HomeMy WebLinkAboutCAG2022-146 - Change Order - #4 - Olson Brothers Excavating, Inc. - Downey Side Channel Restoration Final Phase - 12/13/2022M 0 L Q a Eq ME Agreement Routing Form For Approvals, Signatures and Records Management KENT This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. W A .S H I N G T O N (Print on pink or cherry colored paper) Originator: Stephanie Anderson Date Sent: 12/20/2022 Authorized to Sign: El Director or Designee Mayor Budget Account Number: D20074.64110.330 Department: PW Engineering Date Required: N/A Date of Council Approval: 4/5/2022 Grant? El Yes No Type: N/A Vendor Name: Category: Olson Brothers Excavating, Inc. Contract Vendor Number: Sub -Category: Change Order 4 Project Name: Downey Side Channel Restoration Final Phase Project Details: Provide unit price compensation for added work: provide and install additional wood mulch at a unit price of $1,080.00 per 100 CY. Agreement Amount: $13,079.88 Basis for Selection of Contractor: Bid Start Date: 4/15/2022 Termination Date: 1$0 working days Local Business? []Yes [:]No* If meets requirements per KCC3.70.100, please complete "Vendor Purchase -Local Exceptions" form on Cityspoce. Notice required prior to disclosure? Yes No Date Received by City Attorney: Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: Contract Number: CAG2022-146 Comments: adccW22373, 20 Visit Documents.KentWA.gov to obtain copies of all agreements KENT W A S H I N G T O N CHANGE ORDER NO. #4 NAME OF CONTRACTOR: CONTRACT NAME & PROJECT NUMBER: ORIGINAL CONTRACT DATE: Olson Brothers Excavatina, Inc ("Contractor") Downev Side Channel Restoration Final Phase. April 15. 2022 This Change Order amends the above -referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This Change makes the following revisions to the contract documents and provides unit price compensation for added work: provide and install additional wood mulch at a unit price of $1,080.00 per 100 CY. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $3,129,996.84 including applicable alternates and WSST) Net Change by Previous Change Orders $106,895.72 incl. applicable WSST) Current Contract Amount $3,236,892.56 incl. Previous Change Orders) Current Change Order $11,880.00 Applicable WSST Tax on this Change $1,199.88 Order Revised Contract Sum 3,249,972.44 CHANGE ORDER - 1 OF 3 Original Time for Completion insert date) 100 working days Revised Time for Completion under 110 working days prior Change Orders insert date) Days Required (f) for this Change Order 110 calendar days Revised Time for Completion 110 working days insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: Dlgdaky sisneo by 0ryoe SWrrack Bryce Stu rrock DN,ers EE=bryceiIol", N=Brers net,0-OlsonothersExcavppiInc",CN=Bryce Sturtock Reams: I am approving This tlocumenl By: Date: 202210,21 09020&0700' signature) Print Name: Brvice Sturrock Its PM/Estimator title) DATE: 10/21 /2022 CITY OF KENT: Digitally signed by Chad Bieren DN: C=US, E=cbieren@kenbva.g,,, Chad Bieren CNC jty of had Beene OU=Public Works, By: Date: 2022.12.1310:14:11-08'00' signature) Print Name: Chad Bieren, P.E. Its Public Works Director title) DATE: AF EC KP CHANGE ORDER - 2 OF 3 ATTEST: Kent City Clerk C[In this field, you may enter the electronic filepath where the contract has been saved] APPROVED AS TO FORM: applicable if Mayor's signature required) Kent Law Department CHANGE ORDER - 3 OF 3 File No. 200.2 CHANGE ORDER WORKSHEET NO. 04 Construction Engineering Division - Public Works Project: Downey Side Channel Restoration Final Project No: 18-3007.1 Phase Project Engineer: Melissa Dahl Fed -Aid No: N/A Capital Projects Jason Bryant Contractor: Olson Brothers Manaaer: Date: 10/18/2022 I. Proposed Change This Change makes the following revisions to the Contract Documents and provides unit price compensation for added work: Provide and install additional wood mulch at a unit price of $1,080.00 per 100 CY. i, II. Reason and Background for Change When the Downey project originally went to bid the City provided the wood mulch. Bid item 8115 included the labor and equipment to place stockpiled mulch. Upon placing the provided material it was discovered that additonal mulch would be necessary to complete the project. Olson Brother's provided a price of $1,080.00 per 100 CY for providing and installing wood mulch. A total of 1100 CY were provided and installed. III. Method of Payment NEW PAY ITEMS Notapplicable Sch No . Item Description No 8 l Provide and install straw mulch Total Est. Qty Total Estimated Cost of Unit Unit Price Item 11 100 CY $1,080.00 $11,880.00 New Pay Items Total: $ 11,880.00 DELETE EXISTING PAY ITEM(S) per 1-09.5 Not applicable Page 1 Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. Delete Existing Pay Items Total: $ INCREASE/DECREASE TO EXISTING PAY ITEMS) 0 Notapplicable Sch Bid Item No. Item Description Qty Unit Unit Price Cost of Item No. Increase / Decrease to Existing Pay Items Total: $ - TOTAL ESTIMATED COST OF CHANGE ORDER: 1 $11,880.00 Total of the Cost of Item Columns IV. WORKING DAYS Original Contract: 100 Due This Change Order: 10 Previous Total: 100 TOTAL WORKING DAYS: 110 This Change Order + Previous Total Capital Projects Manager: Date: Jason yant .1,.—, r Capital Projects Date: Supervisor: Jason Barry Construction Manager: - Date: 16'Ac w— ric Connor Page 2 Bryant, Jason From: Peterson, Kelly Sent: Wednesday, September 21, 2022 9:28 AM To: Connor, Eric Cc: Bieren, Chad; Dahl, Melissa; Maloney, Carla; Bryant, Jason; Barry, Jason; Harris, Josh Subject: RE: Downey side channel Eric - Per our discussion with Chad, please proceed with a change order to secure the additional mulch. Thank you, Kelly Kelly Peterson, AICP, Deputy Director -Engineering Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5547 - Cell 253-740-8066 KoetersonCalKentWA.aov CITY OF KENT, WASHINGTON KentWA.aov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Connor, Eric <EConnor@kentwa.gov> Sent: Wednesday, September 21, 2022 8:54 AM To: Peterson, Kelly <KPeterson@kentwa.gov> Subject: FW: Downey side channel From: Bryant, Jason <JBrvant@kentwa.eov> Sent: Wednesday, September 21, 2022 8:41 AM To: Barry, Jason <JBarrv@kentwa.eov> Cc: Connor, Eric <EConnor@kentwa.eov>; Harris, Josh <JHarris@kentwa.eov> Subject: FW: Downey side channel Jason, Out at Downey we have run out of the stockpiled mulch. Olson believes we need an additional 1000CY to complete the project. They have offered to have it delivered for $1080.00 per 100CY load. We have informed Melissa about this and she had Chris do a take off of the remaining areas they believe we may need as much 2200CY. So worst case scenario is $ $24,000.00. Please let us know ASAP if we can proceed? Thank you, Jason Bryant, Capital Projects Manager 1 Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 Jl3rvant(&KentWA.aov CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryce Sturrock <brvices@olsonbrothers.net> Sent: Wednesday, September 21, 2022 6:54 AM To: Bryant, Jason <JBrvant@kentwa.Rov> Cc: Harris, Josh <JHarris@kentwa.Rov>; Joni Dombrowski <ionid@olsonbrothers.net> Subject: Downey side channel EXTERNAL EMAIL Jason, I was told by Gus we might be needing some additional wood chips. We have a line on some hog fuel around the way, the offer was $1,080 per 100 CY load delivered. I would assume placement would fall under the existing and original bid item. please let me know if this is something you would like to move forward with as this offer is currently in production and I would like to lock it in before its gone. Thank you, 022 142' St. E., PuyWouP, WA. %8373 Offk,e' (253) TTO-3944 FaW (2631770.3645 Drtice S-f orrvck Cell: ( 253)-343-4a50 if: I ruces vlsowl rvtl iers.wet Bryant, Jason From: Bryant, Jason Sent: Wednesday, September 21, 2022 9:31 AM To: Bryce Sturrock Cc: Harris, Josh; Joni Dombrowski Subject: RE: Downey side channel Bryce, Please proceed with procuring the additional mulch. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 Jl3rvant(a)KentWA.aov CITY OF KENT, WASHINGTON KentWA.gov Facebook . YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryce Sturrock <bryces@olsonbrothers.net> Sent: Wednesday, September 21, 2022 6:54 AM To: Bryant, Jason <JBryant@kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov>; Joni Dombrowski <jonid@olsonbrothers.net> Subject: Downey side channel EXTERNAL EMAIL I was told by Gus we might be needing some additional wood chips. We have a line on some hog fuel around the way, the offer was $1,080 per 100 CY load delivered. I would assume placement would fall under the existing and original bid item. please let me know if this is something you would like to move forward with as this offer is currently in production and I would like to lock it in before its gone. Thank you, 0422 112" f. F-, PayWkup, WA. U373 OMce: (253) T70-3644 Fafc (253) 7TO.3945 13r9ce Stmrrvck Cell: (253)-343-4550 tMail: bruces vlsvv brvll ers.v e-f' Bryant, Jason From: Bryant, Jason Sent: Wednesday, September 21, 2022 9:31 AM To: Bryce Sturrock Cc: Harris, Josh; Joni Dombrowski Subject: RE: Downey side channel Bryce, Please proceed with procuring the additional mulch. Thank you, Jason Bryant, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5541 1 Cell 253-261-5663 JBrvantCa)KentWA.00v CITY OF KENT, WASHINGTON KentWA.gov Facebook ;,;;:;::.. YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Bryce Sturrock <bryces@olsonbrothers.net> Sent: Wednesday, September 21, 2022 6:54 AM To: Bryant, Jason <JBryant@kentwa.gov> Cc: Harris, Josh <JHarris@kentwa.gov>; Joni Dombrowski <jonid@olsonbrothers.net> Subject: Downey side channel EXTERNAL EMAIL I was told by Gus we might be needing some additional wood chips. We have a line on some hog fuel around the way, the offer was $1,080 per 100 CY load delivered. I would assume placement would fall under the existing and original bid item. please let me know if this is something you would like to move forward with as this offer is currently in production and I would like to lock it in before its gone. Thank you, 01W STA& ZXCAM0111110n. 8422 1121 St. E., PuyWk4p, WA. U373 OMee: (253) T7G-M44 Fast 1253) 774.3845 13r4ce S+Urrvck Cell: (253)-343-4255D Email: brNcesa vlsvv brv l ers.v e A o/ Olt a n WUI z 2u lfico j Cl[fa fk Q. z 2k Su SQ 2, 2; o WWI, i R «' S m cc J O UJN c F OJ fn t O 2 h- chian o WL LU O J Z a0 { J ap $ cr z j u DOo i 4wy a' q E W J z r'' cx.°d B N q oa C uU o a 0 t QiE W + C c H WD ro as j 1 H 5 m d Aw „ w a i ° r, a } G of w a Cl)} o ¢ Uoa = o a 1 s• m J wa E L g2 m V t 2 m Z 4 o4 Z a ti o w LO J U O a Q1 q 2 11J r0 W oO t d m cn D. q °c o Q c 1 ° j U c 4t ~ c LU 33" N LU Q U mJ W M = G ° U, Uzi Po r h J a U cc Z w FO ¢ j iii a w0 a W o cr C) O i Z O i` Enterprises, LLC 16516-119th Avenue CT East / Puyallup, WA 98374 253-435-7740 • Fax 253-840-1251 Cont. #PELLAEL983L7 TE: CUSTOMER: I iii q agIVER:o TRUCK-9 SOLO IT T ) LOAD VIE MATERIAL LOAD DUMP TIME LOAD LOADED HAULED LOCATION LOCATION DUMPED SIZE 13 b I I YscS i I I I I NOTES: 1. Pe[land Enterprises, LLC will not be held responsible for damage caused by delivery inside curb or property line. 2. Customer assumes all responsibility for towing costs if truck has to be towed. - 1 HRSL 1 START TIME I DRIVER END TIME ACCEPTED BY VI k 2 23521