Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CAG2021-137 - Change Order - #1 - Associated Underwater Services, Inc. - Lake Fenwick Hypolimnetic Aerator Improvements - 10/03/2022
0 L a a LO C 0 a 0 C 4.0 0 E W a I1 C a+ 3 0 a, al: 40 to C C1 mc adccW22373_1_20 Agreement Routing Form • For Approvals, Signatures and Records Management KENT This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASH 1 N G T O N (Print on pink or cherry colored paper) Originator: Department: C. Frame PW Engineering Date Sent: Date Required: 1 /3/2023 N/A Authorized to Sign: Date of Council Approval: 0 Director or Designee ❑ Mayor 3/2/2021 Budget Account Number: Grant? 0 Yes ❑ No D20097.64110.330 Budget? El Yes ❑ No Type: N/A Vendor Name: Category: Associated Underwater Services, Inc. Contract Vendor Number: Sub -Category: 1480891 Change Order #1 Project Name: Lake Fenwick Hypolimnetic Aerator Improvements Project Details:Add anchor system in accordance to the 1994 Lk. Fenwick Aerator plan set. Agreement Amount: $48,521.83 Basis for Selection of Contractor: Bid Start Date: N/A Termination Date: 120 Working Days Local Business? ❑ Yes ❑ No* *If meets requirements per KCC 3.70. 700, please complete "Vendor Purchase -Local Exceptions" form on Cityspoce. Notice required prior to disclosure? ❑ Yes 121 No Date Received by City Attorney: Date Routed to the Mayor's Office: Contract Number: CAG2021-137 Comments: Date Routed to the City Clerk's Office:,'? I3V Visit Documents.KentWA.gov to obtain copies of all agreements • KENT W A HI N G T DN CHANGE ORDER NO. #1 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER: ORIGINAL CONTRACT DATE: Associated Underwater Services, Inc. ("Contractor") Lake Fenwick Hvpolimnetic Aerator Improvements, March 18. 2021 This Change Order amends the above -referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Add anchor system in accordance to the 1994 Lk. Fenwick Aerator plan set. Payment includes material, equipment, tools and labor necessary to supply and install the system. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $922,592.31 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $922,592.31 (incl. Previous Change Orders) Current Change Order $44,070.69 Applicable WSST Tax on this Change $4,451.14 Order Revised Contract Sum $971,114.14 CHANGE ORDER - 1 OF 3 Original Time for Completion 120 working days (insert date) Revised Time for Completion under 00 working days prior Change Orders (insert date) Days Required (t) for this Change Order 00 calendar days Revised Time for Completion 120 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: Digitally signed by Chad Bieren DN: C=US, E=cbieren@kent, a go , Chad Bieren CNCity of Kent, OU=Pubtic Works, By. By: N=Chad Bieren Da[e:2022.10.03 17:27:28-0T00' (signature) (signature) Print Name: Corkv Raines Print Name: Chad Bieren. P.E. Its Project Manager Its Public Works Director (title) (title) DATE: 09/29/22 DATE: AF - tc: Kp CHANGE ORDER - 2 OF 3 ATTEST: Kent City Clerk C[In this field, you may enter the electronic filepath where the contract has been saved] APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department CHANGE ORDER - 3 OF 3 File No. 200.2 ENT CHANGE ORDER WORKSHEET NO. 1 Construction Engineering Division - Public Works Project: Lk. Fenwick Hypolimnetic Aerator Impr. Project No: 18-3003 Project Engineer: Tetra Tech Fed -Aid No: n/a Capital Projects Brian Shields Manaaer: Contractor: AUS Date: 9/14/2022 I. Proposed Change Add anchor system in accordance to the 1994 Lk Fenwick Aerator plan set. Payment includes all material, equipment, tools, and labor necessary to supply and install the system. II. Reason and Background for Change Contract drawings for project 18-3003 proposed using the existing anchor system (based on 1994 plan sheets [attached]). During project construction, divers were unable to locate the existing anchor system due to the condition of the lake bottom; the existing float was being held in place by a 2" HDPE air supply line only, allowing it to drift. City of Kent capital projects manager consulted with Tetra Tech who suggested using the 1994 anchor system plan to construct a method of securing the new float. This method was approved through City of Kent PW management. III. Method of Payment NEW PAY ITEMS [:]Not applicable Sch No . Item Description I Anchor System Total Est. Total Estimated Cost of Qty Unit Unit Price Item 1 LS $44,070.69 $ 44,070.69 I$ I$ - New Pay Items Total: $ 44,070.69 DELETE EXISTING PAY ITEM(S) per 1-09.5 F�lNot applicable Sch Bid Item No. Item Descri tion No. P Qty Unit Unit Price Cost of Item Page 1 Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEMS) E]Notapplicable . NoBid Item No. Item Description Qty Unit Unit Price No. $ Increase / Decrease to Existing Pay Items Total: $ Cost of Item *TOTAL ESTIMATED COST OF CHANGE ORDER: 1 $44,070.69 * Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: Due This Change Order: 0 Previous Total: Explanation/Justification for Additional Working Days: *TOTAL WORKING DAYS: 0 * This Change Order + Previous Total Capital Projects Manager: Brian Shields Construction Engineering Supervisor: / ] son Barry Construction Manager:�yj� -- Eric Connor Date: q . z.8 -Zd zz Date: L$ Lt Date: Page 2 DAILY REPORT OF FORCE ACCOUNT WORKED Project Name: Lake Fenwick Hypolimnetic Aerator Improvement Item No.: Change Order 07 Description of Work: 4 Point Anchoring System Prime Contractor: Associated Underwater Services, Inc FA Sheet No.: Project No: 18-3003 Date: 8/20/2022 Work by Subcontractor?: CHECK yes if existing sub no for sub not yet hired Sub -Contractor: no LABOR STRAIGHT TIME OVERTIME NAME CODE OCCUPATION I Hrs Hourly Rate Hrs OT Rate Kris Hunter Diver 40 126.05 $ Dave Schneider Diver & Standby Diver 40 126.05 $ Tyler Averts Tender Rate (prep materials and fabrication) 16 81.61 $ Spencer Glemaker Tender Diver 40 81.61 $ I 1 $ SUBTOTAL -LABOR $ LABOR OVERHEAD & PROFIT @ 31 % $ LABOR TOTAL $ t EQUIPMENJ EQUIPMENT OR ATTACHMENTS OPERATED STANDBY Equipment # Equipment Description Hrs I Hourly Rate Hrs Rate N/A AUS Triple Axle Trailers NO 01 81 19.00 32 8.00 $ N/A 2018 Ram 3500 - AUS 201 49.00 20 24.50 $ N/A Vessel - Daily Rate 5 1150.00 $ $ SL BTOTAL- EQUIPMENT $ EQUIPMENT OVERHEAD & PROFIT @ 21 % $ EQUIPMENT TOTAL $ MATERIALSISERVICE�RENTALSQuantil, MATERIALS /SERVICES Units I Unit Price Ecology Blocks (4) Q $ 25.00 $ 316 Stainless Steel Materials, Eyebolts, Thimbles, Shackles, Clamps, Wire Rope, Nuts, Washers amd Bolts 1 $ 6,784.48 $ Telehandler- 1 Week 1 $ 3,174.93 $ Semi Truck Delivery Service for 3500 Pound Ecology Blocks 1 $ 869A0 $ Dry Docks to Float Anchors to Float Location 4 $ 500.00 $ SUBTOTAL $ OVERHEAD & PROFIT @ 21 % $ TOTAL $ of Hours Worked: TOTAL: $ (Verification 12% MARKUP (for prime when subcontract work) $ (Contractor's Representative Date SHEET TOTAL: $ ICvm I Representatve Date Comments DOLLAR AMOUNT 5,042.00 5,042.00 1,305.76 3,264.40+ - 1 14,654.16 4,542.79 19,196.951 DOLLAR AMOUNT 408.00 1,470.00 5,750.00 7,628.00 1,601.88 9,229.88 DOLLAR AMOUNT 100.00 6,784.48 3,174.93 869.40 2,000.00 12,928.81 2,715.05 15,643.86 44,070.69 44,070.69 _ s S C. R ain�ess tel. (508) 732-9191 fax (508) 732-9798 www.suncorstainless.com Corporate Headquarters 70 Armstrong Road Plymouth, MA 02360 CUSTOMER NO: 1254 BILL TO: SUNCOR - WASHINGTON , WA ACKNOWLEDGEMENT ATLANTIS I WAREHOUSE DATE ORDER NO. RAIL SYSTEMS Las Vegas 08/31/22 404378-00 © tel. (800) 541-6829 CUSTOMER'S PO# I PAGE fax (508) 732-9798 CORKY083122 1 www.atlantisrail.com SHIP TO: ASSOCIATED UNDERWATER SERVICES 6706 NE 175TH ST., UNIT D KENMORE, WA 98028 INSTRUCTIONS FREIGHT TERMS SHIP VIA BEST WAY FREIGHT FREE FedEx Ground LN I ITEM # / DESCRIPTION CITY 1 S0314-2515 SHOULDER EYE BOLT 1" X 611, 316-NM 2 S0124-0013 STANDARD THIMBLE 1/2", 316 SS 3 S0122-0013 HEAVY WIRE ROPE CLIP FED SPEC 1/211, 316-NM 4 S0117-SA20 FORGED D SHACKLE W/ BOLT, 3/4" 316 SS 5 S0119-0020 FORGED BOW SHACKLE W/ SCREW PIN, 3/4" 316 SS 6 S0703-0013-1 WIRE ROPE, 7 X 19 1/2" 1000-, 316 SS LOT#: 6 Lines Total TERMS ITAKER JPRINTDTITM CREDIT CARD Igpi I08/31/22 1 13:10 UM j PRICE I AMOUNT 12 EACH 133.82 1605.84 16 EACH 1.90 30.40 64 EACH 15.78 1009.92 6 EACH 27.19 163.14 6 EACH 33.99 203.94 1 REEL 3771.24 3771.24 Total Ordered 105 Total Invoice Total 6784.48 6784.48 Last Page ISO IMPORTANT NOTICE: UNA4CM ,NA Ejj Please report any damages and/or shortages within 5 days from the date 9001:2015�� of receipt by calling Customer Service at 508-732-9191. Thank you! Certified O United Rentals, BRANCH 805 17700 WEST VALLEY HIGHWAY TUKWILA WA 98188 425-251-8150 4W BOAT LAUNCH .,1 25828 LAKE FEDWICK RD KENT WA 98032 A h Office: 509-533-6500 Cell: 206-889-2540 ASSOCIATED UNDERWATER SVCS INC 3901 E FERRY AVE SPOKANE WA 99202-4645 RENTAL ITEMS: Qty Equipment Description Minimum 1 2331675 FORKLIFT VARIABLE REACH 12000# 53' & UP 930.00 SALES/MISCELLANEOUS ITEMS: Qty Item 1 WA HEAVY EQUIP. RENTAL TAX 1 ENVIRONMENTAL SERVICE CHARGE 1 DELIVERY CHARGE 1 PICKUP CHARGE COMMENTS/NOTES: CONTACT: CORKY RAINES CELL#: 425-417-3585 TT FRIENDLY/GROUND DROP RENTAL RESERVATION # 211075928 Customer # 796394 Reserved Date 09/22/22 Scheduled Out 10/03/22 09:00 AM Estimated In 10/10/22 09:00 AM UR Job Loc :25828 LAKE FEDWICK R UR Job # 72 Customer Job ID: P.O. # 2408 Ordered By CORKY RAINES Written By CAMERON LYONS Salesperson COLBY NICHOLSON This is not an invoice Please do not pay from this document Day 930.00 Price [DRSURWA/MCI] 35.038 [ENV/MCI] 48.860 180.000 180.000 Week 4 Week 2,443.00 7,121.00 Rental Subtotal: Unit of Measure EACH EACH EACH EACH Sales/Misc Subtotal: Agreement Subtotal: Tax: Estimated Total: Estimated Amt. 2,443.00 2,443.00 Extended Amt. 35.04 48.86 180.00 180.00 443.90 2,886.90 288.03 3,174.93 NOTICE: This is not a rental agreement. The rental of equipment and any items listed above is subject to availability and subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page: 1 From: Phil Gallagher <PGallaaher(&vvandvke.com> Sent: Friday, August 26, 2022 8:56 AM To: Corky Raines <corkv(abausdivino.com>; Mark Gallwas <MGallwas()vvandvke.com> Cc: Dustin Audley <dustin(1ausdivino.com>; Sam Cumpton <samantha(&ausdivina.com>; King Hufford <KHufford(c vvandvke.com> Subject: RE: Transport Quote - AUS The rate for this move Is $869.40 per load. This includes FSC. From: Corky Raines <corkv61ausdivina.com> Sent: Friday, August 26, 2022 7:58 AM To: Phil Gallagher <PGallaaher(avvandvke.com>; Mark Gallwas <MGallwas(a)vvandvke.com> Cc: Dustin Audley <dustin(Oausdivina.com>; Sam Cumpton <samantha(abausdivina.com> Subject: Transport Quote - AUS Hi Mark and Phil, Can you send me a quote to transport the below materials from 6706 NE 175th St. Kenmore, WA 98028 TO Lake Fenwick (boat launch area) — 25828 Lake Fenwick Rd, Kent, WA Items to transport: 4 — Ecology Blocks 3500 pounds each Sincerely, Corky Raines Project Manager Associated Underwater Services 6706 NE 175th St., Unit D Kenmore, WA. 98028 www.ausdivina.com corkv(a)ausdivina.com 425-417-3585 (M) t I AUS CONFIDENTIALITY NOTE: The information contained in this email is legally privileged and confidential information intended only for the use of the individual or entity named above. This email may not be copied, duplicated, transferred or forwarded to anybody but the recipient. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this email is strictly prohibited. If you have received this email in error, then please notify us by telephone and destroy the original message. From: Debbie MurDhv To: Corky Raines Subject: ECOLOGY BLOCKS Date: Wednesday, August 10, 2022 3:03:56 PM As per are conversation, our ecology blocks are $25.00 each. They weigh about 3500 lbs. and are 2'x2'x6'. Thanks, Debbie AUS RATES FOR DRY DOCK AND VESSEL- More information can be provided if needed 4 - EZ dock Sections Dive Boat -Daily Rate: Includes Vessel, Triple Axle Trailer, AUS Truck. Daily Use and Dive Package Equipment 25.00 1150.00 Per section/ Per day Per Day Shields, Brian From: Connor, Eric Sent: Thursday, September 8, 2022 7:01 AM To: Shields, Brian; Barry, Jason Subject: FW: Lake Fenwick - Anchor Block Change Order Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bieren, Chad <CBieren@kentwa.gov> Sent: Wednesday, September 7, 2022 6:33 PM To: Mactutis, Michael <MMactutis@kentwa.gov> Cc: Connor, Eric <EConnor@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa.gov>; Valencia-Gica, Rowena <RValencia@kentwa.gov> Subject: RE: Lake Fenwick - Anchor Block Change Order Thanks, all. Please proceed with the change order for Anchor Blocks. Chad Chad Bieren, P.E. Public Works Director Engineering Administration I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 1 Cell 253-740-9139 cbieren(abKentWA.aov CITY OF KENT, WASHINGTON KentWA.aov Facebook YouTube Instaaram From: Mactutis, Michael <MMactutis@kentwa.gov> Sent: Wednesday, September 7, 2022 5:36 PM To: Bieren, Chad <CBieren@kentwa.gov> Cc: Connor, Eric <EConnor@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa.gov>; Valencia-Gica, Rowena <RValencia@kentwa.gov> Subject: RE: Lake Fenwick - Anchor Block Change Order Chad, Thanks for forwarding this to me. The newer aeration system is designed to provide a more widespread and higher level of oxygen distribution in the lake than the previous system. Consequently, it will have significantly more oxygen flowing through it than the previous system, which will make it much more buoyant. Although the previous system did stay anchored as it was supposed to without the anchoring system, the risk of leaving the new system unanchored, and the potential cost to re -sink it or replace it if it is damaged when it floats, as well as probably pay a higher anchoring cost in the future, would justify the proposed cost of installing an adequate anchoring system and eliminating that risk. Let me know if you have any questions. Mike From: Bieren, Chad <CBieren@kentwa.gov> Sent: Wednesday, September 7, 2022 3:56 PM To: Mactutis, Michael <MMactutis@kentwa.gov> Cc: Connor, Eric <EConnor@kentwa.Rov>; Peterson, Kelly <KPeterson@kentwa.gov> Subject: FW: Lake Fenwick - Anchor Block Change Order Hi Mike, Please give me a little more background on the need for anchoring the Lake Fenwick Aerator diffusor pipe - see attached. It sounds like we have not had an anchoring system in place since the original installation in 1994. Conceptually, I understand the need; however, if the old system worked without it, why can't we go without it on the new system? Thanks, Chad Chad Bieren, P.E. Public Works Director Engineering Administration 1 Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5534 1 Cell 253-740-9139 cbieren(cDKentWA.aov CITY OF KENT, WASHINGTON KentWA.nov Facebook YouTube Instagram From: Connor, Eric <EConnor@kentwa.gov> Sent: Wednesday, September 7, 2022 2:02 PM To: Bieren, Chad <CBieren@kentwa.gov> Cc: Barry, Jason <JBarrv@kentwa.gov>; Peterson, Kelly <KPeterson@kentwa.sov> Subject: FW: Lake Fenwick - Anchor Block Change Order Good Afternoon Chad, As you recall, when the in -water work began for the Lake Fenwick Aerator system it was discovered that the original anchoring system was not in place as expected during design. As a result we requested our contractor to provide and install the system as designed in the original system's plan set from 1994. The contractor is able to procure all of the required materials for the anchoring system and has provided the attached pricing for all required procurement, assembly, preparation, and in -water installation. They are estimating 5 days to complete this work. The total proposed cost is $47,043.84. After discussion and review of the proposal with Jason and Brian, we feel like this proposed cost is reasonable for this difficult tasks of handling and rigging the 3,500 lb blocks above ground, floating them in to place on specialized docks, and then carefully lowering them to their desired location. Cable installation, connections, and anchoring will all take place under water. 2 Please let me know if you are okay with preparing a change order and proceeding with this work and their proposed cost. I am available if you would like to discuss or need any additional information. Thank you, Eric Eric Connor, Construction Engineering Manager Phone 253-856-5533 1 Cell 253-797-0693 CITY OF KENT, WASHINGTON PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Shields, Brian <BShields@kentwa.gov> Sent: Wednesday, September 7, 2022 8:10 AM To: Barry, Jason <JBarrv@kentwa.gov> Cc: Connor, Eric <EConnor@kentwa.gov> Subject: FW: Lake Fenwick - Anchor Block Change Order Jason, AUS sent over their COP for the anchor system installation. I worked with them to get the price down from their previous submission; They discounted their total vessel daily rate from $1,500 per day to $1,150 per day. This includes the mobilization of the vessel, the dive equipment on board, etc. Brian Shields, Capita/ Projects Manager Construction Management I Public Works Department 220 4th Avenue South, Kent, WA 98032 Main/Cell 253-293-4973 1 Desk 253-856-6510 bshields@KentWA.aov CITY OF KENT, WASHINGTON KentWA.aov Facebook YouTube From: Corky Raines <corkv@_ ausdiving.com> Sent: Tuesday, September 6, 2022 1:20 PM To: Shields, Brian <BShields@kentwa.gov> Subject: RE: Lake Fenwick - Anchor Block Change Order EXTERNAL EMAIL Hi Brian - I was able to decrease the vessel rate a little, hope this helps. Thanks! Thank you, Corky Raines AUS Diving 425-417-3585 3 From: Corky Raines <corkv@ausdiving.com> Sent: Thursday, September 1, 2022 2:57 PM To: bshields@KentWA.gov; Barry, Jason <JBarrv@kentwa.gov> Cc: Dustin Audley <dustin@ausdiving.com>; Sam Cumpton <samantha@ausdiving.com>; Michael Eakin <michael@ausdiving.com>; Kerry Donohue <kerrv@ausdiving.com> Subject: RE: Lake Fenwick - Anchor Block Change Order Hi Brian, Here are the changes we spoke about, one thing I caught after we spoke about the vessel daily rate is I did not put in the proper labor hours for my divers. I have corrected the hours. Give me a ring to discuss when you have a minute. Thank you, Corky Raines AUS Diving 425-417-3585 From: Corky Raines <corkv(@ausdiving.com> Sent: Thursday, September 1, 2022 12:42 PM To: bshields@KentWA.gov; Barry, Jason <JBarrv@kentwa.gov> Cc: Dustin Audley <dustin@ausdiving.com>; Sam Cumpton <samantha@ausdiving.com>; Michael Eakin <michael@ausdiving.com>; Kerry Donohue <kerrv@ausdiving.com> Subject: Lake Fenwick - Anchor Block Change Order Hi Brian, Please see attached change order for the anchor system. I know there may be some adjustments with the equipment description, the main listing did not have vessel and trailers listed. Feel free to reach out with any questions. I hope you have a great day. Sincerely, Corky Raines Project Manager Associated Underwater Services 6706 NE 175th St., Unit D Kenmore, WA. 98028 www.ausdivinci.com corkv@ausdivina.com 425-417-3585 (M) moms CONFIDENTIALITY NOTE: The information contained in this email is legally privileged and confidential information intended only for the use of the individual or entity named above. This email may not be copied, duplicated, transferred or forwarded to anybody but the recipient. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this email is strictly prohibited. If you have received this email in error, then please notify us by telephone and destroy the original message. T'J 7 BPS. 35502 14'-7" TO OPPOSITE END 1/4" SKIN THKNESS-R 1 13 16"t 1 ALUM L1 1/20 1/2x1/4, LENGTH TO MATCH GRIP STRUT PLANK i I ... 4 FRP L4x4x3/8 PLANK WALL OF SEPARATOR BOX SUPPORT--- _--� DETAIL 3" 1'-0" 0 ALUM BAR 5/160 1/4 LOCK BAR EA SIDE OF REMOVABLE PLANKS, THIS END OF SEPARATOR BOX 1 •-7" TYP } 1/4 FOR WALL TOP FRP 18x4x.375 STRUT, BOND END OF BEAM 7YP SAFETY GRATING i SEE@ TO FRP PL 8x6x1/4 PLANKS i SS ---------- — — — — — -- ____-- — — — ------*___ � �• I I 2 5 16"SS CARRIAGE " . { BOLTS WITH ANCHOR DEVICES EACH END 1 OF EACH PLANK FRP L— _—_-N' _ ---_ ^SUPPORT x3/8 PLRNI< ��N \ I it ( i i i 12- FRP 1/4" STIFFENERS AT EA GRATING PLANK SUPPORT POINT SPACING OF 1/4" I. I I PIA RIVETS FRP L2x2xl/4 BONDED r—'-Y 4- 1/4" DIA RIVETS EA LEG EACH SIDE I 1 „ ( TO W6 WALL STIFFENER PROVIDE DRILLED HOLE THIS END FOR PADLOCK N t o i 3 2 i 1 4 FLANGE 6" DETAIL � D`\ DETAIL S4 3"=1'-O" S4 ALUM BENT BAR 3/8 2 39" THK x 1 1/2 WIDE x HASP, TYP 8 PLACES. a� PROVIDE 5/8 x 1 1/2 i $MAX FOR WALL TOP DETAIL, SEE PROVIDE ALUM BAR END x 2 CONTINUOUS END BAND HOLE FOR LOCK BAR I r - S5 FA BRICATE 6x6 GIN FROM - RA FISER CLAMP, ALUM _� . '. _ ALUM FB 3/8x2 FB 1/4xl 1/2 WITH 2- 1/4'0 " f t CORNERS ION TOP SS BOLTS - -____JI 2- 3/8" DIA SS T---„ 41 O ONLY BOLTS ®2 OC WITH I WASHERS EACH SIDE I - , CUT "X" WEB FROM - - — ? I 1 PLANK, TWO PLACES 9 4 t 4'� t i I EACH END OF TWO 1 (� I I PLANKS TO ALLOW I I HASP TO PROJECT FRP SUPPORT t i L I t ABOVE GRATING L3x3x1/4, ATTACH y 1 y y SURFACE. SMOOTH OVERLAY PIPE WALL WITH ALUM BAR 3/16x3x3 REMOVABLE ALL CUT EDGES i ODIA VERLAY AND 1'4" TACK WELDED TO THIS GRATING PLANKS OF PLANK 1 I F,. j AROUND TS ®8'OC END ONLY TYP TYP GRATING GRATING LOCK DETAIL 5 1 1/2"=1'-0" S4 110 FLOOR STIFFENER 2" LEG BEYOND EA SIDE FRP 718" INSIDE DIA x 1/4 WALL THK SLEEVJE WITH Z' FLANGES OVERLAYED TO TOP & BOT SKINS o 0 Na FRP 1/4 x 6 SLEEVE o T01FFENER SLEEVE bVERLAYED 8 2- 1/4!' DIA RIVETS EA SIDE 3/4" DIA SS EYE BOLT WITH WASHER n EACH SIDE CABLE ANCHOR EYE DETAIL 1 1/2"' S4 S5 FRP SAFELY PLANK SUPPORT ANGLE, SEE PROVIDE OVERSIZE HOLES Y IN HASP FOR FIELD ADJUSTMENT Of ASSEMBLY SECTION i 6'1 LOCKING SCREW CAP BOND NUT EACH SIDE , -���►�--.,_.-...,_.�-1 1/2" DIA FRP THREADED NIPPLE WITH BALLAST TANK � FRP NUT EA END FILL CAP NO SCALE KC Q7, M, Inc. date I designed by 666 I � �� o •AsyG revisions MAY 94 drawn by 1917 First Avenue scale checked by 13_;?> I nsaa � Seattle, Washington 98101 AS NOTED approved by iv,s �✓ �,9T �• �� . B�ONAL Ply` l ckawes a 4/9!i 1 R- , r' GRATING DETAIL FRP t4x, FRP OVE SMOOTH DETAIL ALUM F8 1/4x1 1/2, ROUND OUTBOARD ENDS SMOOTH WHERE CONTACT WITH PIPE WALL 120' 60' i 36" DIA FRP PIPE PIPE SUPPORT SPIDER 8- 1/4"ALUM I O O RIVETS DANGER OFF FRP SIGN PER 0 ° o SECTION 9-28-3 KEEP OF THE STANDARD SPECIFICATIONS 10 THIS DRAWING HAS BEEN REDUCED TO APPROXIMATELY S4 ONE-HALF THE ORIGINAL SCALE City of Kent Lake Fenwick Restoration Hypoiimnetic Aeration O O TYP WARNING SIGN „ SEPARATOR BOX SECTIONS AND DETAILS rrcr L4x4x{/4 FRP OVERLAY BUILT UP To SMOOTH RADII IS TYP WALL STIFFENER a 54 ALUM SPLIT RING CLAMP - FB 1/4 x 1 1/2 WITH 1/4" DIA SS BOLT 6" 8 S4 NOTES: 1. THE SIGN BACKGROUND SHALL BE WHITE, LETTERING SHALL BE ORANGE 2. BLOCK LETTERING SHALL BE 4--INCHES HIGH. 3. THE SIGN SHALL BE MOUNT( 5 BELOW THE TOP OF THE SEPARATOR BOX WALL AND CENTERED. R drawing number sheet number r 10 of 12 WARNING SIGNS @,,AERATOR SEPARATOR BOX 4 SIDE 7YP, SEE LAKE FENWICK SURFACE ELEVATION FOR CABLE ANCHOR EYE, SEE � S6 I I ! � 4 I I 1 /2" DIA SS I WIRE ROPE, TYP OUTLET PIPE c`o EACH. CORNER OF BOX i 1/2" DIA x 6" EYE BOLT W/ f TACK WELDED NUT AND WASHER r\ 7/2" DIA MIDLINE EMBEDDED tN SS WIRE ROPE ANCHOR - r CLAMP WITH SHACKLE PRECAST CONC E 15t ANCHOR, SE 4 C2 ) t 50 LB CONC WEIGHT, TYP 4 !1 PLACES (APPROX 8" SQUARE x 8' / DEEP) 45• 4i LAKE BOTTOM 36" DIA FRP PIPE 2" DIA AERATION PIPES, SEE CIVIL DRAWINGS 1/4" DIA RIVETS j Ajjjjjj �AT 8"OC AROUND 3" H _ H $ I ` R CONT L4x3x3/8 m (LLH) AROUND FLARE BOTTOM OF INSIDE OF PIPE FRP PIPE AS SHOWN 0 DETAIL S1S44 AERATOR ANCHOR SYSTEM 01 1/4„_1,—U' 54 ROTATE ASSEMBLY AS SHOWN (L OF PIPE SS 1/4" STIFFENER PL EACH SIDE, CLEAR DIMENSION INSIDE EQUAL TO 4 1/2" SS PL 5x5x1/4 NUT AND WASHER EACH SIDE OF FRP TYPICAL 1" DIA SS ROD, .I THREADED EACH 1� END t 3/9' THK x 5' SS 1/4'; DIA SS BOLTS CIRCUMFERENTIAL BAND 0 8 OC AROUND W/ i WASHER EACH SIDE, STAGGER TOP & BOT, WALL OF 36" OR 48" DIAMETER FRP PIPE INLET/OUTLET STIFFENER 3'-1Cr 54 date designed by GGB_ 1 a ""f r� revisions KCM, Inc. MAY 94 drown by I KCM 1917 First Avenue scale ] checked by vSb a tee Seattle, Washington 9$101 � As NOTED I approved by Wsr✓ � ��rmuL FRP 2 1/2" INSIDE DIA x 1 4" WALL THK FLANGED 7,1 SLEEVE --------- ` 1 4- 1/4" DIA RIVETS TOP AND SOT FLANGES -- 6" WIDE CIRCULAR FRP OVERLAY I o FRP PIPE WALL- 1/4" DIA RIVETS Cat g OC IN 2.. CHANN°L TOP AND BOT FLANGES AERATOR PIPE SLEEVE 1 112"=V--0„ 02 2 NOTE: FRP SKIN NOT SHOWN FOR CLARITY EXTEND 110 WEB 2 1/2"x 2 1/2" TO CHANNEL WEB, COPE AS REQ'D x8' FRP OVERLAY EACH SIDE __ -------- ----- OF WEB w q_ 0 OVERLAY ALL INTERSECTING o`' WEBS AND FLANGES FRP EDGE CHANNEL 0 RIVET LOCATIONS AT TYP CORNER NOTE: r FRP I SHAPE FRP SKIN NOT SHOWN FLOOR STIFFENER DETAIL 1 1 /2" = V-O" (S4 CURVED FRP 10" CHANNEL WITH MIN 2 3j4" FLANGE " 7/9' DIA SS 80 AND 3/8" WALL THKNESS VARIES. NUT & WASHEF 2" THK x 4 1/2" DIA 1 1 /2" INSIDE 8" WALL NEOPRENE PAD WITH 11" `°DIA HOLE FOR BOLTSEVEjj DIA 2 1/2" x 2 t /2" x 8" FRP OVERLAY EACH SIDE RIVETS EA OF EA STIFFENEF A �ptt o 1/2't FLEXIBLE 1 JOINT FILLER— ( of o'' o I SHAPE BASE STIFFENER, 0/EXTEND WEB AND FLANGE TO CHANNEL WEB 4!'WIDE FRP OVERLAY ./ BENT OVER OPENING FRP SLEEVE STIFFENER PLAN DETAIL 1 1/2"=1'-0" FRP OVERLAY CONT AROUND WALL TOP — MI jI'`' I COPE WALL STIFF AS SHOWN CLOSED CELL FOAM CORE — C6x1.688x.375 WALL TOP CHANNEL 1/4" DIA RIVETS AT 8'OC EA SIDE FRP L3x3x1/4 EACH SIDE OF WEB WITH 1/4 DIA RIVETS EACH LEG TYP WALL TOP DETAIL E 1 1/2"-1'-0" S4 S6 -a�II 1 /4" DIA RIVETS _ 41 l 0 8"OC TYP FRP I SHAPE FLOOR >� STIFFENERS-- EXTEND WEBS TO 0;; o CHANNEL WEB, -- o COPE AS REQ'D to 0``':1 11 2 1 /2"x 2 1/2" RIVET LOCATIONS x8" FRP OVERLAY �' AT CONN °o o " EACH SIDE 9- ° 0 OF WEB 6" WIDE CONT !! , FRP OVERLAY 1 �� AT CORNERS OVERLAY ALL ----- .,__ _ � 3„ INTERSECTINC - t FLANGES WEBS D NOTE: FRP EDGE FRP SKIN CHANNEL NOT SHOWN DETAIL BASE TO WALL DETAIL S4 City of Kent Lake Fenwick Restoration Hypoiimnetic Aeration STIFFENER, SLEEV WRAP AROUND & OVER TO BOLT SLEEVE DOUBLE NUT - FABRICATED FRP PIPE FLANGE x 2 1/2" MIN THK 2- WASHER FOAM INSULATION WRAP ELEVATION 3 S4 2 1/2"x 2 1/2" CONT FRP OVERLAY EACH SIDE OF w£e INTERIOR SIDE CLOSED CELL FOAM CORE � 1 1/2" WIDE FRP SEAL OVERLAY --"' EXITERIOR SIDE r} TYP WALL DETAIL 2 ROWS OF 1/4" DIA RIVETS (ONE 2 1/2'x 2 1/2' EA SIDE OF CONT FRP OVERLAY FLANGE) CAD 8"OC EACH SIDE EACH ROW = — = 110x5x.375 � 6 `VI -" CONT FRP OVERLAY 3' 3" FRP C1OX2.75 OVER RIVETS TYP x.50 EDGE CHANNEL AROUND BASE THIS DRAWING HAS BEEN REDUCED TO APPROXIMATELY ONE-HALF THE ORIGINAL SCALE 10 TYP BASE DETAIL SEPARATOR BOX SECTIONS AND DETAILS TYP WALL STIFF CUT FROM FRP 112x6x.50 PERMISSIBLE SKIN JOINT (EXTERIOR SIDE ONLY) 1/4" DIA RIVETS AT 8"OC EA ROW 9 S4 PERMISSIBLE TOP AND BOT SKIN JOINT CLOSED CELL FOAM CORE 1 1/2' WIDE FRP SEAL OVERLAY TO MATCH SURFACE HEIGHT OF RIVETS QS411 drawing number e sheet number 9 of 12 I $' f CONSTRUCTION LIMIT OD+B" MAX JK ON SHORE TRENCH SECTION (TYP) NO SCALE 12" MAX OD+6' SUBMERGED TRENCH SECTION (TYP) NO SCALE 8—O" 4"CRUSHED SURFACING TOP COURSE 1 �I REPLACE EXIST GROUND COVER IN KIND EXISTING GROUND BACKFILL NATIVE MATERIAL FREE OF ROCKS, ROOTS, AND OTHER ORGANIC MATERIAL COMPRESSED AIR LINE N / EXISTING LAKE BED -^-6"QUARRY SPALLS - BACKFILL NATIVE MATERIAL FREE OF ROCKS AND ROOTS —COMPRESSED AIR LINE J 2- 1 1/2"SS CLAMP 3/4"SS THIMBLE 3/4'DIA SS EYE BOLT DRILL AND EPDXY ANCHOR LAKE BED 6'x2'x2' CONC ANCHOR TYP 4 PLACES AERATOR ANCHORAGE DETAIC NO SCALE I/2'VINYL COATED CHAIN 2' TYP 2.-. 12"BLACK NYLON MIN WEIGHT 225#/100'CABLE TIES, 175# MIN LAKE BED TENSILE STRENGTH I I I i 2"AIRLNE (HOPE) AIRLINE ANCHORING DETAIL Q NO SCALE 2"COPPER AIR LINE \ COMPACTED SUBGRADE -� 2" PACKED JOINT COUPLER 2"HDPE AIR LINE 0 b GRAVEL DRIVEWAY SECTION COPPER TO HDPE TRANSITION DEI'AIL(71 8 NO SCALE NO SCALE C. d KCM, Inc. I dote designed by �S3 40* *�+xhA� revisions 1917 First Avenue MAY 94 drawn by i p se checked by.KCM (Iii7 Seattle, Washington 98101 � AcSalNOTED approved by wyv) a avae t� f�17AL 1 EWES 7�¢/Rl 1 NOTE: ANCHOR 2'AIRLINE FROM SHORELINE TO 90' ELBOW COMPRESSER BLDG WITH CHAIN AS SHOWN IN DETAIL 5 140 2"COPPER AIR LINE VERTICAL SCALE 1"=10' HORIZONTAL SCALE 1"=50' 10' FROM SHORELINE TRANSITION 130 EXISTING GRADE FROM STEEL TO HOPE /� SEE DETAIL_ 6 .. - . -...._ AERATOR 120 _ t SHORELINE EL 120.E i 110 j�THDPE AIR 'LINE- 10 LF NE IN 100 _. UBMLEIRGAED'T ENCN..- _ _.. ........_. ...-_.... r ,.... SEE 3 260 LF � 1- 2" HOPE OW LAKE BED _ 90' ELBOW 90 \_ 400 LF 2"AIRLINE IN TRENCH SEE DETAIL 80 Is _ 2 70 0 50 100 150 200 250 300 350 400 450 500 550 600 650 AIR PIPELINE PROFILE NO SCALE 120' PREVAILING WIND STAKING �5' JUNIPER PLAN 3- 2"x2"x8' DOUGLAS FIR STAKES. ATTACH TO TREE WITH TWO STRANDS TWISTED #12 NEW GALV WIRE AND SET CROWN NEW 5/8 RUBBER HOSE OF ROOTBALL AT FINISH 1>., REMOVE BURLAP FROM TOP 1/3 OF GRADE � L AFTER STAKING R�-1'3' ��'"' FINISH GRADE RK M RK MULCH - 2"DEPTH MULCH CLE SHALLEXTEND \�BEYO D TREESTAKESIN TURF J(y7RF AREAS ROOTBALL,;•.:'\ - - DIA +24" SCARIFY SIDES I BACKFILL SOIL MIXTURE AND BOTTOM-- 1- 4 - COMPACTED BACKFILL SOIL MIXTURE � STAKES SHALL EXTEND MIN OF 3'-0" SNOTE:TAIN TREE STAKES WITH TWO INTO UNDISTURBED SOIL COATS OF #707 OLYMPIC STAIN. TYP CONIFEROUS PLANTING �e NO SCALE G1 City of Kent Lake Fenwick Restoration Hypolimnetic Aeration T41S DRAWING HAS BEEN REDUCED TO APPROXIMATELY ONE-HALF THE ORIGINAL SCALE _ ri—WEATHER PROOF CAP TO BE SEALED WHERE COAX CABLE j� COMES OUT OF POLE TAPERED STEEL POLE, 20'-O" HIGH, 4" D1A MIN A7 BASE b YAvr N ACCESS COVER 4- 1/2' GALV BOLTS z z 3/4" CONDUIT FOR ANTENNA COAX TO BUILDING ENTRANCE W/ WEATHER PROOF BOX ON OUTSIDE OF 3/4"0 ANCHOR STATION. PROVIDE 3/4" CONDUIT PLATE TYP, OR ` t FROM THIS BOX TO TELEMETERING BASE (8.0 C,F. MIN) EQUIPMENT IN STATION BID ALTERNATIVE B ANTENNA POLE DETAIL NO SCALE drawing number C2 TYPICAL DETAILS sheet number 4 of 13