel Work-Compressed Air $158.87 15J 4V 9B View Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $163.90 15J 4V 9B View Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $167.58 15J 4V 9B View Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $173.28 15J 4V 9B View Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $175.40 15J 4V 9B View Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $180.50 15J 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $182.40 15J 4V 9B View Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $184.40 15J 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $186.40 15J 4V 9B View Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $59.95 15J 4V 8Y View Tender King Laborers Tunnel Work-Miner $59.95 15J 4V 8Y View King Laborers Vibrator $57.84 15J 4V 8Y View King Laborers Vinyl Seamer $56.80 15J 4V 8Y View King Laborers Watchman $43.76 15J 4V 8Y View King Laborers Welder $57.84 15J 4V 8Y View King Laborers Well Point Laborer $57.84 15J 4V 8Y View King Laborers Window Washer/Cleaner $43.76 15J 4V 8Y View King Laborers - Underground Sewer General Laborer Et Topman $56.80 15J 4V 8Y View Et Water King Laborers - Underground Sewer Pipe Layer $57.84 15J 4V 8Y View Et Water King Landscape Construction Landscape $43.76 15J 4V 8Y View Construction/Landscaping Or Planting Laborers King Landscape Construction Landscape Operator $78.80 15J 11G 8X View King Landscape Maintenance Groundskeeper $17.87 1 View King Lathers Journey Level $71.53 15J 4C View King Marble Setters Journey Level $66.32 7E 1 N View King Metal Fabrication In Shop), Fitter/Certified Welder $42.17 151 11 E View King Metal Fabrication In Shop), General Laborer $30.07 151 11 E View King Metal Fabrication In Shop), Mechanic $43.63 151 11 E View King Metal Fabrication In Shop) Welder/Burner $39.28 151 11E View King Millwright Journey Level $73.08 15J 4C View King Modular Buildings Cabinet Assembly $15.74 1 View King Modular Buildings Electrician $15.74 1 View King Modular Buildings Equipment Maintenance $15.74 1 View King Modular Buildings Plumber $15.74 1 View about:blank 7/18 2/6/23, 1:26 PM about:blank King Modular Buildings Production Worker $15.74 1 View King Modular Buildings Tool Maintenance $15.74 1 View King Modular Buildings Utility Person $15.74 1 View King Modular Buildings Welder $15.74 1 View King Painters Journey Level $49.46 6Z 11J View King Pile Driver Crew Tender $77.16 15J 4C View King Pile Driver Journey Level $71.98 15J 4C View King Plasterers Journey Level $67.49 7Q 1 R View King Plasterers Nozzleman $71.49 7Q 1 R View King Playground Et Park Equipment Journey Level $15.74 1 View Installers King Plumbers Et Pipefitters Journey Level $95.69 6Z 1G View King Power Equipment Operators Asphalt Plant Operators $80.12 15J 11G 8X View King Power Equipment Operators Assistant Engineer $75.35 15J 11G 8X View King Power Equipment Operators Barrier Machine (zipper) $79.41 15J 11G 8X View King Power Equipment Operators Batch Plant Operator: concrete $79.41 15J 11G 8X View King Power Equipment Operators Boat Operator $80.33 7A 11 H 8X View King Power Equipment Operators Bobcat $75.35 15J 11G 8X View King Power Equipment Operators Brokk - Remote Demolition $75.35 15J 11G 8X View Equipment King Power Equipment Operators Brooms $75.35 15J 11G 8X View King Power Equipment Operators Bump Cutter $79.41 15J 11G 8X View King Power Equipment Operators Cableways $80.12 15J 11G 8X View King Power Equipment Operators Chipper $79.41 15J 11G 8X View King Power Equipment Operators Compressor $75.35 15J 11G 8X View King Power Equipment Operators Concrete Finish Machine - $75.35 15J 11G 8X View Laser Screed King Power Equipment Operators Concrete Pump - Mounted Or $78.80 15J 11G 8X View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators Concrete Pump: Truck Mount $80.12 15J 11G 8X View With Boom Attachment Over 42 M King Power Equipment Operators Concrete Pump: Truck Mount $79.41 15J 11G 8X View With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $78.80 15J 11G 8X View King Power Equipment Operators Cranes Friction: 200 tons and $82.76 7A 11 H 8X View over King Power Equipment Operators Cranes, A-frame: 10 tons and $75.55 7A 11 H 8X View under King Power Equipment Operators Cranes: 100 tons through 199 $81.12 7A 11 H 8X View tons, or 150' of boom (including jib with attachments) King Power Equipment Operators Cranes: 20 tons through 44 $79.62 7A 11 H 8X View tons with attachments King Power Equipment Operators Cranes: 200 tons- 299 tons, or $81.97 7A 11 H 8X View 250' of boom including jib with attachments about:blank 8/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators Cranes: 300 tons and over or $82.76 7A 11H 8X View 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 tons through 99 $80.33 7A 11H 8X View tons, under 150' of boom(including jib with attachments) King Power Equipment Operators Cranes: Friction cranes through $81.97 7A 11H 8X View 199 tons King Power Equipment Operators Cranes: through 19 tons with $79.00 7A 11H 8X View attachments, a-frame over 10 tons King Power Equipment Operators Crusher $79.41 15J 11G 8X View King Power Equipment Operators Deck Engineer/Deck Winches $79.41 15J 11G 8X View (power) King Power Equipment Operators Derricks, On Building Work $80.12 15J 11G 8X View King Power Equipment Operators Dozers D-9 Et Under $78.80 15J 11G 8X View King Power Equipment Operators Drill Oilers: Auger Type, Truck $78.80 15J 11G 8X View Or Crane Mount King Power Equipment Operators Drilling Machine $80.92 15J 11G 8X View King Power Equipment Operators Elevator and man-lift: $75.35 15J 11G 8X View permanent and shaft type King Power Equipment Operators Finishing Machine, Bidwell And $79.41 15J 11G 8X View Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 lbs and over with $78.80 15J 11G 8X View attachments King Power Equipment Operators Forklifts: under 3000 lbs. with $75.35 15J 11G 8X View attachments King Power Equipment Operators Grade Engineer: Using Blue $79.41 15J 11G 8X View Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/Stakeman $75.35 15J 11G 8X View King Power Equipment Operators Guardrail Punch $79.41 15J 11G 8X View King Power Equipment Operators Hard Tail End Dump $80.12 15J 11G 8X View Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $79.41 15J 11G 8X View Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/Directional Drill $78.80 15J 11G 8X View Locator King Power Equipment Operators Horizontal/Directional Drill $79.41 15J 11G 8X View Operator King Power Equipment Operators Hydralifts/Boom Trucks Over $79.00 7A 11H 8X View 10 Tons King Power Equipment Operators Hydralifts/boom trucks: 10 $75.55 7A 11H 8X View tons and under King Power Equipment Operators Leverman $81.75 15J 11G 8X View King Power Equipment Operators Loader, Overhead, 6 Yards. But $80.12 15J 11G 8X View Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $79.41 15J 11G 8X View Yards King Power Equipment Operators Loaders, Plant Feed $79.41 15J 11G 8X View about:blank 9/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators Loaders: Elevating Type Belt $78.80 15J 11G 8X View King Power Equipment Operators Locomotives, All $79.41 15J 11G 8X View King Power Equipment Operators Material Transfer Device $79.41 15J 11G 8X View King Power Equipment Operators Mechanics: All (Leadmen - $80.92 15J 11G 8X View $0.50 per hour over mechanic) King Power Equipment Operators Motor Patrol Graders $80.12 15J 11G 8X View King Power Equipment Operators Mucking Machine, Mole, Tunnel $80.12 15J 11G 8X View Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $75.35 15J 11G 8X View Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (Elevators and $78.80 15J 11G 8X View Manlifts), Air Tuggers, Strato King Power Equipment Operators Overhead, bridge type Crane: $79.62 7A 11 H 8X View 20 tons through 44 tons King Power Equipment Operators Overhead, bridge type: 100 $81.12 7A 11 H 8X View tons and over King Power Equipment Operators Overhead, bridge type: 45 tons $80.33 7A 11 H 8X View through 99 tons King Power Equipment Operators Pavement Breaker $75.35 15J 11G 8X View King Power Equipment Operators Pile Driver (other Than Crane $79.41 15J 11G 8X View Mount) King Power Equipment Operators Plant Oiler -Asphalt, Crusher $78.80 15J 11G 8X View King Power Equipment Operators Posthole Digger, Mechanical $75.35 15J 11G 8X View King Power Equipment Operators Power Plant $75.35 15J 11G 8X View King Power Equipment Operators Pumps - Water $75.35 15J 11G 8X View King Power Equipment Operators Quad 9, Hd 41, D10And Over $80.12 15J 11G 8X View King Power Equipment Operators Quick Tower: no cab, under $79.41 15J 11G 8X View 100 feet in height base to boom King Power Equipment Operators Remote Control Operator On $80.12 15J 11G 8X View Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger and Bellman $75.55 7A 11 H 8X View King Power Equipment Operators Rigger/Signal Person, $79.00 7A 11 H. 8X View Bellman(Certified) King Power Equipment Operators Rollagon $80.12 15J 11G 8X View King Power Equipment Operators Roller, Other Than Plant Mix $75.35 15J 11G 8X View King Power Equipment Operators Roller, Plant Mix Or Multi-lift $78.80 15J 11G 8X View Materials King Power Equipment Operators Roto-mill, Roto-grinder $79.41 15J 11G 8X View King Power Equipment Operators Saws - Concrete $78.80 15J 11G 8X View King Power Equipment Operators Scraper, Self Propelled Under $79.41 15J 11G 8X View 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $78.80 15J 11G 8X View King Power Equipment Operators Scrapers, Self-propelled: 45 $80.12 15J 11G 8X View Yards And Over King Power Equipment Operators Service Engineers: Equipment $78.80 15J 11G 8X View King Power Equipment Operators Shotcrete/Gunite Equipment $75.35 15J 11G 8X View about:blank 10/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators Shovel, Excavator, Backhoe, $78.80 15J 11G 8X View Tractors Under 15 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoe: $80.12 15J 11G 8X View Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $79.41 15J 11G 8X View Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $80.92 15J 11G 8X View Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $81.75 15J 11G 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $80.12 15J 11G 8X View King Power Equipment Operators Spreader, Topsider Et $80.12 15J 11G 8X View Screedman King Power Equipment Operators Subgrader Trimmer $79.41 15J 11G 8X View King Power Equipment Operators Tower Bucket Elevators $78.80 15J 11G 8X View King Power Equipment Operators Tower Crane: over 175' through $81.97 7A 11 H 8X View 250' in height, base to boom King Power Equipment Operators Tower crane: up to 175' in $81.12 7A 11 H 8X View height base to boom King Power Equipment Operators Tower Cranes: over 250' in $82.76 7A 11 H 8X View height from base to boom King Power Equipment Operators Transporters, All Track Or Truck $80.12 15J 11G 8X View Type King Power Equipment Operators Trenching Machines $78.80 15J 11G 8X View King Power Equipment Operators Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View tons and over King Power Equipment Operators Truck crane oiler/driver: under $79.00 7A 11 H 8X View 100 tons King Power Equipment Operators Truck Mount Portable Conveyor $79.41 15J 11G 8X View King Power Equipment Operators Vac Truck (Vactor Guzzler, $79.41 15J 11G 8X View Hydro Excavator) King Power Equipment Operators Welder $80.12 15J 11G 8X View King Power Equipment Operators Wheel Tractors, Farman Type $75.35 15J 11G 8X View King Power Equipment Operators Yo Yo Pay Dozer $79.41 15J 11G 8X View King Power Equipment Operators- Asphalt Plant Operators $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Boat Operator $80.33 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Bobcat $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $75.35 15J 11G 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $75.35 15J 11G 8X View Underground Sewer Et Water about:blank 11/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators- Bump Cutter $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cableways $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Chipper $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Compressor $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - $75.35 15J 11G 8X View Underground Sewer Et Water Laser Screed King Power Equipment Operators- Concrete Pump - Mounted Or $78.80 15J 11G 8X View Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators- Concrete Pump: Truck Mount $80.12 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Pump: Truck Mount $79.41 15J 11G 8X View Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes Friction: 200 tons and $82.76 7A 11 H 8X View Underground Sewer Et Water over King Power Equipment Operators- Cranes, A-frame: 10 tons and $75.55 7A 11 H 8X View Underground Sewer Et Water under King Power Equipment Operators- Cranes: 100 tons through 199 $81.12 7A 11 H 8X View Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) King Power Equipment Operators- Cranes: 20 tons through 44 $79.62 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 20 tons through 44 $79.62 7A 11 H 8X View Underground Sewer Et Water tons with attachments King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $81.97 7A 11 H 8X View Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $82.76 7A 11 H 8X View Underground Sewer Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 tons through 99 $80.33 7A 11 H 8X View Underground Sewer Et Water tons, under 150' of boom(including jib with attachments) King Power Equipment Operators- Cranes: Friction cranes through $81.97 7A 11 H 8X View Underground Sewer Et Water 199 tons King Power Equipment Operators- Cranes: through 19 tons with $79.00 7A 11 H 8X View Underground Sewer Et Water attachments, a-frame over 10 tons King Power Equipment Operators- Crusher $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches $79.41 15J 11G 8X View Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $80.12 15J 11G 8X View Underground Sewer Et Water about:blank 12/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators- Dozers D-9 Et Under $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $78.80 15J 11G 8X View Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $80.92 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Elevator and man-lift: $75.35 15J 11G 8X View Underground Sewer Et Water permanent and shaft type King Power Equipment Operators- Finishing Machine, Bidwell And $79.41 15J 11G 8X View Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 lbs and over with $78.80 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Forklifts: under 3000 lbs. with $75.35 15J 11G 8X View Underground Sewer Et Water attachments King Power Equipment Operators- Grade Engineer: Using Blue $79.41 15J 11G 8X View Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/Stakeman $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $80.12 15J 11G 8X View Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $79.41 15J 11G 8X View Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/Directional Drill $78.80 15J 11G 8X View Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/Directional Drill $79.41 15J 11G 8X View Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom trucks: 10 $75.55 7A 11H 8X View Underground Sewer Et Water tons and under King Power Equipment Operators- Hydralifts/boom trucks: over $79.00 7A 11H 8X View Underground Sewer Et Water 10 tons King Power Equipment Operators- Leverman $81.75 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But $80.12 15J 11G 8X View Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $79.41 15J 11G 8X View Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics: All (Leadmen - $80.92 15J 11G 8X View Underground Sewer Et Water $0.50 per hour over mechanic) King Power Equipment Operators- Motor Patrol Graders $80.12 15J 11G 8X View Underground Sewer Et Water about:blank 13/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators- Mucking Machine, Mole, Tunnel $80.12 15J 11G 8X View Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $75.35 15J 11G 8X View Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (Elevators and $78.80 15J 11G 8X View Underground Sewer Et Water Manlifts), Air Tuggers, Strato King Power Equipment Operators- Overhead, bridge type Crane: $79.62 7A 11 H 8X View Underground Sewer Et Water 20 tons through 44 tons King Power Equipment Operators- Overhead, bridge type: 100 $81.12 7A 11 H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Overhead, bridge type: 45 tons $80.33 7A 11 H 8X View Underground Sewer Et Water through 99 tons King Power Equipment Operators- Pavement Breaker $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $79.41 15J 11G 8X View Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler -Asphalt, Crusher $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10And Over $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Quick Tower: no cab, under $79.41 15J 11G 8X View Underground Sewer Et Water 100 feet in height base to boom King Power Equipment Operators- Remote Control Operator On $80.12 15J 11G 8X View Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bellman $75.55 7A 11 H 8X View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, $79.00 7A 11 H 8X View Underground Sewer Et Water Bellman(Certified) King Power Equipment Operators- Rollagon $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $78.80 15J 11G 8X View Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $79.41 15J 11G 8X View Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $78.80 15J 11G 8X View Underground Sewer Et Water about:blank 14/18 2/6/23, 1:26 PM about:blank King Power Equipment Operators- Scrapers, Self-propelled: 45 $80.12 15J 11G 8X View Underground Sewer Et Water Yards And Over King Power Equipment Operators- Shotcrete/Gunite Equipment $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, $78.80 15J 11G 8X View Underground Sewer Et Water Tractors Under 15 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoe: $80.12 15J 11G 8X View Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $79.41 15J 11G 8X View Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $80.92 15J 11G 8X View Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $81.75 15J 11G 8X View Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $80.12 15J 11G 8X View Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Crane: over 175' through $81.97 7A 11H 8X View Underground Sewer Et Water 250' in height, base to boom King Power Equipment Operators- Tower crane: up to 175' in $81.12 7A 11H 8X View Underground Sewer Et Water height base to boom King Power Equipment Operators- Tower Cranes: over 250' in $82.76 7A 11H 8X View Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or Truck $80.12 15J 11G 8X View Underground Sewer Et Water Type King Power Equipment Operators- Trenching Machines $78.80 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Truck Crane Oiler/Driver: 100 $79.62 7A 11H 8X View Underground Sewer Et Water tons and over King Power Equipment Operators- Truck crane oiler/driver: under $79.00 7A 11H 8X View Underground Sewer Et Water 100 tons King Power Equipment Operators- Truck Mount Portable Conveyor $79.41 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Vac Truck (Vactor Guzzler, $79.41 15J 11G 8X View Underground Sewer Et Water Hydro Excavator) King Power Equipment Operators- Welder $80.12 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $75.35 15J 11G 8X View Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $79.41 15J 11G 8X View Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $57.22 5A 4A View Trimmers about:blank 15/18 2/6/23, 1:26 PM about:blank King Power Line Clearance Tree Spray Person $54.32 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $57.22 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer $51.18 5A 4A View Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $38.99 5A 4A View Trimmers King Refrigeration Et Air Conditioning Journey Level $91.51 6Z 1G View Mechanics King Residential Brick Mason Journey Level $66.32 7E 1 N View King Residential Carpenters Journey Level $36.44 1 View King Residential Cement Masons Journey Level $46.64 1 View King Residential Drywall Applicators Journey Level $71.53 15J 4C View King Residential Drvwall Tapers Journey Level $36.36 1 View King Residential Electricians Journey Level $48.80 1 View King Residential Glaziers Journey Level $28.93 1 View King Residential Insulation Journey Level $28.18 1 View Applicators King Residential Laborers Journey Level $29.73 1 View King Residential Marble Setters Journey Level $27.38 1 View King Residential Painters Journey Level $23.47 1 View King Residential Plumbers Et Journey Level $95.69 6Z 1G View Pipefitters King Residential Refrigeration Et Air Journey Level $91.51 6Z 1G View Conditioning Mechanics King Residential Sheet Metal Journey Level $94.11 7F 1 E View Workers King Residential Soft Floor Lavers Journey Level $55.54 5A 3J View King Residential Sprinkler Fitters Journey Level $55.95 5C 211 View .(Fire Protection), King Residential Stone Masons Journey Level $66.32 7E 1 N View King Residential Terrazzo Workers Journey Level $60.36 7E 1 N View King Residential Terrazzo/Tile Journey Level $24.39 1 View Finishers King Residential Tile Setters Journey Level $21.04 1 View King Roofers Journey Level $59.05 5A 3H View King Roofers Using Irritable Bituminous $62.05 5A 3H View Materials King Sheet Metal Workers Journey Level (Field or Shop) $94.11 7F 1 E View King Shipbuilding Et Ship Repair New Construction Boilermaker $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Carpenter $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Crane $39.58 7V 1 View Operator King Shipbuilding Et Ship Repair New Construction Electrician $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Heat Et Frost $84.58 15H 11C View Insulator King Shipbuilding Et Ship Repair New Construction Laborer $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Machinist $39.58 7V 1 View about:blank 16/18 2/6/23, 1:26 PM about:blank King Shipbuilding Et Ship Repair New Construction Operating $39.58 7V 1 View Engineer King Shipbuilding Et Ship Repair New Construction Painter $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Pipefitter $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Rigger $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Sheet Metal $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction Shipfitter $39.58 7V 1 View King Shipbuilding Et Ship Repair New Construction $39.58 7V 1 View Warehouse/Teamster King Shipbuilding Et Ship Repair New Construction Welder / $39.58 7V 1 View Burner King Shipbuilding Et Ship Repair Ship Repair Boilermaker $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Carpenter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Crane Operator $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Electrician $50.42 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Heat Et Frost $84.58 15H 11C View Insulator King Shipbuilding Et Ship Repair Ship Repair Laborer $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Machinist $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Operating Engineer $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Painter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Pipefitter $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Rigger $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Sheet Metal $50.35 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Shipwright $50.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Warehouse / $45.06 7Y 4K View Teamster King Sign Makers Et Installers Journey Level $55.78 0 1 View .(Electrical) King Sign Makers Et Installers (Non- Journey Level $35.73 0 1 View Electrical), King Soft Floor Lavers Journey Level $55.56 5A 3J View King Solar Controls For Windows Journey Level $15.74 1 View King Sprinkler Fitters (Fire Journey Level $90.99 5C 1X View Protection), King Stage Rigging Mechanics (Non Journey Level $15.74 1 View Structural) King Stone Masons Journey Level $66.32 7E 1 N View King Street And Parking Lot Sweeper Journey Level $19.09 1 View Workers King Surveyors Assistant Construction Site $79.00 7A 11 H 8X View Surveyor King Surveyors Chainman $75.55 7A 11 H 8X View King Surveyors Construction Site Surveyor $80.33 7A 11 H 8X View King Surveyors Drone Operator (when used in $75.55 7A 11 H 8X View conjunction with survey work only) King Surveyors Ground Penetrating Radar $75.55 7A 11 H 8X View Operator King Telecommunication Technicians Journey Level $60.10 7E 1 E View about:blank 17/18 2/6/23, 1:26 PM about:blank King Telephone Line Construction - Cable Splicer $39.15 5A 2B View Outside King Telephone Line Construction - Hole Digger/Ground Person $26.29 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator $32.72 5A 2B View Outside (Light) King Telephone Line Construction - Telephone Lineperson $37.00 5A 2B View Outside King Terrazzo Workers Journey Level $60.36 7E 1 N View King Tile Setters Journey Level $60.36 7E 1N View King Tile, Marble Et Terrazzo Finisher $51.19 7E 1N View Finishers King Traffic Control Stripers Journey Level $51.90 7A 1 K View King Truck Drivers Asphalt Mix Over 16 Yards $72.45 15J 11M 8L View King Truck Drivers Asphalt Mix To 16 Yards $71.61 15J 11M 8L View King Truck Drivers Dump Truck $71.61 15J 11M 8L View King Truck Drivers Dump Truck Et Trailer $72.45 15J 11M 8L View King Truck Drivers Other Trucks $72.45 15J 11M 8L View King Truck Drivers - Ready Mix Transit Mix $72.45 15J 11M 8L View King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 View Installers King Well Drillers Et Irrigation Pump Oiler $15.74 1 View Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 View Installers about:blank 18/18 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four- ten hour schedule,shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten(10)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 1. O. The first ten(10)hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays (except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day)shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer))shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm(or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate of wage.(except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. M. This code appears to be missing.All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. J. All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on Saturdays shall be paid at a one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. K. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40)hours of straight time per week, Monday through Friday, or outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays,and all hours worked in excess of twelve(12)hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more.When an employee returns to work without at least eight(8)hours time off since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the eight(8)hours rest period. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. 3 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 4. C. On Monday through Friday, the first four(4)hours of overtime after eight (8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two (2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay,except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer,the first ten(10)hours on Saturday maybe worked at the straight time rate of pay.All hours worked over twelve(12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. D. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly rate of pay.Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations,regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system,will be paid overtime under the following rates: The first two (2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage. All hours in excess of ten(10)hours will be at two(2)times the hourly rate of wage. The first eight(8)hours worked on Saturday will be paid at one and one-half(1-1/2)times the hourly rate of wage. All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day,ten hour work week,and Saturday shall be paid at one and one half(1%2)times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. The First eight(8)hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight(8)per day on Saturdays shall be paid at double the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 4. 1 The first eight(8)hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight(8)hours on a Saturday shall be paid at double the hourly rate of wage. All hours worked over twelve(12)in a day, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. K All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked over twelve(12)in a day Monday through Saturday,and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. L. The first twelve(12)hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on a Saturday in excess of twelve (12)hours shall be paid at double the hourly rate of pay. All hours worked over twelve (12)in a day Monday through Friday, and all hours worked on Sundays shall be paid at double the hourly rate of wage.All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage, except that all hours worked on Labor Day shall be paid at double the hourly rate of pay. S. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, work performed in excess of(10)hours shall be paid at one and one half(1-1/2)times the hourly rate of pay. On Monday through Friday, work performed outside the normal work hours of 6:00 a.m. and 6:00 p.m. shall be paid at one and one-half(1-1/2)times the straight time rate,(except for special shifts or multiple shift operations). All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without at least eight(8)hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. Multiple Shift Operations:When the first shift of a multiple shift(a two or three shift)operation is started at the basic straight time rate or at a specific overtime rate,all shifts of that day's operation shall be completed at that rate. Special Shifts: The Special Shift Premium is the basic hourly rate of pay plus$2.00 an hour.When due to conditions beyond the control of the employer or when an owner (not acting as the contractor), a government agency or the contract specifications require more than four(4)hours of a special shift can only be performed outside the normal 6am to 6pm shift then the special shift premium will be applied to the basic straight time for the entire shift.When an employee works on a special shift,they shall be paid the special shift premium for each hour worked unless they are in overtime or double-time status. (For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday). U. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.(Except on makeup days if work is lost due to inclement weather,then the first eight(8)hours on Saturday may be paid the regular rate.)All hours worked over twelve(12) hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 5of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 4. V. Work performed in excess of ten(10)hours of straight time per day when four ten(10)hour shifts are established or outside the normal shift(5 am to 6pm),and all work on Saturdays,except for make-up days shall be paid at time and one-half(1 %z)the straight time rate. In the event the job is down due to weather conditions,then Saturday may,be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All work performed on Sundays and holidays and work in excess of twelve(12)hours per day shall be paid at double(2x) the straight time rate of pay. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. When an employee returns to work without a break of eight(8)hours since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8)hours. W. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without at least eight(8)hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. X. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Work performed outside the normal shift of 6 am to 6pm shall be paid at one and one-half the straight time rate,(except for special shifts or three shift operations). All work performed on Sundays and holidays shall be paid at double the hourly rate of wage.Shifts may be established when considered necessary by the Employer. The Employer may establish shifts consisting of eight(8)or ten(10)hours of work(subject to WAC 296-127-022), that shall constitute a normal forty(40) hour work week. The Employer can change from a 5-eight to a 4-ten hour schedule or back to the other. All hours of work on these shifts shall be paid for at the straight time hourly rate.Work performed in excess of eight hours(or ten hours per day(subject to WAC 296-127-022)shall be paid at one and one- half the straight time rate. When due to conditions beyond the control of the Employer, or when contract specifications require that work can only be performed outside the regular day shift,then by mutual agreement a special shift may be worked at the straight time rate, eight(8)hours work for eight(8)hours pay. The starting time shall be arranged to fit such conditions of work. When an employee returns to work without at a break of eight(8)hours since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. Y. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10)hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate. All work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 6of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 11. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B After an employee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked,except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. All non-overtime and non-holiday hours worked between 4:00 pm and 5:00 am,Monday through Friday,shall be paid at a premium rate of 15%over the hourly rate of wage. D. All hours worked on Saturdays and holidays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. E. The first two(2)hours after eight(8)regular hours Monday through Friday,the first ten(10)hours on Saturday, and the first ten(10)hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten(10)hours Monday through Saturday,and Sundays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day,ten hour work week, and Saturday shall be paid at one-half times the hourly rate of wage for the first eight(8) hours.All other hours worked Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. G. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve(12)hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of nine(9)hours or more.When an employee returns to work without at least nine(9)hours time off since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the nine(9)hours rest period. 7of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Overtime Codes Continued 11. H. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40)hours of straight time per week, Monday through Friday, or outside the normal 5 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve(12)hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of ten(10)hours or more.When an employee returns to work without at least ten(10)hours time off since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the ten(10)hours rest period. I. On Monday through Friday,the first four(4)hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established.On a four(4)day ten(10)hour workweek scheduled Monday through Thursday,or Tuesday through Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay.All work performed after 6:00 pm Saturday to 5:00 am Monday,all work performed over twelve(12)hours, and all work performed on holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional two dollar($2.00)per hour for all hours worked that shift. J. All hours worked on holidays shall be paid at double the hourly rate of wage. K. On Monday through Friday hours worked outside 4:00 am and 5:00 pm, and the first two(2)hours after eight(8) hours worked shall be paid at one and one-half times the hourly rate.All hours worked over 10 hours per day Monday through Friday, and all hours worked on Saturdays, Sundays,and Holidays worked shall be paid at double the hourly rate of wage. L. An employee working outside 5:00 am and 5:00 pm shall receive an additional two dollar($2.00)per hour for all hours worked that shift.All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. M. On Monday through Friday,the first four(4)hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established.On a four(4)day ten(10)hour workweek scheduled Monday through Thursday,or Tuesday through Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. Work performed outside the normal work hours of 5:00 a.m and 6:00 p.m shall be paid at one and one-half(1-1/2) times the straight time rate,(except for special shifts or multiple shift operations).When the first shift of a multiple shift(a two or three shift)operation is started at the basic straight time rate or at a specific overtime rate, all shifts of that day's operation shall be completed at that rate.When due to conditions beyond the control of the Employer or when contract specifications require that work can only be performed outside the regular day shift of 5:00 am to 6:00 pm,then a special shift may be worked at the straight time rate,plus the shift pay premium when applicable. The starting time of work will be arranged to fit such conditions of work. Such shift shall consist of eight(8)hours work for eight(8)hours pay or ten(10)hours work for ten(10)hours pay for four ten shifts. On Saturday,the first twelve(12)hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay. All work performed after 6:00 pm Saturday to 5:00 am Monday,all work performed over twelve(12)hours, 8of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) and all work performed on holidays shall be paid at double the straight time rate of pay. Shift Pay Premium: In an addition to any overtime already required,all hours worked between the hours of 6:00 pm and 5:00 am shall receive an additional two dollars($2.00)per hour. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day, Independence Day, Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9). Holiday Codes Continued 6. L. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day(9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day. (7 1/2). 9of16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Holiday Codes Continued S. Paid Holidays:New Year's Day,Presidents'Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And Christmas Day(7). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and Christmas Eve Day(11). H. Paid Holidays:New Year's Day,New Year's Eve Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day, The Day After Christmas,And A Floating Holiday(10). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And Christmas Day(9). Z. Holidays: New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day,Memorial Day, Independence Day,Labor Day,Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 10 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Holiday Codes Continued 7. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays:New Year's Day,Martin Luther King Jr.Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day, Independence Day,Memorial Day, Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,Christmas Day,the Day after Christmas,and A Floating Holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. V. Holidays:New Year's Day,President's Birthday,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day,the day before or after Christmas,and the day before or after New Year's Day. If any of the above listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Eve Day,Christmas Day,the day after Christmas,the day before New Year's Day,and a Floating Holiday. 11 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Holiday Codes Continued 7. X. Holidays:New Year's Day,Day before or after New Year's Day,Presidents'Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off,then the holiday will be taken on the last normal workday.If the holiday falls on a Monday that is the normal day off or on a Sunday,then the holiday will be taken on the next normal workday. Y. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,and Christmas Day. (8)If the holiday falls on a Sunday,then the day observed by the federal government shall be considered a holiday and compensated accordingly. G. New Year's Day,Washington's Birthday,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day,the last scheduled workday before Christmas,and Christmas Day(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. H. Holidays:New Year's Day,Martin Luther King Jr.Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day, Independence Day,Memorial Day, Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,Christmas Day,the Day after Christmas,and A Floating Holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 12 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Holiday Codes Continued 7. V. Holidays:New Year's Day,President's Birthday,Memorial Day, Independence Day,Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day,the day before or after Christmas,and the day before or after New Year's Day. If any of the above listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Eve Day,Christmas Day,the day after Christmas,the day before New Year's Day,and a Floating Holiday. X. Holidays:New Year's Day,Day before or after New Year's Day,Presidents'Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off,then the holiday will be taken on the last normal workday.If the holiday falls on a Monday that is the normal day off or on a Sunday,then the holiday will be taken on the next normal workday. Y. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,and Christmas Day. (8)If the holiday falls on a Sunday,then the day observed by the federal government shall be considered a holiday and compensated accordingly. Z. Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day,the Friday and Saturday after Thanksgiving Day,Christmas Eve,and Christmas Day(9).Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday.Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. 15. G. New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day,the last scheduled workday before Christmas, and Christmas Day(9). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. H. Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Friday after Thanksgiving Day,Christmas Eve Day,and Christmas Day(8).When the following holidays fall on a Saturday (New Year's Day, Independence Day,and Christmas Day)the preceding Friday will be considered as the holiday; should they fall on a Sunday,the following Monday shall be considered as the holiday. I. Holidays:New Year's Day,President's Day,Memorial Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,the last regular workday before Christmas(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. J. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day,the Friday and Saturday after Thanksgiving Day,and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. 13 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A& B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A: $1.00,Level B: $0.75,Level C: $0.50,And Level D: $0.25. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon,Montana, or Idaho. This classification is only effective on or after August 31, 2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho. This classification is only effective on or after August 31,2012. U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit:$2.00,Class B Suit: $1.50, And Class C Suit: $1.00.Workers performing underground work receive an additional$0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked.Workers who work suspended by a rope or cable receive an additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked.Workers who do"pioneer"work(break open a cut,build road, etc.) more than one hundred fifty(150) feet above grade elevation receive an additional$0.50 per hour. V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more.Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over 101'to 150'-$3.00 per foot for each foot over 101 feet.Over 15l'to 220'-$4.00 per foot for each foot over 220 feet. Over 22F- $5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance.25' to 300' - $1.00 per foot from entrance. 300' to 600' -$1.50 per foot beginning at 300'.Over 600' - $2.00 per foot beginning at 600'. W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates would apply to meters not fitting this description. 14 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Note Codes Continued 8. X. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Suit: $1.00,and Class D Suit: $0.50. Special Shift Premium:Basic hourly rate plus$2.00 per hour. When due to conditions beyond the control of the Employer or when an owner(not acting as the contractor),a government agency or the contract specifications requires that work can only be performed outside the normal 5 am to 6pm shift,then the special shift premium will be applied to the basic hourly rate.When an employee works on a special shift,they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time status. (For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Y. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work (work located in the tide plane)all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents($0.75)per hour above the classification rate. Z. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. Special Shift Premium:Basic hourly rate plus$2.00 per hour.When due to conditions beyond the control of the Employer or when an owner(not acting as a contractor),a government agency or the contract specifications require that more than(4)hours of a special shift can only be performed outside the normal 6 am to 6pm shift,then the special shift premium will be applied to the basic straight time for the entire shift.When an employee works on a special shift,they will be paid a special shift premium for each hour worked unless they are in overtime or double- time status. (For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) 9. A. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner(not acting as the contractor),a government agency or the contract specifications require that more than four(4)hours of a special shift can only be performed outside the normal 6 am to 6pm shift,then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift,they shall be paid a special shift premium for each hour worked unless they are in overtime or double- time status.(For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Certified Crane Operator Premium: Crane operators requiring certifications shall be paid$0.50 per hour above their classification rate. Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: (A)— 130'to 199'—$0.50 per hour over their classification rate. (B)—200'to 299'—$0.80 per hour over their classification rate. (C)—300' and over—$1.00 per hour over their classification rate. 15 of 16 Benefit Code Key—Effective 8/31/2022 thru 3/2/2023 (Updates effective on 10/22/2022) Note Codes Continued 9. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. Tide Work:When employees are called out between the hours of 6:00 p.m. and 6:00 a.m.to work on tide work(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. C. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho. These classifications are only effective on or after August 31,2012. D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants,pipelines, towers,dams,bridges,power generation facilities and manufacturing facilities such as chemical plants,etc.,or anywhere abrasive blasting is necessary to prepare surfaces,or hazardous materials encapsulation is required. E. Heavy Construction includes construction,repair,alteration or additions to the production,fabrication or manufacturing portions of industrial or manufacturing plants,hydroelectric or nuclear power plants and atomic reactor construction.Workers on hazmat projects receive additional hourly premiums as follows-Level A: $1.00, Level B: $0.75, Level C: $0.50,And Level D: $0.25. F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants,pipelines, towers,dams,power generation facilities and manufacturing facilities such as chemical plants,etc.,or anywhere abrasive blasting is necessary to prepare surfaces,or hazardous materials encapsulation is required. 16 of 16