Loading...
HomeMy WebLinkAboutCAG2022-399 - Amendment - #2 - Modern Painting Group LLC - Hogan Park Painting Restoration - 11/30/202211/16/2022 Approved by Legal 12/1/22 AMENDMENT - 1 OF 2 AMENDMENT NO. 2 NAME OF CONSULTANT OR VENDOR: Modern Painting Group LLC CONTRACT NAME & PROJECT NUMBER: Hogan Park Painting and Restoration ORIGINAL AGREEMENT DATE: 10/13/2022 This Amendment is made between the City and the above-referenced Consultant or Vendor and amends the original Agreement and all prior Amendments. All other provisions of the original Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force and effect. For valuable consideration and by mutual consent of the parties, Consultant or Vendor’s work is modified as follows: 1.Section I of the Agreement, entitled “Description of Work,” is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, the Consultant or Vendor shall: Reduce SOW to remove Paint Metal Staircase ($1541.40 with Tax). 2.The contract amount and time for performance provisions of Section II “Time of Completion,” and Section III, “Compensation,” are modified as follows: Original Contract Sum, including applicable WSST $52,682.85 Net Change by Previous Amendments including applicable WSST $0 Current Contract Amount including all previous amendments $52,682.85 Current Amendment Sum $-1,400.00 Applicable WSST Tax on this Amendment $-141.40 Revised Contract Sum $51,141.10 AMENDMENT - 2 OF 2 Original Time for Completion (insert date) 10/30/2022 Revised Time for Completion under prior Amendments (insert date) 11/30/2022 Add’l Days Required (±)for this Amendment NA calendar days Revised Time for Completion (insert date) 11/30/2022 The Consultant or Vendor accepts all requirements of this Amendment by signing below, by its signature waives any protest or claim it may have regarding this Amendment, and acknowledges and accepts that this Amendment constitutes full payment and final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Amendment, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and warranty provisions of the original Agreement. All acts consistent with the authority of the Agreement, previous Amendments (if any), and this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this Amendment, which is binding on the parties of this contract. IN WITNESS, the parties below have executed this Amendment, which will become effective on the last date written below. CONSULTANT/VENDOR: By: Print Name: Its DATE: CITY OF KENT: By: Print Name: Its DATE: ATTEST: ___________________________ Kent City Clerk APPROVED AS TO FORM: (applicable if Mayor’s signature required) Kent Law Department Dana Ralph Mayor 11/30/2022 EXHIBIT A FtModern Painting <edmond@Ihrmodempainting mm> soot: Tuesday, November 11, 2022 2:49 PM 11; Dow, Tadd <TOaw@ke,twa gnw subJad: Re: Hogan Park E%TERNALEHAIL r1, Ben, Itap,, Peak ❑Ipjec! rs comdokW iwsides lM melnt suns Oil eolh In0ri6eTh rat Epoxy's at r'was teo3ltnq into ur•ng for those metal stairsrequire a min 5q surime lemphr.•fdrr, applltawr I did not Mink thal the temps would drop this low this quick We are in 11�e ;ok ngnt n wwhrch means uro Surface Muip ra gnlnll Ip hi: in the ik'ljallvii . I ww14s wvo to do dahvel uwtdy work to you, therefore I am recomtry .d IHJ Mat we do the poirs in early spring when the temps are save to work The good thing is that 1 pr,rnd 01e 3rdlm8np:nn1e!1;S t•IW- 1,T e a 134- 501. 0150 VA 1; lust a"0011 rh,rl from 111F: rral Iranmrr:ow and finse wt on everything else that is completed I am ready to do a walkthrough with you tomorrow if you would like to I can do anytime between 9 and 12pm Please let me know your thoughts Best Reld #1 Paint all wood surfaces Pal II Igetai mit, Il;ale Paint red trick with masonry palnt Carpentry & Dspose of debris Edmond sokoll I W neral Mamgar 2o63go.7956 e :.Al�tawl.:"thrnns4nnulnsbl g._ YV'IY,Illant-ja llLyypitlN..eom Cost Tax Total $3.800 ;�382.80 $4,183.80 ISf.469 1. -.;s.1r; ';,1.". 140 $700 $70.70 $770.70 $8.500 $858.50 $9,358.50 Signature: Garin Lee 4L 9,202215:15 PST) Email: glee@kentwa.gov Signature: L�- Email: rlashley@kentwa.gov Signature: szzzq` L�—I�L 1 PST) Email: bjlevenhagen@kentwa.gov Amendment 2 Contract for Signature Final Audit Report 2022-11-15 Created: 2022-11-09 By: Shayla Ott (soft@kentwa.gov) Status: Signed Transaction ID: CBJCHBCAABAA1-WUvPLRaCOxWFVyoCn6WkSggCemMZnL "Amendment 2 Contract for Signature" History Document created by Shayla Ott (sott@kentwa.gov) 2022-11-09 - 9:22:32 PM GMT Document emailed to glee@kentwa.gov for signature 2022-11-09 - 9:25:23 PM GMT Email viewed by glee@kentwa.gov 2022-11-09 - 11:13:23 PM GMT 1 Signer glee@kentwa.gov entered name at signing as Garin Lee 2022-11-09 - 11:15:00 PM GMT Document e-signed by Garin Lee (glee@kentwa.gov) Signature Date: 2022-11-09 - 11:15:02 PM GMT - Time Source: server Document emailed to Ronald Lashley (rlashley@kentwa.gov) for signature 2022-11-09 - 11:15:04 PM GMT Email viewed by Ronald Lashley (rlashley@kentwa.gov) 2022-11-10 - 8:36:57 PM GMT 1 Document e-signed by Ronald Lashley (rlashley@kentwa.gov) Signature Date: 2022-11-10 - 9:21:06 PM GMT - Time Source: server Document emailed to bjlevenhagen@kentwa.gov for signature 2022-11-10 - 9:21:07 PM GMT Email viewed by bjlevenhagen@kentwa.gov 2022-11-14 - 6:45:42 PM GMT E1 Signer bjlevenhagen@kentwa.gov entered name at signing as Brian Levenhagen 2022-11-14 - 6:46:01 PM GMT Powered by r � Adobe T AcrobatSign E1 Document e-signed by Brian Levenhagen (bjlevenhagen@kentwa.gov) Signature Date: 2022-11-14 - 6:46:03 PM GMT - Time Source: server Document emailed to edmond@themodernpainting.com for signature 2022-11-14 - 6:46:07 PM GMT Email viewed by edmond@themodernpainting.com 2022-11-15 - 8:36:25 PM GMT E1 Signer edmond@themodernpainting.com entered name at signing as Edmond Sokoli 2022-11-15 - 8:37:30 PM GMT E1 Document e-signed by Edmond Sokoli (edmond@themodernpainting.com) Signature Date: 2022-11-15 - 8:37:32 PM GMT - Time Source: server Agreement completed. 2022-11-15 - 8:37:32 PM GMT Powered by r � Adobe T Acrobat Sign