Agreement Routing
• For Approvals, Signatures and Records Manage
T This form combines & replaces the Request for Mayor's Signature and
KEN
W A S H I N G T O N (Print on pink or cherry colored paper)
Originator: Department:
C. Frame PW Enginei
Date Sent: Date Require
11 /15/2022 N/A
Authorized to Sign: Date of Coun
El Director or Designee ❑ Mayor N/A
Budget Account Number: Grant? ❑ Ye,.
R20113.64110.330
Budget? El Yes ❑ No Type: N/A
Vendor Name: Category:
ICON Materials Contract
Vendor Number: Sub-Categor
34467 Change C
Project Name: 2021 Asphalt Overlays
Project Details:Adding scope and payment for installation of the traffic islands in the intersection of S. 228th
St and 96th Ave S. The traffic island will be built in accordance to sheet 38A of revision 5.
Agreement Amount: $13,172.14 Basis for Selection of Contractor: Bid
Start Date: N/A Termination Date: 135 Working Days
Local Business? ❑ Yes ❑ No*
*Ifineets requirements per KCC3.70.100, please complete "Vendor Purchase -Local Exceptions" form on Cityspoce.
Notice required prior to disclosure?
❑ Yes I] No
Date Received by City Attorney:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk's Office:
Contract Number:
CAG2021-265
Comments:
adc,W22373 1 20 Visit Documents.KentWA.gov to obtain copies of all agreements
•
4000**
�Fk_NT
WA9.I N.TOV
CHANGE ORDER NO. #4
NAME OF CONTRACTOR:
CONTRACT NAME & PROJECT NUMBER:
ORIGINAL CONTRACT DATE:
ICON Materials ('Contractor")
2021 Asnhalt Overlays
June 03, 2021
This Change Order amends the above -referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
This change order revises the contract by adding scope and payment for
installation of the traffic islands in the intersection of S 228t" St and 96tn
Ave S. The traffic island will be built in accordance to sheet 38A of
Revision 5. The cost of this change order totals $13,172.14
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $5,064,977.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $96,787.13
(incl. applicable WSST)
Current Contract Amount $5,161,764.13
(incl. Previous Change Orders)
Current Change Order
Applicable WSST Tax
Order
Revised Contract Sum
CHANGE ORDER - 1 OF 3
$13,172.14
on this Change $0.00
$.5,174,936.27
Original Time for Completion I
130 working days
(insert date)
Revised Time for Completion under 00 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 105 calendar days
Revised Time for Completion 135 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR:
By: ...--
tu
Print ame:► t1
Its. v`•-_�
(title)
DATE: %I-"I~.�
CHANGE ORDER - 2 OF 3
CITY OF KENT:
Digilelly signed by Chatl DN =11 ere
Chad B i e re n K CU6, E=cbieregod r,n of
U=Public Work,,
entC CN=hatl B4O=0
By. le02208 W :- 211.14 17:36:27-'00'
(signature)
Print Name: Chad Bieren, P.E.
Its Public Works Director
(title)
DATE:
KPEC
ATTEST:
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
cw� &I
Kent City Clerk
Kent Law Department
'tn this field, you may enter the elect oruc fileDath where the contract has heen saved]
CHANGE ORDER - 3 OF 3
File No. 200.2
•
KENT
CHANGE ORDER WORKSHEET NO. 4
Construction Engineering Division - Public Works
Project: 2021 Asphalt Overlays Project No: 21-3001.1
Project Engineer: Mark Madfai Fed -Aid No: N/A
Capital Projects Brian Shields Contractor: Icon Materials
Date: 11/2/2022
I. Proposed Change
This change order revises the contract by adding scope and payment for the installation of the traffic
islands in the intersection of S 228th St and 96th Ave S. The traffic islands will be built in accordance to
sheet 38A of Revision 5. The cost of this change order totals $13,172.14.
II. Reason and Background for Chanqe
Icon Materials constructed the traffic islands found at S 228th St and 96th Ave S in accordance with the
Issued For Construction plan set on the 2022 Overlays (sheet 38). After construction, the City of Kent
determined that the islands did not provide appropriate turning radii for traffic and Revision 5 was
issued. Revision 5 includes a modified design for the traffic islands that provide a wider turning profile
for vehicles.
III. Method of Payment
NEW PAY ITEMS I'] Not applicable
Sch. ( Item Description
_N
I S 228th St and 96th Ave S Traffic Island
Revision
Total Est. I oral tstimated Lost or j
QtY — Unit Unit Price Item 11
1 LS $13,172.14 $
New Pay Items Total: $
DELETE EXISTING PAY ITEM(S) per 1-09.5 R Notapplicable
I Sch I Bid Item No. I Item Description p Q Y
Uni
I t I Unit Price
t
13,172.14
13,172.14
Cost of Item I
Page 1
Delete Existing Pay Items Total: $ -
INCREASE/DECREASE TO EXISTING PAY ITEM(S) O Notapplicable
. No ( Bid Item No.� Item Description Qty Unit Unit Price Cost of Item
No.
$
Increase / Decrease to Existing Pay Items Total: $ -
*TOTAL ESTIMATED COST OF CHANGE ORDER: $13,172.14
* Total of the Cost of Item Columns
IV. WORKING DAYS
Original Contract:1 130 l Due This Change Order: 5 ! Previous Total:l 130
Explanation /3ustification for Additional Working
_ rking Days:
*TOTAL WORKING DAYS: 135
* This Change Order + Previous Total
Capital Projects Manager
Construction Engineering
Supervisor:
Construction Manager:
Brian Shields
3 on Barry
Eric Connor
Date: I I--- Z ^'Z -1-,L-
Date: a zoa�
Date: U %, g
Page 2
EXTRA WORK ORDER
ICON MATERIALS
1508 VALENTINE AVE
CONFIDENTIAL INFORMATION
' PACIFIC, WA 98047
FOR INTENDED RECIPIENT ONLY
(206) 575-3200 Office • (206) 575-3207 Fax
DO NOT DISCLOSE
ICON Job # ICON Foreman Bill Johnson
ICON EWO # :�-
Contractor r City of Kent
Contractor Ref # ;
Project Name ; 2021 Overlay program, City of Kent
Date 10/24/2022
wu�uc
Installation of the modified traffic islands on S 228th and 96th Ave S.
euK
Regular Hours Worked
Double Time Hours Worked
Number of Classification Quantity Unit
Rate
Quantity Unit Rate Total
2 Mid -Level - General Equip. 8 HR
$
80.11
HR $ 104.10 $ 640,89
1 Traffic Control Supervisor 16 HR
$
55.27
HR $ 97.35 $ 884.33
1 Flagger / Pilot Car Driver 20 HR
$
51.18
HR $ 1,023.55
HR
HR
1 General Foreman 2 HR
$
89.85
HR $ 179.70
HR
$
-
HR $ -
HR
$
-
HR $ _ $ _
HR
$
HR $ - $
Total: $ 2,728.46
r
i ECflNT'
111�1��
Material Description Quantity Unit
Cost
Tax % Cost Total
HMA 1/2" 5 Ton
$
65,00
10.00% $ 6.50 $ 357.50
Total:
$ 357,501
-%9QUIPMEN —lift
Regular Flours Worked
Hours on Standby
Equipment Description (Make/ModelNear)
EQ # Quantity Unit Rate
Quantity Unit
Rate
Total
Cat 305E 2013
31.0042 4 HR $ 25.65
HR
$ 8,88
$ 102.60
Ford 2006
51.0072 8 HR $ 22.09
HR
$
$ 176.72
Kenworth lowboy and driver #N/A
52.5630 2 HR $ 165.00
HR
$ _
$ 330.00
-
HR $ -
HR
$
$
HR $ 83,57
HR
$
$ -
Total:
$ 609,32
Name
Service
Quantity Unit
Cost
Total
SPM
Install new curb and paint
1 LS
$ 7,525.00
$ 7,525.00
Total $ 7,525.00
I hereby certify that this Extra Work Oiderrepresents the true and correct quantities of work
-
"TOTAL 00573:AND_ MARKUPS
performed during this period and that prevailing wages have been paid to all laborers, workers or
mechanics on this project in accordance with the Statement of Intent on file with the District
LABOR
$
2,728.46
31.00%
$ 3,574.29
MATERIAL & RENTALS
$
357.50
21.00%
$ 432,58
Owner/Contractor
EQUIPMENT
$
609.32
21.00%
$ 737.28
SUBCONTRACTOR
$
7,525.00
12.00%
$ 8,428.00
BOND MARKUP
$
13,172.14
0.00%
$ -
Total:
ICON MATERIALS
Shields, Brian
From:
Connor, Eric
Sent:
Tuesday, October 25, 2022 10:15 AM
To:
Shields, Brian
Cc:
Barry, Jason
Subject:
FW: Traffic Island Modification
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT, WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Bieren, Chad <CBieren@kentwa.gov>
Sent: Tuesday, October 25, 2022 10:15 AM
To: Peterson, Kelly <KPeterson@kentwa.gov>
Cc: Connor, Eric <EConnor@kentwa.gov>
Subject: RE: Traffic Island Modification
Thank you, both. Please proceed.
Chad Bieren, P.E. Public Works Director
Engineering Administration I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5534 1 Cell 253-740-9139
CbierenCla KentVJA,W1
CITY OF KENT, WASHINGTON
KentWA.aov Facebook _wit':e= Y"Tube Ian as ram
From: Peterson, Kelly <KPetersonC+�kentwa.Rov>
Sent: Tuesday, October 25, 2022 9:52 AM
To: Bieren, Chad <CBieren@_ kentwa.eov>
Cc: Connor, Eric <EConnor@kentwa.gov>
Subject: FW: Traffic Island Modification
Chad -
Eric and I talked about the cost of the island modifications at S. 228th and 981h Ave. S. We
recommend moving forward with the modification to the get the job completed.
Thank you,
Kelly
Kelly Peterson, AICP, Deputy Director -Engineering
Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5547 - Cell 253-740-8066
IKpeterson t+5`' KentWA.aav
CITY OF KENT, WASHINGTON
KentWA.aov Facebook :rwitter YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Connor, Eric <EConnor@kentwa.ttov>
Sent: Monday, October 24, 2022 1:29 PM
To: Peterson, Kelly <KPetersonftentwa.R0V>
Cc: Barry, Jason <JBarrv@kentwa.eov>
Subject: FW: Traffic Island Modification
Good Afternoon Kelly,
Attached is Icon's proposal for the traffic island modifications at S 22V St / 98th Ave S (Revision
5) totaling $13,172.14. Brian was able to get them to revise pricing for their scope of work, but
their subcontractor was unable to provide any reduction in pricing for their
curbing/painting/striping work.
Are you okay with proceeding with a CO to complete the revision at this intersection?
Please let me know if you have any questions or need any additional information.
Thank you,
Eric
Eric Connor, Construction Engineering Manager
Phone 253-856-5533 1 Cell 253-797-0693
CITY OF KENT, WASHINGTON
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Shields, Brian <BShields0kentwa.eov>
Sent: Monday, October 24, 2022 12:13 PM
To: Barry, Jason <JBarrvCMkentwa.sov>
Cc: Connor, Eric <EConnor@kentwa.eov>
Subject: FW: Traffic Island Modification
I'm comfortable with this and can speak to how they estimated their hours. Much better price
than the previous proposal..,
Brian Shields, Capital Projects Manager
Construction Management I Public Works Department
220 4th Avenue South, Kent, WA 98032
Main/Cali 253-293-4973 1 Desk 253-856-6510
bshfelds0KentWA.gQy
CITY OF KENT, WASHINGTON
KentWA.aov Facebook vvitiei, YouTube
From: Johnson, Bill X (ICON Materials)<bill.iohnson(Miconmaterials.com>
Sent: Monday, October 24, 2022 11:34 AM
To: Shields, Brian <BShieldsPkentwa.eov>
2
Cc: Townsend, Tyler (ICON Materials)<tvler.townsendOiconmaterials.com>
Subject: Traffic Island Modification
EXTERNAL EMAIL
Brian,
Please see attached price for the traffic island modification.
Thanks,
A& ICON MAirRIAt5
A CRH COMPANY
Bill Johnson
Ce I I/253-261-4852
Di rect/206-574-3907
Email/ bill.iohnson@iconmaterials.com
PUBLIC WORKS DEPARTMENT
Carla Maloney, Design Engineering Manager
Phone: 253-856-5500
KENT Fax: 253-856-6500
WASH NGTON Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: 8/30/2022
To: Brian Shields, Capital Construction Project Manager
CC: Eric Connor, Construction Manager
Jason Barry, Construction Engineering Supervisor
Rob Brown and Eric Preston, Transportation Engineering
Eric Knowles and Toby Mollett, Survey
From: Susanne Smith, Design Engineer=�:..,;2—
Mark Madfai, Project Engineer M . M .
Through: Carla Maloney, Design Engineering Manag'-0.#(
Regarding: Revision #5
2021 Overlays, 21-3001.1
Please have the contractor make the following revision to the above project.
Changes to the design at S 228T" Street and 96th Avenue South oer new sheet 8A
SHEET 30
References to sheet 38A added
SHEET 38
SW Corner information moved to sheet 38A
SHEET 38A
New sheet with revision to the design of the SW corner.
The improvements on this sheet may require staking from the City survey team. The
design team can provide necessary information to survey when the request is
submitted.
Attachments: Sheets 30, 38 and 38A
END OF REVISION NO. 5
Page 1 of 1 Revision #5 2021 Overlays 21-3001.1
MATCHLINE SEE
MATCHLINE SEE SHEET 31
Ilk,
�e <q y JP
mO1 w I$ �6 s
�ao
°� uF3 i. wg g
J z < IN m- o
wn W 55>
O Y
a s
N
�d>
q<
—�gry
5 n
-
Ww
2:a
� o
n E
7F tJ Bi
Z
�N
4rcJ ��i
=xn
wUr
C4 I
N
a
La
m ..
W
1 R
w
s3o
8
'
J
Uo
wJ
19
m
15 H1BZZ 5 09V6
ONOAN" nH
SZC6-SDZZB{'ON l3OHtld
z$6
w
4.
a
g zo
a -
wm
w
as ib
Ja
z _
t i
mW
Wi
<
0
w
1 s
W n
eF
�IL
K�¢¢ory
z
2
O� V.
2
Q Z
M z
r=
0s
a
�a
wm��v
ra
e
u�i�
u3.o90
W
I
J �xa
�x6w
jam•
q m
NGw
�' i/QI22p G
�iVU
i
it
pia
<
ZG
�
nn
�Gw
4 n
i
m
a
,3s
xg
I
a a g a
a �Sa
a
Qg�
LL8F
-i
-
z- Li
i1ar
IS
r_-�.
UIgRJ Jp12 �M1I�i! WN
da •x
-
O 2
c
tJw1 J ,�
3311.1 NV3f
+f 1N3NOL N39L0
9{Z6•SOZZi{'ON
l3OaVd
a � e
I
q=yq
�3<
o
_
°z5'g1.
ao$
plc
fY
o�
3A08V 33S 3NIIHOIYV4
I
rc�
H 1
I
I
1
I
I
1
Ij
II
r B ° :3
I ,8 S
Uhl
hwo 51�
w
�\ a3 eft
w n
a
-
�d N Q
` N %
W J
= 3
a G� �� WOxIa
N QFi� U
S3"H146 =_ �_�---- on
V8£ 133HS 33S 3NP HJ1VYY
to
� e
Q c
0
Of X L1 �
O ° gg
Z
N � W
0.
S
co
N
V1
W
O
� n
W u A
wUwiy •q
o
a
NON
'
�z
i
oOUz _
I<
.o ?x
' I •• w n
.9 o
U " az
ZoE
VU Ka r
_ 6
'sngw -T
� o¢
N = gt
1I ��
tt .a
a
J ¢ �
3
' � 5
--"^ S3"H1967,37
0 2<
N
N � �
y /' 3
�NIONYI y -
y= to
pNK
W(AS u
r /i $fig,: VDU
/ VI = (n
I i C W
00 h
�
M I` �a
W 1 ySo tJ �+q
W
( r
VI U_ ❑
Z �f T'.Y-C
J 3`
2 U o'en
( W
I Q
Ima
i =
im~ Q m4'I�
�� h
W I.' N
N Ii au�
Ai co it
pp
[j I(
z 1 ooe now ok N 1 rPG
Bbno oaevat rb3e V)
13 �z�
ul c LL - I N 3I I
W �
0
00
ogs
d�