CAG2022-341 - Change Order - #2 - SCI Infrastructure, LLC - 76th Avenue South: North Segment - 01/17/2023
140 a lls� KENT WASHINGTON Agreement Routing Form For Approvals, Signatures and Records Management This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: > 1 /18/2023 N/A 0 L CL Authorized to Sign: Date of Council Approval: 0' a 0 Director or Designee ❑ Mayor 08/02/2022 Budget Account Number: Grant? 0 Yes ❑ No R90125.64110.120 Budget? O Yes ❑ No Type: Federal Vendor Name: Category: SCI Infrastructure, LLC. Contract Vendor Number: Sub -Category: 170264 Change Order #2 = Project Name: 76th Avenue South - North Segment 0 W Project Details: Restrained Joint watermain pipe with field lock gaskets C 1 C 40 E Agreement Amount: $-23,037.17 Basis for Selection of Contractor: Bid a� L Start Date: N/A Termination Date: 75.5 Working Days a Local Business? ❑ Yes ❑ No* *Ifineets requirements per KCC3.70. 100, please complete 'Vendor Purchase -Local Exceptions" form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑ Yes 0 No CAG2022-341 Date Received by City Attorney: Comments: 01 .0 7 30 a, N �a p1 Date Routed to the Mayor's Office: V1 V Date Routed to the City Clerk's Office: 3 adcW22373, z0 Visit Documents.KentWA.gov to obtain copies of all agreements KENT WAS "I NOTON CHANGE ORDER NO. #2 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER: ORIGINAL CONTRACT DATE: 0AU V_�' ki SCI Infrastructure, LLC ("Contractor") 761" Avenue South - North Segment Auciust 23 2022 This Change Order amends the above -referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Revise Kent Special Provision Section 7-09.2 Materials paragraph 2 as follows Restrained Joint (RI) watermain pipe shall be: TR Flex by US Pipe Thrust -Lock by Pacific States Cast Iron Pipe Co. American Pipe Flex Ring locking joint Class 52 ductile iron watermain pipe with field lock gaskets, or approved equal, can also be used as Restrained Joint (RJ) watermain pipe. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $4,165,504.10 (including applicable alternates and WSST) Net Change by Previous Change Orders $9,553.24 (incl. applicable WSST) Current Contract Amount $4,175,057.34 (incl. Previous Change Orders) Current Change Order $-20,923.86 Applicable WSST Tax on this Change Order $-2,113.31 Revised Contract Sum $4,152,020.17 CHANGE ORDER - 1 OF 3 Original Time for Completion 75 working days (insert date) Revised Time for Completion under 0.5 working days prior Change Orders (insert date) Days Required (f) for this Change Order 00 calendar days Revised Time for Completion 75.5 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: -32 PrintN;me: J URE, LLC CITY OF KENT: 0 Chad Bieren Chad B i e re n 2023.01.17 14:48:13-08'00' (sign, ture) (signature) 'Pit r"� S c©e e 0 Print Name: Chad Bieren, P.E. kc--Y 1-1 Ati dthw? Its Public Works Director (title) (title) DATE: 0t-01- 23 DATE: M CU CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk C[In this field, you may enter the electronic filepath where the contract has been saved) Kent Law Department CHANGE ORDER - 3 OF 3 File No. 200.2 KENT wneN�xo raw CHANGE ORDER WORKSHEET NO. 2 Construction Engineering Division - Public Works Project: 76th Avenue South - North Segment Project No: 21-3012 Project Engineer: Mark Madfai Fed -Aid No: STPUL-1075(004) Capital Projects Cameron Bloomer (KBA, Inc.) Contractor: SCI Infrastructure Manager: Date: 12/22/2022 I. Proposed Change Revise Kent Special Provision Section 7-09.2 Materials paragraph 2 as follows: Restrained Joint (RJ) watermain pipe shall be: TR Flex by US Pipe Thrust -Lock by Pacific States Cast Iron Pipe Company American Pipe Flex Ring Locking Joint Field Leek Gaskets shall net be allewed Class 52 ductile iron watermain pipe with Field Lock Gaskets, or approved equal, can also be used as Restrained Joint (RJ) watermain pipe. IAdd a bid item to Schedule II Qty 1 LS Unit Price $-20,923.86 1 II. Reason and Background for cnange Due to supply chain issues, delivery time for restrained joint pipe materials listed in 7-09.2 was quoted by suppliers as between 38 and 40 weeks. Waiting for delivery would result in significant project delay. Restrained Joint gaskets and standard watermain pipe were available within 2 weeks of ordering. The City elected to allow restrained joint gaskets on this project to avoid a significant delay. This also resulted in a cost savings to the City. III. Method of Payment NEW PAY ITEMS L3 Notapplicable Schh. No Item Description Total Est. Qty Unit Unit Price Total Estimated Cost of Item II Watermain Pipe Field Lock Gasket Credit 1 LS -$20,923.86 $ (20,923.86) $ - Page 1 New Pay Items Total: $ (20,923.86) DELETE EXISTING PAY ITEM(S) per 1-09.5 0 Notapplicable Soh No. Bid Item No. Item Description7 Qty Unit Unit Price Cost of Item $ ' Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEM(S) 0 Notapplicable . No No. Bid Item No. Item Description7 Qty Unit Unit Price Cost of Item $ ' Increase / Decrease to Existing Pay Items Total: $ *TOTAL ESTIMATED COST OF CHANGE ORDER:1 -$20,923.86 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 75 7Due This Change Order: 0 Previous Total: 75.5 Explanation/Justification for Additional Working Days: No changes to contract working days are being made with this change order. *TOTAL WORKING DAYS: 75.5 * This Change Order + Previous Total Capital Projects Manager: "vq av"'wl Date: 12/22/2022 Cameron Bloomer DIBItallysl8ned by Jason Barry Construction Engineering Jason Barry DN:cn=JasonB—y,-Cityo/Bent,ou�onstru Jon Date: Englneednq email=)barry@kentwa.gov, cVB n/nQ/nn Supervisor: Date2022.12.2811:41:42-081W L 28 22 Jason Barry Construction Manager: "e""„ , — Date: 1/5/23 Eric Connor Page 2 INDEPENDENT COST ESTIMATE Project: 76th Ave South - North Segement Date: 12/9/2022 Owner: City of Kent Project No: 21-3012 Prime Contractor: SCI Infrastructure Fed Aid No: STPUL-1705(004) Subcontractor: Description of Work: 5 minutes per gasket, 71 gaskets total = 5.9 hrs, say 6 • ' STRAIGHT TIME OVERTIME DOLLAR AMOUNT PRODUCTION RATE OCCUPATION HOURS WWR HOURS WWR Operator (6 ex, 3 loader) -9 $ 88.37 $ (795.33) Pipelayer -6 $ 67.57 $ (405.42) LABOR SUBTOTALS: $ (1,200.75) TOTAL: $ (1,200.75) !� HOURS WORKING HOURS STANDBY ADJUSTED RATE STANDBY RATE DOLLAR AMOUNT EQUIPMENT DESCRIPTION 240 Excavator 6 151.35 $ (908.10) 950 Loader -3 90.55 $ (271.65) Pipe Truck -6 47.04 $ (282.24) EQUIPMENT SUBTOTALS: $ (1,461.99) TOTAL: $ (1,461.99) REFERENCE INVOICE # QUANTITY UNIT PRICE DOLLAR AMOUNT DESCRIPTION WM TR Flex to Standard w/ Field Lock Gaskets -1 1 18,261.12 $ (18,261.12) $ MATERIAL SUBTOTALS: $ (18,261.12) TOTAL: $ (18,261.12) DESCRIPTION EST. DATE OF SERVICE QUANTITY UNIT ESTIMATED COST DOLLARAMOUNT SERVICE SUBTOTALS: $ $ - TOTAL: $ - Resident Engineer (RE) Date ICE SUBTOTAL: $ (20,923.86) ADJUSTMENT (see comment): $ ICE TOTAL: $ (20,923.86) Comments / Notes: 1 of 1 P-60 (Rev. 2019 Mar) Connor, Eric From: Barry, Jason Sent: Thursday, December 15, 2022 12:46 PM To: Connor, Eric Subject: FW: 76th Ave S - TR Flex to Field Lock Pricing Credit From: Cameron Bloomer <cbloomer@kbacm.com> Sent: Thursday, December 15, 2022 12:36 PM To: Jennifer Scoccolo <Jennifer.Scoccolo@scibuilds.com>; David Baus <David.Baus@scibuilds.com> Cc: Alesia Parker <parkera@jts-seattle.com>; Jamie Masters <jmasters@kbacm.com>; Ken Brumley <ken.brumley@scibuilds.com>; Andrew Jonson <andrew.jonson@scibuilds.com>; Barry, Jason <JBarry@kentwa.gov>; Mark Scoccolo <Mark.Scoccolo@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit EXTERNAL EMAIL Hi Jennifer, Agreed, we will use 31% on the labor. Thank you, Cameron Bloomer, PE C 206.819.7148 ( cbloomer kbacm.com KBA, Inc. ( Construction Management Specialists I www.kbacm.com From: Jennifer Scoccolo <Jennifer.Scoccolo@scibuilds.com> Sent: Thursday, December 15, 2022 12:30 PM To: David Baus <David.Baus@scibuilds.com>; Cameron Bloomer <cbloomer@kbacm.com> Cc: Alesia Parker <parkera its-seattle.com>; Jamie Masters <imasters@kbacm.com>; Ken Brumley <ken.brumley@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com>; jbarry <ibarry kentwa.gov>; Mark Scoccolo <Mark.Scoccolo@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Just FYI, it looks like this contract specifications incorporate the 2021 WSDOT spec and not the 2018. Please see attached. The markup on labor was revised to 31% (29% +2% for paid sick leave). Would you please update for future F/A work? 2018 Standard Spec. Mark-up Reference Spec.1-09.6 Labor Equipment Materials Service City of Seattle 27% 17% 17% 17% WSDOT 29% 21% 21% 21% Thanks, �feT j�t�tg�Sul�drt� rY<ti0�u�eft' 2821 S 1541h Street, SeaTac, WA 98188 Phone: 206-242-0633/F206-242-0792 SCIINL*993JA From: David Baus <David.Baus scibuilds.com> Sent: Thursday, December 15, 2022 11:40 AM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Alesia Parker <parkera its-seattle.com>; Jamie Masters <imasters@kbacm.com>; Ken Brumley <ken.brumlev@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com>; jbarry <Lbarrv@kentwa.gov>; Jennifer Scoccolo <Jennifer.Scoccolo@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Cameron, Accepted. Let us know how to process this under the next billing cycle. Thanks David From: Cameron Bloomer <cbloomer@kbacm.com> Sent: Friday, December 9, 2022 9:16 AM To: David Baus <David.Baus@scibuilds.com> Cc: Alesia Parker <Parkera@its-seattle.com>; Jamie Masters <imasters kbacm.com>; Ken Brumley <ken.brumlev@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com>; jbarry <jbarry@kentwa.�ov> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Hi David, See attached counter -proposal, revised to 5 minutes, split the loader time as they can be partially engaged in other work, but will be impacted by a slower moving pipe crew and we took off the foreman and foreman truck. Pipe truck, excavator, and (1/2) loader time should be there as they are directly involved in the work. We would like to move foreward with this one if possible, please review and let me know if you have comments. Thank you, Cameron Bloomer, PE C 206.819.7148 1 cbloomer@kbacm.com KBA, Inc. I construction Management Specialists I www.kbacm.com From: David Baus <David.Baus@scibuilds.com> Sent: Tuesday, November 22, 2022 4:11 PM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Alesia Parker <Parkera@its-seattle.com>; Jamie Masters <imasters kbacm.com>; Ken Brumley <ken.brumlev@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Hi Cameron, Please see attached SCI revised credit pricing. We are taking the stance of 2 minutes and making the following changes to the credit: • Using Field Lock Gasket, the installation of the pipe will still need to be just as precise as installing TR Flex. With field lock, there is not adjustment or re -doing the pipe once driven home. • Foreman time and truck, loader, and pipe truck do not apply since time savings is under a day and their resources will be applied to other areas of work during the pipe operation If the city does not agree with this, maybe we can set up a teams meeting to discuss, Thanks, David Baus SCI Infrastructure, LLC 2821 S. 154th ST SeaTac, WA 98188 206.369.3905 Cell 206.242.0633 Office 206.242.0792 FAX 800.255.0633 Toll Free Contractor * SCIINL*993JA From: Cameron Bloomer <cbloomer kbacm.com> Sent: Tuesday, November 22, 2022 2:57 PM To: David Baus <David.Baus@scibuilds.com> Cc: Alesia Parker <parkera@its-seattle.com>; Jamie Masters <*masters@kbacm.com>; Ken Brumley <ken.brumlev@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Hi David, Thanks for the invoices. We don't agree there is no time savings for deleting steps 6-10 of the install instructions below. Attached is a counter proposal with 10 minutes per joint, 71 total joints. Comes in right around $25,000. Please review and if we can agree to this, ill draft the change order. Thank you, ASSEMBLY INSTRUCTIONS Pipe and hninq, 12" 20" TWO BELL SLOTS 1. Lay pipe or fitting such that both of the bell slots are accessible (in the horizontal position ifpossible). 2. Clean the socket and insert a Tyton Gasket. 3. Clean the pipe spigot end back to the assembly stripes. 4. Lubricate the exposed surface of the gasket and the pipe spigot end back to the weld bead. 5. Make a conventional push -on joint assembly, fully homing the pipe until the first assembly stripe is in the bell socket. Keep the joint in straight alignment during assembly. 6. Insert lower locking segment into a bell slot and slide the segment around the pipe. 7. Insert upper locking segment into the same bell slot and rotate around the pipe. 8. Hold the upper segment in place and wedge the rubber retainer into the slot between the two locking segments. 9. Repeat steps 6-8 for other slot Make sure that all 4locking segments and 2 rubber retainers are securely in place. 10. Extend the joint to remove the stack in the locking segment cavity. Joint extension is necessary to attain the marked laying length on the pipe and to minimize growth or extension of the line as it is pressurized. (Refer to the Toble on page 2l.) 11. Set the joint deflection as required. (See ruble on page 2l.) Cameron Bloomer, PE C 206.819.7148 ( cbloomer@kbacm.com KBA, Inc. ( Construction Management Specialists i www.kbacm.com Components required for each joint: ■ 2 right-hand locking segments (painted red marked RH) ■ 2left-hand locking segments (pointed block, marked CH) ■ 2 rubber retainers ■ i Tyton Gasket ■ Tyton Mint- Lubricant Installation Tips ■ fold and Insert rubber retainells From: David Baus <David.Baus@scibuilds.com> Sent: Monday, November 21, 2022 4:30 PM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Alesia Parker <parkera@its-seattle.com>; Jamie Masters <jmasters kbacm.com>; Ken Brumley <ken.brumlev@scibuilds.com>; Andrew Jonson <andrew.ionson@scibuilds.com> Subject: RE: 76th Ave S - TR Flex to Field Lock Pricing Credit Cameron, Lets try this... Has (4) pages attached Thanks, David Baus 2821 S 154th Street, SeaTac, WA 98188 206136913905 C 206124210633 P 206124210792 F 800125510633 Toll Free Contractors License # SCIINL*993JA 4 From: David Baus Sent: Monday, November 21, 2022 3:26 PM To: Cameron Bloomer < cbloomer@kbacm.com > Cc: Alesia Parker < parkera@its-seattle.com >; imasters@kbacm.com ; Ken Brumley < ken. brumley scibuilds.com_>; Andrew Jonson < andrew.ionson@scibuilds.com> Subject: 76th Ave S - TR Flex to Field Lock Pricing Credit Cameron, Please see attached pricing credit. Revised schedule is coming next. Thanks, David Baus 2821 S 154th Street, SeaTac, WA 98188 206136913905 C 206124210633 P 206124210792 F 8001255 10633 Toll Free Contractors License # SCIINL*993JA 11/21/2022, 3:22 PM ffebtrtfBud1&th&Nord we4t PROJECT: 76th Ave S-N Segement REVISION: 11 DESCRIPTION: 'Pricing is to change watermain material from using TR-Flex pipe to ductile iron pipe with field lock gaskets. SCI believes there is no labor credit due for switching systems. 1,364 LF of pipe to install, using 20-Foot sticks gives 69 connections. If each connection saves a max of 2 minutes per connection, that gives 2.5 hours of crew time saved. All watermain needs to be installed thoroughly, and free of debris to be able to pass purities and pressure test. Switching from TR Flex to using field lock gaskets does not affect the quality of installation needed. TR Flex and Efficiency Credit $ (18,261.12) Total Cost: $ (18,261.12) TOTAL COR: $ (18,261.12) S:\JOBS\2210-76th Ave S-N Segment\05 Extra Work\TR Flex to Field Lok and DI\TR Flex to Field Lok DI Credit Sheet 14 - Added water materials and short load concrete for thrust blocks pg 1 lA Labor: Rate/MH No. Hours / Day Days Subtotal: Subtotal Labor: $ 1 B Equipment: Rate/Hr No. Hours / Day Days Subtotal: Subtotal Equipment: $ 1C Subcontractors Quantity UM Cost/Unit Subtotal: 1 D Materials Quantity UM Cost/Unit TR Flex 12,10,8,6 1 LS $ (110,863.93) Regular DI Pipe with Field Lock 1 LS $ 92,602.81 Subtotal Subcontractor - Subtotal: (110,863.93) 92,602.81 Subtotal Materials: (18,261.72) Subtotal Items 1 A-1 D $ (18,267.72) Mark -Up on Labor at 29%: Mark -Up on Equipment at 21%: Mark -Up on Subcontractors at 1 2%: Mark -Up on Materials at 21%: Purchase Order 8/31/2022 Purchase Order # : 2210-9298 Project: 2210- 76th Avenue South-N Segment (FED AID: STPUL-1 Page:Page 1 or 2 Ferguson Waterworks Inc r Date Ordered: Ordered By: Andrew Expected Date: 9120122 Payment Terms: Net 30 Days SCI INFRASTRUCTURE, LLC Andrew Jonson, 206-399-8990 2821 South 154th Street 76th Ave S SeaTac, WA 98188 Kent, WA Via: All packing sifps and invoices must be marked "JOB." SCI INFRASTRUCTURE, LLC 2821 South 154th Street, SeaTac, WA 98188 Phone:206-242.0633 Fax: 206-242.0792 Z FERGUSON° WATERWORKS 17:58:19 NOV 10 2022 Bid No: B436774 Bid Date: 10/06/22 Quoted By: LJH FEL - TACOMA WW #3156 Deliver To: . 2042 SOUTH 112TH ST From: Lance Hayes TACOMA, WA 98444-0000Comments: Phone:253-538-8275 Fax: 253-531-9909 Customer: SCI INFRASTRUCTURE LLC 76TH AVE S-N SEGMENT 2821 SOUTH 154TH STREET SEATTLE, WA 98188 Cust PO#: DIP ALTERNATE Page 1 of 1 FERGUSON WATERWORKS #3011 Price Quotation Phone: 253-538-8275 Fax: 253-531-9909 Cust Phone: 206-242-0633 Terms: NET 10TH PROX Ship To: SCI INFRASTRUCTURE LLC S 212TH ST 76TH AVE S 76TH AVE S-N SEGMENT KENT, WA 98032 Job Name: 76TH AVE S-N SEGMENT Item Description Quantity Net Price UM Total AFT52PD12 12 CL52 DCL DI FASTITE PIPE 940 61.270 FT 57593.80 AAFGRGSKT12 12 SBR AMARILLO FAST GRIP GSKT 47 261.490 EA 12290.03 AFT52PDX 8 CL52 DCL DI FASTITE PIPE 120 37.120 FT 4454.40 AAFGRGSKTX 8 SBR AMARILLO FAST GRIP GSKT 6 168.720 EA 1012.32 AFT52PD10 10 CL52 DCL DI FASTITE PIPE 160 48.660 FT 7785.60 AAFGRGSKT10 10 SBR AMARILLO FAST GRIP GSKT 8 178.720 EA 1429.76 AFT52PDP 4 CL52 DCL DI FASTITE PIPE 200 36.560 FT 7312.00 AAFGRGSKTP 4 SBR AMARILLO FAST GRIP GSKT 10 72.490 EA 724.90 SUBTOTAL 92602.81 Net Total: $92602.81 Tax: $0.00 Freight: $0.00 Total: $92602.81 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBENVBE/SMALL BUSINESS REQUIREMENTS. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at https://www.ferguson.com/content/website-info/terms-of-sale Govt Buyers: All items are open market unless noted otherwise. LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water systems anticipated for human consumption. Products with "NP in the description are NOT lead free and can only be installed in non -potable applications. Buyer is solely responsible for product selection. COVID-19 ORDER: ANY REFERENCE TO OR INCORPORATION OF EXECUTIVE ORDER 14042 AND/OR THE EO-IMPLEMENTING FEDERAL CLAUSES (FAR 52.223-99 AND/OR DFARS 252.223-7999 IS EXPRESSLY REJECTED BY SELLER AND SHALL NOT APPLY AS SELLER IS A MATERIALS SUPPLIER AND THEREFORE EXEMPT USER THE EXECUTIVE ORDER. HOW ARE WE DOING? WE WANT YOUR FEEDBACK! 0 0 Scan the QR code or use the link below to �. complete a survey about your bids: 0 https://survey.medallia.com/?bidsorder&fc=3156&on=79239 Cameron Bloomer From: David Baus <David.Baus@scibuilds.com> Sent: Tuesday, October 25, 2022 10:23 AM To: Cameron Bloomer Cc: Jamie Masters; Alesia Parker; Ken Brumley; Andrew Jonson Subject: RE: 76th Ave S North Segment RFI 04 Class 52 DI Pipe Hi Cameron, Hot off the press from Ferguson: We have checked with American Pipe, US Pipe and McWane. The following are their joints and lead time: - US Pipe — TR Flex— 38 weeks - McWane — TR Flex — 38 weeks - American Pipe —Flex Ring — 40 weeks. We sell all 3 throughout the United States and had those locations check for lead times. We are am American Pipe distributor in the PNW. We are working on the remaining submittal items no and will get that over ASAP. Thanks, tavid Baus �+n!rasIteiCIureo LLC r. SCI Infrastructure, LLC 2o6.369.3905 Cell From: Cameron Bloomer <cbloomer@kbacm.com> Sent: Monday, October 24, 2022 3:49 PM To: Andrew Jonson <andrew.jonson@scibuilds.com> Cc: Jamie Masters <jmasters@kbacm.com>; Alesia Parker <parkera@jts-seattle.com>; David Baus <David.Baus@scibuilds.com>; Ken Brumley <ken.brumley@scibuilds.com> Subject: RE: 76th Ave S North Segment RFI 04 Class 52 DI Pipe Hi Andrew, See attached response to RFI 4. Let me know if there are any questions. Thank you, 1 Cameron Bloomer, PE C 206.819.7148 1 cbloomer@kbacm.com KBA, Inc. I Construction Management Specialists I www.kbacm.com From: Andrew Jonson <andrew.ionson@scibuilds.com> Sent: Thursday, October 6, 2022 11:45 AM To: Cameron Bloomer <cbloomer@kbacm.com> Cc: Jamie Masters <*masters@kbacm.com>; Alesia Parker <parkera@its-seattle.com>; David Baus <David.Baus@scibuilds.com>; Ken Brumley <ken.brumley@scibuilds.com> Subject: 76th Ave S North Segment RFI 04 Class 52 DI Pipe Cameron Please see attached RFI. Thanks Andrew Jonson 2821 S 154th Street, SeaTac, WA 98188 206124210633 P 206124210792 F 206139918990 C 800 125510633 Toll Free Contractor's License # SCIINL*993JA